PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS CAPITAL PROJECT AND RESERVE STATUS REPORT FISCAL YEAR 2017 PREPARED BY: OFFICE OF FINANCIAL MANAGEMENT AND BUDGET SHERRY BROWN, OFMB DIRECTOR JOHN WILSON, BUDGET DIRECTOR LISA PONTIUS, ASSISTANT BUDGET DIRECTOR

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY

BOARD OF COUNTY COMMISSIONERS

CAPITAL PROJECT AND RESERVE STATUS REPORT

FISCAL YEAR 2017

PREPARED BY:

OFFICE OF FINANCIAL MANAGEMENT AND BUDGET

SHERRY BROWN, OFMB DIRECTOR

JOHN WILSON, BUDGET DIRECTORLISA PONTIUS, ASSISTANT BUDGET DIRECTOR

Page 2: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information
Page 3: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Transmittal Letter................................................................................................... 1

Impact Fee Analysis Impact fee capital fund analysis....................................................................... 3 Impact fee aging analysis.................................................................................. 17

Reserve Analysis Reserve analysis for all funds........................................................................... 23 Contingency reserve analysis............................................................................31 Reserve account activity summary …..............................................................35 Reserve summary by programs & funds (capital funds only).......................37 Reserve account activity....................................................................................41 Claims on reserves............................................................................................. 63 Road Program reserve analysis........................................................................67

Significant Contracting Activity Contracts awarded.............................................................................................75 Final payments approved..................................................................................85

Financial Summaries............................................................................................... 89

Budget Summaries...................................................................................................101

Inactive Projects.......................................................................................................125

CAPITAL PROJECT AND RESERVE STATUS REPORTPALM BEACH COUNTY

TABLE OF CONTENTS

FISCAL YEAR 2017

Page 4: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information
Page 5: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

1

Office of Financial Management &. Budget

P.O. Box 1989

Wesc Palm Beach, FL 33402· 1989

(561) 355·2580

FAX: (561) 355-2 109

www.pbcgov.com

• Palm Beach County

Board of County Commissioners

Paulette Burd!cl(, Mayor

Melissa McKinlay, Vice Mayor

Hal R. Valeche

Dave Kerner

Steven L. Abrams

Mary Lou Berger

Mack Bernard

County Administrator

Verdenia c. Baker

"An Equal Opportunity Affirmative Action Employ er"

Official Electronic Letterhead

INTEROFFICE COMMUNICATION

TO: Members ofthe Board of County Commissioners, County Administration, Depatiment Directors, and Project Managers

THRU: Sherry Brown, Director Office of Financial Management & B get

FROM: Lisa Pontius, Assistant Budget Director ~{) "'· ~~ Office of Financial Management and Bud~

DATE: November 1, 2017

SUBJECT: Capital Project and Reserve Status Report for Fiscal Year 2017.

Attached for your information and review are the Capital Project and Reserve Status Report for the period ending September 30, 2017. Summary information on reserves for all County funds is included in this report.

This report contains information on capital projects for Criminal Justice, Environmental Lands (including Beach Improvements), Fire-Rescue, General Government, Libraries, Parks and Recreation, Road Program, Street and Drainage (MSTU), Airports, and Water Utilities.

Also included is a section on reserves that details activity in the various reserve accounts during the reporting period and reserve balances as of September 30, 2017. This section contains a detailed analysis of Road Program reserves and identifies the various projects which are still to be funded from those reserves. For instance, page 68 identifies $75.39 million in Sweep Reserves. These reserves are currently earmarked for use in the Five Year Road Program.

The repoti includes sections covering significant contracting activity summarizing major contract awards and contract completions as reported by Contract Development & Control.

Page 6: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

2

Page 7: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

IMPACT FEE ANALYSIS Impact fees are collected in six capital program areas. The areas are: Criminal Justice

(Law Enforcement); Fire Rescue; General Government (Public Buildings); Libraries;

Parks & Recreation; and Roads. Impact fees are collected in specific benefit zones and

must be spent within the same zone. No impact fees are currently imposed for either the

Environmental Land/Beach Improvement Program or the Street & Drainage

Improvement Program.

An analysis of available impact fee cash is included in this section. This analysis

presents information on impact fee cash available to be allocated to projects, outstanding

encumbrances, allocated projects which still have balances, reserved pending projects

that are eligible for impact fee funding, and projects which are projected for the future

and are included in the Capital Improvement Program. This information is provided for

all programs that utilize impact fees and by specific geographic impact fee benefit zone

within each program. Cash available for allocation is total cash in the impact fee fund.

Article 13 of the Unified Land Development Code (ULDC) prohibits establishment of a

budget for an impact fee funded project until such time as sufficient cash is available to

fund the project. This section of the report will assist project and program managers in

timing and allocation decisions for their projects.

The Unified Land Development Code (ULDC) Article 13 regulates the collection and

expenditure of impact fees in Palm Beach County. Impact fees are required to be

encumbered within six years of collection and spent within nine years. Fee payers are

entitled to refunds if their fees are not spent or encumbered within those time frames.

Article 13 of the ULDC defines encumbered as either reserved or earmarked for a

specific expenditure.

3

Page 8: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY PARKS & RECREATION PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Park Impact Fees Zone 1 Fund 3601

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $2,127,309 $320,557 $409,430 $751,000 $990,000 $0

Eligible Projects Reserved Projected Year

Bert Winters Park Expansion $0 $990,000 2018-2021Burt Reynolds Park West Side Expansion 248,000 0 2016Loxahatchee River Battlefield Park Improvement 478,000 0 2017Off-Highway Vehicle (OHV) Park 25,000 0 2015Total $751,000 $990,000

4

Page 9: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY PARKS & RECREATION PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Park Impact Fees Zone 2 Fund 3602

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $2,826,737 $583,927 $1,010,696 $550,000 $2,404,000 $0

Eligible Projects Reserved Projected Year

Calypso Bay Waterpark Expansion $200,000 $0 2012John Prince Park Improvements III 0 1,404,000 2018-2020John Prince Park Improvements IV 0 1,000,000 2018-2019John Prince Special Event Areas 250,000 0 2015Park Ridge Golf Course Events Pavilion 100,000 0 2014Total $550,000 $2,404,000

5

Page 10: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY PARKS & RECREATION PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Park Impact Fees Zone 3 Fund 3603

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $7,787,545 $1,512,235 $911,843 $5,262,000 $4,112,000 $0

Eligible Projects Reserved Projected Year

Burt Aaronson South County Regional Park Phase III $600,000 $0 2014Burt Aaronson South County Regional Park Phase III 125,000 0 2015Burt Aaronson South County Regional Park Phase III 500,000 0 2016Burt Aaronson South County Regional Park Phase III 1,000,000 0 2017Burt Aaronson South County Regional Park Phase III 0 1,526,000 2018-2022Caloosa Park Parking Lot Safety Lighting 180,000 0 2014Coconut Cove Waterpark Expansion 200,000 0 2012Canyon District Park Design and Development 607,000 0 2017Canyon District Park Design and Development 0 400,000 2018Morikami Museum and Japanese Gardens Expansion 850,000 0 2015Morikami Museum and Japanese Gardens Expansion 500,000 0 2016Morikami Park East Side Development 0 400,000 2019South Inlet Park Expansion 0 796,000 2020-2021Veteran's Memorial Park Improvements 700,000 0 2015West Delray Regional Park Improvements 0 990,000 2019-2021Total $5,262,000 $4,112,000

6

Page 11: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY ROAD PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Road Impact Fees Zone 1 Fund 3501

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $52,435,050 $13,502,362 $27,452,349 $10,992,051 $21,560,000 $0

Eligible Projects Reserved Projected* Year

Blue Heron Blvd-Congress Ave Intersection Improvements $0 $400,000 2018Center St-Thelma Ave to Woodland Estates Dr 50,000 0 2016Center St-Thelma Ave to Woodland Estates Dr 100,000 0 2017Central Blvd-Indiantown Rd to Longshore Dr 454,051 0 2011Central Blvd-Indiantown Rd Intersection Improvements 250,000 0 2008Central Blvd-Indiantown Rd Intersection Improvements 100,000 0 2010Central Blvd-Indiantown Rd Intersection Improvements 500,000 0 2011Central Blvd-Indiantown Rd Intersection Improvements 300,000 0 2012Church St-Limestone Creek Rd to W. of Central Blvd 350,000 0 2016Church St-Limestone Creek Rd to W. of Central Blvd 300,000 0 2017Church St-Limestone Creek Rd to W. of Central Blvd 0 2,300,000 2018-2019Congress Ave-N. of Northlake Blvd to Alt A1A 1,350,000 0 2013Congress Ave-N. of Northlake Blvd to Alt A1A 550,000 0 2014Congress Ave-N. of Northlake Blvd to Alt A1A 50,000 0 2016Congress Ave-N. of Northlake Blvd to Alt A1A 0 10,760,000 2018-2021Donald Ross Rd and I-95 725,000 0 2010Donald Ross Rd and I-95 1,000,000 0 2013Hood Rd-Central Blvd Intersection Improvements 200,000 0 2016Hood Rd-Central Blvd Intersection Improvements 300,000 0 2017Northlake Blvd-Military Trail Intersection Improvements 150,000 0 2016Northlake Blvd-Military Trail Intersection Improvements 193,000 0 2017Old Dixie Hwy-Park Ave to Northlake Blvd 400,000 0 2010Old Dixie Hwy-Park Ave to Northlake Blvd 250,000 0 2013Old Dixie Hwy-Park Ave to Northlake Blvd 2,200,000 0 2014Park Ave W.-13th St to Old Dixie Hwy 195,000 0 2004PGA Blvd-Central Blvd Intersection Improvements 0 900,000 2018PGA Blvd-Ellison Wilson Rd Intersection Improvements 60,000 0 2016PGA Blvd-Military Trail Intersection Improvements 180,000 0 2014PGA Blvd-Military Trail Intersection Improvements 0 1,800,000 2018Silver Beach Rd-E. of Congress Ave to Old Dixie Hwy 345,000 0 2007Silver Beach Rd-E. of Congress Ave to Old Dixie Hwy 290,000 0 2008Silver Beach Rd-E. of Congress Ave to Old Dixie Hwy 100,000 0 2011Silver Beach Rd-E. of Congress Ave to Old Dixie Hwy 0 5,400,000 2017State Rd 7-State Rd 710 to S. of 150th Ct N. 50,000 0 2016Total $10,992,051 $21,560,000

* Five Year Road Program Approved July 11th, 2017

7

Page 12: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY ROAD PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Road Impact Fees Zone 2 Fund 3502

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $48,617,547 $3,349,183 $14,111,317 $8,104,564 $33,280,000 $0

Eligible Projects Reserved Projected* Year

10th Ave N.-Boutwell Rd Intersection Improvements $50,000 $0 201710th Ave N.-Boutwell Rd Intersection Improvements 0 950,000 2019-202145th St-Military Trail Intersection Improvements 50,000 0 201745th St-Military Trail Intersection Improvements 0 1,650,000 2019-202145th St-I95 to Congress Ave Intersection Improvements 80,000 0 2012Australian Ave-7th St to 15th St 40,000 0 2013Australian Ave-7th St to 15th St 450,000 0 2014Australian Ave-Palm Beach Lakes Blvd Intersection Improvements 170,000 0 2016Australian Ave-Palm Beach Lakes Blvd Intersection Improvements 0 1,500,000 2018Australian Ave-Banyan Blvd to 45th St 456,564 0 2006Community Dr-Military Trail Intersection Improvements 250,000 0 2007Community Dr-Military Trail Intersection Improvements 500,000 0 2008Community Dr-Military Trail Intersection Improvements 590,000 0 2009Community Dr-Military Trail Intersection Improvements 2,679,000 0 2012Congress Ave-N. of Okeechobee Blvd to Ware Dr 50,000 0 2017Congress Ave-N. of Okeechobee Blvd to Ware Dr 0 650,000 2018Congress Ave-Palm Beach Lakes Blvd Intersection Improvements 400,000 0 2017Congress Ave-Palm Beach Lakes Blvd Intersection Improvements 0 2,000,000 2019Florida Mango Rd-10th Ave N. to Edgewater Dr 0 3,500,000 2018-2020Florida Mango Rd-Edgewater Dr to Barbados Rd 220,000 0 2016Florida Mango Rd-Edgewater Dr to Barbados Rd 0 1,800,000 2018-2019Florida Mango Rd-S. of Barbados Rd to N. of Myrica Rd 0 4,100,000 2019-2021Florida Mango Rd-N. of Myrica Rd to Summit Blvd 150,000 0 2015Florida Mango Rd-N. of Myrica Rd to Summit Blvd 250,000 0 2016Florida Mango Rd-N. of Myrica Rd to Summit Blvd 300,000 0 2017Florida Mango Rd-N. of Myrica Rd to Summit Blvd 0 2,400,000 2018-2019Forest Hill Blvd - Military Trail Intersection Improvements 0 3,900,000 2019-2021Haverhill Rd-N. of Caribbean Blvd to Bee Line Hwy 419,000 0 2015Haverhill Rd-N. of Caribbean Blvd to Bee Line Hwy 500,000 0 2017Haverhill Rd-N. of Caribbean Blvd to Bee Line Hwy 0 9,000,000 2018Jog Rd-Roebuck Rd Intersection Improvements 50,000 0 2016Lake Worth Rd-Jog Rd Intersection Improvements 200,000 0 2016Lake Worth Rd-Jog Rd Intersection Improvements 0 630,000 2018Okeechobee Blvd-Church St Intersection Improvements 0 1,200,000 2019Roebuck Rd-Jog Rd to Haverhill Rd 250,000 0 2016

Total $8,104,564 $33,280,000

* Five Year Road Program Approved July 11th, 2017

8

Page 13: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY ROAD PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Road Impact Fees Zone 3 Fund 3503

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $24,738,802 $2,653,110 $6,933,540 $24,486,003 $49,900,000 $0

Eligible Projects Reserved Projected* Year

60th St N.-140th Ave N. to E. of 120th Ave N. $900,000 $0 201560th St N.-140th Ave N. to E. of 120th Ave N. 1,100,000 0 201760th St N.-140th Ave N. to E. of 120th Ave N. 0 11,500,000 2019-202160th St N.-W. of Royal Palm Beach Blvd to E. of RPB Blvd 500,000 0 201560th Street-W. of Royal Palm Beach Blvd to Persimmon Blvd 100,000 0 200960th Street-E. of Royal Palm Beach Blvd to State Rd 7 Extension 323,089 0 2012Acreage Access Rd-Persimmon Blvd to 60th St 60,000 0 2008Benoist Farm Rd-State Rd 80 to Belvedere Rd 60,000 0 2017Benoist Farm Rd-State Rd 80 to Belvedere Rd 0 5,900,000 2018-2020Lyons Rd-Lake Worth Rd to N of L.W.D.D. L-10 Canal 1,000,000 0 2013Lyons Rd-Lake Worth Rd to S of L.W.D.D. L-11 Canal 300,000 0 2016Lyons Rd-Lake Worth Rd to S of L.W.D.D. L-11 Canal 60,000 0 2017Lyons Rd-Lake Worth Rd to S of L.W.D.D. L-11 Canal 0 2,500,000 2018Lyons Rd.-S of L.W.D.D. L-11 Canal to N. of L.W.D.D L-10 Canal 195,000 0 2010Lyons Rd.-S of L.W.D.D. L-11 Canal to N. of L.W.D.D L-10 Canal 0 100,000 2021Northlake Blvd-E. of Hall Blvd to Coconut Blvd 2,500,000 0 2016Northlake Blvd-E. of Hall Blvd to Coconut Blvd 50,000 0 2017Northlake Blvd-E. of Hall Blvd to Coconut Blvd 0 9,200,000 2019Northlake Blvd-E. of Seminole Pratt Whitney Rd to E. of Hall Blvd 500,000 0 2016Northlake Blvd-E. of Seminole Pratt Whitney Rd to E. of Hall Blvd 0 4,300,000 2018Northlake Blvd-Seminole Pratt Whitney Rd to Coconut Blvd 989,000 0 2007Northlake Blvd-Seminole Pratt Whitney Rd to Coconut Blvd 909,000 0 2009Northlake Blvd-Seminole Pratt Whitney Rd to Coconut Blvd 300,000 0 2013Persimmon Blvd-110th Ave to 60th Street 370,000 0 2007Roebuck Rd-State Rd 7 to Jog Rd 0 100,000 2021Royal Palm Beach Blvd-M Canal to S of Orange Blvd 400,000 0 2016Royal Palm Beach Blvd-M Canal to S of Orange Blvd 0 3,700,000 2018State Rd 7 Extension-Persimmon Blvd to 60th Street 2,587,207 0 2012State Rd 7-S. of Lake Worth Rd to N. of State Rd 80 714,121 0 2006Seminole Pratt Whitney-N of Sycamore Dr to High School 358,586 0 2006Seminole Pratt Whitney Rd-Northlake Blvd Intersection Improv. 830,000 0 2006Seminole Pratt Whitney Rd-Northlake Blvd Intersection Improv. 570,000 0 2007Seminole Pratt Whitney Rd-Northlake Blvd Intersection Improv. 1,000,000 0 2008Seminole Pratt Whitney Rd-Northlake Blvd Intersection Improv. 0 4,200,000 2018Seminole Pratt Whitney Rd-Orange Blvd to S. of Northlake Blvd 850,000 0 2008Seminole Pratt Whitney Rd-Orange Blvd to S. of Northlake Blvd 0 8,400,000 2018Seminole Pratt Whitney Rd-PGA Blvd to Bee Line Hwy 1,000,000 0 2005Seminole Pratt Whitney Rd-Seminole Ridge H.S. to 60th St N. 160,000 0 2016

* Five Year Road Program Approved July 11th, 2017(Continued Next Page)

9

Page 14: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY ROAD PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Road Impact Fees Zone 3 Fund 3503

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

Eligible Projects Reserved Projected* Year

Road Impact Fee Zone 3 ContinuedSeminole Pratt Whitney Rd-S. of Okeechobee to N. of Sycamore $2,100,000 $0 2010Seminole Pratt Whitney Rd-State Rd 80 to S. of Okeechobee Blvd 270,000 0 2008Seminole Pratt Whitney Rd-State Rd 80 to S. of Okeechobee Blvd 1,500,000 0 2010Southern Blvd-Lyons Rd/Sansbury's Way 1,930,000 0 2017Total $24,486,003 $49,900,000

* Five Year Road Program Approved July 11th, 2017

10

Page 15: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY ROAD PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Road Impact Fees Zone 4 Fund 3504

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $24,120,547 $4,085,028 $2,266,957 $5,216,872 $10,730,000 $1,821,690

Eligible Projects Reserved Projected* Year

Congress Ave-Hypoluxo Rd $200,000 $0 2011Congress Ave-Hypoluxo Rd to Donnelly Dr 688,872 0 2013Gateway Blvd-Military Trail Intersection Improvements 300,000 0 2017Gateway Blvd-Military Trail Intersection Improvements 0 1,700,000 2019Gateway Blvd-High Ridge Rd Intersection Improvements 15,000 0 2015Gateway Blvd-High Ridge Rd. Intersection Improvements 0 1,180,000 2019Haverhill Rd-S. of L.W.D.D. L-14 Canal to Lake Worth Rd 213,000 0 2012Haverhill Rd-S. of L.W.D.D. L-14 Canal to Lake Worth Rd 400,000 0 2016Lantana Rd-Edgecliff Ave Intersection Improvements 0 350,000 2018Lawrence Rd-over L.W.D.D. L-17 Canal 0 500,000 2018Lawrence Rd-Ponza Pl to Lantana Rd 300,000 0 2017Lawrence Rd-Ponza Pl to Lantana Rd 0 2,000,000 2019-2021Lyons Rd-Lantana Rd to Lake Worth Rd 100,000 0 2012Lyons Rd-Lantana Rd to Lake Worth Rd 1,300,000 0 2013Lyons Rd-Lantana Rd to N. of L.W.D.D. L-14 Canal 1,300,000 0 2016Lyons Rd-N. of L.W.D.D. L-14 Canal to Lake Worth Rd 400,000 0 2016Lyons Rd-N. of L.W.D.D. L-14 Canal to Lake Worth Rd 0 5,000,000 2018Total $5,216,872 $10,730,000

* Five Year Road Program Approved July 11th, 2017

11

Page 16: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY ROAD PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Road Impact Fees Zone 5 Fund 3505

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $60,743,853 $7,655,798 $5,970,042 $7,137,000 $48,091,000 $0

Eligible Projects Reserved Projected* Year

Atlantic Ave-Florida's Turnpike Intersection Improvements $0 $1,500,000 2018Atlantic Ave-State Rd 7 to W. Lyons Rd 10,000 0 2013Boynton Beach Blvd-Acme Dairy Rd Intersection Improvements 0 600,000 2018Boynton Beach Blvd-Florida's Turnpike South Entrance/Exit 0 801,000 2019Clint Moore Rd-Oaks Club Dr to Long Lake Dr 400,000 0 2017Clint Moore Rd-Oaks Club Dr to Long Lake Dr 0 2,700,000 2019-2021Clint Moore Rd-E. of Congress Ave to E. of L.W.D.D. E-4 Canal 200,000 0 2015Clint Moore Rd-E. of Congress Ave to E. of L.W.D.D. E-4 Canal 200,000 0 2016Flavor Pict Rd-State Rd 7 to Lyons Rd 67,000 0 2015Flavor Pict Rd-State Rd 7 to Lyons Rd 80,000 0 2016Glades Rd-Butts Rd Intersection Improvements 100,000 0 2016Glades Rd-Butts Rd Intersection Improvements 30,000 0 2017Glades Rd-Butts Rd Intersection Improvements 0 340,000 2018Glades Rd-Florida's Turnpike Intersection Improvements 100,000 0 2013Glades Rd-Florida's Turnpike Intersection Improvements 220,000 0 2015Linton Blvd-Military Trail Intersection Improvements 0 1,500,000 2018Linton Blvd-S. Federal Hwy Intersection Improvements 50,000 0 2017Linton Blvd-S. Federal Hwy Intersection Improvements 0 650,000 2018Lyons Rd-Clint Moore Rd to Atlantic Ave 2,800,000 0 2015Lyons Rd-Clint Moore Rd to Atlantic Ave 0 9,700,000 2017Lyons Rd-Hillsboro Canal to S.W. 18th Street 50,000 0 2015Lyons Rd-Kimberly Blvd Intersection Improvements 30,000 0 2013Old Dixie Highway - Yamato Rd to Linton Blvd 2,000,000 0 2016Old Dixie Highway - Yamato Rd to Linton Blvd 0 18,350,000 2018-2020Palmetto Park Rd-Boca Rio Rd Intersection Improvements 0 200,000 2018Palmetto Park Rd-E. of Military Trail to I95 0 800,000 2019Palmetto Park Rd-S.W. 7th Ave to S.W. 5th Ave 50,000 0 2017Palmetto Park Rd-S.W. 7th Ave to S.W. 5th Ave 0 3,300,000 2018Sandalfoot Blvd-State Rd 7 0 2,100,000 2018S.W. 3rd St-State Rd 7 0 1,850,000 2018S.W. 18th St-Military Trail Intersection Improvements $250,000 $0 2015Yamato Rd-Lakeridge Blvd to W. of Florida's Turnpike 500,000 0 2017Yamato Rd-Lakeridge Blvd to W. of Florida's Turnpike 0 3,700,000 2019-2021Total $7,137,000 $48,091,000

* Five Year Road Program Approved July 11th, 2017

12

Page 17: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY FIRE RESCUEIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Fire Rescue Impact Fees Fund 3704

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $8,233,800 $357,157 $7,511,402 $0 $2,600,000 $0

Eligible Projects Reserved Projected Year

Fire Station #41 South $0 $2,000,000 2018Southern Blvd 20 Mile Bend Station 0 600,000 2019Total $0 $2,600,000

13

Page 18: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY LIBRARYIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Library Impact Fees Fund 3752

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $2,335,762 $5,725 $12,789 $0 $0 $2,317,248

Eligible Projects Reserved Projected Year

None $0 $0Total $0 $0

14

Page 19: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY CRIMINAL JUSTICE PROGRAMIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Law Enforcement Impact Fees Fund 3803

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $3,165,430 $0 $0 $0 $13,269,000 $0

Eligible Projects Reserved Projected Year

PBSO Shooting Range Expansion $0 $9,919,000 2019-2020PBSO Acreage Substation 0 3,350,000 2017-2018Total $0 $13,269,000

15

Page 20: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY PUBLIC BUILDINGSIMPACT FEE ANALYSIS

FISCAL YEAR 2017

Public Buildings Impact Fees Fund 3805

Year Cash Encumbered

Appropriated Project

BalancesReserved Projects

Projected Eligible Projects Unallocated

2017 $9,189,707 $0 $2,000,431 $150,000 $8,350,000 $0

Eligible Projects Reserved Projected Year

Courthouse Build-Out Phase 2 $0 $2,000,000 2018Courthouse Build-Out Phase 2 150,000 0 2016Courthouse Build-Out Phase 3 0 3,000,000 2021PBSO Acreage Substation 0 3,350,000 2020Total $150,000 $8,350,000

16

Page 21: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

IMPACT FEE AGING ANALYSIS This section of the report presents the status of all impact fees by type and benefit zone to

facilitate analysis of the age of unspent and unencumbered impact fees. The report shows

collections by fiscal year and what amounts of those collections are either unspent or

unencumbered at the report date. For this report, encumbrances are defined as actual

contracts awarded and in force. This definition is more stringent than the ULDC

definition and allows for an early warning of potential problems with untimely spending

of impact fees. Information on the Law Enforcement Countywide Impact Fee is presented

in the Criminal Justice Impact Fee section. This fee is no longer being imposed but will

continue to be reported until all the collections have been spent.

17

Page 22: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYIMPACT FEE AGING ANALYSIS

FISCAL YEAR 2017

Unspent UnencumberedYear Revenues Revenues Revenues

Road Program Zone 1 Fund 35012009 762,732 0 02010 1,150,402 0 02011 779,298 0 02012 1,123,471 0 02013 5,012,563 2,325,663 02014 4,891,103 4,891,103 02015 5,635,464 5,635,464 02016 4,050,907 4,050,907 3,400,7752017 5,297,589 5,297,589 5,297,589Total $31,520,747 $22,200,727 $8,698,365

Encumbrances $13,502,362

Road Program Zone 2 Fund 35022009 920,455 0 02010 1,167,491 0 02011 1,016,410 0 02012 956,598 0 02013 1,392,784 0 02014 5,752,668 5,413,501 2,064,3172015 6,341,783 6,341,783 6,341,7832016 4,889,702 4,889,702 4,889,7022017 7,833,200 7,833,200 7,833,200Total $33,172,885 $24,478,186 $21,129,002

Encumbrances $3,349,183

Road Program Zone 3 Fund 35032009 914,635 0 02010 1,198,730 0 02011 1,231,816 0 02012 4,043,798 0 02013 3,151,494 0 02014 3,505,627 0 02015 3,542,040 0 02016 3,320,974 0 02017 3,754,672 2,450,229 2,450,229Total $27,574,493 $2,450,229 $2,450,229

Encumbrances $2,653,110

18

Page 23: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYIMPACT FEE AGING ANALYSIS

FISCAL YEAR 2017

Unspent UnencumberedYear Revenues Revenues Revenues

Road Program Zone 4 Fund 35042009 481,253 0 02010 1,371,185 0 02011 672,441 0 02012 2,381,542 0 02013 3,338,260 0 02014 2,137,528 0 02015 5,371,235 0 02016 4,977,001 677,181 02017 5,324,076 5,324,076 1,916,229Total $26,742,135 $6,001,257 $1,916,229

Encumbrances $4,085,028

Road Program Zone 5 Fund 35052009 1,675,715 0 02010 817,460 0 02011 1,327,497 0 02012 3,945,578 0 02013 4,715,502 4,356,737 02014 4,199,913 4,199,913 900,8522015 4,554,008 4,554,008 4,554,0082016 12,297,542 12,297,542 12,297,5422017 7,299,422 7,299,422 7,299,422Total $45,544,009 $32,707,622 $25,051,824

Encumbrances $7,655,798

Parks and Recreation Zone 1 Fund 36012009 187,763 0 02010 301,302 0 02011 174,665 0 02012 506,743 0 02013 1,133,696 0 02014 588,778 0 02015 569,230 0 02016 327,271 59,800 02017 540,962 540,962 0Total $4,180,489 $59,800 $0

Encumbrances $320,557

19

Page 24: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYIMPACT FEE AGING ANALYSIS

FISCAL YEAR 2017

Unspent UnencumberedYear Revenues Revenues Revenues

Parks and Recreation Zone 2 Fund 36022009 246,682 0 02010 424,637 0 02011 620,844 0 02012 1,370,849 0 02013 1,198,103 0 02014 1,137,550 697,532 113,6062015 1,062,197 1,062,197 1,062,1972016 1,029,443 1,029,443 1,029,4432017 1,324,699 1,324,699 1,324,699Total $8,974,135 $4,113,871 $3,529,944

Encumbrances $583,927

Parks and Recreation Zone 3 Fund 36032009 572,527 0 02010 891,681 0 02011 927,391 0 02012 1,504,823 0 02013 1,944,565 1,921,672 409,4372014 1,125,262 1,125,262 1,125,2622015 1,470,013 1,470,013 1,470,0132016 1,355,114 1,355,114 1,355,1142017 858,556 858,556 858,556Total $11,923,193 $6,730,617 $5,218,382

Encumbrances $1,512,235

Fire Rescue Fund 37042009 356,263 0 02010 687,973 0 02011 843,069 793,853 436,6972012 1,086,038 1,086,038 1,086,0382013 1,558,268 1,558,268 1,558,2682014 93,140 93,140 93,1402015 115,667 115,667 115,6672016 0 0 02017 617 617 617Total $5,698,718 $3,647,583 $3,290,427

Encumbrances $357,157

20

Page 25: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYIMPACT FEE AGING ANALYSIS

FISCAL YEAR 2017

Unspent UnencumberedYear Revenues Revenues Revenues

Library Fund 37522009 119,448 0 02010 190,774 0 02011 201,137 0 02012 534,161 0 02013 493,965 0 02014 509,786 0 02015 638,209 0 02016 563,661 0 02017 627,693 616,611 610,886Total $4,068,880 $616,611 $610,886

Encumbrances $5,725

Road Patrol Fund 38032009 118,766 0 02010 164,106 0 02011 169,370 0 02012 333,503 296,643 296,6432013 268,069 268,069 268,0692014 243,907 243,907 243,9072015 254,248 254,248 254,2482016 292,330 292,330 292,3302017 261,510 261,510 261,510Total $2,330,493 $1,616,707 $1,616,707

Encumbrances $0

Public Buildings Fund 38052009 265,728 0 02010 363,943 0 02011 368,038 0 02012 680,975 0 02013 880,039 831,267 831,2672014 1,075,152 1,075,152 1,075,1522015 1,440,747 1,440,747 1,440,7472016 1,398,516 1,398,516 1,398,5162017 1,353,829 1,353,829 1,353,829Total $8,487,363 $6,099,511 $6,099,511

Encumbrances $0

21

Page 26: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

22

Page 27: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RESERVE ANALYSIS

FOR ALL FUNDS This section begins with reserve activity by type for all County funds which shows

reserve balances at the beginning of the period, changes during the period, and ending

balances.

23

Page 28: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RE

SER

VE

AN

AL

YSI

S FI

SCA

L Y

EA

R 2

017

Ori

gina

lE

ndin

gFu

ndB

udge

tA

djus

tmen

tsB

alan

ceC

omm

ents

Con

tinge

ncy

Res

erve

s

Con

tinge

ncy

Res

erve

s are

est

ablis

hed

to m

eet u

nant

icip

ated

nee

ds a

nd

emer

genc

ies i

n ea

ch r

espe

ctiv

e fu

nd.

Gen

eral

Fun

d$2

0,00

0,00

0($

696,

882)

$19,

303,

118

Cou

nty

Libr

ary

$2,8

78,6

972,

440,

386

$5,3

19,0

83A

djus

tmen

t prim

arily

due

to b

alan

ce b

roug

ht fo

rwar

d ad

just

men

ts to

reco

ncile

to

FY

201

6 ac

tual

.Fi

re R

escu

e M

STU

$10,

000,

000

(1,6

40,5

62)

$8,3

59,4

38A

djus

tmen

t due

to e

mer

genc

y re

pairs

nee

ded

for F

ire S

tatio

n 19

.Fi

re R

escu

e Im

prov

emen

t$7

37,0

1610

1,49

2$8

38,5

08W

ater

Util

ities

Ope

ratio

n &

Mai

nten

ance

$3,4

97,7

526,

547,

817

$10,

045,

569

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al.

Airp

ort O

pera

tions

$9,0

73,0

174,

631,

576

$13,

704,

593

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al.

Tot

al C

ontin

genc

y R

eser

ves

$46,

186,

482

$11,

383,

827

$57,

570,

309

Cap

ital P

roje

cts R

eser

ves

Cap

ital P

roje

ct R

eser

ves r

epre

sent

am

ount

s set

asi

de fo

r ca

pita

l im

prov

emen

t pro

ject

s inc

ludi

ng b

oth

"Des

igna

ted

Res

erve

s" a

nd

"Und

esig

nate

d R

eser

ves."

80.7

M N

AV

01,

Con

vent

ion

Cen

ter

$239

,491

(239

,491

)$0

25M

GO

03,

Par

ks &

Cul

tura

l Fac

ilitie

s$1

4,07

55,

283

$19,

358

25M

GO

05

Park

s & C

ultu

ral I

mpr

ovem

ents

$443

,764

(416

,903

)$2

6,86

150

M G

O 0

6, W

ater

fron

t Acc

ess

$100

,332

1,71

3$1

02,0

4514

.6M

NA

V 0

6, P

arki

ng F

acili

ties E

xp$2

1,99

4(2

1,99

4)$0

6.1M

Sun

shin

e #8

06,

Par

k &

Mar

ina

Impr

ovem

ent

$013

8$1

388.

1M S

unsh

ine#

9 06

, S C

ount

y G

olf C

ours

e$2

,673

(2,6

73)

$017

6.5M

NA

V 0

8 C

TF, J

ail E

xpan

d/Pu

b B

ldg

$179

,036

(179

,036

)$0

10.0

M N

AV

13

CP,

ISS

VO

IP$2

82,9

1846

,218

$329

,136

27.8

M N

AV

Tax

13

CP,

Con

v$2

8,86

759

6$2

9,46

365

.360

M N

AV

Pub

Imp

Tax

Rev

Bon

d$8

15,7

0519

,379

$835

,084

56.6

45M

NA

V P

ub Im

p Ta

x R

ev B

ond

$1,1

67,2

50(4

80,7

23)

$686

,527

Tran

spor

tatio

n Im

prov

emen

t Fun

d $1

58,5

72,5

14(3

0,95

5,11

9)$1

27,6

17,3

95A

djus

tmen

t prim

arily

due

to b

alan

ce b

roug

ht fo

rwar

d ad

just

men

ts to

reco

ncile

to

FY

201

6 ac

tual

, mid

yea

r and

ann

ual a

djus

tmen

t to

5 ye

ar R

oad

Prog

ram

, an

d va

rious

app

rove

d ro

ad p

rogr

am p

roje

cts.

Roa

d Im

pact

Fee

s Zon

es 1

$47,

058,

573

(33,

001,

572)

$14,

057,

001

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al a

s wel

l as H

ood

Rd.

/E o

f Tur

npik

e to

W. C

entra

l Blv

d.

(13.

6M) a

nd o

ther

app

rove

d ro

ad p

rogr

am p

roje

cts.

24

Page 29: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RE

SER

VE

AN

AL

YSI

S FI

SCA

L Y

EA

R 2

017

Ori

gina

lE

ndin

gFu

ndB

udge

tA

djus

tmen

tsB

alan

ceC

omm

ents

Roa

d Im

pact

Fee

s Zon

es 2

$41,

740,

953

(15,

197,

613)

$26,

543,

340

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

act

ual a

s wel

l as P

urdy

Lan

e/Fo

rest

Hill

Ele

men

tary

to E

. Maj

or

Driv

e (2

.64M

), R

oebu

ck R

d./J

og to

Hav

erhi

ll R

d. (4

.9M

) and

oth

er a

ppro

ved

road

pro

gram

pro

ject

s.

Roa

d Im

pact

Fee

s Zon

es 3

$13,

252,

810

(537

,794

)$1

2,71

5,01

6

Roa

d Im

pact

Fee

s Zon

es 4

$21,

609,

886

(7,8

02,1

92)

$13,

807,

694

Prim

arily

due

to B

BF

adju

stm

ent t

o re

conc

ile to

FY

201

6 ac

tual

and

oth

er

appr

oved

road

pro

gram

pro

ject

s. R

oad

Impa

ct F

ees Z

ones

5$5

0,70

1,66

4(8

,978

,245

)$4

1,72

3,41

9Pr

imar

ily d

ue to

BB

F ad

just

men

t to

reco

ncile

to F

Y 2

016

actu

al, (

3.5M

) Fl

avor

Pic

t Rd/

SR 7

to L

yons

Rd.

., Ly

ons R

d/H

illsb

oro

Can

al to

S.W

. 18t

h St

. (2

M) a

nd o

ther

app

rove

d ro

ad p

rogr

am p

roje

cts.

Uni

ncor

p Im

pr F

und

$9,8

99,2

85(4

69,3

11)

$9,4

29,9

74A

baco

a Tr

ust S

ub A

ccou

nt$4

,738

,733

124,

986

$4,8

63,7

19Pr

opor

tiona

te S

hare

Tru

st F

und

$17,

477,

119

6,56

1$1

7,48

3,68

0Pr

opor

tiona

te S

hare

Tru

st F

und

Zone

2$1

34,3

3837

4,71

7$5

09,0

55Pr

opor

tiona

te S

hare

Tru

st F

und

Zone

3$1

,753

,358

1,08

8$1

,754

,446

Prop

ortio

nate

Sha

re T

rust

Fun

d Zo

ne 5

$337

,584

454

$338

,038

Park

Impr

ovem

ent F

und

$188

,429

82,6

93$2

71,1

22Pa

rk Im

pact

Fee

s Z1

$916

,029

5,44

3$9

21,4

72Pa

rk Im

pact

Fee

s Z2

$1,8

49,8

41(1

,216

,003

)$6

33,8

38A

djus

tmen

t prim

arily

due

to b

alan

ce b

roug

ht fo

rwar

d ad

just

men

ts to

reco

ncile

to

FY

201

6 ac

tual

and

oth

er a

ppro

ved

park

pro

ject

s. Pa

rk Im

pact

Fee

s Z3

$6,9

58,6

06(1

,366

,443

)$5

,592

,163

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al a

nd in

crea

se in

bud

get f

or C

anyo

n D

istri

ct P

ark

desi

gn a

nd

deve

lopm

ent p

roje

ct.

