43
Performance Review Static converter (SIV) Meeting at RDSO On 11.07.2017 1

Performance Review Static converter (SIV) meeting RD… · Sudden voltage changes across QCON relay contact which leads to stucking up of QCON relay contact, hence MCU failure. Action

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Performance Review

Static converter (SIV)

Meeting at RDSO

On 11.07.2017

1

Agenda

Review Of Failures of year 2016-17

Punctuality loss cases 2016-17

Status of reliability action plan

Compliance of meeting at RB

Issues reported by Railways

Status of AMC

2

POPULATION (ALL FIRMS)

3

AAL Total population 960 Units

K -2 Model - 60 Units.

K-3 Model – 87 Units

GC Model – 813 Units

SIEMENS Total population 906 Units

TCD units - 44 units at ELS/ CNB, AQ & BNDM

SCD units – 861 no.

Medha -- SCD units – 337 no.

Hind -- SCD units – 310 no

ABB -- SCD units – 108 no

BT -- SCD units – 53 no

CODAL LIFE

4

As per railway board’s letter no. 2002/AC-II/I/10

dated 24.05.2006 the codal life of auxiliary converter

/Devices for single phase to 3 phase converter is 18

years .

Population details

5

Year wise population of static converter

Year Firm

AAL SIEMENS MEDHA HIND ABB BT TOTAL

0-3 Yrs 123 72 37 81 24 0 337

3-5 Yrs 82 188 157 112 30 28 597

5-7 Yrs 94 225 105 62 45 25 556

7-9 Yrs 453 182 15 34 8 0 692

9-12 Yrs 169 134 13 21 0 0 337

12-15

Yrs

31 49 0 0 0 0 80

> 15 yrs 8 11 0 0 0 0 18

Total 960 861 327 310 107 53 2618

Performance of SIV – a comparision between all

make

6

The detail data on failures from NR, SR, BKSC of SER & SCR (except

KZJ) awaited.

Year 2014-15 2015-16 2016-17

Make Total

pop

Pop

as

recd

Failur

es

FRPC

PY

Pop

as

recd

Failur

es

FRP

CPY

Pop

as

recd

Failur

es

FRP

CPY

AAL 960 479 220 45.93 553 263 47.56 557 281 50.45

SIE 905 438 98 22.37 516 108 20.93 528 89 16.86

MED 337 134 31 23.00 168 49 29.17 173 50 28.9

HIND 310 128 131 102.3 185 114 61.62 206 133 64.36

ABB 105 63 32 50.79 82 33 40.24 78 30 39.46

SIV AAL MAKE

PERFORMANCE OF M/s. AAL MAKE SIV

7

Major Cause/component wise failure analysis (AAL)

SN Year

Component

2014-15 2015- 16 2016-17

1 MCU 31 29 28

2 Cooling Fan

(Bearing + motor)

46 (40+6) 54 (42+12) 29 (21+8)

3 ZCT 19 19 24

4 DCCT / CHCT 03 (3+0) 03 (1+0) 03 (3+0)

5 GDU card inv &

of CHBA

36 (28+8) 55 (41+14) 82 (67+15)

6 Misc 35 34 46

Misc - Transient, RTC, Choke and any other fault having 01 or 02

failure during year

8

Sudden voltage changes across QCON relay contact which

leads to stucking up of QCON relay contact, hence MCU

failure.

Action plan Status

1. Providing RC damping network

across Q-CON relay.

2. Increasing higher rating of Reed

relay with 2 Amps & 5 lacs

operations in place of earlier

one with 1 Amp & 1 lac

operations.

Completed in all units.

The performance is under

watch.

Failure reduced in

modified units as reported

by railways.

9

Main control unit (MCU) AAL make

Reasons of cooling fan failure were mainly due to bearing failures,

loose fitment in Aluminum housing and burning of motor winding .

Action plan Status

1. Diameter of bearing increased and

housing changed to Mild steel and

capacity of fan increased from

500W to 1.5 kW.

2. Design of Fan has been modified

and validated in field trials.

(Havells make).

