Part 4 – HV Overhead – Drawing Register
Number Description
H1-1 3Ph Intermediate (Steel Pole)
H1-2 3Ph Intermediate (Wood Pole)
H2 Single Slack Tee Off, 3Ph without DOF
H3 4 Way Intermediate
H4 Horizontal Termination
H5 In line Strain with/out DOF
H6 Running Disc Angle or Vertical Termination
H7 Running Disc Angle or Vertical Termination
H8-1 Intermediate Cable with/out DOF
H8-2 Intermediate Cable with DOF on separate Crossarm
H9-1 Termination Cable without DOF
H9-2 Termination Cable with DOF
H10-1 Intermediate Transformer HV to LV Open Aerial
H10-2 Intermediate Transformer HV to LV ABC
H11-1 In line Termination Transformer
H11-2 Side Mounted Termination Transformer with DOF
H12 PTS including Earth
H13 Tee Off with/out DOF
H14-1 Combination Switch and Fuse with Raiser
H14-2 Combination Switch and Fuse
H15-1 3Ph Recloser with LV Aerial Supply Arrangement
H15-2 3Ph Recloser with LV U/ground Supply Arrangement
H15-3 3Ph Recloser with Transformer Supply Arrangement
© Horizon Power Corporation
Number Description
H15-4 3Ph Recloser with Solar Supply Arrangement
H15-6 3Ph Recloser on Combination PTS and Raiser Pole with Cable Arrangement
H15-7 3Ph Recloser with Bypass switch and VHF Antenna (Rural)
H16-2 s1 Pole mount LBS Bypass switch on single bush TX VHF Antenna (Rural)
H16-2 s2 Pole mount LBS on two bush TX VHF Antenna (Rural)
H16-3 Pole mount LBS with two bush TX VHF Antenna (Rural)
H16-4 Pole mount LBS with TX supply arrangement
H16-5 Pole mount LBS with LV Aerial supply arrangement
H16-6 Pole mount LBS with LV Underground supply arrangement
H16-7 Pole mount LBS with LV Solar supply arrangement
H17-1 s1 3Ph Recloser on Termination PTS Pole with Cable Arrangement
H17-1 s2 3Ph Recloser on Combination PTS and Raiser Pole with Cable Arrangement
H17-2 3Ph Recloser on Intermediate Pole with Cable Arrangement
H17-3 3Ph Recloser on Termination Pole with Cable Arrangement
H17-4 Stand Alone Cable to Transformer Pole
H17-5 Intermediate Transformer (1PH) 3PH Inline Cables
H18 Termination Pole PTS with Cable and DOF
H19-1 Termination Pole PTS with Cable
H19-2 Termination Pole PTS with Feeder Cable for Feeder Switching
H20-1 Isolation Transformer
H20-2 Isolation Transformer 3Ph Termination, 1Ph inline
H20-3 Isolation Transformer 3Ph Termination, 1Ph inline with DOF
© Horizon Power Corporation
Number Description
H20-4 Isolation Transformer 3Ph Termination, 1Ph cable with DOF
H20-5 Isolation Transformer 3Ph Cable, 1Ph Tee-off with DOF
H20-6 Isolation Transformer 3Ph Inline, 1Ph Tee-off with DOF
H20-7 Isolation Transformer 3Ph Termination, 1Ph cable
H20-8 Termination Transformer 2 Ph line, 1ph spur
H21 Metering Transformer with Overhead Earthwire
H22 Intermediate Wishbone with Overhead Earthwire
H23 Intermediate Flat with Overhead Earthwire
H24 Termination Transformer with Overhead Earthwire
H25 Intermediate Transformer Wishbone Construction
H26 Vertical Inline Strain with Overhead Earthwire for Wishbone Constr.
H27 Wishbone Construction with Tee-off
H28 Vertical Strain Angle with Overhead Earthwire for Wishbone construction
H29-1 Fault indicator LV Aerial supply arrangement
H29-2 Fault indicator Solar supply arrangement
H30 Surge Arrestor standard Line installation
H31-2 22kV Pole Cap Bank with 10kVA Transformer Connection Details
H32-1 33kV Type TSC Oil Switch and Cap pole mounted
H32-2 33kV Single phase transformer pole mounted
H32-3 33kV Type TSC Oil Switch and Cap pole arrangement
H33-1 in-line layout TYPE GE VR-1 50A-100A Details
H33-2 in-line layout TYPE GE VR-1 50A-100A Details
H33-3 Off-set Detail type GE VR-1 50A-100A Arrangement
© Horizon Power Corporation
Number Description
H33-3A Off-set Detail type GE VR-1 50A-100A Arrangement
H33-4 Off-set Detail type GE VR-1 50A-100A Construction Detail
H40-1 1Ph Intermediate
H40-2 1Ph Anti-Clash/Galah Intermediate
H41-1 1Ph Running Disc Angle or Termination
H41-2 1Ph two way Termination
H42 1Ph Intermediate with Tee-off with DOF
H43 1Ph Intermediate with Tee-off
H44 1Ph Double Termination
H45 1Ph Slack Tee-off
H46 1Ph Intermediate Transformer with DOF
H47-1 1Ph Termination Transformer with DOF
H47-2 3Ph Intermediate with 1Ph transformer with DOF
H48-1 1PH Twin Mounted Transformer each side of pole
H48-2 Vertical Mounted 1Ph two Bushing Transformer
H49 Earth and Phase Connections
H50 Earth and Phase Connections 3 to 4 Trfr's
H51-1 1Ph Recloser Strain Termination with 1Ph Transformer Supply
H51-2 1Ph Recloser Inline with 1Ph Transformer Supply
H51-3 1Ph Recloser Inline with 1Ph Transformer Supply
H52 Down Earth Running Earth
H53 1PH inline strain sectionaliser and bypass DOF
H54 1Ph Termination cable with DOF
NOTE:
"X" "X"
300
450
750
230
TOP OF POLE
LINE OF L.V.
RUNNING EARTH
R1
R5
R3
R5
R14
R3
R1
R3
R4
SEE
NO
TE 2
(mm)
X-ARM LENGTHX (mm)
1900
2400
3300
EARTH POINT
EARTH POINT
R13 R6
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
BAT GUARDS
OR
HEAT SHRINK
TO MAINTAIN GROUND CLEARANCE.
2. 750mm STANDARD CONSTRUCTION 580mm ALLOWED
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
800
1050
1500
230
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE INTERMEDIATE
(STEEL POLE)
REVISION DATE
DRAWING No.
D JUNE 2011
H1-1
NOTE:
"X" "X"
230
450
750
230
TOP OF POLE
LINE OF L.V.
RUNNING EARTH
R1
R5
R3
R5R14
R3
R1
R3
R4
SEE
NO
TE 2
(mm)
X-ARM LENGTHX (mm)
1900
2400
3300
BAT GUARDS
OR
HEAT SHRINK
MAXIMUM OF 10 DEGREES WITH CROSSARM STRAP.
CONDUCTORS UP TO 7/4.75 FOR 19/3.25 CONDUCTOR A
THAN 10 DEGREES TO A MAXIMUM OF 20 DEGREES FOR
3. USE CROSSARM STRAP (CB0485) IF DEVIATION IS GREATER
TO MAINTAIN GROUND CLEARANCE.
2. 750mm STANDARD CONSTRUCTION 580mm ALLOWED
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
SEE NOTE 3
800
1050
1500
300
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE INTERMEDIATE
(WOOD POLE)
FOR REFERENCE ONLY
REVISION DATE
DRAWING No.
D JUNE 2011
H1-2
"X" "X"800
400
800
230
TOP OF POLE
R1
R3R3
R1
R3
R3
R4
(mm)
X-ARM LENGTHX (mm)
1900
2400
3300
EARTH POINT
EARTH POINT
R13
R3
R3
RUNNING EARTH
PHASE
RUNNING EARTH TEE-OFF
EARTH POINT
R6
BAT GUARDS
OR
HEAT SHRINK
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
NOTE:
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
800
1050
1500
230
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE SLACK TEE OFF
3 PHASE WITHOUT DROPOUT FUSES
REVISION DATE
DRAWING No.
D JUNE 2011
H2
NOTE:
"X" "X"
450
1725
800
230
TOP OF POLE
R1
R1
R1
R3
R4
(mm)
X-ARM LENGTHX (mm)
1900
2400
3300
EARTH POINT
R13
R3
EARTH POINT
R4
R1
R1R3
R3
R4
R1
R3
LINE OF L.V.
RUNNING EARTH
OFFSET INTERMEDIATE
75
460460920
2400
INTERMEDIATE OFFSET XARM DETAILS
BAT GUARDS
OR
HEAT SHRINK
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH BAY CONSTRUCTION USING 19/3.25 CONDUCTOR.
2. CROSSARM STRAP REQUIRED FOR RURAL/EXTENDED
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
BAT GUARDS
OR
HEAT SHRINK
SEE NOTE 2
230
800
1050
1500
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
4 WAY INTERMEDIATE
REVISION DATE
DRAWING No.
D JUNE 2011
H3
NOTE:
TOP OF POLE
R3
R5R1
PIN
CARRY OVER
R5
R3
R5
R3
R14
R3
R5
R1
R5
R5
R5
R3
R14
945
945
450
970
230
230
300
75
L.V.
R/E
TOP OF POLE
STAYS
SINGLE TERMINATIONDOUBLE TERMINATION
945945
EARTH POINT
BAT GUARDS
OR
HEAT SHRINK
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
805
230
230
230
1565
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
HORIZONTAL TERMINATION
REVISION DATE
DRAWING No.
D JUNE 2011
H4
NOTE:
1000
1000
596
585
1290
23
01200
450
TOP OF POLE
CENTRE PHASET BRACKET
RUNNING EARTH
LINE OF L.V.
EARTH POINT
R3
R3
R3
R5
R5
R5
R10
R10
R10
LINE LOAD
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM
23
0
150
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
IN-LINE STRAIN
WITH OR WITHOUT DROPOUT FUSES
REVISION DATE
DRAWING No.
E NOV 2012
H5
NOTE:
TOP OF POLE
R5R14
R3
450
1200
900
450
450
230
LINE OF L.V.
RUNNING EARTH
STAY
R5
R5
EARTH POINT
4. FOR RDA USE BALLHOOK AND SOCKET
PHASE SPACING. ALL OTHER GROUND CLEARANCES STILL APPLY.
3. FOR BAY LENGTHS OVER 80m USE 12.5m OR 14m POLE WITH 1200mm
SPACINGS APPLY. ALL OTHER GROUND CLEARANCES ALSO APPLY.
2. FOR BAY LENGTHS LESS THAN 80m ON A 12.5m POLE, H7 CONDUCTOR
1. FOR BAY LENGTHS LESS THAN 55m WITH R/E - 12.5m POLE.
SEE NOTE 4
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 12.5m
RUNNING DISC ANGLE
OR VERTICAL TERMINATION
REVISION DATE
DRAWING No.
