PC-1 Form Production Sectors

Embed Size (px)

Citation preview

  • 8/2/2019 PC-1 Form Production Sectors

    1/19

    Revised 2005

    GOVERNMENT OF PAKISTANPLANNING COMMISSION

    PC-1 FORM

    (PRODUCTION SECTORS)

    1. Name of the project:

    2. Location of the projectwith name of the district/

    province

    Attach a map of the area, clearly indicating the project location

    3. Authorities responsible for:

    Indicate name of the agency responsible for sponsoring, execution, operationand maintenance. For provincial projects, name of the concerned federal

    ministry be provided

  • 8/2/2019 PC-1 Form Production Sectors

    2/19

    Medium Term Development

    Framework

    (MTDF) (2005-10)

    FATA Sustainable Development

    Plan (2006-15).

    If not included in the current

    plan, then what warrants its

    inclusion and how is it now

    proposed to be accommodated?

    If the project is proposed to be financed out of block provision, indicate:

    Rs. In Million

    Total block provisionAmount already

    committed

    Amount proposed for

    this projectBalance available

  • 8/2/2019 PC-1 Form Production Sectors

    3/19

    Description

    Existing facilities

    Justification

  • 8/2/2019 PC-1 Form Production Sectors

    4/19

    Details of other physical facilities

    required for the project

    Indicate governance issues of the sector relevant to the project and strategy toresolve them.

    Details of governance issues of the

    sector relevant to the project

    Elaborate strategy to resolve them.

    In addition to above the following sector specific information be provided.

    Agriculture Production

    For fisheries projects: Give area for fishing and the legal rights to that area; theavailability of trawlers; amount and type of fish likely to be available.

    Give area for fishing

    El b t l l i ht t th t

  • 8/2/2019 PC-1 Form Production Sectors

    5/19

    Rotation and anticipated

    rotation

    Volume yield (In metric Tons)

    Availability of access roads

    Saw mills

    Any Other facility in the area.

    For livestock projects: Give the livestock situation of the country and mention anyproblems connected therewith. Present and future herd size, their species age

    characteristics and production capacity.

    Livestock situation of FATA

    Problems connected with

    Livestock

    Present herd size

    Future herd size

    Their species age characteristics

    production capacity

  • 8/2/2019 PC-1 Form Production Sectors

    6/19

    The basis for calculation of the future output

    basis for calculation of the future

    outputFuture Output

    For all agriculture production sector projects, provide (i) transport, equipment &

    field machinery available with the department (ii) effect on farm income and basisfor pricing of outputs (iii) farm gate and international prices.

    Transport, Equipment and Field

    Machinery

    Its effect on farm income

    Basis for pricing of outputs

    Farm gate and international prices.

    Farm income will increase as per the following table:

    Yield (Kg/ha) in project area

    Major Crop Present Future

  • 8/2/2019 PC-1 Form Production Sectors

    7/19

    Industry, Commerce and Minerals

    Provide installed capacity, proposed expansion and available technologies, theselected technology and reason for its selection.

    Installed capacity of the Unit

    Proposed expansion in the capacity

    Details of available technologies

    The selected technology

    Reason for its selection.

    Whether the output is meant for (i) import substitution (ii) meeting domesticdemand or (iii) export oriented.

    Whether the output is meant for

    import substitution

    Whether the output is meeting the

    domestic demand

    Wh th th t t i t

  • 8/2/2019 PC-1 Form Production Sectors

    8/19

    Basis of determining the capital cost

    be provided. It includes market

    survey, schedule rates, estimation onthe basis of previous work done etc.

    Provide year-wise estimation of physical activities as per following:

    Year-wise / Component-wise physical activities

    Components Unit Year-1 Year-2 Year-3 TotalY1

    Y2

    Y3

    Y4

    Y5

    Y6

    Total

    Year-wise / Component-wise financial phasing (Rs. In Million)

    Year-wise / Component-wise Financial Phasing

    ItemYear-1 Year-2 Year-3 Total

    Total Local FEC Total Local FEC Total Local FEC Total Local FEC

    Y1

  • 8/2/2019 PC-1 Form Production Sectors

    9/19

    In Million1 Y1

    2 Y23 Y3

    Year-wise actual expenditure incurred on the project.

    S.No. YearActual expenditure incurred on theproject Rs. In Million

    1 Y1

    2 Y2

    3 Y3

    Item-wise, year-wise actual expenditure and Physical progress.

    S.No.

    Items(As per PC-I)

    Actual expenditure (Rs.Million)

    Physical progress

    Year-1 Year-2

    Year-3

    Year-1 Year-2 Year-3

    1

  • 8/2/2019 PC-1 Form Production Sectors

    10/19

    Indicate exchange rate used to work out FEC in the original and revised PC-I.

