property acquisition
artwork 35 x 24 in
Different approaches depending on project’s impact on property, compensation depends on impact:
3-year temporary easements for grading and other construction-related work areas.
Permanent easements for future maintenance of retaining walls, storm-water management ponds, etc.
Partial acquisitions for strip widenings.
2 3
· Registered property interests will need to be acquired from impacted properities. Owners will be notified by York Region staff.
· Other property owners may be asked to sign “Permission to Enter” authorizations if driveway grading or resurfacing is desired; generally no compensation for this
1
intersection
crosswalk
pedestrianzone
bicycle laneroad
furnishingzone
information kiosk/space for public art
street light
continuityzone
property line
treein grate
pedestrianlight
bench
treein planter
artwork 35 x 24 in
propertyline
furnishing zone
continuityzone
road bicycle lane
pedestrian zone
furnishing zone
continuityzone
pedestrian zone
propertyline
road bicyclelane
boulevard: 4-lane roadsidewalk at typical vivastation intersection
community liaison role
artwork 35 x 24 in
Community liaison specialist is working with property owners, tenants, local businesses, and the general public onsite to:
· Provide timely construction updates
· Be a single point of contact for questions and concerns
· Provide onsite signage and other marketing support materials
· Feature businesses on our website to help attract customers during construction
· Coordinate meetings between project manager, owners and other parties to address individual property concerns/questions
Our public communications and marketing team will be developing strategies to ensure that the public knows what is happening.
preliminary cross section: 4-lane road
mid-block
intersection
CORNELL 1:45UNIONVILLE 1:45
40.00Right-of-way
2.000.30 0.302.50 2.50 2.00
0.60 0.600.50 0.500.30 0.30
1.50 3.50 3.30 3.30 3.50 1.503.50 3.504.00
PublicSidewalk
PublicSidewalk
BicycleLane
BicycleLane2 Through Lanes Transitway
[Coloured Asphalt]Transitway
[Coloured Asphalt]Plantable Raised Median
Rumble Strip2 Through Lanes
ContinuityStrip
ContinuityStrip
Rumble Strip
Boulevard 5.90 Boulevard 5.90
44.00Right-of-way
2.000.30 0.302.50 2.50 2.00
0.60 0.600.50 0.70 0.500.30 Clearance
1.50 3.50 3.30 3.30 0.30 3.30 3.50 1.503.50 4.003.50
PublicSidewalk
PublicSidewalk
BicycleLane
BicycleLane
Through /Right-turn Lane Through Lane Left-turn Lane Transitway [Coloured Asphalt] Shelter/PlatformRumble Strip Offset
2 Through LanesContinuityStrip
ContinuityStrip
Boulevard 5.90
Prop
erty
Lin
e
Boulevard 5.90
Property Line
artwork 35 x 24 in.
yonge street: mulock drive to davis drive
artwork 127” x 30” in
Scale: 1:500
Match Line A
Mat
ch L
ine
A
yonge street rapidways timeline: mulock to davis drive
artwork 35 x 24 in
Property acquisitionunderway
Preliminary designunderway
Final design/construction
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2010 2011
Projected completion date end-2013
engineering and construction timelines
artwork 35 x 24 in
Description
Spadina Subway Extension– Downsview station to York University
Yonge Subway Extension– Finch station to Richmond Hill Centre
H2H3
Hwy 7 – Richmond Hill Centre to Pine Valley DriveHwy 7 – Richmond Hill Centre to Kennedy Road
Y2 Yonge Street – Richmond Hill Centre to 19th Avenue
Y3.2D1
Yonge Street – Mulock Drive to Davis DriveDavis Drive – Yonge Street to Hwy 404
G1 H1H4M1V1Y3.1Y3.3
Green Lane – Yonge Street to East Gwillimbury GO station Hwy 7 – Pine Valley to Highway 50Hwy 7 – Kennedy to York Durham LineMarkham Centre to Don Mills stationHwy 7 to Hwy 407/Jane subway stationYonge Street – 19th Avenue to Mulock DriveYonge Street – Davis Drive to Green Lane
Legend Concept Design / Preliminary Engineering / Land Acquisition Construction Updated January 2010
Project
Subways
Viva Operating Segments
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
how are rapidways built?
artwork 35 x 24 in
Phase 1 : Concept Design Phase 2 : Preliminary Design Phase 3 : Construction
·Utility relocation
·Road widening – one side at a time, including boulevards and planting
·Construct rapidways and stations down middle of road
Complete July 2010 – February 2011 Spring 2011 and forward
Guiding Principles·Maintain access to business locations
·Minimize disruption
·Maintain 3 lanes of traffic
·Clean and safe work site
·Development of design elements
·Construction drawings
·Sequencing / scheduling of construction
intersection: 4-lane road
vivaNext route map
artwork 24 x 35 in
*Planned construction of bus rapid transit, includes dedicated and non-dedicated rapidway**Will connect to Bloor-Danforth subway *Planned construction of bus rapid transit, includes dedicated and non-dedicated rapidway**Will connect to Bloor-Danforth subway Map not to scale
Hig
hway
50
Highway 407
Finch Avenue
Sheppard AvenueSheppard Avenue
Lesl
ie S
tree
t
Steeles AvenueSteeles Avenue
Bat
hurs
t Str
eet
Yong
e St
reet
Yong
e St
reet
Hig
hway
27
Hig
hway
400
Jane
Str
eet
Highway 9
Finch Avenue
Sheppard Avenue
Steeles Avenue
Hig
hway
404
Hig
hway
404
Bay
view
Ave
nue
Ken
nedy
Roa
d
York
Dur
ham
Lin
e
Highway 407
Wellington St. E. Aurora Rd.
