PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –
Page 2: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

PARTNERS

GOLD SPONSORS

PLATINIUM SPONSORS

SILVER SPONSORS

Page 3: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

3 AFTES • INTERNATIONAL CONGRESS • LYON 2014

The French Tunnelling and Underground Space Association (AFTES) is holding its 14th International Congress at the Cité Internationale in Lyon, on 13-15 October 2014. The theme of this year’s congress, “Tunnels and Underground Space: Risks and Opportunities”, was selected to angle the event firmly at reality, addressing topics ranging from the benefits of underground structures in urban areas to risk, generally well-managed today. The Congress will, in addition to a sprawling exhibition area and one hundred speakers, feature tours of technical facilities and showcase an ideas competi-tion, a new addition this year, launched across all of France’s National Higher Schools of Architecture (ENSA) on the topic, “Underground Space and Urba-nity: Which Projects Will Build the Future?”. Winners will present their work and receive their awards during the Congress. In addition, organised in conjunction with corresponding associations in neighbouring countries Belgium, Italy, Portugal, Spain and Switzerland, the Congress will be an event not only for engineers specialized in designing, building and operating underground structures, but also for architects and urban planners, eager to facilitate more extensive use of the underground in urban areas. The Congress will also be an opportunity to illustrate the Association’s chosen focus areas, in particular with a Round Table on Major Transport Infrastructures (integra-tion into major metropolitan areas, economic impact of their activity, and issues relating to the required training for professionals at all levels), and a training seminar for young engineers. AFTES invites you to get involved and participate to your fullest throughout the duration of this leading event, so that your activities enjoy the benefit of high-quality communica-tion and showcasing. This Congress is your congress.

The President of the AFTES, Yann Leblais

PROGRAMME

AFTES INTERNATIONALCONGRESS LYON 2014

Page 4: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

4 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

ASSOCIATIONS PARTNERS

ABTUS/BVOTSAssociation Belge des Techniques et de l’Urbanisme SouterrainsPrésident : Jean-François Thimusc/o ADEB - av. Grandchamp - 148 - B1150 Bruxelles - Belgiquewww.abtus-bvots.be

AETOSAsociación Española de Túneles y Obras SubterráneasPrésident : Manuel Arnaïz Ronda Almagro, 4228010 Madrid - Espagnewww.aetos.es

CPTCPT Comissão Portuguesa de Túneis Sociedade Portuguesa de GeotecniaPrésident : João Bile Serrac/o Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101PT-1700-066 Lisboa - Portugalwww.spgeotecnia.pt

FGU/GTSFachgruppe für Untertagbau / Groupe spécialisé pour les travaux souterrainsPrésident : Luzi Reto GruberBachweg 3CH - 8133 Esslingen - Suisse www.swisstunnel.ch

SIG/ITSSIG/ITS Societa Italiana Gallerie / Italian Tunnelling SocietyPrésident : Andrea PigoriniVia E. Breda n°28 20126 Milano - Italiewww.societaitalianagallerie.it

ITA-AITESITA-AITES (International Tunnelling and Underground Space Association) - Association Internationale des Tunnels et de l’Espace Souterrain) c/o EPFLPrésident : Soren Degn EskesenBât. GC - Station 18 - 1015 Lausanne - Suissewww.ita-aites.org

Page 5: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

5 AFTES • INTERNATIONAL CONGRESS • LYON 2014

CITÉ CENTRE DE CONGRES LYON 50, Quai Charles de Gaulle - 69463 Lyon cedex 06

Tél. : +33 (0)4 72 82 26 [email protected]

CONGRESS PLAN

ExhibitonAgora

Meeting roomsConference room for students

Speakers room

Welcome desks

Cloakrooms

Conference RoomsForum 1 Forum 2

Forum 3

Page 6: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

6 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

1 // CONGRESS PROGRAMMEM

onda

y, Oc

tobe

r 13th

Time FORUM 1 Time FORUM 2 Time AGORA

10:00 am - 12:00 am Welcome and opening speeches 12:00 am - 12:30 am Inauguration of the exhibition4:00 pm - 4:15 pm SETEC “Design and rules”

