23
11/30/2016 Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

11/30/2016

Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

Page 2: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

1 | P a g e

Table of Contents

1) Executive Summary

2) Overview of Primary Care Providers

3) PCMH Timeline

4) Gap Analyses

5) DSRIP & NCQA PCMH Alignment

6) Technical Assistance

7) Workgroup Learning Collaborative

8) Clinical Integration

9) Cultural Competency & Health Literacy Initiatives

10) Workforce Trainings

11) Performance Reporting

Appendix A: NCQA PCMH 2014 Standards

Appendix B: GNYHA DSRIP & PCMH Crosswalk

Page 3: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

2 | P a g e

EXECUTIVE SUMMARY

There are 9 primary care partners participating in Staten Island Performing Provider System projects that require NCQA 2014 PCMH Level 3 recognition. All but three partners are on track to receive this recognition prior to March 31, 2018. Two of these partners will receive PCMH technical assistance through HANYS Solutions.

The DSRIP primary care-based projects and organizational workstreams are interconnected and in line with the PCMH requirements. In addition to the technical assistance offered to partners, the PPS efforts to implement the projects and meet workstream milestones will support the PCMH transformation for these partners.

The SI PPS anticipates that between these 9 primary care partners and the primary care practices participating in 4.b.ii, there will be significant expansion of the patient-centered medical home model on Staten Island – further improving the quality of primary care in the borough.

OVERVIEW OF PRIMARY CARE PROVIDERS

As the United Hospital Fund’s publication The Growth of Medical Homes in New York State, 2014-2016 indicates, the NCQA PCMH recognition program has had limited penetration in Staten Island. The borough has the lowest percentage of PCMH recognized providers in the city at 10%. While the reasons for this are not identified, Staten Island is dominated by small primary care practices composed of one to two physicians. Other boroughs tend to have many more medium to large size primary care practices and health centers with the human and technological resources to support the PCMH model and the Medicaid volume to financially support those resources through the New York State Department of Health Medicaid PCMH incentive payment program.

According to the NCQA Recognized Clinician Directory, there are 13 primary care practices in Staten Island that have PCMH recognition with a combined total of 62 primary care providers. Ten of those practices are in the PPS network and nine of them have executed agreements to participate in PPS projects. Table 1 has a breakdown of the practices, their recognition status, and involvement with the Staten Island PPS.

Page 4: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

3 | P a g e

Table 1: NCQA PCMH Practices in Staten Island*

Practice # PCPs Standards Level Expiration Date

PPS Network

DSRIP Projects

Beacon Christian Community Health Center

9 2011 3 9/29/17 Yes 2.a.iii 2.d.i 3.a.i 3.c.i

Community Health Center of Richmond

10 2014 3 2/17/19 Yes 2.a.iii 2.d.i 3.a.i 3.c.i

Melvin Koplow, MD 1 2014 2 2/24/19 Yes N/A

Metro Community Health Center 2 2014 3 9/15/2019 Yes 2.a.iii 2.d.i 3.a.i 3.c.i

NYC HHC – Coney Island Hospital - Mariner’s Harbor Family Health Center

2 2011 3 5/15/18 No N/A

NYC HHC – Coney Island Hospital - Stapleton Family Health Center

2 2011 3 5/15/18 No N/A

Richmond University Medical Center – Comprehensive Medical Care

3 2011 3 5/25/17 Yes 2.a.iii 2.d.i 3.a.i 3.c.i

Richmond University Medical Center – Comprehensive Pediatric Care

3 2011 3 5/25/17 Yes 2.a.iii 2.d.i 3.a.i 3.c.i

Salvatore Volpe MD PC† 1 2014 3 8/25/18 No N/A

South Shore Physicians PC 3 2014 3 12/4/18 Yes 4.b.ii Staten Island Physician Practice – Clove Road Location

(dba AdvantageCare Physicians)

9 2014 3 4/24/18 Yes 2.a.iii 3.a.i

3.c.i Staten Island Physician Practice – Hylan Blvd Location

(dba AdvantageCare Physicians)

5 2014 3 2/5/19 Yes 2.a.iii 3.a.i

3.c.i

Mt. Sinai Doctors – Victory Medical Group

8 2014 3 9/18/2019 Yes 2.a.iii 3.a.i 3.c.i

* NCQA Recognition Directory, http://recognition.ncqa.org/ (Accessed 10/31/16) † Chief Medical Officer of the Staten Island Performing Provider System

Page 5: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

4 | P a g e

Since receiving PCMH recognition, both Beacon Christian Community Health Center and Community Health Center of Richmond have opened additional locations and hired additional PCPs.

