Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
PARTIAL
PREVIEW
Guthrie, Kentucky
Logan Todd Regional Water Commission
by the
WATER SYSTEM EXPANSION TO SPRINGFIELD, TN.
for the
CONSTRUCTION PLANS
T-1 Title Sheet
C-1 Existing Site Plan
C-2 Site Piping Plan
C-3 Site Grading Plan
October 2016
M-1 Building Mechanical Plan
M-2 Building Floor and Roof Framing Plan
M-3 Mechanical Sections and Details
M-5 Details, Notes and Design Criteria
E-1 Electrical Site Plan
E-2 Enlarged Electrical Site Plan
E-3 Electrical Plan
E-5 One Line Diagram
E-6 MCC-A2 Schedule, VFD Schedule and MCC-A2 Elevation
M-4 Building Details
G-1 Standard Symbols
G-2 Abbreviations
D-1 Electrical Demolition Plan
H-1 HVAC Plan
H-2 HVAC Schedule and Details
E-4 Details and Schedules
PARTIAL
PREVIEW
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
19
25
16 18
20
21
22
23
24
26
27
28
29
30
31
32
ON O
RIGI
NAL D
RAW
ING
M-1DRAWING NO.
FIRM
: McG
hee
DES
BY: M
WM
DWN
BY: M
WM
PRIN
TED:
PROJ
ECT
DATE
: Mar
ch 20
16SC
ALE:
3/16
"=1'-
0"
CHK
BY: C
WW
APP
BY:
LENG
TH O
F BA
R IS
1"
En
gin
ee
rin
g
202 E
wing
Stre
et
(270
) 483
-998
5Gu
thrie,
KY
4223
4
Mc
Gh
ee
www.m
cgheee
nginee
ring.co
m
Oct 31, 2016
Building M
echanical P
lan
Contract N
o. 2 - G
uthrie W
TP
Im
provem
ents
Logan Todd Regional W
ater Com
mission
Guthrie, Kentucky
SPRIN
GFIELD
, TN
W
ATER SU
PPLY PRO
JECT
ELECTRICALROOM
EXISTING HIGH SERVICEPUMP STATION
M-1AHIGH SERVICE PUMP STATION FLOOR PLAN
2'-8" 3'-0" 6'-0" 2'-0" 6'-8" 5'-8"3'-0"
1'-10
"1'-
2"8'-
8"8'-
8"8'-
8"8'-
8"12
'-0"
8"1'-
0"
1'-0"
54'-4
"1'-
0"56
'-4"
2'-6" 2'-6"
6"
3'-0"
40'-8
"10
'-8"
15'-6" 16'-6"
32'-0"
15'-6" 16'-6"
2'-0"
1'-0"
1'-0"
3- 1" TAPSSEE I
M-3
DUAL 8" SURGERELIEF VALVES
SPARE SUCTION BARRELFOR FUTURE PUMP
1 34" ALUMINUMI-BAR GRATING
8" DIP SURGE RELIEF
24" STEEL SUCTIONHEADER
24" STEELDISCHARGE
HEADER
14" B
UTTE
RFLY
VAL
VE
14" D
ISMA
NTLIN
G JO
INT
VERT
ICAL
TUR
BINE
PUM
P
10"x
12" I
NCRE
ASIN
G CU
SHIO
NED
SWIN
G CH
ECK
VALV
E
12" D
ISMA
NTLIN
G JO
INT
PRES
SURE
GAG
E AS
SEMB
LY
2" A
IR R
ELEA
SE V
ALVE
12" B
UTTE
RFLY
VAL
VE
12" 9
0 BE
ND
14" F
LANG
ED D
IP
12" F
LANG
ED D
IP
24" MAGNETICFLOW METER
1'-0"
2'-6"
24" DIP (FExPE) 24" DIP (FExPE)
PRECAST CONCRETE WALL PANELSTO MATCH EXISTING BUILDING (TYP)
DOUBLE 3-0x7-0 DOOR
DOUBLE 3-0x7-0 DOOR
EXISTING BUILDING
SPRINGFIELDPUMP No. 1
SPRINGFIELDPUMP No. 2
SPRINGFIELDPUMP No. 3
SPRINGFIELDPUMP No. 4(FUTURE)
3 - 1" TAPSSEE I
M-3
72'-5"
McGhee14440
L
I
C
EN
S
E
D
P
R
O
F
E
S
S
I
O
NA L
E
N
G
I
N
E
E
R
Michael W.S
T
A
T
E
O
F K
E
N
T
U
C
K
Y
1001
D1001
D1002
SEE
I M-3
SEE CM-3
BM-3
AM-3
PARTIAL
PREVIEW
ON O
RIGI
NAL D
RAW
ING
C-2DRAWING NO.
