1
Global Headquarters Project 03 June 2014
2
AGENDA
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
3
who are we?
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
4
the teamCarl Ordemann, AIA
Principal and Executive DirectorPrincipal-in-Charge
Heather Bensko, LEED AP ID + C
Associate Design LeaderLead Designer and Branding
Connor GlassSr. AssociateSr. Designer
Damian Besculides, AIAAssociate Principal Cost and Schedule Manager
Robert Pizzano, RAPrincipalProject Manager
Tamar MoyAssociateProgramming/ Workplace Specialist
5
13offices8 domestic
5 international
founded in
1981 200awards for
designexcellence
ADA Analysis § Architecture § Area calculations § Benchmark
analysis § Block and stacking plans § Building design consultation §
Building evaluation/selection § Design and Contract Documents §
Code research/variance § Construction administration § Construction
documents § Consulting § Custom furniture/millwork design §
Engineering services coordination § Facilities management assistance §
Furniture selection and procurement § Graphic and signage standards
§ Identity/branding § Interior architecture/design § Landscape
architecture § Lease/workletter consultation § Leasing log/charts §
Material and finish selections § Perspective renderings § Programming §
Project tracking analysis § Real estate and transportation planning services
§ Space planning § Strategic occupancy planning § Tenant standard
specifications § Test-fit space plans § Workplace standards/
procedures development
750staff
worldwide
commercial
healthcare
education
civic
corporate interiors
housing
mixed-use
urban design
the firm
6
clients
7
Our POint Of ViewInTEGRATED USER ExPERIEnCE
intrOsPectiOn is trenDinG
Perkins Eastman’s process is client-centric. Our
approach is never one-size fits all, and the user
experience is integral.
Organizations are looking for meaningful and
enduring workplace design solutions that reflect their
unique DNA.
Leaders are increasingly willing to look inward to
explore management style and guiding principles to
develop strategies crafted for their culture, values,
and business goals.
CLIENT
PRO
JECT
MANAGEM
ENT
DESIG
N
WO
RKPLACE
STRATEGIES
IMPLEM
ENT-
ATION
8
DrawinG On the BreaDth Of Our Practice area exPertise
the learninG cOntinuum
Life is an evolutionary experience set in a continuum
of learning spaces.
These settings — education, workplace, healthcare,
or other — share fundamental values like
collaboration, performance, knowledge-sharing,
and efficiency.
Corresponding design trends such as transparency
and active design are shared between space types,
and often initiated in the professional workplace,
trickleling down to other sectors.
KN
OW
LEDGE
EXC
HANGE
EDUCATION
COMMU
NITYHEALTH-
CARE
INTEGRATED USER
EXPERIENCE
WORK-PLACE
Integrated Technology
Focus Work
InnovationWellness
Communica-tion
Balance Team & Individual
Socializing
Efficient/Smart
Sustainability
Mentoring
9
who are you?
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY L
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
1 0
what we KnOw aBOut citi sO far...
Comments
1 1
what’s citi’s AspIrATIoNAL wOrD clOuD?
RESPONSIBLEFINANCE
CONNECTION
PRODUCTEXPERTISE
SUSTAIN-ABILITY
LEADERSHIPDIVERSE
MERITOCRACYCOMMONPURPOSE
EMERGINGMARKETS
EFFICIENCY NETWORKSOCIAL
RESPONS-IBILITY
GLOBAL-IZATION
DIGITIZATION CLIENTRELATIONSHIP
EXCELLENCEINITIATIVE
COURAGE INGENUITY
VIRTUALTEAM
SERVICEDRIVEN
RESULTS DRIVEN SIMPLE PERFORMANCE CREATIVITY
GLOBALGUIDELINES
TRANSPARENTBEST IN CLASS
PRODUCTS
INNOVATION
WORLD-CLASS BRAND
1 2
cOmmOn wOrKPlace themes fOr financial serVices
OrGanizatiOnal GOals Parti Place-maKinG
THE WORKPLACEOF CHOICE
CONNECTION
TRANSPARENCY
HEALTH & WELLNESS Active design, fitness centers, meditation rooms, day care, connection to nature, sustainability, desk sharing/ mobility strategy, flex work schedules
MILLENNIAL PRIORITIES Smart technology integration, workforce diversity, branding, more casual environment
FLEXIBILITY Reconfigurable seating arrangements that change with team structure
COLLABORATIVE WORK SETTINGS Lounges, cafes, team rooms, coffee bars, open plan with focus spaces
INTEGRATED SMART TECHNOLOGY Connecting virtual, often global, teams
BREAK DOWN SILOS Glass walls, open plan, digitized storage/ archive library, connect to community with public spaces
BRAND MESSAGE Clearly articulated and celebrated brand message and corporate values for employees and visitors
ATTRACT & RETAIN TOP TALENTDesirable recruits increasingly joining faster growing industries such as technology & telecommunications
Millenials looking for less demanding jobs with “more meaningful work” and a better work-life balance
BRIDGE ACROSS DEPARTMENTSIntegrated teams provide better cross checks
Cross-departmental teams are seated together, and front- and back- offices are increasingly blended
Communication, collaboration, and creative thinking improve performance
BE FISCALLY RESPONSIBLEBanks are choosing to specialize in a smaller range of product and service offerings
A safer place to work, with less risk
More focus on community and environmental responsibility
1 3
citi’s rOaDmaP
OrGanizatiOnal GOals Parti Place-maKinG
1 4
the citi city
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
1 5
BUILDIING PROFILE I SOCIAL MEDIA
1 6
75%
13,500 Work points
64,000,000 square feet
25%
388 GREENWICH
AGILE
GLOBAL
390 GREENWICH
LIQUID SPACE
Citi’s Mission: Enabling Progress
Common Purpose
Responsible Finance
Ingenuity
Leadership
Borderless enterprise I The CITy Campus
1 7
EXECUTIVE
MEETING
COLLABORATION
WORK POINTS
AMENITY
vertical integration I Smart StackIng
EQUAL DISTRIBTUTION
1 8
knowledge marketplace I place makIng
S E M I - E N C L O S E D
S H A R E D T E A M
C O L L A B O R AT I V E / G AT H E R I N G
F O O D / B E V E R A G E
R E C E P T I O N
W O R K S PA C E
C I R C U L AT I O N
F O C U S
LOUNGE / PANTRY
ARRIVALS E M I - E N C L O S E D W O R K / M E E T I N G
S E M I - E N -C L O S E D W O R K /M E E T I N G
W O R K S PA C E
W O R K -S PA C E
ARRIVAL
FOCUS
FOCUS
SHARED TEAM
C O L L A B O R AT I V E /G AT H E R I N G
SHARED TEAM
SHARED TEAM
SHARED TEAM
W O R K S PA C EF O R M A L M E E T I N G
W O R K -S PA C E
C O L L A B O R A -
1 9
a
d
b
e
c
f
flexibility +modularity I defInIng the kIt of parts
2 0
5 0 % f o c u s e d w o r k at d e s k
3 0 % s c h e d u l e d m e e t i n g s
2 0 % s p o n ta n e o u s c o l l a b o r at i o n
* R e q u i R e s v a R i e d u n i n t e R R u p t e d w o R k s pa n o f 2 - 3 h o u R s
* n e e d s f R e q u e n t f a c e t o f a c e a c c e s s t o c o l l e a g u e s f o R k n o w l e d g e s h a R i n g
* M a Y B e t e t h e R e d B Y t e c h n o l o g Y o R s e c u R i t Y p R o t o c a l s
4 0 % f o c u s e d w o r k at d e s k
3 0 % s c h e d u l e d m e e t i n g s
3 0 % s p o n ta n e o u s c o l l a b o r at i o n
* R e q u i R e s v a R i e d u n i n t e R R u p t e d w o R k s pa n s o f 1 - 2 h o u R s
* M o v e s f R e q u e n t ly a R o u n d t h e w o R k p l a c e o R b e t w e e n b u i l d i n g s f o R f a c e t o f a c e M e e t i n g s w i t h c o l l e a g u e s
* c o M p l e a t e ly u n t e t h e R e d + M o b i l e
6 0 % f o c u s e d w o r k at d e s k
3 5 % s c h e d u l e d m e e t i n g s
5 % s p o n ta n e o u s c o l l a b o r at i o n
* R e q u i R e s v a R i e d u n i n t e R R u p t e d w o R k s pa n s d e p e n d i n G o n t a s k
* w o R k s m a i n ly o f f s i t e t R a v e l i n G o R f R o m h o m e
* C o m p l e a t e ly u n t e t h e R e d + m o b i l e
r e s i D e n t a G i l e r e m O t e
flexibility +modularity I defInIng workspace typologIes
2 1
63% 78% 20% 3/4manager’s work day spent in meetings
scheduled meetings between 2-4 people
time spent out of the office
People more likely to engage colleagues in face to face interac-tions if they have visual access first
flexibility +modularity I defInIng workspace typologIes
2 2
integrated user experience I dIscoverIng User Personas INTEGRATED USER EXPERIENCE I DEFINING USER TYPOLOGIES
MOBILE RESIDENT CLIENT CONSULTANT
2 3
• Merges work and personal l ife
• f o c u s e s f o r 6 0 - 9 0 M i n u t e s a t a t i M e
• w o r k s a t o d d h o u r s
• w a n t s p e r s o n a l c o n t r o l o f s u r r o u n d i n g s
• s t a y s M o t i v a t e d b y c h a n g i n g a c t i v i t y o r s u r r o u n d i n g s
• SeparateS work and perSonal life
• f o c u S e S f o r 3 - 4 h o u r S o n o n e a c t i v i t y
• n e e d S q u i e t t o b e a b l e t o c o n c e n t r a t e
• S t a y S m o t i v a t e d b y b e i n g “a l o n e t o g e t h e r ”
• f e e l S o v e r w o r k e d a n d i S o l a t e d w h e n e x t e n S i v e ly w o r k i n g f r o m h o m e
• SeparateS work and perSonal life
• f o c u S e S f o r 6 0 m i n u t e S o r m o r e
• S t a y S m o t i v a t e d t h r o u g h c o n S t a n t ly c h a n g i n g S u r r o u n d i n g S
• p r e f e r S e a S y a c c e S S t o f o o d /d r i n k
• f e e l S o v e r w o r k e d a n d i S o l a t e d w h e n e x t e n S i v e ly w o r k i n g f r o m h o m e
sOlO alOne tOGether Buzz BuilDer
integrated user experience I supportIng varIed work styles
2 4
integrated user experience I Day In the LIfe
8:00 AM
CONNECT
2 5
8:00 AM
CONNECT
FOCUS
10:00 AM
2 6
8:00 AM
CONNECT
FOCUS
REGROUP
10:00 AM 1:00 PM
2 7
8:00 AM
CONNECT
FOCUS
REGROUPREPORT
10:00 AM 1:00 PM 3:00 PM
2 8
8:00 AM
CONNECT
FOCUS
REGROUPREPORT
RESPOND
10:00 AM 1:00 PM 3:00 PM 5:00 PM
2 9
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
project delivery
3 0
PrOject manaGement
FACILITIES MANAGEMENT SERVICE
PERKINS EASTMAN PROJECT TEAMAND TECHNICAL STAFF
PROJECTMANAGER’S
ROLE
Real Estate
Legal
MEP Engineer
Structural Engineer
Audio/Visual
Acoustical
Lighting
Food Service
Tele/Data
LEED
CONSULTANTS
Construction Manager
General Contractor
Sub contractors
Furniture
IT Services
Security
Tele/Data
Movers
VENDORS / SUPPLIERS
3 1
PrOject manaGement rOles
• Single Point of Contact
• Schedule Master
• Project Financial Planning (Budgeting)
• Risk Mitigator (Advanced Warnings)
• Coordinating Consultants
• Goals Oriented
• Accountable
• Driver of Results
On time/ On BuDGetHHC - 350,000SF
1 Month Early, Within 2%
3 2
PrOject manaGement tOOlKit
PrOject trax• Project Directory
• Responsibilities Checklist
• Task Outlines
• Sets/ Runs Meetings
• Minutes/ Agendas
• Quality Assurance Checklinst
• Coordinating Consultants
• New Forma (Online Tool)
• Revit
3 3
Citi - Global Headquarters ProjectProject Schedule as Provided by Citi in RFP
May 30, 2014
Item #Phase/ Task Project Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
