Integrated Solid Waste Management System in Panadura BaseHospital Final Report
8/8/2019 Panadura Hospital Waste Management Program l Final Report
2/27
FinalReportWasteManagementProgramPanaduraHospital 2
Human&
Environment
Links
Pro ressive
Or anization
HELP- OWaste Pollution to Solution
Integrated Solid Waste Management System in PanaduraBase Hospital Final ReportReportonHELPOActivities
UndertheIntegratedSolidWasteManagementSysteminPanaduraHospitalProject
June2009
November
2009
JointlyImplementedandby
HELPO&ASIAONLUS
ProjectFundedby
RegioneLazioincollaborationwithOICS.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
3/27
FinalReportWasteManagementProgramPanaduraHospital 3
Cont ent s o f Repor t
1. DescriptionoftheProject2. MessagefromStakeholders3. ExecutiveSummery4. BasicDiscussionandSitevisit5. ExperienceExchangeProgram6. Biogasunitconstruction7. AwarenessPrograms7.1 EffectiveandBenefitsofthebiogasunits7.2 WastesortingimportantandNonOrganicwasteManagement7.3 OrganicFertilizer,Newcultivationsystemsandorganicagriculture7.4 EvaluationandChallengesdiscussionworkshop8. DustbinsandMobileCarts9. AwarenessMaterials9.1 Colorwisewasteseparationcardsandposters9.2 Leafletaboutcommonrulesandregulation10. OpeningCeremonyBiogasprogram11. MonitoringandEvaluationProcess12. FollowedStrategies13. SustainabilityoftheProgram14. ChallengesoftheProgram15. LesionandLearnedthingsoftheProgram16. AchievementsoftheProgram17. FuturePlansandExpansion oftheprogram18. Effectiveofthebiogasprogram19. VoteofThankstofundedOrganizations20. PartnershipsoftheProgram
8/8/2019 Panadura Hospital Waste Management Program l Final Report
4/27
FinalReportWasteManagementProgramPanaduraHospital 4
Desc r ip t ion o f t he Pro ject
PanaduraisthemostpopulatedcityoftheKalutharaDistrictthepopulationamount
is163,492. (PopulationbyD.S.Divisionand sex,Census2001) thiscity is closed to
Colombo andmanypeople live inhere and this commercial area.The cityhasbeen
spreadoutwithin44sqkm.
ThePanaduraBaseHospital is themainhospitalof theareaandonedaymore than
1500patientsarecomingtogetthetreatments.Thetotalpatientsmorethan1000come
tohospital. In last fewyears thishospitalhasbeen facingahugeproblem that is the
wasteproblem.Thetotalwastegenerationisnearly520KGperday.Theycantmanage
thiskindofwasteandmanymassiveproblemswerebegunfrom thiswasteproblem.
Some times local authority carries this waste but that is not enough to solve this
problem.Even theyexpendedmuchmoney toLPGas.Early times theyexpendmore
thanRs.28,000forLPGas.
OnthattimeHELPO&ASIAONLUSorganizationswereinvolvedtosolvethismatter
through implementing a proper waste management program. As a first step we
conductedafieldsurveyandabletofinalize toconstruct thebiogasunit insideof the
PanaduraHospital. The capacity of thebiogas unit is 22m that can dump 500 KG
organicwasteperdayincludingconductingmanyawarenessprogramswhichisrelated
tobiogasunit.
UnderthisprojectweexpectedtodistributetheDustbinsandMobilecartstocarrythe
wastealsoweprinted someawarenessmaterials likehandbillsandposters.Mostof
importantthing
is
conducted
experience
exchange
program.
Through
this
program
PanaduraHospitalstaffcouldabletorealizetheimportantofthisprograminowneyes.
Afterthatexchangeprogramtheyhaveinvolvedtothisprograminactiveway.
Thisprogramisajointworkandthisisaresultofateamworkatthismomenttheyare
notgivingtheorganicwastetocarrytolocalauthority.Thehospitalcouldabletomake
wasteasausefulresourceandtheyaregettingbenefits.Thisisthesuccessstoryofthe
PanaduraHospital.
BeforeSituation AfterSituation
8/8/2019 Panadura Hospital Waste Management Program l Final Report
5/27
FinalReportWasteManagementProgramPanaduraHospital 5
Message f rom Stak eholders
Mr.MarcoBaldiCountryRepresentativeASIAONLUS
Thisprogram
was
funded
by
the
Regione
Lazio
in
collaboration
withOICS. Iwant to say this isa resultofagoodpartnership
withtheallstakeholders.Wewereneededtofindasustainable
solutionforthePanaduraHospitalWasteproblemandHELPO
withother stakeholderscouldable to findasustainsolution to
that problem.And hospital has a responsibility to implement
thisprogramcontinually.Duringthisperiodmanythingsableto
achieved.
Mr.ChathuraWelivitiya Chairman/ChiefExecutiveHELPO
First of all I want to say we are the first organization that
implementedbiogasunitinHospitalatKarapitiyaHospitalin2004.
This program is still running without any problem and waste
problemhasbeenminimized.
In this hospital we didnt constructed a biogas unit and we
implementedaprograminthishospitalandithasseveralsteps.We
expectto
monitor
this
program
continually.
Ithink
this
program
is
veryvaluable for the environment aswell as for the city.Through thisprogramwe
wanttogiveastrongmessagetotheoutsideworldaboutwecanimplementsuccessful
wastemanagementplanineverywhereeveninhospital.