12:30am - 2:00 pm : Lunch Forum 32:00 pm4:00 pm

Topic A Section A1/A11

2:00 pm3:45 pm

Topic C Section C1

Break

4:30 pm6:15 pm

Topic A Section A1/A12

4:15 pm6:00 pm

Topic C Section C2

7:00 pm : Reception at the Town Hall

Tues

day,

Octo

ber 1

4th

8:30 am10:30 am

Topic A Section A2/A21

8:30 am10:15 am

Topic C Section C3

10:30 am10:45 am

SETEC “Metrology and Means”

Break

11:00 am 12:45 am

Topic A Section A2/A22

10:45 am12:30 am

Topic B Section B1

10:45 am12:30 am

Interview on the underground space

12:30 am - 2:00 pm : Lunch Forum 3 2:00 pm3:45 pm

Topic A Section A2/A23

2:00 pm3:45 pm

Topic B Section B2

4:00 pm6:00 pm

Roundtable

Break

6:00 pm7:00 pm

Competition of idea in architecture Awards ceremony to the winners

8:00 pm : Gala dinner

Wed

nesd

ay, O

ctobe

r 15th

8:30 am10:15 am

Topic A Section A3/A31

8:30 am10:15 am

Topic D Section D1

Break

10:45 am12:30 am

Topic A Section A3/A32

10:45 am12:30 am

Topic D Section D2

12:30 am - 1:30 pm : Lunch Forum 3 1:30 pm4:15 pm

Specialist training seminar

Break

4:30 pm5:30 pm

Closure of the Congress

Page 7: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

7 AFTES • INTERNATIONAL CONGRESS • LYON 2014

1 // CONGRESS PROGRAMME

Mon

day,

Octo

ber 1

3th

Time FORUM 1 Time FORUM 2 Time AGORA

10:00 am - 12:00 am Welcome and opening speeches 12:00 am - 12:30 am Inauguration of the exhibition4:00 pm - 4:15 pm SETEC “Design and rules”

12:30am - 2:00 pm : Lunch Forum 32:00 pm4:00 pm

Topic A Section A1/A11

2:00 pm3:45 pm

Topic C Section C1

Break

4:30 pm6:15 pm

Topic A Section A1/A12

4:15 pm6:00 pm

Topic C Section C2

7:00 pm : Reception at the Town Hall

Tues

day,

Octo

ber 1

4th

8:30 am10:30 am

Topic A Section A2/A21

8:30 am10:15 am

Topic C Section C3

10:30 am10:45 am

SETEC “Metrology and Means”

Break

11:00 am 12:45 am

Topic A Section A2/A22

10:45 am12:30 am

Topic B Section B1

10:45 am12:30 am

Interview on the underground space

12:30 am - 2:00 pm : Lunch Forum 3 2:00 pm3:45 pm

Topic A Section A2/A23

2:00 pm3:45 pm

Topic B Section B2

4:00 pm6:00 pm

Roundtable

Break

6:00 pm7:00 pm

Competition of idea in architecture Awards ceremony to the winners

8:00 pm : Gala dinner

Wed

nesd

ay, O

ctobe

r 15th

8:30 am10:15 am

Topic A Section A3/A31

8:30 am10:15 am

Topic D Section D1

Break

10:45 am12:30 am

Topic A Section A3/A32

10:45 am12:30 am

Topic D Section D2

12:30 am - 1:30 pm : Lunch Forum 3 1:30 pm4:15 pm

Specialist training seminar

Break

4:30 pm5:30 pm

Closure of the Congress

Page 8: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

8 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

2 // SCIENTIFIC CONFERENCES

FORUM 1

MONDAY, OCTOBER 13TH FORUM 1

2:00 pm - 4:00 pm Topic A

Design and coordination of tunnels and other underground construction projects

Section A1 - Tunnels in an urban environment A11 - Feedback from the sites

Chairman : Lorenzo Brino

• Général report on section A1: Tunnels in an urban environment. Schivre M.• Experience Gained at New Subway Line U5, Berlin Presentation of the TBM

Tunnel. CD. 001 - Rp.14 - Erdmann P.• The Underground Section of T6 Tram in Viroflay.

CD.002 - Rp.15 - Samama L.• The tunnels of the new Pedemontana Lombarda motorway.

CD.003 - Rp.16 - Lunardi G.• Design of automatic metro line B in Greater Rennes, including feedback

from line A. CD.004 - Rp.17 - Malbrancke G.