Uni

t 11

Acq

uisi

tion/

Enha

ncem

ent

$643

,460

1,35

5$6

44,8

15So

uth

Lox

SI W

etla

nd R

esto

ratio

n$1

31,4

491,

316

$132

,765

Bea

ch Im

prov

emen

t$3

90,5

5929

5,28

6$6

85,8

45So

uth

Lake

Wor

th In

let

$224

,832

3,59

1$2

28,4

23En

viro

nmen

tal R

esou

rces

Cap

ital P

roje

cts

$048

9$4

89Fi

re-R

escu

e Im

pact

Fee

s$2

99,8

9510

,749

$310

,644

Libr

ary

Impr

ovem

ent F

und

$2,7

74,1

323,

095

$2,7

77,2

27Li

brar

y Ex

pans

ion

Prog

ram

$11,

625,

244

16,8

70$1

1,64

2,11

4Li

brar

y Im

pact

Fee

s$2

,180

,276

15,8

05$2

,196

,081

PUD

Civ

ic S

ite C

ash

Out

$942

,129

1,02

4$9

43,1

53La

w E

nfor

cem

ent/I

mpa

ct F

ees Z

2 R

oad

Patro

l$2

,945

,418

42,1

85$2

,987

,603

Publ

ic B

uild

ing

Impr

ovem

ent F

und

$7,6

93,6

0592

,000

$7,7

85,6

05

25

Page 30: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RE

SER

VE

AN

AL

YSI

S FI

SCA

L Y

EA

R 2

017

Ori

gina

lE

ndin

gFu

ndB

udge

tA

djus

tmen

tsB

alan

ceC

omm

ents

Publ

ic B

uild

ing

Impa

ct F

ees

$7,1

27,2

74(2

2,71

0)$7

,104

,564

Cap

ital O

utla

y$4

01,9

221,

171

$403

,093

Info

rmat

ion

Tech

nolo

gy C

apita

l Im

prov

emen

ts$0

4,27

1$4

,271

E911

Car

ry F

orw

ard

Cap

ital

$11,

416

8,24

3$1

9,65

9W

UD

Cap

ital I

mpr

ovem

ents

$35,

190,

984

4,21

1,99

2$3

9,40

2,97

6A

djus

tmen

t prim

arily

due

to b

alan

ce b

roug

ht fo

rwar

d ad

just

men

ts to

reco

ncile

to

FY

201

6 ac

tual

and

Lak

e R

egio

n In

fras

tract

ure

Impr

ovem

ent g

rant

s.

WU

D F

PL R

ecla

imed

Wat

er R

enew

al &

Rpl

cmnt

$4,0

16,4

5255

3,55

9$4

,570

,011

WU

D F

PL D

ebt S

ervi

ce C

over

age

Fund

$1,5

40,3

34(7

35,0

47)

$805

,287

Airp

ort C

apita

l Pro

ject

s$6

48,7

98(2

38,8

01)

$409

,997

Airp

orts

Imp

& D

ev F

und

$25,

514,

393

(18,

162,

926)

$7,3

51,4

67A

djus

tmen

ts p

rimar

ily d

ue to

tran

sfer

s to

fund

pro

ject

s in

Fund

411

1 an

d ba

lanc

e br

ough

t for

war

d ad

just

men

ts to

reco

ncile

to F

Y 2

016

actu

al.

Airp

ort P

asse

nger

Fac

ility

Cha

rge

$26,

029,

496

(3,9

50,2

90)

$22,

079,

206

Adj

ustm

ents

prim

arily

due

to tr

ansf

ers t

o fu

nd p

roje

cts i

n Fu

nd 4

111

and

bala

nce

brou

ght f

orw

ard

adju

stm

ents

to re

conc

ile to

FY

201

6 ac

tual

. N

oise

Aba

tem

ent &

Miti

gatio

n$2

,575

,167

7,37

8$2

,582

,545

Airp

orts

Res

trict

ed A

sset

s Fun

d$1

36,5

6190

1,83

1$1

,038

,392

Tot

al C

apita

l Pro

ject

s Res

erve

s$5

13,5

29,6

23($

117,

133,

407)

$396

,396

,216

Oth

er O

pera

ting

Res

erve

s

Bea

utifi

catio

n M

aint

enan

ce$1

,252

,501

$331

,128

$1,5

83,6

29N

atur

al A

reas

Fun

d76

,872

076

,872

Bon

d W

aive

r Pro

gram

R89

-117

869

1,43

68,

452

699,

888

Aff

orda

ble

Hou

sing

Tru

st F

und

446,

694

044

6,69

4Se

ctio

n 10

8 Lo

an F

und

43,0

44(6

,055

)36

,989

Wor

kfor

ce H

ousi

ng T

rust

Fun

d77

9,23

411

1,61

389

0,84

7La

w E

nfor

cem

ent T

rust

Fun

d2,

575,

972

(1,0

74,8

42)

1,50

1,13

0A

djus

tmen

t prim

arily

due

to tr

ansf

erst

o fu

nd a

war

d re

ceip

ents

and

bal

ance

br

ough

t for

war

d ad

just

men

ts to

reco

ncile

FY

201

6 ac

tual

. C

ount

y Tr

ansp

ort T

rust

Fun

d50

,000

050

,000

Nat

ural

Are

as S

twrd

ship

End

owm

ent

4,85

7,47

80

4,85

7,47

8A

g R

eser

ve L

and

Man

agem

ent

395,

076

152,

182

547,

258

Envi

ronm

enta

l Enh

ance

men

t - F

resh

wat

er51

8,02

4(4

95,1

60)

22,8

64En

viro

nmen

tal E

nhan

cem

ent -

Sal

twat

er41

4,47

0(3

09,0

54)

105,

416

Envi

ronm

enta

l Enh

ance

men

t-Non

spec

ific

1,87

1,24

7(9

13,9

87)

957,

260

Pollu

tion

Rec

over

y Tr

ust F

und

1,43

2,06

2(1

93,7

15)

1,23

8,34

7H

andi

capp

ed P

arki

ng E

nfor

cem

ent

011

,939

11,9

39

Oth

er O

pera

ting

Res

erve

s are

des

igna

ted

fund

s for

a v

arie

ty o

f spe

cific

po

tent

ial n

eeds

.

26

Page 31: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RE

SER

VE

AN

AL

YSI

S FI

SCA

L Y

EA

R 2

017

Ori

gina

lE

ndin

gFu

ndB

udge

tA

djus

tmen

tsB

alan

ceC

omm

ents

Scho

ol Im

pact

Fee

s Zon

es 1

1,22

6,05

1(1

,226

,051

)0

Adj

ustm

ent r

epre

sent

s sch

ool i

mpa

ct fe

es c

olle

cted

by

the

Cou

nty

and

disb

urse

d to

the

Scho

ol D

istri

ct w

ho h

as id

entif

ied

pote

ntia

l pro

ject

s for

the

use

of th

ese

rese

rves

in a

ccor

danc

e w

ith A

rticl

e 13

of t

he U

nifie

d La

nd

Dev

elop

men

t Cod

e.Sc

hool

Impa

ct F

ees Z

ones

24,

396,

926

(3,5

34,6

28)

862,

298

Adj

ustm

ent r

epre

sent

s sch

ool i

mpa

ct fe

es c

olle

cted

by

the

Cou

nty

and

disb

urse

d to

the

Scho

ol D

istri

ct w

ho h

as id

entif

ied

pote

ntia

l pro

ject

s for

the

use

of th

ese

rese

rves

in a

ccor

danc

e w

ith A

rticl

e 13

of t

he U

nifie

d La

nd

Dev

elop

men

t Cod

e.Sc

hool

Impa

ct F

ees Z

ones

33,

680,

728

(3,2

57,1

18)

423,

610

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al. A

djus

tmen

t rep

rese

nts s

choo

l im

pact

fees

col

lect

ed b

y th

e C

ount

y an

d di

sbur

sed

to th

e Sc

hool

Dis

trict

who

has

iden

tifie

d po

tent

ial

proj

ects

for t

he u

se o

f the

se re

serv

es in

acc

orda

nce

with

Arti

cle

13 o

f the

U

nifie

d La

nd D

evel

opm

ent C

ode.

Scho

ol Im

pact

Fee

s Zon

es 4

1,46

9,48

9(6

82,3

88)

787,

101

Avi

atio

n B

atta

lion

5,00

071

,723

76,7

23F/

R L

ong-

Term

Dis

abili

ty P

lan

12,2

11,0

48(3

4,07

5)12

,176

,973

MSB

U-H

ydra

nt R

enta

l Boc

a R

aton

105,

167

(1,1

96)

103,

971

MSB

U-H

ydra

nt R

enta

l-Riv

iera

Bea

ch3,

303

1,19

04,

493

Law

Lib

rary

381,

542

(26,

672)

354,

870

Loca

l Req

uire

men

ts &

Inno

vatio

n85

,019

25,3

1811

0,33

7G

olf C

ours

e O

pera

tions

477,

960

2,15

9,69

22,

637,

652

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al.

MST

D -

Bui

ldin

g32

,995

,591

2,77

7,55

335

,773

,144

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al.

CC

RT

Stre

et L

ight

ing

Mai

nten

ance

64,3

429,

409

73,7

51N

uisa

nce

Aba

tem

ent

4,06

7,18

352

2,87

14,

590,

054

Vic

tims o

f Crim

e Em

erge

ncy

411,

013

041

1,01

3Pu

blic

Saf

ety

Gra

nt41

6,67

256

4,07

898

0,75

0Em

erge

ncy

Man

agem

ent

98,9

89(5

4,46

0)44

,529

Reg

ulat

ion

of T

owin

g B

usin

ess

264,

839

37,7

8430

2,62

3V

ehic

le fo

r Hire

Ord

inan

ce83

1,75

615

7,56

698

9,32

2M

ovin

g O

rdin

ance

72,9

25(5

,930

)66

,995

E-91

1 C

arry

For

war

d 3,

189,

013

293,

698

3,48

2,71

1TD

C -

Con

vent

ion

Cen

ter O

pera

tions

1,47

2,84

4(3

45,8

68)

1,12

6,97

6TD

C -

Film

Com

mis

sion

535,

517

133,

771

669,

288

TDC

- Sp

ecia

l Pro

ject

s1,

287,

539

2,58

91,

290,

128

27

Page 32: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RE

SER

VE

AN

AL

YSI

S FI

SCA

L Y

EA

R 2

017

Ori

gina

lE

ndin

gFu

ndB

udge

tA

djus

tmen

tsB

alan

ceC

omm

ents

TDC

- 4th

Cen

t Loc

al O

ptio

n Ta

x37

0,97

626

2,52

363

3,49

9TD

C- T

ouris

m

1,62

5,67

323

2,11

11,

857,

784

TDC

- Cul

tura

l Arts

672,

548

449,

691

1,12

2,23

9TD

C- B

each

es99

,503

099

,503

TDC

- Sp

orts

Com

mis

sion

1,25

5,27

622

5,11

31,

480,

389

TDC

1st

Cen

t Tou

rist L

ocal

Opt

ion

Tax

5,58

2,87

71,

785,

855

7,36

8,73

2A

djus

tmen

t due

to b

alan

ce b

roug

ht fo

rwar

d ad

just

men

ts to

reco

ncile

to F

Y

2016

act

ual.

D

rug

Abu

se T

rust

Fun

d0

12,4

6712

,467

Coo

pera

tive

Exte

nsio

n R

even

ue F

und

135,

312

20,3

5915

5,67

1PB

C O

ffic

e of

Insp

ecto

r Gen

eral

(IG

)50

,000

050

,000

Crim

e Pr

even

tion

Fund

100,

000

139,

809

239,

809

Dom

estic

Vio

lenc

e Fu

nd32

3,89

6(3

,745

)32

0,15

1C

rimin

al Ju

stic

e R

eser

ve F

und

6,35

4(5

73)

5,78

1Pu

blic

Aff

airs

Rep

lace

men

t Fre

quen

cy41

2,53

310

0,34

751

2,88

0H

UD

Loa

n R

epay

men

t Acc

ount

337,

911

1,54

1,66

71,

879,

578

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al.

USD

A In

term

edia

ry R

elen

ding

63,4

71(8

,968

)54

,503

USE

PA R

evol

ving

Loa

n Fu

nd0

2,97

02,

970

Impa

ct F

ee A

ssis

tanc

e Pr

ogra

m -

Roa

ds Z

one

154

2,89

951

,925

594,

824

Impa

ct F

ee A

ssis

tanc

e Pr

ogra

m -

Roa

ds Z

one

242

3,44

658

,967

482,

413

Impa

ct F

ee A

ssis

tanc

e Pr

ogra

m -

Roa

ds Z

one

329

9,55

71,

650

301,

207

Impa

ct F

ee A

ssis

tanc

e Pr

ogra

m -

Roa

ds Z

one

413

1,66

715

8,99

329

0,66

0Im

pact

Fee

Ass

ista

nce

Prog

ram

- R

oads

Zon

e 5

488,

372

81,6

6057

0,03

2Im

pact

Fee

Ass

ista

nce

Prog

ram

- Pa

rks Z

one

137

,691

5,89

543

,586

Impa

ct F

ee A

ssis

tanc

e Pr

ogra

m -

Park

s Zon

e 2

43,0

2562

843

,653

Impa

ct F

ee A

ssis

tanc

e Pr

ogra

m -

Park

s Zon

e 3

83,8

6910

,526

94,3

9580

0 M

Hz

RR

+ I

Fund

9,03

4,69

624

6,30

09,

280,

996

TDC

-Bld

g R

enew

al &

Rep

lace

men

t1,

820,

126

5,14

7,11

66,

967,

242

Adj

ustm

ent p

rimar

ily d

ue to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile

to F

Y 2

016

actu

al.

Impa

ct F

ee A

ssis

tanc

e Pr

ogra

m -

Publ

ic B

uild

ing

59,0

8721

,022

80,1

09Fl

eet M

anag

emen

t6,

169,

882

(340

,074

)5,

829,

808

Prop

erty

& C

asua

lty In

sura

nce

3,72

1,84

73,

917,

099

7,63

8,94

6A

djus

tmen

t du

e to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile to

FY

20

16 a

ctua

l.R

isk

Man

agem

ent F

und

3,76

5,04

8(3

23,1

35)

3,44

1,91

3Em

ploy

ee H

ealth

Ins.

10,8

37,3

904,

176,

081

15,0

13,4

71A

djus

tmen

t du

e to

bal

ance

bro

ught

forw

ard

adju

stm

ents

to re

conc

ile to

FY

20

16 a

ctua

l.

28

Page 33: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RE

SER

VE

AN

AL

YSI

S FI

SCA

L Y

EA

R 2

017

Ori

gina

lE

ndin

gFu

ndB

udge

tA

djus

tmen

tsB

alan

ceC

omm

ents

Tot

al O

ther

Ope

ratin

g R

eser

ves

$132

,396

,997

$12,

854,

508

$145

,251

,505

Deb

t Ser

vice

Res

erve

sD

ebt S

ervi

ce R

eser

ves a

re e

stab

lishe

d fo

r fu

ture

deb

t ser

vice

pay

men

ts in

ac

cord

ance

with

bon

d re

quir

emen

ts.

176.

5M N

AV

08

DSR

, Jai

l Exp

and/

Pub

Bld

g4,

477,

800

04,

477,

800

94.2

M N

AV

08-

2 D

SR, M

ax P

lanc

k 4,

495,

525

04,

495,

525

17.9

M N

AV

14

DS,

Pal

m T

ran

04,

535

4,53

516

.0 G

O 0

5A D

S, R

ef 2

5M R

ec F

ac8,

011

29,0

9537

,106

115.

8M G

O T

ax 0

6 D

S, R

ef 7

015

4,64

115

4,64

119

.5M

GO

10

DS,

Ref

Par

t 30M

Lib

rary

0

29,3

0529

,305

28.7

M G

O 1

0 D

S, R

ef P

art 2

5M P

arks

G0

51,5

2351

,523

62.7

M N

AV

11

DSR

, Ref

Par

t 81M

Con

v C

ntr 0

45,

701,

875

05,

701,

875

11.8

M G

O 1

4 D

S, R

ef P

art 2

20

87,5

2887

,528

28.0

M G

O 1

4 D

S, R

ef P

art 5

00

254,

950

254,

950

11.6

M N

ote

Paya

ble

08 C

P, E

SL Ju

pite

r24

8,37

863

,810

312,

188

68M

PU

BLI

C Im

p R

ev B

ond

15A

CP

1,23

7,59

315

,634

1,25

3,22

7D

ebt S

ervi

ce R

eser

ves W

UD

All

4,43

7,86

30

4,43

7,86

3D

ebt S

ervi

ce 6

9M P

BIA

Rev

Bon

ds 2

006A

1,55

9(1

,559

)0

Deb

t Ser

vice

16M

PB

IA T

ax R

ev R

ef 2

006B

815

081

5T

otal

Deb

t Ser

vice

Res

erve

s$2

0,60

9,41

9$6

89,4

62$2

1,29

8,88

1

Res

erve

s for

Bal

ance

For

war

d

Gen

eral

Fun

d79

,555

,000

17,1

06,5

2396

,661

,523

Adj

ustm

ent

due

to b

alan

ce b

roug

ht fo

rwar

d ad

just

men

ts to

reco

ncile

to F

Y

2016

act

ual.

Cou

nty

Libr

ary

1,20

0,00

00

1,20

0,00

0Fi

re/R

escu

e M

STU

37,6

61,4

5711

,254

,893

48,9

16,3

50A

djus

tmen

t due

to b

alan

ce b

roug

ht fo

rwar

d ad

just

men

ts to

reco

ncile

to F

Y

2016

act

ual.

Fire

Res

cue

Jupi

ter M

STU

074

,350

74,3

50M

SBU

-Hyd

rant

Ren

tal B

oca

Rat

on89

,475

3,43

092

,905

MSB

U-H

ydra

nt R

enta

l-Riv

iera

Bea

ch1,

665

1,44

63,

111

Met

ro P

lann

ing

Org

aniz

atio

n1,

511,

797

349,

902

1,86

1,69

9T

otal

Res

erve

s for

Bal

ance

For

war

d$1

20,0

19,3

94$2

8,79

0,54

4$1

48,8

09,9

38G

rand

Tot

al$8

32,7

41,9

15($

63,4

15,0

66)

$769

,326

,849

Bal

ance

Forw

ard

Res

erve

sre

pres

ent

fund

sto

beca

rrie

dfo

rwar

dto

subs

eque

ntfis

caly

ears

topa

yex

pens

esun

tilop

erat

ing

reve

nues

such

aspr

oper

tyta

xes

are

rece

ived

.T

hese

amou

nts

repr

esen

tbu

dget

prio

rto

year

end

clo

sing

.

29

Page 34: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

30

Page 35: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

GENERAL FUND

CONTINGENCY RESERVE ANALYSIS This section provides details on the General Fund contingency reserves, followed by a list

of changes during the period and an ending balance.

31

Page 36: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Note: Graph represents balance at the end of each month

GENERAL FUND

As of September 30, 2016, the General Fund Reserve for Contingencies had decreased by $3,617,415 (17.4%). The beginning balance on October 1, 2016, was $20,775,190.

The beginning FY 2017 General Fund Reserve for Contingencies was $20,000,000. Various Boardapproved transfers decreased this original amount to $19,303,118 as September 30, 2017. At thesame time last year, the contingency reserve balance was $17,157,775.

As of September 30, 2017, the General Fund Reserve for Contingencies decreased by $696,882(6.5%). This is primarily due to the Board of County Commissioners approving a Joint PartnershipAgreement with the State of Florida FDOT which caused an increase in Reserves forContingencies ($875,000), Economic Incentive with Cancer Treatment Centers of America Global,Inc. ($357,500), an unanticipated increase in contract with Application Dynamics ($244,913),refunds to municipalities for the Inspector General ($223,588), funding of two positions for PublicSafety ($304,719). There were other smaller impacts to contingency reserves. A complete list ofthese impacts are found on the next page.

CONTIGENCY RESERVE ANALYSIS FISCAL YEAR 2017

16.5

17

17.5

18

18.5

19

19.5

20

20.5

21

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept

Mill

ions

2016 2017

32

Page 37: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

GENERAL FUNDRESERVES FOR CONTINGENCY

Posted/Apprv'd Log # Department Amount Balance10/01/2016 Beginning Balance $20,000,000

10/04/2016 17-0060

Palm Tran- Transfer in the General Fund, to decrease the General Fund transfer, increasing Contingency Reserves. JPA Agreement #4430296-2-84-01 with the State of Florida FDOT.

865,000 20,865,000

10/04/2016 17-0056 Public Safety- Funding for an Animal Control Officer II position (62,480) 20,802,520

11/23/2016 17-0119 Community Services- HUD FY 2015 Continuum of Care Program Grant Agreement No. FL0595L4D051500 (23,249) 20,779,271

12/06/2016 17-0204 Department of Economic Sustainability- Economic Incentive- Cancer Treatment Centers of America Global, Inc. (357,500) 20,421,771

12/12/2016 17-0218 Environmental Resources Management- Fund unanticipated increase in contract with Application Dynamics. (244,913) 20,176,858

12/20/2016 17-0183 Youth Services- Anticipated revenue from DCF in the Adoption Services program 18,000 20,194,858

12/12/2016 17-0253 Department of Economic Sustainability- Economic Incentive Agreement- Granite Telecommunications, LLC. (25,000) 20,169,858

03/14/2017 17-0604 Refunds to the municipalities for the Inspector General (223,588) 19,946,270

03/14/2017 17-0415 Community Services- Provision of emergency services provided to 28 homeless families and individuals. (41,845) 19,904,425

03/14/2017 17-0619 Department of Economic Sustainability- Economic Incentive- 3D Medical Manufacturing, Inc. (89,000) 19,815,425

04/19/2017 17-0704 Public Safety- Funding for an Associate Medical Examiner and Forensic Technician positions. (304,719) 19,510,706

04/20/2017 17-0722Metropolitan Planning Organization- To correct the County match required for the Joint Participation Agreement with Florida Department of Transportation.

5,296 19,516,002

08/22/2017 17-0946 Palm Tran- County match for a grant agreement with CTD (212,884) 19,303,118

Total Remaining Balance $19,303,118

33

Page 38: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

34

Page 39: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RESERVE ACCOUNT ACTIVITY

SUMMARY

FOR ALL CAPITAL PROGRAMS This section includes a summary of total capital reserves by program which shows

reserve balances at the beginning of the period, changes during the period and ending

balances.

35

Page 40: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTY CAPITAL PROJECT STATUS REPORT

RESERVE ACCOUNT ACTIVITY SUMMARYFISCAL YEAR 2017

Program Name Beginning Changes EndingBalance This Period Balance

Criminal Justice Program $3,146,448 ($158,845) $2,987,603

Environmental Lands & Beaches Program $1,638,678 $365,847 $2,004,525

Fire Rescue Program $1,036,911 $112,241 $1,149,152

General Government Program $30,862,079 $4,860,050 $35,722,129

Library Program $16,579,652 $35,770 $16,615,422

Parks & Recreation Program $10,638,334 ($2,889,703) $7,748,631

Road Program $359,263,473 ($95,611,534) $263,651,939

Street & Drainage Program $9,899,285 ($469,311) $9,429,974

Airport Program $54,906,789 ($21,444,367) $33,462,422

Water Utilities Program $46,185,633 $4,030,504 $50,216,137

TOTAL ALL PROGRAMS $534,157,282 ($111,169,348) $422,987,934

36

Page 41: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RESERVE SUMMARY BY

PROGRAMS AND FUNDS

(Capital Funds Only) This section includes a more detailed listing of capital reserves showing beginning and

ending balances and activity by program and fund within a program. Information from

the program/fund section flows into the program summary section.

37

Page 42: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE SUMMARY BY PROGRAM AND FUND

FISCAL YEAR 2017 (Capital Project Funds Only) PROGRAM TITLE BEGINNING CHANGES ENDINGFUND NAME (Number) BALANCE This Period BALANCE

Criminal Justice Program14.6M NAV 06, Parking Facilities Expansion (3040) 21,994 (21,994) 0176.5M NAV 08 CTF, Jail Expand/Public Buildings (3053) 179,036 (179,036) 0Law Enforcement Impact Fees Z-2 Road Patrol (3803) 2,945,418 42,185 2,987,603Total Criminal Justice Program 3,146,448 (158,845) 2,987,603

Environmental Lands Program11.6M Note Payable 08 CP, ESL Jupiter (3061) 248,378 63,810 312,188Unit 11 Acquisition/Enhancement (3650) 643,460 1,355 644,815South Loxahatchee Slough Wetland Restoration (3651) 131,449 1,316 132,765Beach Improvement (3652) 390,559 295,286 685,845South Lake Worth Inlet (3653) 224,832 3,591 228,423Environmental Resources Capital Projects (3654) 0 489 489Total Environmental Lands Program 1,638,678 365,847 2,004,525

Fire Rescue ProgramFire Rescue Improvement (3700) 737,016 101,492 838,508Fire Rescue Impact Fees Z-4 (3704) 299,895 10,749 310,644Total Fire Rescue Program 1,036,911 112,241 1,149,152

General Government Program80.7M NAV 01, Convention Center (3014) 239,491 (239,491) 010.0M NAV 13 CP, ISS VOIP (3071) 282,918 46,218 329,13627.8M NAV Tax 13 CP, Convention Center Hotel (3074) 28,867 596 29,46368M Pub Imp Rev Bond 15A, Conv Ctr Garage & Airport Ct (3076) 1,237,593 15,634 1,253,22765.360M NAV Pub Imp Tax Rev Bond (3078) 815,705 19,379 835,08456.645M NAV Pub Imp Tax Rev Bond (3079) 1,167,250 (480,723) 686,527Pud Civic Site Cash Out (3800) 942,129 1,024 943,153800 Mhz RR+I Fund (3801) 9,034,696 246,300 9,280,996Public Building Improvement Fund (3804) 7,693,605 92,000 7,785,605Public Building Impact Fees (3805) 7,127,274 (22,710) 7,104,564Tourist Development Council Building Renewal and Replacement (3807) 1,820,126 5,147,116 6,967,242Impact Fee Assistance Program - Public Building (3815) 59,087 21,022 80,109Capital Outlay (3900) 401,922 1,171 403,093Information Technology Capital Improvements (3901) 0 4,271 4,271E911 Carry Forward Capital (3905) 11,416 8,243 19,659Total General Government Program 30,862,079 4,860,050 35,722,129

Library Program Library Improvement Fund (3750) 2,774,132 3,095 2,777,227Library Expansion Program (3751) 11,625,244 16,870 11,642,114Library Impact Fees (3752) 2,180,276 15,805 2,196,081Total Library Program 16,579,652 35,770 16,615,422

Parks & Recreation25M GO 03, Parks & Cultural Facilities (3019) 14,075 5,283 19,35825M GO 05, Parks & Cultural Improvements (3020) 443,764 (416,903) 26,86150M GO 06, Waterfront Access (3038) 100,332 1,713 102,0456.1M Sunshine #8 06, Park & Marina Improvements (3043) 0 138 1388.1M Sunshine #9 06, South County Golf Course (3046) 2,673 (2,673) 0Park Improvement Fund (3600) 188,429 82,693 271,122Park Impact Fees Z-1 (3601) 916,029 5,443 921,472

38

Page 43: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE SUMMARY BY PROGRAM AND FUND

FISCAL YEAR 2017 (Capital Project Funds Only) PROGRAM TITLE BEGINNING CHANGES ENDINGFUND NAME (Number) BALANCE This Period BALANCE

Park Impact Fees Z-2 (3602) 1,849,841 (1,216,003) 633,838Park Impact Fees Z-3 (3603) 6,958,606 (1,366,443) 5,592,163Impact Fee Assistance Program - Parks Zone 1 (3621) 37,691 5,895 43,586Impact Fee Assistance Program - Parks Zone 2 (3622) 43,025 628 43,653Impact Fee Assistance Program - Parks Zone 3 (3623) 83,869 10,526 94,395Total Parks & Recreation Program 10,638,334 (2,889,703) 7,748,631

Road ProgramTransportation Improvement Fund (3500) 158,572,514 (30,955,119) 127,617,395Road Impact Fees Zone 1 (3501) 47,058,573 (33,001,572) 14,057,001Road Impact Fees Zone 2 (3502) 41,740,953 (15,197,613) 26,543,340Road Impact Fees Zone 3 (3503) 13,252,810 (537,794) 12,715,016Road Impact Fees Zone 4 (3504) 21,609,886 (7,802,192) 13,807,694Road Impact Fees Zone 5 (3505) 50,701,664 (8,978,245) 41,723,419Abacoa Trust Sub Account (3516) 4,738,733 124,986 4,863,719Proportionate Share Trust Fund (3523) 17,477,119 6,561 17,483,680Impact Fee Assistance Program - Roads Zone 1 (3531) 542,899 51,925 594,824Impact Fee Assistance Program - Roads Zone 2 (3532) 423,446 58,967 482,413Impact Fee Assistance Program - Roads Zone 3 (3533) 299,557 1,650 301,207Impact Fee Assistance Program - Roads Zone 4 (3534) 131,667 158,993 290,660Impact Fee Assistance Program - Roads Zone 5 (3535) 488,372 81,660 570,032Proportionate Share Trust Fund- Zone 2 (3542) 134,338 374,717 509,055Proportionate Share Trust Fund- Zone 3 (3543) 1,753,358 1,088 1,754,446Proportionate Share Trust Fund- Zone 5 (3545) 337,584 454 338,038Total Road Program 359,263,473 (95,611,534) 263,651,939

Street And Drainage ProgramUnincorporated Improvement Fund (3511) 9,899,285 (469,311) 9,429,974Total Street & Drainage Program 9,899,285 (469,311) 9,429,974

Airport ProgramAirports Capital Projects (4110) 648,798 (238,801) 409,997Airports Improvement & Development Fund (4111) 25,514,393 (18,162,926) 7,351,467Airport Passenger Facility Charges (4112) 26,029,496 (3,950,290) 22,079,206Noise Abatement & Mitigation (4113) 2,575,167 7,378 2,582,545Airports Restricted Assets Fund (4114) 136,561 901,831 1,038,392Debt Service 69M PBIA Rev Ref 2006A (4137) 1,559 (1,559) 0Debt Service 16M PBIA Tax Rev Ref 2006B (4138) 815 0 815Total Airport Program 54,906,789 (21,444,367) 33,462,422

Water Utilities ProgramRenewal & Replacement (4010) 1,000,000 0 1,000,000Capital Improvements (4011) 35,190,984 4,211,992 39,402,976WUD FPL Reclaimed Water Renewal (4015) 4,016,452 553,559 4,570,011Debt Service Reserve Wud All (4034) 4,437,863 0 4,437,863WUD FPL Debt Service Coverage (4043) 1,540,334 (735,047) 805,287Total Water Utilities Program 46,185,633 4,030,504 50,216,137

GRAND TOTAL ALL PROGRAMS 534,157,282 (111,169,348) 422,987,934

39

Page 44: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

40

Page 45: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RESERVE ACCOUNT ACTIVITY This section presents a listing of each change to reserves, by fund and program, during

the period. The total of the detail activities by fund flows up to the program/fund section.

41

Page 46: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

CRIMINAL JUSTICE PROGRAM

Judicial ParkingBalance Brought Forward Adjustment ($445,091)Bond Buy Out 423,097Total ($21,994)

Jail Facilities Expansion/Pub BldgPBSO Detention Facilities Renewal/Replacement ($180,460)Balance Brought Forward Adjustment 1,424Total ($179,036)

Law Enforcement Impact Fees Z-2CWIP Sweep $42,185Total $42,185

Total Criminal Justice Program ($158,845)

42

Page 47: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ENVIRONMENTAL LANDS & BEACHES PROGRAM

11.6M Note Payable 08 CP, ESL Jupiter Balance Brought Forward Adjustment $63,810Total $63,810

Unit 11 Acquisition/Enhancement Balance Brought Forward Adjustment $1,355Total $1,355

South Loxahatchee Slough Wetland RestorationBalance Brought Forward Adjustment $1,316Total $1,316

Beach Improvement Balance Brought Forward Adjustment $295,286Total $295,286

South Lake Worth InletBalance Brought Forward Adjustment $3,591Total $3,591

Environmental Resources Capital ProjectsCWIP Sweep $489Total $489

Total Environmental Lands & Beaches Program $365,847

43

Page 48: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

FIRE RESCUE PROGRAM

Fire Rescue Improvement Late Transfer ($283,640)Balance Brought Forward Adjustment 20,528CWIP Sweep 364,604Totals $101,492

Fire Impact Fees Z-4Balance Brought Forward Adjustment $9,206CWIP Sweep 1,543Totals $10,749

Total Fire Rescue Program $112,241

44

Page 49: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

GENERAL GOVERNMENT PROGRAM

80.7M NAV 01 Convention CenterBond Buy Out $4,889,243Balance Brought Forward Adjustment (5,128,734)Total ($239,491)

10.0M NAV 13 CP, ISS VOIPBalance Brought Forward Adjustment $46,218Total $46,218

27.8M NAV Tax 13 CP, Convention Center HotelBalance Brought Forward Adjustment $596Total $596

68M Pub Imp Tax Rev Bond 15C CP, Prof SportsBalance Brought Forward Adjustment $15,634Total $15,634

65.360M NAV Pub Imp Tax Rev Bond 15C CP, Prof SportsBalance Brought Forward Adjustment $19,379Total $19,379

56.645M NAV Pub Imp Tax Rev Bond 15D CP, Prof SportsBalance Brought Forward Adjustment ($480,723)Total ($480,723)

PUD Civic Site Cash OutBalance Brought Forward Adjustment $1,024Total $1,024

800 MHz RR & I FundBalance Brought Forward Adjustment $246,300Total $246,300

(Continued Next Page)

45

Page 50: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

GENERAL GOVERNMENT PROGRAM

Public Building Improvement Fund Various project sweeps $92,000Total $92,000

Public Building Impact Fees Balance Brought Forward Adjustment ($22,710)Total ($22,710)

Tourist Development Council Building Renewal & ReplacementBalance Brought Forward Adjustment $5,147,116Total $5,147,116

Impact Fee Assistance Program - Public BuildingTransfer for Royal Palm Place, Ltd. Affordable Housing Project ($6,744)Balance Brought Forward Adjustment 27,766Total $21,022

Capital OutlayGovernment Center Re-cabling- Project Sweep $64,474CCRT Recouped- Project Sweep 3,524Late Transfer adjustment (66,827)Total $1,171

Information Technology Capital ImprovementsVarious project closings $4,271Total $4,271

E911 Carry Forward CapitalBalance Brought Forward Adjustment $8,243Total $8,243

Total General Government Program $4,860,050

46

Page 51: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

RESERVE ACCOUNT ACTIVITYFISCAL YEAR 2017

LIBRARY PROGRAM

Library Improvement FundBalance Brought Forward Adjustment $3,095Total $3,095

Library Expansion ProgramBalance Brought Forward Adjustment $16,870Total $16,870

Library Impact FeesBalance Brought Forward Adjustment $15,805Total $15,805

Total Library Program $35,770

PALM BEACH COUNTY

47

Page 52: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

PARKS & RECREATION PROGRAM

25.0M GO 03, Recreational & Cultural FacilitiesCWIP Sweep $3,862Balance Brought Forward Adjustment 1,421Total $5,283

25.0M GO 05, Recreational & Cultural FacilitiesKreusler Park Lifeguard/Restroom Building ($418,276)Balance Brought Forward Adjustment 1,373Total ($416,903)

50.0M GO 06, Waterfront AccessBalance Brought Forward Adjustment $1,713Total $1,713

6.1M Sunshine #8 06, so County Golf Course CTFBalance Brought Forward Adjustment $138Total $138

8.1M Sunshine #9 06, South County Golf CourseCWIP Sweep $3,276Balance Brought Forward Adjustment (5,949)Total ($2,673)

Park Improvement FundBalance Brought Forward Adjustment $103,775Transfer to appropriate the Gifts to Parks Revenue received (79,247)CWIP Sweep 58,165Total $82,693

Park Impact Fees Z-1Bert Winters Park Expansion ($100,000)CWIP Sweep 1Balance Brought Forward Adjustment 105,442Total $5,443

(Continued Next Page)

48

Page 53: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

PARKS & RECREATION PROGRAM

Park Impact Fees Z-2Okeeheelee Park South Boating Center project ($750,000)CWIP Sweep 3John Prince Park Improvement project (480,000)John Prince Park Custard Apple Expansion project (32,000)Okeeheelee South Project (75,000)Balance Brought Forward Adjustment 120,994Total ($1,216,003)

Park Impact Fees Z-3Correction of posting error ($1,500,000)CWIP Sweep 32,515Balance Brought Forward Adjustment 101,042Total ($1,366,443)

Impact Fee Assistance Program - Parks Zone 1Balance Brought Forward Adjustment $5,895Total $5,895

Impact Fee Assistance Program - Parks Zone 2Balance Brought Forward Adjustment $21,415Transfer for Royal Palm Place, Ltd. Affordable housing project (20,787)Total $628

Impact Fee Assistance Program - Parks Zone 3Balance Brought Forward Adjustment $10,526Total $10,526

Total Parks & Recreation Program ($2,890,331)

49

Page 54: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

Transportation Improvement Fund- District Improvements

Road Program Reserves - FY 2004Adjustment for Prior Years ($278,000)Right of Way Parcel Maintenance (50,000)Australian Ave - W. 10th Ave to N. of W. 13th RB (100,000)Schall Circle Improvement (100,000)Right of Way Parcel Maintenance (50,000)Total ($578,000)

Road Program Reserves - FY 2005Adjustment for Prior Years ($1,281,719)Coral Ridge Dr - S. County Regional Park N. Ent to 750' N. (30,000)Redding Rd & Sunup Trail Drainage (25,000)Total ($1,336,719)

Road Program Reserves - FY 2006Adjustment for Prior Years ($2,682,801)Palmetto Park Rd & Boca Rio Rd. Intersection Improvements (50,000)Total ($2,732,801)

Road Program Reserves - FY 2007Adjustment for Prior Years ($2,135,155)Total ($2,135,155)

Road Program Reserves - FY 2008Adjustment for Prior Years ($8,184,125)Total ($8,184,125)

Road Program Reserves - FY 2009Adjustment for Prior Years ($3,463,522)Total ($3,463,522)

Road Program Reserves - FY 2010Adjustment for Prior Years ($5,246,417)Total ($5,246,417)

ROAD PROGRAM

(Continued Next Page)