Dr.SagaiKiriwandeniyaMedicalSuperintendentPanaduraBaseHospital
Duringthepastfewmonthswehadabigproblemaboutwastethen
hopefullywecouldabletoimplementthisprogram.Theotherthing
through this program we could able to reorganized the hospital
becausethrough
this
program
every
person
has
been
changed
and
they tried to waste separation in their homes and they feel the
benefitsof theprogramalsomostofpeople startcultivation.Asa
hospitalweexpendmuchmoneyfortheenergybutlastmonthwe
earnedRs.45, 000 from oneburner andwe got anotherburner. I
thing this program is suitable for every hospital because many
hospitalsaresufferingfromthisandwewanttoexpandourbenefits.
AbstractionfromOpeningceremonyspeech
AbstractionfromOpeningceremonyspeech
8/8/2019 Panadura Hospital Waste Management Program l Final Report
6/27
FinalReportWasteManagementProgramPanaduraHospital 6
Ex ecut i ve Summ ery
This report has been summarizes the program which has been implemented in
PanaduraBaseHospitalwiththesupportofAISAONLUSOrganizationandHELPO
jointwork.
This
program
is
been
funded
from
the
Regione
Lazio
in
collaboration
with
OICS. The objectivewas this program Provide a sustainable solution for thewaste
problem ofHospital and protect the Environment.Under this program obtain the
great achievements one is we could able to solve the waste problem and able to
segregatethewaste100%beforedumpthebiogasunit.
ReducetheLPGasusagefrom50%withinmonthandgetaprofitRs.40,000onlyfrom
theLPGasusage.Early time theydidnt think thewastewillbecomea resourceand
theyjust dump it away. But not itbecause a very valuable thing to them and they
gettingmorebenefitsfromtheorganicwasteaswellaspolytheneandplastics.Under
thisprogram
we
provide
asustain
solution
for
all
waste
and
at
this
moment
they
could
findthebuyersforthepolytheneandplasticwaste.
Whilethisprogramimplementingwecouldabletoincreasetheteamworkofhospital
throughtheawareness.Thiswastemanagementprogrambeeneffectiveforthepatients
of the hospital because they learn the important of waste segregate through this
programandother staffwaste segregation startedon theirownhomeand theyhave
minimizethepolytheneandplasticusageasmuchtheycan.
Asaresultofthisprogrammanypeopleandprivatesectorisrequestingtobiogasunit
asasustainablesolutionofthewasteproblem.EvenWesternProvinceCouncilhasbeen
agreed to introduce thisprogram to everyhospital of theprovincebecause they are
sufferingthisproblem.
Thehospitalexpectstoestablishafundtomaintainthisbiogasunitcontinually.During
this program implement we could able to increase the links between Karapitiya
Hospital and Panadura Hospital through an experience exchange program. This
strategywasveryeffectivewhenweimplementthisprogramongroundlevelbecause
theycouldabletorealizetheresultsofthebiogasintheirowneyes.
Finallywe implemented one of success programwith the full of support of our all
stakeholders.But
we
expect
to
introduce
this
solution
to
every
place
because
through
thisprogramwecanachievemanybyproductsanditsveryeffectivetoenvironmentas
well as for the attitudes.Webelieve that construction abiogas is not a sustainable
solutiontosolvethismassiveproblemandwehavetoawarethemaboutthisandhow
tomaintainthisalsothisshouldbecomeapropertyofthemthentheywillprotectitand
implementcontinually.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
7/27
FinalReportWasteManagementProgramPanaduraHospital 7
Bas ic Discuss ion & Si te V is it
Inbeginning of theMay 2009HELPO staff, ASIA
ONLUSstaffandPanaduraHospitalstaffconducteda
basicdiscussion
and
site
visit
before
start
this
program.During thismeetingwecollected thebasic
dateandweanalyzedthosedata.Thenwecouldable
tomakesomedecisionsaboutthisprogramandabout
howtoimplementthisprogram.
During this meeting
abletofinalizethecontributionofeachstakeholderand
madeaplanfortherestofotheractivities.On that time
werealizewhataretheactivitiesshouldweimplementin
future.On
that
time
we
aware
the
Hospital
management
andkeypersonsoftheproposeprogram.Theobjectiveof
thisdiscussionexplainsthefutureprogramandactivities
to theHospitalandgets theirmaximumcorporation for
thisprogram.
Ex per ience Ex c hange Program
Theoneofmost importantactivityof thisprogram
isthis
experience
exchange
program
between
Panadura and Karapitiaya Hospital. They didnt
knowwhatisabiogasunitandhowitsfunctionand
whatarethebenefitsofthebiogasunit.Duringthis
visittheycouldabletoseethebenefitsofthebiogas
unit in their own eyes. During this program also
theywenttoseesomecommunitybiogasunits.One
of the main
aspects of the programwas aware thebeneficiaries
aboutthis
program
and
benefits.
Thisprogrambecame one of focalpoint for success
theprogramduringthisvisittheyrealizetheground
level challenges and biogas function process. Even
theycouldabletoknowabouttheimportantofwaste
separation. For this program Doctors, Nurses and
otherstaffwereparticipatedwiththeofficersofASIAONLUSOrganization.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
8/27
FinalReportWasteManagementProgramPanaduraHospital 8
Biogas Un i t Const ruc t ion
HELPO and ASIA ONLUS Organization has
beendecidedtoconstructabiogasunitasoneof
solutionfor
the
organic
waste
problem
of
the
Panadura Base Hospital. The capacity of the
biogas unit is 22m3 that can dump 500 KG
organic waste per day. Early time they
expendedmuchmoneyfortheLPGasandthey
used 36KG 07 LP Gas cylinders only for the
monthbut now they can use this 07 LP Gas
cylinder for twomonths thatmeans they can
earn 07LPGas cylinders for onemonth also they able to savemore thanRs.40,000
money
within
a
month.
