Upload
others
View
9
Download
0
Embed Size (px)
Citation preview
Pavement Design Report US 27 – 1.59 Miles South of SR 67 to 1.00 Miles North of SR 67
Jay County Des. No. 1700811
May 23, 2019
Prepared For:
Indiana Department of Transportation 100 N. Senate Avenue Indianapolis, IN 46204
Prepared By:
Parsons 101 W. Ohio Street
Suite 2121 Indianapolis, IN 46204
Designed By: Checked By: ___________________ Matt Taylor, PE Tim Kent, PE
2
US 27 Pavement Preventive Maintenance Des # 1700811 Jay County
TABLE OF CONTENTS
Executive Summary ........................................................................................................................................................................... 3
Project Information ............................................................................................................................................................................ 4
DESIGN CRITERIA ........................................................................................................................................................... 4
Pavement History and Condition ...................................................................................................................................................... 4
HISTORY.......................................................................................................................................................................... 4
EXISTING PAVEMENT CONDITION ................................................................................................................................. 5
FWD DATA ....................................................................................................................................................................... 5
EXISTING IRI AND RUT DATA .......................................................................................................................................... 5
GEOTECHNICAL EVALUATION ........................................................................................................................................ 6
EXISTING DRAINAGE CONDITIONS ................................................................................................................................ 6
BINDER SELECTION ....................................................................................................................................................... 6
PAVEMENT ME INPUT VALUES ...................................................................................................................................... 7
Recommendations ............................................................................................................................................................................ 7
PATCHING ....................................................................................................................................................................... 7
PREVENTIVE MAINTENANCE ......................................................................................................................................... 8
Construction Considerations ............................................................................................................................................................. 8
Maintenance Considerations ............................................................................................................................................................ 8
3
US 27 Pavement Preventive Maintenance Des # 1700811 Jay County
Executive Summary
Detailed in this report is the proposed pavement design for US 27. Refer to the Pavement History and Condition
section of this report for a detailed description of the project conditions. The proposed pavement design is as follows:
PATCHING:
Full Depth HMA Patching for US 27:
Saw cut existing pavement and remove, then
HMA Patching, Type D consisting of:
440 #/SYS QC/QA-HMA, 4, 70, Intermediate, 19.0 mm Type D on
1100 #/SYS Average (Match Existing Pavement Thickness) QC/QA-HMA, 4, 64, Base, 25.0 mm Type D on
Subgrade Treatment Modified Type IC, as necessary (9 inches of #53 aggregate on 3 inches of #5 or #2
aggregate)
Partial Depth HMA Patching for US 27:
Milling, Asphalt, 4.0”, then
HMA Patching, Type D consisting of:
440 #/SYS QC/QA-HMA, 4, 70, Intermediate, 19.0 mm Type D on
Existing Pavement
PREVENTIVE MAINTENANCE:
US 27 Mainline and Shoulders 4’ or less wide:
Milling, Asphalt, 1.5” then
165 #/SYS QC/QA-HMA, 4, 70, Surface, 9.5 mm on
Existing Pavement
US 27 Shoulders wider than 4’ and On Street Parking Area:
Milling, Asphalt, 1.5” then
165 #/SYS QC/QA-HMA, 2, 64, Surface, 9.5 mm on
Existing Pavement
The Pavement Patching Table depicts the anticipated locations of patching. Refer to IDM Figure 304-21CC and for a
patching detail. The project designer shall incorporate the patching detail into the construction plans.
4
US 27 Pavement Preventive Maintenance Des # 1700811 Jay County
Project Information
Route Number: US 27
County: Jay
Des No.: 1700811
RFC Date: 02/05/2020
Project Cost: $1,456,000
Route Functional Classification: Principal Arterial
Total Project Length: 2.59 mi.
Net Project Length: 2.55 mi.
Project Location: US 27 from 1.59 Miles South of SR 67 to 1.00 Miles North of SR 67
DESIGN CRITERIA
The pavement design criteria for this project were established based on the Indiana Design Manual (IDM). Table 1
depicts the design criteria that were utilized throughout the project. Traffic data was provided for various sections of
the project. For conservatism, the “worst-case” traffic data was used for the entire length of the project.