50

Page 55: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ROAD PROGRAMRoad Program Reserves - FY 2011Toney Penna Drive & Old Dixie Hwy ($1,600,000)Loxahatchee River Rd & Via Rio Intersection (5,000)Burns Rd & Military Trail Intersection Improvements (35,000)Adjustment for Prior Years (10,671,227)Lantana Rd & Lawrence Rd Intersection Improvements (85,000)Australian Ave Roadway Safety Audit (30,000)Northlake Blvd & Military Trail Intersection Improvements (190,000)Acme Dairy Rd & Sunset Palms Intersection Improvements (10,000)Total ($12,626,227)

Road Program Reserves - FY 2012Adjustment for Prior Years ($21,684,806)Total ($21,684,806)

Road Program Reserves - FY 2013Adjustment for Prior Years ($900,000)Total ($900,000)

Road Program Reserves - FY 2014Adjustment for Prior Years ($15,335,000)Total ($15,335,000)

Road Program Reserves - FY 2015Gateway Blvd & Military Trail Intersection Improvements ($6,500)Railroad Crossing Maintenance (330,000)Adjustment for Prior Years (6,357,634)Woolbright Rd-Military Trail to Lawrence Rd (40,000)CR880 Canal Bank Stabilization (30,000)Blue Heron Blvd & Congress Ave Intersection Improvements (300,000)Total ($7,064,134)

Road Program Reserves - FY 2016Sherwood Forest Blvd over LWDD L-8 Canal ($120,000)Lantana Rd & Willowood Lane Intersection Improvements (45,000)Prairie Rd over LWDD L-8 Canal Bridge (150,000)Garden Road Culvert (1,200,000)Island Way & Limestone Creek Road (140,000)Lyons Rd-Norte Lago to Pine Springs Drive (80,000)

(Continued Next Page)

51

Page 56: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ROAD PROGRAMPalm Beach Lakes Blvd & N Robbins Dr Intersection (175,000)Jog Rd - S. of Clint Moore Rd to Linton Blvd (1,500,000)Indiantown Rd at Sierra Square (50,000)Railroad Crossing Maintenance (515,000)Adjustment for Prior Years (3,391,610)Railroad Crossing Maintenance 110,000Camino Real Rd - S.W. 17th Ct to S.W. 7th Ave (50,000)Total ($7,306,610)

Road Program Reserves - FY 2017Adopted Five Year Road Program Mid Year Adjustment $33,056,496Linton Blvd & S. Federal Highway Intersection Improvements (350,000)Palmwood Rd - 750' N of Donald Ross Rd to Susan Ave (1,320,000)Connector Rd - Lyons Rd to Acme Dairy Rd (700,000)Camino Real Rd - Boca Club Bridge over Intracoastal Waterway (50,000)Gun Club Rd over LWDD E-3 Canal (900,000)Adopted Five Year Road Program Annual Update 10,920,926100th Street S. & SR7 Intersection Improvements (50,000)Jog Rd & LWDD L-16 Canal Intersection Improvements (50,000)Palmetto Park Rd & N.W. 12th Ave (50,000)Summit Blvd over LWDD E-3 Canal (300,000)Lyons Rd - PB Central High Entrance to LWDD L-7 Canal (10,000)Hagen Ranch Rd & Atlantic Avenue Intersection (50,000)Camino Real Rd - Boca Club Bridge over Intracoastal Waterway (2,300,000)Camino Real Rd - Boca Club Bridge over Intracoastal Waterway (50,000)Reserve for Balances Forward (10,926)Lyons Rd - PB Central High Entrance to LWDD L-7 Canal (30,000)Florida Mango Rd over LWDD L-5 Canal Bridge Repair (100,000)Palmetto Park Rd & N.W. 12th Ave (50,000)Lyons Rd - PB Central High Entrance to LWDD L-7 Canal (350,000)Glades Rd & Sandpiper Shores Elementary School (50,000)Camino Real Rd - Boca Club Bridge over Intracoastal Waterway (9,600,000)Linton Blvd & S. Federal Highway Intersection Improvements 300,000Connector Rd - Lyons Rd to Acme Dairy Rd 50,000Kirk Rd Bridge over LWDD L-5 Canal (900,000)Sherwood Forest Blvd over LWDD L-8 Canal (850,000)Fairground Rd & Process Dr Intersection Improvements (150,000)Total $26,056,496

(Continued Next Page)

52

Page 57: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ROAD PROGRAMReserves - SweepGateway Blvd & Military Trail Intersection Improvements $6,500Palmetto Park Rd over LWDD E-4 Canal 68,000Toney Penna Drive & Old Dixie Hwy 1,600,000Browns Farm Road 2,879Overhead School Flashers 3,50810th Ave N. over Keller Canal 131,852Lyons Rd-Norte Lago to Pine Springs Drive 80,000Palm Beach Lakes Blvd & N Robbins Dr 175,000Garden Road Culvert (67,188)Adopted Five Year Road Program Mid Year Adjustment (39,866,496)Indiantown Rd at Sierra Square 50,000Linton Blvd & S. Federal Highway Intersection Improvements 350,000Burns Rd & Military Trail Intersection Improvements 35,000Adopted Five Year Road Program Annual Update 65,751,090Palmetto Park Rd & N.W. 12th Ave 50,000Lyons Rd - PB Central High Entrance to LWDD L-7 Canal 10,000SR80 & Lyons Rd - Sansbury Way Intersection 10,000Hagen Ranch Rd & Atlantic Ave Intersection 50,000FY16 Balance Brought Forward Adjustment 1,675,830Palmetto Park Rd & Boca Rio Rd Intersection 50,000Lantana Rd & Lawrence Rd Intersection Improvements 85,000Reserve for Balances Forward 10,926Lyons Rd - PB Central High Entrance to LWDD L-7 Canal 30,000Camino Real Rd - S.W. 17th Ct to S.W. 7th Ave 50,000Australian Ave - W. 10th Ave to N. of W. 13th RB 100,000Blue Heron Blvd & Congress Ave Intersection Improvements 300,000Coral Ridge Dr - S. County Regional Park N. Ent to 750' N. 30,000Northlake Blvd & Military Trail Intersection Improvements 190,000Lyons Rd - PB Central High Entrance to LWDD L-7 Canal 350,000Palmetto Park Rd & N.W. 12th Ave 50,000Glades Rd & Sandpiper Shores Elementary School 50,000Linton Blvd & S. Federal Highway Intersection Improvements (300,000)Bridges & Crossings Mid Year Adjustment 470,000Total $31,581,901

Total Transportation Improvement Fund ($30,955,119)

(Continued Next Page)

53

Page 58: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ROAD PROGRAMRoad Impact Fees Zone 1Toney Penna Drive & Old Dixie Hwy ($1,600,000)Old Dixie Hwy - Park Ave to Northlake Blvd (3,500,000)Indiantown Rd & Jupiter Farms Intersection Improvements (50,000)Australian Ave - W. 10th to N. of 13th RB (850,000)Burns Rd & Military Trail Intersection Improvements (50,000)Indiantown Rd at Sierra Square (50,000)Toney Penna Dr & Old Dixie Hwy (800,000)Garden Road Culvert 67,188Northlake Blvd & Military Trail Intersection Improvements (150,000)Hood Rd - E. of Turnpike to W. Central Blvd (470,000)Center St Drainage Imp/Thelma Ave to Woodland Estates Dr (80,000)Burns Rd & Military Trail Intersection Improvements (65,000)PGA Blvd & North Military Trail Intersection Improvements (1,150,000)Silver Beach Rd - E. of Congress Ave to Old Dixie Hwy (1,250,000)FY16 Balance Brought Forward Adjustment (605,118)Australian Ave - W. 10th Ave to N. of W. 13th RB (150,000)Blue Heron Blvd & Congress Ave Intersection Improvements (300,000)Australian Ave - W. 10th Ave to N. of W. 13th RB (100,000)Northlake Blvd & Military Trail Intersection Improvements (758,642)Northlake Blvd & Military Trail Intersection Improvements (190,000)Silver Beach Rd - E. of Congress Ave to Old Dixie Hwy (1,750,000)Silver Beach Rd - E. of Congress Ave to Old Dixie Hwy (450,000)Indiantown Rd - Jupiter Farms Rd to W. of Turnpike (2,000,000)Center St Drainage Imp/Thelma Ave to Woodland Estates Dr (1,800,000)Hood Rd & Central Blvd Intersection Improvements (1,000,000)Hood Rd - E. of Turnpike to W. Central Blvd (13,600,000)PGA Blvd & North Military Trail Intersection Improvements (300,000)Total ($33,001,572)

Road Impact Fees Zone 2Florida Mango Rd over LWDD L-6 Canal ($100,000)Roebuck Rd - Jog Rd to Haverhill Rd (50,000)Purdy Ln - Forest Hill Elementary to E. of Major Dr (80,000)Florida Mango Rd over LWDD L-9 & L-10 Canals (340,000)Palm Beach Lakes Blvd & N Robbins Dr (175,000)Haverhill Rd - N. of Caribbean Blvd to Bee Line Hwy (510,000)Florida Mango Rd - Barbados Rd to N. of Myrica Rd (430,000)Lake Worth Rd & Jog Rd Intersection Improvements (160,000)Military Trail & Forest Hill Blvd Intersection Improvements (150,000)

(Continued Next Page)

54

Page 59: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ROAD PROGRAMOkeechobee Blvd & Church St Intersection Improvements (40,000)Drexel Rd over LWDD L-2 Canal (950,000)FY16 Balance Brought Forward Adjustment (312,613)Kirk Rd over LWDD L-7 Canal Bridge Replacement (50,000)Okeechobee Blvd & Church St Intersection Improvements (20,000)Purdy Ln - Forest Hill Elementary to E. of Major Dr (60,000)Kirk Rd - S. of LWDD L-7 Canal to Pot O' Gold St. (1,450,000)Purdy Ln - Forest Hill Elementary to E. of Major Dr (2,640,000)Roebuck Rd - Jog Rd to Haverhill Rd (70,000)Roebuck Rd & Jog Rd Intersection Improvements (920,000)Roebuck Rd - Jog Rd to Haverhill Rd (4,900,000)Okeechobee Blvd & Church St Intersection Improvements (1,420,000)Florida Mango Rd - Barbados Rd to N. of Myrica Rd (370,000)Total ($15,197,613)

Road Impact Fees Zone 3SR80 Pfa Reserves $1,615,87360th St N. - 140th Ave to E. of 120th Ave N. (100,000)Seminole Pratt Whitney - Orange Blvd to Northlake Blvd (50,000)Northlake Blvd - Seminole Pratt to Coconut Blvd (200,000)Lyons Rd - PB Central High Entrance to LWDD L-7 Canal (10,000)SR80 & Lyons Rd - Sansbury Way Intersection (10,000)FY16 Balance Brought Forward Adjustment (655,948)Lyons Rd - PB Central High Entrance to LWDD L-7 Canal (30,000)Seminole Pratt Whitney - Orange Blvd to Northlake Blvd (100,000)Lyons Rd - PB Central High Entrance to LWDD L-7 Canal (350,000)Seminole Pratt & Northlake Blvd Intersection Improvements (147,719)Okeechobee Blvd & Skees Rd Intersection Improvements (500,000)Total ($537,794)

Road Impact Fees Zone 4Haverhill Rd - Lantana Rd to LWDD L-14 Canal ($1,360,000)Gateway Blvd & Military Trail Intersection Improvements (206,500)Haverhill Rd - S. of LWDD L-14 Canal to Lake Worth Rd (7,810,000)Congress Ave - Lantana Rd to Melaleuca Ln 419,927Lyons Rd - Lantana Rd to Lake Worth Rd (275,000)FY16 Balance Brought Forward Adjustment 1,514,381Lantana Rd & Lawrence Rd Intersection Improvements (85,000)Total ($7,802,192)

(Continued Next Page)

55

Page 60: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ROAD PROGRAMRoad Impact Fees Zone 5Palmetto Park Rd over LWDD E-4 Canal ($68,000)Lyons Rd-Norte Lago to Pine Springs Drive (80,000)Linton Blvd & S. Federal Highway Intersection Improvements (350,000)Lyons Rd - Hillsboro Canal to S.W. 18th St (25,000)Clint Moore Rd - Oaks Club Dr to Long Lake Dr (100,000)Palmetto Park Rd & N.W. 12th Ave (50,000)Yamato Rd - Lakeridge Blvd to W of Florida's Turnpike (100,000)S.W. 18th St & Military Trail Intersection Improvements (1,500,000)Clint Moore Rd - E. of Congress Ave to E. of LWDD E-4 Canal 31,488Hagen Ranch Rd & Atlantic Avenue Intersection (50,000)FY16 Balance Brought Forward Adjustment 1,348,267Palmetto Park Rd & Boca Rio Rd Intersection Improvements (50,000)Camino Real Rd - S.W. 17th Ct to S.W. 7th Ave (50,000)Coral Ridge Dr - S. County Regional Park N. Ent to 750' N. (30,000)Linton Blvd & Military Trail Intersection Improvements (100,000)Glades Rd & Butts Rd Intersection Improvements (40,000)Linton Blvd & Military Trail Intersection Improvements (640,000)Palmetto Park Rd & N.W. 12th Ave (50,000)Flavor Pict Rd - SR 7 to Lyons Rd (3,500,000)Glades Rd & Sandpiper Shores Elementary School (50,000)Lyons Rd - Hillsboro Canal to S.W. 18th St. (25,000)Coral Ridge Dr - S. County Regional Park N. Ent to 750' N. (1,200,000)Linton Blvd & S. Federal Highway Intersection Improvements 300,000Lyons Rd - Hillsboro Canal to S.W. 18th St. (2,000,000)Lyons Rd - Clint Moore Rd to Atlantic Ave (100,000)Palmetto Park Rd - E. of Military Trail to I-95 (500,000)Total ($8,978,245)

Abacoa Trust Sub AccountBalance Brought Forward Adjustment $124,986Total $124,986

Proportionate Share Trust Fund Balance Brought Forward Adjustment $6,561Total $6,561

Impact Fee Program - Roads Zone 1 Balance Brought Forward Adjustment $51,925Total $51,925

(Continued Next Page)

56

Page 61: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

ROAD PROGRAMImpact Fee Program - Roads Zone 2Balance Brought Forward Adjustment $58,967Total $58,967

Impact Fee Program - Roads Zone 3Balance Brought Forward Adjustment $1,650Total $1,650

Impact Fee Program - Roads Zone 4 Balance Brought Forward Adjustment $158,993Total $158,993

Impact Fee Program - Roads Zone 5Balance Brought Forward Adjustment $81,660Total $81,660

Total Impact Fee Funds ($65,032,674)

Proportionate Share Trust Fund - Zone 2Balance Brought Forward Adjustment $374,717Total $374,717

Proportionate Share Trust Fund - Zone 3Balance Brought Forward Adjustment $1,088Total $1,088

Proportionate Share Trust Fund - Zone 5Balance Brought Forward Adjustment $454Total $454

Total RoadProgram ($95,611,534)

57

Page 62: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

Unincorporated Improvement (District F)Sandalfoot Cove Canal Spray Treatment ($7,920)Bishoff Road, dead end to Jog Road (120,000)Palm Springs Canal 11 Rd., Eric Terrace, Lone Pineway & Child St. Improvements (231,000)Balance Brought Forward Adjustment (110,391)Total ($469,311)

Total Street & Drainage Program ($469,311)

STREET AND DRAINAGE PROGRAM

58

Page 63: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

AIRPORT PROGRAM

Airport Capital ProjectsRoof of Air Cargo building at PBIA ($275,000)Balance Brought Forward Adjustment 36,199Total ($238,801)

Airports Improvement & DevelopmentPBIA Terminal Apron ($13,616)Return Funds- FAA Grant to rehabilitate taxiway Alpha, extend Romeo, & Improv 1,836,241Gate Replacement phase three at PBIA (1,834,596)Update the Airports' Master Plan Study at various PBC airports (94,531)Runway 10R-28L Rehabilitation project at PBIA (291,181)PBIA Baggage Handling System Operation and Maintenance (7,738,658)Runway Designation Re-Marking & Airfield Signage at PBC Glades Airport (19,850)Runway Designation Re-Marking & Airfield Signage at North PBC Airport (74,194)Runway Designation Re-Marking & Airfield Signage at PBC Park Airport (125,000)Building 3400 HVAC & Roofing Improvements at PBIA (757,867)Construct hangars at PBC Glades Airport (190,000)PBIA Golf View Apron (2,997)Returned funds for land acquisition at Pahokee (grant terminated) 22,961Change order #2 for air handler replacement at PBIA (259,829)Runway pavement rehabilitation & repair at North PBC General Aviation Airport (1,372,188)Runway 3-21 Rehabilitation at PBC Pak Airport (180,000)Cargo facilities access improvements at PBIA (1,135,000)Infrastructure improvements to access roadways and utility corridors for hotel (1,500,000)New parking revenue center at PBIA (1,304,773)Grant match for Fuel Farm at PBC Park Airport (200,000)Golfview commercial property acquistion (4,704,879)Wetland Wildlife Hazard Mitigation at North PBC General Aviation Airport (254,964)Balance Brought Forward Adjustment 2,031,995Total ($18,162,926)

Airport Passenger Facility ChargeNorth Terminal/east Remote Apron pavement rehabilitation ($402,000)Transfer to Airports Improvement & Development Fund-Airfield pavement rehab. ($614,513)Balance Brought Forward Adjustment (2,933,777)Total ($3,950,290)

(Continued Next Page)

59

Page 64: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

AIRPORT PROGRAM

Noise Abatement & MitigationBalance Brought Forward Adjustment $7,378Total $7,378

Airport Restricted Asset FundCorrection of posting error $900,000Balance Brought Forward Adjustment 1,831Total $916,587

Debt Service 69M PBIA Rev Bonds 2006A Balance Brought Forward Adjustment ($1,559)Total ($1,559)

Total Airport Program (21,429,611)

60

Page 65: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYRESERVE ACCOUNT ACTIVITY

FISCAL YEAR 2017

WATER UTILITIES PROGRAM

Capital Improvements Construction of PW-11 in Glades Region $485,000Repair/Replacement of water infrastructure in the Glades Region 1,500,000Balance Brought Forward Adjustment 2,226,992Total $4,211,992

WUD FPL Reclaimed Water Renewal & Replacement Balance Brought Forward Adjustment $553,559Total $553,559

WUD FPL Debt Service Coverage Fund Balance Brought Forward Adjustment ($735,047)Total ($735,047)

Total Water Utilities Program 4,030,504

61

Page 66: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

62

Page 67: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

CLAIMS ON RESERVES This section summarizes various reserves and approved project claims by program.

Projects in later years of the Capital Improvement Program are not included in the claims

section.

63

Page 68: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

CLAIMS ON EXISTING RESERVESFISCAL YEAR 2017

Criminal Justice Program Reserves $2,987,603

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $2,987,603

Environmental Land Program Reserves $2,004,525

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $2,004,525

Fire Rescue Program Reserves $1,149,152

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $1,149,152

General Government Program Reserves $35,722,129

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $35,722,129

64

Page 69: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

CLAIMS ON EXISTING RESERVESFISCAL YEAR 2017

Library Program Reserves $16,615,422

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $16,615,422

Parks & Recreation Program Reserves $7,748,631

Projects With ClaimsBurt Reynolds Park West Side Expansion 248,000Loxahatchee River Battlefield Park Improvement 478,000Off-Highway Vehicle (OHV) Park 25,000Calypso Bay Waterpark Expansion 200,000John Prince Special Events Area 250,000Park Ridge Golf Course Event Pavilion 100,000Burt Aaronson South County Regional Park Phase III 2,225,000Caloosa Park Parking Lot Safety Lighting 180,000Canyon District Park Design and Development 607,000Coconut Cove Waterpark Expansion 200,000Morikami Museum and Japanese Gardens Expansion 1,350,000Veteran's Memorial Park Improvements 700,000

Total Claims $6,563,000

Excess Of Reserves Over (Under) Claims $1,185,631

65

Page 70: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

CLAIMS ON EXISTING RESERVESFISCAL YEAR 2017

Street & Drainage Program Reserves $9,429,974

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $9,429,974

Airport Program Reserves $33,462,422

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $33,462,422

Water Utility Program Reserves $50,216,137

Projects With ClaimsProjects - None $0

Total Claims $0

Excess Of Reserves Over (Under) Claims $50,216,137

66

Page 71: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

ROAD PROGRAM RESERVE

ANALYSIS

67

Page 72: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Currently Budgeted Reserve Balances

Impact Fee Reserves 108,846,470Impact Fees Not Currently Used * (64,680,967)Impact Fees Assignable To Current Projects 44,165,503

FY 2004 Road Program Reserves 709,000FY 2005 Road Program Reserves 2,168,000FY 2006 Road Program Reserves 999,906FY 2007 Road Program Reserves 800,000FY 2008 Road Program Reserves 400,000FY 2009 Road Program Reserves 400,000FY 2010 Road Program Reserves 400,000FY 2011 Road Program Reserves 1,252,000FY 2012 Road Program Reserves 2,465,194FY 2013 Road Program Reserves 2,590,000FY 2014 Road Program Reserves 1,820,000FY 2015 Road Program Reserves 4,958,500FY 2016 Road Program Reserves 7,205,501FY 2017 Road Program Reserves 26,056,496

Total Usable Reserves - Road Program & Impact Fees 96,390,100

Projects With Claims On Reserves

FY 2004 Road Program Project Claims 904,000FY 2005 Road Program Project Claims 3,168,000FY 2006 Road Program Project Claims 3,359,177FY 2007 Road Program Project Claims 3,324,000FY 2008 Road Program Project Claims 3,620,000FY 2009 Road Program Project Claims 1,999,000FY 2010 Road Program Project Claims 5,420,000FY 2011 Road Program Project Claims 2,506,051FY 2012 Road Program Project Claims 7,032,296FY 2013 Road Program Project Claims 7,158,872FY 2014 Road Program Project Claims 5,200,000FY 2015 Road Program Project Claims 9,159,500FY 2016 Road Program Project Claims 13,855,501FY 2017 Road Program Project Claims ** 10,979,496Total Claims 77,685,893

Excess Of Reserves Over (Under) Claims 18,704,207

Sweep Reserve BalancesSweep Reserves 75,392,798

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

ROAD PROGRAM RESERVE ANALYSISFISCAL YEAR 2017

* This amount represents impact fee reserves which are not assigned to projects in the current budget year or prior years of the Road Program. Currently, $3,064,950 is available for allocation in Zone 1 Impact Fee reserves, $18,438,776 is available for allocation in Zone 2 Impact Fee reserves, $8,590,822 is available for allocation in Zone 4 Impact Fee reserves and $34,586,419 is available for allocation in Zone 5 Impact Fee reserves. These reserves can only be used for projects in their respective Zones.

** This amount includes $256,496 reserved for balances forward which will be used to fund the FY 2017 Road Program.

68

Page 73: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

FY 2004 Road Program Projects With Claims Cost Phase

Park Ave West 13th Street to Old Dixie Hwy 195,000 S/DReserve-R/W Countywide 709,000 R

Total FY 2004 Project Claims 904,000

FY 2005 Road Program Projects With Claims Cost Phase

Reserve-Plans/Align. Countywide 668,000 D/SReserve-R/W Countywide 1,500,000 RSeminole Pratt Whitney Rd. PGA to Bee Line Hwy. 1,000,000 R/M

Total FY 2005 Project Claims 3,168,000

FY 2006 Road Program Projects With Claims Cost Phase

Australian Ave. Banyan Blvd. to 45th St. 456,564 S/DReserve-Plans/Align. Countywide 450,000 D/SReserve-R/W Countywide 500,000 RSR 7 S. of Lake Worth Rd. to N. of S.R. 80 714,121 D/R/C/PSeminole Pratt Whitney Rd. N. of Sycamore Dr. to High School 358,586 CSeminole Pratt Whitney Rd. Northlake Blvd. 830,000 D/R

Total FY 2006 Project Claims 3,359,177

FY 2007 Road Program Projects With Claims Cost Phase

Community Dr. Military Tr. 250,000 D/RNorthlake Blvd. Seminole Pratt Whitney Rd. to Coconut Blvd. 989,000 R/MPersimmon Blvd. N. Ext. 110th Ave. to 60th Street 370,000 D/R/MReserve-Plans/Align. Countywide 400,000 D/SReserve-R/W Countywide 400,000 RSeminole Pratt Whitney Rd. Northlake Blvd. 570,000 R/MSilver Beach Rd. E. of Congress Ave. to Old Dixie Hwy. 345,000 R

Total FY 2007 Project Claims 3,324,000

FY 2008 Road Program Projects With Claims Cost Phase

Acreage Access Rd Persimmon Blvd to 60th Street 60,000 D/R/MCentral Blvd Indiantown Rd. Intersection Improvement 250,000 DCommunity Dr Military Trail Intersection Imp 500,000 D/RReserves-Plans & Alignment Countywide 200,000 D/SReserves-ROW Countywide 200,000 RSeminole Pratt SR 80 to S of Okeechobee 270,000 R/CSeminole Pratt Orange to S of Northlake Blvd 850,000 RSeminole Pratt Northlake Blvd Intersection Imp 1,000,000 R/M/CSilver Beach Rd E of Congress to Old Dixie Hwy 290,000 R

Total FY 2008 Project Claims 3,620,000

PHASE CODE: B=BEAUTIFICATION C = CONSTRUCTION R = RIGHT OF WAY S=STUDY D = DESIGN P = PAYMENT M = MITIGATION

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

ROAD PROGRAM RESERVE ANALYSISFISCAL YEAR 2017

69

Page 74: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PHASE CODE: B=BEAUTIFICATION C = CONSTRUCTION R = RIGHT OF WAY S=STUDY D = DESIGN P = PAYMENT M = MITIGATION

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

ROAD PROGRAM RESERVE ANALYSISFISCAL YEAR 2017

FY 2009 Road Program Projects With Claims Cost Phase

60th Street W. of Royal Palm Blvd to Persimmon Blvd N Ext 100,000 R/MCommunity Dr Military Trail Intersection Imp 590,000 R/MNorthlake Blvd Seminole Pratt to Coconut Blvd 909,000 RReserves-Plans & Alignment Countywide 200,000 S/D/MReserves-ROW Countywide 200,000 R

Total FY 2009 Project Claims 1,999,000

FY 2010 Road Program Projects With Claims Cost Phase

Central Blvd. Indiantown Rd. 100,000 RDonald Ross Road and I-95 725,000 DLyons Rd. S. of L.W.D.D. L-11 Canal to N. of L.W.D.D. L-10 Canal 195,000 R/MOld Dixie Hwy Park Ave. to Northlake Blvd. 400,000 D/R/MReserve-Plans/Align. Countywide 200,000 S/D/MReserve-R/W Countywide 200,000 RSeminole Pratt Whitney Rd. SR 80 to S. of Okeechobee Blvd. 1,500,000 CSeminole Pratt Whitney Rd. S. of Okeechobee Blvd. to N. of Sycamore Dr. 2,100,000 C

Total FY 2010 Project Claims 5,420,000

Total FY 2011 Project Claims Cost Phase

Central Blvd. Indiantown Rd. 500,000 RCentral Blvd. Indiantown Rd. to Longshore Dr. 454,051 CCongress Ave. Hypoluxo Rd. 200,000 D/RIntersection Program Countywide 852,000 D/R/M/CReserve-Plans/Align. Countywide 200,000 S/D/MReserve-R/W Countywide 200,000 RSilver Beach Rd. E of Congress Ave to Old Dixie Hwy 100,000 D/R

Total FY 2011 Project Claims 2,506,051

Total FY 2012 Project Claims Cost Phase

45th Street I-95 to Congress Ave. Intersection Improvements 80,000 S60th Street E. of Royal Palm Beach Blvd to SR 7 Extension 1.0 mi, 3 L 323,089 CCentral Blvd. Indiantown Rd. Intersection Improvements 300,000 R/CCommunity Dr. Military Trail Intersection Improvements 2,679,000 RHaverhill Rd. S of LWDDL-14 Canal to Lake Worth Rd 1.3 mi, 4 L & 5 L 213,000 R/MIntersection Program Countywide 200,000 D/R/M/CLyons Rd Lantana Rd to Lake Worth Rd 2.0 mi, 4 L 100,000 E/MReserve-Plans/Align. Countywide 100,000 S/D/MReserve-Roads Countywide 350,000 P/CReserve-R/W Countywide 100,000 RS.R. 7 Extension Persimmon Blvd. to 60th St. 1.0 mi, 2/4 L 2,587,207 C

Total FY 2012 Project Claims 7,032,296

70

Page 75: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PHASE CODE: B=BEAUTIFICATION C = CONSTRUCTION R = RIGHT OF WAY S=STUDY D = DESIGN P = PAYMENT M = MITIGATION

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

ROAD PROGRAM RESERVE ANALYSISFISCAL YEAR 2017

Total FY 2013 Project Claims

Atlantic Ave SR 7 to W of Lyons Rd. 10,000 DAustralian Ave 7th St. to 15th St. ,0.6 mi, 5/6 L 40,000 RCongress Ave. Hypoluxo Rd. to Donnelly Dr., 0.7 mi, 4 L 688,872 CCongress Ave. N. of Northlake Blvd. to Alt. A-1-A .6 mi, 2 L & 3 L 1,350,000 D/R/MDonald Ross Road and I-95 1,000,000 PGlades Rd. Florida's Turnpike Intersection Improvements 100,000 DIntersection Program Countywide 690,000 D/R/M/CLyons Rd Kimberly Blvd Intersection Improvements 30,000 CLyons Rd Lantana Rd to Lake Worth Rd. 2.0 mi, 4 L 1,300,000 R/MLyons Rd Lake Worth Rd, to N. of LWDD L-10 Canal, 1.0 mi, 2 L 1,000,000 R/MNorthlake Blvd. Seminole Pratt Whitney Rd. to Coconut Blvd. 300,000 D/R/MOld Dixie Hwy. Park Ave to Northlake Blvd 0.9 mi, 3 L 250,000 RReserve-Plans/Align. Countywide 200,000 S/D/MReserve-R/W Countywide 200,000 R

Total FY 2013 Project Claims 7,158,872

Total FY 2014 Project Claims

Australian Ave 7th St. to 15th St. ,0.6 mi, 5/6 L 450,000 R/CCongress Ave. N. of Northlake Blvd. to Alt. A-1-A .6 mi, 2L 550,000 D/R/MOld Dixie Hwy. Park Ave to Northlake Blvd 0.9 mi, 3 L 2,200,000 RPGA Blvd. Military Trail Intersection Improvements 180,000 DReserve-Intersections Countywide 1,420,000 S/D/R/M/CReserve-Plans/Align. Countywide 200,000 S/D/MReserve-R/W Countywide 200,000 R

Total FY 2014 Project Claims 5,200,000

Total FY 2015 Project Claims

60th Street North 140th Ave. N. to E. of 120th Ave. N. 900,000 D/R60th Street North W. of Royal Palm Beach Blvd. To E. of Royal Palm Beach Blvd. 500,000 CClint Moore Rd. E. of Congress Ave. to E. of L.W.D.D. E-4 Canal 200,000 DConnector Lyons Rd. to Acme Dairy Rd. 175,000 S/DFlavor Pict Rd SR 7 to Lyons Rd 67,000 MFlorida Mango Rd. over L.W.D.D. L-6 C N. of Myrica Rd. to Summit Blvd. 150,000 D/RGateway Blvd. High Ridge Rd. Intersection Improvements 15,000 DGlades Rd. Florida Turnpike Intersection Improvements 220,000 PHaverhill Rd N. of Caribbean Blvd to Bee Line Hwy 419,000 R/MJog Rd. S. of Hypoluxo Rd. to 10th Ave. N. 40,000 S/DLyons Rd. Hillsboro Canal to SW 18th Street 50,000 RLyons Rd. Clint Moore Rd to Atlantic Ave 2,800,000 R/MNorthlake Blvd S.R. 710 to Military Tr. 50,000 S/DPalmetto Park Rd. Bascule Bridge over Intracoastal Waterway Rehab/Painting 500,000 DReserve-Intersections Countywide 2,423,500 S/D/R/M/CReserve-Plans/Align. Countywide 200,000 S/D/MReserve-R/W Countywide 200,000 RS.W. 18th St. Military Trail 250,000 D/R

Total FY 2015 Project Claims 9,159,500

71

Page 76: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PHASE CODE: B=BEAUTIFICATION C = CONSTRUCTION R = RIGHT OF WAY S=STUDY D = DESIGN P = PAYMENT M = MITIGATION

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

ROAD PROGRAM RESERVE ANALYSISFISCAL YEAR 2017

Total FY 2016 Project Claims

6th Ave. S. over Lake Osborne Dr. 790,000 D/RAustralian Ave Palm Beach Lakes Blvd. Intersection Improvements 170,000 DCenter St. Thelma Ave. to Woodland Estates Dr. 50,000 RChurch St. Limestone Creek Rd. to W. of Central Blvd 350,000 D/R/MClint Moore Rd. E. of Congress Ave. to E. of L.W.D.D. E-4 Canal 200,000 DCongress Ave. N. of Northlake Blvd. to Alt. A-1-A 50,000 DCR 880 (Old SR 80) Rehabilitation 366,000 CFlavor Pict Rd SR 7 to Lyons Rd 80,000 D/RFlorida Mango Rd. over L.W.D.D. L-8 C Edgewater Drive to Barbados Rd. 220,000 DFlorida Mango Rd. over L.W.D.D. L-6 C N. of Myrica Rd. to Summit Blvd. 250,000 D/RGlades Rd. Butts Rd. Intersection Improvements 100,000 R/PHaverhill Rd S. of LWDD L-14 Canal to Lake Worth Rd. 400,000 R/M/CHood Rd. Central Blvd. Intersection Improvements 200,000 R/MJog Rd. Roebuck Rd. Intersection Improvements 50,000 DLake Worth Rd. Jog Rd. Intersection Improvements 200,000 S/D/RLyons Rd. Lantana Rd. to N. of LWDD L-14 Canal 1,300,000 CLyons Rd. N. of LWDD L-14 Canal to Lake Worth Rd. 400,000 D/RLyons Rd. Lake Worth Rd. to S. of LWDD L-11 Canal 300,000 DNorthlake Blvd E. of Seminole Pratt Whitney Rd to E. of Hall Blvd 500,000 D/RNorthlake Blvd E. of Hall Blvd to Coconut Blvd 2,500,000 D/R/MNorthlake Blvd Military Trail Intersection Improvements 150,000 ROld Dixie Hwy. Yamato Rd. to Linton Blvd. 2,000,000 R/MPGA Blvd. Ellison Wilsons Rd. Intersection Improvements 60,000 CReserve-Bridges/Culverts Countywide 150,000 S/D/R/M/CReserve-Intersections Countywide 1,464,501 D/R/M/CReserve-Plans/Align. Countywide 200,000 S/D/MReserve-Railroad Crossings Countywide 195,000 D/C/PReserve-R/W Countywide 300,000 RRoebuck Rd Jog Rd. to Haverhill Rd. 250,000 D/RRoyal Palm Beach Blvd. M-Canal to S. of Orange Blvd. 400,000 R/MSeminole Pratt Witney Rd. Seminole Ridge H.S. to 60th St. North 160,000 D/PS.R.7. S.R. 710 to S. of 150th Ct. N. 50,000 R/P

Total FY 2016 Project Claims 13,855,501

Total FY 2017 Project Claims

6th Ave. S. over Lake Osborne Dr. 300,000 D10th Ave N. Boutwell Rd Intersection Improvements 50,000 D/R45th St Military Trail Intersection Improvements 50,000 D/R60th St N. 140th Ave to E of 120th Ave N. 1,100,000 D/RBenoist Farms Rd. S.R. 80 to Belvedere Rd. 60,000 DCenter St. Thelma Ave. to Woodland Estates Dr. 100,000 CChurch St. Limestone Creek Rd. to W. of Central Blvd. 300,000 D/R/MClint Moore Rd Oaks Club Dr to Long Lake Dr 400,000 D/RCongress Ave N. of Okeechobee Blvd. to Ware Dr. Culvert 50,000 RCongress Ave Palm Beach Lakes Blvd. Intersection 400,000 RCR880 (Old SR80) over C-51 Canal Bridge Replacement 100,000 D/R/MFlorida Mango Rd N. of Myrica Rd. to Summit Blvd. 300,000 D/RGateway Blvd Military Trail Intersection 300,000 RGlades Rd. Butts Rd., Intersection Improvements 30,000 DHaverhill Rd. N of Caribbean Blvd to Bee Line Hwy 500,000 R/CHood Road Central Blvd Intersection Imp. 300,000 CKirk Rd over LWDD L-5 Canal Bridge Replacement 300,000 CLawrence Rd Ponza Place to Lantana Rd 300,000 D/R

72

Page 77: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PHASE CODE: B=BEAUTIFICATION C = CONSTRUCTION R = RIGHT OF WAY S=STUDY D = DESIGN P = PAYMENT M = MITIGATION

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

ROAD PROGRAM RESERVE ANALYSISFISCAL YEAR 2017

Linton Blvd S. Federal Highway Intersection Improvements 50,000 DLyons Rd. Lake Worth Rd. to S. of L.W.D.D. L-11 Canal 60,000 DNorthlake Blvd. E. of Hall Blvd. to Coconut Blvd 50,000 DNorthlake Blvd. Military Trail Intersection 193,000 CPalmetto Park Rd SW 7th Ave to SW 5th Ave 50,000 DReserves-Intersections Countywide 1,600,000 D/R/M/CReserves-Study/Drainage/Plans/Alignme Countywide 300,000 S/D/MReserves-Railroad Crossings Countywide 600,000 D/C/PReserves-ROW Countywide 300,000 RSherwood Forest Blvd over LWDD L-8 Canal 150,000 CSouthern Blvd Lyons Rd/Sanbury's Way 1,930,000 PYamato Rd Lakeridge Blvd to W. of Florida's Turnpike 500,000 D/R

Total FY 2017 Project Claims 10,979,496

73

Page 78: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

74

Page 79: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

CONTRACTS AWARDED This section shows all of the significant capital contracts which have been awarded

during the reporting period. The activity is listed in order by the date the contract was

approved by the Board of County Commissioners. The report also gives a description of

the project and vendor. The contract amount and managing department are also

provided.

75

Page 80: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Engineering Task Order to the annual contract, R2014-0120, in the amount of $142,170, with WantmanGroup, Inc. (WGI), for professional services for the Prairie Road over Lake WorthDrainage District L-8 Canal Bridge Replacement project.

10/18/2016 $142,170

Airports Amendment No. 10 to the Construction Manager (CM) at Risk Contract with the MorgantiGroup, Inc. for CM at Risk Services for Task M-22: Gate Desk Replacement Phase 3 atPalm Beach International Airport (PBIA) in the amount of $1,698,700 and 210 calendardays.