Now
they
are
doing
good
waste
sorting
system
in
beginning
levelandeverywardwisealsoweprovidedmobilewastecollectioncartstocarrythe
waste ineasyway.Theycanget themaximum
efficiencybecausewastesortingishighinevery
ward and all staff has been aware about this
system and they monitor about the waste
separation process. That is another reason for
success thisprogram.NowHospital expects to
giveup theLPGasusageandnow they try to
dothat.Inthosedaystheyhavecultivatedmany
vegetableswith
using
the
organic
fertilizer
whichgetsfromthebiogasunit.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
9/27
FinalReportWasteManagementProgramPanaduraHospital 9
EspecialMoments
of
the
Construction
time
8/8/2019 Panadura Hospital Waste Management Program l Final Report
10/27
FinalReportWasteManagementProgramPanaduraHospital 10
Aw areness Program s
EffecitveandBenefitsoftheBiogasunitsThis is the first
awarenessprogram
for the Hospital
Staff. Topic is
Effective and the
Benefits of the
biogas unit.Under
this program we
discussed about
whatisabiogasunitandwhatthedirectbenefitsareandwhataretheindirectbenefits.
Under
this
section
we
aware
what
are
the
direct
benefits
as
mention
below
CandecreasetheGlobalWarmingandClimateChange PreventtheEnvironmentPollution AlternativeEnergyfortheenergyproblem SolvetheWasteproblemandwastebecomeavaluablething MinimizethewaterpollutionAresomeoffewmaintopicswerediscussedonthattimealsowediscussedaboutthe
importantofthewasteseparation.
WasteSortingImportantandnonorganicwastemanagementThesecondprogramwaswastesortingandnonorganic
wastemanagement. This program is very essential for
them because they didnt have a proper non organic
waste management process and waste sorting. Under
thisprogramweexplainedthemabouttheinternational
standardofthewastesortingandwhatistheimportant
ofthewastesorting.
Alsowe explained aboutwhat
are waste recycling and its benefits and bad benefits of
without waste recycling under this topic especially we
explained about the non organicwastes and itsbad effects.
Alsowehavemadeaplacetostorethepolytheneandplastic
thentosellthewholelot.Alsotheyagreedtoimplementthis
andthisisotherincomefortheHospital.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
11/27
FinalReportWasteManagementProgramPanaduraHospital 11
OrganicFertilizer,NewCultivationsystemandOrganicagricultureThis is the third awarenessprogram that has
been organizedby theHELPO to aware the
hospitalstaff.Ontheotherhand thisprogram
isspecial
because
thorough
this
program
we
expectedtostarttheOrganiccultivationinside
of the Hospital with using the Organic
Fertilizerwhichgetsfromthebiogasunit.
Under this program we explain about the
benefitsandeffectiveofthisorganicmanureof
thebiogasunit andweexplained them about
whatarethetypesthatwecanusealsoawareaboutthismanurecanuseasafertilizer
andasahormoneandasainsecticideandthebestthingisthismanuredoesntheartto
environment.
Also during this program they could able to
learn about thenew cultivation techniques and
urban agriculture strategies. Because this
hospitalhaslimitedspaceandtheyhaveagreed
tocultivateinnearplacesofthebiogasunitwith
usingthismanure.Thisprogramwasatechnical
training about aware new techniques of the
cultivation.
EvaluationandChallengesdiscussionworkshopWhenwedesign thisprogramwe expected to conduct an evaluationworkshop and
challengesdiscussionworkshop.Becausewhentheyimplementbytheirwaytheyface
someproblemsandchallengesandwehave toconductaprogramanddiscussion to
solvethisproblemotherwisethisprogramwillnotfunctionwell.Throughthisprogram
weprovidedmuchtechnicalassistanceforthehospitalstaffandthatknowledgemuch
helpfulthemtocarrythisprogramwell.
At
this
moment
we
didnt
conducted
this
program
and
in
beginning
the
December
expect toconductbecauseon that time theyhaveenoughexperienceand facedsome
challengeswhileimplementthisprogram.ThisisnotanEvaluationworkshopandwe
provide technical advices and develop the current plans like waste collection and
disposal plan and this happenwith their support and from this program they can
realize that thecurrentsituation.Anyway thiskindofprogram isveryessential fora
successwastemanagementprogram.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
12/27
FinalReportWasteManagementProgramPanaduraHospital 12
Dust b ins and Mobi le Car t s
Wehavefollowedalateststrategiesforimplementthisprogram.Thecoloreddustbins
are forwastesortingandcoloredmobilecarts tocarry thewaste.Thissystem isvery
accretivebecause
it
is
very
colorful
and
easy
to
understand
about
what
is
the
process.
We conducted many programs and aware them about the important of the waste
sorting and now they equipments to sort the waste. At this moment the waste
separation is 100%. On the other hand this proper waste sorting is much help to
implementthebiogasunitinaproperway.
Thispartisthemainpartofthebiogasprogrambecauseifwastedoesntseparatewell
thebiogasunitwillnotfunctionwellandtheproblemwillneversolve.Wegaveourall
strengthtoaccomplishthisworkbecausethisistheheartoftheprogram.Wecouldable
to
complete
05
dustbins
to
waste
segregation
and
establish
a
recycling
centre
for
the
otherpolytheneandplasticsrecycle.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
13/27
FinalReportWasteManagementProgramPanaduraHospital 13
Aw areness Mater ia ls
Colorwisewasteseparationcards&PosterWith
the
support
of
ASIA
ONLUS
organization
we
could
able
to
a
card
for
dump
thewaste.Thiscardislittledifferentfromothersbecausewehavedrawsomepicture
thenanyonecanunderstandwhatitisandeasytodumpthewastetocorrectplace.We
haveshowthiscardsanddustbinsineverywardtheneverybodycaneasilyunderstand
aboutwhat is the correct dustbin andwe could realize that this system isworking
withoutanyproblemanditissuccess.