Table 1: Design Criteria
Functional Classification Urban Arterial
Operational Speed (mph) 30-55 (30 for ME)
Construction Year 2020
Design Year 2029
AADT (2020) 9,753
Growth Rate 0%
% Trucks 22.3%
Trucks – AADTT (2020) 2,175
Number of Travel Lanes 2-4
Travel Lane Width (ft) 12
Minimum Required Design Life 9 years (single-lift HMA over AC)
*8 years (single-lift HMA over
PCCP Preventative Maintenance)
Surface Area of New Pavement 62,496 SYS
Life Cycle Cost Analysis Completed
*Used 9 years to match HMA over AC
Pavement History and Condition
HISTORY
The original construction date of this pavement is unknown. Existing plans from 1933 indicate HMA on concrete on
brick. The pavement has been repaired several times since its original construction, most recently with an HMA
overlay project and preventive maintenance project in 2012. The existing pavement surface is now entirely asphalt.
Most of the existing pavement is full depth asphalt, though some is composite. About 40% of the pavement cores
were composite. The composite pavement includes both asphalt on concrete and asphalt on brick. Separate
Pavement ME analyses were performed with all three different existing sections.
5
US 27 Pavement Preventive Maintenance Des # 1700811 Jay County
EXISTING PAVEMENT CONDITION
The existing pavement condition is as follows:
Existing Pavement Type: Full-depth HMA, HMA on PCC, HMA on Brick
Overall Thickness: 16”
Travel Lanes: 2-4 at 11-12' Width
Turn Lanes: 12’ wide turn lanes at various points throughout the project limits
Existing Shoulder: 2-10’, or curb and gutter
Posted Speed Limit: 30-55 mph
Number of Stop Conditions: 7 (signalized intersections)
The roadway appears to be in good structural condition. Some of the noted distresses are low-severity and surficial
in nature, but many are moderate- to high-severity and will require structural repairs. Distresses include longitudinal
cracking, deterioration at existing manholes, age cracking, fatigue cracking, rutting.
FWD DATA
An FWD analyses was performed in October 2018. Table 2 summarizes the results of the FWD testing. The average
modulus of resilience of the asphalt pavement obtained from FWD testing was rounded and input into the Pavement
ME analysis for the existing concrete and brick layers of the composite sections. Other results of the FWD testing
were used for reference only and were not directly input into Pavement ME. Generally, the pavement performed
within the acceptable thresholds for FWD. However, surface deflections were markedly higher south of State Route
67 than they were to the north. South of State Route 67, surface deflections exceed the acceptable threshold at
several points. Subgrade deflections were generally acceptable for the entire project length. Refer to Appendix B for
the full FWD results.
Table 2: Falling Weight Deflectometer Testing Results
Northbound Southbound
Elastic Modulus of Asphalt
(psi)
431,292 454,129
Structural Number 4.78 4.46
Modulus of Resilience of
Subgrade Soil (psi)
7,636 7.025
CBR of Subgrade Soil (%) 4.96 4.64
EXISTING IRI AND RUT DATA
Existing IRI and Rut data is summarized in Table 3 below:
Table 3: IRI and Rut Information
IRI Rut Depth
Minimum 47 0.05
Maximum 269 0.19
Average 123
0.08
Std Dev 55 0.03
6
US 27 Pavement Preventive Maintenance Des # 1700811 Jay County
GEOTECHNICAL EVALUATION
Table 4 depicts the existing soil conditions and recommended values for use in analysis.
Table 4: Geotechnical information
Natural Subgrade (critical used
unless otherwise noted)
A-6
Resilient Modulus of Natural
Subgrade
4,500 psi
Resilient Modulus of Treated
Subgrade
9,000 psi
Subgrade Treatment Type Modified IC (9 inches of #53 Aggregate on
3 inches of #5 or #2 Aggregate)
Depth to Water Table > 6.0 ft (6 ft used for Pavement ME)
Percent Passing #200 Sieve 61.1
Percent Silt 38.7
Liquid Limit 33.7
Plasticity Index 16.2
Natural Density of Natural Subgrade 129
Percent Moisture of Natural Subgrade 19.1
EXISTING DRAINAGE CONDITIONS
Roadside drainage is conveyed via curb cuts, open storm drains, and closed storm sewer systems. The storm sewer
inlets are generally in good condition and appear to be well-maintained. However, several of the curb cuts are
damaged and have weeds growing along the curb line, potentially inhibiting drainage at these locations. In general,
water appears to be adequately draining from the pavement structure but is ponding in several locations along the
gutters and crossroad apron joints. This is likely due to deep, wide distresses at the apron joints and possible
distresses along the gutters. About 160 feet at the south end of the project have open ditches in lieu of curb and
gutter. The open ditches are in good condition and appear to be well maintained. The adjacent land use is primarily
urban and heavily built-up, with numerous homes and businesses throughout the project length.
