    Interim ReportIPTV reduction in Commercial Vehicles

    &

    LCV wheel Rim Failure by Six Sigma

    Methodology

    KaramVeer Singh

    MBA-Tech (C.S)376

  • 7/30/2019 Paper Interim Report

    2/28

    2

    Interim Report

    Presented by

    KaramVeer Singh

    Based on the training undertaken in

    Tata Motors, CVBU, Pune

    Project

    IPTV reduction in Commercial Vehicles

    &

    LCV wheel Rim Failure by Six Sigma Methodology

    Industry Guide

    Mr. R.J. Nagare

    Faculty Supervisor

    PROF. V.Seshadri

  • 7/30/2019 Paper Interim Report

    3/28

    3

    Contents

    Confidentiality Agreement......................................................................................................... 4

    Acknowledgement ..................................................................................................................... 6

    About the company .................................................................................................................... 7

    Part1: ....................................................................................................................................... 10

    IPTV Reduction in Commercial Vehicles by CFT................................................................... 10

    Abstract .................................................................................................................................... 11

    1. Introduction .......................................................................................................................... 12

    1.1 Goal .................................................................................................................................... 12

    2. Main Text/Methodology ...................................................................................................... 122.1 Phase One....................................................................................................................... 12

    2.1.1 Plan Phase ............................................................................................................... 12

    2.1.2 Do Phase ................................................................................................................. 17

    2.1.3 Check Phase ............................................................................................................ 18

    2.1.4. Act Phase ............................................................................................................... 18

    3. Learning/Work Done ....................................................................................................... 19

    4. Schedule ........................................................................................................................... 20

    Part2: ....................................................................................................................................... 21LCV wheel Rim Failure by Six Sigma Methodology................................................................ 21

    Abstract .................................................................................................................................... 22

    1. Introduction...................................................................................................................... 23

    2. Main Text/ Methodology .................................................................................................. 23

    2.1 Define Phase ................................................................................................................. 24

    3. Learning ........................................................................................................................... 28

    References ................................................................................................................................ 28

  • 7/30/2019 Paper Interim Report

    4/28

    4

    Confidentiality Agreement

    The RECIPIENT should agree as follows:

    1. The RECEPIENT shall treat as confidential all information, particularly technical orbusiness information of CVBU whether written or oral, the RECEPIENT received in

    the course of the project hereinafter referred to as "Project"), to which the

    RECEPIENT gained access or which the RECEPIENT otherwise obtained in the

    course of said Project from CVBU or its authorized representatives shall use such

    information only for the purpose of said Project, shall give access only to itsemployees who need to have access and who entered into similar confidentiality

    obligations, and shall not pass it on to third parties and shall protect it against

    unauthorized use by third parties.

    2. No obligation shall apply to information and documents which are:I. already known to, or in the possession of the RECEPIENT prior to receipt of

    such information

    II. which are legally received by the RECEPIENT from a third party without anyconfidentiality obligation

    III. which are in the public domain or enter the public domain through no wrongfulact of RECEPIENT

    IV. which can be proven by the RECEPIENT to have been developed independentlyof confidential information received from CVBU.

    3. The RECEPIENT shall impose the same obligations on its employees, who obtainknowledge of confidential information, unless those employees are already to the

    same degree bound by their contract ofemployment to nondisclosure.

    http://dict.leo.org/se?lp=ende&p=/Mn4k.&search=tohttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=thehttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=samehttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=degreehttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=boundhttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=contracthttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=ofhttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=employmenthttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=employmenthttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=ofhttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=contracthttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=boundhttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=degreehttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=samehttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=thehttp://dict.leo.org/se?lp=ende&p=/Mn4k.&search=to
  • 7/30/2019 Paper Interim Report

    5/28

    5

    4. CVBU providing confidential information shall remain vested holder of suchinformation. Nothing contained in this Agreement will be deemed by implication or

    otherwise to convey to the RECIPIENT any right or license under patent, patent

    application, invention, copyright, trade mark, design, trade name or any other interest

    owned by CVBU either expressly or by implication.

