Best Practice A Good Practice Guide for ® permanent foundation formwork systems www.maxfrank.com Edition United Kingdom

Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

Best PracticeA Good Practice Guide for

® permanent foundation formwork systems

www.maxfrank.comEd

ition

Uni

ted

Kin

gdom

Page 2: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

2 www.max f rank .com

® – Best Practice

Permanent formwork systems offer a time saving and cost

effective method of constructing reinforced concrete founda-

methods.

Introduction

The object of this guide is to ensure that…

Page 3: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

3www.max f rank .com

® – Best Practice

System components & concept

Reinforcement cover spacers

concrete pressure.

latent

-

-

Good Practice requires that…

…concrete wastage is avoided

Faster construction

Page 4: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

4 www.max f rank .com

Common defects associated with some permanent formwork systems

during the pour

Page 5: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

5www.max f rank .com

Common defects associated with some permanent formwork systems

voids

-

act as a crack inducer

Page 6: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

6 www.max f rank .com

Common defects associated with some permanent formwork systems

Page 7: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

7www.max f rank .com

Common defects associated with some permanent formwork systems

-

sed compressive strength and resist crushing

Page 8: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

8 www.max f rank .com

® – Best Practice

Spacer load capacity / excavation depth limits

then ‘normal duty’

then ‘heavy duty’

Importance of suitable spacers:British Standard BS7973 & Concrete Society / NHBC guidance

-

-

-

adjacent

-

5.5 kN/m

25.5 kN

/m2

0,5m

1,0m

2,0m

3,0m

1,5m

2,5m

3,5m

4,0m0,5 kN0 kN 1,0 kN 1,5 kN 2,0 kN 2,5 kN 3,0 kN 3,5 kN

individual spacer load in kN(maximum lateral earth pressure/11 No./m2)

max.0,5 kN

max.3,0 kN

Sand

Ballast

Type 1 MOT

Topsoil

Stiff Clay

Graded stone

6F2

Page 9: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

9www.max f rank .com

® – Best Practice

formwork stiffness

excavation depth

-

inforcement.

-

-

-

max. 300 mm

max. 300 mm

Bridging the cover zone

around the excavation to avoid damaging spacers or shifting the reinforcement

cage out of position.

Page 10: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

10 www.max f rank .com

® – Best Practice

Deep trenches

zip ties so not to encourage corrosion.

Heave protection void formers

Quality Management System-

guide as an aid.

-

-

QUALITY

ACT

CHECKDO

PLAN

Page 11: Permanent formwork Pecafil best practice...2 /DB@EHK® – Best Practice Permanent formwork systems offer a time saving and cost effective method of constructing reinforced concrete

11www.max f rank .com

® – Best Practice

1.0 Reinforcement spacers NO

NO

-

NO