In addition to the practices identified above, SI PPS has also partnered on projects with another 3 organizations that have not yet received PCMH recognition. Table 2 identifies the additional primary care practices.

Table 2: Additional PPS Primary Care Partners

Practice # PCPs # Locations DSRIP Projects

Brightpoint Health 6 1 2.a.iii 3.a.i 3.c.i

Staten Island University Hospital 15 2 2.a.iii 2.d.i 3.a.i 3.c.i

University Physicians Group 26 13 2.a.iii 3.a.i 3.c.i

As PCMH recognition is only a requirement for projects 2.a.iii, 3.a.i, and 3.c.i, this assessment and roadmap will only focus on practices participating in those projects. However, significant efforts are being made to engage 13 practices in NCQA PCMH recognition through project 4.b.ii.

In total, SI PPS PCMH efforts for projects 2.a.iii, 3.a.i, and 3.c.i will include 9 organizations representing 25 practices and approximately 102 primary care providers. The map in Figure 1 demonstrates the locations of these 25 current and future PCMH PPS practices along with the geographic distribution of Medicaid enrollees.

Page 6: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

5 | P a g e

Figure 1: PCP practices and Number of Medicaid Enrollees‡

‡ New York State Department of Health, 2012 Data, https://health.data.ny.gov/Health/Medicaid-Beneficiaries-Inpatient-Admissions-and-Em/m2wt-pje4

Page 7: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

6 | P a g e

PCMH TIMELINE

The DSRIP deadline for PCMH recognition under the 2014 Standards is the end of DY3, Q4 (March 31st, 2018). However, as NCQA will be releasing new 2017 Standards, they will stop accepting applications under the 2014 Standards in September 2017. The New York State Department of Health has arranged with NCQA to make an exception for DSRIP participants, allowing practices that submit between September 2017 and January 2018 to receive a shortened two year recognition at a discounted price.

While the actual PCMH transformation process is variable, the timeline for submitting for PCMH recognition is specifically prescribed by NCQA. Following NCQA’s timeline, SI PPS has outlined the following submission steps in Figure 2 in order to meet the DSRIP deadline.

Figure 2: General NCQA Submission Timeline

Following the new NCQA 2014 Standards deadline, the PCMH survey tool must be submitted no later than September 30, 2017 to receive the full three year recognition. As the NCQA review process can take up to 60 days, recognition would be expected around November 30, 2017. The PCMH application must be submitted at least one week prior to the survey tool so that NCQA has the time to process that component of the submission. This gives an application deadline of September 23, 2017. Per NCQA guidelines, all relevant policies and procedures must be in place at least 3 months ahead of PCMH submission. In addition, the majority of data elements to be included in the submission must be for a minimum of 3 months. Following those timelines, all data should be collected, at the latest, between June and August 2017 and policies and procedures should be instituted before June 2017. This gives practices approximately one month to complete their survey tool and compile their supporting documentation related to this data and these policies and procedures. Any organizations submitting as a multi-site (three or more locations operating under the same EMR and same policies and procedures), will have a slightly different timeline as there are additional steps in

• Data Collection• Policies and

Procedures

6/1/17-8/31/17

• Application Submission

9/23/17• Survey Tool

Submission

9/30/17

• NCQA Decision

11/30/17

1 week

60 days

Page 8: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

7 | P a g e

the submission process. Timelines for those organizations would look similar to the one in Figure 3. NCQA will stop accepting corporate applications under the 2014 Standards in March 2017.

Figure 3: Multi-Site Submission Timeline

Practices that already have PCMH recognition will want to submit their materials prior to the DSRIP deadline and before their recognition expires as the renewal process is less arduous than that for new practices. A lapse in recognition will disqualify practices from the streamlined renewal process. Table 3 outlines the PCMH recognition timeline for each SI PPS practice that has not yet submitted its application. The timeline for UPG may change if it applies through a multi-site application.

Table 3: Practice Specific NCQA Submission Timeline

Data Collection / Policies & Procedures

Recommended Application Submission

Recommended Survey Tool Submission

Recognition Anticipated

Beacon 4/1/17-6/30/17 7/22/17 7/29/17 9/29/17

Brightpoint 6/1/17-8/31/17 9/23/17 9/30/17 11/30/17

SIUH 6/1/17-8/31/17 9/23/17 9/30/17 11/30/17

UPG 6/1/17-8/31/17 9/23/17 9/30/17 11/30/17

GAP ANALYSES

Six of the seven initial primary care partners submitted PCMH assessments to the PPS. Three partners completed detailed factor by factor responses for the NCQA Standards. The PPS contracted with HANYS Solutions to complete PCMH assessments for the remaining three primary care partners.

