property acquisition Different approaches depending on project’s impact on property, compensation depends on impact: 3-year temporary easements for grading and other construction-related work areas. Permanent easements for future maintenance of retaining walls, storm-water management ponds, etc. Partial acquisitions for strip widenings. 2 3 · Registered property interests will need to be acquired from impacted properities. Owners will be notified by York Region staff. · Other property owners may be asked to sign “Permission to Enter” authorizations if driveway grading or resurfacing is desired; generally no compensation for this 1

Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

property acquisition

artwork 35 x 24 in

Different approaches depending on project’s impact on property, compensation depends on impact:

3-year temporary easements for grading and other construction-related work areas.

Permanent easements for future maintenance of retaining walls, storm-water management ponds, etc.

Partial acquisitions for strip widenings.

2 3

· Registered property interests will need to be acquired from impacted properities. Owners will be notified by York Region staff.

· Other property owners may be asked to sign “Permission to Enter” authorizations if driveway grading or resurfacing is desired; generally no compensation for this

1

Page 2: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

intersection

crosswalk

pedestrianzone

bicycle laneroad

furnishingzone

information kiosk/space for public art

street light

continuityzone

property line

treein grate

pedestrianlight

bench

treein planter

artwork 35 x 24 in

propertyline

furnishing zone

continuityzone

road bicycle lane

pedestrian zone

furnishing zone

continuityzone

pedestrian zone

propertyline

road bicyclelane

boulevard: 4-lane roadsidewalk at typical vivastation intersection

Page 3: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

community liaison role

artwork 35 x 24 in

Community liaison specialist is working with property owners, tenants, local businesses, and the general public onsite to:

· Provide timely construction updates

· Be a single point of contact for questions and concerns

· Provide onsite signage and other marketing support materials

· Feature businesses on our website to help attract customers during construction

· Coordinate meetings between project manager, owners and other parties to address individual property concerns/questions

Our public communications and marketing team will be developing strategies to ensure that the public knows what is happening.

Page 4: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

preliminary cross section: 4-lane road

mid-block

intersection

CORNELL 1:45UNIONVILLE 1:45

40.00Right-of-way

2.000.30 0.302.50 2.50 2.00

0.60 0.600.50 0.500.30 0.30

1.50 3.50 3.30 3.30 3.50 1.503.50 3.504.00

PublicSidewalk

PublicSidewalk

BicycleLane

BicycleLane2 Through Lanes Transitway

[Coloured Asphalt]Transitway

[Coloured Asphalt]Plantable Raised Median

Rumble Strip2 Through Lanes

ContinuityStrip

ContinuityStrip

Rumble Strip

Boulevard 5.90 Boulevard 5.90

44.00Right-of-way

2.000.30 0.302.50 2.50 2.00

0.60 0.600.50 0.70 0.500.30 Clearance

1.50 3.50 3.30 3.30 0.30 3.30 3.50 1.503.50 4.003.50

PublicSidewalk

PublicSidewalk

BicycleLane

BicycleLane

Through /Right-turn Lane Through Lane Left-turn Lane Transitway [Coloured Asphalt] Shelter/PlatformRumble Strip Offset

2 Through LanesContinuityStrip

ContinuityStrip

Boulevard 5.90

Prop

erty

Lin

e

Boulevard 5.90

Property Line

artwork 35 x 24 in.

Page 5: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

yonge street: mulock drive to davis drive

artwork 127” x 30” in

Scale: 1:500

Match Line A

Mat

ch L

ine

A

Page 6: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

yonge street rapidways timeline: mulock to davis drive

artwork 35 x 24 in

Property acquisitionunderway

Preliminary designunderway

Final design/construction

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

2010 2011

Projected completion date end-2013

Page 7: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

engineering and construction timelines

artwork 35 x 24 in

Description

Spadina Subway Extension– Downsview station to York University

Yonge Subway Extension– Finch station to Richmond Hill Centre

H2H3

Hwy 7 – Richmond Hill Centre to Pine Valley DriveHwy 7 – Richmond Hill Centre to Kennedy Road

Y2 Yonge Street – Richmond Hill Centre to 19th Avenue

Y3.2D1

Yonge Street – Mulock Drive to Davis DriveDavis Drive – Yonge Street to Hwy 404

G1 H1H4M1V1Y3.1Y3.3

Green Lane – Yonge Street to East Gwillimbury GO station Hwy 7 – Pine Valley to Highway 50Hwy 7 – Kennedy to York Durham LineMarkham Centre to Don Mills stationHwy 7 to Hwy 407/Jane subway stationYonge Street – 19th Avenue to Mulock DriveYonge Street – Davis Drive to Green Lane

Legend Concept Design / Preliminary Engineering / Land Acquisition Construction Updated January 2010

Project

Subways

Viva Operating Segments

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Page 8: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

how are rapidways built?

artwork 35 x 24 in

Phase 1 : Concept Design Phase 2 : Preliminary Design Phase 3 : Construction

·Utility relocation

·Road widening – one side at a time, including boulevards and planting

·Construct rapidways and stations down middle of road

Complete July 2010 – February 2011 Spring 2011 and forward

Guiding Principles·Maintain access to business locations

·Minimize disruption

·Maintain 3 lanes of traffic

·Clean and safe work site

·Development of design elements

·Construction drawings

·Sequencing / scheduling of construction

Page 9: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

intersection: 4-lane road

Page 10: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng
Page 11: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng
Page 12: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

vivaNext route map

artwork 24 x 35 in

*Planned construction of bus rapid transit, includes dedicated and non-dedicated rapidway**Will connect to Bloor-Danforth subway *Planned construction of bus rapid transit, includes dedicated and non-dedicated rapidway**Will connect to Bloor-Danforth subway Map not to scale

