Upload
gavin-williams
View
213
Download
1
Embed Size (px)
Citation preview
Parallel Flow Parallel Flow VisualizationVisualization
— Data Requirements —— Data Requirements —
NERC ORS MeetingNERC ORS MeetingToronto, OntarioToronto, Ontario
September 23-24, 2009September 23-24, 2009
Jim Busbin
Chairman, IDC Working Group
Parallel Flow Parallel Flow VisualizationVisualization
Presentation Topics —Presentation Topics —
PurposePurpose
BackgroundBackground
Data RequirementsData Requirements
Data ArchiveData Archive
IDC Change Order 283, Revision 2IDC Change Order 283, Revision 2
Parallel Flow Parallel Flow VisualizationVisualization
PurposePurpose
Parallel Flow VisualizationParallel Flow VisualizationPurposePurpose
The Purpose Statement from the Parallel Flow The Purpose Statement from the Parallel Flow Visualization SAR states:Visualization SAR states:
The requested enhancements to the TLR The requested enhancements to the TLR procedure in the Eastern Interconnection will procedure in the Eastern Interconnection will improve the wide-area view of Reliability improve the wide-area view of Reliability Coordinators (RCs) such that they better Coordinators (RCs) such that they better understand the current operating state of the understand the current operating state of the bulk electric system and will result in the bulk electric system and will result in the assignment of relief obligations during periods assignment of relief obligations during periods of congestion that are more representative of of congestion that are more representative of those actually contributing to the congestion. those actually contributing to the congestion.
Parallel Flow Parallel Flow VisualizationVisualization
BackgroundBackground
Parallel Flow VisualizationParallel Flow VisualizationBackgroundBackground
May 6 NERC ORS Meeting in Indianapolis, IN. May 6 NERC ORS Meeting in Indianapolis, IN.
IDCWG was directed to:IDCWG was directed to:
Identify the minimum data set required to achieve the required Identify the minimum data set required to achieve the required calculations by the calculations by the September 2009 ORS meetingSeptember 2009 ORS meeting
Identify the required changes to the IDC to identify the GTL Identify the required changes to the IDC to identify the GTL impactsimpacts
Recommend a vendor to perform the GTL calculations for all EI Recommend a vendor to perform the GTL calculations for all EI RCsRCs
Determine, in cooperation with the vendor, the GTL calculation Determine, in cooperation with the vendor, the GTL calculation methodologymethodology
Identify to the ORS any additional items that are required to Identify to the ORS any additional items that are required to incorporate GTL incorporate GTL impactsimpacts
The IDCWG should target having proposed recommendations to the The IDCWG should target having proposed recommendations to the ORS for the ORS for the November 2009 meeting November 2009 meeting
Parallel Flow VisualizationParallel Flow VisualizationBackgroundBackground
IDCWG has discussed and identified requirements to IDCWG has discussed and identified requirements to support Parallel Flow Visualization – we continue to support Parallel Flow Visualization – we continue to evaluate these requirementsevaluate these requirements
June 3-4 IDCWG Meeting:June 3-4 IDCWG Meeting:Discussed charge given by ORSDiscussed charge given by ORS
Initiated identification of requirementsInitiated identification of requirements
July 8-9 IDCWG Meeting:July 8-9 IDCWG Meeting:Meeting held to discuss Parallel Flow VisualizationMeeting held to discuss Parallel Flow Visualization
Identification of requirements continuedIdentification of requirements continued
August 18-19 IDCWG MeetingAugust 18-19 IDCWG MeetingOATI asked to revise Change Order 283 to include OATI asked to revise Change Order 283 to include
requirements identified in July requirements identified in July meeting – this modification will meeting – this modification will become Revision 2become Revision 2
Parallel Flow Parallel Flow VisualizationVisualization
Data Data RequirementsRequirements
Parallel Flow Parallel Flow VisualizationVisualization
Data Requirements — Introductory NotesData Requirements — Introductory NotesReference: “Generation-to-Load Reporting Reference: “Generation-to-Load Reporting Requirements” whitepaper, January 2, 2009Requirements” whitepaper, January 2, 2009
Generation-to-load flows will be calculated by one Generation-to-load flows will be calculated by one vendor. Raw data used in the calculation will be vendor. Raw data used in the calculation will be submitted to the vendor submitted to the vendor
Frequency of all data submission will be every fifteen Frequency of all data submission will be every fifteen minutes unless otherwise noted by (♣). minutes unless otherwise noted by (♣).