•Data Collection•Policies and

Procedures

12/1/16-2/28/17

•Application Submission

3/23/17•Corporate

Survey Tool Submission

3/31/17

•Site Specific Survey Tool Submission

9/30/17•NCQA Decision

11/30/17

60 days 1 week

Page 9: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

8 | P a g e

Table 4 indicates a preliminary assessment of the partners’ status in regard to must pass elements and critical factors. If a practice is unable to meet the requirements of a must pass element, it will not receive any recognition from NCQA. For CHCR, Metro, and Victory, the self-reported assessments indicated that they would be able to pass all critical factors and must pass elements and should achieve Level 3 recognition prior to March 31, 2018. Similarly, RUMC should have little trouble meeting all must pass elements with a refocus on initial care coordination processes implemented for their current NCQA PCMH recognition. Based on their current operations, both SIUH and UPG will not meet a majority of the must pass elements.

Table 4: Preliminary PCMH Assessments

Standard Must Pass Element

Critical Factor Beacon CHCR Metro RUMC SIUH UPG Victory

PCMH 1: PATIENT-CENTERED ACCESS A: Patient Centered Appointment

Access Pending Yes Yes Yes Unknown No Yes

1. Providing same-day appointments for routine and urgent care.

Pending Yes Yes Yes Unknown No Yes

B. 24/7 Access to Clinical Advice

2. Providing timely clinical advice by telephone.

Pending Yes Yes Yes No Unknown Yes

PCMH 2: TEAM BASED CARE D: The Practice Team Pending Yes Yes Yes No No Yes

3. Holding scheduled patient care team meetings or a structured communication process focused on individual patient care.

Pending Yes Yes Yes No No Yes

PCMH 3: IDENTIFY AND MANAGE PATIENT POPULATIONS

D: Use Data for Population Management

Pending Yes Yes Yes Unknown No Yes

E. Implement Evidence Based Decision Support

1. A mental health or substance use disorder.

Pending Yes Yes Yes Unknown Unknown Yes

PCMH 4: PROVIDE SELF-CARE SUPPORT AND COMMUNITY RESOURCES

A. Identify Patients for Care Management

6. The practice monitors the percentage of the total patient population identified through its process and criteria.

Pending Yes Yes Yes Unknown Unknown Yes

B: Care Planning and Self Care Support Pending Yes Yes Yes No Unknown Yes

Page 10: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

9 | P a g e

Standard Must Pass Element

Critical Factor Beacon CHCR Metro RUMC SIUH UPG Victory

C. Medication Management

1. Reviews and reconciles medications for more than 50 percent of patients received from care transitions.

Pending Yes Yes Yes Unknown Unknown Yes

PCMH 5: CARE COORDINATION & TRANSITIONS A: Test Tracking

and Follow-Up 1. Tracks lab tests until results are available, flagging and following up on overdue results.

Pending Yes Yes No Unknown No Yes

2. Tracks imaging tests until results are available, flagging and following up on overdue results.

Pending Yes Yes No Unknown No Yes

B: Referral Tracking and Follow-Up Pending Yes Yes No Unknown Unknown Yes 8. Tracks referrals

until the consultant or specialist’s report is available, flagging and following up on overdue reports.

Pending Yes Yes No Unknown Unknown Yes

PCMH 6: PERFORMANCE MEASUREMENT & QUALITY IMPROVEMENT

D: Implement Continuous Quality Improvement

Pending Yes Yes Yes Unknown Unknown Yes

SIUH

SIUH implemented an electronic medical record in its outpatient practices in July 2016. This provides SIUH over a year to collect required data, connect to the RHIO, launch a patient portal, and achieve Meaningful Use functionality. In addition, SIUH will need to work on transforming its clinical operations to achieve the following PCMH components in order to earn enough points to receive Level 3 recognition.