D JUNE 2011
H6
NOTE:
TOP OF POLE
R14
R3
LINE OF L.V.
RUNNING EARTH
STAY
R5
R5
EARTH POINT
600
600
1200
600
600
230
450
PHASE
PHASE
PHASE
STAY
R5
R5
R14
R5
R14
R5
R14
OVERHEAD R/E
R5 R3
PHASE
PHASE
PHASE
LINE OF L.V.
STAY
STAY
TOP OF POLE
600
600
1200
600
600
230
450
SEE NOTE 1
SEE NOTE 1
1. FOR RDA USE BALLHOOK AND SOCKET
ARRANGEMENT
OVERHEAD RUNNING EARTH
ARRANGEMENT
STANDARD RUNNING EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 14m
RUNNING DISC ANGLE
OR VERTICAL TERMINATION
(1200mm SPACING)
REVISION DATE
DRAWING No.
C JUNE 2011
H7
NOTE:
23
09
00
25
50
1290
585 575
R9
585
870
TOP OF POLE
LINE OF L.V.
R4
R3
R3
R3
R8R8
R1
R1
R10
R1
R7
R6
R13
EARTH POINT
EARTH POINT
BAND-IT
STRAPS
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
2. FOR INTERMEDIATE CABLE WITHOUT DROPOUT
FUSES USE H9 DIMENSIONS FROM CROSSARM
TO CABLE BRACKET AND IF REQUIRED FROM
TOP OF POLE TO RUNNING EARTH.
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R7
2100
450
NO
TE
2
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m/12.5m
INTERMEDIATE CABLE
WITH OR WITHOUT DROPOUT FUSES
REVISION DATE
DRAWING No.
F NOV 2012
H8-1
NOTE:
23
0635
26
25
1080
430 860
R9
870
1080
TOP OF POLE
LINE OF L.V.
R4
R3
R3R3
R8R8
R1
R1
R10
R1
R7
R6
R13
EARTH POINT
EARTH POINT
BAND-IT
STRAPS9
00
86
0
R1
450
R8
R1
R/E
REFER R6 FOR
EARTH RESISTANCE
REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
2. FOR INTERMEDIATE CABLE WITHOUT DROPOUT
FUSES USE H9 DIMENSIONS FROM CROSSARM
TO CABLE BRACKET AND IF REQUIRED FROM
TOP OF POLE TO RUNNING EARTH.
R7
HEAT SHRINK
OR
BAT GUARDS
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
INTERMEDIATE CABLE
WITH DROPOUT FUSES
(ALTERNATE CROSSARM)
REVISION DATE
DRAWING No.
E NOV 2012
H8-2
NOTE:
TOP OF POLE
EARTH POINT
945
945
R5
R3
R3
RUNNING EARTH
R1
230
1650
450
LINE OF L.V.
R14
R1
R3
R5
R3R5
R8
R9
R7
R7
R6
R3
R1
R8 R8
R3R3
R3
R1
R5
R13
EARTH POINT
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF HV OVERHEAD
230
230
630
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
TERMINATION CABLE
WITH DROPOUT FUSES UPSTREAM
REVISION DATE
DRAWING No.
D JUNE 2011
H9-1
NOTE:
TOP OF POLE
EARTH POINT
1000
1000
585
585
1290
23
02
30
90
0 R10
R10
R10
R5
R3
R3
RUNNING EARTH
63
0
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM.
89
0
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m/12.5m
TERMINATION & CABLE
WITH DROPOUT FUSES
REVISION DATE
DRAWING No.
E NOV 2012
H9-2
X-ARM LENGTH
(mm)X (mm)
1900
2400
3300
NOTE:
TOP OF POLE
RUNNING EARTH
23
02
30
635
75
0
22
50
1200
"X" "X"
R13
R6
R3
R3R3
R4 R4
R1
R1
R1
R12 R12
EARTH POINT
R1 (HOLES 22 DIA.)
TRANSFORMER
SUPPORT
R1
R10
R12
PHN
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
INTERMEDIATE TRANSFORMER
HV TO LV OPEN AERIAL
REVISION DATE
DRAWING No.
D AUG 2012
H10-1
ABC
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
R6
800
1050
1500
R8-1
EARTH POINT (R6)
70sqmm DOWN EARTH (R6)
X-ARM LENGTH
(mm)X (mm)
1900
2400
3300
NOTE:
TOP OF POLE
RUNNING EARTH
23
02
30
635
1500
"X" "X"
R13
R6
R1 (HOLES 22 DIA.)
TRANSFORMER
SUPPORT
30
00
R3
R3
R4
R4
R1
R1
R12
R10R1
R3
EARTH POINT
MIN
IMU
M 5
000
KRONE ISOLATORS
ABC
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM.
R8-1
800
1050
1500
EARTH POINT (R6)
70sqmm DOWN EARTH (R6)
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
INTERMEDIATE TRANSFORMER
HV TO LV ABC
REVISION DATE
DRAWING No.
E NOV 2012
H10-2
EARTH POINT
NOTE:
TOP OF POLE
R6
L.V. BRACKET
HV ARRANGEMENT TOP VIEW
R3
R12
LV INTERMEDIATE
LV TERMINATION
945 945
600
450
2250
R13
R/E
R5
HOLES
DIAMETER
(R1) 22
R12
R5 R5R1
R8
R5
R3
R5
R1
R1
R5
R14
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
X-ARM.
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING
ABC
R8-1
R6
230
230
760
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 12.5m
IN-LINE
TERMINATION TRANSFORMER
REVISION DATE
DRAWING No.
D JUNE 2011
H11-1
NOTE:
TOP OF POLE
R6
R13
L.V. BRACKET
RUNNING EARTH
945 945
SIDE STAY
IF REQUIRED
23
02
30
835
35
50
90
0450
HV ARRANGEMENT TOP VIEW
LV ARRANGEMENT TOP VIEW
R3
R8
(R1) 22 DIAMETER
HOLES
R12
TRANSFORMER
SUPPORT
ABC
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING
X-ARM
2. STAY POSITION TO SUIT TAPS, MIN OF 400mm TO
NEAREST HV CONDUCTOR
3. 3550mm DISTANCE MAY BE REDUCED TO 2700mm FOR
GROUND CLEARANCE.
WITH A REDUCED 2500mm CONSTRUCTION ALL WORK
TASK CLEARANCE STANDARDS MUST BE COMPLIED WITH.
SE
E N
OT
E 3
STAY
SEE NOTE 2
STAY SEE
NOTE 2
R8-1
EARTH POINT (R6)
70sqmm DOWN EARTH
(R6)EARTH POINT
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
SIDE MOUNTED
TERMINATION TRANSFORMER
WITH DROPOUT FUSES
REVISION DATE
DRAWING No.
F NOV 2012
H11-2
NOTE:
EARTH POINT
R13
R6
23
02
30
1000
LINE OF L.V.
(R1) 22 DIAMETER HOLES
R3
72
0
20
70
R7 - STANDARD CABLE GUARD
(R1) 14 DIAMETER HOLES
EARTH MAT
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
BAND-IT
STRAPS
600 SQ.
EARTH
MAT
R6
EARTH SPEAR450
ROADSIDE
33kV22kV
MIN
IMU
M H
EIG
HT
150
ROD GUIDE
30
0
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV
OVERHEAD REGARDING X-ARM
R6
450
RUNNING EARTH
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
POLE TOP SWITCH
INCLUDING EARTH
REVISION DATE
DRAWING No.
F DEC 2012
H12
TOP OF
POLE
NOTE:
705
585
585
1000
1000
23
06
00
1200
450
75
1725
X-ARM LENGTH
(mm)X (mm)
1900
2400
3300
"X" "X"
TOP OF POLE
RUNNING EARTH
R3
R3
R3
R3
R4R1
R5
R5
R5
R5
R10
R1
R14
30
0
EARTH POINT
R10
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM
L.V.
HEAT SHRINK
OR
BAT GUARDS
800
1050
1500
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m/12.5m
TEE OFF WITH OR WITHOUT
DROPOUT FUSES
REVISION DATE
DRAWING No.
F DEC 2012
H13
NOTE:
EARTH POINT
R6
TOP OF POLE
(R1) 22 DIAMETER HOLES
R7 - STANDARD CABLE GUARD
EARTH MAT
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
BAND-IT
STRAPS
600 SQ.
EARTH
MAT
R6
EARTH SPEAR450
ROADSIDE
MIN
IMU
M H
EIG
HT
23
02
30
1300
72
0
20
70
R13
(R1)
14 DIAMETER
HOLES
R10
R3
R8
R1R9
R8
R7
R6
ROD GUIDE
150
30
0
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM.
2. 1300mm WITH FUSES AND 900mm WITHOUT
FUSES.
3. PG CLAMP POSITION TO ALLOW FULL
OPERATION OF P.T.S. WITHOUT STRAINING
CONNECTIONS AND LEAD
4. ENSURE ADEQUATE CLEARANCE BETWEEN
LINE AND P.T.S.
SE
E N
OT
E 2
SEE NOTE 4 SEE NOTE 3
R7 - CABLE GUARD
R6
R6
97
0R/E
450
LINE OF L.V.
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m/12.5m
COMBINATION SWITCH AND FUSE
WITH RAISER (11kV AND 22kV)
REVISION DATE
DRAWING No.
F NOV 2012
H14-1
NOTE:R6
TOP OF POLE
(R1) 14 DIAMETER HOLES
EARTH MAT
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
BAND-IT
STRAPS
600 SQ.
EARTH
MAT
R6
EARTH SPEAR450
ROADSIDE
MIN
IMU
M H
EIG
HT
23
02
30
20
01000
72
0
20
70
R13
R3(R1) 22 DIAMETER
HOLES
R3
R8
R8
R9
R7
R7 - STANDARD CABLE GUARD
ROD GUIDE
150
30
0
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R7 CABLE GUARD
SEE NOTE 2
1. REFER TO GENERAL NOTE OF HV
OVERHEAD REGARDING X-ARM
2. DROPOUT FUSE EXTENDER BRACKETS.
PART No. CB3051
R6
R6
450
97
0
LINE OF L.V.
RUNNING EARTH
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m/12.5m
COMBINATION SWITCH AND FUSE
(11kV AND 22kV)
REVISION DATE
DRAWING No.
G DEC 2012
H14-2
EARTH
POINT
NOTE:
TOP OF POLE
R13
1200
1000
1800
450
PHN
1 PH C.B.
L.V.