1 Phase I - A Concept Design 1 2 3 42 Phase I - B Schematic Design 1 2 33 Phase II - A Design Development 1 2 3 44 Phase II - B Construction Documents 1 2 3 4 55 Phase II - C Permiting / Bidding 1 26 Phase II - D Construction Administration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
Citi - Global Headquarters ProjectPerkins Eastman Preliminary Project Schedule as recommended by PE
May 30, 2014
Item #Phase/ Task Project Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
1 Key Milestone Dates u Kick Off2 $ u 4th month Concept / Programming Complete3 $ u 7th month Schematic Design Complete4 $ u 11th month Design Development Complete5 $ $ u 16th month Construction Documents Complete6 $ u 18th month Bidding and Filing Complete7 $ u Move 1 u Move 2 u Move 3 u Move 48 u Move 59 u Move 6
10 u Move 7 u Move 8 u Move 9 u Move 10 u Move 11
11 Phase I - A Concept Design/Plannning Confirmation 1 2 3 4 m Client Approval
12 3 Team kick-off meeting
13 Field Survery 3 Arch and Engineering field inspections
14 r Submit Arch Field Reports and Issue existing conditions backgrounds
15 r Issue MEP equipment evaluation reports
16 Programming Confirmation 3 Interview Citi Business Groups to develop Programming Report
17 3 Confirm Citi Programming Report with Business Groups
18 3 Issue Program
19 m Client Review and comment
20 m Program Validation and Approval
21 Blocking Stacking Plans Review r Issue Blocking Stacking Plans
22 m Client Review and comment
23 Phase I - B Schematic Design 1 2 3 m Client Approval
24 Space Planning/Design r Confirm and Issue Preliminary Space Plans
25 m Client Review and comment
26 r Issue Preliminary Finishes and Materials
27 m Client review and comment
28 Engineering/IT Design Concepts/Narratives r Issue Preliminary Concept Plans/conduit pathways/Narratives
29 m Client Review and comment
30 r Issue Preliminary MEP/IT space requirements
31 r IT equipment room layouts
32 r Issue preliminary conduit runs
33 m Client Review and comment
34 Security/AV r Issue assesment and recommendations
35 m Client Review and comment
36 Phase II - A Design Development 1 2 3 4 m Client Approval
37 Furniture Planning r Issue Furniture Plans
38 Planning r Issue Preliminary Tel/Data and Ceiling/Lighting Plans
39 m Client Review and comment
40 r Design Presentation - Finishes and Materials
41 m Client Review and comment
42 r Final Design Presentation - Finishes and Materials
43 m Client Review and comment
44 Engineering/IT Design r Single Line MEP equipment design/IT equipment room layouts/ conduit runs
45 r Finalize MEP equipment/IT equipment room layouts/ conduit runs
46 Security/AV r Issue equipment requirements and specs
47 Phase II - B Construction Documents 1 2 3 4 5 m Client Approval
48 r Issue Final Tel/Data and Ceiling/Lighting Plans
49 r Issue 50% CDs for Estimate and Coordination
50 r Issue 80% CDs for Coordination, Red Line by Client
51 Phase II - C Bidding / Filing r Issue CDs for Bid and Filing
52 Bidding / Contract Award 1 2 m Award Project
53 File With the DOB 1 2 m Permit In Hand
Phase II - D Construction Administration54 Phase II - D1 - Executive Floors (by others)
55 Phase II - D2 - Pre Con Work
56 Phase II - D3 - Floors 37-32 1 2 3 4 388 Floors 37-32
57 1 Move / Post Occ. Study
58 Phase II - D4 - Floors 31-28, 26-25 1 2 3 4 388 Floors 31-28, 26-25
59 1 Move / Post Occ. Study
60 Phase II - D5 - Floors 24-19 1 2 3 4 388 Floors 24-19
61 1 Move / Post Occ. Study
62 Phase II - D6 - Floors 18-13 1 2 3 4 388 Floors 18-13
63 1 Move / Post Occ. Study
64 Phase II - D7 - Floors 12-6 (7 tot) 1 2 3 4 388 Floors 12-6
65 1 Move / Post Occ. Study
66 Phase II - D - Façade / Atrium (by others) 1 2 3 4 5 6 7 8 9 10 11 12 Facades / Atrium (by Others)
67
68 Phase II - D8 - Amentity Floors 5 thru 1 - Await façade 1 2 3 4 5 6 388 Floors 5-1
69 Atrium / Entry completion 1 Move / Post Occ. Study
70 Phase II - D9 - Floors 8-6 1 2 3 4 5 6 7 8 390 Floors 8 - 6
71 1 Move / Post Occ. Study
72 Phase II - D10 - Data Center 1 2 3 4 5 6 7 390 Data Center Floors 8 & 6
73 1 Move / Post Occ. Study
74 Phase II - D11 - Trading - 5th Floor 1 2 3 4 5 6 7 390 Trading 5th Floor
75 1 Move / Post Occ. Study
76 Phase II - D12 - Trading - 4th Floor 1 2 3 4 5 6 7 390 Trading 4th Floor
77 1 Move / Post Occ. Study
78 Phase II - D13 - Trading - 3rd Floor 1 2 3 4 5 6 7 390 Trading 3rd Floor
79 1 Move / Post Occ. Study
80 Phase II - D14 - Trading - 2nd Floor 1 2 3 4 5 6 7 390 Trading 2nd Floor
81 1 Move / Post Occ. Study
82 Phase II - D15 - Trading - 1st Floor 1 2 3 4 5 6 7 390 Trading 1st Floor
83 1 Move / Post Occ. StudyTIME SAVINGS
Legend: Concept SD DD CD BN CA PO Time Save (9 Months Overall) u Key Mile Stone Event $ Budget Approval m Approval/Completion r Drawing Issue 3 Work Start u Citi Schedule
Phas
e II
- B/C
Con
stru
ctio
n D
ocum
ents
and
Filin
gPh
ase
II - D
Con
stru
ctio
n Ad
min
istra
tion
Clo
seou
t Ph
ase
Executive Floors (By others)Make Ready / Pre Con Work
Mile
ston
e Sc
hedu
le D
ates
and
Bud
get R
evie
ws
Phas
e I -
A C
once
pt D
esig
n / S
ite S
urve
y /
Prog
ram
min
gPh
ase
I - B
Sch
emat
ic D
esig
n (A
ll Fl
oors
All
Area
s)Ph
ase
II - A
Des
ign
Dev
elop
men
t (Al
l Flo
ors
All A
reas
)
3 4
Citi - Global Headquarters ProjectPerkins Eastman Preliminary Project Schedule as recommended by PE
May 30, 2014
Item #Phase/ Task Project Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
1 Key Milestone Dates u Kick Off2 $ u 4th month Concept / Programming Complete3 $ u 7th month Schematic Design Complete4 $ u 11th month Design Development Complete5 $ $ u 16th month Construction Documents Complete6 $ u 18th month Bidding and Filing Complete7 $ u Move 1 u Move 2 u Move 3 u Move 48 u Move 59 u Move 6
10 u Move 7 u Move 8 u Move 9 u Move 10 u Move 11
11 Phase I - A Concept Design/Plannning Confirmation 1 2 3 4 m Client Approval
12 3 Team kick-off meeting
13 Field Survery 3 Arch and Engineering field inspections
14 r Submit Arch Field Reports and Issue existing conditions backgrounds
15 r Issue MEP equipment evaluation reports
16 Programming Confirmation 3 Interview Citi Business Groups to develop Programming Report
17 3 Confirm Citi Programming Report with Business Groups
18 3 Issue Program
19 m Client Review and comment
20 m Program Validation and Approval
21 Blocking Stacking Plans Review r Issue Blocking Stacking Plans
22 m Client Review and comment
23 Phase I - B Schematic Design 1 2 3 m Client Approval
24 Space Planning/Design r Confirm and Issue Preliminary Space Plans
25 m Client Review and comment
26 r Issue Preliminary Finishes and Materials
27 m Client review and comment
28 Engineering/IT Design Concepts/Narratives r Issue Preliminary Concept Plans/conduit pathways/Narratives
29 m Client Review and comment
30 r Issue Preliminary MEP/IT space requirements
31 r IT equipment room layouts
32 r Issue preliminary conduit runs
33 m Client Review and comment
34 Security/AV r Issue assesment and recommendations
35 m Client Review and comment
36 Phase II - A Design Development 1 2 3 4 m Client Approval
37 Furniture Planning r Issue Furniture Plans
38 Planning r Issue Preliminary Tel/Data and Ceiling/Lighting Plans
39 m Client Review and comment
40 r Design Presentation - Finishes and Materials
41 m Client Review and comment
42 r Final Design Presentation - Finishes and Materials
43 m Client Review and comment
44 Engineering/IT Design r Single Line MEP equipment design/IT equipment room layouts/ conduit runs
45 r Finalize MEP equipment/IT equipment room layouts/ conduit runs
46 Security/AV r Issue equipment requirements and specs
47 Phase II - B Construction Documents 1 2 3 4 5 m Client Approval
48 r Issue Final Tel/Data and Ceiling/Lighting Plans
49 r Issue 50% CDs for Estimate and Coordination
50 r Issue 80% CDs for Coordination, Red Line by Client
51 Phase II - C Bidding / Filing r Issue CDs for Bid and Filing
52 Bidding / Contract Award 1 2 m Award Project
53 File With the DOB 1 2 m Permit In Hand
Phase II - D Construction Administration54 Phase II - D1 - Executive Floors (by others)
55 Phase II - D2 - Pre Con Work
56 Phase II - D3 - Floors 37-32 1 2 3 4 388 Floors 37-32
57 1 Move / Post Occ. Study
58 Phase II - D4 - Floors 31-28, 26-25 1 2 3 4 388 Floors 31-28, 26-25
59 1 Move / Post Occ. Study
60 Phase II - D5 - Floors 24-19 1 2 3 4 388 Floors 24-19
61 1 Move / Post Occ. Study
62 Phase II - D6 - Floors 18-13 1 2 3 4 388 Floors 18-13
63 1 Move / Post Occ. Study
64 Phase II - D7 - Floors 12-6 (7 tot) 1 2 3 4 388 Floors 12-6
65 1 Move / Post Occ. Study
66 Phase II - D - Façade / Atrium (by others) 1 2 3 4 5 6 7 8 9 10 11 12 Facades / Atrium (by Others)
67
68 Phase II - D8 - Amentity Floors 5 thru 1 - Await façade 1 2 3 4 5 6 388 Floors 5-1
69 Atrium / Entry completion 1 Move / Post Occ. Study
70 Phase II - D9 - Floors 8-6 1 2 3 4 5 6 7 8 390 Floors 8 - 6
71 1 Move / Post Occ. Study
72 Phase II - D10 - Data Center 1 2 3 4 5 6 7 390 Data Center Floors 8 & 6
73 1 Move / Post Occ. Study
74 Phase II - D11 - Trading - 5th Floor 1 2 3 4 5 6 7 390 Trading 5th Floor
75 1 Move / Post Occ. Study
76 Phase II - D12 - Trading - 4th Floor 1 2 3 4 5 6 7 390 Trading 4th Floor
77 1 Move / Post Occ. Study
78 Phase II - D13 - Trading - 3rd Floor 1 2 3 4 5 6 7 390 Trading 3rd Floor
79 1 Move / Post Occ. Study
80 Phase II - D14 - Trading - 2nd Floor 1 2 3 4 5 6 7 390 Trading 2nd Floor
81 1 Move / Post Occ. Study
82 Phase II - D15 - Trading - 1st Floor 1 2 3 4 5 6 7 390 Trading 1st Floor
83 1 Move / Post Occ. StudyTIME SAVINGS
Legend: Concept SD DD CD BN CA PO Time Save (9 Months Overall) u Key Mile Stone Event $ Budget Approval m Approval/Completion r Drawing Issue 3 Work Start u Citi Schedule
Phas
e II
- B/C
Con
stru
ctio
n D
ocum
ents
and
Filin
gPh
ase
II - D
Con
stru
ctio
n Ad
min
istra
tion
Clo
seou
t Ph
ase
Executive Floors (By others)Make Ready / Pre Con Work
Mile
ston
e Sc
hedu
le D
ates
and
Bud
get R
evie
ws
Phas
e I -
A C
once
pt D
esig
n / S
ite S
urve
y /
Prog
ram
min
gPh
ase
I - B
Sch
emat
ic D
esig
n (A
ll Fl
oors
All
Area
s)Ph
ase
II - A
Des
ign
Dev
elop
men
t (Al
l Flo
ors
All A
reas
)
measuring success
of projects delivered on time
of projects delivered within 5% of original budget
of business from repeat clients
3 6
180 maiDen lane
731 lexinGtOn aVenue
BriDGewater
feDeral reserVe BanK Of new YOrK
case studies
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
3 7
REIMAGINE AND REVITALIZE.
Transform arrival experience
Revitalize interior public spaces
Amenity rich spaces to attract new tenants
Protection against weather events
Leverage connection to emerging waterfront
180 MAIDEN LANE
3 8
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Available
Leased
14’ - 21’ slab height54,477 sq.ft.
95,206 sq.ft.
264,444 sq.ft.
329,374 sq.ft.