MONDAY, OCTOBER 13TH FORUM 1

4:30 pm - 6:15 pm Topic A

Design and coordination of tunnels and other underground construction projects

Section A1 - Tunnels in an urban environment A12 - Major Parisian projects: the near future

Chairman : Jean Launay

• Line 15 Southbound of Grand Paris Express, section « Pont de Sèvres- Noisy- Champs ». CD.005 - Rp.18 - Pons G.

• Alignment of Line 17 of Grand Paris Express as a result of optimized preliminary design. CD.006 - Rp.19 - Duclairoir X.

•Investigation Shaft and real- size in situ Testing for a New Underground Railway Station in La Défense district (Paris). CD.007 - Rp.20 - Marlinge J.• Extension of Paris Metro Line 14 (Saint- Ouen) – Risk management during

design phase. CD.008 - Rp.21 - Jullien P.

CD. : Numero texts. Rp. : Page abstracts Orator

Page 9: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

9 AFTES • INTERNATIONAL CONGRESS • LYON 2014

TUESDAY, OCTOBER 14TH FORUM 1

8:30 am - 10:30 am Topic A

Design and coordination of tunnels and other underground construction projects

Section A2 - Design and Contracting A21 - Controlled designs

Chairman : Alain Guilloux

• Général report on section A2 : Design and Contracting. Robert A.

• Recommandations of AFTES WG16 to take into account the effects due to tunnelling on surrounding structures. CD.011 - Rp.24 - Subrin D.

• The Base Tunnel of the Lyon- Turin New Railway Link: Feedback from the Reconnaissance Works. CD.012 - Rp.25 - Monin N.

• Modelling of primary lining of the caverns of the Romanche- Gavet hydro- electric facilities. CD.013 - Rp.26 - Shiu W.

• The Design Geological and Geotechnical Model (DGGM) for major infrastructures. The contribution of Tectonics and Structural Geology. CD.014 - Rp.27 - Soldo L.

TUESDAY, OCTOBER 14TH FORUM 1

11:00 am - 12:45 am Topic A

Design and coordination of tunnels and other underground construction projects

Section A2 - Design and Contracting A22 - General lessons on production methods

Chairman : Pierre Michel

• Successful challenging project in Poland for tunneling and microtunneling technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C.

• Long length railway tunnelling in Belgium – feasibility design and deci-sion-making. CD.016 - Rp.29 - Berten K.

• Tunnels on the A89 Motorway : Feedback from the Designer. CD.017 - Rp.30 - Martinetto O.

• How can sustainable development issues be taken into consideration to assist the stakeholders into the decision-making process? CD.018 - Rp.31 - D’Aloia Schwartzentruber L.

Page 10: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

10 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

TUESDAY, OCTOBER 14TH FORUM 1

2:00 pm - 3:45 pm Topic A

Design and coordination of tunnels and other underground construction projects

Section A2 - Design and Contracting A23 - Towards a « win-win » contracting process

Chairman : Hubert Tournery

• New recommendation of the Working Group No. 25 «Contracting and economic optimum» . CD.019 - Rp.32 - Thibault J- F.

• First assessment of the evolution of the process of risk management in underground projects for 10 years. CD.020 - Rp.33 - Humbert E.

• Design-and-build contracts for underground constructions; yes, but…Point of view of a contractor’s designer. CD.021 - R. p.34 - Collomb D.

• Cost assessment of tunnels. CD.022 - Rp.35 - Hamaide G.

WEDNESDAY, OCTOBER 15TH FORUM 1

8:30 am - 10:15 am Topic A

Design and coordination of tunnels and other underground construction projects

Section A3 - Feedbacks from TBM and large cavern works A31 - TBM’s

Chairman : Eric Leca

• Général report in section A3 : Feedbacks from TBM and large cavern works- Piraud J.

• Design of Miami Port twin tunnel. CD.032 - Rp.45 - Aubrit- Clochard M.

• Back analysis of TBM excavation through the highly deformable rock of the Fréjus Massif under high cover. CD.033 - Rp.46 - Semeraro M.

• Tunnel of Saverne (Eastern High Speed Line): Progress of the geological and geotechnical studies in design and works phase within the framework of a process of risks management. CD.034 - Rp.47 - Le Bissonnais H.