FIRM
: McG
hee
DES
BY: M
WM
DWN
BY: M
WM
PRIN
TED:
PROJ
ECT
DATE
: Mar
ch 20
16SC
ALE:
3/16
"=1'-
0"
CHK
BY: C
WW
APP
BY:
LENG
TH O
F BA
R IS
1"
En
gin
ee
rin
g
202 E
wing
Stre
et
(270
) 483
-998
5Gu
thrie,
KY
4223
4
Mc
Gh
ee
www.m
cgheee
nginee
ring.co
m
Oct 31, 2016
Site P
iping P
lan
Contract N
o. 2 - G
uthrie W
TP
Im
provem
ents
Logan Todd Regional W
ater Com
mission
Guthrie, Kentucky
SPRIN
GFIELD
, TN
W
ATER SU
PPLY PRO
JECT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
19
25
16 18
20
21
22
23
24
26
27
28
29
30
31
32
EXISTING CLEARWELL No. 1
3" PLANT WATER
12" D
RAIN
HYDRANT
INLETPUMP
STATION
4" SAN SEWER FORCE MAIN
TRANSFORMERS
FIRE HYDRANT
6" DIP
24" D
RAIN
24" DRAIN
36" DIP BYPASS
36" DIP CLEARWELL BYPASS
FIRE HYDRANT
20" D
IP T
O DI
STRI
BUTI
ON
24" D
IP T
O DI
STRI
BUTI
ON
R. J. CORMAN RAILROAD
RAWWATER
STORAGELAGOON
36" D
IP R
AW W
ATER
INLE
T
CHAIN LINK FENCE
24" BUTTERFLYVALVE
24"x6" TEE6" GATE VALVE
FIREHYDRANT
6" DIP
6'-0"6'-
0"6'-
11"
24" BFLY VALVE
36"x24" TEE 36" SLEEVE36" BFLY VALVE
24"x20" TAPPING SLEEVE & VALVE
24"x20" REDUCER
24" 90
24" DIP BYPASS
24" BFLYVALVE
24" TEE
±36'
24" SLEEVE
24" DIP POTABLE WATERPIPELINE TO SPRINGFIELDTN - BY OTHERS
RELOCATED ASPHALT ROAD
C-2ASITE PIPING PLAN
CO
CO
CONNECT 6" DIP ROOF DRAIN LINETO EXISTING 12" STORM SEWER WITHROMAC STYLE CB SEWER SADDLE OR EQUAL
6" D
IP R
OOF
DRAI
N @
1% S
LOPE
CONNECT TO 4" DIP 2" SCH 80 PVC SUMP DISCH
4" DIP ROOF DRAIN
F 575.00L
F 57
4.63
L
F 6" DIP 573.83L
4" DIP ROOF DR
DUCTILE IRONMJ TEE
CONCRETETHRUST
BLOCK
RETAINING GLAND
CONCRETETHRUSTBLOCK
FIREHYDRANT
6" DIP 6" MJ GATEVALVE &DTEXT BOX
CRUSHEDSTONEFILL
NOTES:1. USE RESTRAINED JOINT DUCTILE IRON PIPE OR MECHANICAL JOINT DUCTILE IRON PIPE
WITH RESTRAINING GLANDS TO SECURE ALL FITTINGS.2. FIRE HYDRANTS SHALL BE EITHER:
A AMERICAN DARLING B-84-BB MEULLER CENTURIONC US PIPE METROPOLITAN 250
LPIPE & TRENCH
c
"D" + 12" (TYP)
36" M
INIM
UM O
R AS
SHO
WN
ON P
LANS
6"
TRAFFIC AREASNON-TRAFFIC AREAS
NOMINAL PIPE DIA
"D"EXCAVATED MATERIAL
COMPACTED IN 8"LIFTS TO 95% MAX
DENSITY (ASTM D698)
No. 57 AGGREGATE BACKFILLTO 6" ABOVE TOP OF PIPE
6" No. 57 AGGREGATE BEDDING
No. 57 AGGREGATE TOPAVEMENT SUBGRADE
6" RESERVED TOPSOILSEED AND MULCH
TRAVEL SURFACE
SAWCUT PAVEMENT FULLDEPTH EACH SIDE
REPLACE PAVEMENT PER
NOTE:ALL DIP AND FITTINGS (EXCEPT DRAINS) SHALL BE RESTRAINED JOINTOR MECHANICAL JOINT WITH RESTRAINING GLANDS.
XC-4
C-2B
C-2C
NOTE:EXISTING PIPING IS SHOWN FROM RECORD DRAWINGS AND HAS NOT BEENFIELD LOCATED. SOME SMALLER PIPING IS NOT SHOWN, AND NOUNDERGROUND ELECTRICAL IS SHOWN. RECORD DRAWINGS ARE AVAILABLEFOR REVIEW AT THE ENGINEER'S OFFICE AND AT THE WATER PLANT DURINGNORMAL BUSINESS HOURS. CONTRACTOR SHALL WORK AROUND EXISTINGPIPELINES, CONDUITS, STRUCTURES, ETC. TO INSTALL THE PROPOSEDIMPROVEMENTS. WHERE ADDITIONAL FITTINGS, MATERIALS, ETC. AREREQUIRED DUE TO THE EXISTING UNDERGROUND ITEMS NOT BEING SHOWNCORRECTLY ON THE DRAWINGS, OR WHERE A RELOCATION OF ANY EXISTINGLINES, CONDUITS, ETC. ARE REQUIRED BY THEIR NOT BEING SHOWN, ORSHOWN CORRECTLY, AND WHERE THE RELOCATION IS NOT CALLED FOR ONTHE DRAWINGS, CONTACT THE ENGINEER AND MAKE ARRANGEMENTS FOR ACOMPENSATING CHANGE ORDER PRIOR TO UNDERTAKING THE WORK.
McGhee14440
L
I
C
EN
S
E
D
P
R
O
F
E
S
S
I
O
NA L
E
N
G
I
N
E
E
R
Michael W.S
T
A
T
E
O
F K
E
N
T
U
C
K
Y
PLAN
NOR
TH
CC-2SEE (TYP)
BC-2SEE
PARTIAL
PREVIEW