AuditoriumFitness Center and Cafeteria
22,459
32,018
32,239
32,149
32,149
30,908
16,323
30,438
10,207
31,080
31,080
31,080
31,080
30,907
30,907
30,917
30,136
30,077
30,040
30,040
29,951
29,950
29,902
29,902
29,878
29,878
29,878
29,878
18,832
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
109
87
65
43
21
17,257
STACKING PLAN
Lease Expires 2014
STACKING PLAN + PROJECT METRICS
3 9
2013-06-21
4 0
BUILDING ENTRANCE
4 1
4 2
4 3
4 4
4 5
200 person capacity auditorium200 PERSON AUDITORIUM
4 6
260 seats | operated by restaurant associates | south street seaport/ river views | recently renovated | 3 private dining rooms | updated restrooms
full service cafeteriaFULL SERVICE CAFETERIA
4 7
country club locker rooms | full assortment of cardio equipment including cycling machines, stairmasters, elliptical machines and treadmills | free weights and weight machines
fully equipped fitness centerFITNESS CENTER
4 8
FITNESS CENTERFITNESS CENTER
4 9
H.C.H.C.H.C.
Legend
Conference
Large Office
Office
Workstation
Floor Support
SUPPORTOFFICEOFFICEOFFICEOFFICEOFFICEOFFICESUPPORT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PHONE RMPHONE RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE ECIFFOECIFFOECIFFO
OFFICE
OFFICE
OFFICE
RECEPTIONELEVATOR LOBBY
PANTRY
8 PERSONCONFERENCE RM
8 PERSONCONFERENCE RM
4 PERSONMEETING RM
14 PERSONCONFERENCE RM
16 PERSONCONFERENCE RM
OFFICE
OFFICE
OFFICE
OFFICE
TROPPUSTROPPUSFDITROPPUS
12' - 2"
20' -
0"5'
- 0"
5' - 0
"
6' - 0"
10' -
0"
COATS
COAT
S
© 2012
8.10.2012Progressive Workplace Firm (Financial Service)180 Maiden Lane, 24th Floor
SL GREEN
O�ce + Workstation Spaces - 24th FloorRoom Space Count Head Count
Large O�ce44'21 x '02 ,eciffO4
O�ce2222'21 x '01 ,eciffO
22WorkstationWorkstation, 5' x 6' 140 140
140661latot dnarG
Conference Spaces - 24th FloorRoom Space Count Seat Count
Conference4 Person Conference Room 1 48 Person Conference Room 2 1614 Person Conference Room 1 1416 Person Conference Room 1 16
5005latot dnarG
Office to Workstation Ratio 15:85Conference Room Seats to Staff 1:3.3
RSF 31,080 sfRSF/Person 187 sfUSF 22,689 sfUSF/Person 137 sf
Legend
Conference
Large Office
Office
Workstation
Floor SupportSouth
Stre
etPine Street
Maiden LaneFr
ont Stre
et
OFFICE AND WOrkStAtION SPACES
rOOM SPACE COUNt HEAD COUNt
Large Off ice
Off ice, 20’ x 12’ 4 4
4Office
Off ice, 10’ x 12’ 22 22
22 Workstat ion
Workstat ion, 5’ x 6’ 140 140
140Grand total 166
CONFErENCE AND PrACtICE ArEA SUPPOrt
rOOM SPACE COUNt HEAD COUNt
Conference
4 person Conference Room 1 4
8 person Conference Room 2 16
14 Person Conference Room 1 14
16 Person Conference Room 1 16
50Grand total 50
Off ice to Workstat ion rat io 15:85Conference Room Seats to Staff 1:3.3
RSF/Person 187 sfUSF 22,689 sfUSF/Person 137 sf
TYPICAL TOWER FLOOR - FINANCIAL SERVICES
31,080 SFTYPICAL TOWER FLOOR - FINANCIAL SERVICES
31,080 SF
5 0
TYPICAL TOWER FLOOR - TECHNOLOGY/MEDIA FIRM
31,080 SF
tECHNOLOGY/MEDIA FIrM - PrACtICE ArEA
rOOM SPACE COUNt HEAD COUNt
Off ice
Off ice, 10’ x 11’ 11 11
11Workstat ion
Workstat ion, Bench 172 172
172
Grand total 183
CONFErENCE AND tEAM MEEtING
rOOM SPACE COUNt HEAD COUNt
Conference
12 person Conference Room 1 12
16 person Conference Room 1 16
28Staff Support
4 Person Team Rm 1 4
5 Person Team Rm 2 10
6 Person Team Rm 2 12
8 Person Team Rm 2 16
3 Person Open Team Area 2 6
5 Person Open Team Area 2 10
12 Person Open Team Area
Grand total
2 2482
110
Off ice to Workstat ion rat io 6:94Conference Room Seats to Staff 1:1.6
RSF/Person 170 sfUSF 22,689 sfUSF/Person 124 sf
H.C.H.C.H.C.
Legend
Conference
Office
Staff Workstation
Team Room
Open Collaboration
General Support
6 PERSONTEAM RM
OFFICE OFFICE
LOCKERS
16 PERSONCONFERENCE
ROOM
RECEPTION
12 PERSONCONFERENCE
ROOM
LOCKERSELEVATOR
LOBBY
STAIR A
WOMENMEN
SERVICEELEVATOR
LOBBY
STAIR B
OFFICE
SUPPORT
OFFICE
IDF8 PERSONTEAM RM
8 PERSONTEAM RMSUPPORT
OFFICE
SUPPORT
OFFICE5 PERSONTEAM RM
5 PERSONTEAM RM
PANTRY
4 PERSONTEAM RM
PHONE RM
OFFICEOFFICE
6 PERSONTEAM RM
(3 PPL) OPENCOLLABORATION
(5 PPL) OPENCOLLABORATION
(12 PPL) OPENCOLLABORATION
(3 PPL) OPENCOLLABORATION
(5 PPL) OPENCOLLABORATION
(12 PPL) OPENCOLLABORATION
2' - 6" 2' - 6"
5' - 6
"
10' - 0"
11' -
7"
PANTRY/COFFEE BAR
PHONE RM
COATS
OFFICE
SUPPORTSUPPORT
OFFICE
COATS
OFFICE
© 2012
8.10.2012Technology/Media Firm180 Maiden Lane, 24th Floor
SL GREEN
Technology/Media Firm - Practice Area - 24th FloorRoom Space Count Head Count
O�ce1111'11 x '01 ,eciffO
11WorkstationWorkstation, Bench 172 172
172381latot dnarG
Conference + Team Meeting - 24th FloorRoom Space Count Seat Count
Conference12 Person Conference Room 1 1216 Person Conference Room 1 16
28Sta� Support
41mR maeT nosreP 4012mR maeT nosreP 5212mR maeT nosreP 6612mR maeT nosreP 8
3 Person Open Team Area 2 65 Person Open Team Area 2 1012 Person Open Team Area 2 24
82011latot dnarG
Office to Workstation Ratio 6:94Conference Room Seats TO Staff 1:1.6
RSF 31,080 sfRSF/Person 170 sfUSF 22,689 sfUSF/Person 124 sf
South S
treet
Pine Street
Maiden LaneFr
ont Stre
et
Legend
Conference
Large Office
Office
Workstation
Floor Support
TYPICAL TOWER FLOOR - TECHNOLOGY / MEDIA FIRM31,080 SF
5 1
OCCUPANCY ANALYSIS PER FLOOR
CURRENT FINANCIAL MEDIA / TECH MIx OCCUPANCY INSTITUTION FIRMS
Executive Floor 56 people 66 people 66 people 66 people(22,459rsf) 400 rsf / person 340 rsf / person 340 rsf / person 340 rsf / person Tower Floors (27) 3,340 people 4,482 people 4,941 people 4,698 people(839,160rsf) 250 rsf/ person 187 rsf / person 169 rsf / person 178 rsf / person Low Rise Floors(10) 1,195 people 1,550 people 1,670 people 1,610 people(298,780rsf) 250 rsf / person 192 rsf / person 178 rsf / person 185 rsf / person
total1,160,399rsf 4,591 people 6,098 people 6,677 people 6,374 people 252 rsf / person 190 rsf / person 173 rsf / person 182 rsf / person
net increase 0 people 1,507 people 2,086 people 1,783 people 25% more efficient 32% more efficient 28% more efficient
5 2
731 lexington
5 3
RESEARCH: WHAT WE DID
UX PARTICIPANTS
• (6) Focus Groups - Designer, Prototyper, Usability Analyst (25 Participants)
R&D PARTICIPANTS
• (4) Focus Groups: Software Eng, Snr Software Eng, Team Lead & Technical Architects (29 Participants)
fOcus GrOuPs
GOALS
• What aspects of the workplace ENABLE high performance currently?
• What aspects of the workplace INHIBIT high performance currently?
leaDershiP interViews
GOALS
• Understand FUTURE vision for collaboration between Ux and R&D
• Discuss opportunities for improvements to future workplace
QuestiOnnaires
GOALS
• Quantify findings from the focus groups• Document work processes• Ensure all stakeholders are represented
UX PARTICIPANTS
• Leadership Focus Group (Manager & Direct Reports)
R&D PARTICIPANTS
• 1-on-1 Interviews (Manager’s Direct Reports)
UX PARTICIPANTS
• 30 Respondents
R&D PARTICIPANTS
• 28 Respondents
5 4
RESEARCH | PORTFOLIO ASSESSMENTSPACE IS A FINITE RESOURCE. SOMETHING’S GOT TO GIVE. HOW CAN THE SUPPORTED OPEN PLAN MODEL BE ACCOMMODATED IN AN ALREADY OVERSUBSCRIBED BUILDING?
• Understand the regional, long term, strategic
real estate plan:
• Departmental growth projections
• Change in organizational structure/
business model
• Ideal departmental adjacencies within and
between building stacks
• Conduct utilization studies to identify
“underutilized” spaces (copy rooms, coat
rooms, lower level, Fl 6)
• Is there an appetite for a more robust work from
home program?
• Is de-densification even an option?
• Understand the regional, long term, strategic
real estate plan:
• Available additional space at Location A and
Location B. Other new regional/ satellite offices?
• Study getting “creative” with space use
• Multi-purpose rooms serve double/ tripple duty
• Co-ed bathrooms (or sink areas)
• Smaller individual desks (stack 27” monitors?)
• Are laptops for all a real possibility? When?
ASSESS THE SUPPLY ASSESS THE DEMAND
Location A Location B
Strategic Workplace Tools:
Short-term Master Plan
Long-term Master Plan
New Workplace Strategy
Mockup/ Case Study Rollout
Best Practices Study
Change Management
Communication Strategy
5 5
RESEARCH | R&D LEADERSHIP INTERVIEWS
100% of r&D leaders agree...
TOP 5 BiGGest challenGes TO WORKPLACE PERFORMANCE
1. sPace shOrtaGe
2. limiteD tOOls
3. riGiD aDjacencies
4. BuilDinG infrastructure
5. nO flexiBilitY
• Not enough meeting rooms, teaming v. focus work
• Need laptops | whiteboard in teaming areas
• Seats can not accommodate changes & adds to teams
• challenging circulation, shortage of restrooms
• People feel they don’t have control over their environment.
PHYSICAL SPACE
wOrKPlace elements mODel
“The Workplace” is comprised of 3 Elements.
Disatisfiers in any Element will hinder overall workplace satisfaction.
PEOPLETECH-
NOLOGY
1. Casual conversations promote team unity
2. Quick interactions at desks
3. Accessibility to all, including managers
4. Quickly find anyone you need
5. Energetic buzz
TOP 5 strenGths TO OPen Plan IN WORKPLACE PERFORMANCE
5 6
RESEARCH | R&D FOCUS GROUPS | SWOT
25% 50% 75% 100% 25% 50% 75% 100%
Open plan collaboration Dispersed teams
Accessibility of all Noise distractions
Knowledge sharing among neighbors Poor move coordination process
Pantries - informal collaboration, snacks R&D sits away from product & support teams
Bright space/ natural light Lack of meeting rooms
Ample desk size Lack of focus space/ no ability to concentrate
No touch-down space/ shared space to work
Poor ergonomics/ adjustability
Sub par elevator recall system
Not enough men's restrooms
Lack of informal team areas
No vacant desks
Little leg room under desks
No storage for boxes/ personal items
Not enough desk space for CTO equipment
"Trading" bench layout ineffective
Rules against personalization/ display
Lack of technology in collaboration spaces
Conference room technology maintenance
Overbooking conference rooms
Whiteboards are not "smart"
Mobile meeting apps need upgrading
Poor remote desktop access
EXISTING WORKPLACE STRENGTHS EXISTING WORKPLACE WEAKNESSEStODaY:
the benefits of the open plan- accessibility, ease of collaboration- result in distractions at the desk.
there is not enough space for supporting amenities to allow people to effectively work away from the desks.
the future:
Provide more & better tools, amenities, and flexibility to allow people to be more agile in their workplace.
Don’t “take away”, give back.
