Performance of Ten Performance of Ten Mile Canal Filter Marsh Mile Canal Filter Marsh ProjectProject
Anura Karuna-Muni, P.E., Lee County
Roland Ottolini, P.E., Lee County
Tim Denison, Johnson Engineering, Inc.
Lee County Division of Natural Resources
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Presentation Outline:•Layout of the filter marsh
•Monitoring of water quality and flow
•Data analysis and trends, assuming the filter marsh as a blackbox
•Maintenance of the marsh
•Summary
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Ten Mile and Six Mile Ten Mile and Six Mile WatershedsWatersheds(approximate area = 43,000 acres)(approximate area = 43,000 acres)
Ten Mile Canal WatershedTen Mile Canal Watershed
(Approx. 13 square miles)(Approx. 13 square miles)
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Filter Marsh Cell Orientation and Operation
North Settling Cell/ Filter Marsh
North Filter Marsh
South Settling Cell/Filter Marsh
South Filter Marsh
Lee County Division of Natural Resources
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Water Quality Monitoring Locations
Lee County Division of Natural Resources
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Water Level Monitoring Locations
Lee County Division of Natural Resources
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Filter Marsh Inflow and Outflow (acre-ft)
0
100
200
300
400
Jan
Feb
Mar
Apr
May Jun
Jul
Aug Sep Oct
Nov
Dec
ac-f
t Inflow
Outflow
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Filter Marsh Inflow and Outflow Trendlines(established using 5th order polynomials)
0
100
200
300
400
Jan
Feb
Mar
Apr
May Jun
Jul
Aug Sep Oct
Nov
Dec
ac-f
t
Inflow
Outflow
Trendline(inflow )Trendline(outf low )
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Effect of Rainfall on Flow
0
100
200
300
400
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Flo
w V
olu
me
(a
c-f
t)
0
2
4
6
8
10
12
14
Ra
infa
ll (i
n)
InflowOutflowRainfall
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Water Quality and Level Monitoring Equipments
Avalanche® Multi-bottle, Multi-function Sampler
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Total Nitrogen Concentrations
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Jan
Feb
Mar
Apr
May Jun
Jul
Aug Sep Oct
Nov
Dec
mg
/l
Total Nitrogen(in)
Total Nitrogen (out)
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Total Phosphorus Concentrations
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
Jan
Feb
Mar
Apr
May Jun
Jul
Aug Sep Oct
Nov
Dec
mg
/l
Total Phosphorus (in)
Total Phosphorus (out)
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Total Nitrogen Load Removal
71%71%
55%38%
80%49%
58%78%
99%
91%
99%
100%
0
100
200
300
400
500
Jan
Feb
Mar
Apr
May Ju
n
Jul
Aug Sep Oct
Nov
Dec
Mo
nth
ly L
oad
(kg
)
Load InLoad OutPercentages
2008 Total Load Reduction = 68% (1920 kg)
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Total Phosphorus Load Removal
99% 89%100%
89%
100%
66%
79%
91%
56%74% 88%
87%
0
5
10
15
20
25
Jan
Fe
b
Ma
r
Ap
r
Ma
y
Jun
Jul
Au
g
Se
p
Oct
No
v
De
c
Mo
nth
ly L
oa
d (
kg
)
Load InLoad OutPercentages2008 Total Load
Reduction = 82% (78.9 kg)
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Maintenance Activities
4/15/2008 Aquatic Plant Removal 7 cy mixed
4/15/2008 Aquatic Plant Removal 1 cy chara
5/15/2008 Harvest Cell No. 4 8 cy native
8/6/2008 Aquatic Plant Removal 45 cy mixed
11/17/2008 Aquatic Plant Removal 40 cy mixed
Performance of Ten Mile Canal Performance of Ten Mile Canal Filter Marsh ProjectFilter Marsh Project
Lee County Division of Natural Resources
Nitrogen Load Entering the Filter Marsh
during dry season (706 kg)
during wet season (2115 kg)
Nitrogen Load Leaving the Filter Marsh
during dry season (62 kg)
during wet season (839 kg)
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Phosphorus Load Entering the Filter Marsh
during dry season (17.2 kg) during wet
season (79.5 kg)
Phosphorus Load Leaving the Filter Marsh
during dry season (1.1 kg)
during wet season (16.7 kg)
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
2008 Filter Marsh Performance Summary:Upper limitUpper limit (considering the filter (considering the filter marsh as a blackbox)marsh as a blackbox)
Total Nitrogen Total Nitrogen RemovedRemoved
1920 kg1920 kg
Nitrogen Removal Nitrogen Removal EfficiencyEfficiency
68%68%
Total Phosphorus Total Phosphorus RemovedRemoved
78.9 kg78.9 kg
Phosphorus Phosphorus Removal Removal EfficiencyEfficiency
82%82%
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
2008 Filter Marsh Performance Summary:Upper limitUpper limit (considering the filter (considering the filter marsh as a blackbox)marsh as a blackbox)
Lower limitLower limit (considering the inflow (considering the inflow to be equal to to be equal to discharge – no losses)discharge – no losses)
Total Nitrogen Total Nitrogen RemovedRemoved
1920 kg1920 kg 506 kg506 kg
Nitrogen Removal Nitrogen Removal EfficiencyEfficiency
68%68% 36%36%
Total Phosphorus Total Phosphorus RemovedRemoved
78.9 kg78.9 kg 33 kg33 kg
Phosphorus Phosphorus Removal Removal EfficiencyEfficiency
82%82% 65%65%
Performance of Ten Mile Performance of Ten Mile Canal Filter Marsh ProjectCanal Filter Marsh Project
Lee County Division of Natural Resources
Observations and Recommendations:• The efficiency can be determined in different ways. This study focuses on efficiency based on load in the water column.
• Efficiency and load reduction depends on a number of factors such as loading rate, amount of discharge, residence time, maintenance, volume loss due to seepage, ET, leaks, etc.
• Focus on removing nutrient loads during the wet season
• Coordinate monitoring of water quality and flow
• Stay on top of maintenance schedule
• Develop a simple design that is easy to operate and maintain
• Make aware of factors influencing the efficiency