Performance Testing Process. SASQAG March 2007 Emily Ren T-Mobile. Why We Need Performance Testing?. Before release, managers need to know: Do we have enough hardware? Can we handle the target load? How many users can we handle? Is the system fast enough to make customers happy?. - PowerPoint PPT Presentation
Citation preview
Performance Testing ProcessPerformance Testing Process
SASQAG
March 2007
Emily Ren
T-Mobile
Why We Need Performance Testing?Why We Need Performance Testing?
Before release, managers need to know:
• Do we have enough hardware?• Can we handle the target load? • How many users can we handle? • Is the system fast enough to make customers
happy?
Nature of Performance TestingNature of Performance Testing
It is very different from functional testing. A very challenging job
It requires stellar cooperation and coordination: it is a whole team effort!
Automation tools are very powerful, but expensive and complex, training is needed
It can be fun too!
Why We Need Performance Testing? Why We Need Performance Testing?
The failure of an application can be costly Assure performance and functionality
under real-world conditions Locate potential problems before our
customers do Reduce development time – multiple
rounds of load testing Reduce infrastructure cost
When we do itWhen we do it
During design and development – What is the best server to support target load?– Define system performance requirements
Before release – Is the system reliable enough to go into production?– After functional testing done
Post-deployment – What is the cause of performance degradation?
What we are doingWhat we are doingPerformance testing before release:
Application response times - How long does it take to complete a task? Configuration sizing - Which configuration provides the best performance level? Capacity planning - How many users can the system handle? Regression - Does the new version of the software adversely affect
response time? Reliability - How stable is the system under heavy work load?
PlanTest
Create Scripts
ScenarioCreation
ScenarioExecution
ResultAnalysis
Load Testing ProcessLoad Testing Process
Performance Tuning
Perf. Test Planning DocumentsPerf. Test Planning Documents
Performance Testing Initial Assessment- Pre-test plan document- Help project team to brainstorm their test scope
Performance Test Request Form- Detail information related to whole performance testing process, including setup goals, environment, business process, performance requirement (e.g., response time), usage information, internal support team, etc.
What we are doingWhat we are doing1. Test Planning - Before we run load testing
- Setup goals Measure application response time Configuration sizing Capacity planning Regression Reliability
- Type of testing Load Testing (System performance testing with SLA target load) Stress Testing (Capacity testing to find out breaking point) Duration Testing (Reliability testing to test the system under load)
What we are doing – Cont.What we are doing – Cont.
- Identify usage information - Business Profile
Which business processes to use – BA, Dev team responsible for definition
Isolate peak load and peak time – BA, Dev, application support responsible for definition
Document user actions and input data for each business process
– SME/Functional Testing team responsible for creation of business process document
Sample : Business Profile 1Sample : Business Profile 1- HR App.- HR App. Business ProcessesBusiness Processes
Business Process
Total Users(%)
Avg Number of concurrent
users
Peak number of concurrent
users
Preferred Response Time (Total,
including think time)
Unacceptable Response Time (Total ,
including think time)
Browse 20% 100 2000 2-3 min > 5 min
Time Entry 60% 200 6000 3 min > 5 min
Update personal info.
20% 50 1000 1 min > 3 min
Total 100% 350 9000
Sample : Business Profile 2 – Sample : Business Profile 2 – eCommerce eCommerce Business ProcessesBusiness Processes
Business Process
Total Users(%)
Peak Time
PeakLoad (# ofusers)
Preferred Response Time (Each transaction)
Unacceptable Response Time(Each transaction)
Create Order
20% 4-6 pm 1000 3-5 sec > 8 sec
Browse Catalog
60% 4-6 pm 6000 3-5 sec > 8 sec
Display order
20% 4-6 pm 1000 3-5 sec > 8 sec
Total 100% 8000
What we are doing – Cont.What we are doing – Cont.- Business Profile is the basis for load testing
It is the traffic model of the applicationThe better the documentation of the
business processes, the better the test scripts and scenarios.
Save time on script and scenario creationGood business profile can make it possible to
reuse existing load testing scripts and results later.
What we are doing – Cont.What we are doing – Cont.
2. Create Scripts- Automate business processes in LoadRunner VUGen (Virtual
User Generator): Scripts are C, C++-like code Scripts are different with different protocol/technology
LoadRunner has about 50 protocols, including WAP
- Record user actions Need assistance of SME/Functional Testing group
- Add programming and test data in the scripts- E.g. add correlation to handle dynamic data, e.g. session id- Test data may need lot of work from project team
Sample ScriptSample Script
web_submit_data("logon.sap", "Action=http://watstwscrm02:50000/bd/logon.sap", "Method=POST", "RecContentType=text/html", "Referer=http://watstwscrm02:50000/bd/startEBPP.sap", "Snapshot=t3.inf", "Mode=HTML", ITEMDATA, "Name=login_submit", "Value=true", ENDITEM, "Name=j_authscheme", "Value=default", ENDITEM, "Name=j_alias", "Value={UserName}", ENDITEM, "Name=j_password", "Value=coffee@2", ENDITEM, "Name=j_language", "Value=EN", ENDITEM, "Name=AgreeTerms", "Value=on", ENDITEM, "Name=Login", "Value=Log on", ENDITEM, LAST);
What we are doing – Cont.What we are doing – Cont.