25% 50% 75% 100% 25% 50% 75% 100%
Open plan collaboration Dispersed teams
Accessibility of all Noise distractions
Knowledge sharing among neighbors Poor move coordination process
Pantries - informal collaboration, snacks R&D sits away from product & support teams
Bright space/ natural light Lack of meeting rooms
Ample desk size Lack of focus space/ no ability to concentrate
No touch-down space/ shared space to work
Poor ergonomics/ adjustability
Sub par elevator recall system
Not enough men's restrooms
Lack of informal team areas
No vacant desks
Little leg room under desks
No storage for boxes/ personal items
Not enough desk space for CTO equipment
"Trading" bench layout ineffective
Rules against personalization/ display
Lack of technology in collaboration spaces
Conference room technology maintenance
Overbooking conference rooms
Whiteboards are not "smart"
Mobile meeting apps need upgrading
Poor remote desktop access
EXISTING WORKPLACE STRENGTHS EXISTING WORKPLACE WEAKNESSES
25% 50% 75% 100% 25% 50% 75% 100%
Product and support teams next to R&D Don’t replace 'start up' vibe with 'corporate vibe'
Open lounges with whiteboards & terminals (also used for lunch) Disconnect between floors is hard for cross-floor teaming
Mobile desks on wheels so people can "wheel up to team" Employee turnover if unhappy in work environment
More collaborative desk arrangements (no more benches) Don't put up walls/ keep openness and line of sight
Small team rooms that are unreservable Don't make open plan noise worse with open teaming areas
Quiet space (library, lounge, sections of a floor, focus room) Don't take away assigned desks
Standing height/ adjustable desk options Don't take away meeting space
Provide more conference rooms Keep "destination hubs" like pantries for informal interaction
Non-reservable quiet/ focus spaces studies/ libraries Don't make the floors more dense
Repurpose coat rooms into meeting rooms Poor cirulcation & flow through space/ don't use far away spaces
Variety of collaboration spaces for different needs/ styles Productivity lost due to time spent searching for meeting rooms
"Transparent noise barrier" between teams- break up open plan Productivity lost due to regular interruptions at desk
More whiteboards by desks Don't exclude remote offices
Temporary/ visitor desks Don't take away large monitors
Bar
More desks at perimeter/ maximize light and views
Access to better coffee/ espresso
Gym/ fitness center
Showers for those who ride bikes to work
Unisex bathrooms (or shared sink areas only?)
Upgrade elevator recall system
Laptops with docking stations make moving around easier
Improved access to video conferencing
Communication & display between groups (wall projection)
25-hour Movi wall in pantry connect to other offices real time
FUTURE OPPORTUNITIES FUTURE THREATS
25% 50% 75% 100% 25% 50% 75% 100%
Product and support teams next to R&D Don’t replace 'start up' vibe with 'corporate vibe'
Open lounges with whiteboards & terminals (also used for lunch) Disconnect between floors is hard for cross-floor teaming
Mobile desks on wheels so people can "wheel up to team" Employee turnover if unhappy in work environment
More collaborative desk arrangements (no more benches) Don't put up walls/ keep openness and line of sight
Small team rooms that are unreservable Don't make open plan noise worse with open teaming areas
Quiet space (library, lounge, sections of a floor, focus room) Don't take away assigned desks
Standing height/ adjustable desk options Don't take away meeting space
Provide more conference rooms Keep "destination hubs" like pantries for informal interaction
Non-reservable quiet/ focus spaces studies/ libraries Don't make the floors more dense
Repurpose coat rooms into meeting rooms Poor cirulcation & flow through space/ don't use far away spaces
Variety of collaboration spaces for different needs/ styles Productivity lost due to time spent searching for meeting rooms
"Transparent noise barrier" between teams- break up open plan Productivity lost due to regular interruptions at desk
More whiteboards by desks Don't exclude remote offices
Temporary/ visitor desks Don't take away large monitors
Bar
More desks at perimeter/ maximize light and views
Access to better coffee/ espresso
Gym/ fitness center
Showers for those who ride bikes to work
Unisex bathrooms (or shared sink areas only?)
Upgrade elevator recall system
Laptops with docking stations make moving around easier
Improved access to video conferencing
Communication & display between groups (wall projection)
25-hour Movi wall in pantry connect to other offices real time
FUTURE OPPORTUNITIES FUTURE THREATS
5 7
RESEARCH: WHAT WE FOUND
EXISTING WORKSPACE STRENGTHS
1. Open plan provides good access
2. Knowledge sharing among neighbors
3. Pantries, social interaction and snacks
4. Bright space and natural light
EXISTING WORKSPACE WEAKNESSES
1. Lack of space for focus work
2. Informal teaming space required
3. Meeting rooms are too big
4. More shared whiteboards needed
5. Physically dispersed teams
RESEARCH OBJECTIVES
Validate & Quantify Existing Finding
Present New Insights
executiVe summarY
The main benefit of the open plan-
ease of collaboration- results in
distractions at the desk.
There are not enough supporting
amenities to allow people to
effectively work away from desks.
The solution is The Next Generation
of “Supported Open Plan”, which
addresses each of the existing
workplace weaknesses/ key findings
with a scalable kit of parts.
5 8
DESIGN OPPORTUNITIES | “KIT-OF-PARTS”
COLLABORATION PODSLIDING WHITE
BOARDS
RIGHT-SIZED
CONFERENCE ROOMS
FOCUS ROOMS
The proposed solution to the existing workplace weaknesses is the “supported Open Plan”, which addresses each of the key
findings with a scalable kit of parts. In addition to meeting rooms, we are proposing the following space typologies to add
additional opportunities for:
1. Physically dispersed teams
2. Lack of space for focus work
3. Informal teaming space required
4. Meeting rooms are too big
5. More shared whiteboards needed
a DB c
5 9
DESIGN OPPORTUNITY A | RIGHT SIZED CONFERENCE ROOMS
KEY PLAN
3D PLAN DETAIL PERSPECTIVE VIEW
SUPPORTS KEY FINDINGS
#3. MEETING ROOMS ARE TOO BIGReplaces 8 person room with 2-4 person meeting space and allows for addition of (6) workpoints while supporting user workstyle.
73% of meetings are 4 people or less
54% of meetings are 2 people or less
#4. MORE SHARED WHITEBOARDS NEEDEDProvides writable whiteboard surface for ideation & separation from adjacent desks
SLIDING WHITE BOARD PANELSEXISTING CONDITIONS
6 0
DESIGN OPPORTUNITY B | SLIDING WHITE BOARDS
KEY PLAN
3D PLAN DETAIL PERSPECTIVE VIEW
SUPPORTS KEY FINDINGS
#4. MORE SHARED WHITEBOARDS NEEDEDProvides sliding writable whiteboard surface for ideation & maximizes board area surface
SLIDING WHITE BOARD PANELS
6 1
DESIGN OPPORTUNITY C | nOn-BOOKaBle FOCUS ROOM
KEY PLAN PERSPECTIVE VIEW
SUPPORTS KEY FINDINGS
#1. LACK OF SPACE FOR FOCUS WORKSliding door allows user controlled separation for focused work and 2 person meetings
#2. INFORMAL TEAMING SPACE REQUIREDProvides areas for informal interactions (room can be non-reservable)
#5. PHYSICALLY DISPERSED TEAMSProvides work space for agile collocation of team members
SCENARIO
The UX Manager and a Team Lead work together for a number of hours on a plan for a new product strategy for senior management.
They can focus and collaborate uninterrupted but are still accessible to the rest of the team if necessary.
6 2
DESIGN OPPORTUNITY D | nOn-BOOKaBle SKETCHING ROOM
SUPPORTS KEY FINDINGS
#1. LACK OF SPACE FOR FOCUS WORKRotating acoustical panel allows user controlled separation for focused work and 2-4 person stand-up meetings
#2. INFORMAL TEAMING SPACE REQUIREDProvides areas for ad-hoc interactions
#4. MORE SHARED WHITEBOARDS NEEDEDProvides 2 sided writable whiteboard surface for ideation & separation from adjacent desks
Other:
HI + LOW FIDELITYIncorporates standard Bloomberg terminal for wire framing and viewing of other digital information
PERSPECTIVE VIEWKEY PLAN
3D PLAN DETAIL
6 3
DESIGN CONCEPT | Flexible Collaboration | FLOOR 22
DESIGN INTERVENTIONS
RIGHT-SIZED CONFERENCE ROOMS
SLIDING WHITE BOARDS
FOCUS ROOMS
COLLABORATION PODpivoting collaboration pods with sketching surfaces + terminals
EXISTING CONDITIONS
PROPOSED PLAN
PRINTER
a
B
c
D
PROPOSED
21 (+1)
6 (-6)
4 (+4)
2 (+2)
KeY metricsExISTING
Fixed Desk 20
Meeting Seats 12
Informal Collaboration 0Focus Room Seats 0
f
a
a
cD
B
B
B
BB
6 4
SUPPORTED OPEN PLAN | Workflow Scenario
EXISTING CONDITIONS PROPOSED PLAN
10:05 amThe rest of the team go upstairs to the desk area
10:20am A designer has a question about the Ux standard for Pop Ups. She contacts the standard owner and they go to the collaboration pod to discuss.
11:00am A Ux Designer has a weekly meeting with their TL. As the meeting is just with 2 people, they use the new Right Sized conference room.
13:15pm A Usability Analyst drops by to discuss plans for User Testing with a Ux Designer. They move to the Focus Room so they can collaborate without disrupting those working at their desks.
16:06 pm The Ux Manager and the Visual Design Manager are preparing a management presentation. It wouldn’t be possible to book a room for 2 hours on short notice but now they can collaborate in the Focus Room, whilst still being accessible to their team.
15:36 pm A Visual Designer wants to review her mocks with the Ux Designer. In the Collaboration Pod, they shows mocks on the screen and sketch alternatives on the white board.
6 5
QUESTION | What is our Workplace of the Future? Can we create a distinctly **** workplace?
Can we leverage the mobility of the sales force to test a new workplace model?
SPEC
SALES
CO
PIER
5W5 MILAN
5W4 MADRID
5W2 BERLIN - 24/7
5W3 ZURICH
5W1 LONDON
5W10
5W9
5W8
5W7
5W6
IDF RM
COAT RM
COPY AREA
WOMEN
MEN
SERVICEELEVATOR
ELEVATORLOBBY
MEN
COAT RM
J.C.
COPY RM
STORAGEELECTRICAL
ELEC CL.
HVAC
ELEC.
TELE CL
MECH
STAIRB
STAIRA
STAIRC
ELEC CL
SALES
FISH TANK
FIT API
PRODUCT
FXET
CAMS
CORE
CAM
S
−
−−
−
−
−−
−−
−−
−−
’
−
−
−−
−
−
−−
−
−
−
−
−
−
−
−
−−
−−
−−
−−
−
−
−−
−−
−
−
−
−−
−
−
−
−
−
−−
−
−
−−
−−
−−
−−
’
−
−
−−
−−
−−
−−
−−
−−
−−
−
−
−
−
−
−
−−
−−
−−
−
−
−
−−
−−
−
−
−−
−
−
−
−−
−−
−−
−−
−−
−
−
−
−
−−
−
−
’
−−
−
−
−−
−−
−
−
−−
−−
−
−
−
−
−
−
−−
−−
−−
−
−
−−
−
−
−
−−
−−
−−−
−−−
−
−−
−
−−
−−
−
−−
−
−−
−−
−−
−−−
−−−
−
−−
−−−
−−−
−
−−
−−−
−−
−
−−
−−
−−
−−
−
−
−−
−−
−−
−−
−−−
−−
−
−
−
−−
−
−−−
−
−−
−
−−
−−−
−−
−
−
−−
−−−
−−
−
−−−
−−
−
−
−−
−
−−
−−−
−
−
−
−
−−
−
−
−−
−−−
−
−−
−−−
CORE SALES GROUPSASSET / INDUSTRY
NE SELLSIDE
FOREIGN BANKS
DOMESTIC MAJORS
CAN / MEX
NY/CT HEDGE FUNDS
MID ATL / MID-WEST
NE BUYSIDE
SOUTHEAST
CROSS DISCIPLINE GROUPSAPP SPEC
FIT
PRODUCT
API
FXET
CORE
CAMS
OTHERUNOCCUPIED WP
CONFERENCE
CAUSAL MEETING
5W OCCUPANTS• CORE SALES is a good sample population
because of its inherent mobility
• OTHER OCCUPANT GROUPS support sales
and interact with the nine core sales groups.
APPROACH
• Gather and review qualitative input through a
series of interviews and workshops with focus
groups
• Gather and review quantitative data through
analysis of badge data and current floor plans
• Review findings and co-create aspirational
scenarios for the future
Existing Core Sales plan
6 6
FINDINGS | CURRENT MOBILITY OF 5W GROUPS
5W occupants can be viewed as “residents” and “travelers”.