BOLT HOLE
RECLOSER
SECURED AGAINST POLE
MECHANICAL PROTECTION OVER COAX
CORRUGATED CONDUIT FITTED AS
WARNING SIGN
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
XLPE
2.5mm SQ. 1C
PROTECTION OF CABLES
25mm CONDUIT FOR MECHANICAL
2700
R36
POINT
EARTH
R6
230
ANTENNA UPPER EDGE
2 x 20mm BANDIT STRAPS.
SELECTED RADIO BASE SUPPORTED WITH
3. ORIENTATION OF ANTENNA DEPENDANT ON
2. RECLOSER INDICATION TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
SEE NOTE 3
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
WITH LV AERIAL SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H15-1
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
TOP OF POLE
R13
BOLT HOLE
RECLOSER
SECURED AGAINST POLE
MECHANICAL PROTECTION OVER COAX
CORRUGATED CONDUIT FITTED AS
WARNING SIGN
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
PROTECTION OF CABLES
25mm CONDUIT FOR MECHANICAL
R36
POINT
EARTH
R6
230
1500
2200
1800
R7
CB
ANTENNA UPPER EDGE
NOTE:
2 x 20mm BANDIT STRAPS.
SELECTED RADIO BASE SUPPORTED WITH
3. ORIENTATION OF ANTENNA DEPENDANT ON
2. RECLOSER INDICATION TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OFRESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
SEE NOTE 3
R6
2700
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
WITH LV UNDERGROUND SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H15-2
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
TOP OF POLE
R13
RECLOSER
BOLT HOLE
CORRUGATED CONDUIT FITTED AS
MECHANICAL PROTECTION OVER COAX
SECURED AGAINST POLE
WARNING SIGN
MAXIMUM SEPARATION
BETWEEN EARTH AND
CONTROL CABLE (UMBILICAL)
25mm CONDUIT FOR MECHANICAL
PROTECTION OF CABLES
R36
R6
23
0
1500
1800
22
00
1 PH C.B.
ANTENNA UPPER EDGE
NOTE:
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM.
2. RECLOSER INDICATION TO FACE ROADWAY.
3. ORIENTATION OF ANTENNA DEPENDANT ON
SELECTED RADIO BASE SUPPORTED WITH
2 x 20mm BANDIT STRAPS.REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
SEE NOTE 3
LOAD LINE
27
00
R6
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
WITH TRANSFORMER SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
G DEC 2012
H15-3
EARTH POINT
THIS ANTENNA IS EARTHED
TO ISOLATE FROM EARTH DISCONNECT
ANTENNA CABLE AT CONTROL BOX.
REMOVE ANTENNA IF WORK AREA IS
OBSTRUCTED. RESTORE WHEN FINISHED
WARNING
NOTE:
TOP OF POLE
R13
BOLT HOLE
RECLOSER
SECURED AGAINST POLE
MECHANICAL PROTECTION OVER COAX
CORRUGATED CONDUIT FITTED AS
WARNING SIGN
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
PROTECTION OF CABLES
25mm CONDUIT FOR MECHANICAL
R36
POINT
EARTH
R6
230
1500
2200
1800
(R37) BATTERY ENCLOSURE
450
ANTENNA UPPER EDGE
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
SOLAR PANELS WHICH MUST FACE NORTH
4. USE MAXIMUM SEPERATION POSSIBLE BETWEEN
2 x 20mm BANDIT STRAPS.
SELECTED RADIO BASE SUPPORTED WITH
3. ORIENTATION OF ANTENNA DEPENDANT ON
2. RECLOSER INDICATION TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
SEE NOTE 4
SEE NOTE 3
2700
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
WITH SOLAR SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H15-4
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
R13
27
00
72
03
00
EARTH
POINT
R6EARTH MAT
20
70
MIN
IMU
M H
EIG
HT
ROD GUIDE
150
(R1) 14 DIAMETER
HOLES
NOTE:
R7 - STANDARD CABLE GUARD
R36
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
EARTH SPEAR
450
600 SQ.
EARTH
MAT
R6
ROADSIDE
(R1) 22 DIAMETER
HOLES
LINE OF L.V.
1200
1200
80
0
RECLOSER
BOLT HOLE
23
0
TOP OF POLE(R1) 22 DIAMETER
HOLES
R8
R9
R6
R7
MAXIMUM SEPARATION
BETWEEN EARTH AND
CONTROL CABLE (UMBILICAL)
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM.
2. RECLOSER INDICATION TO FACE ROADWAY.
(IF POSSIBLE)
3. SEE H15 SERIES FOR LV CONNECTION DETAIL
AND COMMS (IF APPLICABLE)
LV SUPPLY ARRANGEMENT
NOT SHOWN - SEE NOTE 3
REFER R6 FOR EARTH RESISTANCE REQUIREMENTS
R7 - CABLE GUARD
R6
R6
R6
R1
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
ON COMBINATION PTS & RAISER POLE
WITH CABLE ARRANGEMENT
REVISION DATE
DRAWING No.
F DEC 2012
H15-6
TOP OF POLE
(R1) 22 DIAMETER
HOLES
R3
(R1) 22 DIAMETER
HOLES
R6
R13
REFER R6 FOR EARTH RESISTANCE REQUIREMENTS
R6
NO
TE
5
R6
ROD GUIDE
MIN
IMU
M H
EIG
HT
NOTE:
ANTICLIMB GUARDR36
SEE NOTE 5
SEE NOTE 4
ANTENNA UPPER EDGE
MIN
IMU
M
MAXIMUM SEPARATION
BETWEEN EARTH AND
CONTROL CABLE (UMBILICAL)
WARNING SIGN
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
27
00
20
70
150
(R1) 14 DIAMETER
HOLES
72
03
00
23
0
70
0
R/E
EARTH SPEAR
450
600 SQ.
EARTH
MAT
R6
ROADSIDE
27
00
TOP OF POLE
TOP OF RECLOSER
EARTH
POINT (R6)
EARTH
MAT
1. ALL HOLES 18 DIAMETER U.O.N.
2. RECLOSER INDICATION TO FACE ROADWAY.
3. SEE H15 SERIES FOR COMMS (IF APPLICABLE).
4. ANTENNA MODEL AND ORIENTATION TO RADIO
BASE TO BE PROVIDED BEFORE INSTALLATION
SUPPORTED WITH 2 x 20mm BANDIT STRAPS.
5. CONTROL BOX HEIGHT MAY BE REDUCED TO
1500mm IN LOW VANDALISM AREAS
6. DROPOUT FUSE EXTENDER BRACKETS.
PART No. CB3051
1 PH. C.B.
EARTH POINT1200
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
3 PHASE RECLOSER
WITH BY-PASS SWITCH AND VHF ANTENNA
(RURAL AREAS)
REVISION DATE
DRAWING No.
E DEC 2012
H15-7
400
23
0
THIS ANTENNA IS EARTHED
TO ISOLATE FROM EARTH DISCONNECT
ANTENNA CABLE AT CONTROL BOX.
REMOVE ANTENNA IF WORK AREA IS
OBSTRUCTED. RESTORE WHEN FINISHED
WARNING
NOTE:
TOP OF POLE
WARNING SIGN
MAXIMUM SEPARATION
BETWEEN EARTH AND
CONTROL CABLE (UMBILICAL)
R6
150
27
00
R13
23
0
23
0
R3
(R1) 22 DIAMETER HOLES
ANTENNA UPPER EDGE
1 PH. C.B.
CONTROL BOX50
0
400
1500
(R1) 22 DIAMETER HOLES
ANTICLIMB GUARD
20
70
72
03
00
(R1) 14 DIAMETER
HOLES
150
MIN
IMU
M H
EIG
HT
ROD GUIDE
EARTH MAT
R6
ROADSIDE
EARTH
SPEAR450
600 SQ.
EARTH MAT
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
SHEET 1
25mm CONDUIT FOR MECHANICAL
PROTECTION OF CABLES
SEE NOTE 6
REFER R6 FOR EARTH RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM.
2. LOAD BREAK SWITCH TO FACE ROADWAY.
3. SEE H15 SERIES FOR COMMS
(IF APPLICABLE)
4. ANTENNA MODEL AND ORIENTATION TO
RADIO BASE TO BE PROVIDED BEFORE
INSTALLATION.
5. CONTROL BOX HEIGHT MAY BE REDUCED
TO 1500mm IN LOW VANDALISM AREAS
6. DROPOUT FUSE EXTENDER BRACKETS.
PART No. CB3051
R36
SEE NOTE 5
SEE NOTE 4
NO
TE
5
R6
R6
R/E 60
0
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
POLE MOUNT LOAD BREAK SWITCH
BYPASS SWITCH ON SINGLE BUSH TX
VHF ANTENNA (RURAL AREAS)
REVISION DATE
DRAWING No.
G DEC 2012
H16-2
EARTH
POINT
MIN
THIS ANTENNA IS EARTHED
TO ISOLATE FROM EARTH DISCONNECT
ANTENNA CABLE AT CONTROL BOX.
REMOVE ANTENNA IF WORK AREA IS
OBSTRUCTED. RESTORE WHEN FINISHED
WARNING
NOTE:
TOP OF POLE
WARNING SIGN
MAXIMUM SEPARATION
BETWEEN EARTH AND
CONTROL CABLE (UMBILICAL)
R6
60
0
27
00
R13
23
0
23
0
R3
ANTENNA UPPER EDGE
MIN
IMU
M
1 PH. C.B.
CONTROL BOX
400
1500
ANTICLIMB GUARD
20
70
150
MIN
IMU
M H
EIG
HT
ROD GUIDE
EARTH MAT
R6
ROADSIDE
EARTH
SPEAR450
600 SQ.
EARTH MAT
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
SHEET 2
1200
(R1) 22 DIAMETER
HOLES
TOP VIEW 330- LARGE X-ARM
(UPPER P.T.S. NOT SHOWN)
25mm CONDUIT FOR MECHANICAL
PROTECTION OF CABLES
SEE NOTE 6
REFER R6 FOR EARTH RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM.
2. LOAD BREAK SWITCH TO FACE ROADWAY.
3. SEE H15 SERIES FOR COMMS (IF APPLICABLE).
4. ANTENNA MODEL AND ORIENTATION TO RADIO BASE
TO BE PROVIDED BEFORE INSTALLATION SUPPORTED
WITH 2 x 20mm BANDIT STRAPS.
5. CONTROL BOX HEIGHT MAY BE REDUCED TO 1500mm
IN LOW VANDALISM AREAS
6. DROPOUT FUSE EXTENDER BRACKETS.
PART No. CB3051
SEE NOTE 4
R36
SEE NOTE 5
NO
TE
5
150
R/E
R6
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
POLE MOUNT LOAD BREAK SWITCH
BYPASS SWITCH ON TWO BUSH TX
VHF ANTENNA (LOCAL AREAS)
REVISION DATE
DRAWING No.