    5. The RECIPIENT undertakes to return to CVBU all proprietary information in originalwithout retaining any copies, as and when called for by CVBU.

    6. The RECIPIENT shall indemnify and hold CVBU harmless from and against any andall loss, liability, claim and expense, including all court costs, expenses and legal fees,

    which CVBU might suffer/incur as a result of any violation of this Agreement by the

    RECIPIENT.

    7. The RECIPIENT acknowledges that the disclosure of the Data under this Agreementwould give rise to irreparable injury to CVBU, inadequately compensable in damages.

    Therefore, CVBU may seek and obtain injunctive relief against the breach or

    threatened breach of the RECIPIENT obligations and undertakings hereunder, in

    addition to any other legal remedies which may be available.

  • 7/30/2019 Paper Interim Report

    6/28

    6

    Acknowledgement

    I take this opportunity to express my gratitude and extend sincere thanks to Tata Motors

    Commercial Vehicles Business Unit (CVBU) Pvt. Ltd. for offering me an exceptional

    platform to gain exposure and assimilate knowledge in the field of Total Quality

    Management. It was an enriching experience to learn the tools and techniques used in this

    field at CVBU.

    I wish to extend my earnest and deep gratitude to Mr. P.Y. Deo Sr.AGM, Quality

    Assurance (CVBU) and my guides Mr. R.J.Nagare AGM, QA (CVBU), Mr. A.P

    SrivastavaAGM, QA (CVBU) for their encouragement and support that they have provided

    to me during the tenure of my Internship at CVBU. I would also like thank Mr. P.Panchbhai

    HR (CVBU) for giving me the opportunity to undergo internship at CVBU.

    I would like to extend my sincere regards to Mr. Shubhyan Bhattacharyaa Assistant

    Manager, Production (CVBU) and Mr. Sunil Gharge- Sr. Officer, QA (CVBU) for helping

    me to learn the nuances of the CFT and overall workflow at CVBU.

    I would also like to thank the following people for their valuable inputs and necessary support

    which have held me in good stead during the course of my Internship at CVBU:

    Mr. Veera Raghavan,

    Mr. Pravin Kollam,

    I am also thankful to Prof. V.Seshadri (Faculty in Charge) for providing me all the support

    during the internship.

    There are others whom I have not mentioned in this acknowledgement but without their ready

    support, encouragement and guidance my internship could not have been complete. I thank

    them all.

    KaramVeer Singh

    Tata Motors

    CVBU, Pune

  • 7/30/2019 Paper Interim Report

    7/28

    7

    About the company

    Tata Motors Limited is India's largest automobile company, with consolidated revenues of

    Rs. 92,519 crores (USD 20 billion) in 2009-10. It is the leader in commercial vehicles in each

    segment, and among the top three in passenger vehicles with winning products in the

    compact, midsize car and utility vehicle segments. The company is the world's fourth largest

    truck manufacturer, and the world's second largest bus manufacturer.

    The company's 24,000 employees are guided by the vision to be "best in the manner in which

    we operate, best in the products we deliver and best in our value system and ethics."

    Established in 1945, Tata Motors' presence indeed cuts across the length and breadth of India.

    Over 5.9 million Tata vehicles ply on Indian roads, since the first rolled out in 1954. The

    company's manufacturing base in India is spread across Jamshedpur (Jharkhand), Pune

    (Maharashtra), Lucknow (Uttar Pradesh), Pantnagar (Uttarakhand) and Dharwad (Karnataka).

    Following a strategic alliance with Fiat in 2005, it has set up an industrial joint venture with

    Fiat Group Automobiles at Ranjangaon (Maharashtra) to produce both Fiat and Tata cars and

    Fiat powertrains. The company is establishing a new plant at Sanand (Gujarat). The

    company's dealership, sales, services and spare parts network comprises over 3500 touch

    points; Tata Motors also distributes and markets Fiat branded cars in India.