• Core Sales teams can be viewed as “residents” and “travelers” (based on the location of
their clients); all are expected to visit with clients at least 40% of the time.
• APP SPEC | FIT | FxET groups mirror the Core Sales travel patterns. They are knowledge
leaders and travel in support of core sales staff. They have their own sales goals.
• Other groups, such as PROD have some travel time, but are predominantly residents of 5W.
• For the nine Core Sales Teams, occupancy rarely hits 100% , only a few days per month at
90% capacity.
• Badge data does not tell us the amount of time each occupant spends at their workstation,
or if they come and go throughout the day.
Highest badge-in for core sales over a 5 month period was Monday Jan 9th
with 374 or 93% capacity(avg Monday is 86% capacity).
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th
50
100
150
200
250
300
350
400
AVG 287
322 11 15 348 319 237 248 319 6 10 360 286 258 271 287 10 6 15 333 252 237 287 8 14 362 272 234 232
FEBRUARY 2013 | CORE SALES DAILY BADGE-IN NUMBER
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th
CORE SALES GROUPS
FEBRUARY 2013 | % THAT BADGED IN BY GROUP
CANADA / MEXICO
ASSET / INDUSTRY
DOMESTIC MAJORS
FOREIGN BANKS
MID-ATL / MID-WEST
NORTHEAST BUYSIDE
NORTHEAST SELLSIDE
NY / CT HEDGE FUNDS
SOUTH / CARIBBEAN
“TRAVELERS”
“RESIDENTS”
Lowest badge-in for core sales over a5 month period was Wednesday May 22nd
with 227 or 56% capacity (average mid-week is 65% capacity).
BLP-SALES MOBILITY STUDYT= travelers (badge in @731Lex less than 60% of workdays)R=Residents (badge in @731Lex more than 60% of workdays)based on January-May 2013 badge data
Perkins Eastman 2/2/14
GROUP NAME TEAM NAME SEQ ID
JAN # DAYS OUT
FEB # DAYS OUT
MARCH # DAYS OUT
APRIL # DAYS OUT
MAY # DAYS OUT
TOT # DAYS OUT
TOT #WORK DAYS
# DAYS =40% OUT
# DAYS =30% OUT R / T
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 20 4 8 8 9 2 31 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 122 4 3 3 7 1 18 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 135 1 6 6 4 4 21 104 14 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 217 3 1 1 3 1 9 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 383 10 3 8 4 9 34 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 33 9 4 9 9 7 38 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 60 0 1 4 1 7 13 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 65 6 9 5 9 7 36 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 70 9 7 9 6 12 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 127 6 8 5 14 6 39 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 4 8 12 44 17 13 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 276 3 2 11 5 3 24 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 300 7 7 6 9 10 39 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 361 9 11 9 6 10 45 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 371 8 8 9 9 9 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 401 10 10 10 13 11 54 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 74 2 5 1 0 5 13 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 172 1 0 3 1 5 10 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 175 9 11 9 11 9 49 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 190 7 6 5 9 9 36 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 244 7 11 10 10 9 47 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 308 11 8 8 6 11 44 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 339 8 9 7 15 9 48 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 10 2 4 4 5 5 20 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 81 8 8 7 6 9 38 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 170 5 2 3 4 6 20 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 180 2 6 6 5 1 20 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 227 3 1 0 2 2 8 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 402 5 2 0 3 2 12 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 84 8 12 4 8 11 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 152 0 3 4 4 7 18 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 171 13 8 10 9 11 51 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 177 15 8 8 11 4 46 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 204 11 6 9 8 11 45 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 218 7 6 11 7 8 39 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 223 18 11 21 50 63 25 18 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 229 1 6 11 3 14 35 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 245 2 3 1 3 3 12 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 260 12 9 8 9 5 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 263 6 8 7 10 13 44 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 328 2 7 4 6 8 27 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 357 4 8 10 9 6 37 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 7 7 22 8 6 R
6 7
FINDINGS | CORE SALES TEAM USER TYPE PROFILES
5W occupants can be viewed as “Residents” and “Travelers”, each with distinct workplace profiles and needs.
CLIENT LOCATION
GROUPS
DESK TYPES
DESK ASSIGNMENT
IN-OFFICE PRIMARY
WORKMODE
CRITICAL WORKPLACE
TOOLS*
SEAT RATIO
MEETING AREA
SEAT RATIO
TIME SPENT IN OFFICE
RESIDENT TRAVELER
60% + <60%
1 : 4.5 ratio for conference seats;1 : 7.5 ratio for casual meeting seats
1 : 4.5 ratio for conference seats;1 : 7.5 ratio for casual meeting seats
laptops & Thin Client Technology; Personal storage lockers & mobile file cabinets
laptops & Thin Client Technology;Personal storage lockers & mobile file cabinets
Heads-down work;Scheduled meetings;Informal collaboration
heads-down work, but if given laptops while on the road as recommended, will likely come to the office for collaboration more
Assigned benches for team & group leads;Unassigned for others
Assigned benches for team & group leads;Unassigned for others
1:1 4’w assigned for team & group leads;1:1 4’w unassigned benches for others
1:1 4’w assigned for team & group leads;1:0.6 4’w unassigned benches for others; 1:0.4 4’w unassigned benches for others
4’ wide benches along perimeter zone;3’ wide high touchdown desks available to all
4’ wide benches in interior zone;3’ wide high touchdown desks available to all
Foreign bank, Domesetic Majors, NY/ CT Hedge Funds, NorthEast Sell Side
Asset/ Industry, Canada/ Mexico, NorthEast Buy Side, South/ Carribean, Mid Atlantic/ Midwest, NorthEast Sell Side
NY Metro Area Outside of NYC
PrOtOcOl
• All must visit with clients at
least 40% of the time
• Badge data can categorize
users into Residents
& Travelers based on
number of days each
badges into HQ
• Travelers spend 40%+
days traveling (not
badging into HQ)
• Does not take into account
badging in for short
periods of time & leaving
• Over a period of 104
business days (January
- May 2013), 153/415,
badged in <60% of the
time (full days)
• 218/415 badged in
<70% of the time
6 8
PLANNING GUIDELINES
Develop a workplace solution that promotes the following principles:
NEIGHBORHOOD SCALE
• Plan organized to support team-based groups of 40-50 people (a “Neighborhood”)
• neighborhoods = sales Group
• The sense of ‘coming home’ shifts to neighborhood from individual desk
• Neighborhood consists of resident & traveler desks adjacent to support & amenity
• mobile desks provided for visitor and guest touchdown
VARIOUS WORK MODES
• Each neighborhood has close proximity & visual access to ample shared spaces
- Open collaborative space- idea sharing, learning & team building
- Quiet study spaces- focused individual work
- Dedicated & non-dedicated conference spaces- meeting
- Individual storage- personal needs
• Recommended ratio of 4.5 workpoint seats to 1 conference seat
• Varied height work areas for different modes & preferences
HIGH “BUZZ” LEVEL
• High energy atmosphere stems from organic idea exchange
• Workplace encourages “getting up” for intentional & unintentional information flow
• “Active buzz” spaces zoned separately from “quiet decompression” spaces
• Team leaders shift teammates around for better learning/mentoring
• shared workpoint model results in fewer empty seats on travel days
OPEN COLLAB-ORATIVE
ENCLOSEDCONFERENCE
& QUIET ZONE
NEIGHBORHOOD(TEAM “HOME”)
NEIGHBORHOOD(TEAM “HOME”)
NEIGHBORHOOD(TEAM “HOME”)
NEIGHBORHOOD(TEAM “HOME”)
Resident Workerson Perimeter
Travelerson Interior
Touchdown Desks onInterior, Adjacent to Support & Amenities
High-Energy Separatefrom Quet Zones
Each Neighborhood has Visual Access to Ample Variety
of Shared Spaces
1
2
3
Planning Concept Diagram
6 9
perimeter workstations are retained for resident workers and are shared or “hot desks” for traveling workers
mix of mobile workpoints and benching for varied worktypes along interior promote
movement and activity and help to create and retain “buzz”
work surfaces at varied heights and sizes to accomodate different work styles
reduced number of typ workstation reduces empty seats on travel days
Library | Resource Centerplace for AppSpec to hold
knowledge sessions and a place to meet, work and share knowledge
increased number of conference rooms for dedicated and non-dedicated use
feedback from end users revealed that desks were not viewed as precious- a comforatble place to connect to their phones, computers and team is more important
all end users expressed an interest in learning from their colleagues both
in-group, across the department and across the company - a greater, and
more direct connection to product development was desired
a change of posture throughout the day is desired while being able to still have work continuity PLANNING GUIDELINES
having available meeting spaces for ad hoc and scheduled meetings was the #1 request by end users
Core Sales Teams whether residents or travelers are at clients at least 40% of the time
Team Leaders expressed an interest in moving the members of their team around to promote learning
PLANNING GUIDELINES | FOR PILOT IMPLEMENTATION
seating is organized by neighborhood / group
1
2
3
1
3
2
1
2
3
Neighborhood Scale
Various Work Modes
High Buzz Level
2
confidential client
WORKPLACE STRATEGY Parti
PARTI PLACE-MAKING
OF NATURE
FLEXIBLE
FOSTERCULTURE | WAY OF BEING
MEANINGFULCONNECTIONS
• Highlight what’s natural & genuine• Connect residents with nature • Integrate smart sustainable systems • Be humble- not grandiose nor man made
• Create space that is easily adaptable • Allow users to shape their environment
• Provide secure & robust infrastructure • Foster Way of Being through design• Create highly functional space to meet needs
• Create space for serendipitous connections• Offer opportunities to build meaningful
relationships through work & play• Balance intensity & activity with silence &void• Create scale with neighborhoods
PRINCIPLES
• Harmony with nature & universe• Simple, honest, timeless, integrated into
world• Reality & truth
• Learning from mistakes• Continuously adapt, improve, invent • Self reflection
• Radical transparency & truth• Base decisions on learning from
problems • Independent thinking
• Meaningful work & relationships• 1+1=3• Constantly get in synch• Assertive & open minded• Thoughtful disagreement
Design Parti align the business | cultural objectives of an organization with place-making priniciples that guide all aspects of the project.
WORKPLACE STRATEGY Current Workplace Standards as Benchmark
ASSESSMENT OF MOST RECENT & SUCCESSFUL BUILDOUT VALIDATES THE BEST
PRACTICE KEY METRICS & PLANNING GUIDELINES RECOMMENDED
FOR USE IN FUTURE DESIGNS.
PERKINS EASTMAN 5.19.14
SPACE CATEGORYAREA(USF)
QUANTITY
WORK-POINT
TOTAL AREA (USF)
%
WORKPOINTS (OFFICE / WORKSTATION) 496 41,007 44%PO-A (Leadership Office) 300 0 0 - PO-B (Typical Office) 150 27 27 4,050 SH-O-A (Shared 2-Person Office) 150 47 94 7,050 SH-O-B (Shared 3-Person Office) 150 23 69 3,450 SH-O-C (Shared 4-Person Office) 300 2 8 600 WSA (Typical Desk) 36 298 298 10,728 35% Circulation Factor 13,934 1 13,934 Planning Factor (3%) 1,194 1 1,194 44 Small
114 MediumMEETING (FORMAL / INFORMAL) 13,865 15% 86 LargeFocus/ Phone Room 50 7 350 32 X-LargeSmall Meeting Room (4p) 120 5 600 0 Board RmSmall Meeting Room (6p) 150 4 600 Medium Meeting Room (8p) 240 8 1,920 276 Conf SeatsMedium Meeting Room (10p) 300 5 1,500 Large Meeting Room (12p) 360 6 2,160 Large Meeting Room (14p) 420 1 420 X-Large Meeting Room (16p) 480 2 960 Board Room (30p) 1,000 0 - * vs. workpoints
Informal Meeting Space / Lounge 200 0 - Breakout Space 300 0 - Project Space/ War Room/Ideation 240 1 240 35% Circulation Factor 4,712 1 4,712 Planning Factor (3%) 404 1 404
AMENITY 14,341 15%Business Center/ Client Lounge/ Library 250 4 1,000 Training Room (30 pl) 1,000 0 - Learning Lab/ Boot Camp/Think Tank 1000 1 1,000 Auditorium/ Multi-Purpose Space (60 pl) 2,200 1 2,200 Game/ Activity Room 500 0 - Convenience Pantry 350 1 350 Coffee / Juice Bar (in connectors) 50 0 - Café 650 0 - Warming Kitchen (warming) 700 2 1,400 Dining Room 1,500 2 3,000 Fitness Center (spa,gym,locker rms,studio,Dr.) 6,500 0 - Quiet/ Meditation Room 50 1 50 Reception 500 0 - Wellness (Sick, Mother's) Room 50 1 50 35% Circulation Factor 4,873 1 4,873 Planning Factor (3%) 418 1 418
SUPPORT 24,203 26%Support 7105 1 7,105 Copy/ Print 180 8 1,440 Files/ Printer Stations Throughout 9 107 963 Coat Closets 15 4 60 AV Room 2,548 1 2,548 IDF/MDF Rooms 1,579 2 3,158 35% Circulation Factor 8,224 1 8,224 Planning Factor (3%) 705 1 705
SUBTOTAL PROGRAM NUSF 93,416 100% NOTES:* Does not include core space
TOTAL AVAILABLE NUSF IN BUILDING 93,807 BALANCE 391 - Does not include area in connectors
DRAFT
188 NUSF/ WORKPOINT*
0.6 CONFERENCE SEAT RATIO
20 WESTPORT 2ND FLOOR PROGRAM
EXISTING SPACE REQUIREMENTS KEY METRICS
496 WORKPOINTS
44%
15%
15%
26%
20 WESTPORT PROGRAM SPACE ANALYSIS
0%
5%
23% SH-O60%
26% CLOSED PLAN
2
GlendinningPlanning Space Typology
cOnference
rOOm seats
tO wOrKPOints
nusf/ wOrKPOint wOrKPlace aVeraGe
(128 nusf/ existing workplace workpoint)
.6 188
WORKPLACE STRATEGY
Floor 2NS
05..
