Headquarters : Konutkent Mah. 3029 Cad. No:3/91 06810 Çankaya Ankara/TURKEY Phone : +90 312 472 42 50 Fax : +90 312 502 74 75 Email : [email protected]
�PERA INSTALLATION GUIDE
PRODUCT FEATURES:
The decorat�ve value of l�ght perfectly comb�nes w�th h�gh performances and effic�ency �n the l�ght�ng of urban areas. �Pera �s equally used as l�ght sources and refined arch�tectural elements for urban decor.
Des�gned to last �n extremely harsh env�ronments.
RECOMMENDATIONS FOR THE USER:
1)Before the �nstallat�on, make sure that there �s no voltage.2)Do not touch the fitt�ng when �t �s work�ng on / sw�tched on3)Do not look at the fitt�ng d�rectly or from a short d�stance.4)D�sconnect / sw�tch off the fitt�ng before chang�ng the lamps
NOTES:
-Techn�cal amendments are reserved. -CE – Conform�ty mark -The manufacturer �s then d�scharged from l�ab�l�ty when damage �s caused by �mproper use or �nstallat�on. -Clean lum�na�re regularly w�th solvent-free cleansers from d�rt and depos�ts. Do not use h�gh pressure cleaners.
Lb2322 Lb2324
2
Headquarters : Konutkent Mah. 3029 Cad. No:3/91 06810 Çankaya Ankara/TURKEY Phone : +90 312 472 42 50 Fax : +90 312 502 74 75 Email : [email protected]
1) The anchor bolts are mounted.
�PERA INSTALLATION GUIDE
Anchorage
T�jen
3) - The prepared anchor is embedded in the concrete and leveled.
Incom�ng energyhose
Outgo�ng energyhose
Concrete
300mm300mm
300mm
Incom�ng energycable
Outgo�ng energycable
2) The incoming energy hoses are drawn to the installation floor and the concrete is poured
Concrete
Concrete
4) After the concrete �s dr�ed, the energy cable �s done.
20mm
Maximum 20 mmfrom the rods toanchor
For Lb2322;
3
Headquarters : Konutkent Mah. 3029 Cad. No:3/91 06810 Çankaya Ankara/TURKEY Phone : +90 312 472 42 50 Fax : +90 312 502 74 75 Email : [email protected]
�PERA INSTALLATION GUIDE
6) Lum�na�re �s t�ghtened to the flange w�th screws.
(+) Brown
( ) Green-Yellow
(-) Blue
*Please contact us for cables �f �n d�fferent colors.
Lum�nare Cable
5) Electrical connection is done and luminaire is placed on the flange.
*The connect�ons should be under IP protect�on.
4
Headquarters : Konutkent Mah. 3029 Cad. No:3/91 06810 Çankaya Ankara/TURKEY Phone : +90 312 472 42 50 Fax : +90 312 502 74 75 Email : [email protected]
1) The anchor bolts are mounted.
�PERA INSTALLATION GUIDE
Anchorage
T�jen
3) - The prepared anchor is embedded in the concrete and leveled.
Incom�ng energyhose
Outgo�ng energyhose
Concrete
300mm300mm
300mm
Incom�ng energycable
Outgo�ng energycable
2) The incoming energy hoses are drawn to the installation floor and the concrete is poured
Concrete
Concrete
4) After the concrete �s dr�ed, the energy cable �s done.
20mm
Maximum 20 mmfrom the rods toanchor
For Lb2324;
5
Headquarters : Konutkent Mah. 3029 Cad. No:3/91 06810 Çankaya Ankara/TURKEY Phone : +90 312 472 42 50 Fax : +90 312 502 74 75 Email : [email protected]
�PERA INSTALLATION GUIDE
5) The flange is seated on the anchor and the new inox washer is tightened to the threads.
7) Lum�na�re �s t�ghtened to the flange w�th screws from the r�ght and left.
6) Electrical connection is done and luminaire is placed on the flange.
Lum�nareCable
OutputEnergy
InputEnergy
(+) Brown
( ) Green-Yellow
(-) Blue
Fuse Box Connect�on
*Please contact us for cables �f �n d�fferent colors.
Lum�nare Cable
Fuse Box
Flange