    Tata Motors, the first company from India's engineering sector to be listed in the New York

    Stock Exchange (September 2004), has also emerged as an international automobile

    company. Through subsidiaries and associate companies, Tata Motors has operations in the

    UK, South Korea, Thailand and Spain. Among them is Jaguar Land Rover, a business

    comprising the two iconic British brands that was acquired in 2008. In 2004, it acquired the

    Daewoo Commercial Vehicles Company, South Korea's second largest truck maker. The

    rechristened Tata Daewoo Commercial Vehicles Company has launched several new

    products in the Korean market, while also exporting these products to several international

    markets. Today two-thirds of heavy commercial vehicle exports out of South Korea are from

    Tata Daewoo. In 2005, Tata Motors acquired a 21% stake in Hispano Carrocera, a reputed

    Spanish bus and coach manufacturer, and subsequently the remaining stake in 2009.

    Hispano's presence is being expanded in other markets. In 2006, Tata Motors formed a joint

    venture with the Brazil-based Marcopolo, a global leader in body-building for buses andcoaches to manufacture fully-built buses and coaches for India and select international

  • 7/30/2019 Paper Interim Report

    8/28

    8

    markets. In 2006, Tata Motors entered into joint venture with Thonburi Automotive

    Assembly Plant Company of Thailand to manufacture and market the company's pickup

    vehicles in Thailand. The new plant of Tata Motors (Thailand) has begun production of the

    Xenon pickup truck, with the Xenon having been launched in Thailand in 2008.

    Tata Motors is also expanding its international footprint, established through exports since

    1961. The company's commercial and passenger vehicles are already being marketed in

    several countries in Europe, Africa, the Middle East, South East Asia, South Asia and South

    America. It has franchisee/joint venture assembly operations in Kenya, Bangladesh, Ukraine,

    Russia, Senegal and South Africa.

    The foundation of the company's growth over the last 50 years is a deep understanding of

    economic stimuli and customer needs, and the ability to translate them into customer-desired

    offerings through leading edge R&D. With over 3,000 engineers and scientists, the

    company's Engineering Research Centre, established in 1966, has enabled pioneering

    technologies and products. The company today has R&D centres in Pune, Jamshedpur,

    Lucknow, Dharwad in India, and in South Korea, Spain, and the UK. It was Tata Motors,

    which developed the first indigenously developed Light Commercial Vehicle, India's first

    Sports Utility Vehicle and, in 1998, the Tata Indica, India's first fully indigenous passenger

    car. Within two years of launch, Tata Indica became India's largest selling car in its segment.

    In 2005, Tata Motors created a new segment by launching the Tata Ace, India's first

    indigenously developed mini-truck.

    In January 2008, Tata Motors unveiled its People's Car, the Tata Nano, which India and the

    world have been looking forward to. The Tata Nano has been subsequently launched, as

    planned, in India in March 2009. A development, which signifies a first for the global

    automobile industry, the Nano brings the comfort and safety of a car within the reach of

    thousands of families. The standard version has been priced at Rs.100,000 (excluding VAT

    and transportation cost).

    In May 2009, Tata Motors introduced ushered in a new era in the Indian automobile industry,

    in keeping with its pioneering tradition, by unveiling its new range of world standard trucks

    called Prima. In their power, speed, carrying capacity, operating economy and trims, they will

  • 7/30/2019 Paper Interim Report

    9/28

    9

    introduce new benchmarks in India and match the best in the world in performance at a lower

    life-cycle cost.

    Tata Motors is equally focused on environment-friendly technologies in emissions and

    alternative fuels. It has developed electric and hybrid vehicles both for personal and public

    transportation. It has also been implementing several environment-friendly technologies in

    manufacturing processes, significantly enhancing resource conservation

    Through its subsidiaries, the company is engaged in engineering and automotive solutions,

    construction equipment manufacturing, automotive vehicle components manufacturing and

    supply chain activities, machine tools and factory automation solutions, high-precision

    tooling and plastic and electronic components for automotive and computer applications, and

    automotive retailing and service operations.