• 24/7 access to clinical advice • Continuity of care • Creating care teams and structured communication • Population management for preventive and chronic care services • Care planning processes and self-management support • Lab, imaging and referral tracking • Care transition processes • Quality improvement processes

Page 11: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

10 | P a g e

UPG

UPG has a robust EMR and an easy ability to make modifications as its Chief Medical Officer is also the CMO of its EMR system. It has been a successful partner in a Pioneer ACO with a strong focus on quality for its Medicare population but has yet to apply this effort to its Medicaid population. In addition, the 13 practices operate as a loose federation of clinics that do not follow standardized policies and processes. Their recent merger with Northwell Health may support more standardized polices and processes for the practices. UPG has nearly two years to complete its transformation to a multi-site NCQA Level 3 PCMH. The assessment identified the following PCMH components as critical gaps for UPG:

• Same day appointments • Creating care teams and structured communication • Population management for preventive and chronic care services • Care transition processes • Patient satisfaction surveys • Quality improvement processes

Overview

Seven out of the nine PPS primary care partners have either become patient-centered medical homes or have the leadership buy-in to pursue the necessary transformation for PCMH. Two partners, SIUH and UPG, are at risk of failing the NCQA recognition process by the DY3 Q4 deadline without significant practice transformation efforts. Both would benefit from increased leadership support of PCMH transformation. Should the Advanced Primary Care requirements be less stringent than the NCQA Patient-Centered Medical Home standards, SIUH and UPG could consider pursuing APC as an alternative.

DSRIP & NCQA PCMH ALIGNMENT

While NCQA PCMH recognition is a distinct DSRIP milestone, the transformation to a patient-centered medical home directly aligns with a number of milestones from SI PPS projects and organizational workstreams. GNYHA produced a crosswalk that identifies the direct correlation between PCMH Standards and DSRIP project milestones. A modified version of the crosswalk can be found in Appendix B. A summary of the project and workstream alignment with PCMH follows in Table 5. Nearly every PCMH element intersects with some component of the DSRIP program.

Page 12: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

11 | P a g e

Table 5: DSRIP and PCMH Alignment

PCMH Element DSRIP Project DSRIP Workstream

1.A. Patient Centered Appointment Access

2.d.i Patient Activation

1.B. 24/7 Access to Clinical Advice Clinical Integration

1.C. Electronic Access Clinical Integration

2.A. Continuity

2.B. Medical Home Responsibilities Cultural Competency and Health Literacy

2.C. Culturally and Linguistically Appropriate Services

Cultural Competency and Health Literacy

2.D. The Practice Team Workforce Cultural Competency and Health Literacy

3.A. Patient Information 3.c.i Diabetes Management Clinical Integration

3.B. Clinical Data Clinical Integration

3.C. Comprehensive Health Assessment

3.a.i Integration of Primary Care and Behavioral Health

Cultural Competency and Health Literacy

3.D. Use Data for Population Management

2.a.iii Health Home At-Risk 2.d.i Patient Activation 3.a.i Integration of Primary Care and Behavioral Health 3.c.i Diabetes Management

3.E. Implement Evidence Based Decision Support

3.c.i Diabetes Management

4.A. Identify Patients for Care Management

2.a.iii Health Home At-Risk 3.a.i Integration of Primary Care and Behavioral Health

4.B. Care Planning and Self-Care Support

2.a.iii Health Home At-Risk

4.C. Medication Management 3.a.i Integration of Primary Care and Behavioral Health

4.D. Use Electronic Prescribing Clinical Integration

4.E. Support Self Care and Decision Making

3.a.i Integration of Primary Care and Behavioral Health

5.A. Test Tracking & Follow-Up Clinical Integration

5.B. Referral Tracking & Follow-Up 2.a.iii Health Home At-Risk 3.a.i Integration of Primary Care and Behavioral Health 3.c.i Diabetes Management

Clinical Integration

Page 13: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

12 | P a g e

PCMH Element DSRIP Project DSRIP Workstream

5.C. Coordinate Care Transitions 2.a.iii Health Home At-Risk 2.b.iv Care Transitions

Clinical Integration

6.A. Measure Clinical Quality Performance

Performance Reporting

6.B. Measure Resource Use and Care Coordination

Performance Reporting

6.C. Measure Patient/Family Experience

Performance Reporting

6.D. Implement Continuous Quality Improvement

Performance Reporting

6.E. Demonstrate Continuous Quality Improvement

2.d.i Patient Activation Performance Reporting

6.F. Report Performance Performance Reporting

TECHNICAL ASSISTANCE

SI PPS has offered to support PCMH technical assistance for all primary care practices participating in relevant projects through an agreement with Healthcare Association of New York State (HANYS) Solutions’ PCMH Advisory Services. HANYS Solutions has a successful track record of PCMH transformation and recognition across the State and with a variety of types of primary care practices. The technical assistance components are outlined in Table 6 and were presented to the Ambulatory Care Workgroup in October 2015.