3.RDSO also issued modification

sheet no RDSO/ 2016/EL/MS

/0449 Rev 0 dated 30.03.2016 for

the same

1.No such failures on (Havells

make) cooling fan has been

reported by railways .

2. Firm has been advised to

submit the maintenance

procedure of modified cooling

fan.

3.Some Sheds implemented

modified cooling fan as per

RDSO modification sheet no

0449 and performance

reported satisfactory.

10

Cooling Fan Failure (AAL make)

Cooling failure ( AAL)

11

Cable of AC choke was passing just beneath the ZCT leading to erratic operation

of ZCT due to variation in impedance value. Also, mechanical stresses developed

on the core of ZCT which leads to its failure.

Action plan Status

1

AAL has been advised to replace

ZCTs of M/s. DEESYS make of Korea

by M/s. Broycee Control of England.

Firm has replaced 100 units.

Railways are also replacing ZCTs of

DEESYS make by M/s. Broycee

Control, England make during

failures of ZCTs.

12

Failure of ZCT AAL

There have been frequent failures of Battery Charger and chopper CT.

All failures were of ABB make CTs. There was a loose connection in

power supply terminals due to wrong position of screw.

Action plan Status

1 Firm have sent failed DCCT/CHCT

to OEM (ABB) for investigation and

reported failures were due to

defective batch of 180 no.’s. Firm

has been advised to replace ABB

make CT by LEM make CT.

Total 130 no.’s replaced.

Firm reported 3 sheds (AQ, ET &

NKJ) denied to accept new ABB

make CT for replacement, as firm

replaces ABB make CT by ABB

make CTs,

13

Charger/ Chopper CT failures of AAL

GDU card failures of Inverter & Battery charger section are failing due

to decrease in winding resistance & voltage range of Pulse transformer

and reducing value of capacitor in GDU card after 5 to 6 years of

service.

Action plan Status

1

2

Winding resistance and voltage

range of pulse transformer

measurement is to be done by

Sheds and to be replaced on

condition basis.

BZA shed carried out rewinding of

defective pulse transformer.

Performance reported by shed as

satisfactory of such transformers.

Performance of replaced

pulse transformer is under

watch.

The performance of re-winded

pulse transformer in GDU

card awaited.

14

GDU card failures of AAL

GDU card failures of Inverter & Battery charger section are failing due

to decrease in winding resistance & voltage range of Pulse transformer

and reducing value of capacitor in GDU card after 5 to 6 years of

service.

Action plan Status

1

2

The second reason of GDU card

failures are due to detoriating of

capacitors value. The detoriating

capacitor cannot block DC voltage

which create DC offset in

transformer leading to heating of

transformer hence, interrupted

pulse to Gate.

The winding resistance, voltage

range of pulse transformer and

capacitance value of capacitor are

also to be measured.

ELS/ED and ELS/BZA have

carried out rewinding of

defective pulse transformer.

Performance reported by shed

as satisfactory.

Further performance to be

monitored.

Other shed can obtain the

process.

15

GDU card failures of AAL Cont

Maintenance practices adopted by ELS/ BZA & ED

ELS/ ED has repaired 83 Nos. of cards.

ELS/ BZA investigated the failures of GDU card,

found GDU card was failing due to failure of Pulse

transformer. Shed has developed an In-house test

bench and re-wind the Pulse transformer. They

achieved the same voltage range of pulse of +16 V to -

11 V and winding resistance of 0.2 to 0.3 Ω.

ELS/BNDM stated resistance is 0.017 to 0.023 Ω.

16

Till now shed has provided 12

no.’s of such re-winded Pulse

transformers and all are

working satisfactorily. In this

way they have saved purchase

of complete GDU card which

costs 2.2 lakhs.

SIV SIEMENS MAKE

PERFORMANCE OF M/s. SIEMENS SUPPLIED 180 KVA

STATIC CONVERTER

17

Major Component-wise year wise failure analysis SIEMENS

SN Year

Component

2014-15 2015-16 2016-17

1 Battery Charger 22 18 11

2 Cooling Fan

bearing + motor +

churning fan

22 (11+11) 22 (7+13+2) 34 (22+10+2)

3 Inverter (1+ 2) 03 (1+2)

8 (3+5)

8 (5+3)

4 M 1300 & M

2100

06 (6+0) 4 (1+3) 7 (3+4)

5 Misc. 32 39 18

Misc --- Transient, RTC, Choke and any other fault having 01 or 02

failure during year.