    Tata Motors is committed to improving the quality of life of communities by working on four

    thrust areasemployability, education, health and environment. The activities touch the lives

    of more than a million citizens. The company's support on education and employability is

    focused on youth and women. They range from schools to technical education institutes to

    actual facilitation of income generation. In health, our intervention is in both preventive and

    curative health care. The goal of environment protection is achieved through tree plantation,

    conserving water and creating new water bodies.

  • 7/30/2019 Paper Interim Report

    10/28

    10

    Part1:

    IPTV Reduction in Commercial Vehicles by CFT

  • 7/30/2019 Paper Interim Report

    11/28

    11

    Abstract

    Incidents per Thousand Vehicles(IPTV) reduction in commercial vehicles is significantly

    aimed to diminish faults per thousand vehicles so to accomplish TATA demarcated quality

    standards and at the same time to realize customer satisfaction. The project also pen down the

    challenge of understanding conditions under which the fault can occur and to rectify these

    faults till root and prevent their reoccurrence. Alongside using worldwide quality tools to

    achieve the IPTV targets set. This will also bring various departments together and they can

    better understand the problems together. IPTV reduction will also help to reduce cost

    expenses and increase customer satisfaction. The methodology followed is PDCA that is

    Plan, Do, Check and Act. The targets for each team are well defined and should be reached as

    per the given deadline. As a student of Operation management I had a practical

    implementation of PDCA and many other Quality tools which add up to my knowledge. The

    various teams are setup for seamless interexchange between various departments throughout

    the CVBU. Each phase is well defined and weekly, fortnightly and monthly reviews take

    place to see the working of the CFT teams. The learning also includes Team participation and

    team management, which gives a practical opportunity to learn managerial skills in a World

    Class learning environment.

  • 7/30/2019 Paper Interim Report

    12/28

    12

    1. Introduction

    The Cross Functional Team (CFT) were setup by the Quality Assurance department to look

    into the increasing warranty cost which was in other way affecting the overall profitability of

    the CVBU but also were adding to customer dissatisfaction. The main objective was

    Reduction of IPTV. The CFTs were instituted with the motive to not only overcome the

    increasing cost of the warranty and customer dissatisfaction but also to find the root cause of

    the problem and to make sure that it will not come up again.

    The CFTs were formed as per the Aggregates and their scope of work was well defined. The

    targets of the teams were defined clearly and the issues which the CFT have to work on were

    determines based in Incidents per Thousand vehicles (IPTV).

    The schedule for the CFT was prepared to enable the member to give justice to every majorcause and to deliver the attainable results as per the deadlines and to review the progress of

    the teams.

    1.1 Goal

    The CFT working is divided into 4 phases as per the methodology to be followed. The IPTV

    reduction was to take place as followed:

    1. Plan2. Do3. Check4. Act

    The Goal was to reduce the IPTV which will in return the cost and will increase the customer

    satisfaction hence customer loyalty. The complaints, for which the IPTV was high and

    needed special attention to control and improve upon, were decided to be achieved by Six

    Sigma Methodology.

    2. Main Text/Methodology

    2.1 Phase One

    2.1.1 Plan Phase

  • 7/30/2019 Paper Interim Report

    13/28

    13

    The plan phase started with rolling down of CFT teams and team structure. The role and

    responsibility for each member of CFT was defined by the charter. The plan phase was

    divided into:

    Define Project Observations Analysis

    Define Phase:The define phase gave a formal start to the project with the dedicated teams with well-defined

    roles and targets to achieve. This phase included defining of:

    1.

    Team Charter, CFT formation with Mentor / Champion / Leader / Member / Roledefinition.

    Fig1:CFT Team Structure

    Role and Responsibi liti es of CFT members

    S.No Member Role

    1 Mentor Debottle-necking the

    Leader Champion Co-Leader

    ERC Design

    ADD

    QA

    APL

    MFG

    Service

    QRS

  • 7/30/2019 Paper Interim Report

    14/28

    14

    issue (

    Execution/Commercial

    settlement/ Field

    implementation )

    2 Champion Subject Expert

    3 Leader/Co-Leader One who works along

    with team members for

    solution.