Alsowehaveprintedaposterwhichincludesallpicturesthroughthiswayanyonecan
easilyunderstand thewholepicture inaminute.Through thisposterweexpected to
giveaninstantwholepictureforthepersonwhoseesthis.
PrintedColorwisewasteseparationCadres
8/8/2019 Panadura Hospital Waste Management Program l Final Report
14/27
FinalReportWasteManagementProgramPanaduraHospital 14
LeafletaboutBiogasandCommonrulesUnderthisprogramwehaveplannedtostartnewlythingthatisprintaleafletwhichis
sayaboutourbiogasprogramwaste sorting system includingwhatare the common
rulesinsideofthePanaduraHospital.Becausewethinkthisisveryessentialtovisitors
whocome
to
the
Hospital
every
day.
When
some
patient
arrives
to
the
Hospital
as
a
residentpatientweprovidethisleaflet.Throughthisdocumenttheycanlearnaboutthe
situationof thehospital andwhat are the rules inside of thehospital.We think this
programismucheasiertowastesegregationbecauseeverybodyknowtheprocessand
thisactivityweintroducetohospitalinfirsttimebutitissuccess.
Openi ng Cerem ony Biog as Program
On 17th November is the most important day of the whole program because we
expectedto
open
this
program
on
that
day
with
the
participation
of
many
distinguished
guests.ThechiefgustwasHon.GovernorofWesternProvincealsoHon.JagathAngage
MinisterofHealthofWesternProvince.Mr.SheltonPereraDivisionalDirectorand
Mr.AmalHarshaProvincialDirectorHealthwereparticipated to thisceremony.Even
officersofASIAONLUSandHELPOwereparticipatedwithHospitalOfficers.
In beginning speech conducted by the MS of
Hospitalandshewarmlywelcomealldistinguish
gueststhensheexplainedaboutwhytheyneeded
thissolutionandwhatarethebenefitstheygetting
fromthis
biogas
unit.
Even
she
explained
she
said
within testing time they could able to earn from
thisbiogasprogrammorethanRs.45,000fromLP
Gas.
Also she explained that they have started the
cultivationandthatisonlyfromorganicfertilizerandexpecttogetagoodincomefrom
thatandsellingthepolytheneandplasticstoo.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
15/27
FinalReportWasteManagementProgramPanaduraHospital 15
Then Mr. Chathura Welivitiya Chairman and Chief
Executive of HELPO explained about theprogram andwhy
we implemented this program and what the goal of this
programis.Alsoheexplainedthatthebenefitsoftheprogram
andwhy this is important for hospital alsohe told about the
challengeswhile this implementing and also he proposed to
establishafundformaintainthisprogramproper.Ifthiscould
not able to establish this programwill failbecausewe cant
support forever to implement this and explained about the
importantofthekeepmonitoring.
Duringhisspeechheexplainedwhatthegoaloftheorganizationgoalofthisprogram
becausewehelptoreduce themethanegasemission toairthat iswhywe implement
thisprogramalsowehelpotherstosustainablewastemanagementprogram.
After that Mr. Maro Baldi Country
RepresentativeASIAONLUSexplainedwhy they
involved to this program and their role of the
program.He said thisprogram is so valuable for
thehospitalandhesaidthroughthisprogramthey
couldabletogiveastrongmessage tocommunity
as well as for the government also he expect to
introducethissystemtomanyhospitalinthearea.
They expect togetgoodprofit from thisprogram
andimplement
this
process
continue
and
he
said
my
expectation
is
to
carry
this
programcontinueandprotecttheenvironmentforourtomorrow.
Dr. Shelton Perera Regional Direcotr Kaluthra
District (WP)was expressed his ideas about this
program and he said I could able tojoin this in
KarapitiyaHospitalandon that time IwasMSof
the hospital and I know about the benefits of a
Biogas unit and through this we can solve this
problem
and
achieve
great
achievements.
And
we
wanttoimplementthisinsustainwaybecauseitis
easy to start but difficult thing is to carry this
sustainway.Alsohesaidthatheexpecttointroducethisprogramineveryhospitalof
the province since next year because at this moment every hospital is facing this
problemandneedasustainsolution.BecauseIknowaboutthevalueofthisprogram
andthroughthiswecanreducethecostandearnmoremoneyfromthewaste.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
16/27
FinalReportWasteManagementProgramPanaduraHospital 16
On that time the Mr. Jagath Angage Minister of
Health of Western Province hasbeen explained
aboutthe importantofthisprogramandhowthe
municipalitygettingbenefitandalsoproposed to
establish a fund formaintains of thebiogasunit
alsoheexpecttointroducethisprogramstoother
hospitalsof thewesternprovince. I came to start
this program and I am very happy that I could
able to participate to opening ceremony of the
biogasunitandIsawinmyowneyesthebenefitsandhowtheycultivatedinhereandI
amremember thebeforesituationandIexpect to introduce this toallhospitalsofthe
provincebecausethisisagoodsystem.
Finally speech was conducted by the Western
Province
Governor
Secretary
Mr.
