Paul FosterCivil Project ManagerDLZ Indiana, LLC
FRONT STREET
•Located In The City Of Mishawaka•North Of Downtown•On Old Uniroyal Site
FRONT STREET
•City Demolished More Than 2 Million Square Feet OfAbandoned Industrial Facilities
FRONT STREET
• City Of Mishawaka Vision To Transform The Site IntoA Bold New Mixed‐use Development
FRONT STREET•Roundabout Developed At Front St. And Spring St.•Focal Point For The Development•Aesthetics Of Roundabout•DLZ Developed Conceptual Plan•City Reviewed And Approved The Plan
FRONT STREET
FRONT STREET
•Conceptual Plan Approved•Colored Concrete Pavement•Joint Pattern
•More Complicated Than Normal Roadway•Internal Office Discussion
•Worked With Mr. Chris Tull On Behalf Of Concrete Pavement Association
FRONT STREET
•Isolated Circle•1” Expansion Joint ‐ 9 •Ear Construction ‐ 3•Longitudinal Const. Joint ‐ 8•Construction Changes
FRONT STREET•Divided Into 16 Sections
•Contraction Joints ‐ 6•Longitudinal Joints ‐7•Tooled Joints ‐ 90•Slick Finish ‐ 95
FRONT STREET
•Colored Concrete Pavement•Concrete Header•Joint Pattern
•Sawed Joint ‐ 91
FRONT STREET
FRONT STREET
INTRODUCTIONS
QUESTIONS?
PAUL [email protected]