Page 11: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

11 AFTES • INTERNATIONAL CONGRESS • LYON 2014

WEDNESDAY, OCTOBER 15TH FORUM 1

10:45 am - 12:30 am Topic A

Design and coordination of tunnels and other underground construction projects

Section A3 - Feedbacks from TBM and large cavern works A32 - Large caverns

Chairman : Michel Levy

• Challenges in constructing the Nant de Drance hydroelectric scheme. CD.035 - Rp.48 - Garin E.

• The construction of two tunnels in difficult stress-strain conditions in Sotchi: the results of the first real comparison between NATM and ADECO-RS. CD.036 - Rp.49 - Lunardi G.

• Construction of the main access tunnels to the next level of El Teniente copper mine in Chile. CD.037 - Rp.50 - Lecomte B.

• Grouting Works around the New Veytaux Underground Hydroelectric Plant. CD.038 - Rp.51 - Müller O.

FORUM 2

MONDAY, OCTOBER 13TH FORUM 2

2:00 pm - 3:45 pm Topic C

Development of uses for underground space Section C1 - Innovations in uses for underground space

Chairman : Willy De Lathauwer

• Général report on topic C : Development of uses for underground space. Labbé M.

• Converting an underground quarry in an experimental and demonstration platform. CD.067 - Rp.84 - Cherkaoui A.

• Should we revisit the idea of underground siting of nuclear power plants? A scientific Rock Mechanics view. CD.068 - Rp.85 - De Bruyn D. / Piraud J.

• Feasibility aspects of lined tunnels and shafts for compressed air energy storage in weak rock masses. CD.069 - Rp.86 - Perazzelli P.

Page 12: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

12 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

MONDAY, OCTOBER 13TH FORUM 2

4:15 pm - 6:00 pm Topic C

Development of uses for underground space Section C2 - The Underground City

Chairman : Jean-Paul Godard

• «Ville 10D – Ville d’idées», a National Project to promote the use of under-ground space of metropolis. CD.070 - Rp.87 - Palisse J.P.

• What future for the urban underground? Subsurface and surface potential in San Antonio, Texas. CD.071 - Rp.88 - Doyle M.R.

• Resilience of the internal city of Montreal: observation, analysis and possible developments. CD.072 - Rp.89 - Diab Y.

• Legal aspects of underground urban planning. CD.073 - Rp.90 - Cocquière A.

TUESDAY, OCTOBER 14TH FORUM 2

8:30 am - 10:15 am Topic C

Development of uses for underground space Section C3 - Optimisation of underground spaces

Chairman : Monique Labbé

• What lessons of vernacular architecture for sustainable design in desert environments (Algeria)? CD.074 - Rp.91 - Benoudjafer I.

• Estimates of accident costs saved due to new pedestrian tunnels in the Montréal’s interior city. CD.075 - Rp.92 - Boisvert M.

• Optimization of the underground space in the design of Metro stations, from a constructive and architectural point of view. CD.076 - Rp.93 - Trussoni E.

• Opening of an underground red sandstone quarry at Rothbach. CD.077 - Rp.94 - Piraud J.

Page 13: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

13 AFTES • INTERNATIONAL CONGRESS • LYON 2014

TUESDAY, OCTOBER 14TH FORUM 2

10:45 am - 12:30 am Topic B

Technological progress and innovations Section B1 - Innovations in respect of boring machines

Chairman : Jean-François Thimus

• Général report on topic B : Technological progress and innovations. Subrin D.

• TBM excavation in Underground Research Laboratory of Meuse Haute-Marne. CD.049 - Rp.64 - Carraretto S.

• Robotized Maintenance of TBM Cutter Heads. CD.050 - Rp.65 - Girault B.

• The Evolution and Future of Earth Pressure Balance Machine Tunnelling. CD.051 - Rp.66 - Jordan D.

TUESDAY, OCTOBER 14TH FORUM 2

2:00 pm - 3:45 pm Topic B

Technological progress and innovations Section B2 - Innovations in respect of other aspects

of underground constructionChairman : Florent Robert

• Development of immediate re-use of the underground excavated material as mineral resource. CD.052 - Rp.67 - Galler R.

• Production of high quality concrete with mica rich sand – experience from large construction sites. CD.053 - Rp.68 - Thalmann C.

• NEWTUN – New technical developments in pipe roofing. CD.054 - Rp.69 - Cascarino S.

• Precast Tunnel Segments Reinforced With Fiberglass Reinforcement. CD.055 - Rp.70 - Meda A.