A.W
Gunarathne andheexplained thathe could able
to identify the value of this process and he told
that he expect to introduce this system to all
hospitalsof theprovincebecause thisprovince is
thewell populated province of the country and
waste problem is high in here and we need a
sustainable solution for it. Inhere Icouldable to
see how they cultivated and see the flame of
Biogas
and
waste
became
a
resource
in
here
and
this
is
a
very
good
program
for
introducetoallhospitals.Ithinkmodernworldisfacingabigproblemthatisclimate
changeandwehavetofindthiskindsolutionforsolveourmothernatureandIreally
appreciatethisgreatefforttosolvethewasteprobleminPanaduraHospital.
OpeningofPanaduraHospitalBiogasunit
8/8/2019 Panadura Hospital Waste Management Program l Final Report
17/27
FinalReportWasteManagementProgramPanaduraHospital 17
Moni tor ing and Evaluat ion Proc ess
HELPOimplementedthisprogramwithagreatgoalandthatisforimplementproper
wastemanagement program in PanaduraHospitalwith providing other facilities to
themincluding
equipments
and
knowledge.
From
the
beginning
level
we
believe
that
we need a strongmonitoring and evaluationprocess from our side aswell as from
Hospital side. While this program implement we conducted monthly monitoring
programsalsowefollowednewstrategiestomonitorthisprogram.
We have formed a co group inHospital tomonitor this program and they get the
responsible tomonitor the program. Through the programswemade a competition
betweenthehospitalwardandallstaffgottheresponsibleformonitorthisprogramin
lowest level.From theAISAONLUSOrganizationsside theyalsomonitorabout this
programalso
they
helped
to
monitor
those
all
activities.
FromtheHELPOsideweexpecttomonitor
thisprogram ineverymonthandconducta
meetingwiththecogroupanddiscussabout
the current situation. From the beginning
stage we conduct technical visit in every
month to monitor the program and we
provide thenecessary technicalassistance to
the officers.During those visits our officers
helped them to overcome some challenges.Also this strategy was much important to
implement good and correct waste
managementprogram.Sometimeswevisitto
some hospital wards to check about the
waste separation process and it related
works.Throughthosevisitswecouldableto
stopsomewrongmethodsoftheminorstaff
andwehad to stepby step todevelop and
increasethe
knowledge
of
them.
Now
they
do finalwaste segregationbeforedump the
wastetobiogasunitandearlytheydidntdo
thatandaftertheawarenesstheydothatand
thatisgoodforthebiogasunit.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
18/27
FinalReportWasteManagementProgramPanaduraHospital 18
Fol low ed St ra t eg ies
Whenwe implement thisprogramwehave followedourownstrategies toovercome
the challenges and implement the program. Themain strategy was the conducted
awarenessprograms.
When
we
design
the
program
we
have
consider
about
what
are
thesuitablesubjectsandwhataretheareaswillbeaproblemwhentheyimplementthis
program.Onbeginning levelwehavedesignverysuitablesubjects for theawareness
program
Valueandthebenefitsofthebiogas Wastesortingandnonorganicwastemanagement Technicalsideofthebiogasunit Organicfertilizer&ModernCultivationprocessandbenefits EvaluationworkshopstodiscussaboutthefaceddifficultiesThose programs hasbeen linked to othersbecause this goes stepby step from the
beginningprogramtheycanunderstandaboutthevalueandbenefitsofthebiogasand
secondweexplainwhatisthesuitablestepsandprocesstorunthisprograminproper
waybywaste sorting and non organicwastemanagement. Third program is about
Organic fertilizer andModernCultivation process and itsbenefits through thisway
they start the organic cultivation. Finally we discuss about the challenges and
difficultiestheyhavebeenfacedduringthisprogramimplementing.
Second strategy we have followed for success this program make a competition
betweenstaff
and
wards.
This
is
very
good
strategy
because
everybody
expects
to
become first and implement thisprogramproperly and through thisway everybody
monitorthisprogram.Andfromacogrouptomonitortheprogrambecausethisisone
ofgoodprocesstomonitorprogramanditisthesustainablethingtorunthislongtime.
HELPO implemented another strategy that is inserting the pictures to the waste
separationcardsotherwiseitwonttoeasytounderstand.Thosecardsarecolorfuland
everybodywouldlike toseethiscard twicebecausetheydidntsee thiskindof thing
and through this dustbins people and othersbecome to dump thewaste to correct
dustbin. Eventhroughpicturesdrawcaneasilyunderstandaboutprogramanddump
correctlyand
in
03
languages.
This
process
is
much
easier
to
implement
correct
waste
program. Providing the mobile carts were one of best strategy to implement this
programinsustainwaybecausethosecartscancarryineverywardandeasytocollect
thewaste and those are colorwise. And at thismoment they established a waste
collectionstoreandotherpolythene,plasticandcardboardcaneasytocarry.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
19/27
FinalReportWasteManagementProgramPanaduraHospital 19
Inherewehavefollowedanewstrategythatprintlittlestrangeleafletaboutthisbiogas
programandincludeabutcommonrulesandregulationsforaresidentpatients.When
patientcomestohospitalgavethisleafletandwhentheyleavethehospitaltheyhaveto
hand over this leaflet. This activitywas very effective to aware the resident patient
becausetheycantawarebyconductingameetingandthisisthebestsolutiontoaware
themandtheyknowaboutwhatistherulesandregulationsandthroughthiswecould
abletomakeeverywardtobestwasteseparationevenallnursescanmonitorthewaste
separation of theward.And every resident patient dumps thewaste to correctbin
becausewhentheyarrivetohospitaltheyhavebeenwellaware.