10/18/2016 $1,698,700

Facilities Consultant Services Authorization (CSA) No. 20 with Colom & Associates, Inc. (R2014-1916) to provide architectural engineering services for the Water Utilities DepartmentWater Treatment Plant (WUD WTP) No. 11 Membrane Building Addition/Renovationsand New Storage Building (project) in the amount of $151,062.

10/18/2016 $151,062

Facilities Consultant Services Authorization (CSA) No. 6 with Wantman Group, Inc. (WGI) (R2014-0120) to provide structural engineering/architectural services for the Water UtilitiesDepartment Western Facilities Hurricane Hardening project in the amount of $118,902.

10/18/2016 $118,902

Water Utilities

Work Authorization (WA) No. 5 for the Emergency 30" Force Main Repair on 40th StreetNorth (Project) with Johnson-Davis Incorporated in the amount of $657,444.19

10/18/2016 $657,444

Enviromental Resources

Work Order No. 0650-3 to the Palm Beach County Artificial Reef & Breakwater AnnualContract, Project No. 2015ERM01 (R2015-0650) with Coston Marine Services, Inc.provides for the West Palm Beach Living Shoreline Currie and Osprey Park Project at acost not to exceed $525,714.97 beginning August 29, 2016 through December 27, 2016.

10/18/2016 $525,715

Water Utilities

Work Authorization (WA) No. 3 for CD03 South County Water Services ReplacementPhase 4 (Project) with Johnson-Davis Incorporated in the amount of $1,420,634.13.

11/1/2016 $1,420,634

Enviromental Resources

Task Assignment No. GC896-01 to DEP Contract No. GC896 (R2016-0787) with theFlorida Department of Environmental Protection (FDEP) which provides ongoing sitemanagement activities for 173 petroleum contamination sites for a not to exceed amount of$774,199.

11/1/2016 $774,199

Airports Contract with Ranger Construction Industries, Inc. in the amount of $2,899,617 for theTaxiway A Rehabilitation project at Palm Beach International Airport (PBIA).

11/1/2016 $2,899,617

Airports Amendment No. 9 to the General Consulting Agreement with AECOM Technical Services,Inc. for consulting/professional services in the amount of $1,120,634 and to exercise thesecond one year renewal option for the continued performance of professional planning anddesign services related to the approved Palm Beach County Airports Capital ImprovementProgram.

11/1/2016 $1,120,634

Engineering Work Order 2015053-11 utilizing Palm Beach County's annual asphalt milling andresurfacing contract R2016-0143 with Ranger Construction Industries, Inc. in the amount of$1,295,000 to mill and resurface Military Trail from PGA Boulevard to Donald Ross Road.

11/22/2016 $1,295,000

Engineering Work Order 2015053-12 utilizing the County's Contract with Ranger ConstructionIndustries, Inc. in the amount of $675,000 to mill and resurface Haverhill Road fromOkeechobee Blvd. to Roebuck Road.

11/22/2016 $675,000

Engineering Work Order 2015053-13 in the amount of $1,070,000 to mill and resurface Jog Road fromsouth of Clint Moore Road to Linton Boulevard utilizing Palm Beach County's annualasphalt milling and resurfacing contract R2016-0143 with Ranger Construction Industries,Inc.

11/22/2016 $1,070,000

Engineering Task Order to the annual contract, R2014-0892, in the amount of $135,136.71, with HSQGroup, Inc. (HSQ), for professional services for the Palm Beach Lakes Boulevard andNorth Robbins Drive intersection improvements.

11/22/2016 $135,137

76

Page 81: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Engineering Work Order 2015053-10 (Work Order) in the amount of $950,000 to mill and resurfaceGun Club Road from Jog Road to Congress Avenue (Improvements) utilizing Palm BeachCounty s (County) annual asphalt milling and resurfacing contract R2016-0143 (Contract)with Ranger Construction Industries, Inc. (Ranger).

11/22/2016 $950,000

Airports Contract with Ranger Construction Industries, Inc. in the amount of $2,149,892.64 for theRunway 10R-28L Rehabilitation project at Palm Beach International Airport (PBIA).

11/22/2016 $2,149,893

Engineering Contract with Lambert Bros., Inc. (Lambert) in the amount of $1,127,274.30 for theconstruction of the Palmwood Road Slope Stabilization Project, from 750 feet north ofDonald Ross Road to Susan Avenue (Project).

12/6/2016 $1,127,247

Airports Contract with A1 Property Services Group, Inc. in the amount of $757,867 for Building3400 Heating, Ventilating and Air Conditioning (HVAC) and Roof Improvements at PalmBeach International Airport (PBIA).

12/6/2016 $757,867

Facilities Contract with The Airtex Corporation in the amount of $409,000 for the Southern RegionOperation Center (SROC) Building A Heating Ventilation and Air Conditioning (HVAC)Replacement Project.

12/6/2016 $409,000

Water Utilities

Amendment No. 2 to the Water Utilities Department (WUD) Lift Station RehabilitationContinuing Construction Contract (Contract) with Hinterland Group, Inc., renewing theContract for an additional one year and increasing the Contract amount by $2,000,000.

12/6/2016 $2,000,000

Water Utilities

Contract for Professional Consultation/Engineering Services (Contract) with CESConsultants, Inc. for the Water Main Improvements Project (Project) in the amount of$496,389.63.

12/6/2016 $496,390

Water Utilities

Contract for Professional Consultation/Engineering Services (Contract) with JLAGeosciences, Inc. for the System-wide Wellfield Improvements Hydrogeologic,Engineering Design and Construction Services (Project) in the amount of $3,195,573.10.

12/6/2016 $3,195,573

Enviromental Resources

Work Order No. 1825-07 to the Palm Beach County Dune & Wetland Restoration AnnualContract (Contract) (R2013-1825), Project No. 2013ERM01 with Eastman AggregateEnterprises, LLC (Eastman) for an amount not-to-exceed $1,409,288.10 providing for dunerestoration services for the Singer Island Dune Restoration (Project) for a period of fifty-seven calendar days.

12/6/2016 $1,409,288

Engineering Task Order to the annual contract, R-2014-0119, in the amount of $113,642.62, with AlanGerwig & Associates, Inc. (AGA), for professional services for the Davis Road over LakeWorth Drainage District L-6 Canal bridge replacement project (Project).

12/20/2016 $113,643

Engineering Task Order to the annual agreement, R-2013-0415, in the amount of $133,690.25, withSimmons & White, Inc. (S&W), for professional services for the Church Street fromLimestone Creek Road to west of Central Boulevard project (Project).

12/20/2016 $133,690

Engineering Work Order No. 2013052-021 (Work Order) in the amount of $441,000 to mill andresurface Le Chalet Boulevard from Jog Road to Military Trail (Improvements) utilizingPalm Beach County s (County) annual asphalt milling and resurfacing contract R-2013-0235 with Community Asphalt Corp.

12/20/2016 $441,000

Airports Amendment No. 5 to the General Consulting Agreement with CH2M Hill, Inc., forConsulting/Professional Services in the amount of $1,342,596.14 and to exercise the secondone year renewal option for the continued performance of professional planning and designservices related to the approved Palm Beach County Airports Capital ImprovementProgram.

12/20/2016 $1,342,596

Water Utilities

Work Authorization No. 26 with Globaltech, Inc., for the Water Treatment Plant No. 11(WTP No. 11) Variable Frequency Drive (VFD) Replacements for Membrane Feed Pumps1 and 4 and High Service Pumps 1 and 2 in the amount of $399,743.75.

12/20/2016 $399,744

77

Page 82: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Enviromental Resources

Work Order No. ERM 14C-08 to the Palm Beach County Annual Pathway and MinorConstruction Contract Project No. 2013051 (R-2013-0427) with Wynn and SonsEnvironmental Construction Co., Inc., not to exceed $542,866.90 to construct public usefacilities at the Winding Waters Natural Area.

12/20/2016 $542,867

Engineering First Amendment to the annual asphalt milling and resurfacing contract R2016-0143 withRanger Construction Industries, Incorporated (Ranger), dated February 9, 2016, to increasethe amount of the contract in a not to exceed amount from $11,000,000 to $14,000,000, andto extend the contract expiration date from February 8, 2017, to February 8, 2018.

1/10/2017 $3,000,000

Engineering First Amendment to the annual roadway pathway & minor construction contract R2016-0230, Project No. 2015055, dated March 1, 2016, with Wynn & Sons EnvironmentalConstruction Company, Incorporated (Wynn & Sons) to increase the amount of the contractby $1,600,000 and to extend the expiration date from February 28, 2017, to February 28,2018.

1/10/2017 $1,600,000

Engineering First Amendment to the annual roadway pathway & minor construction contract R2016-0231, Project No. 2015056 (Federalized), dated March 1, 2016, with Wynn & SonsEnvironmental Construction Company, Incorporated (Wynn & Sons) to increase the amountof the contract by $260,000 and to extend the expiration date from February 28, 2017, toFebruary 28, 2018.

1/10/2017 $260,000

Facilities Amendment No. 2 to the contract with Robling Architecture Construction, Inc. (R2016-0762) in the amount of $406,252 for the temporary Golf Learning Center at Osprey PointGolf Course project in Boca Raton establishing a Guaranteed Maximum Price (GMP).

1/10/2017 $406,252

Water Utilities

Contract with Hinterland Group, Inc. for the Water Utilities Department (WUD) PipelineContinuing Construction Contract (Contract) for a 24-month term with the option of one 12-month renewal in the amount of $22,637,321.63.

1/10/2017 $22,637,322

Water Utilities

Consultant Services Authorization (CSA) No. 15 for the Water Treatment Plant (WTP) No.2 Expansion Study (Project) with Kimley-Horn and Associates, Inc. in the amount of$173,892.60.

1/10/2017 $173,893

Water Utilities

Contract with Southern Underground Industries, Inc. for the Water Main Extensionconnecting State Road 15 to State Road 80 Project in Belle Glade in the amount of$687,900.

1/10/2017 $687,900

Water Utilities

Work Authorization (WA) No. 7 for the Force Main Improvements on Lyons Road fromNorte Lago to north of Pine Springs Drive (Project) with Johnson-Davis Incorporated in theamount of $813,782.69.

1/10/2017 $813,783

Water Utilities

Work Authorization (WA) No. 10 for the East Central Water Reclamation Facility(ECRWRF) Improvements Phase 2 Project with Globaltech, Inc., in the amount of$1,247,150.76.

1/10/2017 $1,247,151

Engineering Task Order to the annual contract, R-2014-0119, in the amount of $113,642.62, with AlanGerwig & Associates, Inc. (AGA), for professional services for the Davis Road over LakeWorth Drainage District L-6 Canal bridge replacement project (Project).

1/24/2017 $113,643

Engineering Task Order to the annual agreement, R-2013-0415, in the amount of $133,690.25, withSimmons & White, Inc. (S&W), for professional services for the Church Street fromLimestone Creek Road to west of Central Boulevard project (Project).

1/24/2017 $133,690

Engineering Work Order No. 2013052-021 (Work Order) in the amount of $441,000 to mill andresurface Le Chalet Boulevard from Jog Road to Military Trail (Improvements) utilizingPalm Beach County s (County) annual asphalt milling and resurfacing contract R-2013-0235 with Community Asphalt Corp.

1/24/2017 $441,000

78

Page 83: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Airports Amendment No. 5 to the General Consulting Agreement with CH2M Hill, Inc., forConsulting/Professional Services in the amount of $1,342,596.14 and to exercise the secondone year renewal option for the continued performance of professional planning and designservices related to the approved Palm Beach County Airports Capital ImprovementProgram.

1/24/2017 $1,342,596

Water Utilities

Work Authorization No. 26 with Globaltech, Inc., for the Water Treatment Plant No. 11(WTP No. 11) Variable Frequency Drive (VFD) Replacements for Membrane Feed Pumps1 and 4 and High Service Pumps 1 and 2 in the amount of $399,743.75.

1/24/2017 $399,744

Enviromental Resources

Work Order No. ERM 14C-08 to the Palm Beach County Annual Pathway and MinorConstruction Contract Project No. 2013051 (R-2013-0427) with Wynn and SonsEnvironmental Construction Co., Inc., not to exceed $542,866.90 to construct public usefacilities at the Winding Waters Natural Area.

1/24/2017 $542,867

Engineering Contract with Rosso Site Development, Inc. (Rosso) in the amount of $592,582.07 for theconstruction of Connector Road from Lyons Road to Acme Dairy Road (Project).

2/7/2017 $592,582

Water Utilities

Utility Work by Highway Contractor Agreement (At Utility Expense) (UWHCA) with theFlorida Department of Transportation (FDOT) in the amount of $419,053.32.

2/7/2017 $419,053

Water Utilities

Sole Source Term Contract (Contract) with Siemens Demag Delaval Turbomachinery, Inc.(Siemens) for Turblex Blower Model KA22SV-GL225 OEM Parts & Service, over a five-year term in an amount not to exceed $1,250,000 with no renewal options.

2/7/2017 $1,250,000

Engineering Contract with Ferreira Construction Southern Division Co., Inc. (Ferreira) in the amount of$791,834.15 for the construction of Gun Club Road over the Lake Worth Drainage District(LWDD) E-3 Canal (Project).

3/14/2017 $791,834

Engineering Contract with Ferreira Construction Southern Division Co., Inc. (Ferreira) in the amount of$297,391 for the construction of Summit Boulevard over Lake Worth Drainage District(LWDD) E-3 Canal.

3/14/2017 $297,391

Engineering Annual Traffic Loops Contract, Project No. 2017050, with AUM Construction, Inc.(AUM), in an amount not to exceed the total value of $1,000,000 for task orders.

3/14/2017 $1,000,000

Engineering Annual Guardrail Contract, Project No. 2017052, with Southeast Highway Guardrail andAttenuators, LLC (Southeast), in an amount not to exceed the total value of $300,000 fortask orders.

3/14/2017 $300,000

Engineering Annual Traffic Signal Contract, Project No. 2017051, with Gerelco Traffic Controls, Inc.(Gerelco), in an amount not to exceed the total value of $3,000,000 for task orders.

3/14/2017 $3,000,000

Engineering Work Order 2015055-55 (Work Order) in the amount of $355,918.50 for the constructionof a concrete and asphalt pathway on Haverhill Road from north of Caribbean Boulevard tothe north entrance of Dyer Park (Project) utilizing Palm Beach County s (County) annualpathway and minor construction contract R2016-0230 (Contract) with Wynn & SonsEnvironmental Construction Co. Inc. (Wynn).

3/14/2017 $355,919

Engineering Contract with Weekley Asphalt Paving, Inc. (Weekley) in the amount of $1,225,347.98 forthe construction of Southwest 18th Street & Military Trail intersection improvements.

3/14/2017 $1,225,348

Airports Change Order No. 4 to the contract with Ranger Construction Industries, Inc. in the amountof $180,749.50 and 62 calendar days to construct Golfview Infrastructure, Phase 1 at PalmBeach International Airport (PBIA).

3/14/2017 $180,750

Airports Change Order No. 2 to Amendment No. 8 (Task M-18) to the Construction Manager (CM)at Risk Contract with The Morganti Group, Inc. for air handler replacement at Palm BeachInternational Airport (PBIA) in the amount of $259,828.87 and 6 calendar days.

3/14/2017 $259,829

79

Page 84: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Facilities Amendment No. 1 to the contract with Robling Architecture Construction, Inc. (R2016-0762) in the amount of $1,219,255 for improvements to the Water Utilities CentralRegional Operations Center (WUD CROC) Building 10 (Administration), Building 1(Operations & Maintenance), Building 2 (Meter Shop) and Building 6 (Storage) in WestPalm Beach establishing a Guaranteed Maximum Price (GMP).

3/14/2017 $1,219,255

Facilities Amendment No. 1 to the contract with Trillium Construction, Inc. (R2016-0764) in theamount of $2,153,000 for the Water Utilities Department Water Treatment Plant (WUDWTP) No. 11, in Belle Glade, Membrane Building Addition/Renovations projectestablishing a Guaranteed Maximum Price (GMP).

3/14/2017 $2,153,000

Facilities Consultant Services Authorization (CSA) No. 5 with Leo A. Daly Company (R2015-1459)to provide design and construction administration services for PBSO Detention FacilitiesRenewal/Replacement (R/R) Phase 2A in the amount of $578,496.

3/14/2017 $578,496

Water Utilities

Contract with Florida Design Drilling Corporation for the Water Treatment Plant (WTP)No. 3 Wellfield Improvements Project (Project) in the amount of $1,396,875.

3/14/2017 $1,396,875

Water Utilities

Work Authorization No. 7 to Hinterland Group, Inc. for Sanitary Sewer Lining ProjectWellfield System 8 (Project) in the amount of $1,040,134.

3/14/2017 $1,040,134

Water Utilities

Contract with Aquifer Maintenance and Performance Systems, Inc. (AMPS) for the System-wide Wellfield Maintenance for Palm Beach County Water Utilities Department (Contract)over a 12-month term in an amount not to exceed $1,189,076 with an option to renew forfour additional 12-month terms.

3/14/2017 $1,189,076

Water Utilities

Consultant Services Authorization (CSA) No. 14 for the Water Treatment Plant 3 WellfieldImprovements Project with JLA Geosciences, Inc. in the amount of $402,798.48.

3/14/2017 $402,798

Enviromental Resources

Work Order No. 0650-5 to the Palm Beach County Artificial Reef & Breakwater AnnualContract (R2015-0650), Project No. 2015ERM01 with Coston Marine Services, Inc. for anamount not-to-exceed $338,259.81 providing for a living shoreline project along BryantPark in Lake Worth for a period of 120 calendar days.

3/14/2017 $338,260

Engineering A Contract with MJC Land Development, LLC (MJC) in the amount of $753,615.60 for thewidening of Drexel Road, from Fair Green Road to 15th Lane North.

4/4/2017 $753,616

Airports Professional Services Agreement with HDR Engineering, Inc. in the amount of$1,229,026.38 for the performance of professional airfield design and engineering servicesin support of airfield pavement rehabilitation and reconstruction improvements at PalmBeach International Airport (PBIA).

4/4/2017 $1,229,026

Water Utilities

Change Order No. 1 with R.J. Sullivan Corp. for the Water Treatment Plant (WTP) No. 8Anion Exchange System (Project) in the amount of $111,894.64 with a 61-day time

4/4/2017 $111,895

Engineering Work Order 2015053-24 (Work Order) in the amount of $535,000 to mill and resurface thecounty-maintained residential streets within the Royal Palm Estates Subdivision Parcels 1-4(Improvements) utilizing Palm Beach County s (County) annual asphalt milling andresurfacing contract R2016-0143 (Contract) with Ranger Construction Industries, Inc.(Ranger).

5/2/2017 $535,000

Engineering Work Order 2015053-25 (Work Order) in the amount of $250,000 to mill and resurface thecounty-maintained residential streets within the Indian Wells subdivision (Improvements)utilizing Palm Beach County s (County) annual asphalt milling and resurfacing contractR2016-0143 (Contract) with Ranger Construction Industries, Inc. (Ranger).

5/2/2017 $250,000

Engineering Work Order 2015053-26 in the amount of $270,000 to mill and resurface Browns FarmRoad from approximately ten miles south of CR880 to approximately twelve miles south ofCR880 utilizing Palm Beach County s (County) annual asphalt milling and resurfacingcontract R2016-0144 (Contract) with Community Asphalt Corp. (Community).

5/2/2017 $270,000

80

Page 85: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Engineering Work Order 2015053-27 in the amount of $395,000 to mill and resurface CR880 from SamSenter Road to the east for two miles utilizing the County s contract with Community.

5/2/2017 $395,000

Engineering Contract with Dickerson Florida, Inc. (Dickerson) in the amount of $889,634 for theconstruction of County Road 880 Twenty Mile Bend Slope Protection Phase III (Project).

5/2/2017 $889,634

Airports Amendment No. 6 to the Construction Manager at Risk (CMAR) Contract with The WeitzCompany, LLC for Terminal Improvements at Palm Beach International Airport (PBIA) tocomplete Task W-6: Cargo Building 1475 Roof Improvements at PBIA in the amount of$2,714,988 and 230 Calendar Days, and exercising the third and final one-year renewaloption for the continuation of services

5/2/2017 $2,714,988

Facilities Contract with One Call Property Services, Inc. in the amount of $797,945 for Palm TranClosed Circuit Television (CCTV) Systems Replacements at the Palm Tran North, West,and 4-Points (Central) Facilities.

5/2/2017 $797,945

Water Utilities

Contract with Hinterland Group, Inc. (Contract) for the 2017 Telemetry InformationManagement Systems (TIMS) Upgrade Project (Project) in the amount of $1,196,008.

5/2/2017 $1,196,008

Water Utilities

Change Order No. 2 with R. J. Sullivan Corp. for the Water Treatment Plant (WTP) No. 8Anion Exchange System Project in the amount of $197,155 with a 35-day time extension tothe final completion date.

5/2/2017 $197,155

Enviromental Resources

Task Order No. 1377-01 to Contract (R2016-1377) with Olsen Associates, Inc. (Olsen) inan amount not to exceed $166,585 providing for professional engineering, design,environmental surveys, reporting, and documentation to be used in preparation of a beachnourishment feasibility study for the North County Comprehensive Shore Protection Project(NCCSPP) Segment II shoreline.

5/2/2017 $166,585

Water Utilities

Work Authorization (WA) No. 1 for the Water and Force Main replacement at Dr. MartinLuther King Jr. Boulevard and SW 10th Street in Belle Glade (Project) with HinterlandGroup Inc. in the amount of $324,736.4

5/16/2017 $324,736

Water Utilities

Work Authorization (WA) No. 4 for the Water Treatment Plant (WTP) No. 9 PermeateFlush Project (Project) with Globaltech Inc., in the amount of $1,999,288.

5/16/2017 $1,999,288

Engineering Contract with Rosso Site Development, Inc. (Rosso) in the amount of $743,903.10 for theconstruction of Wallis Road Pathway, E-3 Canal to Haverhill Road.

6/6/2017 $743,903

Engineering Task order to the annual structural contract R-2017-0027 with R.J. Behar & Company, Inc.(RJB), in the amount of $114,982.89, for professional services for the Florida Mango Roadover PBC L-2 Canal Bridge Replacement (Project).

6/6/2017 $114,983

Engineering Supplement No. 1 (Supplement) with AE Engineering, Inc. (AEE) to Project Contract in theamount of $1,587,922.22 for construction engineering and inspection (CEI) services for thebridge rehabilitation of Camino Real Road/Boca Club Bridge over the IntracoastalWaterway (Project).

6/6/2017 $1,587,922

Engineering Second amendment to the annual roadway pathway and minor construction contract R-2016-0230, Project No. 2015055, dated March 1, 2016, with Wynn & Sons EnvironmentalConstruction Company Inc. (Wynn & Sons), to increase the amount of the contract by$3,500,000.

6/6/2017 $3,500,000

Facilities Contract with All-Site Construction, Inc. in the amount of $1,084,602 to construct boatlaunch and restroom improvements at Okeeheelee Park South, located at 7500 Forest HillBoulevard.

6/6/2017 $1,084,602

Water Utilities

Contract with TLC Diversified, Inc. (Contract) for the Glades Priority 1 Lift StationRehabilitation Project (Project) in the amount of $879,700.

6/6/2017 $879,700

Water Utilities

Work Authorization (WA) No. 5 with Cardinal Contractors, Inc., for the TR01 WaterTreatment Plant (WTP) No. 2 Improvements Project (Project) in the amount of $1,911,309.

6/6/2017 $1,911,309

81

Page 86: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Engineering a contract with Community Asphalt Corp. (Community) in the amount of $1,411,513.80 forconstruction of intersection improvements at Northlake Boulevard and Military Trail(Project).

6/20/2017 $1,411,514

Airports Change Order No. 2 to the Contract with ARINC Incorporated in the amount of $139,708and 60 Calendar Days for the installation of the Common Use Passenger Processing System(CUPPS) at Palm Beach International Airport (PBIA).

6/20/2017 $139,708

Facilities Contract with Protect Video, Inc. in the amount of $595,859 for replacement of the existingexhibit hall lighting at the Convention Center

6/20/2017 $595,859

Engineering Contract with Rosso Site Development, Inc. (Rosso) in the amount of $1,067,218.45 for theconstruction of Coral Ridge Drive, from Regional Park Drive to 750' north (Project).

7/11/2017 $1,067,218

Engineering Contract with Rosso Site Development, Inc. (Rosso) in the amount of $1,583,167.36 for theconstruction of Center Street from Thelma Avenue to Woodland Estates Drive (Project).

7/11/2017 $1,583,167

Engineering A second amendment to the annual asphalt milling and resurfacing contract R-2016-0143,Project No. 2015053, dated February 9, 2016 with Ranger Construction Inc., (Ranger) toincrease the amount of the contract by $6,000,000.

7/11/2017 $6,000,000

Engineering A second amendment to the annual asphalt pavement marking contract R-2016-0693,Project No. 2016051, dated June 7, 2016 with Southwide Industries Inc. (Southwide), toincrease the amount of the contract by $2,000,000.

7/11/2017 $2,000,000

Facilities Amendment No. 3 to the contract with Robling Architecture Construction, Inc. (R-2016-0762) in the amount of $1,463,148 for the Water Utilities Department (WUD) HurricaneHardening Projects in Belle Glade establishing a Guaranteed Maximum Price (GMP).

7/11/2017 $1,463,148

Water Utilities

Contract with All Webbs Enterprises, Inc., for the GL01 Water Treatment Plant 11 (WTP11) Production Well 11 Well and Wellhead Project (Project) in the amount of $1,469,205.

7/11/2017 $1,469,205

Water Utilities

Work Authorization (WA) No. 6 with Cardinal Contractors, Inc., for the TR04 WaterTreatment Plant (WTP) No. 8 Lime Slakers, Fuel Storage Tanks and High Service PumpReplacement Project (Project) in the amount of $1,906,492.

7/11/2017 $1,906,492

Airports Contract with West Construction, Inc. in the amount of $6,353,448.52 for the SouthsideRedevelopment Program Phase 1 and 2 project at Palm Beach County Park (Lantana)Airport.

7/11/2017 $6,353,449

Engineering Task Order to the annual contract, R-2014-0119, in the amount of $113,642.62, with AlanGerwig & Associates, Inc. (AGA), for professional services for the Davis Road over LakeWorth Drainage District L-6 Canal bridge replacement project (Project).

8/15/2017 $113,643

Engineering Work Order No. 2013052-021 (Work Order) in the amount of $441,000 to mill andresurface Le Chalet Boulevard from Jog Road to Military Trail (Improvements) utilizingPalm Beach County s (County) annual asphalt milling and resurfacing contract R-2013-0235 with Community Asphalt Corp.

8/15/2017 $441,000

Facilities Change Order No. 3 to the contract with Trillium Construction, Inc., (R-2012-1002)decreasing the Guaranteed Maximum Price (GMP) for the Jupiter Branch LibraryRenovations project in the amount of $127,282.56.

8/15/2017 $127,283

Water Utilities

Work Authorization No. 26 with Globaltech, Inc., for the Water Treatment Plant No. 11(WTP No. 11) Variable Frequency Drive (VFD) Replacements for Membrane Feed Pumps1 and 4 and High Service Pumps 1 and 2 in the amount of $399,743.75.

8/15/2017 $399,744

Enviromental Resources

Work Order No. ERM 14C-08 to the Palm Beach County Annual Pathway and MinorConstruction Contract Project No. 2013051 (R-2013-0427) with Wynn and SonsEnvironmental Construction Co., Inc., not to exceed $542,866.90 to construct public usefacilities at the Winding Waters Natural Area.

8/15/2017 $542,867

82

Page 87: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Engineering Contract with Hardrives Inc. (Hardrives), in the amount of $5,025,814.20 for theconstruction of Roebuck Road from Jog Road to Haverhill Road, and Roebuck Road andJog Road Intersection Improvements (Project).

9/26/2017 $5,025,814

Engineering Contract with Ranger Construction Industries, Inc. (Ranger) in the amount of$14,135,972.41 for the construction of Hood Road, east of Florida s Turnpike to west ofCentral Boulevard, and Hood Road and Central Boulevard intersection improvements

9/26/2017 $14,135,972

Engineering Contract with R&D Paving LLC (R&D), in the amount of $1,612,166.88 for theconstruction of Lyons Road from Hillsboro Canal to SW 18th Street (Project).

9/26/2017 $1,612,167

Engineering Contract with R&D Paving LLC (R&D), in the amount of $705,164.20 for the constructionof Sherwood Forest Boulevard over Lake Worth Drainage District L-8 Canal (Project).

9/26/2017 $705,164

Engineering Contract with DP Development of the Treasure Coast LLC (DPD), in the amount of$2,397,947.33 for the construction of Purdy Lane from Forest Hill Elementary to east ofMajor Drive (Project).

9/26/2017 $2,397,947

Engineering Contract with Johnson-Davis Inc. (JDI), in the amount of $849,298 for the construction ofKirk Road over Lake Worth Drainage District L-5 Canal (Project).

9/26/2017 $849,298

Engineering Contract with Kiewit Infrastructure South Co. (Kiewit), in the amount of $8,891,974.50 forthe rehabilitation of the Camino Real Road/Boca Club bridge over the IntracoastalWaterway (Project).

9/26/2017 $8,891,975

Engineering Contract with D.S. Eakins Construction Corporation (Eakins) in the amount of$1,207,343.65 for the construction of Kirk Road over Lake Worth Drainage District L-7Canal from south of Lake Worth Drainage District L-7 Canal to Pot O Gold Street

9/26/2017 $1,207,344

Airports Contract with H.L. Pruitt Corp. in the amount of $1,031,572 for the Runway Signage andMarking Re-Designation project for Palm Beach County Department of Airports GeneralAviation (GA) Airports: Palm Beach County Glades Airport (PHK), Palm Beach CountyPark Airport (LNA), and North Palm Beach County General Aviation Airport (F45).

9/26/2017 $1,031,572

Airports Amendment No. 10 to the General Consulting contract with AECOM Technical Services,Inc. for Consulting/Professional Services in the amount of $2,007,669 for the continuedperformance of professional planning and design services related to the approved PalmBeach County Airports Capital Improvement Program.

9/26/2017 $2,007,669

Facilities Amendment No. 2 to the contract with Trillium Construction Inc. (R-2016-0764) in theamount of $1,843,000 for the Water Utilities Department Water Treatment Plant (WTP)No. 11 Storage Building project, in Belle Glade, establishing a Guaranteed Maximum Price(GMP).

9/26/2017 $1,843,000

Facilities Contract with Collage Design & Construction Group, Inc. dba The Collage Companies(Collage) in the amount of $1,892,000 to construct Bert Winters Park Improvementslocated in Juno Beach.

9/26/2017 $1,892,000

Water Utilities

Contract with Hinterland Group, Inc., (Contract) for the Lift Station Rehabilitation ProjectA; Bid Package 1 (Project) in the amount of $5,051,500.

9/26/2017 $5,051,500

Water Utilities

Work Authorization (WA) No. 3 for the Gator Boulevard, Water Main Extension; EastSugar House Road to Duda Road with Hinterland Group Inc., in the amount of

9/26/2017 $792,003

Water Utilities

Contract with Kirlin Florida LLC, for the TR08 Southern Region Water ReclamationFacility (SRWRF) Headworks Screenings and Effluent Pumping Improvements Project inthe amount of $7,046,000.

9/26/2017 $7,046,000

Water Utilities

Contract with Electron Corp. of South Florida, for the TR07 Water Treatment Plant 11(WTP 11) Smart Wellfield Improvements Project (Project) in the amount of $682,383.

9/26/2017 $682,383

Water Utilities

Work Authorization (WA) No. 12 for the Water Distribution System Improvements Phase1: Ponderosa Drive (Project) with Johnson-Davis, Incorporated in the amount of

9/26/2017 $960,538

83

Page 88: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

CONTRACTS AWARDED

DEPT PROJECT NAME/VENDOR/COMMENTS AGENDA DATE AMOUNT

Water Utilities

Work Authorization (WA) No. 6 for the Priority Aerial Canal Crossing ImprovementsProject (Project) with Hinterland Group, Inc., in the amount of $765,220.20

9/26/2017 $765,220

Water Utilities

Amendment No. 1 to the Contract with Holtz Consulting Engineers, Inc., forConsulting/Professional Services for the Lift Station Rehabilitation Project A (R-2016-0899) in the amount not to exceed $257,723.80.

9/26/2017 $257,724

Water Utilities

Utility Work by Highway Contractor Agreement (At Utility Expense) (UWHCA) with theFlorida Department of Transportation (FDOT) in the amount of $922,433.92.

9/26/2017 $922,434

Water Utilities

Contract with Lanzo Trenchless Technologies Inc. - South (Lanzo), for the Glades Priority1 Collection System Rehab & Sanitary Sewer Evaluation Survey (SSES) Project in theamount of $2,465,282.

9/26/2017 $2,465,282

84

Page 89: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

FINAL PAYMENTS APPROVED This section lists all final payments for significant contracts throughout the reporting

period. This signifies the end of the contract and usually the substantial completion of a

capital project. Final payments approved are also listed chronologically.

85

Page 90: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

ORIGINAL COMPLETEDCONTRACT CONTRACT

DATE DEPT PROJECT NAME/ CONTRACTOR AMOUNT AMOUNTOct-16 Engineering CR 880 Twenty Mile Bend Slope Protection $4,064,012 $2,823,565

Shoreline Foundation, Inc. Nov-16 Water Utilities SR 15 & Gator Blvd Water Main Extension, Belle Glade $2,149,199 $2,212,446

AKA Services, Inc. Nov-16 Water Utilities Southern Region Water Reclamation Facility Electrical & Instrumentation

Improvements$1,756,788 $1,756,788

Electron Corp. of South FloridaDec-16 Water Utilities SW Belle Glade Water Main & Water Services Replacement, Zone 1-

Phase 2$4,169,147 $3,841,172

B & B Uderground Contractors, Inc.Dec-16 Water Utilities Water Main & Force Main Aerial Crossing Replacement in Belle Glade,

Priority #1$721,542 $642,748

Johnson-Davis, Inc.Dec-16 Facilities Main Judicial Complex FTR Central Recording Room Electrical &

HVAC Upgrades$215,900 $220,235

Sentech Electric, Inc.Dec-16 Engineering North County Senior Center Roof Replacement $198,600 $197,200

Therma Seal Roof Systems, LLCJan-17 Water Utilities WTP 3 & 9 Wells Replacement & Rehabilitation $1,889,310 $1,965,439

All Webbs Enterprises, Inc.Jan-17 Water Utilities WTP 11 Floridan Aquifer Wells Rehabilitation $444,444 $630,875

Florida Design Drilling CorporationJan-17 Engineering 60th Street North from W of Royal Palm Beach Blvd to E or Royal Palm

Blvd.$4,528,128 $4,305,467

J.W. Cheatham, LLCJan-17 Facilities Pahokee Recreation Center HVAX $524,777 $390,938

Ryman Mechanical, Inc.Feb-17 Facilities Jupiter Farms Radio Tower Equipment Shelter $423,375 $429,399

Cedars Electro-Mechanical, Inc.Feb-17 Engineering Bluegill Trail from Grassy Water Preserve/Northlake Blvd to N of PGA

Blvd.$566,703 $590,748

Dickerson Florida, Inc.Feb-17 Engineering C.R. 880 Twenty Mile Bend Slope Protection $883,590 $862,894

Dickerson Florida, Inc.Mar-17 Facilities WUD WTP #8 Filter Building Renovations $227,927 $236,651

Anzco, Inc.Mar-17 Engineering Old Dixie Highway/45th Street to Park Avenue $1,048,217 $1,046,474

Ranger Construction Industries, Inc. Apr-17 Water Utilities East Central Regional Water Reclamation $629,954 $748,153

Ralph Della-Pietra, Inc.Apr-17 Engineering Burns Rd. & Military Trail Intersection Improvements $1,338,246 $1,250,824

Rosso Site Development, Inc.Jun-17 Airports Taxiway W at PBI $3,558,818 $3,552,241

Rosso Site Development, Inc.Jun-17 Airports Baggage Handling System Improvements at PBI $41,983,731 $41,343,865

The Whiting-Turner Contracting CompanyJul-17 Enviromental Pahokee Marina Re-Configuration and Fisheries $1,154,957 $1,139,603

Kelly Brothers, Inc.

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

FINAL PAYMENTS APPROVED

86

Page 91: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

ORIGINAL COMPLETEDCONTRACT CONTRACT

DATE DEPT PROJECT NAME/ CONTRACTOR AMOUNT AMOUNT

PALM BEACH COUNTYCAPITAL PROJECT STATUS REPORT

SIGNIFICANT CONTRACTING ACTIVITYFISCAL YEAR 2017

FINAL PAYMENTS APPROVED

Jul-17 Engineering Penny Lane/Melaleuca Lane to Dead End $454,771 $335,999R&D Paving, LLC

Aug-17 Water Utilities Lyons Rd. Water Main System Improvements $543,110 $513,654Johnson-Davis, Inc.

Sep-17 Water Utilities WTP 9 Wellfield Control Panel Upgrades & RTU's $1,165,468 $1,194,484Electron Corp. of South Florida

Sep-17 Facilities Waterway Park $5,168,000 $5,307,949West Construction, Inc.

87

Page 92: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

88

Page 93: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

FINANCIAL SUMMARIES This section shows a financial summary which presents a comparison of budgeted and

actual revenues and expenditures. The actual revenues and expenditures reflect year-to-

date amounts through the date of the report. Encumbered amounts represent balances as

of the end of the period. As part of the year-end process, all open encumbrances should

roll into the following fiscal year.