Methodology & Computations
The proposed pavement design was analyzed using AASHTO's Pavement ME software for adherence to the
performance criteria stated in Chapter 304 of the Indiana Design Manual. The sections of roadway adjacent to this
project consist of HMA pavement.
BINDER SELECTION
The proposed binder was selected using LTPPBind software which predicted that PG70-28 was appropriate for the
surface and intermediate layers. The recommended binder is PG70-22, in compliance with INDOT policies.
Utilizing the traffic data above and IDM Figure 304-15A, ESAL category 4 is required.
See Appendix E for the full LTPPBind Output.
7
US 27 Pavement Preventive Maintenance Des # 1700811 Jay County
PAVEMENT ME INPUT VALUES
Table 5 illustrates the input values used for this project that differ from standard or values recommended in the
INDOT provided data, the default or given data is shown in italics.
Table 5: Pavement ME Inputs
Input Parameter Value Used Reference
Existing Construction 1967 Assumed; original construction
year unknown
Existing Pavement Section – HMA on
PCC
12” HMA on 7” Crushed Stone PCC modeled as crushed stone;
Based on pavement cores
Existing Pavement Section – HMA on
Brick
7” HMA on 4” Crushed Stone Brick modeled as crushed stone;
Based on pavement cores
Recommendations
PATCHING
Full depth HMA patching for asphalt sections shall consist of:
Saw cut existing pavement and remove, then
HMA Patching, Type D consisting of:
440 #/SYS QC/QA-HMA, 4, 70, Intermediate, 19.0 mm Type D on
1100 #/SYS Average (Match Existing Pavement Thickness) QC/QA-HMA, 4, 64, Base, 25.0 mm Type D on
Subgrade Treatment Modified Type IC, as necessary (9 inches of #53 aggregate on 3 inches of #5 or #2
aggregate)
4-inch partial depth HMA patching, where required, shall consist of:
Milling, Asphalt, 4.0”, then
HMA Patching, Type D consisting of:
440 #/SYS QC/QA-HMA, 4, 70, Intermediate, 19.0 mm Type D on
Existing Pavement
The Pavement Patching Table depicts the anticipated locations of patching. Refer to IDM Figure 304-21CC for a
patching detail. The project designer shall incorporate patching details into the construction plans.
Modified Subgrade Treatment Type IC shall be in accordance with 207.04 except that the subgrade treatment shall
consist of 9.0 inches of coarse aggregate No. 53 over 3.0 inches of coarse aggregate No.5. or No.2 with a Geotextile
Type 2A in accordance with ISS 918.02(c) Type 2A placed at the bottom of the aggregate. Air-cooled blast furnace
slag shall not be used.
8
US 27 Pavement Preventive Maintenance Des # 1700811 Jay County
PREVENTIVE MAINTENANCE
US 27 Mainline and Shoulders 4’ or less wide: Milling, Asphalt, 1.5” then 165 #/SYS QC/QA-HMA, 4, 70, Surface, 9.5 mm on Existing Pavement US 27 Shoulders wider than 4’ and On Street Parking Area:
Milling, Asphalt, 1.5” then 165 #/SYS QC/QA-HMA, 2, 64, Surface, 9.5 mm on Existing Pavement Pavement ME Analysis Based Life: 25 years Functional (IRI), >50 years Structural (Rutting)
Practical Engineering Based Life: 15 years Functional (IRI), 50 years Structural (Rutting)
Estimated Construct Cost: $1,062,755 Cost of Ownership: Cost/Lane-Mile/Year (over service life) = $23,623/ln-mi/yr
See maintenance considerations for schedule of activities that are particular to this project.