The key strategy was conducing an Experience Exchange program between Galle
KarapitiyaHospitalandPanaduraHospitalbefore implement thisprogram.Hospital
staffofPanaduradidntseeabiogasunitand itsprocessand theydidntbelieve this
storywhentheyvisitedtotheKarapitiayaHospitaltheycouldabletoseethisstoryin
theirowneyesandthentheybelievedthiscando in theirhospitalinbetterway than
KarapitiyaHospital. In thisprogram theysaw theeffectiveof thebiogasandbenefits
andhowKarapitiyaHospitalcouldabletodecreasetheLPGasusageandearnmoney
and their separation process and non organicwastemanagement. Then everybody
thinkwecanimplementthiskindofprogram.
Whenweimplementthisprogramwehavefollowedmanystrategiestoimplementthis
program insustainandsuccessway.Wehadvariousstrategiesforeveryactivityand
through this way we could able to implement one of success program. Especially
experience exchangeprogramweremuchhelpedus to implement thisprogram and
thatwasthefoundationoftheprogram.
Sust a inab i l i ty o f t he Program
HELPOexpectedtoimplementthisprograminsustainwayandwehaveformedaco
group formonitor this program and they keepmonitor this program alsoHospital
managementhaveplanned toestablishafund formaintainsandforsustainabilityfor
thisprogram.NowtheycouldabletoreducetheLPGasusageandthatearnedmoney
willexpecttousetothisfundtoo.Whenthereisarepairthatfundwillusetorepairthe
biogas
unit
and
other
related
things.
Fromtheorganizationsideweexpecttoprovidethetechnicalsupportwhentheyneed
andbecausethiscomponentisoneofmainthingforsustainandthisisoneofpartof
our partnership program.At thismoment hospitalmanagement appointed separate
teamforthisbiogasunitandtheymaintainthisbiogasunitandcultivatealsotheyhave
goodknowledgeaboutthisprocessandtheywelltrained.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
20/27
FinalReportWasteManagementProgramPanaduraHospital 20
Throughourawarenessandotheractivitiesallstaffawareaboutourprogramandthey
knowaboutthecorrectprocessandthereisagoodmonitoringteamandwhenallthose
thingsbe together theprogram implement in sustainway.Even they finallyseparate
theallwastebeforedumpthebiogasunitandthatisoneofmainthingforlonglasting
success.
Chal lenges of t he Program
01 ThefirstchallengewasweconductedanExperienceExchangeprogrambetweenKarapitiyaHospitalandPanaduraHospitalbeforebegintheprogrambutunfortunately
we had to start the program after severalmonths. From that reason their positive
attitudesweregoesdownandwehad to improve that frombeginning level.Because
theysawthesuccessandtheyneededtostartthisprogramassoonaspossiblebutthe
processwere
slow
and
it
took
much
time
to
approve
the
program.
For
overcome
this
challenges we conducted a basic discussion with the hospital staff and able to
encouragethemtostartthisprogram.
02 The secondmain challengewas about how toawaretheresidentpatientsabout thewasteseparation
and this program. Because patients are change
everydaybydayand those is thekeypersonofwaste
generation and their visitors. Ifwe cant aware them
aboutthisprogramthewholeeffortwillbegoesdown.
Wehave
followed
agood
and
strong
strategy
for
this
that isprinta leaflet forevery residentpatient.When
newpatientscometohospitalasaresidentpatientthis
leaflet issues topatientorpatient relative.Andpatient leave thehospital theyshould
handoverthisleaflettohospitalandweincludethenormalregulationsandrulesofthe
hospitalandthroughthisleafletwecouldabletoaware
thekeypersonandtheyknowabouthowtodumpthe
waste and its process.Now patient knows about the
normalprocedureandusually theydontgo todump
the waste to wrong dustbin. And that leaflet much
easier for the hospital to implement good service
because every person knows about the systems and
procedures.Through this leafletwaste sortingquality
wasincreasedineverywardandpatientscouldabletounderstandaboutthevalueof
thewastesorting.Thisleafletprocesswasverysuccessfulandthissystemhasstartedin
firsttimeinhospital.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
21/27
FinalReportWasteManagementProgramPanaduraHospital 21
03 Theotherchallengewasgather theallstafffor trainingsandforovercomethatwe conductedmoreprogramsand second thing is the trained staff aware theothers
abouttheprocess.Ontheotherhandthisisanexperienceexchangeprogramandthis
processismucheasiertoovercomethechallengebecausewecantgathertheminsame
time
and
all
staff
should
be
aware
about
the
whole
system
and
if
we
could
not
able
to
solvethiswearefailing.Butfollowingthatstrategywecouldabletoovercomethat.
04 Whenwe implement thisprogramwehad toworkwith theWesternProvinceWasteManagementAuthoritythechallengewastheirgoalsandourprojectgoalsdidnt
sameandmatchandtheyhadseparateprogramforthisbutbeforeimplementthiswe
both should have a one goals. For overcome this challenge we conducted some
meetingswithallstakeholdersandwehaveexpressedaboutour ideasandgoalsand
sharebothpartiesideasandbecameonesolutionforimplementthisprogram.
05 Theotherchallengeweexpect there isno fund for themaintainsbecauseafteroneandtwoyearslatertheallequipmentswillbebrokedownandthehospitalhastofindnewdonationstocarrythisprogramcontinueandweexpecttoguidethehospital
to establish a fund andwe expect to get the income from the earnedmoney from
decreaseLPGasandtheotherwayissellingthepolytheneplastics.