89

Page 94: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

AIRPORTS PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Charges for Services $12,918,000 $10,633,461 ($2,284,539)Grants 43,677,486 7,145,800 (36,531,686)Interest 918,500 1,113,254 194,754Miscellaneous (60,750) 686,941 747,691

TOTAL REVENUES $57,453,236 $19,579,456 ($37,873,780)

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Acquisition $6,643,128 $919,068 $229,419 $5,494,641Design 10,797,433 1,833,126 2,335,541 6,628,766Construction 117,600,309 19,285,928 18,059,687 80,254,694Other 29,856,193 8,697,389 5,109,237 16,049,567Reserves 33,461,607 0 0 33,461,607

TOTAL EXPENDITURES $198,358,670 $30,735,511 $25,733,884 $141,889,275

REVENUES LESS ($140,905,434) ($11,156,055)EXPENDITURES

TRANSFERS IN 61,015,607 28,355,010

TRANSFERS OUT 43,278,857 9,249,096

BALANCES FORWARD 123,168,684 123,168,684

FUND BALANCE AT 9/30/17 $0 $131,118,543

CURRENT MODIFIED

CURRENT MODIFIED

90

Page 95: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

CRIMINAL JUSTICE PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Impact Fees $110,000 $261,510 $151,510Interest 61,000 72,997 11,997Miscellaneous (8,550) 4,403 12,953

TOTAL REVENUES $162,450 $338,910 $176,460

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Construction $970,373 $99,811 $851,399 $19,163Other 674,992 96,495 578,496 1Reserves 2,987,603 0 0 2,987,603

TOTAL EXPENDITURES $4,632,968 $196,306 $1,429,895 $3,006,767

REVENUES LESS ($4,470,518) $142,604EXPENDITURES

TRANSFERS IN 0 0

TRANSFERS OUT 446,412 446,412

BALANCES FORWARD 4,916,930 4,916,930

FUND BALANCE AT 9/30/17 $0 $4,613,122

CURRENT MODIFIED

CURRENT MODIFIED

91

Page 96: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

ENVIRONMENTAL LANDS AND BEACHES PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Charges for Services $202,317 $61,044 ($141,273)Grants 3,283,652 1,186,168 (2,097,484)Interest 180,000 247,607 67,607Miscellaneous 729,212 124,563 (604,649)

TOTAL REVENUES $4,395,181 $1,619,382 ($2,775,799)

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Acquisition $2,264 $0 $0 $2,264Construction 2,463,671 281,006 0 2,182,665Design 137,693 119,231 25,581 (7,119)Other 21,768,527 2,934,817 2,107,076 16,726,634Payments to Other Agencies 1,508,658 1,133,918 0 374,740Reserves 2,004,525 0 0 2,004,525

TOTAL EXPENDITURES $27,885,338 $4,468,972 $2,132,657 $21,283,709

REVENUES LESS ($23,490,157) ($2,849,590)EXPENDITURES

TRANSFERS IN 7,732,186 3,918,461

TRANSFERS OUT 1,138,465 976,057

BALANCES FORWARD 16,896,436 16,896,436

FUND BALANCE AT 9/30/17 $0 $16,989,250

CURRENT MODIFIED

CURRENT MODIFIED

92

Page 97: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

FIRE RESCUE PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Impact Fees $0 $617 $617Interest 172,000 276,629 104,629Miscellaneous (8,600) 14,396 22,996

TOTAL REVENUES $163,400 $291,642 $128,242

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Acquisition $321,707 $0 $0 $321,707Construction 14,690,777 462,584 6,138 14,222,055Design 2,095,554 113,119 432,228 1,550,207Other 2,603,179 1,054,540 0 1,548,639Reserves 1,149,152 0 0 1,149,152

TOTAL EXPENDITURES $20,860,369 $1,630,243 $438,366 $18,791,760

REVENUES LESS ($20,696,969) ($1,338,601)EXPENDITURES

TRANSFERS IN 2,868,000 2,868,000

TRANSFERS OUT 0 0

BALANCES FORWARD 17,828,969 17,828,969

FUND BALANCE AT 9/30/17 $0 $19,358,368

CURRENT MODIFIED

CURRENT MODIFIED

93

Page 98: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

GENERAL GOVERNMENT PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Assessments $0 $1,252,500 $1,252,500Charges for Services 2,805,637 519,327 (2,286,310)Developer Contributions 324,213 25,000 (299,213)Grants 1,318,810 286,809 (1,032,001)Impact Fees 1,400,000 1,353,829 (46,171)Interest 2,414,227 2,864,377 450,150Miscellaneous 53,097,769 46,749,924 (6,347,845)

TOTAL REVENUES $61,360,656 $53,051,766 ($8,308,890)

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Acquisition $182,911 $172,649 $5,780 $4,482Construction 131,816,856 69,604,584 22,851,429 39,360,843Design 2,597,299 112,303 277,153 2,207,843Other 111,847,965 29,304,303 18,805,806 63,737,856Payments to Other Agencies 9,382,758 3,369,027 0 6,013,731Reserves 38,142,899 0 0 38,142,899

TOTAL EXPENDITURES $293,970,688 $102,562,866 $41,940,168 $149,467,654

REVENUES LESS ($232,610,032) ($49,511,100)EXPENDITURES

TRANSFERS IN 53,784,707 37,804,203

TRANSFERS OUT 25,761,874 16,645,117

BALANCES FORWARD 204,587,199 204,587,199

FUND BALANCE AT 9/30/17 $0 $176,235,185

CURRENT MODIFIED

CURRENT MODIFIED

94

Page 99: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

LIBRARY PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Impact Fees $550,000 $627,693 $77,693Interest 156,200 310,902 154,702Miscellaneous (35,300) 17,472 52,772

TOTAL REVENUES $670,900 $956,067 $285,167

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Construction $496,829 $17,293 $55,219 $424,317Design 222,670 0 5,725 216,945Other 3,955,869 140,587 64,263 3,751,019Reserves 16,615,422 0 0 16,615,422

TOTAL EXPENDITURES $21,290,790 $157,880 $125,207 $21,007,703

REVENUES LESS ($20,619,890) $798,187EXPENDITURES

TRANSFERS IN 4,809,781 4,809,781

TRANSFERS OUT 9,781 9,781

BALANCES FORWARD 15,819,890 15,819,890

FUND BALANCE AT 9/30/17 $0 $21,418,077

CURRENT MODIFIED

CURRENT MODIFIED

95

Page 100: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

PARKS & RECREATION PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Grants 5,455,000 1,849,371 (3,605,629)Impact Fees 2,360,000 2,724,217 364,217Interest 226,957 347,031 120,074Miscellaneous 333,500 401,058 67,558

TOTAL REVENUES $8,375,457 $5,321,677 ($3,053,780)

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Construction $17,383,326 $8,770,859 $2,360,937 $6,251,530Design 5,068,979 823,828 1,656,961 2,588,190Other 3,854,185 2,435,323 728,300 690,562Payments to Other Agencies 629,911 79,817 550,092 2Reserves 7,566,997 0 0 7,566,997

TOTAL EXPENDITURES $34,503,398 $12,109,827 $5,296,290 $17,097,281

REVENUES LESS ($26,127,941) ($6,788,150)EXPENDITURES

TRANSFERS IN 4,257,780 3,954,950

TRANSFERS OUT 143,083 100,145

BALANCES FORWARD 22,013,244 22,013,244

FUND BALANCE AT 9/30/17 $0 $19,079,899

CURRENT MODIFIED

CURRENT MODIFIED

96

Page 101: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

ROAD PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Developer Contributions 1,337,473 375,945 (961,528)Gas Taxes 10,434,000 10,006,947 (427,053)Grants 4,036,795 202,785 (3,834,010)Impact Fees 13,899,775 29,824,364 15,924,589Interest 3,938,000 6,030,672 2,092,672Miscellaneous 16,370,889 879,164 (15,491,725)

TOTAL REVENUES $50,016,932 $47,319,877 ($2,697,055)

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Acquisition $18,392,213 $1,187,433 $5,305,233 $11,899,547Construction 118,537,079 16,608,276 24,893,760 77,035,043Design 26,385,657 5,520,065 9,426,793 11,438,799Other 11,709,001 4,554,554 822,102 6,332,345Payments to Other Agencies 2,198,102 193,574 309,459 1,695,069Reserves 261,412,803 0 0 261,412,803

TOTAL EXPENDITURES $438,634,855 $28,063,902 $40,757,347 $369,813,606

REVENUES LESS ($388,617,923) $19,255,975EXPENDITURES

TRANSFERS IN 1,672,987 1,672,986

TRANSFERS OUT 2,222,588 2,222,588

BALANCES FORWARD 389,167,524 389,167,524

FUND BALANCE AT 9/30/17 $0 $407,873,897

CURRENT MODIFIED

CURRENT MODIFIED

97

Page 102: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

STREET AND DRAINAGE PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Assessments $700,000 $714,437 $14,437Interest 97,000 152,978 55,978Miscellaneous (39,850) 8,585 48,435

TOTAL REVENUES $757,150 $876,000 $118,850

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Acquisition $2,482 $0 $0 $2,482Construction 251,175 32 0 251,143Design 538,109 37,092 147,344 353,673Other 46,624 14,510 0 32,114Payments to Other Agencies 166,778 59,684 0 107,094Reserves 9,429,974 0 0 9,429,974

TOTAL EXPENDITURES $10,435,142 $111,318 $147,344 $10,176,480

REVENUES LESS ($9,677,992) $764,682EXPENDITURES

TRANSFERS IN 0 0

TRANSFERS OUT 0 0

BALANCES FORWARD 9,677,992 9,677,992

FUND BALANCE AT 9/30/17 $0 $10,442,674

CURRENT MODIFIED

CURRENT MODIFIED

98

Page 103: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

WATER UTILITIES PROGRAM FUNDSFINANCIAL SUMMARY

FISCAL YEAR 2017

ACTUAL VARIANCEREVENUES BUDGET (YTD)

Assessments $595,000 $519,949 ($75,051)Connection Fees 9,026,000 8,453,178 (572,822)Grants 1,985,000 0 (1,985,000)Interest 0 2,906,721 2,906,721Miscellaneous 5,195,000 (2,191,157) (7,386,157)

TOTAL REVENUES $16,801,000 $9,688,691 ($7,112,309)

ACTUAL ENCUMBERED BALANCEEXPENDITURES BUDGET (YTD)

Construction $195,826,324 $55,945,412 $59,666,241 $80,214,671Other 0 0 32,416 (32,416)Reserves 44,972,987 0 0 44,972,987

TOTAL EXPENDITURES $240,799,311 $55,945,412 $59,698,657 $125,155,242

REVENUES LESS ($223,998,311) ($46,256,721)EXPENDITURES

TRANSFERS IN 28,671,850 24,775,763

TRANSFERS OUT 10,716,000 8,015,975

BALANCES FORWARD 206,042,461 206,042,461

FUND BALANCE AT 9/30/17 $0 $176,545,528

CURRENT MODIFIED

CURRENT MODIFIED

99

Page 104: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

100

Page 105: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

BUDGET SUMMARIES This section identifies the Budget Summary by Project report. This report provides a

“one-line” listing for each project showing the current budget, fiscal year spending to

date, encumbrances as of the report date and remaining balances. The report provides

totals for projects and total program. This report provides information on all funded

accounts including those projects which have available project detail reports.

101

Page 106: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

126,

730

3,52

013

0,25

00

126,

730

03,

520

74,0

1018

,312

92,3

220

74,0

1013

,500

4,81

26,

981

513,

670

520,

651

510,

974

517,

955

2,40

029

620

7,72

253

5,50

274

3,22

451

0,97

471

8,69

615

,900

8,62

8

476,

717

65,0

0054

1,71

70

476,

717

065

,000

3,89

5,00

82,

332,

055

6,22

7,06

379

,321

3,97

4,32

91,

654,

259

598,

475

3,20

5,44

242

2,61

73,

628,

059

178,

653

3,38

4,09

421

,987

221,

977

2,87

1,33

628

4,50

63,

155,

842

10,3

582,

881,

694

027

4,14

87,

483,

072

1,45

3,02

88,

936,

100

389,

220

7,87

2,29

20

1,06

3,80

853

9,80

344

9,20

098

9,00

36,

701

546,

504

223

442,

276

395,

685

290,

331

686,

016

34,3

9443

0,07

90

255,

937

31,2

672,

893,

733

2,92

5,00

062

0,93

465

2,20

12,

241,

792

31,0

0831

,301

,695

7,40

5,71

738

,707

,412

1,60

9,58

132

,911

,275

2,15

7,28

83,

638,

848

826

94,1

7495

,000

082

60

94,1

7420

5,34

720

4,27

740

9,62

40

205,

347

020

4,27

73,

679,

703

2,25

7,86

95,

937,

572

97,0

383,

776,

742

49,6

182,

111,

213

104,

195

67,3

9417

1,58

90

104,

195

067

,394

17,9

79,7

836,

193,

928

24,1

73,7

1191

2,36

818

,892

,151

229,

196

5,05

2,36

422

,410

,234

9,48

9,37

131

,899

,605

6,09

7,02

128

,507

,255

944,

866

2,44

7,48

41,

650,

812

375,

000

2,02

5,81

20

1,65

0,81

29,

950

365,

050

2,34

1,47

615

1,66

12,

493,

137

6,64

22,

348,

118

014

5,01

979

5,31

920

1,64

499

6,96

30

795,

319

020

1,64

425

2,81

720

1,00

045

3,81

712

,461

265,

278

018

8,53

95,

697,

905

1,21

6,63

26,

914,

537

05,

697,

905

01,

216,

632

1,53

6,72

148

5,23

12,

021,

952

189,

151

1,72

5,87

317

8,25

211

7,82

75,

305,

618

1,25

4,99

96,

560,

617

05,

305,

618

01,

254,

999

2,71

8,43

481

1,59

03,

530,

024

710,

587

3,42

9,02

179

,562

21,4

411,

258,

831

500,

994

1,75

9,82

599

,860

1,35

8,69

138

,750

362,

384

564,

138

226,

308

790,

446

056

4,13

80

226,

308

3,33

8,88

744

6,72

13,

785,

608

51,2

103,

390,

097

15,5

0138

0,01

0

A26

8 A

irsid

e Pr

ojec

tsA

269

Saf

ety

& R

ehab

Pro

ject

sA

271

New

Rev

enue

Con

trol S

yste

m

A03

1 E

quip

men

t-Mai

nten

ance

A03

2 E

quip

men

t-Cra

sh F

ire R

escu

eA

035

P-C

-New

Ter

min

al

A18

3 N

-Nor

th C

ount

y T-

Han

gers

A18

6 P

-Per

mits

& F

ees

A18

7 P

-Lan

d A

cq W

Of R

/W 9

l

101

Agr

icul

ture

- C

apita

lA

G04

Mou

nts G

arde

n D

esig

n Se

rvic

es

A04

3 P

bia-

Envi

rom

enta

l

AG

08 M

ount

Bot

anic

al G

arde

n W

alkw

ay

121

Air

port

s - C

apita

l

Tot

al A

gric

ultu

re -

Cap

ital

A03

9 P

-Dem

oliti

on

AG

15 T

ropi

cal W

etla

nds G

arde

n at

MB

G

A02

9 E

quip

men

t-Airs

ide

A03

0 E

quip

men

t-Adm

inis

tratio

n

A21

2 P

-Ter

min

al Im

prov

emen

tsA

215

P-C

abin

Air

Con

trol S

yste

m

A10

7 P

-Des

ign/

Engi

neer

ing

Serv

ices

A17

3 P

-Pro

ject

Insp

ectio

n &

Adm

inA

175

P-T

estin

g &

Mis

c En

gine

erin

g

A09

3 B

ldg

1475

Re-

Roo

fing

A25

9 P

BIA

Run

way

9/2

7 En

viro

nmen

tal I

mpa

ct

A25

4 P

ahok

ee P

roje

cts

A23

2 N

c-Pr

ojec

tsA

253

Lan

tana

Pro

ject

s

A26

1 A

irpor

t Mas

ter P

lan

A26

5 M

isc

Taxi

way

Rep

air

A26

7 B

uild

ing

3400

Reh

abili

tatio

n

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

102

Page 107: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

2,29

0,17

553

5,52

52,

825,

700

02,

290,

175

053

5,52

592

4,77

521

,524

946,

299

092

4,77

50

21,5

240

1,61

2,89

81,

612,

898

00

01,

612,

898

1,32

0,62

013

,382

1,33

4,00

20

1,32

0,62

00

13,3

823,

654,

952

609,

949

4,26

4,90

10

3,65

4,95

299

260

8,95

799

4,96

09,

953

1,00

4,91

30

994,

960

09,

953

1,23

8,51

411

2,37

21,

350,

886

01,

238,

514

011

2,37

20

10,0

0010

,000

00

010

,000

2,82

8,39

14,

344

2,83

2,73

50

2,82

8,39

10

4,34

45,

051,

396

1,45

6,79

06,

508,

186

05,

051,

396

58,5

011,

398,

289

950,

154

62,4

251,

012,

579

095

0,15

40

62,4

251,

040,

935

834,

067

1,87

5,00

20

1,04

0,93

514

2,82

069

1,24

71,

104,

940

4,39

5,06

25,

500,

002

315,

485

1,42

0,42

53,

611,

512

468,

065

666,

932

58,0

7072

5,00

20

666,

932

17,1

0540

,965

50,3

02,5

464,

760,

917

55,0

63,4

631,

818,

204

52,1

20,7

5157

6,72

42,

365,

989

180,

580

1,33

1,00

81,

500,

004

8,81

918

9,39

914

3,00

71,

167,

598

78,1

693,

526,

185

3,60

4,35

444

,206

122,

375

03,

481,

979

5,80

4,92

21,

331,

008

7,13

5,93

020

9,43

76,

014,

359

93,8

361,

027,

735

075

0,00

075

0,00

00

00

750,

000

2,13

8,60

95,

217,

483

7,35

6,09

24,

245,

531

6,38

4,14

085

2,89

411

9,05

95,

960,

511

87,8

196,

048,

330

05,

960,

511

2,56

085

,259

11,3

60,8

733,

639,

130

15,0

00,0

030

11,3

60,8

730

3,63

9,13

060

,209

2,56

4,79

32,

625,

002

37,2

2597

,433

2,50

0,00

027

,568

714,

454

2,41

6,04

73,

130,

501

071

4,45

40

2,41

6,04

74,

087,

639

112,

585

4,20

0,22

40

4,08

7,63

99,

308

103,

277

1,66

4,25

243

5,74

92,

100,

001

01,

664,

252

5,08

743

0,66

25,

128,

054

4,82

0,65

79,

948,

711

3,97

6,19

29,

104,

247

842,

021

2,44

34,

520,

608

156,

502

4,67

7,11

099

54,

521,

602

11,4

3814

4,06

93,

866,

210

258,

792

4,12

5,00

2(2

2,60

3)3,

843,

607

267,

608

13,7

8781

2,86

416

9,48

398

2,34

733

481

3,19

86,

964

162,

185

3,46

7,73

72,

499,

634

5,96

7,37

10

3,46

7,73

70

2,49

9,63

418

3,19

96,

801

190,

000

018

3,19

90

6,80

112

5,00

52,

658,

904

2,78

3,90

91,

916,

648

2,04

1,65

129

0,03

945

2,21

9

A32

5 L

N R

ehab

Itin

eran

t Apr

onA

326

LN

Reh

ab R

W 3

/21

and

927

A32

7 N

C W

etla

nd M

itiga

tion

A33

0 P

-Em

erge

ncy

Cra

sh P

hone

Sys

tem

A33

1 P

-Run

way

10R

-28L

Reh

ab

A31

1 P

BIA

Gol

f Vie

w A

pron

A31

2 P

BIA

Mis

c Ta

xiw

ays B

, D, a

nd E

A31

3 P

BIA

Run

way

10L

-28R

Reh

abA

315

Lan

tana

Pav

emen

t Reh

abA

316

Pah

okee

Apr

on C

onst

ruct

ion

A32

0 P

BIA

-Ter

min

al A

pron

A32

2 P

ahok

ee A

irfie

ld L

ight

ing

A32

3 P

BIA

-Air

Han

dler

Uni

t Rep

lace

A32

4 P

BIA

-Res

troom

Impr

ovem

ent

A30

3 G

A S

ecur

ity Im

prov

emen

tsA

304

Bag

gage

Sys

tem

Impr

ovem

ents

A30

5 C

omm

on U

se P

asse

nger

Pro

cess

ing

Syst

emA

306

Ter

min

al F

IS E

xpan

sion

A30

8 P

BIA

Sec

urity

A31

0 N

orth

Cou

nty

Han

ger I

nfra

stru

ctur

e

A28

0 N

orth

Cou

nty

Sew

er P

lant

A28

3 R

unw

ay 1

3-31

Pav

emen

t Rem

oval

A29

2 L

anta

na R

unw

ay 1

5/33

Reh

abA

294

PB

IA N

orth

Cou

nty

Hel

icop

ter P

ads

A29

5 P

BIA

Nor

th C

ount

y W

etla

nd M

itiga

tion

Cre

dits

A29

7 P

BIA

Air

Car

go R

amp

Ext

A27

4 P

BIA

Par

king

Gar

age

#1 R

enov

atio

nA

275

Airf

ield

Mar

king

Impr

ovem

ents

A27

9 L

anta

na C

onst

ruct

Han

gars

PB

C A

irpar

k

A28

8 P

BIA

Enp

lane

/Dep

lane

Roa

dway

Lig

htin

g

A29

9 P

BIA

Sou

tsid

e Ta

xila

ne Im

prov

emen

tsA

300

Nor

th C

ount

y A

pron

s & T

axila

nes

A30

1 L

anta

na H

anga

rs

103

Page 108: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

151,

814

3,37

5,85

83,

527,

672

2,81

7,49

92,

969,

313

186,

623

371,

736

3,22

1,36

33,

929,

190

7,15

0,55

390

1,29

74,

122,

660

691,

366

2,33

6,52

70

80,3

5880

,358

00

080

,358

23,4

321,

476,

569

1,50

0,00

125

,590

49,0

2215

6,33

21,

294,

647

434,

173

7,88

8,37

68,

322,

549

2,86

4,19

23,

298,

365

4,91

0,16

511

4,02

00

500,

000

500,

000

1,98

21,

982

495,

000

3,01

80

2,00

0,00

02,

000,

000

00

02,

000,

000

041

,278

41,2

780

00

41,2

7824

,076

975,

925

1,00

0,00

160

,650

84,7

2677

,972

837,

303

05,

823,

825

5,82

3,82

518

4,11

618

4,11

61,

580,

619

4,05

9,09

00

2,50

0,00

02,

500,

000

00

02,

500,

000

012

,061

,122

12,0

61,1

2211

0,70

811

0,70

829

1,07

411

,659

,340

01,

000,

000

1,00

0,00

00

00

1,00

0,00

00

1,50

0,00

01,

500,

000

2,80

12,

801

01,

497,

199

02,

000,

000

2,00

0,00

00

00

2,00

0,00

00

1,73

6,43

81,

736,

438

00

01,

736,

438

02,

000,

000

2,00

0,00

00

00

2,00

0,00

00

402,

000

402,

000

110,

708

110,

708

291,

074

218

032

8,99

332

8,99

30

00

328,

993

035

5,49

835

5,49

80

00

355,

498

026

0,82

126

0,82

10

00

260,

821

07,

738,

658

7,73

8,65

80

00

7,73

8,65

80

99,2

5099

,250

00

099

,250

062

5,00

062

5,00

00

00

625,

000

037

0,97

037

0,97

00

00

370,

970

095

0,00

095

0,00

00

00

950,

000

090

0,00

090

0,00

00

00

900,

000

02,

444,

376

2,44

4,37

60

00

2,44

4,37

60

2,60

9,54

62,

609,

546

00

02,

609,

546

02,

270,

000

2,27

0,00

00

00

2,27

0,00

00

1,00

0,00

01,

000,

000

00

01,

000,

000

09,

409,

758

9,40

9,75

80

00

9,40

9,75

80

33,4

61,6

0733

,461

,607

00

033

,461

,607

246,

419,

113

198,

370,

254

444,

777,

783

30,7

35,5

1527

7,15

4,62

725

,733

,885

141,

889,

274

A34

0 P

HK

Fue

l Far

m Im

prov

emen

t

A33

4 P

HK

, Des

ign

of A

WO

SA

335

NC

Per

imet

er F

ence

Impr

ovA

336

PB

IA T

axiw

ay C

Reh

abA

337

LN

Sec

urity

Impr

ovA

338

LN

Fue

l Far

m, T

erm

and

Han

g Im

pA

339

Run

way

Mar

king

Red

esig

natio

n

A34

1 P

BIA

Mis

cell

Taxi

way

Reh

abA

342

PB

IA T

erm

inal

Sw

itchg

ear

A34

3 P

BIA

Dra

inag

e Im

prov

emen

tsA

344

LN

Pav

emen

t Reh

abili

tatio

nA

345

PH

Reh

ab R

/W 1

7/35

and

Ass

oc T

/WA

346

PB

IA A

RFF

Fac

ility

Impr

ovem

ents

A34

7 P

BIA

UPG

R A

cces

s Sig

nage

and

Lan

dsca

peA

348

PB

IA T

erm

Esc

alat

or R

epla

cem

ent-P

H1

A35

0 P

BIA

N. T

ERM

INA

L EA

ST R

EMO

TE

A35

1 L

NA

MA

STER

PLA

N U

PDA

TE &

EX

HIB

ITA

352

NC

MA

STER

PLA

N U

PDA

TE &

EX

HIB

ITA

353

PH

K M

AST

ER P

LAN

UPD

ATE

& E

XH

IBIT

A35

5 P

B B

AG

GA

GE

HA

ND

LIN

G S

YST

EM (O

M)

A35

6 P

H.R

W D

esig

natio

n R

e-M

arki

ng &

Airf

ield

A

357

NC

, RW

Des

igna

tion

Re-

Mar

king

& A

irfie

ld

A35

8 L

N, R

W D

esig

natio

n R

e-M

arki

ng &

Airf

ield

A

359

PH

, Con

stru

ct H

anga

rsA

360

LN

, Run

way

3-2

1 R

ehab

ilita

tion

A36

1 N

C, R

w P

avem

ent R

ehab

and

Rep

air 8

R-2

6L

A36

2 P

B, N

ew P

arki

ng R

even

ue C

ente

rA

363

PB

, Car

go F

acili

ties A

cces

s Im

prov

emen

t

A90

0 C

apita

l Res

erve

s

A33

2 P

-Tax

iway

A R

ehab

A33

3 P

BIA

Gol

fvie

w A

pron

Pha

se II

Tot

al A

irpo

rts -

Cap

ital

A36

4 L

NA

, Con

stru

ct a

Fue

l Far

m a

nd W

ash

Rac

kA

363

PB

, Gol

fvie

w C

omm

erci

al P

rope

rty A

cqui

stio

n

104

Page 109: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

1,15

9,02

17,

747

1,16

6,76

87,

746

1,16

6,76

70

11,

159,

021

7,74

71,

166,

768

7,74

61,

166,

767

01

23,8

64,8

3611

,135

,164

35,0

00,0

002,

541,

390

26,4

06,2

260

8,59

3,77

40

7,43

2,38

47,

432,

384

7,33

9,01

97,

339,

019

093

,365

23,8

64,8

3618

,567

,548

42,4

32,3

849,

880,

409

33,7

45,2

450

8,68

7,13

9

133,

822

500,

180

634,

002

103,

710

237,

532

55,4

2534

1,04

50

20,0

0020

,000

00

020

,000

5,35

046

6,45

047

1,80

00

5,35

00

466,

450

5,35

5,26

957

,513

5,41

2,78

20

5,35

5,26

90

57,5

1311

,365

,115

75,0

0011

,440

,115

011

,365

,115

075

,000

4,02

4,40

697

5,59

55,

000,

001

04,

024,

406

097

5,59

533

,064

285,

936

319,

000

17,2

9350

,357

026

8,64

35,

072,

080

759,

478

5,83

1,55

80

5,07

2,08

060

,944

698,

534

455,

172

461,

446

916,

618

045

5,17

28,

838

452,

608

075

,000

75,0

000

00

75,0

0031

6,83

179

8,77

01,

115,

601

9,50

432

6,33

50

789,

266

010

0,00

010

0,00

025

,557

25,5

570

74,4

430

100,

000

100,

000

1,81

61,

816

098

,184

26,7

61,1

094,

675,

368

31,4

36,4

7715

7,88

026

,918

,988

125,

207

4,39

2,28

2

14,2

91,5

6785

9,80

515

,151

,372

599,

897

14,8

91,4

6424

,862

235,

047

29,4

47,6

662,

814,

632

32,2

62,2

982,

385,

577

31,8

33,2

4313

,143

415,

911

43,7

39,2

333,

674,

437

47,4

13,6

702,

985,

474

46,7

24,7

0738

,005

650,

958

1,95

5,77

925

3,52

22,

209,

301

01,

955,

779

025

3,52

251

0,36

433

,579

543,

943

30,4

8654

0,85

10

3,09

36,

587,

913

1,04

4,87

47,

632,

787

54,6

366,

642,

549

638,

769

351,

469

3,56

7,81

51,

059,

076

4,62

6,89

10

3,56

7,81

50

1,05

9,07

615

,133

,560

765,

245

15,8

98,8

052,

842

15,1

36,4

0132

5,15

943

7,24

5

Q00

5 P

BSO

Rad

io R

epla

cem

ent

321

Cou

nty

Libr

ary

- Cap

ital

0699

Sem

inol

e Pr

att-O

keec

h/Sy

cam

ore

0431

Nor

thla

ke B

lvd

Agr

eem

ent

L070

New

Tec

hnol

ogy

L071

Sig

nage

4230

Con

stru

ctio

n C

oord

inat

ion

4260

Roa

dway

Pro

duct

ion

L064

Par

king

Lot

Rep

air/R

enov

atio

nL0

66 A

nnex

L067

A/C

Rep

air/R

epla

cem

ent

L068

Rem

odel

Circ

ulat

ion

Des

k

0621

Old

Sta

te R

oad

80 R

ehab

/Mai

nt06

20 S

emin

ole

Prat

t-Nrth

lake

/Bee

lin06

03 T

raff

ic C

alm

ing/

Spee

d H

umps

Tot

al C

omm

unity

Ser

vice

s/C

apita

l

Tot

al E

ngin

eeri

ng &

Pub

lic W

orks

141

Com

mun

ity S

ervi

ces/

Cap

ital

Tot

al C

ount

y L

ibra

ry -

Cap

ital

360

Eng

inee

ring

& P

ublic

Wor

ks

361

Eng

& P

ub W

ks -

Rd

Pgm

Cap

ital

Tot

al S

heri

ff-C

apita

l

L069

Roo

f Rep

air/R

epla

cem

ent

L063

Sys

tem

wid

e Eq

uipm

ent U

pgra

deL0

50 N

. Cou

nty

Reg

iona

l Exp

ansi

onL0

49 M

ain

Libr

ary

Expa

nsio

n

L032

Car

pet R

epla

cem

ent

1691

Tra

nsfe

rs-S

herif

f Cap

ital

L041

Int

/Ext

Pai

ntin

g O

f Bra

nche

s

L031

Sec

urity

/Fire

Ala

rms S

yste

ms

161

Sher

iff-C

apita

l

M00

7 C

s Com

pute

r Upg

rade

105

Page 110: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

3,09

9,37

584

7,05

13,

946,

426

323,

157

3,42

2,53

11,

596

522,

299

10,6

92,3

2385

0,79

811

,543

,121

64,4

7410

,756

,796

747,

970

38,3

549,

503,

154

16,8

949,

520,

048

2,26

29,

505,

415

8,05

16,

581

9,90

0,07

149

1,09

610

,391

,167

49,4

729,

949,

543

044

1,62

42,

523,

445

340,

676

2,86

4,12

170

,536

2,59

3,98

159

,358

210,

782

2,31

0,28

340

8,30

02,

718,

583

02,

310,

283

246,

086

162,

214

191,

013

20,1

8221

1,19

511

,089

202,

102

09,

093

10,2

11,5

772,

551,

681

12,7

63,2

580

10,2

11,5

7735

,426

2,51

6,25

56,

565,

542

238,

190

6,80

3,73

218

16,

565,

723

5,72

023

2,28

92,

281,

414

8,74

12,

290,

155

02,

281,

414

08,

741

947,

749

170,

941

1,11

8,69

00

947,

749

017

0,94

115

5,56

412

3,07

927

8,64

38,

696

164,

260

011

4,38

34,

928,

627

1,55

1,42

16,

480,

048

36,4

344,

965,

061

414,

443

1,10

0,54

41,

008,

883

5,01

6,51

76,

025,

400

208,

804

1,21

7,68

72,

293,

348

2,51

4,36

51,

482,

231

3,72

9,82

85,

212,

059

52,9

591,

535,

189

1,57

23,

675,

298

52,1

54,9

743,

374,

295

55,5

29,2

6945

7,93

652

,612

,910

462,

149

2,45

4,20

942

8,32

53,

363,

364

3,79

1,68

951

,774

480,

099

2,10

0,56

21,

211,

028

3,10

3,73

64,

810,

869

7,91

4,60

575

9,62

13,

863,

357

3,45

0,62

360

0,62

518

,778

,355

3,76

818

,782

,123

018

,778

,355

03,

768

13,8

44,3

5179

5,37

614

,639

,727

124,

600

13,9

68,9

5169

,060

601,

716

4,47

0,03

327

5,06

64,

745,

099

04,

470,

033

027

5,06

656

1,91

618

3,09

374

5,00

90

561,

916

35,4

6414

7,62

989

3,92

271

9,52

41,

613,

446

111,

461

1,00

5,38

256

9,96

038

,103

1,39

1,51

580

,101

1,47

1,61

60

1,39

1,51

565

,000

15,1

011,

314,

252

35,7

501,

350,

002

01,

314,

252

3,79

031

,960

540,

681

2,25

8,23

42,

798,

915

189,

164

729,

846

1,55

7,60

651

1,46

45,

260,

218

367,

412

5,62

7,63

015

95,

260,

377

036

7,25

39,

481

2,49

0,52

02,

500,

001

09,

481

02,

490,

520

35,5

2011

4,48

415

0,00

40

35,5

200

114,

484

678,

138

76,4

8975

4,62

70

678,

138

10,6

3065

,859

621,

103

438,

906

1,06

0,00

92,

044

623,

147

224,

043

212,

819

1,71

2,40

632

4,83

12,

037,

237

39,2

821,

751,

688

37,0

3124

8,51

893

5,54

815

9,45

21,

095,

000

093

5,54

864

,773

94,6

79

1172

RC

A B

lvd

& S

R81

1 (A

lt A

1A) I

nter

sect

ion

1178

Lyo

ns R

d/S

of L

WD

D L

-11

Can

al to

N o

f

1183

Bur

ns R

d &

Mili

tary

Tra

il In

ters

ectio

n Im

p12

01 P

athw

ay P

rogr

am F

Y20

06

1151

Pat

hway

Pro

gram

FY

200

511

52 T

raff

ic S

igna

ls -

Mas

t Arm

s11

60 I

ndia

ntw

on R

d/Ju

pite

r Far

ms R

d to

W o

f 11

61 C

entra

l Blv

d/In

dian

tow

n R

d to

Lon

gsho

re D

r11

66 A

tlant

ic A

ve A

rea

Con

tribu

tion

1167

Cen

tral B

lvd

& In

dian

tow

n Tu

rn L

ane

1064

Old

Dix

ie H

wy/

Park

Ave

-Nor

thla

ke10

85 W

. Atla

ntic

Ave

/W o

f Lyo

ns R

d to

E. o

f FL

1116

Acr

eage

Acc

ess R

oad-

Pers

imm

on B

lvd.

to 6

0th

1140

Sem

inol

e Pr

att/S

ycam

ore

Dr.

to N

of S

ycam

ore

1143

Com

mun

ity D

r/Mili

tary

to V

illag

e B

lvd.

1148

Aus

tralia

n A

ve/B

anya

n A

ve to

45t

h St

0924

Rec

ordi

ng F

ees

0966

Nor

thla

ke B

l/Sem

Pra

tt-C

ocon

ut09

94 S

ilver

Bch

Rd/

E O

f Con

-Old

Dix

1000

Uni

ncor

prat

ed A

rea

O.T

.I.S

1001

Int

raco

asta

l Cro

ssin

gs10

04 T

oney

Pen

na D

r&O

ld D

ixie

Hw

y

0728

Sem

inol

e Pw

-Ora

nge/

Nor

thla

ke07

62 C

ongr

ess-

Hyp

olux

o-La

ntan

a07

68 A

nnua

l Con

tract

s/D

es&

Ad

Cos

ts

0813

Lyo

ns R

d/Li

nton

To

W.A

tlant

ic08

63 O

rang

e B

lvd.

& R

pb B

lvd.

Inte

r09

23 S

emin

ole

Col

ony

Drn

ge E

-Dis

2

0703

Com

pute

r Equ

ipm

ent R

d Pg

m07

04 G

lade

s Are

a R

&R

0727

Sem

inol

e Pw

-Syc

amor

e/O

rang

e07

25 S

emin

ole

Pw-S

r 80/

Oke

echo

bee

0784

Sr 7

/S O

f Lw

Rd-

No

Of S

outh

ern

106

Page 111: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

641,

709

13,2

9665

5,00

50

641,

709

013

,296

86,6

9236

3,30

845

0,00

00

86,6

920

363,

308

63,2

5738

6,74

345

0,00

010

,762

74,0

1911

,406

364,

575

19,3

7080

,630

100,

000

019

,370

6,43

174

,200

1,67

4,27

88,

712,

731

10,3

87,0

094,

730,

877

6,40

5,15

52,

578,

649

1,40

3,20

51,

204,

068

4,82

1,01

36,

025,

081

01,

204,

068

04,

821,

013

877,

553

1,42

7,45

52,

305,

008

291,

995

1,16

9,54

840

6,00

972

9,45

22,

643,

073

3,42

6,93

76,

070,

010

2,84

3,74

95,

486,

822

480,

141

103,

046

227,

209

1,39

2,79

71,

620,

006

739,

439

966,

648

425,

241

228,

116

302,

434

97,5

6840

0,00

20

302,

434

097

,568

265,

538

1,37

2,08

51,

637,

623

56,6

3532

2,17

391

6,13

139

9,31

951

9,84

51,

907,

159

2,42

7,00

413

2,78

265

2,62

71,

635,

992

138,

386

264,

561

72,9

4133

7,50

20

264,

561

072

,941

1,47

4,47

125

,533

1,50

0,00

40

1,47

4,47

10

25,5

3318

,366

81,6

3510

0,00

13,

142

21,5

080

78,4

9319

9,41

234

,013

233,

425

019

9,41

230

,045

3,96

817

3,71

922

2,28

439

6,00

315

3,79

232

7,51

112

,440

56,0

5250

,673

349,

331

400,

004

116,

934

167,

607

100,

477

131,

920

546,

559

65,0

9861

1,65

70

546,

559

8,63

156

,467

82,8

5837

,147

120,

005

082

,858

037

,147

195,

056

1,49

4,94

71,

690,

003

46,4

6524

1,52

139

,469

1,40

9,01

424

8,60

650

1,40

075

0,00

625

,815

274,

421

391,

775

83,8

1038

,739

11,2

6350

,002

038

,739

011

,263

281,

697

3,59

8,30

73,

880,

004

86,5

3636

8,23

325

3,51

63,

258,

255

05,

000

5,00

00

00

5,00

038

0,08

892

,219

472,

307

038

0,08

891

,515

704

19,4

9610

,506

30,0

020

19,4

960

10,5

0641

,210

58,7

9610

0,00

674

241

,952

7,17

250

,882

292,

083

1,33

4,07

41,

626,

157

1,01

7,62

01,

309,

703

240,

758

75,6

961,

044,

638

15,3

98,0

9516

,442

,733

368,

545

1,41

3,18

311

2,71

514

,916

,834

99,7

8883

0,21

693

0,00

442

,338

142,

126

757,

846

30,0

3261

,767

328,

237

390,

004

15,1

0276

,868

23,9

8728

9,14

888

,129

64,8

6015

2,98

912

,608

100,

737

40,4

8811

,764

1386

Blu

e H

eron

And

Aus

tralia

n In

ters

ectio

n Im

p.