Hig

hway

50

Highway 407

Finch Avenue

Sheppard AvenueSheppard Avenue

Lesl

ie S

tree

t

Steeles AvenueSteeles Avenue

Bat

hurs

t Str

eet

Yong

e St

reet

Yong

e St

reet

Hig

hway

27

Hig

hway

400

Jane

Str

eet

Highway 9

Finch Avenue

Sheppard Avenue

Steeles Avenue

Hig

hway

404

Hig

hway

404

Bay

view

Ave

nue

Ken

nedy

Roa

d

York

Dur

ham

Lin

e

Highway 407

Wellington St. E. Aurora Rd.

Davis Drive

Green Lane

Bloomington Rd.

Stouffville Rd.

Major MacKenzie DriveMajor MacKenzie Drive

Highway 7Highway 7

Highway 7

Lesl

ie S

tree

tDo

n M

ills

Roa

d

Funded Rapidways*

Future Rapidways*

Spadina Subway Extension

Proposed Light Rail Transit**

Proposed Yonge Subway Extension

Terminals

GO Transit Rail Lines

N E W M A R K E T

W H I T C H U R C H -S T O U F F V I L L E

A U R O R A

V A U G H A N

V A U G H A N M A R K H A M

R I C H M O N D H I L L M A R K H A M

T O R O N T OT O R O N T O

Don Mills Station

UnionvilleStation

Downsview Station

FinchStation

East GwillimburyGO Station

NewmarketGO Station

CornellRichmond Hill

Centre

WesternGateway

VaughanMetropolitanCentreKipl

ingIsl

ington

Islingto

nHele

nHele

nPine V

alley

Ansley G

rove

Weston

Keele

York

Universi

ty

York

Universi

ty

Royal O

rchard

Royal O

rchard

Finch W

est

Finch W

est

Sheppa

rd Wes

t

Sheppa

rd Wes

t

Steeles

Wes

t

Steeles

Wes

t

Hwy 407

Transit

way

Hwy 407

Transit

way

Dufferin

Dufferin

Promen

ade

Promen

adeBath

urst

Bathurst

Atkinso

n

Bayvie

w

Bayvie

w

16th-C

arrvill

e

16th-C

arrvill

e

Bantry

-Scott

Steeles

Steeles

Cummer/Drew

ry

Cummer/Drew

ry

Clark

Deniso

n

Esna-

SteelesEsn

a-Stee

les

McNico

ll

Senec

a Hill

Senec

a Hill

Leith Hill

Leith Hill

Langs

taff

/ Lon

gbrid

ge

Langs

taff

/ Lon

gbrid

ge

14th

Weldric

kMajo

r MacK

enzie

Major M

acKen

zie

Crosby

Elgin M

ills19

th-Gam

ble

Jeffe

rson

Jeffe

rson

KingBloo

mington

Bloomingto

n

Regatt

a

Regatt

aHen

derso

nGolf LinksWell

ingtonOrch

ard Heig

hts

Orchard

Heights

Mulock

Eagle

Parksid

e-

Lon

gford

Green Lan

e

Green Lan

e

Bristol

Bristol

Main

Southl

ake

Huron Heig

hts

Huron Heig

htsLes

lieLes

lie

Savage

Bernard

Valle

ymed

e

Valle

ymed

e

Chalmers

- Sou

th Park

Chalmers

- Sou

th Park

West B

eaver

Creek

West B

eaver

Creek

Leslie

Leslie

East B

eaver

Creek

East B

eaver

Creek

Allstat

e Park

way

Woodb

ineTo

wn Centre

Blvd.

Cedarl

and

Kenned

y

Kenned

y

Wooten

Way

Wooten

Way

Markham

Stouffv

ille Hos

pital

Markham

Stouffv

ille Hos

pital

McCow

an

Main St. M

arkham

Galswort

hy

Bur Oak

Warden

Enterpri

se

Enterpri

se

Martin Grov

e

Martin Grov

e

Highway

27

Highway

27

Highway

427

Highway

427

Commerc

e

Commerc

e

Page 13: Past Meetings > Yonge Street Newmarket > February 22, 2010 · Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2010 2011 Projected completion date end-2013. eng

energy-efficient lightingthroughout for greater safetyand comfort

gently sloping ramp provideseasy wheelchair, motorizedscooter and stroller access

ample seating inside and outprovides greater personalspace and comfort

flexible cash, pass and Prestofare machines

artwork 35 x 24 in

roof extends up and over Viva vehiclesto keep snow and rain off whileembarking/disembarking

roof and side panels made ofreflective tinted glass for greatervisibility and comfort

extended platform length canaccommodate multiple Vivavehicles, enhancing embarking/disembarking efficiency

raised platform provides level boardingof Viva vehicles, eliminating theneed to climb steps or lift objects

temperature and motion activated heaters in full wind enclosure provide warmth while motion-activated entry doors minimize heat loss

arrival/departure screensprovide real-time scheduling

info plus up-to-the-minutetime, weather, news, sports

and market headlines

full-time securitysurveillance and

intercom foremergency assistance

on platform

tactile pavers alongrapidway edge provide

greater safety

vivastation design elements