Construction Considerations
Joint Adhesive shall be applied per standard specification 401.15. A 24-inch wide liquid asphalt sealant
shall be placed centered on all longitudinal joints that have joint adhesive installed as per standard specification 401.15.
After milling the existing pavement surface any visible crack which is ¼” wide or wider shall be sealed before the tack coat is applied. The material used to fill the crack shall be PG64-22, no emulsion shall be used. The sealed cracks should not be overbanded.
Existing traffic signal loops, that are disturbed by milling, shall be replaced, prior to completion of the project.
Existing storm sewer structures, within the pavement area, shall be adjusted to the final grade of the pavement, as necessary.
Maintenance Considerations
The US 27 pavement section has a functional life expectancy of 9 years. This life expectancy depends on the following preventive maintenance schedule:
Joint/Crack Seal, at Years 3, 25% Longitudinal Joint Seal, inspect and clean storm drains Joint/Crack Seal, at Year 6, 50% Longitudinal Joint Seal, inspect and clean storm drains Preventive Maintenance expected at around Year 9, inspect and clean storm drains
Pt. ID RP Lane Station Alignment WIDTH LENGTH AREA (SYS) DEPTH WIDTH LENGTH AREA (SYS) DEPTH SB NB
BEGIN 1+10
M0080 Driving 19+11 A 4 10 4 Left Wheel Path
M0067 Driving 20+53 A 4 111 49 4 10.9 Begin 4' Wide Patch, Left Wheel Path (to M0068)
M0068 Driving 21+64 A 4 4 End 4' Wide Patch, Left Wheel Path (from M0067)
M0069 Driving 22+05 A 4 60 27 4 5.9 Begin 4' Wide Patch, Left Wheel Path (to M0070)
M0070 Driving 22+65 A 4 4 End 4' Wide Patch, Left Wheel Path (from M0069)
M0071 Driving 22+85 A 4 132 59 4 12.9 Begin 4' Wide Patch, Left Wheel Path (to M0073)
M0073 Driving 24+17 A 4 4 End 4' Wide Patch, Left Wheel Path (from M0071)
M0075 Driving 24+17 A 4 51 4 Begin 4' Wide Patch, Right Wheel Path (to M0076)
M0076 Driving 24+68 A 4 4 End 4' Wide Patch, Right Wheel Path (from M0075)
M0113 Driving 52+21 A 4 31 4 Begin 4' Wide Patch, Left Joint (to M0112)
M0112 Driving 52+51 A 4 4 End 4' Wide Patch, Left Joint (from M0113)
M0010 Driving 88+75 A 4 81 36 4 7.9 Begin 4' Wide Patch, Left Joint (to M0011)
M0011 Driving 89+56 A 4 4 End 4' Wide Patch, Left Joint (from M0010)
M0089 Driving 91+99 A 4 60 4 Begin 4' Wide Patch, Left Joint (to M0090)
M0090 Driving 92+59 A 4 4 End 4' Wide Patch, Left Joint (from M0089)
M0091 Driving 92+90 A 4 15 4 Left Joint
M0092 Driving 93+00 A 4 384 4 Begin 4' Wide Patch, Left Joint (to M0093)
M0093 Driving 96+84 A 4 4 End 4' Wide Patch, Left Joint (from M0092)
VIRB0099 Driving 105+15 A 4 20 9 4 2.0 Joint at Approach Apron
M0017 Driving 111+53 A 4 70 31 4 6.8 Begin 4' Wide Patch, Left Joint (to M0018)
VIRB0098 Driving 111+70 A 4 20 9 4 2.0 Joint at Approach Apron
M0018 Driving 112+23 A 4 4 End 4' Wide Patch, Left Joint (from M0017)