18

Indigenized Battery charger failed due to failure of rectifier module due

to Diode getting open circuit.

Action plan Status

1 Firm has to modify rectifier section

in their Indigenized Battery

charger.

Amongst 286 units 276 units

has been modified by the

firm.

Firm has been advised to

modify balance 10 units

early. (Modification pending

in MGS -05, LDH –03, TATA-

01, BKSC – 01 )

Performance is to be

monitored

19

Failure of Battery charger

The cooling fan of M/s Siemens failed due to bearing failures and Jam.

Firm stated the major failure of cooling fan bearing is due to either

improper mounting of cooling fan or improper maintenance . Total

cooling fan failures are 34 no.= Motor jam 10 & bearing problem 22 no )

in the year 2016-17

Action plan Status

1

2

As per firm’s advice the

bearing of cooling fan is to be

replaced after a service period

4.5 years.

RDSO has issued guideline

vide RDSO letter no

EL/1.2.9.1 dated 29.04.2016

Zonal railways to replace bearing

as per OEM recommendation.

The guide line is to be followed also

requested to replace bearing as per

OEM recommendation.

20

Cooling fan failure M/s. Siemens

The failures of inverter module are repetitive due to various reasons like

component failures, IGBT failure etc. During previous meeting firm has

been advised to draw action plan of Inverter failure.

Action plan Status

1 There are two cases of warranty

failures of Inverter . Loco no 28726

and loco no 27263 of ELS/AQ and

ELS/BSL respectively

Firm stated the causes of

failures along with action

plan is to be submitted to

RDSO.

Firm also stated that no clear

trend has been noticed for

the failures.

The investigation of Inverter

failures under warranty is

awaited.

21

Inverter failures of Siemens

SIV HIND RECTIFIER MAKE

PERFORMANCE OF M/s. HIND RECTIFIER SUPPLIED 180

KVA STATIC CONVERTER

22

Major Component-wise year wise failure analysis HIND

SN Year

Component 2014-15 2015-16 2016-17

1 QCON timer card 09 9 10

2 Crow bar section 09 09 9

3 Cooling Fan

bearing + motor)

14 (5+9) 5 (3+2) 7 (3+4)

4 Snubber

Capacitor

01 08 8

5 Control card A

703 & A704

10 ( 8+2) 25 (19+6) 11 (10+1)

6 Fuse 06 07 5

Misc 50 28 33

Misc --- Transient, cable looseness, sensors, software and any other

fault having 01 or 02 failure during year

23

Initially wiring of delay timer was tapped from secondary of Auto

transformer at 380 ± 5% V but the voltage spikes were the cause of

melting the fuses failures.

Action plan Status

1

2

The firm proposed to change the

secondary tap point taken from

380 ± 5% V to 110 ± 5% since at

low voltage spikes will be less

Use of 110 V timer

Firm has modified 34 units

and after satisfactory

performance , firm has been

permitted to modify all the

units.

Fitment feed back along with

performance is under watch .

24

QCON TIMER CARD OF M/s HIND

The problem was unwanted firing pulse to crow bar thyristor for

protection of DC link over voltage.

Action plan Status

1 To prevent unwanted firing of

crow bar thyristor an energy

absorption unit is being

introduce by firm.

Firm has introduced in 07 locos

an energy absorption unit (04 no

ET, 01 CNB 01 JHS & 01 NKJ).

which reduces the excess energy

generated due to unwanted firing

of crow bar thyristor and thereby

preventing the melting of fuse.

Another 50 units has been

permitted & to be done within 02

(two) months. Fitment feed back

along with performance is under

watch.

25

CROW BAR THYRISTOR OF M/s HIND

The capacitance value (0.47 mF) of Snubber capacitors are deteriorating

after a service period of 3 to 4 years of service. The value is deteriorating

from 0.47 micro farad to 0.5 nano farad. The capacitors are Oil filled.