Page 14: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

14 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

WEDNESDAY, OCTOBER 15TH FORUM 2

8:30 am - 10:15 am Topic D

Managing underground infrastructures Section D1 - Sustainable infrastructures

Chairman : Miguel Fernandez-Bollo

• Général report on topic D: Managing underground infrastructures - Varjabedian M.

• Risk management in major public infrastructure projects. CD.079 - Rp.98 - Deulofeu C.

• New AFTES recommendations on waterproofing treatments in underground structures. CD.080 - Rp.99 - Mahuet J.L.

• Tunnel auscultation strategy: implantation and notation. CD.081 - Rp.100 - Rhayma N.

WEDNESDAY, OCTOBER 15TH FORUM 2

10:45 am - 12:30 am Topic D

Managing underground infrastructures Section D2 - Flagship renovation site

Chairman : Daniel Mérakeb

• ECOMINT - Tunnels Waterproofing by Thin Shells. CD.082 Rp.101 - Larive C.

• Renovation of smoke extraction system of the Nanterre-La Défense underground complex. CD.083 - Rp.102 - Darpas M.

• Innovative method of replacing a ballasted track by a track on concrete in a tunnel under operation. CD.084 - Rp.103 - Alvarez A

• Heavy renovation of the Croix-Rousse(Lyon) tunnel : management of the project in a constrained urban context. CD.085 - Rp.104 - Roux T.

WEDNESDAY, OCTOBER 15TH FORUM 2

1:30 pm - 4:15 pm Specialist training seminar

Managing risk in underground structuresChairman : Richard Kastner

• Introduction - Kastner R.• Challenge and approach taken by AFTES control risks.

Rp.122- 125- Robert A.• Risk management process during studies.

Rp.122- 125 - Gaillard C.• Contractualisation principles Rp.122- 125 - Hamaide G.• Discussion Rp.122- 125 - Kastner R. & al• Seminar conclusion. Rp.122- 125 - Deffayet M.

Page 15: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

15 AFTES • INTERNATIONAL CONGRESS • LYON 2014

AGORA

MONDAY, OCTOBER 13TH AGORA

8:30 am – 10:00 am : Registration – Reception Bellecour 10:00 am – 10:30 am : Welcome • Philippe Millard, Président du Congrès 10:30 am – 12:00 am : Opening speaches :

• Alain Vidalies, Secrétaire d’état aux Transports • Eliane Giraud, Vice-présidente de la Région Rhône-Alpes, déléguée aux transports • Jean-Luc Da Passano, Vice-président du Grand Lyon • Yann Leblais, Président de l’AFTES • Eric Leca, Membre du Bureau de l’AITES • Hubert du Mesnil, Président de Lyon-Turin Ferroviaire • Gérard Cherel, Directeur du programme de la Société du Grand Paris 12:00 am – 12:30 am : Inauguration of the exhibition

4:00 pm – 4:15pm : SETEC « Design and rules »

TUESDAY, OCTOBER 14TH AGORA

10:30 am – 10:45 am : SETEC « Metrology and means »

10:45 am - 12:15 am : Interview on the underground space

4:00 pm – 6:00 pm : Round table animated by Pierre Ostian Know-now and training

• Eliane Giraud, Vice-présidente de la Région Rhône-Alpes, déléguée aux transports• Alain Chabert, Directeur du département « Etudes du Projet » de LTF • Patrick Dieny, Chargé de la mission NLTL auprès du Préfet de la Savoie • Michel Lallement, Président du Syndicat des Entrepreneurs de Travaux

Souterrains • Gérard Labrit, Directeur du projet « Anneau des Sciences » au Grand Lyon • Anne Lambusson, RFF, Directrice Région Rhône-Alpes Auvergne • Ludovic Boyron, Directeur de la Mission « Part Dieu » au Grand Lyon • Frédéric Longchamp, Directeur des gares de Lyon et Grenoble pour

« Gares et Connexions » de la SNCF • Dominique Perrault, Architecte du projet « Two Lyon »

6:00 pm – 7:00 pm : Competition of idea in architecture Awards ceremony to the winners

WEDNESDAY, OCTOBER 15TH AGORA

4:30 pm – 5:30 pm : Closure of the congress• Rick Lovat, Vice-président de l’AITES• Yann Leblais, Président de l’AFTES