VIRB0097 Driving 117+32 A 6 10 7 4 1.5 Left Wheel Path
VIRB0096 Driving 127+86 A2 4 20 9 4 2.0 Right Wheel Path
M0019 Driving 129+44 A2 6 91 61 4 13.4 Begin 6' Wide Patch, Right Wheel Path (to M0020)
M0020 Driving 130+35 A2 6 4 End 6' Patch, Right Wheel Path (from M0019)
M0022 Driving/Right Turn 133+38 A2 4 152 68 4 14.9 Begin 4' Wide Patch, Joint (to M0023)
M0023 Driving/Right Turn 134+90 A2 4 4 End 4' Wide Patch, Joint (from M0022)
VIRB0093 Driving 138+26 A2 4 64 28 4 6.3 Joint at Approach Apron
END 138+88
SUBTOTAL 197 196 43 43
UNDISTRIBUTED AMOUNT 20% 39 39 9 9
TOTAL PARTIAL DEPTH HMA PATCHING (TONS) 236 104
PAVEMENT PATCHING TABLE - PARTIAL DEPTHUS 27 - Des. No. 1700811
FROM 1.59 MILES SOUTH OF SR 67 TO 1.00 MILES NORTH OF SR 67
Partial Depth
RP 63.48 to 66.06
Location Quantity (Tons)
Notes
SB Lanes NB Lanes
HMA Depth (in) QuantityPt. ID RP Lane Station Alignment WIDTH LENGTH WIDTH LENGTH SB NB TONS
BEGIN 1+10
M0116 Driving 15+87 A 6 10 7 16 5.9 Right Wheel Path
M0115 Driving 15+97 A 6 20 13 16 11.7 Left Wheel Path
M0114 Driving 16+28 A 6 12 8 16 7.0 Left Wheel Path
VIRB0068 Driving 16+53 A 12 20 27 16 23.5
VIRB0069 Driving 18+17 A 12 20 27 16 23.5
M0079 Driving 19+41 A 14 16 25 16 21.9
VIRB0070 Driving 19+93 A 12 6 8 16 7.0
M0065 Driving 20+23 A 14 16 25 16 21.9
M0066 Driving 20+43 A 6 10 7 16 5.9 Left Wheel Path
M0072 Driving 23+46 A 6 6 4 16 3.5 Right Wheel Path
M0074 Driving 24+17 A 14 6 9 16 8.2
M0077 Driving 24+68 A 14 172 267 16 235.4 Begin 14' Wide Patch, Right Wheel Path (to M0078)
VIRB0071 Driving 26+18 A 6 10 7 16 5.9
VIRB0072 Driving 26+32 A 12 20 27 16 23.5
M0078 Driving 26+40 A 14 16 End 14' Wide Patch, Right Wheel Path (from M0077)
M0062 Driving 29+34 A 14 6 9 16 8.2
M0063 Driving 29+34 A 6 30 20 16 17.6 Begin 6' Wide Patch, Right Wheel Path (to M0064)
M0064 Driving 29+64 A 6 16 End 6' Wide Patch, Right Wheel Path (from M0063)
M0061 Driving 30+05 A 6 30 20 16 17.6 Begin 6' Wide Patch, Left Wheel Path (to M0060)
M0060 Driving 30+35 A 6 16 End 6' Wide Patch, Left Wheel Path (from M0061)
M0059 Driving 31+97 A 6 35 23 16 20.5 Right Wheel Path
M0056 Driving 32+06 A 14 31 48 16 42.4 Begin 14' Wide Patch, Right Wheel Path (to M0057)
M0058 Driving 32+07 A 6 6 4 16 3.5 Left Wheel Path
M0057 Driving 32+37 A 14 16 End 14' Wide Patch, Right Wheel Path (from M0056)
M0082 Driving 32+57 A 6 16 11 16 9.4 Right Wheel Path
VIRB0120 Driving 32+59 A 4 24 11 16 9.4 Joint at Approach Apron
VIRB0073 Driving 32+72 A 12 20 27 16 23.5
M0055 Driving 39+15 A 6 20 13 16 11.7 Right Wheel Path
VIRB0074 42+10 A Begin Pavement Break for Railroad (South)
VIRB0075 42+53 A Railroad
VIRB0116 43+06 A Begin Pavement Break for Railroad (North)
M0111 Driving 52+61 A 6 6 4 16 3.5 Left Wheel Path
M0110 Driving 52+81 A 12 6 8 16 7.0
VIRB0077 52+90 A Begin Bridge Exception (South)
M0001 Driving 54+03 A 6 20 13 16 11.7 Begin 6' Wide Patch, Left Wheel Path (to M0003)
VIRB0078 54+05 A End Bridge Exception (North)