Capacitors are to be replaced by dry type only.

Action plan Status

1 Firm has been asked to make a

cycle check on the value of

snubber capacitors and if the value

deteriorates they have to replace

with new Capacitors of Dry Type.

One cycle checking done.

Firm has replaced snubber

capacitors in 26 locos with

dry type. Total 247 unit have

been checked. Sheds are

being requested to check the

value of capacitors during

maintenance and replace if

required. This has been

communicated to all railways.

26

Snubber Capacitor problem of M/s HIND

The basic problem is bearing failure. All the bearing failures are after a

service Failures of cooling fan increased . Mainly due to ageing of more

than 04 years.

Action plan Status

1 Zonal railways are advised to

replace bearing after a service

period of 04 years. .

Zonal railways have to replace

the bearing after a service

period of 04 years.

27

Cooling Fan failures of M/s HIND

There are failures of Control Cards A 704 (Chopper) & A 703 (Inverter) .

VD-9 diode failed and Programmable logic device damaged.

The failure of inverter control card ( A 703) increased

Action plan Status

1 The failed control cards were sent

to M/s. Transtanik/ Germany for

investigation by firm. It was

reported by the firm that diode

(VD-9) and PLD (Programmable

logic device) of SCR board

damaged and these were replaced

by the firm.

The performance of control card

failures is under watch.

Detailed action plan awaited.

Advised to submit action plan on

inverter control card ( A 703)

28

Control card failures of M/s HIND

25 Amps rating fuse in Battery charger out put failed make EATON and

FERRAZ.

Action plan Status

1 The 25 Amps rating fuse in

Battery charger out put failed.

Replacement of fuse by 35 Amps.

The fuse of M/s EATON and

FERRAZ are replaced by 35

amps. All fuse replaced. The

performance is under watch.

29

Fuse failures in Battery Charger out put

SIV MEDHA MAKE

PERFORMANCE OF M/s. MEDHA SERVO DRIVE

SUPPLIED 180 KVA STATIC CONVERTER

30

Major Component-wise year wise failure analysis MEDHA

SN Year

Component 2014-15 2015-16 2016-17

1 Main control

card

0 0 4

2 TDC-IF 9 6 8

3 dv/dt capacitor 0 0 1

4 Battery

Charger

4 6 5

5 Cooling Fan 0 0 1

6 Misc 8 21 17

Misc ---Transient, volt free contact, power supply card and any

other fault having 01 or 02 failure during year

31

The tripping of SIV occurred due to sensing over voltage of OHE though

OHE voltage was below specified limit.

Action plan Status

1. The case has been studied by the

firm and found that heat generated

in TDC-IF card which leads to

opening of solder joint of a resistor

in RC circuit. The firm has now

provided RC network in place of

resistor.

2. On further study the limit of OHE

sensor of SIV is being increased

from 500 ms to 1 sec. by software

modification vide letter dated

5.4.2017

3. Average time increased from 200ms

to 500ms

1. Problem occurred again in

the locos where modification in

RC network of TDC-IF card was

carried out. .

2. Software modification in 20

locos in ELS/CNB and KZJ.

The performance is satisfactory.

Firm has been advised to

implement the modification in

all units.

32

TDC-IF & MCU card failure of M/s Medha SIV

There are failures of dv/dt capacitor . This is a new trend of failures.

Action plan Status

1. Firm has been asked to submit the

investigation report on failures of

dv/dt capacitor. Also advised to

submit action plan to be adopted .

1. The investigation report

awaited .

33

dv/dt capacitor failures of M/s Medha SIV

SIV ABB MAKE

PERFORMANCE OF M/s. ABB SUPPLIED 180 KVA STATIC

CONVERTER

34

Major Component-wise year wise failure analysis ABB

SN Year

Component

2014-15 2015-16 2016-17

1 PEC card 00 03 05

Battery charger 01 03 01

2 Cooling Fan 12 07 11

Misc 10 10 06

Misc ---Transient, micro switch, power module, and any other fault having

01 or 02 failure during year

35

Cooling fan getting jammed after a service period of 4 to 5 years

Action plan Status

1

The cooling fan bearing is to be

replaced after a service period of 04

years.