Data will be submitted to reflect current-hour Data will be submitted to reflect current-hour conditions and a projection of peak next hour conditions and a projection of peak next hour conditions. To be clear, each data submission will conditions. To be clear, each data submission will contain data for the present hour and also for the next contain data for the present hour and also for the next hour hour
Parallel Flow Parallel Flow VisualizationVisualization
Data Requirements — CategoriesData Requirements — Categories
Load and LossesLoad and Losses• Real Time Load Magnitude and DistributionReal Time Load Magnitude and Distribution
Generation OutputGeneration Output• Real-Time Output vs. Static ValuesReal-Time Output vs. Static Values
Flowgate FlowsFlowgate Flows• Provides Error Checking CapabilityProvides Error Checking Capability
Topology UpdatesTopology Updates• Provides More Frequent Update of Topology Provides More Frequent Update of Topology
and and
Additional DataAdditional Data
Parallel Flow Parallel Flow VisualizationVisualization
Data RequirementsData RequirementsLoad and Losses —Load and Losses —
Total Real-Time BA LoadTotal Real-Time BA Load• Geographic ZonesGeographic Zones• Conforming / Non-Conforming ZonesConforming / Non-Conforming Zones• Individual Bus Loads Individual Bus Loads • andand Total for BA Total for BA
Real-Time Losses for Total BAReal-Time Losses for Total BA
Projection of Next Hour Total Peak BA LoadProjection of Next Hour Total Peak BA Load• Geographic ZonesGeographic Zones• Conforming / Non-Conforming ZonesConforming / Non-Conforming Zones• Individual Bus LoadsIndividual Bus Loads• andand Total for BA Total for BA
Projection of Next Hour Losses for Total BAProjection of Next Hour Losses for Total BA
Parallel Flow Parallel Flow VisualizationVisualization
Data RequirementsData RequirementsGeneration Output —Generation Output —
Real-Time Generation OutputReal-Time Generation Output• Output for Each Generating Unit Shown in ModelOutput for Each Generating Unit Shown in Model• Net of Auxiliary Equipment / As ModeledNet of Auxiliary Equipment / As Modeled
Total Real-Time Generation Output for BATotal Real-Time Generation Output for BA
Projected Next Hour Generation OutputProjected Next Hour Generation Output• Output for Each Generating Unit Shown in ModelOutput for Each Generating Unit Shown in Model• Projected Maximum Output of Unit in Next HourProjected Maximum Output of Unit in Next Hour• Net of Auxiliary Equipment / As ModeledNet of Auxiliary Equipment / As Modeled
Total Projected Next-Hour Generation Output for Total Projected Next-Hour Generation Output for BABA
Generating Unit Real-Time Upper and Lower Generating Unit Real-Time Upper and Lower Normal LimitsNormal Limits
Joint Ownership Identification ♣Joint Ownership Identification ♣
Parallel Flow Parallel Flow VisualizationVisualization
Data RequirementsData RequirementsFlowgate Flows —Flowgate Flows —
Actual real-time flow on each active flowgate Actual real-time flow on each active flowgate monitored element shown in the Book of Flowgatesmonitored element shown in the Book of Flowgates
Projection of next hour maximum flow on each active Projection of next hour maximum flow on each active flowgate monitored element shown in the Book of flowgate monitored element shown in the Book of Flowgates Projection of Next Hour Losses for Total Flowgates Projection of Next Hour Losses for Total BABA
Actual real-time flow on each active flowgate Actual real-time flow on each active flowgate contingency element shown in the Book of Flowgatescontingency element shown in the Book of Flowgates
Projection of next hour maximum flow on each active Projection of next hour maximum flow on each active flowgate contingency element shown in the Book of flowgate contingency element shown in the Book of FlowgatesFlowgates
Un-accounted for usage will be identified and Un-accounted for usage will be identified and calculated as the difference between real time flows calculated as the difference between real time flows and the summation of calculated tag impacts, market and the summation of calculated tag impacts, market flows and generation-to-load flowsflows and generation-to-load flows
Parallel Flow Parallel Flow VisualizationVisualization
Data RequirementsData RequirementsTopology Updates —Topology Updates —
Increase frequency of IDC update from SDX and Increase frequency of IDC update from SDX and matrix calculation to every fifteen minutes matrix calculation to every fifteen minutes
Outage updates submitted to SDX every fifteen Outage updates submitted to SDX every fifteen minutes minutes
Parallel Flow Parallel Flow VisualizationVisualization
Data RequirementsData RequirementsAdditional Data —Additional Data —
Control Device Data – Scheduled and Actual Control Device Data – Scheduled and Actual Flows, Real-Time and Projected Next Hour:Flows, Real-Time and Projected Next Hour: Phase shifting transformersPhase shifting transformers DC linesDC lines Variable frequency transformersVariable frequency transformers
Dynamic Schedules – Actual and projected next-Dynamic Schedules – Actual and projected next-hour flows hour flows
Identification of pumped storage hydro units ♣Identification of pumped storage hydro units ♣
Parallel Flow Parallel Flow VisualizationVisualization
Data RequirementsData RequirementsAdditional Data —Additional Data —
(NAESB / United States) – Designated Network (NAESB / United States) – Designated Network Resource (DNR) generating units/plantsResource (DNR) generating units/plants
(NAESB / United States) – DNR capacity(NAESB / United States) – DNR capacity
(NAESB) Assignment of priorities for generation-(NAESB) Assignment of priorities for generation-to-load (7-F versus 6-NN)to-load (7-F versus 6-NN)
Net scheduled interchangeNet scheduled interchange
Net actual interchangeNet actual interchange
Individual actual tie-line flowsIndividual actual tie-line flows
Parallel Flow Parallel Flow VisualizationVisualization
Data ArchiveData Archive
Parallel Flow Parallel Flow VisualizationVisualization
Data ArchiveData Archive
Impact archive will be added that savesImpact archive will be added that saves• Tag impactsTag impacts• Market flowsMarket flows• Generation to load flowsGeneration to load flows• Un-accounted for usageUn-accounted for usage• Real-time flows by flowgateReal-time flows by flowgate
Archive to run around the clock – not just when a Archive to run around the clock – not just when a flowgate is in TLRflowgate is in TLR
Suggest current calendar year’s and previous Suggest current calendar year’s and previous year’s data be available on lineyear’s data be available on line
Suggest previous three year’s data be available Suggest previous three year’s data be available off-lineoff-line
Parallel Flow Parallel Flow VisualizationVisualization
IDC Change Order 283,IDC Change Order 283,
Revision 2Revision 2
Parallel Flow Parallel Flow VisualizationVisualization