1375

Gla

des R

d an

d Fl

orid

a Tu

rnpi

ke13

76 L

awre

nce

Roa

d 30

0' S

to 2

00' N

of L

-17

Can

al13

79 A

ustra

lian

Ave

. W10

th to

N o

f W 1

3th

RB

1382

Hoo

d R

d/E

of T

urnp

ike

to W

. Cen

tral B

lvd

1383

Lin

ton

Blv

d &

Mili

tary

Tra

il In

ters

ectio

n13

84 B

lue

Her

on &

Con

gres

s Int

erse

ctio

n Im

p.

1366

PG

A B

lvd.

& M

ilita

ry T

rail

Inte

rsec

tion

1367

Lak

e W

orth

Rd.

and

Jog

Rd.

Inte

rsec

tion

1368

45t

h St

reet

and

Con

gres

s Ave

. Int

erse

ctio

n13

69 C

ongr

ess A

ve/N

orth

lake

to A

lt. A

1A13

71 P

ark

Ave

/Con

gres

s Ave

. to

Old

Dix

ie H

wy

1373

Clin

t Moo

re R

oad

& M

ilita

ry T

rail

Inte

rsec

tion

1352

Tra

ffic

Sig

nals

-Mas

t Arm

s FY

200

913

58 L

yons

Rd/

Nor

te L

ago

to G

lade

s Rd

1362

Mili

tary

Tra

il &

For

est H

ill B

lvd.

Inte

rsec

tion

1363

10t

h A

ve. N

and

Bou

twel

l Rd.

Inte

rsec

tion

1364

10t

h A

ve. N

& M

ilita

ry T

rail

Inte

rsec

tion

1365

Lyo

ns R

d an

d K

imbe

rly B

lvd.

Inte

rsec

tion

1337

Hav

erhi

ll R

d/La

ntan

a R

d to

L-1

4 C

anal

1343

SR

7/C

ount

y Li

ne to

Pal

met

to P

ark

Rd

(OTI

S)13

47 G

arde

n R

oad

Cul

vert

1348

Nor

thla

ke B

lvd

& M

ilita

ry T

rail

Inte

rsec

tion

1349

Cul

vert

Rep

air &

Rep

lace

men

t13

51 P

athw

ay P

rogr

am F

Y20

09

1252

Tra

ffic

Sig

nals

-Mas

t Arm

s FY

2007

1302

Tra

ffic

Sig

nals

-Mas

t Arm

s FY

200

813

25 H

aver

hill

Rd/

S of

LW

DD

-14

Can

al to

Lak

e

1326

Don

ald

Ros

s Rd

and

I-95

Inte

rcha

nge

1335

Poi

nt C

hose

n B

ridge

Fen

der S

yste

m

1336

Lyo

ns R

oad/

Lant

ana

Roa

d to

Lak

e W

orth

Roa

d

1202

Tra

ffic

Sig

nals

Mas

t Arm

FY

2006

1203

Spe

cial

Tra

ffic

Sig

nal P

roje

cts

107

Page 112: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

480,

219

3,65

9,78

54,

140,

004

88,1

5856

8,37

73,

000,

418

571,

209

610,

919

1,18

9,08

41,

800,

003

395,

169

1,00

6,08

850

9,71

628

4,19

921

5,80

72,

074,

196

2,29

0,00

350

,210

266,

017

5,85

62,

018,

130

525,

144

6,05

4,85

96,

580,

003

108,

523

633,

667

57,0

865,

889,

249

637,

221

891,

519

1,52

8,74

053

1,79

51,

169,

016

169,

661

190,

063

216,

221

103,

784

320,

005

12,8

2122

9,04

277

,472

13,4

9224

3,23

676

,768

320,

004

24,6

1826

7,85

449

,084

3,06

627

1,31

53,

041,

792

3,31

3,10

719

0,83

846

2,15

318

0,80

82,

670,

147

93,2

9044

,710

138,

000

093

,290

4,30

040

,410

38,3

3821

1,66

425

0,00

20

38,3

380

211,

664

364

99,6

3610

0,00

00

364

099

,636

190,

219

259,

785

450,

004

87,5

3027

7,74

968

,320

103,

936

71,3

6173

,640

145,

001

071

,361

48,7

3724

,903

113,

748

31,2

5414

5,00

20

113,

748

031

,254

18,6

1810

,207

28,8

250

18,6

180

10,2

0716

3,21

428

6,78

845

0,00

210

5,38

126

8,59

590

,605

90,8

0263

,233

86,7

6815

0,00

129

,751

92,9

8541

,725

15,2

9213

3,06

01,

566,

945

1,70

0,00

535

,570

168,

630

92,5

241,

438,

851

316

9,68

410

,000

031

60

9,68

499

,229

165,

777

265,

006

100,

538

199,

767

11,0

0054

,239

230,

030

469,

972

700,

002

138,

108

368,

137

179,

923

151,

941

650,

617

1,84

9,38

52,

500,

002

368,

565

1,01

9,18

282

0,69

566

0,12

559

,261

15,7

3975

,000

059

,261

015

,739

204,

331

180,

672

385,

003

164,

359

368,

690

3,55

012

,763

62,2

5137

,750

100,

001

715

62,9

665,

906

31,1

2911

8,95

515

7,04

727

6,00

24,

914

123,

868

42,2

5110

9,88

214

3,74

730

7,75

545

1,50

225

,937

169,

683

155,

968

125,

851

390,

847

38,2

6942

9,11

618

,169

409,

016

13,2

576,

843

156,

629

234,

375

391,

004

25,5

4418

2,17

314

9,14

059

,691

158,

583

1,09

4,42

01,

253,

003

12,1

7517

0,75

826

,846

1,05

5,40

028

,773

21,2

3050

,003

028

,773

021

,230

141,

355

193,

647

335,

002

52,1

1619

3,47

210

8,65

132

,880

187,

688

1,02

2,31

51,

210,

003

301,

307

488,

995

449,

946

271,

062

1438

Hoo

d R

d. a

nd C

entra

l Blv

d. In

ters

ectio

n14

39 S

umm

it B

lvd.

ove

r SFW

MD

C-5

1 C

anal

1440

Flo

rida

Man

go R

d. o

ver L

WD

D L

-6 C

anal

1441

Dre

xel R

d. o

ver L

WD

D L

-2 C

anal

1431

Oke

echo

bee

Blv

d @

Pon

ce D

eLeo

n St

WB

Rt

1432

Boy

nton

Bea

ch B

lvd.

and

S. E

ntra

nce

to F

L 14

34 P

GA

Blv

d. a

nd C

entra

l Blv

d. In

ters

ectio

n14

35 G

atew

ay B

lvd.

and

Mili

tary

Tra

il In

ters

ectio

n14

36 A

cme

Dai

ry R

d. a

nd S

unse

t Pal

ms I

nter

sect

ion

1437

Lan

tana

Rd.

and

Law

renc

e R

d. In

ters

ectio

n

1424

Oke

echo

bee

Blv

d an

d C

hurc

h St

. Int

erse

ctio

n 14

25 P

olo

Clu

b R

d. fr

om 4

5th

Plac

e So

uth

to L

ake

1426

Lan

tana

Rd

@ E

dgec

liff A

ve-W

. Rt T

urn

Lane

1427

Roy

al P

alm

Bea

ch B

lvd.

from

M-C

anal

to S

. of

1428

Old

Dix

ie H

wy

from

Yam

ato

Rd

to L

into

n B

lvd

1430

Gla

des R

d an

d Ju

dge

Win

ikof

f Rd

U T

urn

1415

Con

gres

s Ave

& P

alm

Bea

ch L

akes

Blv

d.

1416

Lak

e W

orth

Rd

@ P

BSC

Ent

ranc

e In

ters

ectio

n14

17 C

entra

l Blv

d. a

t Hoo

d R

d14

18 R

ustic

Lak

es D

rain

age

Impr

ovem

ent @

1421

W. A

tlant

ic A

ve. &

Fla

. Tur

npik

e In

ters

ectio

n14

23 G

lade

s Rd

& B

utts

Rd.

Inte

rsec

tion

Imp.

1394

S.W

. 3rd

St.

from

SR

7 to

E o

f SR

713

95 S

anda

lfoot

Blv

d fr

om S

R7

to E

. of S

R 7

1396

Pur

dy L

ane/

Fore

st H

ill E

lem

. to

E of

Maj

or D

r13

99 S

outh

ern

Blv

d &

Lyo

ns R

d-Sa

nsbu

rys W

ay14

00 M

inor

Inte

rsec

tions

-FY

2010

1402

Tra

ffic

Sig

nals

-Mas

t Arm

s FY

2010

1387

Fla

vor P

ict R

d/SR

7 to

Lyo

ns R

d13

88 L

yons

Rd/

Clin

t Moo

re R

d to

Atla

ntic

Ave

1389

Lyo

ns R

d/H

illsb

oro

Can

al to

SW

18t

h St

1391

Roe

buck

Rd/

Jog

Rd

to H

aver

hill

Rd

1392

Hav

erhi

ll R

d/N

. of C

arib

bean

Blv

d. to

Bee

Lin

e

108

Page 113: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

18,2

9390

8,05

692

6,34

933

4,41

035

2,70

341

3,17

316

0,47

311

4,46

012

2,54

223

7,00

225

,768

140,

228

66,0

0730

,768

313,

454

36,5

4835

0,00

20

313,

454

036

,548

010

,000

10,0

000

00

10,0

0094

,480

29,4

2612

3,90

60

94,4

800

29,4

262,

978,

108

2,68

1,43

35,

659,

541

446,

791

3,42

4,89

946

4,75

21,

769,

890

524,

468

12,3

75,5

3412

,900

,002

110,

455

634,

923

1,70

3,35

510

,561

,724

1,34

8,87

815

1,12

91,

500,

007

10,5

301,

359,

408

014

0,59

950

2,37

934

7,62

585

0,00

40

502,

379

034

7,62

547

,142

27,8

6075

,002

3,44

150

,583

024

,419

188,

874

1,59

9,35

71,

788,

231

164,

024

352,

898

1,14

1,35

229

3,98

228

,409

21,5

9150

,000

028

,409

021

,591

154,

531

76,4

7323

1,00

435

,574

190,

105

9,09

131

,809

40,3

569,

647

50,0

031,

120

41,4

763,

047

5,48

092

,923

682,

079

775,

002

291,

568

384,

491

374,

328

16,1

830

500,

000

500,

000

00

433,

149

66,8

5114

0,34

210

4,66

024

5,00

224

,591

164,

933

31,6

3148

,438

18,2

7923

518

,514

234

18,5

130

150

,205

719,

797

770,

002

221,

883

272,

088

338,

923

158,

992

93,0

5032

6,95

242

0,00

220

8,47

830

1,52

73,

737

114,

738

2,65

27,

349

10,0

012,

984

5,63

60

4,36

51,

600,

839

539,

164

2,14

0,00

388

,144

1,68

8,98

30

451,

020

40,2

021,

519,

800

1,56

0,00

21,

170,

107

1,21

0,30

90

349,

693

3,07

06,

930

10,0

000

3,07

02,

800

4,13

08,

614

1,04

1,38

71,

050,

001

431,

746

440,

360

421,

518

188,

123

19,4

735,

527

25,0

000

19,4

730

5,52

70

624,

711

624,

711

00

062

4,71

113

4,57

460

,426

195,

000

013

4,57

40

60,4

2662

,768

137,

234

200,

002

51,9

9111

4,75

957

,473

27,7

7017

,114

382,

888

400,

002

117,

395

134,

509

217,

361

48,1

3281

,941

1,27

8,06

11,

360,

002

151,

141

233,

082

946,

941

179,

979

131,

914

488,

088

620,

002

291,

918

423,

832

7,18

318

8,98

762

,527

87,4

7515

0,00

249

,440

111,

966

5,67

332

,362

1478

Lin

ton

Blv

d &

Sou

th F

eder

al H

wy

1471

Wes

tgat

e C

RA

L-2

Can

al Im

prov

emen

t14

72 J

og R

d an

d G

lade

s Rd

Inte

rsec

tion

1473

Con

gres

s Ave

ove

r WPB

"F"

Can

al, N

of

1475

FL

Man

go o

ver L

WD

D L

-8 C

anal

S o

f Exu

ma

14

76 C

oral

Rid

ge D

r. an

d S.

Cou

nty

Reg

iona

l Par

k N

. 14

77 P

GA

Blv

d. a

nd E

lliso

n W

ilson

Rd.

Inte

rsec

tion

1465

Nor

thla

ke B

lvd.

, SR

710

to M

ilita

ry T

rail

1466

Jog

Rd.

, S o

f Hyp

olux

o R

d. to

10t

h A

ve. N

.14

67 J

og R

d., S

of C

lint M

oore

Rd.

to L

into

n B

lvd.

1468

SR

7, S

R 7

10 to

S. o

f 150

th C

t. N

. (Lo

xaha

tche

e 14

69 W

oolb

right

Rd.

, Mili

tary

Tra

il to

Law

renc

e R

d.14

70 P

alm

etto

Par

k R

d. a

nd G

lade

s Rd.

Inte

rsec

tion

1458

Con

nect

or R

d fr

om L

yons

Rd

to A

cme

Dai

ry R

d14

59 W

est C

amin

o R

eal a

t the

CSX

T R

ailro

ad-

14

61 G

atew

ay B

lvd.

and

Hig

h R

idge

Rd.

Inte

rsec

tion

1462

Clin

t Moo

re R

d., E

of C

ongr

ess A

ve to

E o

f 14

63 B

enoi

st F

arm

Rd.

, SR

80

to B

elve

dere

Rd.

1464

6th

Ave

. S. o

ver L

ake

Osb

orne

Dr.

1452

Tra

ffic

Sig

nals

-Mas

t Arm

s FY

2011

1453

Red

ding

Rd

& S

unup

Tra

il D

rain

age

1454

S.W

. 18t

h St

. and

Mili

tary

Tra

il In

ters

ectio

n14

55 C

ongr

ess A

ve @

PB

Sta

te C

olle

ge E

ntra

nce

L.

1456

Sou

ther

n B

lvd

and

Kirk

Rd

Inte

rsec

tion

1457

Cen

tral B

lvd.

and

Uni

vers

ity B

lvd.

Inte

rsec

tion

1444

Con

gres

s Ave

., H

ypol

uxo

Rd

to S

of L

anta

na

14

45 D

illm

an R

d., S

choo

l to

Jog

Rd

Path

way

1446

Dye

r Blv

d an

d M

ilita

ry T

rail

Inte

rsec

tion

1448

C.R

880

Em

bank

men

t Rep

airs

Nea

r 20

Mile

14

49 C

amin

o R

eal R

d/B

oca

Clu

b B

ridge

ove

r IC

WW

1451

Pat

hway

Pro

gram

-FY

2011

1442

Gun

Clu

b R

d. o

ver L

WD

D E

-3 C

anal

1443

Chu

rch

St. L

imes

tone

Cre

ek R

d to

W. o

f Cen

tral

109

Page 114: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

22,1

6817

7,83

420

0,00

22,

858

25,0

2559

,162

115,

815

79,0

4873

0,95

381

0,00

15,

626

84,6

7446

0,06

326

5,26

40

50,0

0050

,000

35,9

6835

,968

014

,033

4,24

855

,752

60,0

007,

166

11,4

150

48,5

864,

315

80,6

8685

,001

42,5

7246

,888

038

,114

51,0

9757

8,90

463

0,00

132

,450

83,5

4715

7,42

638

9,02

911

,153

93,8

5010

5,00

326

,678

37,8

303,

633

63,5

3962

914

,371

15,0

008,

910

9,53

92,

918

2,54

311

,433

143,

568

155,

001

35,5

0546

,938

010

8,06

392

0,74

511

3,04

01,

033,

785

44,4

5096

5,19

640

,417

28,1

7326

,145

963,

856

990,

001

192,

937

219,

082

489,

448

281,

471

34,9

7310

3,02

713

8,00

029

,181

64,1

5445

,616

28,2

301,

421

98,5

8010

0,00

118

,824

20,2

4510

,914

68,8

423,

339

96,6

6210

0,00

127

,982

31,3

210

68,6

8055

299

,449

100,

001

17,6

2518

,177

63,8

7617

,948

9,45

890

,544

100,

002

11,0

6520

,523

079

,479

954

199,

047

200,

001

835

1,78

90

198,

212

414

449,

586

450,

000

67,0

1567

,429

182,

367

200,

204

1,01

6,20

748

3,79

61,

500,

003

26,4

601,

042,

668

80,3

4237

6,99

410

0,90

229

9,09

940

0,00

138

,884

139,

787

12,9

2724

7,28

81,

647

698,

354

700,

001

18,1

1019

,757

068

0,24

55,

310

344,

691

350,

001

57,7

8963

,099

102,

938

183,

964

8,83

911

1,16

312

0,00

266

,979

75,8

188,

205

35,9

790

292,

000

292,

000

4,55

24,

552

125,

699

161,

749

011

5,00

011

5,00

073

,247

73,2

4790

540

,847

5,60

719

4,39

420

0,00

153

,612

59,2

1986

,236

54,5

4610

,109

74,8

9285

,001

16,1

2026

,229

9,71

449

,059

2,63

447

,366

50,0

0049

23,

127

046

,874

93,9

9215

6,00

925

0,00

136

,849

130,

842

011

9,16

00

275,

000

275,

000

40,8

6740

,867

89,3

9114

4,74

24,

499

95,5

0110

0,00

020

,232

24,7

3128

,087

47,1

825,

769

44,2

3250

,001

28,7

5434

,523

015

,478

068

,000

68,0

0025

,623

25,6

230

42,3

77

1512

S S

win

ton

Ave

. & S

E/SW

1st

Stre

et S

igna

l15

13 P

alm

etto

Par

k R

d. &

Boc

a R

io R

d. In

ters

ectio

n15

14 L

anta

na R

d. a

nd W

illow

ood

Lane

Inte

rsec

tion

1515

Pal

met

to P

ark

Rd.

ove

r LW

DD

E-4

Can

al,

1506

Ada

ptiv

e Tr

affic

Con

trol S

yste

m g

lade

d R

oad

1507

Dr.

Mar

tin L

uthe

r Kin

g Jr

. Blv

d/R

osen

wal

d

1508

Pal

m B

each

Lak

es B

lvd.

& N

. Rob

bins

Dr.

1509

Lan

tana

Roa

d an

d B

rent

woo

d B

lvd.

Inte

rsec

tion

1510

Son

risa

Del

Nor

te C

ul d

e Sa

c Im

prov

emen

ts15

11 S

R7

Exte

nsio

n , 6

0th

Stre

et to

Nor

thla

ke B

lvd.

1499

45t

h St

reet

/E o

f Hav

erhi

ll to

W o

f Mili

tary

Tra

il15

01 P

athw

ay P

rogr

am-F

Y20

1215

02 T

raff

ic S

igna

ls-M

ast A

rms-

FY20

1215

03 P

alm

etto

Par

k R

oad/

E of

Mili

tary

to I-

9515

04 P

rairi

e R

oad

over

LW

DD

L-8

Can

al B

ridge

1505

Gla

des R

d &

San

dpip

er S

hore

s Ele

m S

choo

l

1492

Rig

ht o

f Way

Par

cel M

aint

enan

ce14

93 S

E 23

rd A

venu

e an

d Fe

dera

l Hig

hway

14

94 O

keec

hobe

e B

lvd

and

Jog

Roa

d In

ters

ectio

n14

95 B

elve

dere

Roa

d &

San

sbur

y's W

ay14

97 I

slan

d W

ay a

nd C

asa

Circ

le-C

hurc

h St

14

98 Y

amat

o R

oad

and

Lyon

s Roa

d In

ters

ectio

n

1485

Oke

echo

bee

Blv

d. a

nd S

kees

Rd.

Inte

rsec

tion

1486

Nor

thla

ke B

lvd.

& A

lt. A

1A In

ters

ectio

n14

87 S

R 8

0 &

Lyo

ns R

d/Sa

nsbu

rys W

ay In

ters

ectio

n14

88 I

slan

d W

ay a

nd L

imes

tone

Cre

ek R

d.14

90 C

R88

0 C

anal

Ban

k St

abili

zatio

n Ph

ase

II14

91 F

lorid

a M

ango

Rd

over

LW

DD

L-9

& L

-10

1479

Fai

rgro

und

Rd

and

Proc

ess D

r. In

ters

ectio

n14

80 C

R 8

80 B

ridge

ove

r C-5

1 C

anal

1482

Tra

dew

ind

Roa

d an

d W

indi

ng C

reek

Lan

e R

oad

1483

Cam

ino

Rea

l Rd.

, SW

17t

h C

ourt

to S

W 7

th

1484

Lyo

ns R

oad/

Nor

te L

ago

to P

ine

Sprin

gs D

r.

110

Page 115: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

099

1,11

299

1,11

243

,274

43,2

7415

,193

932,

645

415

1,32

8,58

51,

329,

000

1,22

0,44

61,

220,

861

3,88

410

4,25

50

255,

000

255,

000

13,9

3813

,938

24,0

6721

6,99

40

200,

000

200,

000

13,0

1713

,017

109,

301

77,6

820

310,

000

310,

000

4,67

04,

670

39,9

2826

5,40

10

310,

000

310,

000

5,82

85,

828

030

4,17

20

255,

000

255,

000

20,7

9920

,799

20,8

9521

3,30

60

50,0

0050

,000

11,5

9411

,594

038

,406

033

5,00

033

5,00

060

,788

60,7

8823

8,60

335

,609

010

0,00

010

0,00

019

,663

19,6

6344

,500

35,8

370

100,

000

100,

000

6,57

96,

579

093

,421

080

0,00

080

0,00

013

,426

13,4

260

786,

574

010

0,00

010

0,00

07,

326

7,32

60

92,6

740

100,

000

100,

000

11,6

2711

,627

088

,373

050

,000

50,0

0011

,500

11,5

003,

078

35,4

220

1,80

0,00

01,

800,

000

275,

871

275,

871

1,22

5,20

929

8,92

00

1,50

0,00

01,

500,

000

3,66

93,

669

01,

496,

331

01,

400,

000

1,40

0,00

083

0,13

083

0,13

00

569,

870

01,

200,

000

1,20

0,00

069

7,79

669

7,79

60

502,

204

090

0,00

090

0,00

074

2,62

074

2,62

010

0,86

056

,520

050

0,00

050

0,00

037

,068

37,0

6839

5,00

067

,932

035

0,00

035

0,00

00

022

7,44

712

2,55

30

300,

000

300,

000

195,

666

195,

666

010

4,33

40

200,

000

200,

000

00

173,

162

26,8

380

150,

000

150,

000

4,60

44,

604

98,5

7646

,819

010

0,00

010

0,00

00

022

,436

77,5

640

100,

000

100,

000

25,3

7025

,370

51,6

7522

,955

050

,000

50,0

000

031

,201

18,7

990

50,0

0050

,000

00

25,9

5124

,049

050

,000

50,0

000

033

,793

16,2

070

50,0

0050

,000

49,2

0849

,208

079

20

50,0

0050

,000

28,8

6328

,863

021

,137

025

0,00

025

0,00

00

00

250,

000

1530

Jog

Rd

and

LWD

D L

-16

Can

al In

ters

ectio

n

1550

Min

or In

ters

ectio

ns-F

Y20

13

1545

Sec

tions

of S

eacr

est B

lvd.

Stri

ping

1534

Hav

erhi

ll R

oad

from

Oke

echo

bee

Blv

d. to

1535

Lan

tana

Rd.

from

wes

t of S

R7

to T

urnp

ike

1536

Sec

tion

of K

irk R

oad

Dra

inag

e

1524

Sum

mit

Bou

leva

rd o

ver L

WD

D E

-3 C

anal

1525

Pal

met

to P

ark

Roa

d an

d N

.W. 1

2th

Ave

nue

1526

Yam

ato

Rd,

Lak

erid

ge B

lvd

to W

of F

lorid

a's

1527

Flro

ida

Man

go R

d, B

arba

dos R

d to

N. o

f Myr

ica

1528

Clin

t Moo

re R

d, O

aks C

lub

Dr t

o Lo

ng L

ake

Dr

1529

60t

h St

reet

N, 1

40th

Ave

to E

of 1

20th

Ave

N.

1518

Lox

ahat

chee

Riv

er R

oad

and

Via

Rio

15

19 F

lorid

a M

ango

Rd

over

PB

C L

-2 C

anal

Brid

ge

1520

Kud

za R

d. o

ver L

WD

D L

at. 8

Can

al (9

3431

2)15

21 S

mith

Sun

dy R

d. o

ver L

WD

D L

at. 3

3 C

anal

15

22 L

oxah

atch

ee R

iver

Rd

over

SFW

MD

C-1

8 15

23 1

00th

Stre

et S

outh

and

SR

7 In

ters

ectio

n

1516

She

rwoo

d Fo

rest

Blv

d ov

er L

WD

D L

-8 C

anal

1517

Pal

mw

ood

Rd/

750'

N. o

f Don

ald

Ros

s to

Susa

n

1547

Sec

tions

of C

lint M

oore

Roa

d St

ripin

g15

48 S

ectio

ns o

f Hag

en R

anch

Roa

d St

ripin

g15

49 S

ectio

ns o

f Pal

m B

each

Lak

es B

lvd.

Stri

ping

1537

Sec

tion

of Jo

g R

oad

Strip

ing

1538

CR

A1A

from

Don

ald

Ros

s Rd.

to M

arci

nski

1541

Sec

tions

of M

ilita

ry T

rail

Strip

ing

1542

Lak

e O

sbor

ne D

r. ov

er L

ake

Bas

s Can

al

1543

Sec

tions

of C

ongr

ess A

venu

e St

ripin

g15

44 S

ectio

ns o

f Gat

eway

Blv

d. S

tripi

ng

1546

Sec

tions

of O

ld D

ixie

Hig

hway

Stri

ping

1531

Mili

tary

Tra

il fr

om P

GA

Blv

d. to

Don

al R

oss

1532

Pal

m B

each

Lak

es B

lvd.

ove

r FEC

R/R

15

33 G

un C

lub

Roa

d fr

om Jo

g R

oad

to C

ongr

ess A

ve.

111

Page 116: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

1,15

9,47

534

0,52

91,

500,

004

23,4

111,

182,

887

1,60

031

5,51

810

9,45

949

0,54

360

0,00

217

,257

126,

717

241,

806

231,

480

01,

500,

000

1,50

0,00

03,

450

3,45

012

,728

1,48

3,82

20

390,

000

390,

000

160,

699

160,

699

174,

000

55,3

010

250,

000

250,

000

00

025

0,00

086

2,16

663

7,83

81,

500,

004

39,8

9490

2,06

040

,832

557,

112

060

0,00

060

0,00

011

9,83

911

9,83

958

,046

422,

115

025

0,00

025

0,00

00

00

250,

000

914,

167

585,

835

1,50

0,00

221

9,40

01,

133,

567

94,3

0327

2,13

20

600,

000

600,

000

00

060

0,00

00

250,

000

250,

000

00

025

0,00

028

9,86

91,

210,

133

1,50

0,00

236

0,97

665

0,84

554

,374

794,

782

060

0,00

060

0,00

00

00

600,

000

025

0,00

025

0,00

00

00

250,

000

01,

500,

000

1,50

0,00

049

3,77

149

3,77

167

,460

938,

769

060

0,00

060

0,00

00

00

600,

000

050

,000

50,0

0012

,206

12,2

060

37,7

940

30,0

0030

,000

00

030

,000

013

5,00

013

5,00

00

00

135,

000

010

0,00

010

0,00

00

00

100,

000

090

0,00

090

0,00

00

00

900,

000

360,

960

744,

041

1,10

5,00

10

360,

960

716,

649

27,3

9214

2,92

991

6,88

01,

059,

809

85,8

2822

8,75

783

1,00

151

01,

880,

000

1,88

0,00

034

,376

34,3

761,

584,

367

261,

257

236,

327,

601

177,

016,

756

413,

344,

355

27,4

97,1

5626

3,82

4,75

843

,826

,172

105,

693,

439

5,35

4,21

914

,945

,785

20,3

00,0

042,

814,

911

8,16

9,13

01,

656,

230

10,4

74,6

445,

354,

219

14,9

45,7

8520

,300

,004

2,81

4,91

18,

169,

130

1,65

6,23

010

,474

,644

927,

120

72,8

811,

000,

001

092

7,12

00

72,8

8118

1,71

310

4,45

028

6,16

38,

711

190,

423

4,34

091

,399

1,10

8,83

317

7,33

11,

286,

164

8,71

11,

117,

543

4,34

016

4,28

0

F092

Em

erge

ncy

Veh

icle

Prio

rity

Syst

emM

119

Cen

ter S

t Dra

inag

e Im

p/Th

elm

a to

Woo

dlan

dT

otal

Eng

-Mis

c C

apita

l Pro

ject

s

1751

Pat

hway

Pro

gram

- FY

2017

1752

Tra

ffic

Sig

nals

Mas

t Arm

s - F

Y20

17

5302

Aba

coa/

Cou

nty

Porti

onM

119

Cen

ter S

t Dra

inag

e Im

p/Th

elm

a to

Woo

dlan

d

1861

Hag

en R

anch

Roa

d an

d A

tlant

ic A

venu

e

2270

Rai

lroad

Cro

ssin

g M

aint

enan

ce

1863

SW

1st

Stre

et fr

om U

S 27

to S

W 7

th A

venu

e18

64 F

lorid

a M

ango

Rd.

ove

r LW

DD

L-5

Can

al,

1865

Kirk

Rd.

ove

r LW

DD

L-5

Can

al, B

ridge

1862

Aus

traili

an a

venu

e R

oadw

ay S

afet

y A

udit

1551

Pat

hway

Pro

gram

-FY

2013

1552

Tra

ffic

Sig

nals

-Mas

t Arm

s-FY

2013

1554

Lyo

ns R

d. fr

om P

.B. C

entra

l Hig

h En

t. to

1600

Min

or In

ters

ectio

n-FY

2014

1700

Min

or In

ters

ectio

ns-F

Y20

16

1650

Min

or In

ters

ectio

ns-F

Y20

1516

51 P

athw

ay P

rogr

am-F

Y20

1516

52 T

raff

ic S

igna

ls-M

ast A

rms-

FY20

15

R00

2 P

avem

ent M

gmt/R

oadw

ay S

tripi

ngT

otal

Eng

-Rd

& B

ridg

e C

apita

l Mai

nt.

364

Eng

-Mis

c C

apita

l Pro

ject

s

Tot

al E

ng &

Pub

Wks

- R

d Pg

m C

apita

l

363

Eng

-Rd

& B

ridg

e C

apita

l Mai

nt.

1701

Pat

hway

Pro

gram

-FY

2016

1601

Pat

hway

Pro

gram

-FY

2014

1602

Tra

ffic

Sig

nals

-Mas

t Arm

s-FY

2014

1702

Tra

ffic

Sig

nals

-Mas

t Arm

s-FY

2016

1750

Min

or In

ters

ectio

ns -

FY20

17

1553

Kirk

Rd.

, S o

f LW

DD

L-7

Can

al to

Pot

O'G

old

112

Page 117: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

2,47

2,86

920

6,41

52,

679,

284

65,4

662,

538,

335

014

0,94

934

,517

17,4

2651

,943

5,24

539

,762

012

,181

204,

793

140,

382

345,

175

020

4,79

310

6,75

633

,626

838,

465

35,5

4087

4,00

50

838,

465

4,08

231

,458

1,26

0,65

017

4,35

51,

435,

005

321,

260,

682

2,48

017

1,84

388

,566

11,4

3810

0,00

48,

826

97,3

922,

296

317

012

0,00

012

0,00

028

,266

28,2

6631

,730

60,0

040

7,92

07,

920

3,48

33,

483

04,

437

023

1,00

023

1,00

00

00

231,

000

4,89

9,86

094

4,47

65,

844,

336

111,

318

5,01

1,17

814

7,34

468

5,81

4

033

8,61

933

8,61

90

00

338,

619

1,17

4,24

811

5,44

01,

289,

688

21,5

391,

195,

787

093

,091

551,

679

42,0

2059

3,69

90

551,

679

042

,020

1,75

1,54

828

,192

1,77

9,74

00

1,75

1,54

80

28,1

9216

,211

264,

001

280,

212

2,57

218

,783

026

1,42

934

7,31

810

7,68

445

5,00

21,

150

348,

468

010

6,53

416

8,45

256

,550

225,

002

016

8,45

22,

182

54,3

683,

920

31,0

8135

,001

30,4

1634

,336

066

516

6,77

886

7,02

91,

033,

807

24,8

4119

1,61

969

4,28

314

7,90

547

2,14

419

,357

491,

501

047

2,14

487

318

,484

591

87,0

0087

,591

059

10

87,0

0012

9,19

798

2,38

41,

111,

581

401,

595

530,

792

578,

434

2,35

511

0,53

946

2,86

357

3,40

237

2,60

248

3,14

10

90,2

610

95,0

0095

,000

00

095

,000

060

,000

60,0

003,

780

3,78

042

055

,801

4,89

2,62

43,

557,

220

8,44

9,84

585

8,49

55,

751,

120

1,27

6,19

21,

421,

724

23,1

8034

,822

58,0

023,

053

26,2

3331

,767

223

,180

34,8

2258

,002

3,05

326

,233

31,7

672

1263

Silv

er B

each

Rd

Stre

et L

ight

ing-

Dis

t 7

S205

Far

go A

ve/E

l Pas

o D

rive

to A

rrow

head

Driv

eS2

06 E

l Pas

o D

rive,

Pan

cho

Way

and

Pin

to D

rive

E

S185

60t

h St

reet

N/2

00th

Tra

il N

to E

of M

Can

alS1

70 H

ypol

uxo

Vill

. Ann

ual S

pray

Tr

S045

Mst

u D

istri

ct F

X00

6 C

CR

T R

ecou

ped

Fund

ing

X09

2 C

inqu

ez P

ark

East

Are

a Im

prov

emen

ts

S207

Myr

tle D

rive

and

47th

Way

Sou

th, D

ead

End

to

S210

Bis

hoff

Roa

d, d

ead

end

to Jo

g R

oad

Dra

inag

eS2

11 S

anda

lfoot

Cov

e C

anal

Spr

ay T

reat

men

t Mai

nt.

S212

Pal

m S

prin

gs C

anal

11

Rd,

Erie

Ter

r, Lo

ne P

ine

X11

2 W

ater

gate

MH

P N

eigh

borh

ood

Park

X10

4 S

treet

Lig

htin

g Pr

ojec

t

X04

4 S

chal

l Circ

le P

avin

g &

Dra

inX

087

Hom

e B

eaut

ifica

tion

Imp.