Page 16: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

16 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

Page 17: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

17 AFTES • INTERNATIONAL CONGRESS • LYON 2014

3 // TECHNICAL EXCURSIONS

• Tuesday, October 14th

Visit to the “Soft modes” tunnel of the Croix-Rousse extended by the visit to the Gallo-Roman Museum at FourvièreBy coach - Departure 8:30 am (Amphithéâtre - Cité Internationale)

• Tuesday, October 14th

Visit to the Technical Center “Louis Vicat” By coach - Departure 8:30 am (Amphithéâtre - Cité Internationale)

• Wednesday, October 15th

Visit of the maintenance and operation centre of the Grand Lyon tunnelsBy coach - Departure 8:30 am (Amphithéâtre - Cité Internationale)

4 // EVENTS

• Monday, October 13th : Official evening event at the Town Hall.• Tuesday, October 14th : Evening Gala event at the Abbaye de Collonges.Located on the bank of the River Saône, the Abbaye de Collonges will welcome you from 8pm onwards in a dazzling and unique setting. To the sound of organs and barrel organs you will savour the cuisine of one of the world’s leading ‘masters of gastronomy’, Paul Bocuse. You will travel by coach from the Congress Centre to the venue of the reception.

Page 18: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

18 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

5 // LIST OF EXHIBITORS

PARTNERS ASSOCIATIONSAFTES - ABTUS/BVOTS - AETOS - CPT - FGU/GTS - SIG/ITS - TUNNELLING ASSOCIATION OF CANADA - ITA-AITES ....................1 4 - 1 6 - 1 8 - 2 0

NATIONAL ASSOCIATIONSAFGC - ASTEE - CFGI - CFMR - CFMS - COBATY - COFHUAT - FSTT - INDURA - SIM .. 5 - 1 0 - 1 1 - 1 2 - 1 9

PRESS ............................................................. 2 - 4

EXHIBITORS ABTUS-BVOTS - CEI - DE MEYER - DENYS - GALERE + BAM-LUX - TUC RAIL - SMET TUNNELLING - WAYSS & FREYTAG INGENIEURBAU AG .......... 1 1 0