M0054 Driving 54+23 A 14 40 63 16 55.0 Begin 14' Wide Patch, Right Wheel Path (to M0053)
M0002 Driving 54+23 A 6 6 4 16 3.5 Right Wheel Path
M0003 Driving 54+23 A 6 16 End 6' Wide Patch, Left Wheel Path (from M0001)M0053 Driving 54+63 A 14 16 End 14' Wide Patch, Right Wheel Path (from M0054)M0052 Driving 54+63 A 6 72 48 16 42.2 Begin 6' Wide Patch, Right Wheel Path (to M0050)M0051 Driving 54+74 A 6 6 4 16 3.5 Existing ManholeM0050 Driving 55+35 A 6 16 End 6' Wide Patch, Right Wheel Path (from M0052)VIRB0114 Passing 55+97 A 6 6 4 16 3.5 Existing ManholeM0109 Passing 59+00 A 6 6 4 16 3.5 Left Wheel PathM0083 Driving 63+51 A 11 6 7 16 6.5
M0049 Passing 63+91 A 11 71 87 16 76.6 Begin 11' Wide Patch, Right Wheel Path (to M0047)M0048 Driving 64+12 A 11 6 7 16 6.5
M0047 Passing 64+62 A 11 16 End 11' Wide Patch, Right Wheel Path (from M0049)M0046 Passing 64+62 A 6 30 20 Begin 6' Wide Patch, Right Wheel Path (to M0045)M0045 Passing 64+92 A 6 End 6' Wide Patch, Right Wheel Path (from M0046)
SB Lanes NB Lanes Area (sys)LocationNotes
PAVEMENT PATCHING TABLE - FULL DEPTHUS 27 - Des. No. 1700811
FROM 1.59 MILES SOUTH OF SR 67 TO 1.00 MILES NORTH OF SR 67
Full Depth
RP 63.48 to 66.06
Full Depth
HMA Depth (in) QuantityPt. ID RP Lane Station Alignment WIDTH LENGTH WIDTH LENGTH SB NB TONS
SB Lanes NB Lanes Area (sys)LocationNotes
PAVEMENT PATCHING TABLE - FULL DEPTHUS 27 - Des. No. 1700811
FROM 1.59 MILES SOUTH OF SR 67 TO 1.00 MILES NORTH OF SR 67
Full Depth
RP 63.48 to 66.06
Full Depth
M0043 Passing 65+12 A 11 102 125 16 109.7 Begin 11' Wide Patch, Right Wheel Path (to M0039)
M0044 Driving 65+12 A 6 51 34 16 29.9 Begin 6' Wide Patch, Left Wheel Path (to M0042)
M0042 Driving 65+63 A 6 16 End 6' Wide Patch, Left Wheel Path (from M0044)
M0041 Driving 65+83 A 6 6 4 16 3.5 Left Wheel Path
M0040 Driving 65+94 A 6 6 4 16 3.5 Left Wheel Path
M0039 Passing 66+14 A 11 16 End 11' Wide Patch, Right Wheel Path (from M0043)
M0038 Passing 66+74 A 6 6 4 16 3.5 Existing Manhole
M0037 Passing 70+39 A 6 6 4 16 3.5 Existing Manhole
M0004 Passing 76+86 A 4 51 23 16 19.9 Begin 4' Wide Patch, Right Wheel Path (to M0007)
M0005 Driving 76+86 A 4 31 14 16 12.1 Begin 4' Wide Patch, Left Wheel Path (to M0006)
M0036 Passing 77+17 A 11 12 15 16 12.9
M0006 Driving 77+17 A 4 16 End 4' Wide Patch, Left Wheel Path (from M0005)
M0035 Passing 77+27 A 6 70 47 16 41.2 Begin 6' Wide Patch, Right Wheel Path (to M0034)
M0007 Passing 77+37 A 4 16 End 4' Wide Patch, Right Wheel Path (from M0004)
M0008 Passing 77+57 A 4 30 13 16 11.7 Begin 4' Wide Patch, Right Wheel Path (to M0008)
M0009 Passing 77+87 A 4 16 End 4' Wide Patch, Right Wheel Path (from M0009)
M0033 Passing 77+97 A 11 6 7 16 6.5
M0034 Passing 77+97 A 6 16 End 6' Wide Patch, Right Wheel Path (from M0035)
M0032 Driving 79+00 A 11 6 7 16 6.5
M0031 Passing 79+50 A 6 30 20 16 17.6 Begin 6' Wide Patch, Right Wheel Path (to M0030)