Table 6: HANYS Technical Assistance Program

Component Description

Client Portal Approximately forty (40) on-demand learning modules. Each cohort will be given a specific curriculum in alignment with the cohort level project plan, type of practice and type of submission.

Web-based Advisory Sessions

Regularly-scheduled live, web-based, interactive advisory sessions. This session gives the practice (s) the opportunity to ask questions, seek guidance and clarification.

Cohort Project Plan Management

Cohort level project plan by a PCMH advisor and/or analyst for PCMH task management throughout the transformation. PCMH Advisory Services will develop the cohort project plan, monitor due dates, and manage aspects of the project plan while your team gets the work done.

Page 14: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

13 | P a g e

As the primary care practices are all at different stages of recognition and a few had already executed contracts with other organizations, only a few practices expressed interest in the HANYS Solutions’ technical assistance. Table 7 outlines the practices and their technical assistance partners. Both Beacon and CHCR chose not to pursue technical assistance as they had recently received NCQA 2011 PCMH recognition.

Table 7: PCMH Technical Assistance Partners

Practices Technical Assistance Partner

Beacon Christian Community Health Center N/A

Brightpoint Health N/A

Metro Community Health Center Primary Care Development Corporation

Community Health Center of Richmond N/A

Richmond University Medical Center HANYS Solutions

Staten Island Physician Practice N/A

Staten Island University Hospital HANYS Solutions

University Physicians Groups HANYS Solutions

Mt. Sinai Doctors – Victory Medical Group Primary Care Development Corporation

In addition to technical assistance partners, the SI PPS’s Director of Ambulatory Care Initiatives is an NCQA PCMH Certified Content Expert and has facilitated PCMH recognition for facilities in New York City. The SI PPS’s Chief Medical Officer was the first solo practitioner to achieve NCQA PCMH 2014 Level 3 recognition in New York. They are both available to provide any needed support to primary care practices.

WORKGROUP LEARNING COLLABORATIVE

SI PPS has formed an Ambulatory Care Workgroup to address primary care-based projects. While initially focused on projects 3.a.i Model 1 and 3.c.i, the workgroup had a natural alignment with the planned PCMH workgroup and the two workgroups were combined. As the DSRIP and PCMH crosswalk section indicates, the PPS’s efforts to promote evidence-based diabetes management and integration of behavioral health align with components of NCQA’s PCMH 2014 Standards.

The purpose of this workgroup, as outlined by its charter, is to provide clinical and operations expertise to support planning and implementation of primary care-based projects. The Workgroup may also provide guidance for relevant cross-project topics. The Workgroup is comprised of clinical and operations leaders from all seven primary care partner organizations and will guide development and implementation of identified projects, including processes, workflows, standards of care and more. In order to meet PPS-wide goals, the workgroup will

Page 15: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

14 | P a g e

also serve as a learning collaborative for partners to share best practices and learn from each other and from other committees and workgroups, such as the Care Management Workgroup, Clinical Integration Workgroup, etc.

CLINICAL INTEGRATION

SI PPS is supporting its partners in the implementation and enhancement of electronic medical records. NCQA PCMH 2014 Standards are aligned with CMS Meaningful Use Stage 2 requirements. Level 3 PCMH recognition has been structured in such a way that it cannot be attained without an EMR. Thus, implementing an EMR and ensuring that it has MU Stage 2 functionality is crucial for all primary care partners and their efforts toward achieving PCMH Level 3 recognition. Table 8 indicates which primary care practices are using EMRs with meaningful use certification.

Table 8: Primary Care Practices and MU Status of EMR

Practice MU Certified

AdvantageCare Physicians Pending data

Beacon Christian Community Health Center Yes

Brightpoint Health Yes

Metro Community Health Center Yes

Community Health Center of Richmond Yes

Richmond University Medical Center Yes

Staten Island University Hospital Yes

University Physicians Group Yes

Mt. Sinai Doctors – Victory Medical Group Yes

In addition, SI PPS is supporting its project partners in integrating their electronic medical records with the local RHIO, Healthix. This clinical integration supports partner needs related to PCMH factors focused on electronic exchange of key clinical information and sharing of electronic summary-of-care records for care transitions. Table 9 indicates the RHIO connectivity status for each primary care practice.

