LithoWorks PEB. PEB Plate repeatability. Dataset:3 data sets, each one 2 days apart from previous Metrology: On-Wafer analysis . TEA Systems Corp. 65 Schlossburg St. Alburtis, PA 18011 610 682 4146 [email protected] August 27,2003. Project Summary. Program :LithoWorks PEB - PowerPoint PPT Presentation
Citation preview
LithoWorks PEBLithoWorks PEBLithoWorks PEBLithoWorks PEB
PEB Plate repeatability
Dataset: 3 data sets, each one 2 days apart from previous
Metrology: On-Wafer analysis
TEA Systems Corp.65 Schlossburg St.Alburtis, PA 18011
610 682 [email protected]
August 27,2003
Sept. 2003 LithoWorks PEB Page -2-SLS Inc. Confidential
Project Summary
• Program: LithoWorks PEB
• Situation: Three data sets have been presented from PEB Bake 8:
• July 16,18 & 21 of 2003
• Objective of this analysis: Determine PEB stability Note: Activation temperatures are set at 100 oC
Sept. 2003 LithoWorks PEB Page -3-SLS Inc. Confidential
July 16 PEB 8
• Thermal variation from wafer mean vs time
Sept. 2003 LithoWorks PEB Page -4-SLS Inc. Confidential
July 16: Total THERMAL Energy
Integrated area under the time-temp curve
Sept. 2003 LithoWorks PEB Page -5-SLS Inc. Confidential
July 16; Energy Variation
Integrated area under the time-temp curve showing temperature delta from wafer average
Sept. 2003 LithoWorks PEB Page -6-SLS Inc. Confidential
July 16; Range & rise times
Rise/Fall TimesStart Time Start TempRise Delta Time Delta TempSlope
20.1310 22.6110 TRUE 27.9870 95.0070 3.3947123.2410 118.8310 FALSE 2.4550 -1.0650 -0.4338127.6600 116.9710 FALSE 38.7890 -90.4370 -2.3315
Plot of range of temperature about the mean temperature
AND mean temperature
Sept. 2003 LithoWorks PEB Page -7-SLS Inc. Confidential
July 16: Thermal Maps
Temperature before heating (left) and at end of maximum temperature period (right)
Sept. 2003 LithoWorks PEB Page -8-SLS Inc. Confidential
July 18; PEB 8
Sept. 2003 LithoWorks PEB Page -9-SLS Inc. Confidential
July 18; Energy Total
Sept. 2003 LithoWorks PEB Page -10-SLS Inc. Confidential
July 18; Energy Variation
Sept. 2003 LithoWorks PEB Page -11-SLS Inc. Confidential
July 18; Thermal Range
Rise/Fall TimesStart Time Start TempRise Delta Time Delta TempSlope
11.7840 22.3390 TRUE 27.0050 95.4200 3.5334112.9300 119.0630 FALSE 38.7890 -93.4470 -2.4091
Sept. 2003 LithoWorks PEB Page -12-SLS Inc. Confidential
July 18; hi/low steady state
Sept. 2003 LithoWorks PEB Page -13-SLS Inc. Confidential
July 21; PEB 8
Sept. 2003 LithoWorks PEB Page -14-SLS Inc. Confidential
July 21; Thermal Energy Total
Sept. 2003 LithoWorks PEB Page -15-SLS Inc. Confidential
July 21; Variation in Thermal Energy
Sept. 2003 LithoWorks PEB Page -16-SLS Inc. Confidential
July 21; Thermal Range over Time
Rise/Fall TimesStart Time Start TempRise Delta Time Delta TempSlope
16.6940 22.3740 TRUE 25.5320 94.9420 3.7185119.3130 118.0440 FALSE 33.3880 -91.1410 -2.7298
Sept. 2003 LithoWorks PEB Page -17-SLS Inc. Confidential
July 21; Steady state temperature profiles
Sept. 2003 LithoWorks PEB Page -18-SLS Inc. Confidential
July 21; Thermal Heating
Click on image to play movie of thermal
heating.Press esc to exit.
Sept. 2003 LithoWorks PEB Page -19-SLS Inc. Confidential
Comparison of Rise/Fall Cycles
Rise/Fall TimesDate Start Time Start Temp Rise Delta Time Delta Temp Slope Min Temp Max Temp
July 16,2003 20.13 22.61 TRUE 27.99 95.01 3.3947 22.04 120.04123.24 118.83 FALSE 2.46 -1.07 -0.4338127.66 116.97 FALSE 38.79 -90.44 -2.3315
July 18,2003 11.78 22.34 TRUE 27.01 95.42 3.5334 22.05 120.00112.93 119.06 FALSE 38.79 -93.45 -2.4091
July 21,2003 16.69 22.37 TRUE 25.53 94.94 3.7185 22.04 120.03119.31 118.04 FALSE 33.39 -91.14 -2.7298
Recall that the July 16 cycle had a slightly larger range/rise in temperature at 127 seconds.
Notice that none of the 3 ranges achieved steady state during at the
high temperature cycle. Range across the wafer was still at about 1
oC when cooling started.Start of cooling