ACO PASSAVANT AG ....................................... 1 4 5

ANIXTER - SOFRASAR ..................................... 2 0 9

ANTEA GROUP................................................ 2 2 6

ARCADIS - sponsor argent ........................ 1 5 3 - 1 5 5

ARTELIA VILLE & TRANSPORT .......................... 2 5 6

ARTHUR HABERMANN GMBH & CO. KG ........ 3 5 6

ASQUAPRO .................................................... 1 5 8

ASSOCIATION FRANÇAISE DE GÉNIE CIVIL (AFGC) ......................................1 1

A.S.T. BOCHUM / BAYSTAG GMBH ......... 2 1 3 - 2 1 5

ASTEE ASSOCIATION SCIENTIFIQUE ET TECHNIQUE POUR L’EAU ET L’ENVIRONNEMENT ......................................1 0

ATP-CONSTRUCTION COMPOSITES ............... 3 1 0

BASF FRANCE SAS DIVISION CONSTRUCTION CHEMICALS ................. 2 4 8 - 2 5 0

BBM GROUP ..................................2 5 8 - 3 5 7 - 3 5 9

BEKAERT NV ................................................... 3 4 7

BELLOLI SA .......................................................5 6

BG INGÉNIEURS CONSEILS ............................ 2 0 4

BMS - DRILLMAT ............................................ 3 4 1

BOCHUMER EISENHÜTTE HEINTZMANN GMBH & CO. KG .....2 5 8 - 3 5 7 - 3 5 9

BONNA SABLA................................................ 2 2 0

BOUYGUES TP - gold sponsor ...1 2 0 - 1 2 2 - 2 2 1 - 2 2 3

CARSAT RHÔNE-ALPES ................................... 1 6 5

CBE GROUP ................................................... 2 3 4

CEGELEC MOBILITY - silver sponsor ......... 2 4 2 - 2 4 4

CENTRE D’ÉTUDES DES TUNNELS (CETU) .................................................... 1 4 7 - 1 4 9

CERIB - PROMETHEE ...................................... 2 0 6

CETCO / DIP TECHNOLOGIES .............................2 7

CFE LOCATION................................................ 3 0 7

CFT GMBH COMPACT FILTER TECHNIC..............................2 5 8 - 3 5 7 - 3 5 9

CHANTIERS MODERNES ........................ 2 5 7 - 2 5 9

CHRYSO SAS .................................................. 2 0 1

CIMBÉTON ............................................. 1 5 7 - 1 5 9

CLARIANT SE SUCCURSALE FRANCE .............. 3 4 5

CLUSTER LUMIÈRE ............................................4 9

CMC ............................................................... 1 6 7

CMM - COCENTAL .......................................... 1 7 0

COFELY AXIMA ....................................... 2 2 4 - 3 2 5

CONDAT S.A. .......................................... 2 0 5 - 2 0 7

CSM BESSAC .......................................... 1 4 6 - 2 4 7

DARRAS ET JOUANIN ..........1 6 0 - 1 6 2 - 1 6 4 - 2 6 1 - 2 6 3 - 2 6 5

DATC ...................................................... 3 5 3 - 3 5 5

DATWYLER SEALING TECHNOLOGIES DEUTSCHLAND GMBH ................................... 2 1 4

DELUERMOZ .................................................. 3 6 0

DODIN CAMPENON BERNARD ...................... 2 5 3

DOERKEN S.A.S. ................................................2 1

DRAGON ............................................................. 8

DSD FIROC ET ATDI SAS .................................. 1 0 8

DSI ARTÉON ................................................... 3 0 6

DYNAOPT ..........................................................6 1

ECCE’LECTRO ....................................................4 9

ECE COGEMACOUSTIC ................................... 1 6 6

ECOCEM FRANCE ........................................... 2 0 2

EDF - CENTRE D’INGÉNIERIE HYDRAULIQUE ....6 0

EDILON SEDRA FRANCE ........................ 1 2 4 - 1 2 6

EDM ............................................................... 1 0 0

EFECTIS GROUP ............................................. 3 2 9

EGIS - silver sponsor................................. 1 1 3 - 1 1 5

EIFFAGE TP - gold sponsor ................2 2 8 - 2 3 0 - 2 3 2

EPC FRANCE ................................................... 1 6 8

ETANDEX ................................................ 1 4 8 - 1 5 0

F2A................................................................. 1 1 4

FAENA .................................................... 3 6 5 - 3 6 7

FAMA S.P.A. .................................................... 3 0 5

FERMACELL AESTUVER ................................... 3 2 7

FISCHER S.A.S. ....................................... 1 0 2 - 2 0 3

FONDASOL ..................................................... 3 6 6

FRANCE INJECTION SERVICE ......................... 3 4 3

FREYSSINET .................................................... 3 4 0

GALYONEO ..................................................... 3 0 4

GASCOGNE GÉNIE CIVIL SAS.......................... 3 1 7

GEODATA........................................................ 3 3 3

GEO INSTRUMENTATION................................ 3 3 9

GRACE PRODUITS DE CONSTRUCTION .............3 4

Page 19: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

19 AFTES • INTERNATIONAL CONGRESS • LYON 2014

GRAND LYON COMMUNAUTÉ URBAINE .....................4 0 - 4 2 - 4 4

HBI HAERTER INGÉNIEURS CONSEILS ........... 2 1 2

HERCO KÜHLTECHNIK GMBH ........................ 3 2 0

HERRENKNECHT AG - silver sponsor ........ 1 2 3 - 1 2 5