M0030 Passing 79+80 A 6 16 End 6' Wide Patch, Right Wheel Path (from M0031)
M0029 Passing 80+82 A 6 20 13 16 11.7 Begin 6' Wide Patch, Right Wheel Path (to M0028)
M0084 Passing 80+91 A 6 10 7 16 5.9 Right Wheel Path
M0085 Driving 80+91 A 6 6 4 16 3.5 Left Wheel Path
M0086 Passing 81+01 A 6 10 7 16 5.9 Right Wheel Path
M0028 Passing 81+02 A 6 16 End 6' Wide Patch, Right Wheel Path (from M0029)
M0087 Passing 81+32 A 6 50 33 16 29.3 Begin 6' Wide Patch, Right Wheel Path (to M0088)
M0088 Passing 81+82 A 6 16 End 6' Wide Patch, Right Wheel Path (from M0087)
M0108 Passing 83+25 A 4 20 9 Begin 4' Wide Patch, Right Wheel Path (to M0107)
M0107 Passing 83+45 A 4 End 4' Wide Patch, Right Wheel Path (from M0108)
M0106 Passing 83+85 A 11 6 7 16 6.5
M0105 Driving 84+86 A 11 20 24 16 21.5
M0104 Passing 85+51 A 12 20 27 16 23.5
VIRB0105 Driving 86+02 A 6 12 8 16 7.0 Approach Apron
M0103 Driving 87+33 A 6 6 4 16 3.5 Existing Manhole
VIRB0104 Driving 89+45 A 12 12 16 16 14.1 Existing Manhole
VIRB0103 Driving 91+43 A 6 6 4 16 3.5 Existing Manhole
VIRB0102 Driving 92+06 A 6 6 4 16 3.5 Existing ManholeVIRB0101 Driving 94+84 A 6 6 4 16 3.5 Existing ManholeM0012 Driving 98+06 A 6 71 47 16 41.8 Begin 6' Wide Patch, Left Wheel Path & Left Joint (to M0014)M0013 Driving 98+36 A 6 6 4 16 3.5 Right Wheel PathM0014 Driving 98+77 A 6 16 End 6' Wide Patch, Left Wheel Path & Left Joint (from M0012)VIRB0084 Driving 103+66 A 12 12 16 16 14.1
M0015 Driving 107+38 A 6 61 41 16 35.8 Begin 6' Wide Patch, Left Wheel Path (to M0016)VIRB0085 Driving 107+47 A 12 6 8 16 7.0
M0016 Driving 107+99 A 6 16 End 6' Wide Patch, Left Wheel Path (from M0015)M0094 Driving 108+58 A 6 20 13 16 11.7 Left Wheel Path & Left JointM0102 Driving 113+24 A 11 6 7 16 6.5
VIRB0088 Driving 121+99 A2 6 13 9 16 7.6 Right Wheel PathVIRB0089 Driving 122+12 A2 6 16 Right Wheel PathM0095 Driving 122+15 A2 6 15 10 16 8.8 Right Wheel PathM0096 Driving 122+35 A2 4 91 40 16 35.6 Begin 4' Wide Patch, Right Wheel Path (to M0097)M0097 Driving 123+26 A2 4 16 End 4' Wide Patch, Right Wheel Path (from M0096)
HMA Depth (in) QuantityPt. ID RP Lane Station Alignment WIDTH LENGTH WIDTH LENGTH SB NB TONS
SB Lanes NB Lanes Area (sys)LocationNotes
PAVEMENT PATCHING TABLE - FULL DEPTHUS 27 - Des. No. 1700811
FROM 1.59 MILES SOUTH OF SR 67 TO 1.00 MILES NORTH OF SR 67
Full Depth
RP 63.48 to 66.06
Full Depth
VIRB0090 Driving 129+04 A2 6 12 8 16 7.0 Right Wheel PathM0098 Driving 129+13 A2 4 6 3 16 2.3 Right Wheel PathM0021 Driving 130+35 A2 12 6 8 16 7.0
M0027 Driving 132+77 A2 6 122 81 16 71.6 Begin 6' Wide Patch, Right Wheel Path (to M0026)M0026 Driving 133+99 A2 6 16 End 6' Wide Patch, Right Wheel Path (from M0027)M0101 Driving 135+20 A2 6 15 10 16 8.8 Right Wheel PathM0099 Right Turn 136+01 A2 6 71 47 Begin 6' Wide Patch, Left Wheel Path (to M0100)M0100 Right Turn 136+72 A2 6 End 6' Wide Patch, Left Wheel Path (from M0099)M0025 Driving 137+73 A2 6 41 27 16 24.2 Begin 6' Wide Patch, Right Wheel Path (to M0024)M0024 Driving 138+14 A2 6 16 End 6' Wide Patch, Right Wheel Path (from M0025)END 138+88