G DEC 2012
H16-2
72
03
00
(R1) 14 DIAMETER
HOLES
EARTH
POINT
(R1) 22
DIAMETER
HOLES
THIS ANTENNA IS EARTHED
TO ISOLATE FROM EARTH DISCONNECT
ANTENNA CABLE AT CONTROL BOX.
REMOVE ANTENNA IF WORK AREA IS
OBSTRUCTED. RESTORE WHEN FINISHED
WARNING
NOTE:
TOP OF POLE
WARNING SIGN
MAXIMUM SEPARATION
BETWEEN EARTH AND
CONTROL CABLE (UMBILICAL)
EARTH
POINT
R6
150
1200
27
00
R13
1080
1500
23
0
80
23
0
R3
(R1) 22 DIAMETER HOLES
ANTENNA UPPER EDGE
MIN
IMU
M
1 PH. C.B.
CONTROL BOX
25mm CONDUIT FOR MECHANICAL
PROTECTION OF CABLES
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM.
2. LOAD BREAK SWITCH TO FACE ROADWAY.
3. SEE H15 SERIES FOR COMMS (IF APPLICABLE)
4. ORIENTATION OF ANTENNA DEPENDANT ON
SELECTED RADIO BASE SUPPORTED WITH
2 x 20mm BANDIT STRAPS.
5. CONTROL BOX HEIGHT MAY BE REDUCED TO
1500mm IN LOW VANDALISM AREAS
6. DROPOUT FUSE EXTENDER BRACKETS.
PART No. CB3051
SEE NOTE 4
R36
NOTE 5
NO
TE
5
REFER R6 FOR EARTH RESISTANCE REQUIREMENTS
SEE
NOTE 6
R/E 60
0
R6
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
POLE MOUNT LOAD BREAK SWITCH
IN-LINE STRAIN WITH
2 BUSHING TX SUPPLY
REVISION DATE
DRAWING No.
G DEC 2012
H16-3
THIS ANTENNA IS EARTHED
TO ISOLATE FROM EARTH DISCONNECT
ANTENNA CABLE AT CONTROL BOX.
REMOVE ANTENNA IF WORK AREA IS
OBSTRUCTED. RESTORE WHEN FINISHED
WARNING
NOTE:
TOP OF POLE
WARNING SIGN
MAXIMUM SEPARATION
BETWEEN EARTH AND
CONTROL CABLE (UMBILICAL)
EARTH
POINT
R6
1 PH. C.B.
1900
27
00
R13
CONTROL BOX
ANTENNA UPPER EDGE
MIN
IMU
M
25mm CONDUIT FOR MECHANICAL
PROTECTION OF CABLES
25mm CORRUGATED CONDUIT FITTED AS
MECHANICAL PROTECTION OVER COAX
SECURED AGAINST POLE AND CONDUIT
1200
TOP VIEW
(UPPER X-ARM NOT SHOWN)
NO
TE
4
R36
NOTE 4
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM.
2. LOAD BREAK SWITCH TO FACE ROADWAY.
3. ORIENTATION OF ANTENNA DEPENDANT ON
SELECTED RADIO BASE SUPPORTED WITH
2 x 20mm BANDIT STRAPS.
4. CONTROL BOX HEIGHT MAY BE REDUCED TO
1500mm IN LOW VANDALISM AREAS
5. DROPOUT FUSE EXTENDER BRACKETS.
PART No. CB3051
SEE
NOTE 5
SEE NOTE 3
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
150
R/ER6
60
0
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
POLE MOUNT LOAD BREAK SWITCH
WITH TRANSFORMER SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
G DEC 2012
H16-4
THIS ANTENNA IS EARTHED
TO ISOLATE FROM EARTH DISCONNECT
ANTENNA CABLE AT CONTROL BOX.
REMOVE ANTENNA IF WORK AREA IS
OBSTRUCTED. RESTORE WHEN FINISHED
WARNING
NOTE:
TOP OF POLE
WARNING SIGN
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
POINT
EARTH
R6
1 PH. C.B.
RUNNING EARTH
1500
150
1200
1200
2700
R13
CONTROL BOX
N PH
450
L.V.
ANTENNA UPPER EDGE
MINIM
UM
PROTECTION OF CABLES
25mm CONDUIT FOR MECHANICAL
SECURED AGAINST POLE AND CONDUIT
MECHANICAL PROTECTION OVER COAX
25mm CORRUGATED CONDUIT FITTED AS
NO
TE 4
NOTE 4
R36
1500mm IN LOW VANDALISM AREAS
4. CONTROL BOX HEIGHT MAY BE REDUCED TO
2 x 20mm BANDIT STRAPS.
SELECTED RADIO BASE SUPPORTED WITH
3. ORIENTATION OF ANTENNA DEPENDANT ON
2. LOAD BREAK SWITCH TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
SEE NOTE 3
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
POLE MOUNT LOAD BREAK SWITCH
WITH LV AERIAL SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H16-5
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
NOTE:
TOP OF POLE
WARNING SIGN
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
POINT
EARTH
R6
1 PH. C.B.
RUNNING EARTH
1500
150
2700
R13
CONTROL BOX
ANTENNA UPPER EDGE
PROTECTION OF CABLES
25mm CONDUIT FOR MECHANICALSECURED AGAINST POLE AND CONDUIT
MECHANICAL PROTECTION OVER COAX
25mm CORRUGATED CONDUIT FITTED AS
1200
R7
BASE OF POLE
CABLE PIT AT
NO
TE 4
NOTE 4
R36
1500mm IN LOW VANDALISM AREAS
4. CONTROL BOX HEIGHT MAY BE REDUCED TO
2 x 20mm BANDIT STRAPS.
SELECTED RADIO BASE SUPPORTED WITH
3. ORIENTATION OF ANTENNA DEPENDANT ON
2. LOAD BREAK SWITCH TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
SEE NOTE 3
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
POLE MOUNT LOAD BREAK SWITCH
WITH LV UNDERGROUND SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H16-6
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
NOTE:
TOP OF POLE
WARNING SIGN
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
POINT
EARTH
R6
RUNNING EARTH
1500
150
2700
R13
CONTROL BOX
ANTENNA UPPER EDGE
PROTECTION OF CABLES
25mm CONDUIT FOR MECHANICAL
SECURED AGAINST POLE AND CONDUIT
MECHANICAL PROTECTION OVER COAX
25mm CORRUGATED CONDUIT FITTED AS12
00
1200MINIM
UM
MINIM
UM
450
R37
NO
TE 5
NOTE 5
R36
1500mm IN LOW VANDALISM AREAS
5. CONTROL BOX HEIGHT MAY BE REDUCED TO
SOLAR PANELS AND THEY MUST FACE NORTH.
4. USE MAXIMUM SEPERATION POSSIBLE BETWEEN
2 x 20mm BANDIT STRAPS.
SELECTED RADIO BASE SUPPORTED WITH
3. ORIENTATION OF ANTENNA DEPENDANT ON
2. LOAD BREAK SWITCH TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
SEE NOTE 3
SEE NOTE 4
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
POLE MOUNT LOAD BREAK SWITCH
WITH SOLAR SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H16-7
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
NOTE:
TOP OF POLER13
800
1200
1200
BOLT HOLE
RECLOSER
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
2700
R36
POINT
EARTH
R6
230
300
720
(R1) 14 DIAMETER HOLES
ROD GUIDE
2070
150
R7 - STANDARD CABLE GUARD
EARTH MAT
MINIM
UM
HEIG
HT
MAT
EARTH
600 SQ.
R6
EARTH SPEAR
ROADSIDE
POSITION TO SUIT
REQUIRED
3 EXTRA ROD GUIDES
450
HOLES
(R1) 22 DIAMETER
R3
LINE OF L.V.
EXTENSION
RAYCHEM BRACKET
HOLES
(R1) 22 DIAMETER
R8
R9
R7
R6
2000
R7
R9R8
R4
FOR CLARITY
RECLOSER OMITTED
SHEET 1
GF1592
IC0047
NOT SHOWN - SEE NOTE 3
LV SUPPLY ARRANGEMENT
AND COMMS (IF APPLICABLE)
3. SEE H15 SERIES FOR LV CONNECTION DETAIL
2. RECLOSER INDICATION TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R7 - CABLE GUARD
R6
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
ON TERMINATION PTS POLE
WITH CABLE ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H17-1
R13
2700
300
720
POINT
EARTH
R6EARTH MAT
2070
MINIM
UM
HEIG
HT
ROD GUIDE
150
HOLES
(R1) 14 DIAMETER
NOTE:
R7 - STANDARD CABLE GUARD
R36
POSITION TO SUIT
REQUIRED
3 EXTRA ROD GUIDES
EARTH SPEAR
450
MAT
EARTH
600 SQ.
R6
ROADSIDE
HOLES
(R1) 22 DIAMETER
LINE OF L.V.
800
1200
1200
BOLT HOLE
RECLOSER
230
TOP OF POLE
HOLES
(R1) 22 DIAMETER
R8
R9
R6
R7
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
SHEET 2
AND COMMS (IF APPLICABLE)
3. SEE H15 SERIES FOR LV CONNECTION DETAIL
(IF POSSIBLE)
2. RECLOSER INDICATION TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
NOT SHOWN - SEE NOTE 3
LV SUPPLY ARRANGEMENT
REFER R6 FOR EARTH RESISTANCE REQUIREMENTS
R7 - CABLE GUARD
R6
R6
R6
R1
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
ON COMBINATION PTS & RAISER POLE
WITH CABLE ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H17-1
NOTE:
TOP OF POLE
R13
800
1200
1200
BOLT HOLE
RECLOSER
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
2700
R36
POINT
EARTH
R6
230
POSITION TO SUIT
REQUIRED
3 EXTRA ROD GUIDES
R3
HOLES
(R1) 22 DIAMETER
R8
R9
R7
R6
2000
R7
R9
R8
R4
FOR CLARITY
RECLOSER OMITTED
LINE OF L.V./PILOT
GF1592
IC0047
R1
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
AND COMMS (IF APPLICABLE)
3. SEE H15 SERIES FOR LV CONNECTION DETAIL
2. RECLOSER INDICATION TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
NOT SHOWN - SEE NOTE 3
LV SUPPLY ARRANGEMENT
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
ON INTERMEDIATE POLE
WITH CABLE ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H17-2
NOTE:
TOP OF POLE
R13
CONTROL CABLE (UMBILICAL)
BETWEEN EARTH AND
MAXIMUM SEPARATION
2700
R36
POINT
EARTH
R6
230
HOLES
(R1) 22 DIAMETER
R8
R9
R7
R6
R7
R9
R8
R4
FOR CLARITY
RECLOSER OMITTED
GF1592
IC0047
1200
1300
1240
TOP OF CONTROL BOX
RECLOSER BOLT HOLE
NOT SHOWN - SEE NOTE 3
LV SUPPLY ARRANGEMENT
AND COMMS (IF APPLICABLE)
3. SEE H15 SERIES FOR LV CONNECTION DETAIL
2. RECLOSER INDICATION TO FACE ROADWAY.
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
3 PHASE RECLOSER
ON TERMINATION POLE
WITH CABLE ARRANGEMENT
REVISION DATE
DRAWING No.