14BRIDGEWATER - 20 WESTPORT 2 NSBENCHMARK
SINGLE OFFICE 20 20
20 40
22 66
1 4
70 70
QUANTITY OCCUPANTS
DOUBLE OFFICE
TRIPLE OFFICE
QUAD OFFICEWORK-STATIONS
200TOTAL
136NO. OF CONFERENCE SEATS
0.68
65/35
RATIO OF CONFERENCE SEATS TO PERSONNEL
RATIO OF PERSONNEL IN P.O. V WORKSTATIONS
239 SFNUSF/WP
BOMA NUSF FLOOR: 47,750 SF
NUSF FLOOR WITHOUT TECHNOLOGY: 44,784 SF
418 SF
2,548SF
05..
14BRIDGEWATER - 20 WESTPORT 2 NSBENCHMARK
SINGLE OFFICE 20 20
20 40
22 66
1 4
70 70
QUANTITY OCCUPANTS
DOUBLE OFFICE
TRIPLE OFFICE
QUAD OFFICEWORK-STATIONS
200TOTAL
136NO. OF CONFERENCE SEATS
0.68
65/35
RATIO OF CONFERENCE SEATS TO PERSONNEL
RATIO OF PERSONNEL IN P.O. V WORKSTATIONS
239 SFNUSF/WP
BOMA NUSF FLOOR: 47,750 SF
NUSF FLOOR WITHOUT TECHNOLOGY: 44,784 SF
418 SF
2,548SF
SINGLE OFFICE 7 7
611 SF
550 SF
27 54
1 3
1 4
228 228
296
QUANTITY OCCUPANTS
DOUBLE OFFICE
TRIPLE OFFICE
QUAD OFFICEWORK-STATIONS
TOTAL
145NO. OF CONFERENCE SEATS
0.5
23/77
RATIO OF CONFERENCE SEATS TO PERSONNEL
RATIO OF PERSONNEL IN P.O. V WORKSTATIONS
156 SFNUSF/WP
BOMA NUSF FLOOR: 46,057 SF
NUSF FLOOR WITHOUT TECHNOLOGY: 44,896 SF
05..
14BRIDGEWATER - 20 WESTPORT 2 EBENCHMARK
SINGLE OFFICE 7 7
611 SF
550 SF
27 54
1 3
1 4
228 228
296
QUANTITY OCCUPANTS
DOUBLE OFFICE
TRIPLE OFFICE
QUAD OFFICEWORK-STATIONS
TOTAL
145NO. OF CONFERENCE SEATS
0.5
23/77
RATIO OF CONFERENCE SEATS TO PERSONNEL
RATIO OF PERSONNEL IN P.O. V WORKSTATIONS
156 SFNUSF/WP
BOMA NUSF FLOOR: 46,057 SF
NUSF FLOOR WITHOUT TECHNOLOGY: 44,896 SF
05..
14BRIDGEWATER - 20 WESTPORT 2 EBENCHMARK
Floor 2E
Current Workplace Standards as Benchmark
WORKPLACE STRATEGY
SCENARIO
SCENARIO 2
TrANsForMATIoN
SCENARIO 3
TrANsForMATIoN
For THE FUTUrE
• 3-5 year strategy • Redistribute staff so
Campus A houses Research during Campus B renovation
• Improve client experience and infrastructure
• 10-15 year strategy • Establish Campus A as
a proper Headquarters location
• Provide best practice workplace experience to staff and guests on a more permanent basis
• 15+ year strategy • Expand and occupy
entire Campus A site to accommodate future growth
• Establish Campus A as a HQ site with best practice workplace experience
• Option to add 20K SF Auxiliary space in 500 (including 6K basement space), and a full kitchen
• 984 FTE • (875 in existing leasehold +109 for aux space)• 2 workplace renovation options (complete vs partial)• 2 infrastructure upgrade options (build AV hub and
either upgrade rooms to standard or deviate from standard)
• Renovate 400 Atrium• Add Aux space/ basement in 500, add full kitchen • Add 16K SF new space as amenity hub• 984 FTE
(875 in existing leasehold +109 for Aux space)• Complete workplace floor renovations• Complete infrastructure upgrade (future standard)• Conduct site ugrades, option to reclad buildings
• Renovate 400 Atrium• Add Aux space/ basement in 500, add full kitchen • Add 16K SF new spce as amenity hub• Add 48K SF Building 100 and 84K SF Building 200
(typical workplace floors) and Building 300 Cafeteria• 1,500 FTE • Complete workplace floor renovations• Complete infrastructure upgrade (future standard)• Conduct site ugrades, connect campus, reclad option
100
100
100
NEW
NEW
NEW
SITE/ PLAZA
SITE/ PLAZA
SITE/ PLAZA
200
200
200
300
300
300
400
400
400
500
500
500
SCOPEIN OUT (BW)
OUT (NON-BW)OBJECTIVE DESCRIPTION/ ASSUMPTIONS
1B500 ADD
1A1PartialTech &ArchReno
1A2Full
Tech &ArchReno
SCENARIO 1
IMproVEMENT
1ANO 500 ADD
1B1PartialTech &ArchReno
1B2Full
Tech &ArchReno
Campus Plan Scenarios
WORKPLACE STRATEGY
30%
19%24%
27%
SCENARIO 2 AVERAGE
(both floors)
SCENARIO 2 “TRANSFORMATION”
05.1
9.14
BRIDGEWATER - NYALA FARMS
CAFE
BOOT CAMP
RECRUITING CENTER
SECONDARYRECEPTION (?)
RECEPTION(ATRIUM)
CLIENT EXPERIENCE ZONE
MULTIPURPOSE
URBAN LIVINGROOM
FIRST FLOOR SECOND FLOOR
OUT OF SCOPE - BW SPACE
OUT OF SCOPE - NON-BW SPACE
AMENITY
CONFERENCING
WORKPLACE
SUPPORT
BUILDING CORE
100
BARN* BARN*
200 200
300
400
500
100
300
400
500
CONFERENCE
BUSINESSCENTER
*BARN CONFIGURATION TBD
SUPPORT
KITCHEN
FITNESS
URBAN LIVINGROOM
500 BASEMENT
Master Plan Scenarios: Metrics
WORKPLACE STRATEGY Adjacency Diagrams
RESEARCHANALYTICS
RESEARCHSYSTEMIZATION
RESEARCHCOOP
RESEARCHTECHRESEARCH
IACO
RESEARCHSEC
COREMNGMNT
CM(GD)
CLIENTSERVICESRESEARCH
CLIENTSERVICESEXTERNAL
CLIENT SERVICES MNGMT/
COO
CLIENT SERVICES
REPORTING
CLIENTSERVICES
TECHNOLOGY
ASSTDOPERATIONS/
SUPPORT
CLIENTEXPERIENCE
ZONE
BOOTCAMP
RECRUITINGCENTER
REPRO-GRAPHICS
ROOM
WORKPLACE STRATEGY Departmental Program: Scenario 1A
BUILDING 300 386 SEATS 26% CLOSED 74% OPEN
NYALA FARMSDEPARTMENTAL STACK DIAGRAM PO-A PO-B SH-O* WS-A Total DPT SEATSOPTION 1A 300_2 Research Analytics 0 2 14 88 104 Research 252
300_2 Research Systemization 3 0 18 52 73 Core Mgt 99
300_2 Research COO Pillar 0 0 3 7 10 CS&M 258300_2 Flex Seats 0 1 2 15 18 CM Tech 40
3 3 36 163 206 Asst Ops 41Trading 115Acct Mngt 82
PO-A PO-B SH-O* WS-A Total SUB TOTAL 887300_1 Research Security 0 1 6 1 8 Gen Flex Seats 56300_1 Research Research Tech 0 0 1 46 47 Trdng/AM Flex 111300_1 Research IAC Office 0 0 2 7 9 TOTAL 1054300_1 Core Management - 2 3 41 53 99 ACTUAL FIT 973300_1 Flex Seats 0 1 2 14 17
2 5 52 121 180 GOAL 1042OVER/UNDER 69
BUILDING 400 283 SEATS 25% CLOSED 75% OPEN -69
PO-A PO-B SH-O* WS-A Total NOTES:400_2 CS&M Management/ COO 3 7 3 9 23 Provide 70 non-Trader/ AM "Flex Seats".400_2 CS&M External Pillar 0 12 4 58 75 20% accommodated in focus rooms and400_2 CS&M Reporting Pillar 0 3 1 16 20 other amenity spaces.400_2 CS&M Research Pillar 0 12 4 49 66 80% (56) are office and workstation seats400_2 Flex Seats 0 1 2 14 17
3 36 15 146 200 GOAL = 875 FTE + 56 non-Trading/AM flex seats + 111 Trading/ AM flex seats (existing)
PO-A PO-B SH-O* WS-A Total400_1 CM Tech 0 4 4 32 40400_1 Research 0 0 0 1 1400_1 Miscellaneous 0 1 1 11 14400_1 HR 0 0 0 1 1400_1 Client Services 0 0 0 1 1400_1 Security 0 1 1 5 6400_1 IT 0 0 0 2 3400_1 Facilities 0 2 2 12 15400_1 Flex Seats 0 0 0 2 2
0 8 8 67 83
BUILDING 500 385 SEATS
PO-A PO-B SH-O* WS-A Total500_2 CS&M Technology Pillar 0 9 3 63 75500_2 Flex Seats 0 0 0 2 2500_2 Trading 33500_2 Account Mngmnt 65
500_2 Flex Seats 69244
PO-A PO-B SH-O* WS-A Total500_2 Trading Research Pillar 0 0 0 0 79500_2 Account Mngmnt 17
Core To be Placed 500_2 Research 3Out of Scope Assorted Operations 500_2 Flex Seats 42
Other Tenant CM Tech (from GD) 141
NYALA 300, 400 & 500 1054 SEATS
Seatcount- 2015 (+ 4% Growth)
Bldng_Floor
Department Subgroup Seatcount- 2015 (+ 4% Growth)
Subgroup
BUILDING 300
BUILDING 400
BUILDING 500
Bldng_Floor
Department
Department SubgroupSeatcount- 2015 (+ 4% Growth)
Bldng_Floor
Department Subgroup
DEPARTMENT SUMMARY
2
1
BUILDING 300
BUILDING 400
BUILDING 500
Bldng_Floor
Department SubgroupSeatcount- 2015 (+ 4% Growth)
Bldng_Floor
Department SubgroupSeatcount- 2015 (+ 4% Growth)
Seatcount- 2015 (+ 4% Growth)
Bldng_Floor
CORE MNGMT
PUBLIC AMENITY ZONE
PUBLIC AMENITY ZONE
PUBLIC AMENITY ZONE
RESEARCH TECH
RESEARCH IACO
RESSEC
RESEARCH ANALYTICS
RESEARCH COOP
RESEARCH SYSTEMIZATION
CS&M EXTERNAL
CS&M RESEARCH
CS&M REPORTING
CS&MMNGMT/ COO
PUBLICAMENITYZONE
CS&MTECHNOLOGY
CAFETERIA
FITNESSCENTER
BOOTCAMP
TRADING/ASSET
MANAGEMENT
TRADING/ASSET
MANAGEMENT
KITCHEN/ RECEPTION
RECEPTION/TOWNHALL
RECRUITCENTER
CLIENTEXPER.ZONE
Perkins Eastman D R A F T F O R C O M M E N T 04.24.14
WORKPLACE STRATEGY
THE AGILE OFFICE FOOTPRINT
• Typical office can seat 1-4
• Private office, shared office, or team room
• Technology setup allows for easy change
of room function
• 2-seat layout can be assigned to one
person with a flex seat for guests, team
members of future growth
• Increase density over time
THE AGILE KIT OF PARTS
• Planning module
• Balanced and robust mix of focus and
collaborative areas within view of desk
• When module remains intact, best practice
ratios met
• 8-12 desks for every conference room, (2)
focus spaces, (2) small team zones
• Mirror pods for neighborhoods of 24-48
• Amenities outside of neighborhood serve
larger scale community needs
The Agile Workplace
THE AGILE OFFICE FOOTPRINT
THE AGILE KIT OF PARTS
20 30 40
80 80 80
0
20
40
60
80
100
120
140
Single Office 50/50 Mix Double Office
Total Workpoints for Agile 80/20 Plan With Range of Office Sharing
Workstations Office Seats
7 9
federal reserve bank
8 0
fisG’s chanGe manaGement GOalThe FISG workplace was reinvented to align with a new, more transparent and collaborative, operating environment put in place in response to the Dodd-Frank Act.