    Monitoring and issue

    resolution

    5 ERC Design Design Expert

    6 ADD Vendor coordination/

    development

    7 QA Inspection/ Data

    Provider

    8 APL Facility Planning &

    implementation

    9 MFG Processes verification &

    conformance

    10 Service Failed Sample

    collection/data &

    resolution

    implementation

    11 Quality & Reliability Support Life estimation,DFMEA, PFMEA

    2. Goal Statement, setting the target to the team and defining the same. Goal orobjective statements provide direction for planning, for evaluating plans and for

    guiding projects and actions. A "good" goal statement is SMART:

    Specific

  • 7/30/2019 Paper Interim Report

    15/28

    15

    Measurable Acceptable Realistic

    Time bound

    Observation PhaseThe observation phase was more concerning about knowing more about the problem and all

    aspects related to it. The observation phase is one of the most crucial stage of the

    methodology and need to be done with care and step by step. The observation phase included:

    1. Data Collection, data from all sources such as Warranty / JDP / Customer complaints/ 4 level rejection/ rework data and Pareto / Audit data / benchmarking data, Draw

    PFD, failure and action took history.

    Data Collection and presentation

    2.

    Data Stratification is a technique useful in analysing data to find improvementopportunities. Stratification helps analyse cases in which data actually masks the real

    facts. This often happens when the recorded data is from many sources but is treated

    as one number. Multiple multilevel Pareto, check sheet.

  • 7/30/2019 Paper Interim Report

    16/28

    16

    Region Wise Data

    3. Understanding currentdesign and process controls, Understanding design,mechanism and functionality, benchmarking comparison at concept level. Process

    documents, drawings, Control Plans, DFMEA, Design Guideline

    4. Customer Voice Analysis, minimum of 30 Voice of customer to be taken.

    Voice of Customer

    5. Defining and Understandingfailure modes, 5W-2H analysis Who? Identity customers complaining What? Identity the problem adequately and accurately When? Timing - When did the problem start?

  • 7/30/2019 Paper Interim Report

    17/28

    17

    Where? Location - Where is it occurring? Why? Identify known explanations How? In what mode or situation did the problem occur?

    How Many? Magnitude - Quantify the problem6. Problem Definition, Tree diagram (break down to smaller problems). Focused

    problems / Issues to be worked upon with target for each problem.

    7. Containment Action, Most interim actions are temporary short term actions takenuntil a permanent corrective action is defined, implemented and verified. The danger

    of many interim corrective actions is that they are considered to be a permanent

    solution to the problem. Interim Corrective Action Detection strategy (Vehicle,

    aggregate, assy and part level).

    Analysis PhaseThis phase defines the problem that the customer is trying to solve. The deliverable result at

    the end of this phase is a requirement document. Ideally, this document states in a clear and

    precise fashion what is to be built. This analysis represents the ``what'' phase. The

    requirement document tries to capture the requirements from the customer's perspective by

    defining goals and interactions at a level removed from the implementation details.

    Cause-Effect Analysis, Ishikawa diagram for each problem Verification & Validation of Causes, 3G Analysis and other Quality and Analytical

    tools like 7 QC tools, component search, DOE, regression, control chart, 5WHY as

    applicable

    Identification of Root Cause, Tree diagram for validated causes for each failuremode.

    2.1.2 Do PhaseThe Do Phase was concerned with the practical solution that will aptly counter the

    upcoming complaints and errors. This phase is the based on the data and outcomes from the

    Plan phase, the observations and analysis of the Plan phase provides with the areas to attack

    and which are the root causes for the upcoming complaint. The Do Phase is generally based

    on the actions that should be taken in order compete with the increasing complaints and to

    reduce the cost of warranty. The Do Phase is further divided intoActions which are:

  • 7/30/2019 Paper Interim Report

    18/28

    18

    Benchmarking, Competitor Product / Process Benchmark with focus on failure modeor cause (Minimum 3). This will reveal the industry standards and will also suggest

    some upcoming trends for that problem. The benchmarking also helps in attaining

    right direction to meet the industry pace.