D JUNE 2011
H17-3
NOTE:
TOP OF POLE
R13 R6
HOLES
(R1) 22 DIAMETER
R9
R7
GF1591
IC0047
630
2500
POINT
EARTH
EARTH POINT
OFFSET ARM CB1121
LESS MOVEMENT IN AIR
150 ABC AND LUGS FOR
CZ0366
PHN
HOLE
(R1) 14 DIAMETER
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R6
1200
GROUND CLEARANCE REQUIREMENTS
2. POLE HEIGHT DETERMINED BY FINAL
HV OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 12.5m
STAND ALONE
CABLE TO TRANSFORMER POLE
REVISION DATE
DRAWING No.
D JUNE 2011
H17-4
NOTE:
TOP OF POLER
131000
90
01
10
4
R6
23
0
R3
(R1) 22 DIAMETER
HOLES
R9
75
0
R7
R9
R8
80
80
R/E
OPTION 1
OP
TIO
N 2
OPTION 2
LOWER RAYCHEM SIDE
HIGHER RAYCHEM SIDE
R8
R5
R3
D.O.FUSE
DOWNLINE
R9
R9
R/E SPURS
PLAN VIEW
(R1) 14 DIAMETER
HOLES
EARTH POINT
EARTH POINT
(R1) 14 DIAMETER
HOLE
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM.REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R7
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
INTERMEDIATE TRANSFORMER (1PH)
3PH INLINE CABLES/2x1PH SPURS
WITH/WITHOUT DROPOUT FUSES
REVISION DATE
DRAWING No.
G DEC 2012
H17-5
NOTE:
EARTH POINT
TOP OF POLE
LINE OF L.V.
(R1) 22 DIAMETER HOLES
R3
600 SQ.
EARTH
MAT
R6
EARTH SPEAR450
ROADSIDE
23
02
30
1000
1650
20
70
150
ANTI-CLIMBING GUARD
ROD GUIDE
MIN
IMU
M
(R1) 14 DIAMETER HOLES
EARTH MAT
R6R13
CABLE
AWAY
FROM
TRAFFIC
30
0
R10
R8
R9
(R1) 14 DIAMETER HOLES
72
0
3 EXTRA ROD GUIDES
REQUIRED
POSITION TO SUIT
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R7 - CABLE GUARD
R7 - CABLE GUARD
R6
97
0
75
0
STAY
RUNNING EARTH
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m/12.5m
TERMINATION POLE TOP SWITCH
WITH CABLE AND DROPOUT FUSE
REVISION DATE
DRAWING No.
F DEC 2012
H18
NOTE:EARTH POINT
TOP OF POLE
LINE OF L.V.
(R1) 22 DIAMETER HOLES
R3
MAT
EARTH
600 SQ.
R6
EARTH SPEAR
450
ROADSIDE
230
230
900
1650
2070
150
ANTI-CLIMBING GUARD
ROD GUIDE
MINIM
UM
(R1) 14 DIAMETER HOLES
EARTH MAT
R6R13
R7
720
650
TOP OF POLE
STAY
POSITION TO SUIT
CARRY OVER INSULATOR
PREFERRED CONSTRUCTION
H19/2 IS THE
REQUIRED
3 EXTRA ROD GUIDES
(R1) 14 DIAMETER HOLE
TRAFFIC
FROM
AWAY
CABLE
300
HV OVERHEAD REGARDING X-ARM
1. REFER TO GENERAL NOTE OF
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R7 - CABLE GUARD
R7 - CABLE GUARD
R6
970
RUNNING EARTH
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
TERMINATION POLE TOP SWITCH
WITH CABLE
REVISION DATE
DRAWING No.
D JUNE 2011
H19-1
NOTE:
EARTH POINT
TOP OF POLE
LINE OF L.V.
(R1) 22 DIAMETER HOLES
R3
MAT
EARTH
600 SQ.
R6
EARTH SPEAR450
ROADSIDE
230
230
900
1650
2070
150
GF2134
IF NEEDED
CARRY OVER INSULATOR
ANTI-CLIMBING GUARD
ROD GUIDE
MINIM
UM
(R1) 14 DIAMETER HOLES
EARTH MAT
R6R13
TRAFFIC
FROM
AWAY
CABLE
720
300
DUE TO STAY POSITION.
/ POLE RATING INCLUDED IN DESIGN
AS POSSIBLE AND SOIL CONDITIONS
BRACKET AND STAY TO BE AS HIGH
2. IF THIS LAYOUT IS USED THE CABLE
HV OVERHEAD REGARDING X-ARM
1. REFER TO GENERAL NOTE OF
SEE NOTE 2
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R7 - CABLE GUARD
R7 - CABLE GUARD
R6
970
R1
RUNNING EARTH
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
TERMINATION POLE TOP SWITCH
WITH FEEDER CABLE
FOR FEEDER SWITCHING
REVISION DATE
DRAWING No.
D JUNE 2011
H19-2
TOP OF POLE
23
0
23
0
1900
400
MIN
IMU
M
ANTI-CLIMBING GUARDROD GUIDE
EARTH POINT
EARTH MATR13
R6
(R1) 14 DIAMETER HOLES
NOTE:
20
70
150
R6
ROADSIDE
EARTH
SPEAR450
600 SQ.
EARTH MAT
72
03
00
(R1) 22 DIAMETER
HOLES
R10
R3
(R1) 14 DIAMETER
HOLE
R9
R8
R8
CABLE BRACKET
TX SUPPORT
(R1) 22 DIAMETER
HOLE
(R1) 22 DIAMETER
HOLE
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
2. PG CLAMP POSITION TO ALLOW FULL OPERATION
OF P.T.S. WITHOUT STRAINING CONNECTIONS AND
LEADS
SEE NOTE 2
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R7 - CABLE GUARD
R7 - CABLE GUARD
R6
R6
R6
1000
RUNNING EARTH
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
ISOLATION TRANSFORMER
REVISION DATE
DRAWING No.
F NOV 2012
H20-1
TOP OF POLER
13 R6
NOTE:
EARTH POINT
R10
R3
R1
460
1000
1000
50
07
50
23
0
STAY
TX SUPPORT
RUNNING EARTH
R1
78
00
R3 EARTH POINT
R3
R3R5
R1 R8
R5
R8
D.O.FUSE
DOWNLINE
(R1) 22 DIAMETER
HOLES
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
2. STAY POSITION TO SUIT TAPS, MINIMUM OF 400mm
TO NEAREST HV CONDUCTOR
R14
SEE NOTE 2
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
ISOLATION TRANSFORMER
3 PHASE TERMINATION, 1 PHASE INLINE
WITHOUT 1 PHASE DROPOUT FUSE
REVISION DATE
DRAWING No.
F NOV 2012
H20-2
TOP OF POLE
R13 R6
NOTE:
EARTH POINT
R10
R3
R1
460
1000
1000
50
07
50
23
0
STAY
TX SUPPORT
RUNNING EARTH
R1
R3 EARTH POINT
R3
R3R5
R1
R8R5
R8
OPTION NOT
SHOWN ON
PLAN VIEW
R3
R5
1 PHASE INLINE
SECTIONAL PLAN VIEW
(R1) 22 DIAMETER
HOLES
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
2. STAY POSITION TO SUIT TAPS, MINIMUM OF 400mm
TO NEAREST HV CONDUCTOR
R14
SEE NOTE 2
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
ISOLATION TRANSFORMER
3 PHASE TERMINATION, 1 PHASE INLINE
WITH 1 PHASE DROPOUT FUSE
REVISION DATE
DRAWING No.
F NOV 2012
H20-3
TOP OF POLER
13 R6
NOTE:
EARTH POINT
R10
R12
30
STAY
TX SUPPORT
RUNNING EARTH
R1
R3
EARTH POINT
R3
R3
R5
R1
R8R5
R8
R1
50
0
R7
(R1) 22 DIAMETER
HOLES
CABLE BRACKET
R14
PLAN VIEW
460
1000
1000
50
0
75
0
78
00
(R1) 14
DIAMETER
HOLE
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
ISOLATION TRANSFORMER
3 PHASE TERMINATION, 1 PHASE CABLE
WITH/WITHOUT 1 PHASE DROPOUT FUSE
REVISION DATE
DRAWING No.
G DEC 2012
H20-4
TOP OF POLE
R13 R6
NOTE:
EARTH POINT
R10
R3
23
0
STAY
TX SUPPORT
RUNNING EARTH
R5 EARTH POINT
R8
R9
R5
R8
(R1) 22 DIAMETER
HOLES
1200
1000
50
07
50
CABLE BRACKET(R1) 14 DIAMETER
HOLE
R5
R7
R14
PLAN VIEW
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
2. INSULATOR REQUIRED ONLY IF DOF IS USED FOR
THE INLINE CONNECTION OTHERWISE NOT NEEDED IF
DOF IS DOWNLINE
R3
SEE NOTE 2
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
ISOLATION TRANSFORMER
3 PHASE CABLE, 1 PHASE TEE OFF
WITH/WITHOUT 1 PHASE DROPOUT FUSE
REVISION DATE
DRAWING No.
F NOV 2012
H20-5
TOP OF POLER
13 R6
NOTE:
EARTH POINT
R10
R3
R1
23
0
TX SUPPORT
RUNNING EARTH
R3 EARTH POINT
R3
R3
R5
R1
R5
R8
(R1) 22 DIAMETER
HOLES
83
01500
75
0
160
R3
R3
R3
R8
DOF/RECLOSER
DOWNLINE
PLAN VIEW
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
HEAT SHRINK OR
BAT GUARDS
R6
30
0
STAY
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
ISOLATION TRANSFORMER
3 PHASE IN-LINE, 1 PHASE TEE OFF
WITHOUT 1 PHASE DROPOUT FUSE
REVISION DATE
DRAWING No.
F NOV 2012
H20-6
TOP OF POLE
R13 R6
NOTE:
EARTH POINT
R10
R1
23
0STAY
TX SUPPORT
RUNNING EARTH
R1
R3
EARTH POINT
R3
R5
R5
R1
R8
(R1) 22 DIAMETER
HOLES
460
1000
1500
75
0
R14
R7
R14
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
R1
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
ISOLATION TRANSFORMER
3 PHASE TERMINATION, 1 PHASE CABLE
REVISION DATE
DRAWING No.