The CM goal was to engage the staff in learning to work effectively in this new workplace paradigm.
FEDERAL RESERVE BAN K O F N EW YO RK FISG
CHANGE NETWORK STRUCTURE
Senior Leadership Team
Rep from Pilot Group
Sponsor
Rep fromPilot group
Rep from Pilot group
PilotTeams
PilotTeams
PilotTeams
PilotTeams
LateralCommunication
Top DownCommunication
Bottom UpCommunication
Senior Leadership Team Members moving to pilot floors
Working Committee:Change agents to be identified for each group moving to the pilot floors (target- 12 to 15 people)
REPSONSIBILITIES:Monitoring issues/rumors, informing team members, developing guidelines for technology/workplace usage, advising on packing for move, assisting with questions during move-in
COO
F EDERAL RES ERVE B ANK OF NEW YORK F IS G
MANAGING/S U PPORT ING CH ANGE
DEFINE THE GAPbetween today’s culture/behaviors & tomorrow’s desired culture/ behaviors
CLOSE THE GAPthrough change management actions
MONITOR IMPACTRefine the change management actions to achieve goals
8 1
Timing Activity Description Audience Deliverer Developer/Advisor
Ongoing Intranet Regular updates on all areas of FISG’s Transformation projects to tie transformation efforts to FISG's value proposition‐‐ Description of each work stream: Workspace; People and Culture; One roof Model; BPE/BPI; Risk; Business Innovation (Note: Workspace work stream has dedicated page)‐‐ Blog (Sarah, all Directs, all work stream leaders)‐‐ Ask the Boss (staff questions)‐‐ FISG Idea Generator
All FISG Comms and Intranet team Comms, Project Team, and Perkins Eastman
Ongoing OneFed Online communities created to solicit input, facilitate ongoing discussions, and generally encourage collaboration.
All FISG Varies TBD
May‐June, 2013 FISG Style Focus Groups Gather feedback on the FISG Style framework and refine the framework so that it resonates with staff.Encourage sense of ownership and commitment to culture/behavior change outlined in FISG Style model.
Volunteer participants (18% of FISG staff)
People Culture Team Perkins Eastman
June 17, 2013 FISG Town Hall Introduce Transformation:‐ Context‐ Six work streams‐ Focus on two:1) Workspace ‐ more open, collaborative, no offices2) People & Culture ‐ introduce FISG Style
‐ How staff can get engaged: Intranet presence (Blog, Ask the Boss, FISG’s Idea Generator), Prototype, Pilot Floors.‐ All Functions will have a Function Town Hall within two weeks of the Group Town Hall to reiterate the messages.
All FISG Sarah Dahlgren, Joonho Lee
Comms and Perkins Eastman
June‐Sept, 2013 Function Town Hall Meetings (including Pre‐meeting On‐line Survey and Small Group Work Sessions)
Gather input on where the function is today along the 12 FISG Style continuums and the changes required to reach transformation goals at three levels:‐ Individual‐ Function Management‐ FISG and beyondEmphasize that change begins at the individual level and that we need to work together to achieve the goals
All FISG People Culture team People Culture team and Perkins Eastman
Aug ‐ Sept, 2013 Roundtable discussions Unstructured discussion forums to clarify goals, dispel rumors, and emphasize that FISG leaders are expected to be role models for the culture/behavior change.
Direct reports to SLT (originally requested by Steve Manzari for CFI leaders) and then expanded to broader group
Project team Project team and Perkins Eastman
Sept. 2013 Prototype Open House Encourage staff to visit prototype to see four workspaces, quiet room, and informal collaboraton spaces; share feedback with the project team.
All FISG Comms Project Team
Sept 2013 ‐ Aug 2014 Prototype “test occupants" (experiences and blogging)
Work in the prototype for a week or more to experience the value of the open work environment and uses for the quiet room. Share lessons learned with the project team and blog about the experience for FISG team members to read.
All FISG Project team Project Team and Perkins Eastman
September 23, 2014 FISG Town Hall Update On Transformation: Describe Phase 1 FISG Style ActionsVideo on experiences in the prototypePresent latest version of the design for the pilot floors
All FISG Sarah Dahlgren Comms, Project Team, and Perkins Eastman
Nov, 2013 Pre‐Pilot Survey On‐line survey to capture baseline data All FISG Comms Perkins Eastman
Nov/Dec, 2013 Moving notice for occupants of Floors 22 and 23
Meetings and e‐mail messges to notify staff on Floors 22 and 23 about their new locations and move schedule.
All staff moving from pilot floors Project team Comms
Nov/Dec, 2013 Participation notice for Pilot Floors
Meetings with groups selected for pilot floors All staff to occupy pilot floors Project team Comms
Nov/Dec, 2013 Updates on Pilot Floors E‐mail and web postings about:‐ Update on changes to pilot design (if any) based on prototype testing‐ Pilot construction and move schedule‐ Staff that were selected as pilot participants‐ Details of the moves/re‐stacking – let staff know where staff from 22 and 23 will be moving
All FISG Comms and Intranet team Comms and Intranet team
January 23, 2014 "Groundbreaking" event on Pilot Floors
Celebration of the start of demolition/construction on pilot floors FISG leadership and project team
Project team Project team
January 27, 2014 Town Hall Focus on 2014 as implementation year All FISG Sarah Dahlgren Comms and Project Team
February 3, 2014 Pre‐Pilot Survey Summary of Findings
Review of survey results and recommendations for actions based on findings. Metrics and Project Team Perkins Eastman Perkins Eastman
February, 2014 FISG Style Checkpoint Interview Function and SSO team leaders to discuss the impact of the 1st phase of FISG Style changes. Make recommendations for 2nd Phase of FISG Style actions.
Function and SSO team leaders People Culture Team Perkins Eastman
Feb 2014 ‐ Aug 2014 Construction Updates Email and web updates to communicate that construction is underway and to provide progress updates about pilot floors
All FISG Comms Comms
Spring 2014 Launch Change Network for Pilot Floors
Recruit one representative from each group that will be occupying the two pilot floors to participate in the Change Network, a team that will be responsible for: providing updates to their groups, fielding questions from their groups and getting answers from the project team, keeping the project team informed about rumors and other concerns, developing guidelines about use of the pilot floors, and guiding people through the move process. Plan and conduct orientation meeting for the members of the change network.
Designated Pilot Floor Participants
Project Team Perkins Eastman
Spring 2014 Develop Guidelines for Pilot Floors
Change network members will meet on a regular basis to draft and refine:1. Guidelines for Workplace/Technology Usage on Pilot Floors2. Guidelines for Moving to Pilot Floors3. Guidance for Leaders as Role Models on Pilot Floors
Project Team Change Network Perkins Eastman
June‐July, 2014 Hard‐hat Tours of Pilot Floors for Pilot Floor Occupants Only
Tours led by change network members for their groups; discussion of the guidelines and the move schedule (including packing details).
Designated Pilot Floor Participants
Change Network Perkins Eastman
X days before move date
Packing events Dress‐down days, lunch events, for packing: materials to be moved to the pilot floors, materials for long‐term storage
Designated Pilot Floor Participants
Change Network Perkins Eastman
August, 2014 Move‐in day(s) events Welcome and move‐in events to help people settle in, explore the new environment, and engage in different work habits facilitated by the new workplace and technology on the pilot floors.
Designated Pilot Floor Participants
FISG Leadership and Change Network
Perkins Eastman
August, 2014 Post‐move Workstyle Coaching
Provide guidance to pilot participants regarding optimum use of the workplace and technology.
Designated Pilot Floor Participants
FISG Leadership, Change Network, and Perkins Eastman
FISG Leadership, Change Network, and Perkins Eastman
September, 2014 Tours of Pilot Floors for Non‐Pilot Floor Occupants
Tours led by change network members for FISG staff who did not move to the pilot floors. FISG Non‐ Pilot Floor Participants
Change Network Change Network
September, 2014 FISG Style Year 1 checkpoint Re‐administer on‐line FISG Style survey to determine progress made in closing the gaps on the 12 continuums. Lead work sessions at the Function level to discuss progress and next steps. Reinforce the connection between the culture/behavior changes and the pilot workplace.
All FISG People Culture Team Perkins Eastman
2014 (after pilot floors move‐in)
Pilot Updates Provide regular updates via email and web posts on how the pilot is working: share stories through blogs, desktop videos, etc. about the experience of working on the pilot floors and the changes that have been made as a result of feedback
All FISG Comms Comms and Perkins Eastman
6 months after move‐in
Post‐Pilot Survey Determine the impact of the pilot floor on participants. Compare pilot floor participant responses to non‐pilot.
All FISG People Culture Team People Culture team and Perkins Eastman
fisG’s chanGe manaGement actiVitY matrix & select finDinGs
Timing Activity Description Audience Deliverer Developer/Advisor
Ongoing Intranet Regular updates on all areas of FISG’s Transformation projects to tie transformation efforts to FISG's value proposition‐‐ Description of each work stream: Workspace; People and Culture; One roof Model; BPE/BPI; Risk; Business Innovation (Note: Workspace work stream has dedicated page)‐‐ Blog (Sarah, all Directs, all work stream leaders)‐‐ Ask the Boss (staff questions)‐‐ FISG Idea Generator
All FISG Comms and Intranet team Comms, Project Team, and Perkins Eastman
Ongoing OneFed Online communities created to solicit input, facilitate ongoing discussions, and generally encourage collaboration.
All FISG Varies TBD
May‐June, 2013 FISG Style Focus Groups Gather feedback on the FISG Style framework and refine the framework so that it resonates with staff.Encourage sense of ownership and commitment to culture/behavior change outlined in FISG Style model.
Volunteer participants (18% of FISG staff)
People Culture Team Perkins Eastman
June 17, 2013 FISG Town Hall Introduce Transformation:‐ Context‐ Six work streams‐ Focus on two:1) Workspace ‐ more open, collaborative, no offices2) People & Culture ‐ introduce FISG Style
‐ How staff can get engaged: Intranet presence (Blog, Ask the Boss, FISG’s Idea Generator), Prototype, Pilot Floors.‐ All Functions will have a Function Town Hall within two weeks of the Group Town Hall to reiterate the messages.
All FISG Sarah Dahlgren, Joonho Lee
Comms and Perkins Eastman
June‐Sept, 2013 Function Town Hall Meetings (including Pre‐meeting On‐line Survey and Small Group Work Sessions)
Gather input on where the function is today along the 12 FISG Style continuums and the changes required to reach transformation goals at three levels:‐ Individual‐ Function Management‐ FISG and beyondEmphasize that change begins at the individual level and that we need to work together to achieve the goals
All FISG People Culture team People Culture team and Perkins Eastman
Aug ‐ Sept, 2013 Roundtable discussions Unstructured discussion forums to clarify goals, dispel rumors, and emphasize that FISG leaders are expected to be role models for the culture/behavior change.
Direct reports to SLT (originally requested by Steve Manzari for CFI leaders) and then expanded to broader group
Project team Project team and Perkins Eastman
Sept. 2013 Prototype Open House Encourage staff to visit prototype to see four workspaces, quiet room, and informal collaboraton spaces; share feedback with the project team.
All FISG Comms Project Team
Sept 2013 ‐ Aug 2014 Prototype “test occupants" (experiences and blogging)
Work in the prototype for a week or more to experience the value of the open work environment and uses for the quiet room. Share lessons learned with the project team and blog about the experience for FISG team members to read.
All FISG Project team Project Team and Perkins Eastman
September 23, 2014 FISG Town Hall Update On Transformation: Describe Phase 1 FISG Style ActionsVideo on experiences in the prototypePresent latest version of the design for the pilot floors
All FISG Sarah Dahlgren Comms, Project Team, and Perkins Eastman
Nov, 2013 Pre‐Pilot Survey On‐line survey to capture baseline data All FISG Comms Perkins Eastman
Nov/Dec, 2013 Moving notice for occupants of Floors 22 and 23
Meetings and e‐mail messges to notify staff on Floors 22 and 23 about their new locations and move schedule.