Lesion and Leaned t h ings o f Program
From this program we realize many things one is we can implement good waste
management
program
inside
of
the
Hospital
because
many
people
are
saying
that
nobodycantimplementwastemanagementprograminsideofthehospitalbutitisnot
trueinherebecauseatthismomentithappensandpastonemonththeycouldableearn
morethanRs.45,000fromwaste.Alsoweknewthatwecanprovideasustainsolution
towasteproblem through thebiogasprogram and for the environmentpollution as
well as Global Warming and Climate Change. The other learned thing was that
Hospitalcandoawastemanagement incorrectwaybecauseevery timeallstaffand
patientscanbechangeanditishardthingtogatherandawaretheybutwecouldable
tochangethat.
The second thingwe could learned is the teamwork and listen to others ideas and
discussionbecausewhenweimplementallactivitieswedidnttrytopushourideato
them andwe conducted adiscussion about the need and gather the allparticipants
ideasandablefinalsolution.Wepreparedthewastemanagementplanwiththemand
theydecidedtheplacesputthedustbinsthatcaneasilymonitorandthatthingwasvery
successfulbecausetheyget theresponsibleformonitorand implement this insuccess
way.Wecouldable torealize the importantof teamworkbecausewithout their team
8/8/2019 Panadura Hospital Waste Management Program l Final Report
22/27
FinalReportWasteManagementProgramPanaduraHospital 22
work the system will not work and we believe that teamwork is much need to
implementtheprogram.Sometimeswehavechangedourideasandplansafterdiscuss
withthembecausetheyknowthecorrectneed.Foranexampletheleafletinbeginning
timewetriedtoprintaleafletaboutbiogasprogramandthentheyinformedusthatit
shouldbe includeabout common rulesand regulationsand theyexpect to issue this
whenpatient arrive to hospital as a residentpatient.Through this the all staff and
patientsawarethesystemandthiswasmucheasytowastesortingandimplementthis
programinsuccessway.
Theother learnedthingiswehaveagoodexample toshowotherhospitalbecausein
here theallactivitiesmuchhelpful for the implement.Andwehaveapackofwaste
managementprogramthatcanintroducetootherplacesandalldistinguishguestswere
expect to introduce this tootherplacesbecause through this they saw the resultand
benefits.
Theother
thing
is
the
important
of
the
Partnership
because
we
had
astrong
partnership
ofASIAONLUS,PanaduraHospital,HELPObecausethosearethekeyplayersofthe
game. Before implement everythingwe discuss and then implement andwe didnt
createanythingwithoutotherspermissionandinformationsharingis100%andwehad
agoodmutualunderstandingabouteachothersresponsibilitiesandrole.
Ach ievements o f t he Program
Whenwe implementwecouldable toachievemany thingsduring the implementing
periodand
after
implement.
The
main
thing
is
we
could
able
to
expand
our
program
to
manyhospitalsafter implement thisministerofhealthofwesternprovincehasbeen
requestedfromustoimplementthisbiogasprogramineveryhospitalofthearea.After
thatPadiyathalawaHospital,UdugamaHospital,MathaleHospitalandTrincoNaval
CampandHospitalwererequestedthebiogasprogramandatthismomentUdugama
andMathaleandTrincoNavalCampandHospitalwecouldabletostartthisinsuccess
way.
SecondachievementismakenewrequestsfromthePrivatesectorbecausemanysmall
hotelsandrestaurantswererequestedfromustoconstructbiogasunitsintheirplaces.
Becausethey
are
expend
much
money
for
the
LP
Gas
and
they
have
abig
problem
of
waste.ThroughthisHELPOcouldabletoexpandourwastemanagementprogramto
manyplacesandexpectstoreducethemethanegasemissiontoair.Becauseotherscan
seethebenefitsofthisandtheywouldliketohaveaoneintheirplaces.
Eventhroughthisexperiencewecouldabletomakeawastemanagementpackage.We
haveourowntrainingmodulesandstrategiesprocesstoawarethebeneficiariesandwe
8/8/2019 Panadura Hospital Waste Management Program l Final Report
23/27
FinalReportWasteManagementProgramPanaduraHospital 23
haveourownbiogasunitwithwemodifiedbecauseweconstructchinamodelandwe
havemodifiedit.Alsowehavepostersandleafletsanddustbinsforthispackageand
HELPOexpectstointroducethismanyplacesinfuture.
When we implement this program HELPO could form new and well trained
professionalconstruction
team
with
the
labors.
Through
this
team
we
started
to
construct more biogas units in various places because we had little professional
constructionteammembersbutfromthisbiogasunitweformedmoremembersandwe
couldabletoexpandthecapacityofourtechnicalside.
TheMainachievementisHospitalcouldearnmorethanRs.45,000fromthedecreasing
theLPGasusageduringthelastmonthandtheyearned07LPGascylinderswhichhas
40KG inonecylinder.Before theyused this07cylinder inonemonthbutwhen this
biogas unit established they could able to use this for twomonths thatmeans they
earned07cylinders.Alsotheyhavestartedtheorganiccultivationinthehospitalthen
theyexpect
to
sell
the
organic
fertilizer
which
gets
from
the
biogas
unit.
For
the
non
organicwastemanagement theyconstructedstorage in thehospitalandexpect toget
anotheradditionalincomefromsellingthat.
Fut ure Plans and Ex pansion of Program
HELPOexpects toexpand thisprogram tomanyhospitalsof theareaand introduce
this program tomany hospitals especially forHoranaHospital, KalutharaHospital
including theotherhospitalsofwesternprovince.Many localauthorities inKaluthara
andother
district
were
requesting
the
biogas
units
at
this
moment
including
the
Army,
Navy camps.We havemany requests from the every hospital of theKaluthara and
otherwesternprovincehospitalandtheministerhasagreedtoimplementthiskindof
program in hospital and he gave the permission to itwhile hewas conducting his
speechonopeningceremony.