F NOV 2012
H20-7
TOP OF POLE
R13
R6
NOTE:
EARTH POINT
R3
R1
230
TOP OF TX
RUNNING EARTH
R3
R3
R5
HOLES
(R1) 22 DIAMETER
230
1200
R14
PLAN VIEW
TO NEAREST HV CONDUCTOR
2. STAY POSITION TO SUIT TAPS, MINIMUM OF 400mm
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
SEE NOTE 2
R14
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 12.5m
TERMINATION TRANSFORMER
2 PHASE LINE, 1 PHASE SPUR
REVISION DATE
DRAWING No.
D JUNE 2011
H20-8
NOTE:
TOP OF POLE
EARTH POINT
EARTH POINT
80
1200
1200
230
230
1200
1200
230230
TOP OF POLE
RUNNING EARTH
OVERHEAD RUNNING EARTH
RUNNING EARTH
(STANDARD CONSTRUCTION ONLY)
R6
R13
STANDARD CONSTRUCTION
OVERHEAD RUNNING EARTH
R3
R3
R4R1
(R1) 22 DIAMETER HOLES
HOLES
(R1) 22 DIAMETER
R4
R3R1
R1
R3
R3
R3
R3
R1
R1
R8
COMMS PANEL
OF 400mm TO HV TAPS.
3. STAY POSITION TO BE AT MINIMUM DISTANCE
----> CURRENT FLOW FROM A1 TO A2
A2 TERMINAL CLOSEST TO LOAD
2. A1 TERMINAL CLOSEST TO SOURCE
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
BAT GUARDS
HEAT SHRINK OR
R6
R6
R6
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
METERING TRANSFORMER
REVISION DATE
DRAWING No.
D JUNE 2011
H21
METER METER
NOTE:
TOP OF POLE
STAY
EARTH POINT
230
1200
750
380
80
R13 R6
(R1) 22 DIAMETER HOLES
R3
R5
R3
OVERHEAD RUNNING EARTH
POINT
EARTH
OF 400mm TO HV TAPS.
2. STAY POSITION TO BE AT A MINIMUM DISTANCE
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
SEE NOTE 2
R14
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 14m
INTERMEDIATE WISHBONE
WITH OVERHEAD EARTHWIRE
REVISION DATE
DRAWING No.
C JUNE 2011
H22
NOTE:
TOP OF POLE
EARTH POINT
EARTH POINT
R13 R6
80
300
1200
230
STAY
OVERHEAD RUNNING EARTH
R1
R1
R1
R1
R5R5
R3
R4
R4
R3
R14
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
INTERMEDIATE FLAT CONSTRUCTION
WITH OVERHEAD EARTHWIRE
REVISION DATE
DRAWING No.
C JUNE 2011
H23
EARTH POINT
NOTE:
TOP OF POLE
1200
230
900
230
R13
R6
R1
PH N
1200
TX SUPPORT
RUNNING EARTH
L.V.
R5
EARTH POINT
R3 R5
R5
R14
R8
HOLES
(R1) 22 DIAMETER
R12
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEADRESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 12.5m
TERMINATION TRANSFORMER
WITH OVERHEAD EARTH
REVISION DATE
DRAWING No.
D JUNE 2011
H24
NOTE:
TOP OF POLE
R3OVERHEAD RUNNING EARTH
80
23
0
38
07
50
1000
95
02
25
01200
R13
R6
EARTH POINT
EARTH
POINT
23
0(R1) 22 DIAMETER
HOLES
(R3) CENTRE PHASE
R3
R8
R8
R8
R10
(R1) 22 DIAMETER HOLES
R1
R12
PH N
L.V.
TX
1. REFER TO GENERAL NOTE OF HV
OVERHEAD REGARDING X-ARM.
REFER R6 FOR EARTH RESISTANCE REQUIREMENTS
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 14m
INTERMEDIATE TRANSFORMER
WISHBONE CONSTRUCTION
REVISION DATE
DRAWING No.
G DEC 2012
H25
TOP OF POLE
STAY
750
1200
1200
1200
230
75
75
250
75
325
75
325
75
R5
R5
R5
R5
R14
R3
R3
R3
R3
R3R5
RUNNING EARTH
EARTH POINT
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 14m
VERTICAL IN-LINE STRAIN
WITH OVERHEAD EARTHWIRE
FOR WISHBONE CONSTRUCTION
REVISION DATE
DRAWING No.
C JUNE 2011
H26
NOTE:
TOP OF POLE
EARTH POINT
230
1000
750
380
80
R13 R6
(R1) 22 DIAMETER HOLES
R3
R3
R3
OVERHEAD RUNNING EARTH
POINT
EARTH
750
R3
R3R5R1
R1
R5
R3
R3
230
OVERHEAD REGARDING X-ARM.
1. REFER TO GENERAL NOTE OF HV
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 14m
WISHBONE CONSTRUCTION
WITH TEE-OFF
REVISION DATE
DRAWING No.
C JUNE 2011
H27
TOP OF POLE
STAY
RUNNING EARTH
1200
1200
1200
230
600
600
600
600
75
75
75
75
75
75
STAY
R3
R3
R3
R3
R5
R5
R5
R5
R14
R14
EARTH POINT
R5R14
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 14m
VERTICAL STRAIN ANGLE
WITH OVERHEAD EARTHWIRE
FOR WISHBONE CONSTRUCTION
REVISION DATE
DRAWING No.
C JUNE 2011
H28
NOTE:
EARTH POINT
R6
R13
500
1500
1200
NO
TE 10
DRAIN HOLE AT BOTTOM
N PH
BAND-IT STRAPS
2-3 METERS.
10. SEPERATION TO LOWEST CONDUCTOR SHOULD BE
ISOLATED PRIOR TO MAINTAINANCE.
9. SINGLE PHASE CONNECTION BOX - ENCLOSURE TO BE
EXPOSURE.
INSTALLED ON SOUTH SIDE OF POLE TO MINIMISE U.V.
8. ARRANGEMENT DEPENDANT ON ANTENNA, USUALLY
7. WARNING SIGN (SEE L00-1704)
REFLECTIVE NUMBERS ON ROAD SIDE OF ENCLOSURE.
6. FAULT INDICATOR NUMBER TO BE DISPLAYED WITH
BASE.
5. ORIENTATION OF ANTENNA DEPENDANT ON SELECTED RADIO
OVER COAX BUNDLED AND SECURED AGAINST POLE.
4. CORRUGATED CONDUIT FITTED AS MECHANICAL PROTECTION
3. 25mm CONDUIT FOR MECHANICAL PROTECTION OF CABLES.
2. CONNECTION TO LV DEPENDANT ON SUPPLY ARRANGEMENTS.
X-ARM.
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING
SEE NOTE 7
SEE NOTE 5
SEE NOTE 8
SEE NOTE 4
SEE NOTE 3
SEE NOTE 6
SEE NOTE 9
SEE NOTE 2
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
FAULT INDICATOR
L.V. AERIAL SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
C JUNE 2011
H29-1
0
9
4
7
6
4
2
CBC 1C6
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
NOTE:
EARTH POINT
R6
R13
500
DRAIN HOLE AT BOTTOM
BAND-IT STRAPS
1200
NO
TE 8
STRAPS OR BOLT AS PERMITTED.
9. ALTERNATIVELY FITTED DIRECTLY TO POLE WITH BAND-IT
2-3 METERS.
8. SEPERATION TO LOWEST CONDUCTOR SHOULD BE
EXPOSURE.
INSTALLED ON SOUTH SIDE OF POLE TO MINIMISE U.V.
7. ARRANGEMENT DEPENDANT ON ANTENNA, USUALLY
REFLECTIVE NUMBERS ON ROAD SIDE OF ENCLOSURE.
6. FAULT INDICATOR NUMBER TO BE DISPLAYED WITH
BASE.
5. ORIENTATION OF ANTENNA DEPENDANT ON SELECTED RADIO
OVER COAX BUNDLED AND SECURED AGAINST POLE.
4. CORRUGATED CONDUIT FITTED AS MECHANICAL PROTECTION
3. 25mm CONDUIT FOR MECHANICAL PROTECTION OF CABLES.
2. SOLAR PANELS TO BE FACING NORTH
X-ARM.
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING
SEE NOTE 5
SEE NOTE 4
SEE NOTE 3
SEE NOTE 7
SEE NOTE 6
SEE NOTE 9SEE NOTE 2
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
FAULT INDICATOR
WITH SOLAR CELL SUPPLY
ARRANGEMENT
REVISION DATE
DRAWING No.
C JUNE 2011
H29-2
0
9
4
7
6
4
2
THIS ANTENNA IS EARTHED
OBSTRUCTED. RESTORE WHEN FINISHED
REMOVE ANTENNA IF WORK AREA IS
ANTENNA CABLE AT CONTROL BOX.
TO ISOLATE FROM EARTH DISCONNECT
WARNING
NOTE:
TOP OF POLE
(mm)
X-ARM LENGTH
1350
2100
80
EARTH POINT
R13 R6
TOP BOLT HOLE
LINE OF L.V.
SURGE ARRESTOR
ABC TAPS
1300mm LG.
900mm LG.900mm LG.
"X"
230
230
"Y"
80
Y (mm)
300
300
>=900
<900 NOTE 2
>=900
<900
NOTE 2
X (mm)
ALTERNATIVE METHODS USED TO MEET L.V. CLEARANCE.
3. IF BREASTPLATE FITTED, X MUST BE 300mm AND
LIVE LINE CREW.
2. WORK MUST BE UNDERTAKEN DE-ENERGISED OR BY
REGARDING X-ARM
1. REFER TO GENERAL NOTE OF HV OVERHEAD
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
OR BAT GUARDS
HEAT SHRINK
R6
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
SURGE ARRESTOR
STANDARD LINE INSTALLATION
REVISION DATE
DRAWING No.
D JUNE 2011
H30
EARTH POINT
NOTE:
TOP OF POLE
R6R13
(R1) 22 DIAMETER
HOLES
NL C T
AC LINE
(BLACK)
NEUTRAL
(ORANGE)
CLOSE
(BLUE)
TRIP
(RED)
POWER - ACTIVE NEUTRAL TO CONTROLLER
TO TRANSFORMER L.V.
SECTION A-A
TERMINAL STRIP ON CAPACITOR BANK
27
00
1200
90
0
23
01000
TO CAPACITOR DOF
TO PHASE TO PHASE
DOF NOT
REQUIRED
FOR 1
BUSHING TX
CONTROL CABLE
(CONNECT TO TERMINAL
STRIP ON FRAME)
EARTH
CONTROL BOX
AA
(R1) 22 DIAMETER
HOLES
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING
X-ARM
2. FRAME AND CONTROL BOX MUST BE GROUNDED WITH
70mm2 STRANDED COPPER.