    Solution Identification / prioritization for recurrence prevention for each validatedCause include thorough Benefit, Cost, and Speed analysis.

    Verification & Validation, once the actions are in progress the improvements done tothe process or to the product should be followed through CAE analysis / design

    verification / part and assy try-out.

    Action Implementation, one the verification and validation is done and the assemblytry-outs are being taken then the team should decide onImplementation of

    Permanent Corrective Action and raising the breakpoint. The breakpoint will help in

    tracking the improvement done and can be a strategic lookout.

    2.1.3 Check PhaseOnce the actions are being taken and the validation and verification is completed the team the

    team should check the results and the subsequent effect of those improvements over the

    working at line or in testing and also at the field level. The check phase insists upon checking

    the results at:

    Internal at individual problem level and overall at field level Review need for continuation of containment action Review and evaluate the result of the change Measure progress against milestones Check for any unforeseen consequences

    2.1.4. Act PhaseThe Act phase comes when the Check phase is successful and we are satisfied with the

    actions and improvements taken as a part of PDCA cycle. If successful, Standardize process

    changes, Communicate to all involved, Provide training in new methods. Along with these

    the Act Phase is divided into:

    Replication opportunity, wherever possible if the same problem arises and the failuremodes are same then the solution should be implemented and Horizontal deployment

    across lines, models, parts, aggregates, suppliers, plants etc. of the solution should be

  • 7/30/2019 Paper Interim Report

    19/28

    19

    done and the transfer of the solution should be done seamlessly throughout the

    company.

    QC Story Report, Document the process and results in QC story format and upload onlearning portal. Also update the manufacturing and process teams to integrate the

    same for future references.

    Felicitation, the team should be congratulated once the project is successful andtargets are achieved.

    3.Learning/Work Done Team Management: To look after the smooth on-going of CFT teams and to provide

    Minutes of meetings (MoMs) as per the standard Tata Motors format. Also to report

    the absenteeism of the members and to drop a mail as and when needed.

    Product Life Cycle management: worked on PLM to visualize the actual assembly asdefined by ERC so that teams can easily make out what wrong is going on at

    assembly line while production.

    Assembly Line Environment: Thorough study at the assembly line to check the As-Is and To-Be processes and also to cross check various parts designed with the

    designs released by ERC. Data Stratification: which helps the team to analyse/ audit and to perform various

    tasks such as:

    1. Sampling Planning2. Audit Planning3. Identification of potential exceptions4. Determining outliners5. Comparison and understanding data6. Comparison of various dealers to get dealer-bias7. Kilometres wise data analysis

    Root Cause Analysis: designed for use in investigating and categorizing the rootcauses of events with safety, health, environmental, quality, reliability and production

    impacts.

    Data Presentation: instituting formats for various presentations to be given by variousCFTs and transforming data obtained through Prowac. Also to present Glide Paths

    for the on-going progress.

  • 7/30/2019 Paper Interim Report

    20/28

    20

    Failed Parts Analysis: Analysis of parts received through warranty cell from thedealer and also to check whether the part received is OK or Not-OK.

    Quality tools: Learned various QC tools and total quality tools in a practicalenvironment, includes:

    1. Cause and Effect Diagram2. 5W-2H3. Pareto4. PDCA5. Benchmarking6. Auditing

    4. ScheduleThe schedule for the working of CFT teams is as below,

    The Check phase is undergoing as per the plans and project charter and after the

    Check the Act Phase will start.