Gra

nt

X16

2 L

imes

tone

Cre

ek P

hase

IIX

159

Lak

e W

orth

Wes

t Com

mun

ity C

ente

r

X13

5 G

ram

ercy

Par

k N

eigh

borh

ood

Park

365

Eng

-Str

eet I

mp

Cap

ital P

rojc

ts

Tot

al C

crt P

rogr

am P

roje

cts

X17

5 W

ater

gate

Est

ates

Stre

et L

ight

ing

X16

8 L

-10

Can

al Im

prov

emen

t Pro

ject

X16

9 P

enny

Lan

e Pa

ving

and

Dra

inag

e Im

prov

emen

tsX

170

Mer

idia

n R

d D

rain

age

Impr

ovem

ents

X15

8 W

allis

Pat

hway

Pro

ject

366

Ccr

t Pro

gram

Pro

ject

s

Tot

al E

ng-S

tree

t Im

p C

apita

l Pro

jcts

Tot

al D

istr

ict I

mpr

ovem

ent P

roje

cts

368

Dis

tric

t Im

prov

emen

t Pro

ject

s

X14

0 L

imes

tone

Cre

ek P

ark

113

Page 118: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

7,67

6,29

244

,591

7,72

0,88

369

27,

676,

984

9943

,800

96,1

7065

3,83

075

0,00

016

8,20

326

4,37

30

485,

627

025

0,00

025

0,00

00

00

250,

000

12,7

64,9

1956

8,23

313

,333

,152

53,3

1912

,818

,239

25,5

8148

9,33

263

,835

,863

1,23

6,13

465

,071

,997

110,

518

63,9

46,3

810

1,12

5,61

62,

340,

623

464,

437

2,80

5,06

00

2,34

0,62

30

464,

437

9,06

2,36

713

4,95

69,

197,

323

09,

062,

367

013

4,95

62,

198,

059

796,

936

2,99

4,99

515

,853

2,21

3,91

278

1,08

21

1,50

4,83

013

,535

1,51

8,36

513

,534

1,51

8,36

50

16,

026,

260

213,

238

6,23

9,49

861

,044

6,08

7,30

40

152,

194

9,67

4,21

51,

860,

379

11,5

34,5

9411

3,71

09,

787,

925

86,0

611,

660,

608

1,41

4,88

527

9,75

61,

694,

641

1,62

61,

416,

511

027

8,13

016

,160

,775

5,15

5,94

721

,316

,722

144,

153

16,3

04,9

2757

1,76

14,

440,

034

3,75

3,28

423

3,65

83,

986,

942

03,

753,

284

023

3,65

867

,664

333,

988

401,

652

14,1

4981

,813

031

9,83

911

,413

,898

2,32

4,97

213

,738

,870

1,79

6,30

313

,210

,200

85,8

0844

2,86

22,

032,

599

256,

863

2,28

9,46

22,

003

2,03

4,60

20

254,

860

1,63

0,39

646

5,81

72,

096,

213

5,46

61,

635,

862

2,66

345

7,68

83,

987,

845

157,

496

4,14

5,34

13,

920

3,99

1,76

50

153,

576

2,30

7,58

02,

267,

652

4,57

5,23

217

2,26

22,

479,

841

44,3

652,

051,

025

13,1

75,2

893,

606,

738

16,7

82,0

2725

2,76

313

,428

,052

447,

552

2,90

6,42

474

7,00

338

9,10

11,

136,

104

79,1

0982

6,11

223

,596

286,

396

981,

368

2,08

8,63

83,

070,

006

1,13

7,95

72,

119,

324

095

0,68

12,

469,

000

145,

801

2,61

4,80

110

7,70

22,

576,

702

29,3

458,

753

9,59

6,07

775

0,30

210

,346

,379

191,

856

9,78

7,93

27,

447

551,

000

608,

734

118,

905

727,

639

060

8,73

40

118,

905

5,44

0,45

21,

068,

910

6,50

9,36

222

,832

5,46

3,28

427

,298

1,01

8,78

019

0,96

6,44

625

,880

,813

216,

847,

259

4,46

8,97

419

5,43

5,41

72,

132,

658

19,2

79,1

83

607,

571

842,

431

1,45

0,00

263

,170

670,

741

47,5

5073

1,71

111

,178

25,3

2336

,501

011

,178

025

,323

M05

1 C

entra

l Boc

a Sh

ore

Prot

ectio

nM

100

Sho

relin

e Pr

otec

tion

Pgm

Act

ivM

209

Uni

t 11

Emin

ent D

omai

n A

cqui

s.M

213

S L

ox S

loug

h W

etla

nd R

estrt

ion

M70

3 S

lwid

San

d Tr

ans P

lant

Rec

ons

B20

9 8

00m

hz R

enew

al A

nd R

epla

cem

ent

E458

Blu

egill

Tra

il (N

ENA

)E4

59 S

nook

Isla

nd M

angr

ove

Miti

gatio

nM

015

Oce

an R

idge

Sho

re P

rote

ctio

nM

016

S.B

oca

Rat

on S

hore

Pro

tect

ion

M02

8 Ju

no B

each

Sho

re P

rote

ctio

nM

033

Em

erge

ncy

Bea

ch R

espo

nses

M03

4 P

b M

idto

wn

Shor

e Pr

otec

tion

M03

7 S

inge

r Isl

and

Sp/D

une

Rst

rtion

M03

9 N

orth

Boc

a Sh

ore

Prot

ectio

nM

040

Cor

al C

ove

Dun

e R

esto

ratio

n 97

M04

1 D

elra

y B

each

Sho

re P

rote

ct 9

9M

044

S P

alm

Bea

ch D

une

Res

tora

tion

M04

5 Ju

pite

r/Car

lin S

hore

Pro

tect

2M

046

Sou

th L

ake

Wor

th In

let M

gmt

E111

Env

ironm

enta

l Res

tora

tion

E114

Env

ironm

enta

l Res

tora

tion

FY20

16E1

15 E

nviro

nmen

tal R

esto

ratio

n FY

2017

E270

Lox

ahat

chee

Slo

ugh-

Ecos

ite 1

09E4

06 C

ypre

ss C

reek

Tra

ctE4

21 N

orth

Jupi

ter F

latw

oods

B26

7 A

da S

igna

ge C

ount

ywid

e

E433

Win

ding

Wat

ers N

atur

al A

rea

E457

Jun

o D

unes

FIN

D M

SA 6

14B

381

Env

iron

men

tal R

es M

gt-C

ap

Tot

al E

nvir

onm

enta

l Res

Mgt

-Cap

411

Faci

litie

s Dev

& O

ps C

apita

l

114

Page 119: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

171,

349,

656

1,15

1,35

417

2,50

1,01

090

,291

171,

439,

946

837,

966

223,

098

840,

085

9,92

085

0,00

50

840,

085

09,

920

1,91

5,22

22,

444,

080

4,35

9,30

21,

051,

293

2,96

6,51

536

2,22

71,

030,

560

2,85

6,30

289

,248

2,94

5,55

00

2,85

6,30

20

89,2

4822

3,65

011

6,35

334

0,00

334

,218

257,

867

1,18

780

,948

111,

565

38,4

3715

0,00

20

111,

565

19,8

8518

,522

44,2

0455

,796

100,

000

044

,204

36,1

6719

,630

24,9

5843

25,0

0142

25,0

000

15,

899

05,

899

05,

899

00

27,2

682,

733

30,0

010

27,2

680

2,73

349

3,51

431

,488

525,

002

6,26

049

9,77

30

25,2

281,

047,

892

5,34

7,10

96,

395,

001

99,8

111,

147,

703

1,05

1,66

14,

195,

637

8,05

311

1,94

912

0,00

210

,143

18,1

9625

,103

76,7

039,

642

90,3

5910

0,00

131

,430

41,0

724,

833

54,0

9610

3,58

41,

743,

419

1,84

7,00

30

103,

584

106,

438

1,63

6,98

123

8,38

96,

611

245,

000

6,61

024

5,00

00

117

,711

232,

291

250,

002

134,

862

152,

573

97,4

281

117,

091

182,

911

300,

002

172,

649

289,

740

5,78

04,

482

146,

058

635,

943

782,

001

14,1

2816

0,18

666

,438

555,

377

4,17

2,75

55,

569,

677

9,74

2,43

22,

947,

007

7,11

9,76

317

5,32

12,

447,

349

1,70

0,94

43,

538,

915

5,23

9,85

975

3,61

82,

454,

562

200,

514

2,58

4,78

352

5,60

51,

087,

398

1,61

3,00

364

,464

590,

069

16,2

611,

006,

674

5,54

8,06

01,

630,

618

7,17

8,67

818

0,82

45,

728,

884

999,

725

450,

070

02,

000,

000

2,00

0,00

00

00

2,00

0,00

04,

954,

521

45,4

845,

000,

005

04,

954,

521

045

,484

2,87

6,24

362

3,76

03,

500,

003

499

2,87

6,74

20

623,

261

345,

274

914,

727

1,26

0,00

10

345,

274

091

4,72

744

3,60

514

5,39

658

9,00

12,

451

446,

055

100,

280

42,6

6553

,332

842,

668

896,

000

2,39

255

,724

084

0,27

656

0,71

320

,974

581,

687

056

0,71

30

20,9

749,

530,

370

6,15

0,63

415

,681

,004

4,53

7,94

814

,068

,318

461,

366

1,15

1,32

04,

144,

807

451,

345

4,59

6,15

239

6,29

64,

541,

103

44,9

7210

,077

B55

7 C

ount

y H

ome

Dem

oliti

onB

558

Airp

ort C

ente

r Ren

ovat

ion

B55

9 E

nter

pris

e D

ata

Cen

ter

B51

0 C

ount

ywid

e El

ectro

nic

Syst

ems F

Y 2

010

B53

0 R

oger

Dea

n St

adiu

m R

epai

r & R

enov

atio

nsB

537

Bui

ldin

g R

&R

Cou

ntyw

ide

FY20

12

B54

7 R

adio

Sys

tem

800

MH

Z Sy

stem

Ref

resh

B

548

Rad

io S

yste

m A

nalo

g M

icro

wav

e Sy

stem

B

551

Bui

ldin

g R

&R

Cou

ntyw

ide

FY20

13B

552

Rad

io S

yste

m R

epai

r & R

epla

ce F

Y20

13B

556

Jupi

ter H

ealth

Cen

ter E

xpan

sion

B54

4 E

lect

roni

c Sy

stem

s R&

R C

ount

ywid

e FY

2012

B54

5 P

BSO

Hea

dqua

rters

Mod

ifica

tions

B54

6 C

ourth

ouse

Jury

Ass

embl

y FY

2012

B40

8 G

over

nmen

t Cen

ter S

pace

Rea

lloca

tion

B42

5 P

BSO

Hea

dqua

rters

Spa

ce M

aste

r Pla

n

B36

3 In

dust

rial F

acili

ty (V

ista

) Fur

nitu

re

B40

3 C

ount

ywid

e Se

curit

y Sy

stem

07

B43

6 C

ourth

ouse

Com

mon

Are

a FF

E 10

B43

8 C

ourth

ouse

Tel

epho

nic

Inte

grat

ion

09

B39

3 D

ist 4

& T

raff

ic R

elo

@W

AA

B37

1 R

enew

al &

Rep

lace

men

t

B36

2 Ja

il Ex

pans

ion

Proj

ect

B50

2 N

orth

Cou

nty

Cou

rthou

se-D

igita

l Rec

ordi

ng F

Y

B43

9 C

ount

ywid

e Fi

re A

larm

Rep

lace

men

t 09

B45

1 P

BSO

Evi

denc

e B

ldg

B52

0 C

ourth

ouse

Cen

tral R

ec H

VA

C F

Y20

11

B50

5 C

ourth

ouse

Com

mon

Are

as F

FE F

Y 2

010

B52

4 V

ario

us F

acili

ty R

enov

atio

nsB

525

FD

&O

Lan

d A

cqui

sitio

n FY

2011

B52

6 C

ount

ywid

e El

ectro

nic

Syst

ems F

Y20

11

B43

7 C

ourth

ouse

FTR

Cra

sh C

art 0

9

115

Page 120: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

1,85

2,48

314

7,51

92,

000,

002

93,3

441,

945,

827

25,4

5328

,722

025

0,00

025

0,00

076

,391

76,3

9167

,800

105,

810

55,5

2244

,478

100,

000

055

,522

044

,478

54,6

0932

,552

87,1

6110

,500

65,1

090

22,0

5263

,428

36,5

7210

0,00

05,

329

68,7

570

31,2

430

300,

000

300,

000

00

030

0,00

022

4,84

635

,154

260,

000

022

4,84

610

,942

24,2

1266

,330

13,6

7380

,003

12,0

0078

,330

01,

673

255,

740

71,1

6532

6,90

571

,164

326,

904

01

2,58

5,18

31,

378,

398

3,96

3,58

114

2,46

62,

727,

649

23,9

321,

212,

000

37,7

41,3

8022

,258

,626

60,0

00,0

0611

,146

,116

48,8

87,4

951,

512,

752

9,59

9,75

813

1,31

774

6,18

487

7,50

186

,766

218,

083

065

9,41

841

4,88

93,

398,

164

3,81

3,05

321

3,81

062

8,69

926

0,72

42,

923,

630

125,

325

414,

676

540,

001

59,7

7218

5,09

611

,529

343,

375

700,

805

360,

031

1,06

0,83

620

7,02

990

7,83

437

215

2,63

00

250,

000

250,

000

00

025

0,00

00

300,

000

300,

000

21,5

6821

,568

827

8,42

434

,067

265,

933

300,

000

034

,067

026

5,93

31,

078,

389

1,31

4,57

42,

392,

963

768,

400

1,84

6,78

941

,540

504,

634

71,8

828,

118

80,0

000

71,8

820

8,11

816

4,30

592

,696

257,

001

016

4,30

50

92,6

9670

,861

,217

64,1

38,7

8713

5,00

0,00

449

,490

,745

120,

351,

962

13,8

56,8

5179

1,19

132

,531

117,

469

150,

000

117,

038

149,

569

043

13,

171,

000

13,

171,

001

03,

171,

000

01

06,

300,

000

6,30

0,00

037

0,05

437

0,05

420

5,25

95,

724,

687

7,86

3,48

319

,736

,519

27,6

00,0

028,

263,

910

16,1

27,3

934,

210,

113

7,26

2,49

60

75,0

0075

,000

61,9

3861

,938

2,60

910

,543

050

,000

50,0

000

00

50,0

0040

,625

44,3

7585

,000

8,19

248

,817

036

,183

010

0,00

010

0,00

00

00

100,

000

113,

461

386,

540

500,

001

011

3,46

11,

000

385,

540

B57

8 C

ount

ywid

e Pa

rks R

enew

al &

Rep

l FY

15

B56

4 C

ourth

ouse

Fel

ony

Cou

rtroo

m M

icro

phon

esB

565

Cou

rthou

se Ju

ry R

oom

Aco

ustic

sB

566

Cou

rthou

se M

ailro

om

B59

6 C

lerk

Cam

eras

@M

JC C

ash

Cou

nter

s

B59

2 C

ourth

ouse

8th

Flo

or B

uild

-Out

B59

3 P

BSO

MD

C E

/W T

ower

R &

RB

594

PB

SO M

DC

Ele

ct S

yste

m R

& R

B59

5 R

adio

Sys

tem

P25

Mig

ratio

n

B57

7 C

ount

ywid

e El

ectri

c Sy

s Ren

ewal

& R

epl F

Y15

B56

0 C

onst

itutio

nal F

acili

ty Im

prov

emen

ts F

Y20

14B

561

Cou

ntyw

ide

Faci

lity

Ren

ovat

ions

FY

2014

B56

2 C

ourth

ouse

Cle

rk E

vide

nce

Mod

s

B58

8 P

BSO

HQ

Med

ia R

enov

atio

nsB

587

PB

SO M

arin

e B

oat L

ife R

enov

atio

n

B60

2 C

ourth

ouse

Cle

rk E

vide

nce

Deh

umid

ityB

603

Hig

h R

idge

Sec

ure

Lobb

y

B59

0 N

ew S

tadi

um

B60

4 L

and

Due

Dili

genc

e FY

16

B58

4 W

Cou

nty

Adm

Bui

ldin

g M

ods

B58

5 V

ario

us F

ac Im

pr/C

onst

itutio

nal O

ffic

ers F

Y15

B57

6 C

ount

ywid

e B

uild

ing

Ren

ewal

& R

epl F

Y15

B56

8 N

orth

Cou

nty

Cou

rthou

se C

rtroo

m #

2/H

R#2

711

B56

9 S

tate

Atto

rney

Mai

n Sh

ell S

pace

270

0B

570

Gov

ernm

ent C

ente

r/Cou

rthou

se P

arki

ng

B

571

Bui

ldin

g R

& R

Cou

ntyw

ide

FY20

14

B58

1 G

over

nmen

t Cen

ter C

ham

ber M

onito

r Rep

lace

B57

9 C

ount

ywid

e V

ario

us F

acili

ty Im

prov

emen

ts

B57

2 C

onve

ntio

n C

ente

r Par

king

Gar

age

B57

3 E

lect

roni

c Sy

stem

s R &

R C

ount

ywid

e FY

2014

B60

7 P

BSO

Com

mun

ity S

ervi

ces

116

Page 121: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

08,

700

8,70

00

00

8,70

00

250,

000

250,

000

00

025

0,00

035

1,56

53,

237,

436

3,58

9,00

170

2,35

71,

053,

923

195,

969

2,33

9,10

90

1,05

8,00

01,

058,

000

145,

236

145,

236

35,0

6587

7,70

05,

613

1,13

7,38

71,

143,

000

544,

190

549,

803

195,

491

397,

706

010

0,00

010

0,00

00

00

100,

000

01,

000,

000

1,00

0,00

011

7,70

311

7,70

310

4,65

777

7,64

015

5,69

750

,304

206,

001

564

156,

261

049

,740

21,3

9439

,322

60,7

160

21,3

940

39,3

220

1,00

0,00

01,

000,

000

00

01,

000,

000

07,

500,

000

7,50

0,00

058

4,11

058

4,11

01,

200,

199

5,71

5,69

10

1,70

0,00

01,

700,

000

00

93,7

171,

606,

283

01,

300,

000

1,30

0,00

033

,061

33,0

6110

,554

1,25

6,38

40

250,

000

250,

000

00

025

0,00

00

250,

000

250,

000

00

025

0,00

00

2,55

0,00

02,

550,

000

00

02,

550,

000

025

0,00

025

0,00

096

096

09,

075

239,

965

050

0,00

050

0,00

024

4,64

324

4,64

321

9,96

535

,392

01,

300,

000

1,30

0,00

00

00

1,30

0,00

034

3,29

2,80

518

2,32

7,74

752

5,62

0,55

184

,199

,762

427,

492,

566

26,9

56,6

7871

,171

,371

020

0,00

020

0,00

00

00

200,

000

01,

149,

152

1,14

9,15

20

00

1,14

9,15

225

5,52

93,

234,

471

3,49

0,00

062

,448

317,

977

350,

512

2,82

1,51

163

4,64

42,

965,

296

3,59

9,94

00

634,

644

02,

965,

296

571,

344

2,94

8,65

73,

520,

001

057

1,34

40

2,94

8,65

728

3,37

871

6,62

31,

000,

001

028

3,37

80

716,

623

465,

397

34,6

0450

0,00

10

465,

397

034

,604

86,7

602,

413,

240

2,50

0,00

00

86,7

600

2,41

3,24

03,

550,

815

321,

189

3,87

2,00

464

,492

3,61

5,30

70

256,

697

196,

692

28,3

0922

5,00

10

196,

692

4,13

024

,180

072

5,00

072

5,00

00

00

725,

000

47,2

2876

,230

123,

458

76,2

3012

3,45

80

0

F085

Sta

tion

24 R

epla

cem

ent

5000

Prio

r Yea

r Ref

unds

9900

Fire

Res

cue

Cap

ital R

eser

ves

F082

Sem

inol

e Pr

att/B

ee L

ine

Stat

ion

F097

Sta

tion

72 R

epla

cem

ent

F100

Dis

patc

h U

PS R

epla

cem

ent

B61

2 C

ount

ywid

e El

ectri

c Sy

s Ren

ewal

& R

epl F

Y16

B61

3 C

ount

ywid

e Pa

rks R

enew

al &

Rep

l FY

16B

614

Cou

ntyw

ide

Var

ious

Fac

ility

Impr

ovem

ents

B60

8 N

Cou

nty

Cou

rthou

se C

lerk

Acc

ess

F056

Sta

tion

22 R

epla

cem

ent

B61

1 C

ount

ywid

e B

uild

ing

Ren

ewal

& R

epl F

Y16

B61

5 V

ario

us F

ac Im

pr/C

onst

itutio

nal O

ffic

ers F

Y16

B61

6 P

BSO

MD

C S

ec C

amer

aB

618

PB

SO H

Q C

omm

Ren

oB

619

Con

stitu

tiona

l Fac

ility

Impr

ovem

ents

FY

17B

620

Cou

ntyw

ide

Bui

ldin

g R

enew

al &

Rep

lace

men

t

Tot

al F

acili

ties D

ev &

Ops

Cap

ital

F102

New

Tac

tical

Com

man

d U

nit

F103

Enh

ance

men

ts to

Exi

stin

g Ta

ctic

al C

omm

and

F094

Sta

tion

37 Im

prov

emen

tsF0

95 S

tatio

n 34

Ren

ovat

ions

F096

Gla

des H

eadq

uarte

rs/T

rain

ing

Com

plex

B61

0 Y

outh

Ser

vice

s 4 P

ts R

enov

atio

n

Q00

2 C

ount

ywid

e A

DA

Ren

ovat

ions

Q00

3 C

ount

ywid

e R

adio

Rep

lace

men

t

441

Fire

Res

cue-

Cap

ital

B62

2 C

ount

ywid

e El

ectro

nic

Syst

ems R

enew

al &

Q00

4 C

ourth

ouse

Ele

ctro

nic

Syst

em R

&R

/Com

man

d

B62

4 L

and

Due

Dili

genc

e FY

17Q

001

Hou

sing

Uni

ts fo

r Hom

eles

s, Ex

trem

ely

Low

B62

3 C

ount

ywid

e V

ario

us F

acili

ty Im

prov

emen

ts

B62

1 C

ount

ywid

e Pa

rks R

enew

al &

Rep

lace

men

t

117

Page 122: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

520,

028

97,4

7361

7,50

122

,194

542,

222

3,56

571

,714

960,

652

36,3

5099

7,00

226

,767

987,

419

9,58

30

57,8

3067

,170

125,

000

10,2

1368

,043

6,13

850

,820

03,

400,

000

3,40

0,00

032

4,70

132

4,70

13,

080

3,07

2,22

076

8,06

197

8,60

51,

746,

666

978,

310

1,74

6,37

10

295

01,

468,

000

1,46

8,00

064

,889

64,8

8961

,359

1,34

1,75

28,

398,

357

20,8

60,3

6929

,258

,727

1,63

0,24

410

,028

,601

438,

367

18,7

91,7

61

32,5

9078

,064

110,

654

032

,590

078

,064

32,5

9078

,064

110,

654

032

,590

078

,064

2,16

7,30

33,

719

2,17

1,02

22,

735

2,17

0,03

893

153

1,59

1,55

420

,950

1,61

2,50

40

1,59

1,55

42,

650

18,3

0096

5,75

623

4,24

41,

200,

000

096

5,75

642

,000

192,

244

3,92

3,84

31,

168

3,92

5,01

10

3,92

3,84

30

1,16

84,

970,

998

504,

011

5,47

5,00

943

9,07

95,

410,

077

22,8

4842

,084

2,44

9,71

683

2,44

9,79

982

2,44

9,79

80

175

6,54

520

,057

776,

602

075

6,54

516

,556

3,50

113

7,13

96,

797

143,

936

013

7,13

90

6,79

76,

749,

051

100,

967

6,85

0,01

899

,887

6,84

8,93

897

810

239

8,30

31,

702

400,

005

1,34

539

9,64

80

357

99,5

5918

5,44

328

5,00

20

99,5

590

185,

443

351,

145

18,8

5537

0,00

04,

425

355,

570

14,4

291

384,

157

15,8

4840

0,00

55,

605

389,

762

010

,243

39,9

9150

,009

90,0

000

39,9

910

50,0

097,

666,

637

2,33

3,37

210

,000

,009

1,69

8,94

39,

365,

581

615,

184

19,2

451,

543

8,45

810

,001

7,30

08,

842

01,

158

115,

148

384,

853

500,

001

163,

723

278,

871

136,

420

84,7

1014

8,93

71,

067

150,

004

940

149,

877

012

725

,295

174,

705

200,

000

138,

376

163,

671

2,62

533

,704

62,9

3537

,066

100,

001

28,7

7691

,711

4,37

73,

913

025

0,00

025

0,00

055

,000

55,0

000

195,

000

025

,000

25,0

0024

,999

24,9

990

1

F108

Roy

al P

alm

Bea

ch F

ire S

tatio

ns P

urch

ase

Tot

al F

ire

Res

cue-

Cap

ital

I239

AM

S A

dvan

tage

Fin

anci

al S

yste

ms M

odifi

catio

n

Tot

al G

ener

al S

ervi

ces-

Cap

ital

491

Iss C

apita

l Pro

ject

s

I267

Vis

ual P

lann

ing

Tech

nolo

gies

-Sys

tem

M09

2 E

nviro

n C

omp

& C

lean

-Up

95

I253

Dat

a C

ente

r Upg

rade

to 1

0/10

0 G

igab

iteI2

55 F

iber

Bui

ldou

t of E

nter

pris

e N

etw

ork

F107

Fire

Sta

tion

#41

Nor

th

F116

Fire

Sta

tion

19 R

emed

iatio

n an

d R

epai

rs

F104

Sta

tion

48 E

xpan

sion

I306

WA

N R

R&

I FY

2010

I308

Oce

Prin

ter R

epla

cem

ent

I295

Net

wor

k Eq

uipm

ent a

nd V

endo

r Sup

port

I291

Wiri

ng fo

r Cou

rt R

ecor

ding

Tec

hnol

ogy

I237

Nov

ell M

etad

irect

ory

F105

Sta

tion

42 R

oof R

epla

cem

ent &

Inte

rior

F106

Gen

erat

ors B

atta

lion

4

461

Gen

eral

Ser

vice

s-C

apita

l

I261

Net

wor

k/In

tern

et S

ecur

ity/T

hrea

t Man

agem

ent

I229

Wire

less

Con

nect

ivity

I326

Fib

er B

uild

out o

f Ent

erpr

ise

Net

wor

k (F

Y20

16)

I327

Wire

less

Con

nect

ivity

(FY

2016

)

I329

WA

N In

-Bui

ldin

g C

ablin

g (F

Y20

16)

I330

GIS

Pro

ject

(FY

2016

)I3

33 V

ideo

Ser

vice

Del

iver

y (F

Y20

16)

I315

Ser

ver M

anag

emen

t Sys

tem

I316

WA

N In

-Bui

ldin

g C

ablin

g-FY

2012

I319

UPS

Bat

tery

Rep

lace

men

tI3

21 U

nifie

d C

omm

unic

atio

ns/V

OIP

Pro

ject

I328

Cor

e N

etw

ork

Upg

rade

s (FY

2016

)

I323

Cou

rt A

dmin

-Dig

ital S

igna

ge E

xpan

sion

118

Page 123: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

916

449,

084

450,

000

091

614

2,21

430

6,87

029

,831

20,1

6950

,000

17,5

1747

,349

02,

652

37,1

6937

,832

75,0

010

37,1

690

37,8

320

225,

000

225,

000

211,

968

211,

968

013

,032

63,0

2560

6,97

867

0,00

337

1,86

943

4,89

30

235,

109

01,

200,

000

1,20

0,00

091

,050

91,0

5092

6,34

618

2,60

414

6,54

71,

396,

089

1,54

2,63

692

8,95

01,

075,

497

046

7,13

913

7,37

055

6,00

169

3,37

110

6,00

024

3,37

00

450,

001

050

0,00

050

0,00

049

2,12

449

2,12

47,

742

134

030

0,00

030

0,00

00

010

9,91

219

0,08

80

150,

000

150,

000

112,

076

112,

076

37,2

7564

90

505,

000

505,

000

136,

168

136,

168

356,

844

11,9

880

100,

000

100,

000

99,4

3799

,437

056

30

150,

000

150,

000

00

015

0,00

00

400,

000

400,

000

344,

248

344,

248

55,7

502

010

0,00

010

0,00

086

,895

86,8

950

13,1

050

40,0

0040

,000

00

040

,000

067

5,00

067

5,00

052

2,92

852

2,92

80

152,

072

028

0,00

028

0,00

024

0,17

024

0,17

00

39,8

305,

459,

106

358,

613

5,81

7,71

931

9,18

55,

778,

291

039

,428

38,8

79,5

2212

,428

,140

51,3

07,6

626,

751,

800

45,6

31,3

202,

495,

081

3,18

1,25

9

035

0,00

035

0,00

00

00

350,

000

01,

400,

000

1,40

0,00

014

,789

14,7

8969

,000

1,31

6,21

10

3,92

6,00

03,

926,

000

00

03,

926,

000

17,5

93,9

6613

2,45

917

,726

,425

017

,593

,966

013

2,45

917

,593

,966

5,80

8,45

923

,402

,425

14,7

8917

,608

,755

69,0

005,

724,

670

014

,655

14,6

550

00

14,6

5537

7,66

122

4,90

360

2,56

436

,513

414,

175

1,20

318

7,18

73,

405,

460

24,2

953,

429,

755

03,

405,

460

024

,295

35,9

71,1

9011

,584

35,9

82,7

740

35,9

71,1

909,

553

2,03

12,

408,

249

6,59

52,

414,

844

02,

408,

249

06,

595

P496

Car

lin P

ark

Impr

ovem

ents

I356

Sto

rage

Dire

ctor

Har

dwar

e R

epla

cem

ent

M01

0 G

is P

roje

ct

5003

Pal

m T

ran

Con

nect

ion

Equi

pmen

t 17.

9M N

AV

9905

Gift

s For

Par

ks P

rogr

am

3103

Pal

m T

ran

Veh

icle

Pur

chas

e-N

on-B

us31

04 P

alm

Tra

n Sh

elte

r Pad

s31

05 P

alm

Tra

n So

uth

Cou

nty

Expa

nsio

n

Tot

al M

ass T

rans

- C

apita

l

581

Park

s & R

ecre

atio

n-C

apita

l

I346

Fib

er B

uild

out o

f Ent

erpr

ise

Net

wor

k (F

Y 2

017)

I347

Wire

less

Con

nect

ivity

(FY

201

7)I3

48 C

ore

Net

wor

k U

pgra

des (

FY 2

017)

I349

WA

N In

-Bui

ldin

g C

ablin

g (F

Y 2

017)

I350

Enh

ance

d 91

1 U

C T

el S

ys

I341

Bel

le G

lade

Fib

er (F

Y20

16)

I342

Mic

roso

ft O

ffic

e Su

ite U

pgra

de (F

Y20

16)

I344

Adv

anta

ge P

erfo

rman

ce B

udge

ting

Syst

em

I345

Net

wor

k Eq

uipm

ent &

Ven

dor S

uppo

rt (F

Y

I337

LEX

Bac

kup

& R

ecov

ery

(FY

2016

)I3

38 C

itrix

Exp

ansi

on (F

Y20

16)

I354

Dig

ital A

gend

a Tr

acki

ng A

pplic

atio

nI3

55 E

nter

pris

e Se

curit

y &

Thr

eat M

gmt (

FY 2

017)

Tot

al Is

s Cap

ital P

roje

cts

P456

Bur

t Rey

nold

s Par

k Im

prov

emen

tsP4

42 G

ifts T

o Pa

rks

P462

Sou

th C

ount

y R

egio

nal P

hase

II

I334

EO

C C

ompu

ter R

oom

HV

AC

Rem

edia

tion

541

Mas

s Tra

ns -

Cap

ital

I352

Ent

erpr

ise

Bac

kup

RR

&I (

FY 2

017)

I353

WIN

TEL/

UN

IX S

erve

r RR

&I (

FY 2

017)

I335

Vis

ta D

ata

Cen

ter R

eloc

ate

Eqp

(FY

2016

)

I340

Ent

erpr

ise

Secu

rity

& T

hrea

t Mgm

t (FY

2016

)

119

Page 124: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

5,26

0,28

719

1,27

35,

451,

560

68,2

285,

328,

515

98,7

1524

,331

529,

950

2,05

353

2,00

30

529,

950

02,

053

716,

171

33,8

3275

0,00

39,

810

725,

981

024

,022

2,06

1,03

41,

995,

377

4,05

6,41

11,

469,

317

3,53

0,35

039

,995

486,

065

759,

835

240,

164

999,

999

075

9,83

50

240,

164

2,69

7,12

847

1,16

73,

168,

295

333,

478

3,03

0,60

513

6,98

670

33,

116,

112

32,3

903,

148,

502

32,2

973,

148,

408

921

150,

724

1,01

9,81

31,

170,

537

34,6

0618

5,33

09,

236

975,

971

3,25

7,63

82,

994,

223

6,25

1,86

12,

822,

396

6,08

0,03

465

,548

106,

279

2,95

4,47

744

5,53

33,

400,

010

285,

939

3,24

0,41

784

,151

75,4

4225

2,48

047

,521

300,

001

47,5

2030

0,00

00

123

8,25

924

1,74

348

0,00

219

,745

258,

004

022

1,99

823

0,96

788

8,38

91,

119,

356

628,

355

859,

322

20,8

6823

9,16

657

2,40

510

,210

582,

615

8,57

458

0,97

91,

250

386

192,

505

1,50

7,54

21,

700,

047

217,

878

410,

383

1,00

9,47

028

0,19

463

0,35

084

,191

714,

541

84,1

9071

4,53

90

218

4,77

629

,757

214,

533

018

4,77

60

29,7

5726

6,18

230

3,82

157

0,00

316

,346

282,

527

10,9

9927

6,47

617

9,42

632

0,57

550

0,00

10

179,

426

032

0,57

512

4,80

615

,194

140,

000

012

4,80

60

15,1

9440

7,22

246

2,78

187

0,00

361

,417

468,

639

102,

251

299,

113

92,9

7951

8,02

361

1,00

20

92,9

7951

8,02

21

010

0,00

010

0,00

00

00

100,

000

303,

573

2,36

930

5,94

20

303,

573

02,

369

958,

918

541,

084

1,50

0,00

240

1,38

21,

360,

300

8,98

513

0,71

741

0,50

189

,498

499,

999

041

0,50

10

89,4

9812

5,10

484

3,17

396

8,27

750

4,83

462

9,93

813

6,34

920

1,99

034

,813

73,2

4910

8,06

213

,329

48,1

4122

,036

37,8

850

1,50

0,00

01,

500,

000

440

440

1,39

0,34

910

9,21

134

,110

42,7

3076

,840

42,1

1376

,223

061

710

8,00

011

0,00

021

8,00

00

108,

000

011

0,00

047

,502

252,

499

300,

001

583

48,0

8511

,679

240,

237

51,7

3979

8,26

084

9,99

929

2,50

034

4,23

920

,566

485,

194

P799

Osp

rey

Poin

t Gol

f Cou

rse

Clu

bhou

se E

xpan

sion

P793

Can

yons

Dis

trict

Par

k D

esig

n an

d D

evel

opm

ent

P794

Coc

onut

Cov

e W

ater

park

Impr

ovem

ents

P795

Jim

Bra

ndon

Equ

estri

an C

ente

r Foo

ting

P796

Mor

ikam

i Mus

eum

and

Japa

nese

Gar

dens

P771

Man

goni

a Pa

rk C

omm

unity

& S

enio

r Cen

ters

P780

Par

ks C

ount

ywid

e R

epai

rs, R

epla

cem

ents

and

P7

81 J

ohn

Prin

ce P

ark

Cam

pgro

und

Phas

e II

IP7

82 J

ohn

Prin

ce P

ark

Spec

ial E

vent

Are

aP7

87 R

.G. K

reus

ler P

ark

Life

guar

d/R

estro

om

P788

Inf

orm

atio

n Te

chno

logy

Exp

ansi

on a

nd

P718

Res

troom

Ren

ovat

ions

FY

2011

P745

Lak

e Ly

tal P

ool

P750

Res

troom

Ren

ovat

ions

P757

AD

A C

ompl

ianc

e M

easu

res

P769

Riv

erbe

nd P

ark

Util

ity C

onne

ctio

n

P527

Oke

ehee

lee

Sout

h Pa

rk D

ev P

hase

III

P645

Sou

th C

ount

y R

egio

nal P

ark

Phas

e II

I FY

2008

P689

Tow

n of

Lan

tana

Spo

rtsm

an's

Park

FY

2009

P690

Dub

ois P

ark

Expa

nsio

n FY

2010

P701

Bur

t Rey

nold

s Par

k B

oat R

amp

Park

ing

FY20

11

P594

Wat

erw

ay P

ark

P568

Art

in P

ublic

Pla

ces/

Pass

-Thr

ough

P560

Joh

n Pr

ince

Par

k Im

prov

emen

ts P

hase

IV

P554

Dub

ois H

ome

Res

tora

tion

P555

Tre

e R

epla

cem

ent P

rogr

am

P616

Riv

erbe

nd/R

eese

Gro

ve P

ark

Ph 3

P606

Bel

le G

lade

Mar

ina

P607

Ber

t Win

ters

Par

k B

oat R

amp

Expa

nsio

n

P706

Inf

orm

atio

n Te

chno

logy

Exp

ansi

on a

nd

P714

Oke

ehee

lee

Sout

h Pa

rk B

oatin

g C

ente

r FY

2011

P715

Par

k R

idge

Gol

f Cou

rse

Impr

ovem

ents

FY

2011

P717

Rec

reat

ion

Faci

lity

Impr

ovem

ents

and

120

Page 125: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

270,

627

35,2

3330

5,86

035

,232

305,

859

01

107,

274

57,7

2716

5,00

154

,640

161,

914

1,08

91,

998

2,87

261

,629

64,5

010

2,87

20

61,6

290

10,0

0010

,000

00

010

,000

82,9

462,

054

85,0

000

82,9

460

2,05

464

,206

2,89

467

,100

064

,206

2,45

044

471

,358

178,

642

250,

000

174,

035

245,

393

4,58

027

7,31

022

,690

30,0

000

7,31

00

22,6

9049

,529

471

50,0

000

49,5

290

471

02,

400,

000

2,40

0,00

01,

710,

804

1,71

0,80

459

3,31

595

,880

055

0,00

055

0,00

036

2,71

036

2,71

011

5,45

671

,833

022

5,00

022

5,00

027

,707

27,7

0747

,503

149,

790

075

,000

75,0

0031

,850

31,8

5041

,971

1,18

00

150,

000

150,

000

413

413

014

9,58

70

200,

000

200,

000

00

020

0,00

00

150,

000

150,

000

00

015

0,00

00

30,0

0030

,000

28,9

7528

,975

01,

025

074

,467

74,4

670

049

,600

24,8

670

32,0

0032

,000

24,9

7624

,976

3,27

63,

749

04,

000,

000

4,00

0,00

035

135

10

3,99

9,64

90

2,00

0,00

02,

000,

000

00

02,

000,

000

01,

500,

000

1,50

0,00

00

00

1,50

0,00

00

1,00

0,00

01,

000,

000

00

01,

000,

000

085

0,00

085

0,00

00

00

850,

000

060

0,00

060

0,00

00

00

600,

000

060

0,00

060

0,00

00

00

600,

000

040

0,00

040

0,00

00

00

400,

000

040

0,00

040

0,00

00

00

400,

000

040

0,00

040

0,00

00

00

400,

000

040

0,00

040

0,00

00

00

400,

000

030

0,00

030

0,00

00

00

300,

000

020

0,00

020

0,00

00

00

200,

000

020

0,00

020

0,00

00

00

200,

000

P817

Gen

eral

Rec

reat

ion

Faci

litie

s Rep

air &

P811

Coc

onut

Cov

e W

ater

park

Kio

sk A

rea

P812

Life

guar

d To

wer

s and

Bea

ch A

cces

s P8

14 G

ener

al P

ark

Rep

air a

nd R

enov

atio

nP8

15 A

quat

ic F

acili

ties a

nd B

each

Rep

air a

nd

T012

Cal

oosa

Par

k M

ultip

urpo

se F

ield

s 5,6

Lig

ht

T009

BA

SCR

Fie

lds 8

,9,1

0,11

Lig

ht R

epla

cem

ent

T008

BA

SCR

Fie

lds 4

,5,6

,7 L

ight

Rep

lace

men

t

T010

Oke

ehee

lee

Tenn

is C

ourts

and

Ski

Cou

rse

Ligh

t

P818

Adm

inis

tratio

n B

uild

ing

Car

pet R

epla

cem

ent

P800

Par

k O

pera

tions

Equ

ipm

ent R

epla

cem

ent

T011

Pin

ewoo

ds P

ark

Bas

ebal

l Fie

lds 1

,2,3

Lig

ht

P816

Spe

cial

Rec

reat

ion

Faci

litie

s & M

useu

m R

epai

r

P802

The

rape

utic

Rec

reat

ion

Pool

Res

urfa

cing

P804

Wes

t Boy

nton

Rec

reat

ion

Cen

ter I

mpr

ovem

ents

P805

Kar

en M

arcu

s Oce

an P

ark

Pres

erve

P808

Jup

iter B

each

Par

k U

plan

d Im

prov

emen

tsP8

10 A

thle

tic F

ield

Tur

f Ren

ovat

ion

P801

Pla

ygro

und

Rep

lace

men

t and

Res

urfa

cing

T006

Oke

ehee

lee

Park

Sof

tbal

l Fie

lds 1

,2,3

,4 L

ight

T007

Oke

ehee

lee

MPF

10,

11,1

2,13

,Lig

ht

P819

Hav

erhi

ll Pa

rk B

aske

tbal

l Cou

rt C

onst

ruct

ion

P820

Joh

n Pr

ince

Par

k C

ampg

roun

d C

aret

aker

's

T005

San

talu

ces P

ool F

acili

ty R

enov

atio

n T0

04 C

omm

unity

Par

k N

ew D

evel

opm

ent

P826

Ber

t Win

ters

Par

k A

thle

tic F

ield

Impr

ovem

ents

P827

Joh

n Pr

ince

Par

k C

ampg

roun

d C

aret

aker

's T0

01 L

ake

Lyta

l Poo

l Fac

ility

Rep

lace

men

tT0

02 W

est B

oynt

on P

ark

Ath

letic

Fie

ld R

enov

atio

n T0

03 W

est B

oynt

on P

ark

Ath

letic

Fie

ld R

enov

atio

n

P821

Jup

iter B

each

/DuB

ois P

ark

Impr

ovem

ents

T014

Pio

neer

Par

k Te

nnis

and

Bas

ketb

all C

ourts

T0

15 J

upite

r Far

ms P

ark

Bas

ebal

l 1,2

Lig

ht

121

Page 126: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

020

0,00

020

0,00

00

00

200,

000

017

5,00

017

5,00

00

00

175,

000

015

0,00

015

0,00

00

00

150,

000

015

0,00

015

0,00

00

00

150,

000

015

0,00

015

0,00

00

00

150,

000

010

0,00

010

0,00

00

00

100,

000

010

0,00

010

0,00

00

00

100,

000

010

0,00

010

0,00

00

00

100,

000

085

,000

85,0

000

076

,391

8,60

90

77,7

5077

,750

00

077

,750

075

,000

75,0

000

00

75,0

000

64,5

0064

,500

00

064

,500

052

,750

52,7

500

00

52,7

500

52,7

5052

,750

00

052

,750

052

,750

52,7

500

00

52,7

500

50,0

0050

,000

00

050

,000

050

,000

50,0

000

00

50,0

000

32,7

5032

,750

00

032

,750

032

,750

32,7

500

00

32,7

5072

1,17

412

8,82

885

0,00

254

,445

775,

619

074

,383

70,4

89,8

2935

,478

,101

105,

967,

930

9,93

7,92

980

,427

,755

4,63

3,93

420

,906

,240

1,82

0,39

61,

254,

605

3,07

5,00

11,

254,

604

3,07

5,00

00

10

1,00

0,00

01,

000,

000

14,9

0314

,903

6,41

697

8,68

10

500,

000

500,

000

108,

199

108,

199

039

1,80

10

50,0

0050

,000

00

49,9

2477

030

,000

30,0

0028

,975

28,9

750

1,02

50

142,

000

142,

000

00

014

2,00

00

160,

830

160,

830

00

016

0,83

00

48,0

0048

,000

00

048

,000

1,82

0,39

63,

185,

435

5,00

5,83

11,

406,

681

3,22

7,07

756

,340

1,72

2,41

5P8

33 D

uboi

s Par

k H

isto

ric R

enov

atio

n Pl

an

P594

Wat

erw

ay P

ark

P607

Ber

t Win

ters

Par

k B

oat R

amp

Expa

nsio

nP7

01 B

urt R

eyno

lds P

ark

Wes

t Sid

e Ex

pans

ion

P821

Jup

iter B

each

/DuB

ois P

ark

Impr

ovem

ents

P822

Can

al P

oint

Pla

ygro

und

Impr

ovem

ents

(CD

BG

)P8

23 L

ake

Lyta

l Par

k R

enov

atio

ns (C

DB

G)