EvenwegotrequestfromtheeasternprovincehospitalsandSabaragamuwaProvince
Hospitalsbecause those all places could able to see the result from their own eyes.
HELPO expects to implement and introduce this system to other placebecausewe
haveenoughexperienceabovethisfiledandweintroducedagoodmodeltoPanadura
Hospital.Even
the
secretary
of
the
western
province
governor
has
been
agreed
to
provide thenecessarypermission toestablish thebiogasunit ineveryhospitalof the
provincebecausethisprovinceissufferingwasteproblemandmanypeoplearecoming
tothoseareaseverydayandwastecollectioncantmanagetolocalauthorities.
We expect to introduce thismodel to private sectorbecausewe have thousands of
requests from private sector to construct biogas units for their hotels and small
8/8/2019 Panadura Hospital Waste Management Program l Final Report
24/27
8/8/2019 Panadura Hospital Waste Management Program l Final Report
25/27
FinalReportWasteManagementProgramPanaduraHospital 25
Vote o f Thank s t o Funded Organizat ions
Thisprogram isbeen funded from theRegione
LazioincollaborationwithOICS.ASIAONLUS
Organizationbeen
implemented
this
program
with the coordination of theHELPO.On this
time we vote of thanks to our all funded
organizations for thisprogrambecause through thisprogram theycouldable toearn
more thanUS$450 inamonth fromreducing theLPGasusage.Also theyexpect to
start tosell theorganic fertilizer.Allstakeholderscouldable to this targetbecauseof
our donor support and ones again we would like to thanks to Regione Lazio in
collaborationwithOICS.
Part nersh ips o f t he Program
HELPO(HumanandEnvironmentLinksProgressive
Organization)
NGO(nongovernmentorganization)basedinGalleinSriLankasSouthernProvince.
HELPOwasformedin1993withtheaimsof
helpingpeopletosecuretheirhumanrights; protectingtheenvironmentforthefutureand; strengtheningthecommunitytowardsindependentdevelopmentFollowingtheSouthAsiantsunamiinDecember2004,HELPObecameinvolvedinarangeof
programstohelpcommunitiesrecoverfromthedisaster.Ourworkaspartofthereliefefforthas
included developing housing for displaced people, reconstructing community facilities and
providingadvice,assistanceandmicrofinancetosmallbusinesses.
Ourvision
Ourvisionisofaworldwithsocialjusticeandenvironmentallyfriendlyeconomicdevelopment.
Ourmission
Ourmission is to support vulnerable communities in Sri Lanka to identify their needs and
developsolutionsthroughpartnershipswithstakeholders.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
26/27
FinalReportWasteManagementProgramPanaduraHospital 26
AssociazionediSolidarietInternazionaleinAsia ASIAONLUS
Organization
This is a leading organizationwhich implementsmanyprograms in Sri Lanka since
manyyears.Since2005ASIAhasbeenworkingwithonPostTsunamiProjects inSri
Lanka.ASIA isaregisteredNGO inSriLankaandhaspartnershipswithwithpublic
intuitionsandlocalNGOatnationallevelandlocallevel.IntheframeofPostTsunami
interventions,ASIAhasdevelopedprojects in theSouthWestCoast (Kaluthara,Galle,
andMatara
Districts)
and
in
the
east
coast
(Batticaloa
District)
Duringthepasttimetheyhelpedthegrassrootlevelcommunityinvarioustypesliketo
develop their lost livelihood and housing including the environmental protection
programs.
ASIAONLUS implementmanyprograms to help tograss root level community and
their living standards too. This organization has beenworkingwith Sir Lanka since
Tsunamitime.
Panadura
Base
Hospital
PanaduraHospitalisoneofmainhospitalofthedistrictandmanypeoplearecomingto
everydayforgettingtreatment.Foronedaymorethan1000patientsarecomingforthis
hospitalandthisisabasehospitalandthegovernmentexpectstoexpandthisprogram
withthefacilities.
ThevisionofHospital
QualitativeHealth
Service
through
the
consecration
TheMissionofHospital
Provide qualitative, effective, continues and developing health service on Agreeable,
affableenvironmentandusingtopicalmedicalstrategiesandusingtrainingsofthestaff
andmanagingtheresources.
8/8/2019 Panadura Hospital Waste Management Program l Final Report
27/27
WesternProvinceWasteManagementAuthority
Vision
WasteFreeEnvironment
Mission
Protection,Management and Enhancement of theprovincial environment byway of
establishingasuitableWasteManagementStructure,StrategyandLegalFrameworkfor
the Province with the Coordination of relevant Institutes/Organizations in the
ProvincialandCentralGovernments.
AimsandObjectives
1.ToimplementtheprovisionsoftheStatute.
2.
To
keep
the
environment
of
the
urban
and
rural
areas
in
the
Province
clean
for
the
well
beingofthepeopleaswellasforthefloraandfaunaoftheprovince.
3.TointroducewastemanagementregulationsforSolidWaste,hazardouswaste,clinical
orinfectiouswasteintheprovince.
4. To implement the said guidelines with the help of local authorities and waste
managementcontractorswhoarepresentlyinvolvedinwastemanagement.
5.ToassistLocalAuthorities in themanagementandcontrolofallcategoriesofwaste
(municipal,hazardous
and
clinical
or
infectious)
its
collection,
transportation,
treatment,
transferanddisposal.