    May Jun July Aug

    M O N T H SPHASE

    Plan

    Do

    Check

    Act

    Under Going

    Still to start

  • 7/30/2019 Paper Interim Report

    21/28

    21

    Part2:

    LCV wheel Rim Failure by Six Sigma Methodology

  • 7/30/2019 Paper Interim Report

    22/28

    22

    Abstract

    The Wheel Rim complaint in LCVs is one of the highest contributors to its warranty cost and

    also is one of the most repetitive and frequent occurring problem in LCVs, this can also be

    contributed to the volumes of LCV as it is one of the largest producing in volume terms. So

    to reduce the current failure rate to zero a six sigma methodology was adopted to examine

    the entire possible factors that can lead to a complaint or failure and then to observe the

    severity of each of them and to take actions to reduce them and to attain the results as been

    decided. The Six Sigma methodology followed was DMAIC that is Define, Measure,

    Analyze, Improve and Control, each phase has to be completed within dedicated timeline and

    following a review with mentor and champion of the team the next stage is taken up. Theactivity including data collection from assembly line and to study the As-Is processes

    followed by operator as assembly line and to checkthem with To-Be processes given by

    ERC and design teams. The data stratification was also an important stage which is helping

    the team as a part of measure and to provide the significance of each of the complaint and the

    occurrence of each. The define phase also include analyzing customer data and to separate

    the Voice of Customer to actually understand what is the failure as felt by the customer.

  • 7/30/2019 Paper Interim Report

    23/28

    23

    1.IntroductionThe Wheel Rim failure for LCV was taken up Six Sigma Team as there could not be any

    particular reason which can be pointed out as the cause for the wheel rim failure and IPTV

    for this particular complaint was a major contributor for LCV graphs to rise up. The wheelrim failure project was undertaken to eliminate the warranty failure of Wheel rim failure in

    LCV and improve customer satisfaction. The Six Sigma approach followed was DMAIC as

    this was an existing that is being used throughout CVBU for its LCV vehicles.

    The DMAIC approach followed that is Define, Measure, Analyse, Improve and Control has

    to be completed within 3 months from the date of start till the Improve Phase.

    The wheel rim six sigma was aimed to reduce the current failure of 16.6/1000 to Zero.

    Project Name: WHEEL RIM FAILURE

    Purpose: To eliminate wheel rim failures from 16.6/1000 to ZERO.

    2.Main Text/ MethodologyThe six sigma methodology for this was based on DMAIC approach. The Table below shows

    the DMAIC methodology followed at Tata motors CVBU

    DEFINE MEASURE ANALYSIS IMPROVE CONTROL

    Understand and

    quantify the

    problem

    Discover the

    scope of work

    Formulate

    objectives

    Identify

    resources

    Build the action

    plan

    Establish

    communication

    Identify

    potential issues

    Plan for

    measurement

    Build

    operational

    definitions for

    data

    Understand

    data types

    Design data

    gathering tools

    Gather data

    Analyze data

    Verify and

    validate

    hypotheses

    Identify

    variation

    Determine

    vital few root

    causes

    Validate root

    causes

    Quantify

    improvement

    Brainstorm

    solutions

    Develop the To-

    Be model

    Formulate action

    plans

    Identify potential

    risks

    Analyze cost and

    benefit Test the

    new process

    Plan for

    implementation

    Implement

    the solution

    Establish

    control plan

    Build the

    dashboards

    Monitor

    performance

    Maintain

    performance

    Close and

    handover

    Improve

  • 7/30/2019 Paper Interim Report

    24/28

    24

    Identify roles

    and

    responsibilities

    Understand

    current process

    and operations

    and validate

    Prepare

    analysis tools

    Establish the

    baseline of

    current

    opportunity continuously

    (Source: SixSigma Team, CVBU,Pune)

    2.1Define PhaseThe Define Phase started with setting up a team which will be dedicated for achieving the

    desired result. The team consisted of Mentor, Champion, Leader, Members and a Six Sigma

    Black belt. Once the team were instituted the define phase started out with a meeting of all

    the members to actually understand what does the problem is and what actually is the

    Purpose of the team and of theproject, Alignment with the companys strategic business

    plans, Clear Targets, Clear Scope, Clear Roles and Responsibilities, Team Member

    Alignment with the Team Purpose.