X13

5 G

ram

ercy

Par

k N

eigh

borh

ood

Park

Tot

al P

arks

& R

ec -

Gra

nts

582

Park

s & R

ec -

Gra

nts

Tot

al P

arks

& R

ecre

atio

n-C

apita

l

T016

Wes

tgat

e Sp

ort F

ield

s and

Bba

ll C

ourt

Ligh

t T0

17 J

PP O

sbor

ne B

ound

less

Pla

ygro

und

Surf

ace

T018

Sun

set C

ove

Am

phith

eate

r Sou

nd S

yste

m

T019

Ber

t Win

ters

Bal

lfiel

d 1

Ligh

t Rep

lace

men

tT0

20 J

uno

Park

Bal

lfiel

d 1

Ligh

t Rep

lace

men

tT0

21 D

yer P

ark

Play

grou

nd R

epla

cem

ent

T022

Ber

t Win

ters

Bal

lfiel

d 2

Ligh

t Rep

lace

men

tT0

23 P

ione

er P

ark

Bal

lfiel

d 2

Ligh

t Rep

lace

men

tT0

24 W

est B

oynt

on P

ark

Play

grou

nd S

urfa

ce

T025

Lak

e Ly

tal P

ark

Act

ivity

Bui

ldin

g Pl

aygr

ound

T0

26 J

PP O

sbor

ne B

ound

less

Pla

ygro

und

Stru

ctur

e T0

27 T

hera

peut

ic R

ecre

atio

n Po

ol R

esur

faci

ngT0

28 J

uno

Park

Pla

ygro

und

Rep

lace

men

tT0

29 L

ake

Ida

Park

4th

St P

layg

roun

d R

epla

cem

ent

T030

Pau

l Rar

din

Park

Pla

ygro

und

Rep

lace

men

tT0

31 C

anal

Poi

nt C

omm

unity

Cen

ter S

eptic

Sys

tem

T0

32 L

oxah

atch

ee G

rove

s Sep

tic S

yste

m

T033

Joh

n St

retc

h Pa

rk P

layg

roun

d R

epla

cem

ent

T034

San

ders

Par

k Pl

aygr

ound

Rep

lace

men

t

P757

AD

A C

ompl

ianc

e M

easu

res

122

Page 127: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

51,0

5654

8,94

460

0,00

031

,537

82,5

9315

4,85

436

2,55

311

,783

497,

783

509,

566

491,

781

503,

564

6,00

02

37,1

2112

3,73

716

0,85

824

,141

61,2

6217

,673

81,9

2377

,385

1,10

7,61

61,

185,

001

077

,385

01,

107,

616

177,

345

2,27

8,08

02,

455,

425

547,

459

724,

804

178,

527

1,55

2,09

4

1,86

1,54

298

7,34

62,

848,

888

134,

700

1,99

6,24

225

0,85

160

1,79

50

700,

000

700,

000

00

070

0,00

00

19,6

5919

,659

00

019

,659

19,1

171,

683

20,8

000

19,1

170

1,68

30

100,

000

100,

000

00

010

0,00

01,

880,

658

1,80

8,68

83,

689,

346

134,

700

2,01

5,35

925

0,85

11,

423,

137

4,50

0,00

31

4,50

0,00

40

4,50

0,00

30

163

,717

,637

19,0

17,8

6182

,735

,498

10,5

41,0

4574

,258

,682

5,08

6,25

83,

390,

558

28,2

22,5

817,

295,

317

35,5

17,8

9826

,111

28,2

48,6

922,

137,

454

5,13

1,75

217

,149

,385

5,15

9,92

422

,309

,309

2,65

0,44

119

,799

,826

2,11

5,99

439

3,48

916

,638

,833

9,43

3,17

226

,072

,005

4,01

2,75

320

,651

,586

4,47

5,18

294

5,23

84,

594,

022

4,73

6,77

99,

330,

801

779,

720

5,37

3,74

31,

973,

247

1,98

3,81

215

7,95

8,02

25,

498,

302

163,

456,

324

1,22

4,31

115

9,18

2,33

473

8,61

53,

535,

376

1,26

4,58

12,

155,

422

3,42

0,00

359

9,50

91,

864,

090

353,

987

1,20

1,92

65,

373,

595

4,81

7,41

010

,191

,005

169,

161

5,54

2,75

618

9,55

04,

458,

699

38,9

40,6

4110

,285

,463

49,2

26,1

0460

6,59

939

,547

,240

7,76

9,49

51,

909,

369

7,43

6,19

66,

499,

607

13,9

35,8

031,

943,

886

9,38

0,08

21,

061,

421

3,49

4,30

01,

715,

386

2,76

2,48

44,

477,

870

638,

071

2,35

3,45

61,

773,

320

351,

094

3,68

3,97

16,

995,

034

10,6

79,0

052,

802,

137

6,48

6,10

82,

404,

036

1,78

8,86

12,

569,

781

12,

569,

782

02,

569,

781

01

71,9

65,3

0021

,581

,891

93,5

47,1

911,

978,

948

73,9

44,2

476,

913,

535

12,6

89,4

0932

,541

,593

45,4

60,5

1878

,002

,111

10,6

48,2

2943

,189

,822

16,3

56,2

3418

,456

,055

64,6

183,

492,

384

3,55

7,00

21,

446,

180

1,51

0,79

81,

426,

035

620,

169

7,37

8,22

214

,147

,783

21,5

26,0

059,

673,

702

17,0

51,9

231,

840,

934

2,63

3,14

7

661

Publ

ic S

afet

y C

apita

l

9299

E-9

11 R

eser

ves

9255

NG

-911

Pro

ject

s92

58 F

Y17

911

Pro

ject

s

PS01

AC

C C

hick

ee H

utPS

02 K

olte

r-B

riger

Hur

rican

e Sh

elte

r Cap

acity

W00

2 C

apita

l Im

pr-S

yste

m #

2

721

Wat

er U

tiliti

es-C

apita

l

Tot

al P

ublic

Saf

ety

Cap

ital

W00

0 C

apita

l Im

pr-N

orth

ern

Reg

ion

W00

1 C

apita

l Im

pr-S

yste

m #

1

W00

3 C

apita

l Im

pr-S

yste

m #

3W

004

Wel

lfiel

d R

ehab

ilita

tion

and

Expa

nsio

nW

005

Cap

ital I

mpr

-Sys

tem

#9

W00

6 W

ater

& S

ewer

-All

Syst

ems

W00

7 U

tility

Lin

e R

eloc

atio

ns-C

ount

y R

oad

Proj

ects

W00

8 R

ecla

imed

Wat

er S

yste

m

W03

1 A

sset

Man

agem

ent P

rogr

am

W01

6 M

embr

ane

Elem

ent R

epla

cem

ents

W01

9 C

olle

ctio

n Sy

stem

Ren

ewal

& E

xpan

sion

W02

0 L

ake

Reg

ion

Impr

ovem

ent P

roje

ctW

026

Gla

des U

tility

Aut

horit

y C

apita

l

W01

0 S

outh

ern

Reg

iona

l Ww

tpW

014

Exp

ansi

on C

apita

l Sys

3

W03

5 E

ast C

entra

l Was

tew

ater

Rec

lam

atio

n Fa

cilit

yW

037

Gla

des R

egio

n O

pera

tions

Cen

ter

P701

Bur

t Rey

nold

s Par

k W

est S

ide

Expa

nsio

nP7

66 O

cean

Inle

t Mar

ina

Ren

ovat

ions

P791

Boa

t Ram

p R

enov

atio

nT

otal

Flo

rida

Boa

ting

Impr

ovem

ent

584

Flor

ida

Boa

ting

Imp.

Pro

gram

P594

Wat

erw

ay P

ark

123

Page 128: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Bud

get

Bal

ance

Des

crip

tion

CA

PIT

AL

PR

OJE

CT

BU

DG

ET

SU

MM

AR

IES

FISC

AL

YE

AR

201

7

Prio

r Y

ear

Spen

ding

Cur

rent

B

udge

tC

umul

ativ

e B

udge

tC

urre

nt

Spen

ding

Cum

ulat

ive

Spen

ding

Enc

umbe

red

Am

ount

9,48

2,25

219

,401

,971

28,8

84,2

233,

704,

609

13,1

86,8

612,

598,

361

13,0

99,0

010

4,10

0,00

04,

100,

000

00

04,

100,

000

475,

196,

617

192,

841,

324

668,

037,

941

53,4

45,4

1252

8,64

2,03

059

,213

,658

80,1

82,2

57

27,5

42,2

5423

1,37

527

,773

,629

027

,542

,254

94,6

1513

6,76

179

,471

,868

8,37

5,00

087

,846

,868

3,02

8,00

082

,499

,868

05,

347,

000

107,

014,

122

8,60

6,37

511

5,62

0,49

73,

028,

000

110,

042,

122

94,6

155,

483,

761

761

Gen

eral

Gov

ernm

ent C

apita

l

Tot

al W

ater

Util

ities

-Cap

ital

Tot

al G

ener

al G

over

nmen

t Cap

ital

ED01

Max

Pla

nck

Gra

nt P

rogr

am76

08 C

onve

ntio

n C

ente

r Hot

el

W03

8 G

lade

s Reg

ion

Wat

er D

istri

butio

n Sy

stem

W

039

Bro

war

d C

ount

y R

ecla

imed

Wat

er D

is S

yste

m

124

Page 129: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

INACTIVE PROJECTS

This section provides a listing of capital budget projects (other than reserve accounts)

which have had no expenditure activity during the last year. The list does not distinguish

projects by funding source which means the total shown for the list will not have a direct

ad valorem tax equivalency.

This listing is being provided to project managers for review and comment. Projects

which no longer require funding should be swept into reserves. Project managers should

contact the Fixed Assets Division of Financial Management and Budget (FAMO) to

initiate the closing out of these projects. Once FAMO completely capitalizes the project,

a budget transfer can be processed to sweep the project balance into reserves.

125

Page 130: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / NameAgriculture - Capital101 3,520.00

3900 101 18,312.0021,832.00

121 65,000.00121 375,000.00121 94,174.00121 Unit A175 P-Testing & Misc Engineering 204,277.00121 Unit A186 P-Permits & Fees 67,394.00121 Unit A253 Lantana Projects 201,644.00121 Unit A259 PBIA Runway 9/27 Environmental Impact Study 1,216,632.00121 Unit A265 Misc Taxiway Repair 1,254,999.00121 Unit A269 Safety & Rehab Projects 226,308.00121 Unit A274 PBIA Parking Garage #1 Renovation 535,525.00121 Unit A275 Airfield Marking Improvements 21,524.00121 Unit A279 Lantana Construct Hangars PBC Airpark 1,612,898.00121 Unit A280 North County Sewer Plant 13,382.00121 Unit A283 Runway 13-31 Pavement Removal 609,949.00121 Unit A288 PBIA Enplane/Deplane Roadway Lighting 9,953.00121 Unit A292 Lantana Runway 15/33 Rehab 112,372.00121 Unit A294 PBIA North County Helicopter Pads 10,000.00121 Unit A295 PBIA North County Wetland Mitigation Credits 4,344.00121 Unit A297 PBIA Air Cargo Ramp Ext. 1,456,790.00121 Unit A299 PBIA Soutside Taxilane Improvements 62,425.00121 Unit A300 North County Aprons & Taxilanes Infrastructure 834,067.00121 Unit A310 North County Hanger Infrastructure 750,000.00121 Unit A312 PBIA Misc Taxiways B, D, and E 87,819.00121 Unit A313 PBIA Runway 10L-28R Rehab 3,639,130.00121 Unit A316 Pahokee Apron Construction 2,416,047.00121 Unit A320 PBIA- Terminal Apron 112,585.00121 Unit A322 Pahokee Airfield Lighting 435,749.00121 Unit A327 NC Wetland Mitigation 2,499,634.00121 Unit A330 P-Emergency Crash Phone System 6,801.00121 Unit A334 PHK, Design of AWOS 80,358.00121 Unit A338 LN Fuel Farm, Term and Hang Imp 2,000,000.00121 Unit A339 Runway Marking Redesignation 41,278.00121 Unit A342 PBIA Terminal Switchgear 2,500,000.00121 Unit A344 LN Pavement Rehabilitation 1,000,000.00121 Unit A346 PBIA ARFF Facility Improvements 2,000,000.00121 Unit A348 PBIA Term Escalator Replacement- PH1 2,000,000.00121 Unit A355 PB Baggage Handling System (OM) 7,738,658.00121 Unit A356 PH.RW Designation Re-Marking & Airfield Signage 99,250.00121 Unit A357 NC, RW Designation Re-Marking & Airfield Signage 651,160.00121 Unit A358 LN, RW Designation Re-Marking & Airfield Signage 370,970.00121 Unit A359 PH, Construct Hangars 950,000.00121 Unit A360 LN, Runway 3-21 Rehabilitation 900,000.00121 Unit A361NC, RW Pavement Rehab and Repair 8R-26L & 13-31 2,444,376.00

41114111

41114111

4111

4111

4111

4111

4111

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget101

Unit AG04 Mounts Garden Design Services

101 Argiculture - Capital

4111

411141114111

411141114111

121 Airports - Capital

3900

4111

4111411141114111

41114111

Unit AG08 Mount Botanical Garden Walkway

4111

41114111411141114111411141114111

4110 Unit A029 Equipment- Airside4110 Unit A215 P-Cabin Air Control System

4111

4111

4111

4111

4111

41114111

4111 Unit A173 P-Project Inspection & Admin 4111

126

Page 131: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / Name

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget121 Unit A362 PB, New Parking Revenue Center 2,609,546.00121 Unit A363 PB, Cargo Facilities Access Improvement 2,270,000.00121 Unit A364 LNA, Construct a Fuel Farm and Wash Rack 1,000,000.00121 Unit A365 PB, Golfview Commercial Property Acquistion 9,409,758.00

57,001,776.00

3523 143 10,522.003534 143 50,964.003534 143 37,610.00

143 1,219.00143 402.00143 814.00

101,531.00

321 20,000.00321 466,450.00321 49,825.00321 75,000.00321 975,595.00321 461,446.00321 75,000.00321 798,770.00

3751 321 7,688.003751 321 740,964.003752 321 18,514.00

3,689,252.00

361 Unit 0620 Seminole Pratt-Nrthlake/Beelin 8,382.003500 361 Unit 0621 Old Stare Road 80 Rehab/Maint 1,059,076.00

361 Unit 0727 Seminole Pw-Sycamore/Orange 167,719.00361 Unit 0728 Seminole Pw-Orange/Northlake 120,881.00

3500 361 Unit 0863 Orange Blvd. & RPB Blvd. Inter 8,741.00361 Unit 0923 Seminole Colony Drnge E-Dis 2 170,941.00

3500 361 Unit 1085 W. Atlantic Ave/W of Lyons Rd to E. of FL Turnpike 3,768.003500 361 Unit 1116 Acreage Access Road- Persimmon Blvd. to 60th Street 74,831.003500 361 Unit 1152 Traffic Signal- Mast Arms 35,750.00

361 Unit 1166 Atlantic Ave Area Contribution 2,490,520.003500 361 Unit 1167 Central Blvd. & Indiantown Turn Lane 114,484.003500 361 Unit 1183 Burns Rd. & Military Trail Intersection Imp. 103,097.003500 361 Unit 1201 Pathway Program FY2006 159,452.003500 361 Unit 1202 Traffic Signals Mast Arm FY2006 13,296.00

361 Unit 1203 Special Traffic Signal Projects 363,308.00361 Unit 1302 Traffic Signals- Mast Arms FY 2008 80,630.00361 Unit 1343 SR7/County Line to Palmetto Park Rd (OTIS) 97,568.00361 Unit 1349 Culvert Repair & Replacement 72,941.00361 Unit 1351 Pathway Program FY2009 25,533.00

35003500

321

3500

35003500

3500

3500

3500

321

3500

3750

County Library - Capital

361 Eng & Pub Wks - Rd Pgm Capital3500

3750 Unit L050 N. County Regional Expansion/Renovation

3750 Unit L032 Carpet Replacement

3750 Unit L063 Systemwide Equipment Upgrade

Unit L049 Main Library Expansion/Renovation

Unit L066 AnnexUnit L066 Annex

County Library - Capital

121 Airports - Capital

143 Department of Economic Sustainability

3815 Unit 1462 NRI Art Lofts at West Village- FY 2017 (9/12/2017)

3750 Unit L069 Roof Repair/Replacement

143 Department of Economic Sustainability

Unit L041 Int./Ext. Painting of BranchesUnit L049 Main Library Expansion/Renovation

Unit L067 A/C Repair/Replacement3750 Unit L068 Remodel Circulation Desk

37503750

4111411141114111

3815 Unit 1460 Habitat South- FY 2017 (9/12/2017)3815 Unit 1461 CLT Davis Landing- FY 2017 (9/12/2017)

Unit 1462 NRI Art Lofts at West Village- FY 2017 (9/12/2017)Unit 1460 Habitat South- FY 2017 (9/12/2017)Unit 1461 CLT Davis Landing- FY 2017 (9/12/2017)

127

Page 132: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / Name

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget361 Unit 1358 Lyons Rd./ North Lago to Glades Rd. 34,013.00361 Unit 1373 Clint Moore Road & Military Trail Intersection 92,219.00361 Unit 1400 Minor Intersections-FY2010 211,664.00

3500 361 Unit 1402 Traffic Signals- Mast Arms FY 2010 99,636.00361 Unit 1418 Rustic Lakes Drainage Improvement @ Northlake Blvd. 10,207.00361 Unit 1444 Congress Ave., Hypoluxo Rd to S of Lantana Rd. Paving 36,548.00361 Unit 1445 Dillman Rd., School to Jog Rd Pathway 10,000.00

3500 361 Unit 1452 Traffic Signals- Mast Arms FY2011 347,625.00361 Unit 1459 West Camino Real at the CSXT Railroad-Crossing Imp. 500,000.00361 Unit 1469 Woolbright Rd., Military Trail to Lawrence Rd. 41,387.00361 Unit 1520 Kudza Rd. over LWDD Lat 8 Canal (934312) 160,000.00361 Unit 1521 Smith Sundy Rd. over LWDD Lat. 33 Canal (PB934411) 160,000.00361 Unit 1550 Minor Intersections-FY2013 250,000.00361 Unit 1600 Minor Intersection-FY2014 250,000.00361 Unit 1650 Minor Intersections-FY2015 250,000.00361 Unit 1652 Traffic Signals-Mast Arms-FY2015 600,000.00361 Unit 1700 Minor Intersections-FY2016 250,000.00361 Unit 1702 Traffic Signals-Mast Arms-FY2016 500,000.00

3500 361 Unit 1750 Minor Intersections- FY 2017 250,000.003500 361 Unit 1752 Traffic Signals Mast Arms- FY 2017 600,000.00

361 Unit 1862 Australian Avenue Roadway Safety Audit 30,000.00361 Unit 1863 SW 1st St. from US 27 to SW 7th Avenue 135,000.00361 Unit 1864 Florida Mango Rd. over LWDD L-5 Canal, Bridge Replacement 100,000.00361 Unit 1865 Kirk Rd. over LWDD L-5 Canal Bridge Replacement 900,000.00361 Unit 2270 Railroad Crossing Maintenance 744,041.00

3501 361 Unit 1172 RCA Blvd & SR811 (Alt A1A) Intersection 76,489.00361 Unit 1326 Donald Ross Rd and I-95 Interchange Modifications 10,960.00361 Unit 1371 Park Ave/Congress Ave. to Old Dixie Hwy 5,000.00361 Unit 1417 Central Blvd. at Hood Rd 31,254.00

3501 361 Unit 1468 SR 7, SR 710 to S. of 150th Ct. N. (Loxahatchee Slough) 6,930.003502 361 Unit 1143 Community Dr./Military to Village Blvd. 183,093.003502 361 Unit 1364 10th Ave. N & Military Trail Intersection 65,098.00

361 Unit 1368 45th Street and Congress Ave. Intersection 11,263.003502 361 Unit 1416 Lake Worth Rd. @ PBSC Entrance Intersection 73,640.003502 361 Unit 1439 Summit Blvd. over SFWMD C-51 Canal 21,230.003502 361 Unit 1446 Dyer Blvd and Military Trail Intersection 29,426.003503 361 Unit 0784 SR 7/ S. of LW Rd. North of Southern 2,551,681.003503 361 Unit 1140 Seminole Pratt/Sycamore Dr. to N of Sycamore Dr. 275,066.003503 361 Unit 1399 Southern Blvd & Lyons Rd. - Sansbury Way 44,710.003504 361 Unit 0762 Congress-Hpoluxo-Lantana 408,300.00

361 Unit 1425 Polo Club Rd. from 45th Place South to Lake Worth Rd. 9,684.00361 Unit 1455 Congress Ave @ PB State College Entrance L. Turn Lane Ext 21,591.00361 Unit 1365 Lyons Rd and Kimberly Blvd. Intersection 37,147.00361 Unit 1375 Glades Rd and Florida Turnpike 10,506.00361 Unit 1430 Glades Rd and Judge Winikoff Rd U Turn 15,739.00361 Unit 1470 Palmetto Park Rd. and Glades Rd. Intersection 5,527.00

3505 361 Unit 1472 Jog Rd. and Glades Rd. Intersection Improvements 60,426.00361 Unit 1326 Donald Ross Rd and I-95 Interchange Modifications 4,810,053.00

350035003500

3500

35003500

3500

35003500

3500350035003500

3501

35003500

3523

35053505

3502

3504350435053505

35013501

35003500350035003500

3500

128

Page 133: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / Name

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget365 Unit S185 60th St. N/200th Trail N to E of M Canal 140,382.00

3511 365 Unit S205 Fargo Ave/El Paso Drive to Arrowhead Drive 35,540.00365 Unit S212 Palm Springs Canal Rd., Erie Terr. , Lone Pine way, and Chil 231,000.00

3519 361 Unit 0431 Northlake Blvd. Agreement 253,522.003900 361 Unit 1347 Garden Road Culvert 915.003900 361 Unit 1471 Westgate CRA L-2 Canal Improvement 624,711.003950 361 Unit 1537 Section of Jog Road Striping 350,000.003950 361 Unit 1539 CR 880 Resurfacing 300,000.003950 361 Unit 1540 Brown's Farms Road Resurfacing 200,000.003950 361 Unit 1541 Sections of Military Trail Striping 200,000.003950 361 Unit 1543 Sections of Congress Avenue Striping 100,000.003950 361 Unit 1546 Sections of Old Dixie Highway Striping 50,000.00

22,984,141.00

364 72,881.0072,881.00

366 Unit X092 Cinquez Park East Area Improvements 28,192.00366 Unit X169 Penny Lane Paving and Drainage Improvements 32,500.00

3600 366 Unit X135 Gramercy Park Neighborhood Park 41,664.00366 Unit X087 Home Beautification Imp. Grant 42,020.00366 Unit X135 Gramercy Park Neighborhood Park 14,886.00

3900 366 Unit X159 Lake Worth West Community Center Expansion Project 19,357.003600 366 Unit X162 Limestone Creek Phase II 87,000.00

366 Unit X170 Meridian Rd Drainage Improvements 95,000.00

360,619.00

Environmental Resources Mgt. - Capital381 Unit M213 S Lox Slough Wetland Restrtion 118,905.00

3652 381 Unit M033 Emergency Beach Response 233,658.003654 381 Unit E115 Environmental Restoration FY 2017 250,000.003654 381 Unit E421 North Jupiter Flatwoods NA 464,437.00

381 Unit E433 Winding Waters Natural Area 134,956.001,201,956.00

411 Unit B393 Dist. 4 Traffic Relo @WAA 89,248.00411 Unit B547 Radio System 800MHZ System Refresh FY2012 45,484.00411 Unit B267 Ada Signage Countywide 25,323.00411 Unit B363 Industrial Facility (Vista) furniture 9,920.00411 Unit B408 Governmnet Center Space Reallocation 38,437.00411 Unit B419 Countywide Card Access 09 168,270.00411 Unit B425 PBSO Headquarters Space Master Plan 55,796.00411 Unit B438 Courthouse Telephonic Integration 09 2,733.00411 Unit B442 Countywide Security Systems Replacement 09 37,000.00411 Unit B510 Countywide Electronic Systems FY 2010 1,743,419.00

3800

3900

366 Ccrt Program Projects

411 Facilities Dev & Ops Capital

3804

381

381 Environmental Resources Mgt. - Capital

3651

3654

3801

3804380438043804380438043804

361 Eng & Pub Wks - Rd Pgm Capital

366 Ccrt Program Projects

3900

35113511

3900

3511

3511

364 Eng- Misc Capital Projects3950 Unit F092 Emergency Vehicle Priority System

761 General Government- Capital

129

Page 134: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / Name

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget411 Unit B527 Countywide Repair, Replace & Reno Cty Buildings FY2011 1,112.00411 Unit B534 North County Hearing Room 2711 BO 3,006.00411 Unit B545 PBSO Headquarters Modification 30,618.00411 Unit B551 Building R&R Countywide FY2013 914,727.00411 Unit B557 County Home Demolition 20,974.00411 Unit B562 Courthouse Clerk Evidence Mods 44,478.00411 Unit B566 Courthouse Mailroom 300,000.00411 Unit B568 North county Courthouse Crtroom #2/HR#2711 Buildout 35,154.00411 Unit B579 Countywide Various Facility Improvements FY15 250,000.00411 Unit B584 W County Adm Building Mods 265,933.00411 Unit B587 PBSO Marine Boat Life Renovation 8,118.00411 Unit B588 PBSO HQ Media Renovations 92,696.00411 Unit B602 Courthouse Clerk Evidence Dehumidity 50,000.00411 Unit B604 Land Due Diligence FY16 100,000.00411 Unit B607 PBSO Community Services 386,540.00411 Unit B608 N County Courthouse Clerk Access 8,700.00411 Unit B610 Youth Services 4 Pts Renovation 250,000.00411 Unit B614 Countywide Various Facility Improvements FY16 100,000.00411 Unit B618 PBSO HQ Comm Reno 39,322.00411 Unit B619 Constitutional Facility Improvements FY 17 1,000,000.00411 Unit B621 Countywide Parks Renewal & Replacement FY 17 1,700,000.00411 Unit B623 Countywide Various Facility Improvements FY17 250,000.00411 Unit B624 Land Due Diligence FY 17 250,000.00411 Unit B546 Courthouse Jury Assembly FY2012 2,000,000.00411 Unit B451 PBSO Evidence Bldg. 4,395,000.00411 Unit B594 PBSO MDC Elect System R&R 5,600,000.00411 Unit Q001 Housing Units for Homeless, Extremely Low Income, & Low 2,550,000.00

22,862,008.00

441 944,340.00441 2,948,657.00441 716,623.00

3700 441 34,604.003700 441 2,413,240.003700 441 28,309.003704 441 1,400,000.00

441 200,000.00441 2,020,956.00441 725,000.00

11,431,729.00

461 78,064.00

78,064.00

491 20,950.00491 234,244.00

3704

3805

38043804

38043804

380438043804

3804

Unit F095 Station 35 Renovations

441 Fire Rescue-Capital3700 Unit F082 Seminole Pratt/Bee Line Station

3704 Unit 5000 Prior Year Refunds 3704 Unit F082 Seminole Pratt/Bee Line Station

411 Facilities Dev & Ops Capital

3700 Unit F094 Station 37 Improvements

Unit M092 Environ Comp & Clean-Up 95

461 General Services-Capital

491 Iss Capital Projects

3804

3804

3804

3804

Unit F100 Dispatch UPS ReplacementUnit F107 Fire Station #41 North

Unit F096 Glades Headquarters/Training Complex

Unit F102 New Tactical Command Unit

441 Fire Rescue-Capital

461 General Services-Capital

380438043804

3900

3901 Unit I237 Novell MetadirectoryUnit I239 AMS Advantage Financial Systems Modification3901

395039503950

3804

3700 Unit F085 Station 24 Replacement

38043804

3804

3804

3804

3804

3804

130

Page 135: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / Name

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget491 1,168.00491 20,057.00491 6,797.00491 185,443.00491 Unit I319 UPS Battery Replacement 50,009.00491 Unit I337 LEX Backup & Recovery (FY2016) 37,832.00491 Unit I346 Fiber Buildout of Enterprise Network (FY 2017) 300,000.00491 Unit I350 Enhanced 911 UC Tel Sys 150,000.00491 Unit I354 Digital Agenda Tracking Application 40,000.00

1,046,500.00

541 132,459.00541 350,000.00541 3,926,000.00

4,408,459.00

581 240,164.003019 581 500,000.00

581 1,297.003020 581 7,624.003020 581 20,636.003020 581 203,000.003020 581 50,000.003038 581 Unit P456 Burt Reynolds Park Improvements 24,295.003043 581 Unit P462 South County Regional Phase II 4,829.003043 581 Unit P717 Recreation Facility Improvements and Renovations FY2011 7,824.00

581 Unit P745 Lake Lytal Pool 320,575.00581 Unit P554 Dubois Home Restoration 2,053.00581 Unit P750 Restroom Renovations 15,194.00581 Unit P780 Parks Countywide Repairs, Replacements and Renovations FY14 2,369.00581 Unit P795 Jim Brandon Equestrian Center Footing Renovation 110,000.00581 Unit P802 Therapeutic Recreation Pool Resurfacing 61,629.00581 Unit P808 Jupiter Beach Park Upland Improvements 2,894.00581 Unit P811 Coconut Cove Waterpark Kiosk Area Renovation 22,690.00

3600 581 Unit P812 Lifeguard Towers and Beach Access Replacements 471.003600 581 Unit P819 Haverhill Park Basketball Court Construction 200,000.003600 581 Unit P820 John Prince Park Campground Caretaker's Residence 150,000.00

581 Unit P826 Bert Winters Park Athletic Field Improvements 74,467.003601 581 Unit P496 Carlin Park Improvements 6,595.003601 581 Unit P778 Bert Winters Park Expansion 100,000.00

581 Unit P805 Karen Marcus Ocean Park Preserve 2,054.00581 Unit P782 John Prince Park Special Event Area 89,498.00

3603 581 Unit P462 South County Regional Phase II 6,755.00581 Unit P527 Okeeheelee South Park Dev. Phase III 492.00581 Unit P787 R.G. Kreusler Park Lifeguard/Restroom Building 200,000.00581 Unit T002 West Boynton Park Athletic Field Renovation 2,000,000.00581 Unit T003 Buttonwood Park Athletic Field Renovation 1,500,000.00

3600

3019

3019 Unit P568 Art in Public Places/Pass-Through

541

541 Mass Trans Capital Projects

36003600

3603

3600

Unit P683 TAB Development Educational and Community Center FY 2009

Unit P560 John Prince Park Improvements Phase IV

491 Iss Capital Projects

581 Parks & Recreation-Capital

Unit P717 Recreation Facility Improvements and Renovations FY2011 Unit P769 Riverbend Park Utility ConnectionUnit P771 Mangonia Park Community & Senior Centers

36003600

3950

3901 Unit I291 Wiring for Court Recording Technology3901 Unit I308 Oce Printer Replacement

Unit P717 Recreation Facility Improvements and Renovations FY2011

3600

Mass Trans Capital Projects

3096 Unit 3105 Palm Tran South County Expansion

3901

3600

3600

36013602

Unit I253 Data Center Upgrade to 10/100 GigabiteUnit I267 Visual Planning Technologies- System

39013901

3901390139013901

3075 Unit 5003 Palm Tran Connection Equipment 17.9 M NAV 14CPUnit 3103 Palm Tran Vehicle Purchase- Non-Bus3096

39503950

131

Page 136: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / Name

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget581 Unit T004 Community Park New Development 1,000,000.00581 Unit T005 Santaluces Pool Facility Renovation 850,000.00581 Unit T006 Okeeheelee Park Softball Fields 1,2,3,4 Light Replacement 600,000.00581 Unit T007 Okeeheelee MPF 10,11,12,13 Light Replacement 600,000.00581 Unit T008 BASCR Fields 4,5,6,7 Light Replacement 400,000.00581 Unit T009 BASCR Fields 8,9,10,11 Light Replacement 400,000.00581 Unit T010 Okeeheelee tennis Courts and Ski Course Light Replacement 400,000.00581 Unit T011 Pinewoods Park Baseball Fields 1,2,3 Light Replacement 400,000.00581 Unit T012 Caloosa Park Mulitpurpose Fields 5,6 Light Replacement 300,000.00581 Unit T014 Pioneer Park Tennis and Basketball Court Light Replacement 200,000.00581 Unit T015 Jupiter Farms Park Baseball 1,2 Light Replacement 200,000.00581 Unit T016 Westgate Sport Fields and Basketball courts Light Replacement 200,000.00581 Unit T017 JPP Osborne Boundless Playground Surface Replacement 175,000.00581 Unit T018 Sunset Cove Amphitheater Sound System Replacement 150,000.00581 Unit T019 Bert Winters Ballfield 1 Light Replacement 150,000.00581 Unit T020 Juno Park Ballfield 1 Light Replacement 150,000.00581 Unit T021 Dyer Park Playground 100,000.00581 Unit T022 Bert Winters Ballfield 2 Light Replacement 100,000.00581 Unit T023 Pioneer Park Ballfield 2 Light Replacement 100,000.00581 Unit T025 Lake Lytal Park Activity BuildingPlayground Replacemnt 77,750.00581 Unit T026 JPP Osborne Boundless Playground Structure Replacement 75,000.00581 Unit T027 Therapeutic Recreation Pool Resurfacing 64,500.00581 Unit T028 Juno Park Playground Replacement 52,750.00581 Unit T029 Lake Ida Park 4th St. Playground Replacement 52,750.00581 Unit T030 Paul Rardin Park Playground Replacement 52,750.00581 Unit T031 Canal Point Community Center Septic System Replacement 50,000.00581 Unit T032 Loxahatchee Groves Septic System Replacement 50,000.00581 Unit T033 John Stretch Park Playground Replacement 32,750.00581 Unit T034 Sanders Park Playground Replacement 32,750.00

12,943,405.00

Parks & Recreation Grants - Capital582 Unit P757 ADA Compliance Measures 50,000.00582 Unit P822 Canal Point Playground Improvements (CDBG) 142,000.00582 Unit P823 Lake Lytal Park Renovations (CDBG) 160,830.00

3600 582 Unit P833 Dubois Park Historic Renovation Plan 48,000.00584 Unit P791 Boat Ramp Renovation 1,107,616.00

1,508,446.00

661 Unit PS01 ACC Chickee Hut 1,683.00661 Unit PS02 Kolter-Briger Hurricane Shelter Capacity 100,000.00661 Unit 9258 FY 17 911 Projects 700,000.00

801,683.00

721 4,100,000.00721 485,000.00

4,585,000.00

3600

3600582

582

581 Parks & Recreation-Capital

661 Public Safety- Capital3900

661 Public Safety- Capital3905

4011 Unit W041 $458K LR WPT Well Field EPA Grant

Parks & Recreation Grants - Capital

39503950395039503950

36003600

395039503950395039503950395039503950

3900

721 Water Utilities- Capital

395039503950395039503950

3950

721 Water Utilities- Capital

4011 Unit W039 Broward County Reclaimed Water Dis System

39503950395039503950395039503950

132

Page 137: PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS …discover.pbcgov.org/ofmb/budget/Reports/Status Report... · 2018-06-05 · is included in this section. This analysis presents information

Fund Dept Unit Number / Name

PROJECT INACTIVITY REPORTFISCAL YEAR 2017

2017 Uncommitted Budget

761 231,375.00

231,375.00

GRAND TOTAL 140,849,317.00

761 General Government- Capital

761 General Government- Capital3074 Unit 7608 Convention Center Hotel

133