HILTI FRANCE ................................................. 2 1 6

HOBAS FRANCE ............................................. 3 5 8

HODAPP GMBH & CO. KG .............................. 3 4 8

HOLCIM (FRANCE) ................................. 2 6 8 - 2 7 0

INGEROP ................................................ 2 1 7 - 2 1 9

ISC ................................................................. 2 1 8

ISOLATION FEU SERVICES .................................4 3

ITASCA / SOLEXPERTS / GEOKON.................... 2 2 2

ITECH ............................................................. 2 2 5

ITMSOIL ......................................................... 3 2 6

JENNMAR ...................................................... 2 7 1

LE MATÉRIEL TECHNIQUE / ARCANE ............... 3 2 2

LHOIST ........................................................... 3 2 3

LIEBHERR FRANCE SAS .................................. 1 1 2

LISTEC GMBH ....................................................5 3

LOMBARDI .................................................... 1 5 4

LYON TURIN FERROVIAIRE ..................... 1 0 5 - 1 0 7

MAPEI – UTT DIVISION ................................... 3 1 9

MAUERHOFER ET ZUBER...................................5 4

METALLIANCE S.A. .......................................... 3 3 5

MIRE S.A.S. .................................................... 2 4 9

MONTABERT ................................................... 3 4 9

MS ................................................................. 1 1 7

NFM TECHNOLOGIES .....................2 3 6 - 2 3 8 - 3 3 7

NGE / GUINTOLI .................................... 1 7 2 - 1 7 3

NOUVETRA ..................................................... 3 1 2

NUVIA PROTECTION ............................... 1 1 6 - 1 1 8

PATRY ............................................................. 3 4 2

PERAZIO ................................................. 3 6 5 - 3 6 7

PERFOROC LTD .............................................. 2 6 9

PROMAT ......................................................... 1 2 7

RAZEL-BEC - silver sponsor ........1 6 0 - 1 6 2 - 1 6 4 - 2 6 1 - 2 6 3 - 2 6 5

RBL-REI .......................................................... 2 4 0

RÉSEAU FERRÉ DE FRANCE .................... 3 1 3 - 3 1 5

ROBODRILL .................................................... 3 5 1

ROCKSOIL ...................................................... 3 2 8

SADE SERVICE TRAVAUX SPÉCIAUX ................ 2 2 7

SAINT-GOBAIN SEVA / FIBRAFLEX .................. 1 5 6

SANDVIK MINING AND CONSTRUCTION ....... 2 6 0

S & B INDUSTRIAL MINERALS GMBH ............. 3 6 1

SCHAUENBURG TUNNEL-VENTILATION GMBH ........................ 3 2 0

SEFI-INTRAFOR......1 6 0 - 1 6 2 - 1 6 4 - 2 6 1 - 2 6 3 - 2 6 5

SEMA ................................................................1 5

SEMM LOGGING ........................................... 2 1 1

SETEC - silver sponsor ...................................... 2 4 6

SIKA ............................................................... 2 6 6

SIREG ............................................................. 1 0 3

SNCF / INGÉNIERIE ET PROJETS - silver sponsor ......................................... 2 5 2 - 2 5 4

SNF SAS ............................................................3 1

SOCIÉTÉ DE L’INDUSTRIE MINÉRALE (SIM) .......1 9

SOCLI ............................................................. 3 0 8

SOILMEC ........................................................ 2 6 7

SOLDATA ........................................................ 1 2 1

SOLETANCHE BACHY.............................. 1 4 4 - 2 4 5

SOL SOLUTION ............................................... 2 5 5

SOTRAISOL FONDATIONS ........1 6 0 - 1 6 2 - 1 6 4 - 2 6 1 - 2 6 3 - 2 6 5

SOTRALENTZ CONSTRUCTION ........................ 3 2 4

SPIE BATIGNOLLES .................2 0 8 - 2 1 0 - 3 0 9 - 3 1 1

SPIE FONDATIONS ......................................... 1 7 1

SYSTRA - silver sponsor ............................ 2 6 2 - 2 6 4

TITANOBEL ..................................................... 3 0 3

T-MIX .............................................................. 1 5 2

TRACTEBEL ENGINEERING (FRANCE) / COYNE ET BELLIER .............................................5 2

TRE ESSE ENGINEERING SRL .......................... 3 2 8

TROX FRANCE................................................. 3 2 1

URBAINE DE TRAVAUX ..........1 6 0 - 1 6 2 - 1 6 4 - 2 6 1 - 2 6 3 - 2 6 5

VICAT ...................................................... 1 0 4 - 1 0 6

VINCI CONSTRUCTION GRANDS PROJETS - platinium sponsor .......................................... 2 5 1

WAT GMBH ....................................2 5 8 - 3 5 7 - 3 5 9

ZED TUNNEL GUIDANCE LTD .......................... 3 3 1

ZITRON S.A. ...........................................2 6 - 2 8 - 3 0

Page 20: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –

20 AFTES • CONGRÈS INTERNATIONAL • LYON 2014

6 // PLAN DE L’EXPOSITION

Page 21: PARTNERS - aftes.asso.fr Lyon 2014... · technologies for the construction of the 9 km DN2800 collector. CD.015 - Rp.28 - Madryas C. • ong length railway tunnelling in Belgium –