    The first phase deals with mainly:

    Project Brief, mostly a pictorial sketch, photo or a drawing giving a brief overwhat is the defect and what all parts are involved in it. Defining the defect with the

    help of a pictorial representation.

    Wheel Rim Failure

    Project Charter, which defines the flowing:

  • 7/30/2019 Paper Interim Report

    25/28

    25

    Business Case, Project Goals, Measurable CTQs, Funding, Business Champion,

    Risk/Issues, Core team, Expected Benefits.

    Identifying Customer Critical To Quality(CTQs), are one of the main sourceswhich tells us what all problems customer undergoes and what are the failure

    modes customer feels for the undertaken problem. The CTQs are also used to

    make the CTQ flow downs which tell the weak points that can lead to the problem

    and which may lead to the wheel rim failure. The CTQ flow-downs provide the

    possible reasons which are major contributors to the problem.

    CTQ Flow down

    Project Scope, so that the team do not get deviate from their aim and to keep themon track the project scope defines what all vehicles will the team cover. The scope-

    in and scope-out frame provides with the areas that the team will cover and also the

    other vehicle which may be facing the same problem can derive a solution suitable

    to them for their complaints in wheel rim. Some vehicle are put in scope out which

    are not covered at all and they have problems far different from the LCV. SIPOC: Supplier, Input, Process, Output, Customer.

    The SIPOC requires to study of the assembly process of wheel on the vehicle and

    to note down critical points and the practices followed by employee at assembly

    line. To note down the As Is processes and to compare them with To-Be

    standardized processes. The SIPOC also requires to pen down all the suppliers

    providing the same components and to compare the As IS design at the supplier

    end with To-Be design at ERC. Also all the materials required at the time of

    assembly are noted and checked as per the specifications of the design.

  • 7/30/2019 Paper Interim Report

    26/28

    26

    SIPOC

    Threat vs. Opportunity Matrix: It is a matrix which correlates and presents the longterm and short term threats and opportunity. The short term threats are those which

    show their results within 6 months of maturity and they are mainly part failure and

    warranty cost. The short term opportunity involves making a contingency plan and

    to control the increasing failure and cost at the same time also assure the customer

    of the quality assurance. Long term threats are those which affects on the brand

    value of Tata Motors and also pose a threat with Supplier relations and

    subsequently undermining the quality of LCV. The long term opportunity on the

    same way provides with a far reaching magnitude over the quality standards

    followed at Tata Motors and the ever increasing customer satisfaction and on the

    same time least investment in warranty cost.

    Cause and Effect Diagram, is a tool that helps identify, sort, and display possiblecauses of a specific problem or quality characteristic. It graphically illustrates the

    relationship between a given outcome and all the factors that influence the

    outcome. This type of diagram is sometimes called a "fishbone diagram" because

    of the way it looks.

  • 7/30/2019 Paper Interim Report

    27/28

    27

    Cause and Effect Diagram

    DMAIC Time PlanThe DMAIC plan shows the status of the Define Phase is almost complete and after

    a review of the team the next stage of Measure will be started as per the Six Sigma

    Methodology followed by Tata Motors CVBU. Till date the project is under control

    and on schedule.

    Jul Aug Sep Oct

    Undergoing

    Still to start

    Still to start

    M O N T H SPHASE

    Control

    Define

    Measure

    Analyse

    Improve

    Still to start

    Still to start

  • 7/30/2019 Paper Interim Report

    28/28

    3.Learning Exposure to Six Sigma Methodology followed by Tata Motors Data Collection Process Study Time Management Project management Documentation

    References

    Data from Internal Sources at Tata Motors PDCA methodology as followed at Tata Motors CVBU Six Sigma(DMAIC) as followed at Tata Motors CVBU Automotive Principles by Don Knowles www.tatamotors.com www.mytatamotors.com

    http://www.tatamotors.com/http://www.tatamotors.com/http://www.mytatamotors.com/http://www.mytatamotors.com/http://www.mytatamotors.com/http://www.tatamotors.com/