3. WARNING SIGN FITTED 1.8m - 2m ON CAPACITOR FUSE
SIDE.
4. LV ABC CABLE TO BE USED FOR PHASE CONNECTIONS.
1000kVAR BANKS REQUIRE 40 AMP DOFS
500kVAR BANKS REQUIRE 20 AMP DOFS
5. FIT SIGN "TRANSFORMER MUST BE SET TO TAP 1.
6. ADJUST TRANSFORMER TAP POSITION AND TX DATA PLATE.
7. SWITCH TERMINALS TO BE PROTECTED BY INSULATING CAPS
NOTE 7
NOTE 3
NOTE 5
NOTE 6
R6
R6
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
22kV POLE MOUNTED CAPACITOR BANK
WITH 10kVA TRANSFORMER
CONNECTION DETAILS
REVISION DATE
DRAWING No.
F NOV 2012
H31-2
NOTE:
R6R13
23
06
00
23
01335
(R1) 22 DIAMETER
HOLES
440
1200
47
6
22
35
30
04000
27
00
LAYOUT FOR
OPTIONAL
UPPER X-ARM
OIL SWITCH
23
0
CONTROL BOX
RUNNING EARTH
L.V. SUPPLY
STAY
CAPACITOR
(R1) 22 DIAMETER
HOLES
COMMON
R3W3
B3
B2B1
W2
W1
R2
R1
VIEW OF LOWER X-ARM
VIEW OF UPPER X-ARM
R4
B4
W4
UPPER X-ARM
LOWER X-ARM
LOWER X-ARM
OIL SWITCH
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
33kV TYPE TSC OIL SWITCH
AND CAPACITOR
POLE MOUNTED
REVISION DATE
DRAWING No.
F DEC 2012
H32-1
NOTE:
R6R13
(R1) 22 DIAMETER
HOLES
RUNNING EARTH
TX SUPPORT
RW
B
TOP OF POLE
23
04
05
23
01900
36
50
60
0
(AP
PR
OX
)
STAY
L.V. SUPPLY
35
0340
R
B
W
WB R
PLAN VIEWREFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM
2. FRAME AND CONTROL MUST BE GROUNDED WITH 70mm2
STRANDED COPPER CABLE.
3. LV ABC CABLE TO BE USED FOR PHASE CONNECTIONS
4. FIT SIGN "TRANSFORMER MUST BE SET TO TAP 1".
5. ADJUST TRANSFORMER TAP POSITION AND Tx DATA PLATE
HEAT SHRINK OR
BAT GUARDS
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
33kV SINGLE PHASE TRANSFORMER
POLE MOUNTED
REVISION DATE
DRAWING No.
G DEC 2012
H32-2
NOTE:
R6R13
23
0635
1540
865
(R1) 22 DIAMETER
HOLES450
2040
47
6
27
00
OIL SWITCH 2405
CONTROL BOX
RUNNING EARTH
CAPACITOR
R
W
B
TOP OF POLE
L.V. SUPPLY
(R1) 22
DIAMETER
HOLES
R/E
RUNNING EARTH
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF
HV OVERHEAD REGARDING X-ARM
HEAT SHRINK OR
BAT GUARDS
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
33kV TYPE TSC OIL SWITCH
AND CAPACITOR
ARRANGEMENT
REVISION DATE
DRAWING No.
G DEC 2012
H32-3
NOTE:
R W B
39
00
39
00 1700 1700
LOAD
SOURCE
1 B
AY
23
0
23
0
A
A
SECTION
E
KING BOLT HOLE
RUNNING EARTH
A
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
VOLTAGE REGULATOR - 11m
IN-LINE LAYOUT
TYPE GE VR-1 50A-100A
DETAILS
REVISION DATE
DRAWING No.
E DEC 2012
H33-1
52
0
SE
E
NO
TE
2
1. REFER R6 FOR EARTH RESISTANCE
REQUIREMENTS.
2. 520mm STANDARD CONSTRUCTION 350mm ALLOWED
TO MAINTAIN GROUND CLEARANCE.
NOTE:
TOP OF POLE
23
0
80
1200
23
0
1800
R13
27
00
4100
MIN
IMU
M
SE
E N
OT
E 2
(R1) 22 DIAMETER
HOLES
630290
50
0
SURGE
ARRESTOR
STAY
IF REQ’D
INLINE
DOF
CONTROL
BOX
1200
R/E
DIS
T T
O S
UIT
VR BASE
EARTH
POINT
EARTH LINK
BETWEEN
REG. POLES
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
2. VOLTAGE REGULATOR TYPE 95kV BIL
DISTANCE - 50A: 2380
- 100A: 2550
3. MINIMUM 6kN POLE
4. LOCAL AND SOIL CONDITIONS MAY REQUIRE STAYS
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
VOLTAGE REGULATOR - 11m
IN-LINE DETAIL
TYPE GE VR-1 50A-100A
CONSTRUCTION DETAIL
REVISION DATE
DRAWING No.
G DEC 2012
H33-2
NOTE:
CSECTION
E
C
3000 3000 10000
B
B
BSECTION
23
0
80
23
0
R/E
1 B
AY
23
0
23
0
R/E
OFFSET
X-ARM
X-ARM
X-ARMCENTRE PHASE
STAY
SEE NOTE 2
SEE NOTE 2
REFER DRG. No. H33/4
SECTION D
T-OFF STAY
SEE NOTE 3.
T-OFF STAY
SEE NOTE 3
IN-LINE 100A
DOF N/O
1. REFER R6 FOR EARTH RESISTANCE
REQUIREMENTS
2. ISOLATORS ON REGULATOR POLE
OR AT BOTH T-OFF POLES.
3. OFFSET ARM SLACK STRAIN, FOR FULL
STRAIN USE H33-3A (H13 (DCS) T-OFF)
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
VOLTAGE REGULATOR - 11m
OFF-SET DETAIL
TYPE GE VR-1 50A-100A
ARRANGEMENT
REVISION DATE
DRAWING No.
E DEC 2012
H33-3
1200
635
1200
NOTE:
CSECTION
E
C
3000 3000 10000
B
B
BSECTION
23
0
80
23
0
R/E
1 B
AY
23
0
23
0
R/E
OFFSET
X-ARM
X-ARM
X-ARMCENTRE PHASE
STAY
SEE NOTE 2
SEE NOTE 2
REFER DRG. No. H33/4
SECTION D
T-OFF STAY
SEE NOTE 3.
T-OFF STAY
SEE NOTE 3
IN-LINE 100A
DOF N/O
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
VOLTAGE REGULATOR - 11m
OFF-SET DETAIL
TYPE GE VR-1 50A-100A
DETAILS
REVISION DATE
DRAWING No.
E DEC 2012
H33-3A
1200
635
1200
1. REFER R6 FOR EARTH RESISTANCE
REQUIREMENTS
2. ISOLATORS ON REGULATOR POLE
OR AT BOTH T-OFF POLES.
3. FULL STRAIN (REFER H13 DCS)
FOR OFFSET ARM SLACK STRAIN USE H33-3.
NOTE:
TOP OF POLE
23
0
80
R13
27
00
4100
MIN
IMU
M
SE
E N
OT
E 2
CONTROL
BOX
VR BASE
EARTH
POINT
80
23
01000
23
01800
DIS
TA
NC
E
TO
SU
IT
STAY
(R1) 22
DIAMETER
HOLES
DSECTION
Sht 3
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM
2. VOLTAGE REGULATOR TYPE 95kV BIL - DISTANCE - (50A: 2380mm) - 100A: (2550mm)
3. MINIMUM 6kN POLE
4. LOCAL AND SOIL CONDITIONS MAY REQUIRE STAYS.
5. EARTH LINK REQUIRED BETWEEN REGULATOR POLES.
6. ISOLATORS ON REGULATOR POLE OR AT BOTH T-OFF POLES.
7. 1800mm WITH ISOLATORS OR 1200mm WITHOUT.
SE
E N
OT
E 7
SEE NOTE 5
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
VOLTAGE REGULATOR - 11m
OFF-SET DETAIL
TYPE GE VR-1 50A-100A
CONSTRUCTION DETAIL
REVISION DATE
DRAWING No.
G DEC 2012
H33-4
(B PHASE) (W PHASE)
AERIAL
STAY
350
230
230
TOP OF POLE
RUNNING EARTH
R3
R1
R3
R4
EARTH POINT
R13 R6
R1
EARTH POINT
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE INTERMEDIATE
REVISION DATE
DRAWING No.
C JUNE 2011
H40-1
TOP OF POLE
RUNNING EARTH
R3
R1
R3
R4
EARTH POINT
R13 R6
230
230
EARTH POINT
HEAT SHRINK
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE
ANTI CLASH/GALAH INTERMEDIATE
REVISION DATE
DRAWING No.
C JUNE 2011
H40-2
NOTE:
TOP OF POLE
R5
R3
EARTH POINT
R13 R6
230
300
EARTH POINT
900
EARTH POINT
R14
RUNNING EARTH
PHASE
RUNNING DISC ANGLE
EARTH
RUNNING DISC ANGLE
19.1kV NETWORK.
1. STAY TO BE BONDED TO EARTH ON
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE
RUNNING DISC ANGLE OR TERMINATION
REVISION DATE
DRAWING No.
C JUNE 2011
H41-1
NOTE:
TOP OF POLE
RUNNING EARTH
R1
R4
EARTH POINT
R13 R6
300
75
300
1200
230
1500
230
230
(R3) CARRY OVER INSULATOR
RUNNING EARTH
LO
NG
ER
BA
Y
SID
E
POINT
EARTH
EARTH POINT
MANUAL REFERENCE.
FOR 33kV, OPTIONAL FOR 22kV. R14 CONSTRUCTION
POSITIONED TO AVOID CONTACT. BONDED TOGETHER
2. R/E TERMINATIONS AND STAY WIRE (EYEBOLT)
1. RUNNING EARTH POSITION IF NOT TERMINATED.
SEE NOTE 1
SEE NOTE 2
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE
TWO WAY TERMINATION
REVISION DATE
DRAWING No.
C JUNE 2011
H41-2
NOTE:
TOP OF POLE
RUNNING EARTH
R3
R4
EARTH POINT
R13 R6
23
02
30
1200
30
07
5
75
R3
R3
R3
R4
R1
R5R10
R5
STAY
14 DIAMETER HOLES
R14
40
EARTH POINT
1. STAY TO BE BONDED TO EARTH ON 19.1kV NETWORK.
2. STAY NOT REQUIRED FOR SLACK BAY ARRANGEMENT.
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE INTERMEDIATE WITH TEE OFF
WITH DROPOUT FUSE
REVISION DATE
DRAWING No.