SUBTOTAL 1303 489 1510UNDISTRIBUTED AMOUNT 20% 261 98 302
PROJECT LENGTH (MILES)TOTAL PROJECT AREA - (SYS) % of Project AreaTOTAL FULL DEPTH PATCHING - (SYS) 3.44%TOTAL FULL DEPTH PATCHING - (TONS) TOTAL PARTIAL DEPTH PATCHING - (SYS) 0.38%TOTAL PARTIAL DEPTH PATCHING - (TONS)
TOTAL HMA PATCHING (SYS)TOTAL HMA PATCHING (TONS)
Length 2.59 Miles
23871916
2.5962,49621511812236104
HMA for Patching, Type D Match Existing Thickness
Intermediate and Base Mixes
Top of Existing Asphalt Surface
Patch Length as Specified In Patching Tables
For Subsequent Overlay Mill, Overlay with HMA Surface Course
----------------- -----------------
Existing Pavement
FULL DEPTH HMA PATCH (NOT TO SCALE)
Existing Pavement
, Modified
Figure 304-21CC
PARTIAL-DEPTH HMA PATCH
2’-0
2’-0
2’-0
as SpecifiedPatch Depth
Concrete
Top of Existing
Surface
Top of Existing Asphalt
over crack
Center patch
Crack
Type ____
HMA Patching,
Surface
Top of Existing Asphalt
Concrete
Top of Existing
as SpecifiedPatch Depth
Type ____
HMA Patching,
joint or crack
Center patch over
Joint or Crack
Type ____
HMA Patching, joint or crack
Center patch over
Joint or Crack
HMA Overlay Required
CONCRETE PAVEMENT
COMPOSITE PAVEMENT
ASPHALT PAVEMENT
D
Max. 1/3 D
3" or
SUBGRADE TREATMENT TYPE IC, MODIFIED The Standard Specifications are revised as follows:
SECTION 207, AFTER LINE 8, INSERT AS FOLLOWS:
207.02 Materials Materials shall be in accordance with the following.
Coarse Aggregate, Class D or Higher, Size No. 5,8,11, 12, 53, or 73 ....................................... 904
Geotextile for Pavement and Subgrade .................................... 918.02(c)
Section 207, AFTER LINE 34, INSERT AS FOLLOWS:
(e) Geotextile in accordance with 214 placed under aggregate No. 5, 8, and 53 in accordance with 301.
SECTION 207, AFTER LINE 88, INSERT AS FOLLOWS:
1. Type IC, Modified; 9 in. thick of the subgrade constructed with coarse aggregate No. 53 over 3 in of coarse aggregates No. 5, or No. 8. A layer of geotextile for subgrade Type 2A shall encapsulate the bottom 3 inches of coarse aggregates. Air cooled blast furnace slag shall not be used.
SECTION 207, AFTER LINE 140, INSERT AS FOLLOWS: 207.05 Method of Measurement Subgrade treatment will be measured in both cut and fill areas by the square yard per type.
Chemicals for modification, excavation, aggregates, and geotextile materials will not be measured.
SECTION 207, AFTER LINE 163, INSERT AS FOLLOWS: The cost of subgrade treatments including testing, sampling, aggregates for cut or at-grade
areas, chemicals for modification, geotextile, geogrid, water, and the excavation required for the methods chosen by the Contractor shall be included in the cost of the pay item for subgrade treatment, type.