    S.

    No.

    Exchange rate used

    to work out FEC in

    the original PC-I.

    Exchange rate used to work out FEC in

    the revised PC-I.

    8. Annual operating and maintenance cost after completion of the project:

    Item-wise annual operating cost based on proposed capacity utilization for 5 years..

    Item-wise annual operating cost based on proposed capacity utilization for 5 years (Million PKR)

    Description Year-1 Year-2 Year-3 Year-4 Year-5

    Total

  • 8/2/2019 PC-1 Form Production Sectors

    11/19

    Year-1

    Year-2

    Year-3Year-4

    Year-5

    Projected demand/supply for 10 years.

    Year Demand Supply

    Year-1

    Year-2

    Year-3

    Year-4

    Year-5

    Year-6

    Year-7

    Year-8

    Year-9

    Year-10

    Proposed year-wise production and unit price of the product.

    Y P d i U i P i

  • 8/2/2019 PC-1 Form Production Sectors

    12/19

    (a) Equity:

    1 Sponsors own resources2 Federal government

    3 Provincial government

    4 DFIs/banks

    5 General public

    6 Foreign equity (indicate partner agency)

    7 NGOs/ beneficiaries

    8 Others

    Total

    b) Debt

    Indicate the local and foreign debt, interest rate, grace period, and repayment

    period for each loan separately. The loan repayment schedule is also annexed.

    c) Grants along with source

    d) Weighted cost of capital

  • 8/2/2019 PC-1 Form Production Sectors

    13/19

    Financial analysis:

    Quantifiable output of the project

    S.No.

    Item Details

    1 Building

    2 Equipment3. Machinery

    4 Trained Manpower

    Profit and loss account and cash flow statement

    (Rupees In Million)

    D. Cash flow Statement

    YearsCapital

    costO&M cost Total cost

    Total

    production

    Total

    revenue

    Net

    revenue

    Year-1

    Year-2

  • 8/2/2019 PC-1 Form Production Sectors

    14/19

    Internal financial rate of return (IFRR):

    Unit cost analysis

    S.No.

    Item Details

    1 Building Rs.------- per S.ft

    2 EquipmentRs.------- (Cost per uni)t

    3. Machinery Rs.------- (Cost per uni)t

    4 Trained Manpower Rs. -------- (Cost per person)

    Break even Point (BEP)

    S.No.

    Description Details

    1 Cost Rs.------- million

    2 Benefits Rs.------- million

    3. IRR 12%

    4 NPV at 12% 0

  • 8/2/2019 PC-1 Form Production Sectors

    15/19

    S.No.

    Description Details

    1 Discounted Cost Rs.------- million2 Discounted Benefits Rs.------- million

    3. NPV Rs.------- million

    4 BCR

    Internal economic rate of return (IERR)

    S.No.

    Description Details

    1 Discounted Cost Rs.------- million

    2 Discounted Benefits Rs.------- million

    3. IERR

    Foreign exchange rate of the project (Bruno's Ratio) for import substitute and exportoriented projects

    S.No.

    Description Details

    1 Foreign Exchange

  • 8/2/2019 PC-1 Form Production Sectors

    16/19

    Unskilled

    Total

    Details are appended.

    Sensitivity Analysis

    Impact of delays on project cost and viability

    S.No.

    Impact of Delays oDescription

    Details

    1 On project cost

    2 On viability of theProject

    12. a) Implementation schedule

    Indicated starting and completion date of the project

    Item-wise/year-wise implementation schedule in line chart correlated withthe phasing of physical activities.

    Item-wise/year-wise implementation schedule

  • 8/2/2019 PC-1 Form Production Sectors

    17/19

    13. Management structure manpower requirements including specialized skills during

    construction and operational phases:

    Administrative arrangements for implementation of project.

    The manpower requirements by skills during execution and operation of the project tobe provided.

    The job description, qualification, experience, age and salary of each post to beprovided.

    During execution

    Designation Qualification,Experience Age in Years Daily Salary in

    RupeesJob description

    During operation

    Designation Qualification,Experience Age in Years Monthly Salary in

    Job description

  • 8/2/2019 PC-1 Form Production Sectors

    18/19

    Prepared By:Name

    Designation, Phone No.

    & Date

    Checked By:

    Name

    Designation, Phone No.

    & Date

    Recommended By:

    Name

    Designation, Phone No.

    & Date

    Forwarded by for Consideration of Competent Forum.

    Name

    Designation, Phone No.

    & Date

  • 8/2/2019 PC-1 Form Production Sectors

    19/19

    19