All staff moving from pilot floors Project team Comms
Nov/Dec, 2013 Participation notice for Pilot Floors
Meetings with groups selected for pilot floors All staff to occupy pilot floors Project team Comms
Nov/Dec, 2013 Updates on Pilot Floors E‐mail and web postings about:‐ Update on changes to pilot design (if any) based on prototype testing‐ Pilot construction and move schedule‐ Staff that were selected as pilot participants‐ Details of the moves/re‐stacking – let staff know where staff from 22 and 23 will be moving
All FISG Comms and Intranet team Comms and Intranet team
January 23, 2014 "Groundbreaking" event on Pilot Floors
Celebration of the start of demolition/construction on pilot floors FISG leadership and project team
Project team Project team
January 27, 2014 Town Hall Focus on 2014 as implementation year All FISG Sarah Dahlgren Comms and Project Team
February 3, 2014 Pre‐Pilot Survey Summary of Findings
Review of survey results and recommendations for actions based on findings. Metrics and Project Team Perkins Eastman Perkins Eastman
February, 2014 FISG Style Checkpoint Interview Function and SSO team leaders to discuss the impact of the 1st phase of FISG Style changes. Make recommendations for 2nd Phase of FISG Style actions.
Function and SSO team leaders People Culture Team Perkins Eastman
Feb 2014 ‐ Aug 2014 Construction Updates Email and web updates to communicate that construction is underway and to provide progress updates about pilot floors
All FISG Comms Comms
Spring 2014 Launch Change Network for Pilot Floors
Recruit one representative from each group that will be occupying the two pilot floors to participate in the Change Network, a team that will be responsible for: providing updates to their groups, fielding questions from their groups and getting answers from the project team, keeping the project team informed about rumors and other concerns, developing guidelines about use of the pilot floors, and guiding people through the move process. Plan and conduct orientation meeting for the members of the change network.
Designated Pilot Floor Participants
Project Team Perkins Eastman
Spring 2014 Develop Guidelines for Pilot Floors
Change network members will meet on a regular basis to draft and refine:1. Guidelines for Workplace/Technology Usage on Pilot Floors2. Guidelines for Moving to Pilot Floors3. Guidance for Leaders as Role Models on Pilot Floors
Project Team Change Network Perkins Eastman
June‐July, 2014 Hard‐hat Tours of Pilot Floors for Pilot Floor Occupants Only
Tours led by change network members for their groups; discussion of the guidelines and the move schedule (including packing details).
Designated Pilot Floor Participants
Change Network Perkins Eastman
X days before move date
Packing events Dress‐down days, lunch events, for packing: materials to be moved to the pilot floors, materials for long‐term storage
Designated Pilot Floor Participants
Change Network Perkins Eastman
August, 2014 Move‐in day(s) events Welcome and move‐in events to help people settle in, explore the new environment, and engage in different work habits facilitated by the new workplace and technology on the pilot floors.
Designated Pilot Floor Participants
FISG Leadership and Change Network
Perkins Eastman
August, 2014 Post‐move Workstyle Coaching
Provide guidance to pilot participants regarding optimum use of the workplace and technology.
Designated Pilot Floor Participants
FISG Leadership, Change Network, and Perkins Eastman
FISG Leadership, Change Network, and Perkins Eastman
September, 2014 Tours of Pilot Floors for Non‐Pilot Floor Occupants
Tours led by change network members for FISG staff who did not move to the pilot floors. FISG Non‐ Pilot Floor Participants
Change Network Change Network
September, 2014 FISG Style Year 1 checkpoint Re‐administer on‐line FISG Style survey to determine progress made in closing the gaps on the 12 continuums. Lead work sessions at the Function level to discuss progress and next steps. Reinforce the connection between the culture/behavior changes and the pilot workplace.
All FISG People Culture Team Perkins Eastman
2014 (after pilot floors move‐in)
Pilot Updates Provide regular updates via email and web posts on how the pilot is working: share stories through blogs, desktop videos, etc. about the experience of working on the pilot floors and the changes that have been made as a result of feedback
All FISG Comms Comms and Perkins Eastman
6 months after move‐in
Post‐Pilot Survey Determine the impact of the pilot floor on participants. Compare pilot floor participant responses to non‐pilot.
All FISG People Culture Team People Culture team and Perkins Eastman
FEDERAL RESERVE BAN K O F N EW YO RK FISG
CHANGING HOW TEAM MEMBERS USE THEIR T IME
Shift from solo work to organic collaboration (through insight sharing, stronger sense of community, digital workstyle)
Shift from back-to-back meetings to quick, informal conversations (re-think number of meetings, decision-making style, number of participants)
8 2
fisG’s PilOt flOOr- tOwn hall PresentatiOn
8 3
fisG’s PilOt flOOr- tOwn hall PresentatiOn
8 4
fisG’s PilOt flOOr- tOwn hall PresentatiOn
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
project imagery
8 6
trading
8 7
relOcatiOn case stuDY
StAckiNg pLAN 2.0
FLOORs 62-665 Typical Floors24,982 gsf Each Floor124,910 gsf Total
FLOORs 46-6116 Typical Floors30,775 gsf Each Floor492,400 gsf Total
FLOORs 14-4532 Typical Floors36,571 gsf Each Floor1,170,272 gsf Total
FLOORs 6-94 Typical Floors - Depressed Slab55,914 gsf Each Floor223,656 gsf Total
TOTAL gsF AbOvE2,011,238 gsf
THrEE WOrlD TrADE CEnTEr
MAiN ENTRy LEvEL
66
6261
4645
14
9
6
8 8
FLOOr pLAtE ANALySiS 3.0
TypiCAL 6TH-9TH FLOORs § total Floors
4
§ gross square Footage 55,914 sf per Floor
§ total gross square Footage 4 Floors 223,656 gsf
§ core area: including shafts 13,347 gsf
§ core as a % of gross
7.6%
§ core area: shafts only 9,855 gsf
§ net usable square Footage
42,567 sf per Floor
§ total net usable square Footage 4 Floors 170,272 nusf
§ gross to net usable loss Factor
24%
*Note: Floors 6-9 have a depressed slab to accommodate raised floor.
THrEE WOrlD TrADE CEnTErflOOr Plate analYsis
8 9
flOOr Plate analYsis
TypiCAL 14TH-45TH FLOORs § total Floors
32
§ gross square Footage 36,571 sf per Floor
§ total gross square Footage 32 Floors 1,170,272 gsf
§ core area: including shafts 10,795 gsf
§ core as a % of gross 7%
§ core area: shafts only 7,065 gsf
§ net usable square Footage
25,776 sf per Floor
§ total net usable square Footage 32 Floors 824,832 nusf
§ gross to net usable loss Factor
29.5%
FLOOr pLAtE ANALySiS 3.1THrEE WOrlD TrADE CEnTEr
9 0
9th flOOr traDinG BtESt Fit - 9th FLOOr trAdiNg B 4.1
TRADiNg b: 6-pACk suppORT
Areas § gross 55,914 sf § core 13,347 sf § net usable 42,567 sf
Legend Workspace § private offices 34 § work stations 80 § trading positions 387 § total personnel 501 § net usable per person 84 sf
Conferencing § conference rooms 16 § 20 seats
(5-Person Conferencing) 4 § 30 seats
(6-Person Conferencing) 5 § 16 seats
(8-Person Conferencing) 2 § 40 seats
(10-Person Conferencing) 4 § 28 seats
(28-Person Conferencing) 1 § total conference seats 134 § conference seats to
personnel ratio 0.27 to 1
Amenities § Business centers 4 § it network rooms 2 § large cafe/pantry 1
THrEE WOrlD TrADE CEnTEr
9 1
15th flOOr traDinG tESt Fit - 15th FLOOr trAdiNg 4.2
TRADiNg: MiD RisE
Areas § gross 36,571 sf § core 10,795 sf § net usable 25,776 sf
Legend Workspace § private offices 12 § work stations 12 § trading 232 § reception 1 § total personnel 257 § net usable per person 100 sf
Conferencing § conference rooms 14 § 5 seats
(5-Person Conferencing) 1 § 24 seats
(6-Person Conferencing) 4 § 40 seats
(8-Person Conferencing) 5 § 40 seats
(10-Person Conferencing) 4 § total conference seats 109 § conference seats to
personnel ratio 0.42 to 1
Amenities § Business centers 2 § it network rooms 2 § large cafe/pantry/
Vending 1 § pantry 1
THrEE WOrlD TrADE CEnTEr
9 2
T RA D ING
Aladdin Capital Pasternak, Baum & Company Partner Reinsurance CRT Capital Group
MF Global Strategic Value Partners Sorin Capital Management Noble Americas
NYSE Next Generation Trading TD Securities GE Asset Management UBS
traDinG
9 3
KeY trenDs | TRADInG EnvIRonMEnT DESIGn
BOrDerlessenterPrise
free ranGe technOlOGY
mODularitY + aGilitY
reGulatOrY resPOnse
talent turnOVer
healthY wOrKPlace
9 4
nYse: next GeneratiOn traDinG flOOr
9 5
nYse: DesiGnateD marKet marKers POst DesiGn
9 6
nYse: next GeneratiOn traDinG POsts
9 7
General electric: asset manaGement
9 8
merrill lYnch
9 9
Deutsche BanK | PRoJECT RoDAn
Deutsche Bank: Project Rodan
1 0 0
Deutsche Bank: Project Rodan
Deutsche BanK | PRoJECT RoDAn
1 0 1
Deutsche Bank: Project Rodan
Deutsche BanK | PRoJECT RoDAn
1 0 2
Deutsche Bank: Project Rodan
Deutsche BanK | PRoJECT RoDAn
1 0 3
tD securities
1 0 4
tD securities
1 0 5
Emergency day care center / medical
1 0 6
chilDrens health anD wellness center
1 0 7
chilDrens health anD wellness center
1 0 8
mt sinai schOOl Of meDicine
1 0 9
msK
1 1 0
msK
1 1 1
fitness
1 1 2
General electric
1 1 3
30 lincOln Plaza
1 1 4
amBerlY wellness
1 1 5
food service
1 1 6
aVenues: the wOrlD schOOl
1 1 7
BBc america
1 1 8
BBc america
1 1 9
PePPeriDGe farm
1 2 0
PePPeriDGe farm
1 2 1
cOnfiDential firm
1 2 2
Getco uBs On call
1 2 3
uBs On call
1 2 4
conference center/ auditorium
1 2 5
GetcoDunbar High School
1 2 6
Getco sunY stOnY BrOOK simOns center
1 2 7
Getco uBs On call
1 2 8
Getco mOtt haVen
1 2 9
media production facility
1 3 0
Getco sKY news- lOnDOn , enGlanD
1 3 1
Getco Peninsula - DOha
1 3 2
Getco Peninsula - Kuala lumPa malaYsia
1 3 3
Getco Kaufman astOria stuDiOs, nY
1 3 4
Getco nBc exPerience stOre, new YOrK nY
1 3 5
Getco steiner stuDiO screeninG rOOm, BrOOKlYn nY
1 3 6
Getco steiner stuDiO screeninG rOOm, BrOOKlYn nY
1 3 7
general office
1 3 8
Getco BBc america
1 3 9
Getco BOehrinGer inGleheim Pharmaceuticals
1 4 0
Getco cOnfiDential firm
1 4 1
Getco General electric : enerGY financial serVices
1 4 2
Getco mcGraw hill
1 4 3
Getco cOnfiDential firm
1 4 4
Getco sirius
1 4 5
collaboration zones
1 4 6
Getco cOnfiDential firm
1 4 7
Getco BOehrinGer inGleheim Pharmaceuticals
1 4 8
Getco PePPeriDGe farm
1 4 9
BBc wOrlDwiDe america
1 5 0
BBc wOrlDwiDe americas
1 5 1
data centers
1 5 2
uniteD natiOns
1 5 3
nOrDen ParK
1 5 4
crt caPital GrOuP: Data center
1 5 5
the cerValis Data center
1 5 6
mf GlOBal Data center
1 5 7
state Of cOnnecticut: new Data center
1 5 8
1. INTRODUCTION
2. CITI DISCOVERY
3. THE CITI CITY
4. PROJECT DELIVERY L
5. CASE STUDIES
6. PROJECT IMAGERY
7. WHY US?
why us?
1 5 9
WHY US?
• GLOBAL
• DEEP BENCH / RESOURCES
• RELEVANT EXPERIENCE
• GOOD LISTENERS
• CULTURE OF URGENCY
• ENTHUSIASM
• BREDTH OF PRACTICE AREA EXPERTISE
• FOCUS ON INTEGRATED USER EXPERIECE
1 6 0
Thank you