3. Create Test Scenario - Build test scenario according to usage information in
Business Profile- Load Calculation- Can use rendezvous point, IP Spoofing, etc. - Run-Time setting Think time Pacing Browser Emulation: simulate browser cache, new user each iteration Browser version, bandwidth, etc.
What we are doing – Cont.What we are doing – Cont.
4. Execute Load Testing - Execute test scenarios with automated test
scripts in LoadRunner Controller- Isolate top time transactions with low load- Overdrive test (120% of full load) to isolate SW
& HW limitations
- Work with Internal Support Team to monitor the whole system, e.g., web server, DB server, middleware, etc.
Example Parameters to MonitorExample Parameters to Monitor
system - % total processor time Memory - page faults/sec Server work queues - bytes transferred/sec HTTP Response Number of connections
• Support team will have better ideas for what to monitor • Individual write-up is highly suggested as part of test report• ---need to get csv files, then import to LoadRunner
What we are doing – Cont.What we are doing – Cont.
5. Analyze Test Result - Analysis- Collect statistics and graphs from LoadRunner- Report results
- Most commonly requested results:Transaction Response timeThroughputHits per secHTTP responseNetwork Delay*Server Performance
- Merge graphs to make it more meaningfulTransaction response time under loadResponse time/Vuser vs CPU utilizationCross scenario graphs
What we are doing – Cont.What we are doing – Cont.
6. Test Report - Don’t send LoadRunner result and graphs
directly
- Send summary to the whole team- Report key performance data and back end
performance data
- Add notes for each test run
- Keep test history: for team to compare test runs
What we are doing – Cont.What we are doing – Cont.
7. Performance Tuning- Help identify the bottlenecks and degradation points
to build an optimal system - Hardware, Configuration, Database, Software, etc
- Drill down on transaction details, - e.g. webpage breakdown- Diagnostics
- Show Extended Log to dev team- Data returned by server- Advanced Trace: Show logs of all VUser messages and function calls
What we are doing – Cont.What we are doing – Cont.
8. Communication Plan
- Internal Support Team: - - PM, BA, environment / development /
architect, network, DBA, functional test lead, etc.
- Resource plan
Timeline/Activities - ExampleTimeline/Activities - Example
Test Planning, Script Creation – 4 weeks
Test Execution – 4 weeks
Trail run - 2 days1. Round 1 – Load Testing: Response time with SLA target load: 1
week2. Round 2 – Stress Testing: find breaking point: 1 week3. Round 3 – Duration (Reliability) test: 2 days4. More performance tuning – 3 days5. Document and deliver final report – 2-3 days
Projects Projects
Projects :All performance testing projects in
T-Mobile’s IT dept40+ projects in <3 yearsThe Standard Performance Testing
Process has worked very well on all projects
Automation Tools Automation Tools - Mercury LoadRunner- Mercury LoadRunner
– Scripting: VUGen (Virtual User Generator)– Performance test execution:
Controller – build test scenarios according to business profile and load calculation
Load Generator – run virtual users– Performance test result analysis
Analysis– provides test reports and Graphs– Summarize the system performance
Automation Tools Automation Tools – Performance Center– Performance Center
Web-enabled global load testing tool Performance Testing team can manage multiple, concurrent load testing projects across different geographic locations
User Site - conduct and monitor load tests. Privilege Manager- manage user and project access
rights Administration Site - for overall resource management
and technical supervision
Automation Tools - Automation Tools - DiagnosticsDiagnostics
- Pinpoint Root Cause– Solve tough problems Memory leaks and trashing Thread deadlock and synchronization Instance tracing Exceptions
Diagnostics Methodology in Diagnostics Methodology in Pre-productionPre-production
Start with monitoring of business process– Which transactions are problematic
Eliminate system and network components– Infrastructure monitors and metrics
Isolate application Tier and method– Triage (using Transaction Breakdown)
Correct behavior and re-test
Broad Heterogeneous Platform Broad Heterogeneous Platform SupportSupport
WebSphere J2EE/Portal Server
WebLogic J2EE/Portal Server
JBoss, Tomcat, JServ Oracle Application
Server J2EE
MS .NET Generic/Custom JAVA SAP Net/Weaver
J2EE/Portal Oracle 11i
Applications Siebel
Performance Engineering Performance Engineering - Bridge the Gap- Bridge the Gap
80% of IT Organizations experience failures in apps that passed the test phases and rolled into production
HyPerformix – Performance Engineering Production line: Designer, Optimizer and Capacity
Manager
HyPerformix Optimizer (Capacity Planning): can bridge the gap between testing and production environments and leverage load test data to accurately show how the application will perform when in production.
Performance Engineering Performance Engineering - HyPerformix Optimizer- HyPerformix Optimizer
Configuration sizing, Capacity planning Create production-scale models
– Perf. Test team and Architect team work together
Load test and production perf. data are seamlessly integrated with Optimizer
Ensure capacity is match to current and future business requirements
Reduce risk before application deployment
What Performance Testing can do What Performance Testing can do for business? for business?
Performance testing is critical. Competition in market is high: customer switch cost is low, cost to keep customers is high
Performance Testing can protect revenue by helping to isolate and fix problems in the software infrastructure
Improve availability, functionality, and scalability of business critical applications
Ensure products are delivered to market with high confidence that system performance will be acceptable
Proactive performance testing can decrease costs of production support and help desk
A good Performance Testing Process is essential to get performance testing done right and on time!