Table 9: Primary Care Practices and RHIO Connectivity

Practice RHIO

AdvantageCare Physicians In Development

Beacon Christian Community Health Center In Development

Brightpoint Health Implemented/Operational

Community Health Center of Richmond Implemented/Operational

Page 16: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

15 | P a g e

Practice RHIO

Metro Community Health Centers Implemented/Operational

Richmond University Medical Center Implemented/Operational

Staten Island University Hospital Implemented/Operational

University Physicians Group In Development

Mt. Sinai Doctors – Victory Medical Group Implemented/Operational

By DY3 Q4, all primary care partners will have an EMR implemented and will be connected to the Healthix RHIO.

CULTURAL COMPETENCY & HEALTH LITERACY

SI PPS has a strong focus on cultural competency and health literacy and, as outlined in the strategy for that organizational workstream, the PPS will be collaborating with primary care practices on the following:

• Cultural competency training - SI PPS is offering a compliment of trainings including language access, medical interpreting, health literacy health communication, cultural competency and healthcare equality. These trainings will be offered at all PPS sites and to all provider types. Every employee in the PPS will attend Bias, Culture and Values 1199 Training and Employment Fund’s introductory Cultural Competency training. SI PPS has also contracted with the Pride Center of Staten Island to conduct PPS wide LGBTQ Healthcare Equality trainings.

• Population Health Literacy Improvement - SI PPS has convened a workgroup consisting of health care providers and literacy service organizations such as the YMCA, JCC, and the NYPL to assist with developing a borough-wide health literacy toolkit which focus on Staten Island specific health disparities and outcomes related to PPS projects.

• SI PPS has identified gaps in the provision of culturally and linguistically appropriate services based on results from a PPS wide Cultural Competency and Health Literacy needs assessment. SI PPS has secured a vendor for Language Access Services (including video remote and telephonic interpreting and translating services), has prioritized sites with little to no access to language services and will support sites with video interpreter equipment as needed. PPS is also offering Medical Interpreter Training and train-the-trainer courses available to qualified employees.

As identified above, these goals directly align with PCMH requirements for culturally and linguistically appropriate services and assessment of health literacy. In addition, trainings will support PCMH requirements for training staff on communicating with the patient population, especially vulnerable groups.

Page 17: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

16 | P a g e

WORKFORCE TRAININGS

The PPS is tracking a workforce of over 11,500 employees, union and non-union requiring various levels of training. Through a partner survey, SI PPS has catalogued current partner training programs utilized and then created a gap analysis for needed future training. This training will be clinical and non-clinical in nature and will be done in conjunction with 1199 Training and Employment Fund (TEF) and other potential vendors for such topics as LEAN – Six Sigma training. Existing internal partner resources and new outside vendors will be used.

Future training will be built upon a broad training module on DSRIP 101 – a review of how DSRIP transforms relationships between inpatient and outpatient partners to improve care delivery. Partner specific training programs are being developed by using the original survey and also site visits. This approach has permitted a deeper dive into training needs and has led to the creation of training strategies by DSRIP project and job titles associated with each project. This is an on-going analysis, based upon program implementation and the movement of human resources as part of the collaborative health care integration process.

Specifically in regards to PCMH transformation, 1199 TEF has a robust care coordination training that will support PCMH requirements for staff training. Additional training components on motivational interviewing will fulfill the needs of primary care practices to train staff on self-management support, self-efficacy, and behavior change. As described above, the PPS will be implementing the cultural competency training. The PPS is also exploring project-specific trainings related to SBIRT, depression management, and diabetes education – all of which align with aspects of PCMH.

PERFORMANCE REPORTING

Through the performance reporting workstream, SI PPS has contracted with SpectraMedix to develop an enterprise data warehouse. This warehouse will combine claims data and EMR data to create performance dashboards for partners. This will support PCMH requirements related to performance measurement and quality improvement. Numerous DSRIP measures fall into the PCMH categories of clinical quality, utilization, care coordination, and patient experience – presenting the primary care practices with an array of metrics to incorporate into their quality improvement efforts. In addition, the SI PPS plans to support rapid cycle improvement efforts will further support partners’ development and enhancement of quality improvement programs.