E NOV 2012
H42
NOTE:
350
230
230
TOP OF POLE
RUNNING EARTH
R3
R1
R3
R4
EARTH POINT
R13 R6
1200
300
600
R5
R1
R5
R14
EARTH POINT
R3
RUNNING EARTH
STAY
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH ARRANGEMENT.
2. STAY NOT REQUIRED FOR SLACK BAY
19.1kV NETWORK.
1. STAY TO BE BONDED TO EARTH ON
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE INTERMEDIATE WITH TEE OFF
WITHOUT DROPOUT FUSE
REVISION DATE
DRAWING No.
C JUNE 2011
H43
NOTE:
TOP OF POLE
EARTH POINT
R13 R6
EARTH POINT
RUNNING EARTH
230
230
75
75
1200
75
R5
R5
R5
R5
R3
R3
R14
R14
A A
TWIN EARTHS
SECTION A-A
R5
19.1kV NETWORK.
1. STAY TO BE BONDED TO EARTH ON
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE
DOUBLE TERMINATION
REVISION DATE
DRAWING No.
C JUNE 2011
H44
TOP OF POLE
R3
R1
R3
R4
EARTH POINT
R13 R6
R1
R5EARTH POINT
RUNNING EARTH
230
230
930
40
850
RUNNING EARTH
STANDOFF BRACKET
HOLES
(R1) 14 DIAMETER
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE SLACK TEE-OFF
WITHOUT DROPOUT FUSE
REVISION DATE
DRAWING No.
C JUNE 2011
H45
TOP OF POLE
R3
R4
R13
R6
R3
R4
R1
35
023
02
30
35
0
1500
30
0
R3R1
R10
16mm2
XLPE
(R1) 22 DIAMETER HOLES
R/E
TX SUPPORT
16mm2
XLPE
EARTH POINT
1000 W
ITH
OU
T D
OF
(R1) 14 DIAMETER HOLES
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
EARTH POINT (R6)
25sqmm DOWN EARTH (R6)
a2
a1
a3
a4
25sqmm PVC COVERED
COPPER DOWN EARTH
TO EARTH POINT
16sqmm TAP
TERMINAL BLOCK
SERVICE
NEUTRAL 100A FUSE HOLDER
QUICK LUGS TO 25sqmm
DOWN EARTH
TRANSFORMER
WIRING DETAILS
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE
INTERMEDIATE TRANSFORMER
WITH OR WITHOUT DROPOUT FUSE
REVISION DATE
DRAWING No.
F NOV 2012
H46
NOTE:
TOP OF POLE
R13 R6
R3 R10
16mm2
XLPE
(R1) 22 DIAMETER HOLES
16mm2
XLPE
23
03
00
90
02
50
30
0
23
0
STAY
RUNNING EARTH
Tx SUPPORT
Tx SUPPORT
R5
R5R14
(R1) 14 DIAMETER HOLES
90
1. STAY TO BE BONDED TO EARTH ON
19.1kV NETWORK.
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
a2
a1
a3
a4
25sqmm PVC COVERED
COPPER DOWN EARTH
TO EARTH POINT
16sqmm TAP
TERMINAL BLOCK
SERVICE
NEUTRAL 100A FUSE HOLDER
QUICK LUGS TO 25sqmm
DOWN EARTH
TRANSFORMER
WIRING DETAILS
EARTH POINT
25sqmm DOWN EARTH (R6)
EARTH POINT (R6)
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE
TERMINATION TRANSFORMER
WITH OR WITHOUT DROPOUT FUSE
REVISION DATE
DRAWING No.
F NOV 2012
H47-1
TOP OF POLE
R13
R6
16mm2
XLPE
RUNNING EARTH
Tx SUPPORT
(R1) 14 DIAMETER HOLES
23
02
30
635
180
1500
25
03
00
Tx SUPPORT
(R1) 22 DIAMETER
HOLES
R3
R3
R4
R4
R1
R1
R10
16mm2
XLPE
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
HEAT SHRINK
OR BAT GUARDS
NOTE:
1. REFER TO GENERAL NOTE OF HV OVERHEAD
REGARDING X-ARM
a2
a1
a3
a4
25sqmm PVC COVERED
COPPER DOWN EARTH
TO EARTH POINT
16sqmm TAP
TERMINAL BLOCK
SERVICE
NEUTRAL 100A FUSE HOLDER
QUICK LUGS TO 25sqmm
DOWN EARTH
TRANSFORMER
WIRING DETAILS
EARTH POINT (R6)
25sqmm DOWN EARTH (R6)
EARTH POINT
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 12.5m
3 PH INTERMEDIATE WITH SINGLE PHASE
TRANSFORMER WITH DROPOUT FUSE
REVISION DATE
DRAWING No.
F NOV 2012
H47-2
2/09/2016 10:31:56 AM ___H:\00 - Temp - 00\HP\AB\H48-1.dgn___GIS900526___mleroux
2/09/2016 10:37:38 AM ___H:\00 - Temp - 00\HP\AB\H48-2.dgn___GIS900526___mleroux
2/09/2016 11:03:48 AM ___H:\00 - Temp - 00\HP\AB\H49_C.dgn___GIS900526___mleroux
2/09/2016 10:58:42 AM ___H:\00 - Temp - 00\HP\AB\H50_C.dgn___GIS900526___mleroux
NOTE:
23
0
20
0 80
1200
1200
450
675
R13
27
00
TOP OF POLE
LOAD LINE
SURGE ARRESTOR
20 BAND-IT STRAP
LINE OF L.V.
RUNNING EARTH
LV ABC OR
16mm2 XLPE
CONTROL
R6
R10
(R1) 22
DIAMETER
HOLES
(R1) 22 DIAMETER HOLES
LV ABC OR
16mm2 XLPE
STANDARD CONSTRUCTION
EARTH POSITION
COMMS CABLE
MAX. DIST. AWAY
FROM L.V. AND EARTH
R36
C.B. OR FUSES
ALTERNATE POSITION
OF RUNNING EARTH
DOWN EARTH NOTE:
SURGE ARRESTORS DIRECT MOUNTED ON RECLOSER/FRAME
CONSIDERED EARTHED.
THE EARTH OF SEPARATE SURGE ARRESTORS (CROSSARM ETC.) TO
BE CONNECTED TO THE RECLOSER EARTH STUD OR AS COLSE AS
POSSIBLE ONTO THE MAIN EARTH.
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM.
2. PHASE TO EARTH SEPARATED MIDBAY TO BE MAINTAINED.
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
R6
EARTH POINT (R6)
70sqmm DOWN EARTH (R6)
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE RECLOSER
STRAIN TERMINATION WITH
SINGLE PHASE TRANSFORMER SUPPLY
REVISION DATE
DRAWING No.
F NOV 2012
H51-1
NOTE:
23
01000
1200
450
TOP OF POLE
LOAD
SURGE ARRESTOR
LINE OF L.V.
RUNNING EARTH
R6
EARTH POINT
(R1) 22 DIAMETER HOLES
LV ABC OR
16mm2 XLPE
COMMS CABLE
MAX. DIST. AWAY
FROM L.V. AND EARTH
R36
C.B. OR FUSES
DOWN EARTH NOTE:
SURGE ARRESTORS DIRECT MOUNTED ON RECLOSER/FRAME
CONSIDERED EARTHED.
THE EARTH OF SEPARATE SURGE ARRESTORS (CROSSARM ETC.) TO
BE CONNECTED TO THE RECLOSER EARTH STUD OR AS COLSE AS
POSSIBLE ONTO THE MAIN EARTH.
R13
27
00
R3
R4
R1
R10
SOURCE
(R1) 22 DIAMETER
HOLE
TX
SUPPLY
RECLOSER
BYPASS
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM.
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE RECLOSER
INLINE WITH
SINGLE PHASE TRANSFORMER SUPPLY
REVISION DATE
DRAWING No.
F NOV 2012
H51-2
NOTE:
23
0
80
1780
1530
450
675
R13
27
00
TOP OF POLE LOAD LINE
SURGE ARRESTOR
LINE OF L.V.
RUNNING EARTH
CONTROL
R6
R10
(R1) 22 DIAMETER HOLES
STANDARD CONSTRUCTION
EARTH POSITION
COMMS CABLE
MAX. DIST. AWAY
FROM L.V. AND EARTH
R36
C.B. OR FUSES
DOWN EARTH NOTE:
SURGE ARRESTORS DIRECT MOUNTED ON RECLOSER/FRAME
CONSIDERED EARTHED.
THE EARTH OF SEPARATE SURGE ARRESTORS (CROSSARM ETC.) TO
BE CONNECTED TO THE RECLOSER EARTH STUD OR AS COLSE AS
POSSIBLE ONTO THE MAIN EARTH.
80
LV ABC OR
16mm2 XLPE
WITH L/L CLAMPS
(R1) 22 DIAMETER
HOLE
EARTH POINT
R8 LV ABC
R14
1. REFER TO GENERAL NOTE OF HV OVERHEAD REGARDING X-ARM.
REFER R6 FOR EARTH
RESISTANCE REQUIREMENTS
R6
R6
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
STRUCTURE - 11m
SINGLE PHASE RECLOSER
IN-LINE DOF/STANDOFF BRACKETS
WITH SINGLE PHASE TRANSFORMER SUPPLY
REVISION DATE
DRAWING No.
G DEC 2012
H51-3
EARTH
POINT
27
0
RUNNING EARTH
R3
EARTH POINT
R13 R6
EARTH POINT
R8
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m
DOWN EARTH-RUNNING EARTH
REVISION DATE
DRAWING No.
C JUNE 2011
H52
NOTE:
TOP OF POLE
R3
EARTH POINT
EARTH POINT
R13 R6
230
80
1400
270
STAND OFF
RUNNING EARTH
LOADLINE
HOLES
(R1) 14 DIAMETER
R3R5
DOF SECTIONALISER
12.5m POLE IF INADEQUATE GROUND CLEARANCE.
1. USE 11m POLE.
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
SINGLE PHASE INLINE STRAIN WITH
SECTIONALISER AND BY-PASS FUSE
REVISION DATE
DRAWING No.
C JUNE 2011
H53
NOTE:
EARTH POINT
EARTH POINT
R13 R6
RUNNING EARTH
R3
450
860
230
400
230
LINE OF L.V.
TOP OF POLE
STAY
R5
R5
R14
R3 R3
R7
R7
R9
RESISTANCE REQUIREMENTS
REFER R6 FOR EARTH
RUNNING EARTH AND L.V. LOWERED TO SUIT.
H9 DIMENSION 400 WILL BE 900.
1. IF FUSES FITTED SEE H8 FOR LOCATION THEN
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
STRUCTURE - 11m/12.5m
SINGLE PHASE TERMINATION CABLE
WITH DROPOUT FUSE UPSTREAM
REVISION DATE
DRAWING No.
C JUNE 2011
H54