Zonal Railways advised

accordingly .

36

Cooling fan failures M/s ABB SIV

Problem was due to loose connection between male & female connectors

of PEC due to which fuse of input/output also melting.

Action plan Status

1

The power supply card connection

with junction box was not proper

which causes these failures.

PEC card failure increased

PEC card assembly replaced

No failures reported till then.

37

PEC card failures M/s ABB SIV

OPEN POINT

Problem of booting time

Action plan Status

1

The booting time on PEC 80 is 55

secs.

If loco pilot made HBA off/on then

booting time takes 55 sec other

competitor is 10 to 15 sec.

Software modification required as

made in 3 phase system

Already discussed in

previous meeting but firm

refused that time but Firm is

again advised to make the

improvement as done in has

been advised in different 3

phase system

38

PEC card failures M/s ABB SIV

Maintenance practices adopted by ELS/ BZA & ED

ELS/ ED & ELS/ BZA have developed Electronic Lab for

testing of various Electronics cards of 180 KVA Static

Converter.

39

Status of AMC of SIV

Firm Status

AAL • Firm has given two types of budgetary quotations. (SIV older than

06 years & SIV less than 06 years). Railways have not floated any

tender.

Hirect • Firm has given budgetary quotations.

• LOA awarded for 06 units by ELS/BSL/CR on 07.06.2017.

• Tender has been invited for 06 units by ELS/BSL/CR which is

under TC.

Siemens • Firm has given budgetary quotations.

• LOA awarded for 29 units by ELS/HWH/ER on 11.05.2017.

• Expected LOA from ELS/ASN /ER

• Tender has been invited for 43 units by ELS/BSL/CR, & 57 units

ELS/RPM/SR

Medha • Firm has given budgetary quotations.

• LOA awarded for 06 units by ELS/ASN/ER on 21.04.2017.

• LOA awarded for 01 units by ELS/BRC/WR on 27.04.2017.

• LOA awarded for 06 units by ELS/HWH/ER on 21.04.2017.

• LOA awarded for 07 units by ELS/AJJ/SR on 21.07.2017.

• Tender will be opened for 60 units by SCRly on 19.05.2017.

ABB • Firm has given budgetary quotations.

40

41

Month

Total

punctu

ality

loss in

Electric

locos

Total

failures

for which

SIV has

been

marked

SIV

failures

External Failures

Problem at

Load side/

loco item like

MCP/ MPCS/

present

Relays and

fuse etc.

Maintenance

lapses/ loose

connection/

control

cable/loose

connectors

Transient

(Succeeded

on HBA

OFF/ON)/

Found Normal

Cooling

Fan

Apr-16 132 12 06 02 00 02 02

May-16 191 15 10 02 01 00 02

Jun-16 183 09 05 02 02 00 00

Jul-16 167 13 03 04 05 00 01

Aug-16 171 17 05 07 05 00 00

Sep-16 129 09 04 03 01 00 01

Oct-16 171 19 09 08 01 00 01

Nov-16 144 21 10 04 05 00 02

Dec-16 140 15 07 04 03 00 01

Jan-16 142 18 10 03 02 00 03

Feb-16 134 14 07 03 01 00 03

Mar-16 166 18 10 04 01 01 02

Totals 1870 180 86 46 27 03 18

Punctuality cases of elocos for SIV (2016-17)

42

Month

Total

punctu

ality

loss in

Electric

locos

Total

failures

for which

SIV has

been

marked

SIV

failures

External Failures

Problem at

Load side/

loco item like

MCP/ MPCS/

present

Relays and

fuse etc.

Maintenance

lapses/ loose

connection/

control

cable/loose

connectors

Transient

(Succeeded

on HBA

OFF/ON)/

Found Normal

Cooling

fan

Apr-15 168 17 10 6 0 1 0

May-15 206 15 04 4 3 3 1

Jun-15 308 16 04 4 4 2 2

Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Totals 682 48 18 14 7 6 3

Punctuality cases of elocos for SIV (2017-18)

THANKS

43