Palm ppt

Embed Size (px)

Citation preview

  • 8/12/2019 Palm ppt

    1/14

  • 8/12/2019 Palm ppt

    2/14

    Faridabad - the Heart of NCR with excellent connectivity with Delhi ,Noida, Gurgaon

    Metro, Badarpur flyover have further improved connectivity

    The proposed FNG Expressway is being planned to link the town with Noidaand Greater Noida. The other link connecting Faridabad to Gurgaon isbeing widened into a four-lane road .

    Connected by the upcoming Kundli-Manesar-Palwal (KMP) Expressway

    Delhi Metro Phase III (to be completed by 2014), is already under progress,which will connect Delhi to Faridabad by linking Badarpur, NHPC Chowk,Badkal Chowk, Old Faridabad and YMCA Chowk and will bring moreinfrastructure development to the city. Metro to Ballabgarh also getsapproved

    FARIDABAD- The Growth Hotspot

  • 8/12/2019 Palm ppt

    3/14

    FARIDABAD- The Growth Hotspot

  • 8/12/2019 Palm ppt

    4/14

  • 8/12/2019 Palm ppt

    5/14

  • 8/12/2019 Palm ppt

    6/14

    The road along Agra Canal from BPTP Bridge to Sector 75 entry point is

    being strengthened and re-carpeting of the road has been done

    In addition to the above, the work of construction of bridge on GurgaonCanal connecting sector 74 75 from by pass road has also been startedby HUDA through Haryana Irrigation department . The photographs are

    attached below

    Greater Faridabad Upgradation Update

  • 8/12/2019 Palm ppt

    7/14

  • 8/12/2019 Palm ppt

    8/14

  • 8/12/2019 Palm ppt

    9/14

  • 8/12/2019 Palm ppt

    10/14

  • 8/12/2019 Palm ppt

    11/14

  • 8/12/2019 Palm ppt

    12/14

  • 8/12/2019 Palm ppt

    13/14

    Last Four Launches in Greater Faridabad and Surajkundhave been on BSP of Rs.3800 sqft to 7500psft

    Park Sentosa- 4000psft- Sector-77RPS Auria- 3900psft- Sector-89Puri, Anandvillas- 6000psft- Sector-81RISE- 7500psft- Planet Surajkund

    Projects in Sector-70 Ansal Royal Heritage and MulberryCounty are selling at 3500psft. Sector-70 is 5 KMs ahead of

    Sector-76.

    BPTP Resort just across the sector road sells at 4200psft

    Inventory of 2BHK on fresh sales is not available in any ofthe projects in Faridabad except for Sector-70

  • 8/12/2019 Palm ppt

    14/14

    Loading on Units is the lowest among all competitors inPalm Residency

    By the time possession of the apartment comes up in 2015,more than 500 families would be living the vicinity.

    Construction is in Full Swing, 11 th Floor Slab is complete injust more than a years time after start of the constructionin April 2012

    Brickwork, Plaster and even floor tiles are being laid inlower floors

    Builders timeline to complete construction is Dec 2014.