Page 18: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

17 | P a g e

APPENDIX A

Page 19: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

18 | P a g e

APPENDIX B: GNYHA DSRIP & PCMH CROSSWALK Modified from www.gnyha.org (Downloaded 12/14/2015)

Page 20: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

DSRIP Project Project Requirement Metric/Deliverables PCMH Standard

2.a.iii Health Home At-Risk Intervention Program

Ensure all PPS safety net providers are actively sharing EHR systems with local health information exchange and sharing health information among clinical partners, including direct exchange, alerts, and patient record look up

EHR meets connectivity to RHIO's HIE and SHIN-NY requirements

Standard 5B - Referral Tracking and Follow-up 5.B.7. Has the capacity for electronic exchange of key clinical information and provides an electronic summary of care record to another provider for more than 50% of referrals Standard 5C - Coordinate Care Transitions 5.C.7. Exchanges key clinical information with facilities and provides an electronic summary of care record to another care facility for more than 50% of patient transitions of care Standard 6G - Use Certified EHR Technology 6.G.8. The practice has access to a health information exchange 6.G.9. The practice has bidirectional exchange with a health information exchange

PPS uses alerts and secure messaging functionality

Ensure that EHR systems used by participating safety net providers meet Meaningful Use and PCMH Level 3 standards by end of DY3

EHR Meets Meaningful Use Stage 2 CMS requirements

2014 PCMH Standards are aligned with Meaningful Use Stage 2

Perform population health management by actively using EHRs and other IT platforms, including use of targeted patient registries

PPS identifies targeted patients through patient registries and is able to track actively engaged patients for project milestone reporting [SEE ACTIVELY ENGAGED DEFINITION]

Standard 4B - Care Planning and Self-Care Support 4.B.1. Care team and patient collaborate to develop and update an individual care plan for 75% of high risk patients, incorporating patient preferences and functional/lifestyle goals 4.B.2. Care team and patient collaborate to develop and update an individual care plan for 75% of high-risk patients, incorporating identification of treatment goals

Develop a comprehensive care management plan for each patient to engage him/her in care and to reduce patient risk factors

Procedures to engage at-risk patients with care management plan instituted

Standard 4A - Identify Patients for Care Management The practice establishes a systematic process and criteria for identifying patients who may benefit from care management, including consideration of the following:

Page 21: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

DSRIP Project Project Requirement Metric/Deliverables PCMH Standard

Establish partnerships between primary care providers and the local Health Home for care management services with plans that clearly delineate roles and responsibilities for both parties

Each identified PCP establishes partnerships with local Health Home for care management services

4.A.1. Behavioral health conditions 4.A.2. High cost/high utilization 4.A.3. Poorly controlled or complex conditions 4.A.4. Social determinants of health 4.A.5. Referrals by outside organizations

Establish partnerships between the primary care providers, in concert with the Health Home, with network resources for needed services; the provider should work with local government units, such as SPOAs and public health departments, where necessary

PPS has established partnerships with medical, behavioral health, and social services Standard 5B - Referral Tracking and Follow-up

5.B.2. Maintains formal and informal agreements with a subset of specialists based on established criteria 5.B.3. Maintains agreements with behavioral health providers PPS uses EHRs and HIE system to

facilitate and document partnerships with needed services

Implement evidence-based practice guidelines to address risk factor reduction, as well as to ensure appropriate management of chronic diseases; develop educational materials consistent with the population's cultural and linguistic needs

PPS has adopted evidence-based practice guidelines for management of chronic conditions. Chronic condition appropriate evidence-based practice guidelines developed and process implemented Standard 3D - Use Data for Population Health Management

At least annually the practice proactively identifies populations of patients and reminds them of needed care, including for: 3.D.3. Three different chronic disease or acute care services 3.D.4. Patients not recently seen by the practice 3.D.5. Medication monitoring or alert

Regularly scheduled formal meetings are held to develop collaborative evidence-based care practices

PPS has included social services agencies in development of risk reduction and care practice guidelines Culturally competent educational materials have been developed to promote management and prevention of chronic diseases

2.b.iv Care Transitions Intervention Model to Reduce 30-day Readmissions for Chronic Health Conditions

Protocols will include care record transitions with timely updates provided to the members' providers, particularly primary care provider

Policies and procedures are in place for including care transition plans in patient medical record and ensuring medical record is updated in interoperable EHR or updated in the primary care provider record

Standard 5C - Coordinate Care Transitions 5.C.2. Shares clinical information with admitting hospitals and emergency departments 5.C.3. Consistently obtains patient discharge summaries from the hospital and other facilities 5.C.5. Exchanges information with the hospital during a patient's hospitalization

Page 22: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

DSRIP Project Project Requirement Metric/Deliverables PCMH Standard

2.d.i Implementation of Patient Activation Activities

Increase the volume of non-emergent (primary, behavioral, dental) care provided to UI, NU and LU persons