Davis Drive
Green Lane
Bloomington Rd.
Stouffville Rd.
Major MacKenzie DriveMajor MacKenzie Drive
Highway 7Highway 7
Highway 7
Lesl
ie S
tree
tDo
n M
ills
Roa
d
Funded Rapidways*
Future Rapidways*
Spadina Subway Extension
Proposed Light Rail Transit**
Proposed Yonge Subway Extension
Terminals
GO Transit Rail Lines
N E W M A R K E T
W H I T C H U R C H -S T O U F F V I L L E
A U R O R A
V A U G H A N
V A U G H A N M A R K H A M
R I C H M O N D H I L L M A R K H A M
T O R O N T OT O R O N T O
Don Mills Station
UnionvilleStation
Downsview Station
FinchStation
East GwillimburyGO Station
NewmarketGO Station
CornellRichmond Hill
Centre
WesternGateway
VaughanMetropolitanCentreKipl
ingIsl
ington
Islingto
nHele
nHele
nPine V
alley
Ansley G
rove
Weston
Keele
York
Universi
ty
York
Universi
ty
Royal O
rchard
Royal O
rchard
Finch W
est
Finch W
est
Sheppa
rd Wes
t
Sheppa
rd Wes
t
Steeles
Wes
t
Steeles
Wes
t
Hwy 407
Transit
way
Hwy 407
Transit
way
Dufferin
Dufferin
Promen
ade
Promen
adeBath
urst
Bathurst
Atkinso
n
Bayvie
w
Bayvie
w
16th-C
arrvill
e
16th-C
arrvill
e
Bantry
-Scott
Steeles
Steeles
Cummer/Drew
ry
Cummer/Drew
ry
Clark
Deniso
n
Esna-
SteelesEsn
a-Stee
les
McNico
ll
Senec
a Hill
Senec
a Hill
Leith Hill
Leith Hill
Langs
taff
/ Lon
gbrid
ge
Langs
taff
/ Lon
gbrid
ge
14th
Weldric
kMajo
r MacK
enzie
Major M
acKen
zie
Crosby
Elgin M
ills19
th-Gam
ble
Jeffe
rson
Jeffe
rson
KingBloo
mington
Bloomingto
n
Regatt
a
Regatt
aHen
derso
nGolf LinksWell
ingtonOrch
ard Heig
hts
Orchard
Heights
Mulock
Eagle
Parksid
e-
Lon
gford
Green Lan
e
Green Lan
e
Bristol
Bristol
Main
Southl
ake
Huron Heig
hts
Huron Heig
htsLes
lieLes
lie
Savage
Bernard
Valle
ymed
e
Valle
ymed
e
Chalmers
- Sou
th Park
Chalmers
- Sou
th Park
West B
eaver
Creek
West B
eaver
Creek
Leslie
Leslie
East B
eaver
Creek
East B
eaver
Creek
Allstat
e Park
way
Woodb
ineTo
wn Centre
Blvd.
Cedarl
and
Kenned
y
Kenned
y
Wooten
Way
Wooten
Way
Markham
Stouffv
ille Hos
pital
Markham
Stouffv
ille Hos
pital
McCow
an
Main St. M
arkham
Galswort
hy
Bur Oak
Warden
Enterpri
se
Enterpri
se
Martin Grov
e
Martin Grov
e
Highway
27
Highway
27
Highway
427
Highway
427
Commerc
e
Commerc
e
energy-efficient lightingthroughout for greater safetyand comfort
gently sloping ramp provideseasy wheelchair, motorizedscooter and stroller access
ample seating inside and outprovides greater personalspace and comfort
flexible cash, pass and Prestofare machines
artwork 35 x 24 in
roof extends up and over Viva vehiclesto keep snow and rain off whileembarking/disembarking
roof and side panels made ofreflective tinted glass for greatervisibility and comfort
extended platform length canaccommodate multiple Vivavehicles, enhancing embarking/disembarking efficiency
raised platform provides level boardingof Viva vehicles, eliminating theneed to climb steps or lift objects
temperature and motion activated heaters in full wind enclosure provide warmth while motion-activated entry doors minimize heat loss
arrival/departure screensprovide real-time scheduling
info plus up-to-the-minutetime, weather, news, sports
and market headlines
full-time securitysurveillance and
intercom foremergency assistance
on platform
tactile pavers alongrapidway edge provide
greater safety
vivastation design elements