Volume of non-emergent visits for UI, NU and LU populations increased

Standard 6E - Demonstrate Continuous Quality Improvement 6.E.3. Achieving improved performance on one utilization or care coordination measure

3.a.i Integration of Primary Care and Behavioral Health Services

Co-locate behavioral health services at primary care practice sites (Model 1)

Behavioral health services are co-located within the PCMH/APC practices and are available (Model 1)

Standard 5B - Referral Tracking and Follow-Up 5.B.4. The practice integrates behavioral health care providers within the practice site

Develop collaborative evidence-based standards of care, including medication management and care engagement processes (Model 1)

Coordinated evidence-based care protocols are in place, including medication management and care engagement processes

Standard 4C - Medication Management Standard 4E - Support Self-Care and Shared Decision Making

Conduct preventive care screenings, including behavioral health screenings (PHQ-2 or 9, and for those screening positive, SBIRT) implemented for all patients to identify unmet needs (Model 1)

Policies and procedures are in place to facilitate and document completion of screenings

Standard 3C - Comprehensive Health Assessment 3.C.9. The practice collects and regularly updates a comprehensive health assessment that includes depression screening for adults and adolescents using a standardized tool Standard 4A - Care Management and Support 4.A.1. The practice establishes a systematic process and criteria for identifying patients who may benefit from care management, including behavioral health conditions

At least 90% of patients receive screenings at the established project sites Positive screenings result in "warm transfer" to behavioral health provider as measured by documentation in EHR

Use EHRs and other technical platforms to track all patients engaged in the project (All Models)

PPS identifies target patients and is able to track actively engaged patients for project milestone reporting [SEE ACTIVELY ENGAGED DEFINITION]

Standard 3D - Use Data for Population Health Management At least annually the practice proactively identifies populations of patients and reminds them of needed care, including for: 3.D.1. Two different preventive care services 3.D.3. Three different chronic disease or acute care services 3.D.4. Patients not recently seen by the practice 3.D.5. Medication monitoring or alert

3.c.i Evidence-Based Strategies for Disease Management in High-Risk/Affected Populations—Diabetes

Implement evidence-based practices for disease management specific to diabetes in the community and ambulatory care settings

Evidence-based practice strategies for the management and control of diabetes in the PPS-designated area are developed and implemented for all participating providers, along with developing protocols for disease management and training staff

Standard 3E - Implement Evidence-based Decision Support 3.E.3. The practice implements clinical decision support following evidence-based guidelines for an acute condition

Page 23: Patient-Centered Medical Home Assessment & Roadmap · 11/30/2016 . Patient-Centered Medical Home Assessment & Roadmap Population Health Management Workstream – Milestone 1

DSRIP Project Project Requirement Metric/Deliverables PCMH Standard

Develop care coordination teams including use of nursing staff, pharmacists, dieticians, and community health workers to address lifestyle changes, medication adherence, health literacy issues, and patient self-efficacy and confidence in self-management

Clinically interoperable system is in place for all participating providers

Standard 5B - Referral Tracking and Follow-up 5.B.7. Has the capacity for electronic exchange of key clinical information and provides an electronic summary of care record to another provider for more than 50% of referrals

Care coordination teams are in place and include nursing staff, pharmacists, dieticians, community health workers, and Health Home care managers where applicable Care coordination processes are in place

Develop "hot spotting" strategies, in concert with Health Homes, to implement programs such as the Stanford Model for chronic diseases in high-risk neighborhoods

If applicable, PPS has implemented collection of valid and reliable REAL (Race, Ethnicity, and Language) data and uses data to target high-risk populations, develop improvement plans, and address top health disparities

Standard 3A - Patient Information The practice uses an electronic system to record the following as structured (searchable) data for more than 80% of its patients: 3.A.3. Race 3.A.4. Ethnicity 3.A.5. Preferred Language

If applicable, PPS has established linkages to health homes for targeted patient populations

If applicable, PPS has implemented Stanford model through partnerships with community-based organizations

Use EHRs or other technical platforms to track all patients engaged in this project

PPS identifies targeted patients and is able to track actively engaged patients for project milestone reporting [SEE ACTIVELY ENGAGED DEFINITION]

Standard 3D - Use Data for Population Health Management At least annually the practice proactively identifies populations of patients and reminds them of needed care, including for: 3.D.3. Three different chronic disease or acute care services 3.D.4. Patients not recently seen by the practice

PPS uses a recall system that allows staff to report which patients are overdue for which preventive services, and to track when and how patients were notified of needed services