Environmental Monitoring Report Bi-Annual Environmental Monitoring Report (Sindh Provincial Road Improvement Project - SPRIP) (December 2018) PAK: Sindh Provincial Road Improvement Project (SPRIP) Prepared by Project Management Unit (PMU), Works and Services Department (WSD), Government of Sindh (GOS) for the Asian Development Bank.

PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

Environmental Monitoring Report

Bi-Annual Environmental Monitoring Report (Sindh Provincial Road Improvement Project - SPRIP) (December 2018)

PAK: Sindh Provincial Road

Improvement Project (SPRIP)

Prepared by Project Management Unit (PMU), Works and Services Department (WSD),

Government of Sindh (GOS) for the Asian Development Bank.

Page 2: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

NOTES

(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.

(ii) In this report, "$" refers to US dollars. This Bi-Annual Environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Project Loan No. 3305-PAK

JULY TO DECEMBER 2018

Pakistan: Sindh Provincial Road Improvement Project (SPRIP)

Funded by the Asian Development Bank - ADB

Prepared by Aleem Butt

Project Management Consultants (PMC)

Hyderabad, Pakistan

For Project Management Consultants PMC

Works and Services (W&S) Department Govt. of Sindh

Endorsed by: (staff name of IA/PIU) and signature, submission date

Page 4: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 0

TABLE OF CONTENTS

1. INTRODUCTION ............................................................................................. 5

1.1 Preamble ............................................................................................................ 5

1.2 Headline Information ......................................................................................... 5

2. PROJECT DESCRIPTION AND CURRENT ACTIVITIES .............................. 6

2.1 Project Description ............................................................................................ 6

2.2 Project Contracts and Management ................................................................. 7

2.3 Project Activities During Current Reporting Period ........................................ 9

2.4 Description of Any Changes to Project Design ............................................... 9

3. ENVIRONMENTAL SAFEGUARD ACTIVITIES ........................................... 10

3.1 General Description of Environmental Safeguard Activities ........................ 10

3.2 Site Audits ........................................................................................................ 10

3.3 Issues Tracking (Based on Non-Conformance Notices) ............................... 11

3.4 Trends .............................................................................................................. 13

3.5 Unanticipated Environmental Impacts or Risks ............................................ 13

4. RESULTS OF ENVIRONMENTAL MONITORING ....................................... 14

4.1 Overview of Monitoring Conducted during Current Period .......................... 14

4.1.1 Air Quality .......................................................................................................... 15

4.1.2 Water Quality ..................................................................................................... 16

4.1.3 Noise and Vibration ........................................................................................... 16

4.2 Trends .............................................................................................................. 17

4.3 Summary of Monitoring Outcomes ................................................................ 17

4.4 Material Resources Utilization ........................................................................ 17

4.4.1 Current Period ................................................................................................... 17

4.4.2 Cumulative Resource Utilization ........................................................................ 19

4.5 Waste Management ......................................................................................... 21

4.5.1 Current Period ................................................................................................... 23

4.5.2 Cumulative Waste Generation ........................................................................... 24

4.6 Health and Safety ............................................................................................. 25

4.6.1 Community Health and Safety ........................................................................... 25

4.6.2 Worker Safety and Health .................................................................................. 25

Page 5: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 1

4.7 Training ............................................................................................................ 26

5. FUNCTIONING OF THE SEMP .................................................................... 27

5.1 SEMP Review ................................................................................................... 27

6. GOOD PRACTICE AND OPPORTUNITY FOR IMPROVEMENT ................. 28

6.1 Good Practice .................................................................................................. 28

6.2 Opportunities for Improvement ...................................................................... 28

7. SUMMARY AND RECOMMENDATIONS ..................................................... 29

7.1 Summary .......................................................................................................... 29

7.2 Recommendations ........................................................................................... 31

LIST OF TABLES:

Table 1: Road Packages ............................................................................................. 7

Table 2: Project Environmental Key Personnel ............................................................ 8

Table 3: Contractor Packages Detail ........................................................................... 8

Table 4: Project Activities during Current Reporting Period .......................................... 9

Table 5: Site Audits with Significant Findings ............................................................. 10

Table 6: Summary of Issues Tracking Activity for Current Period ............................... 12

Table 7: Water Consumption during Current Period................................................... 17

Table 8: Fuel Consumption during Current Period ..................................................... 18

Table 9: Cumulative Water Consumption for Project life ............................................ 19

Table 10: Cumulative Fuel Consumption for Project Life ............................................. 20

Table 11: General Waste Management Practice .......................................................... 21

Table 12: Waste Genration and Management during Current Reporting Period ........... 23

Table 13: Cumulative Waste Genration and Management of Project Life .................... 24

Table 14: Cumulative External Training for Project Life Cycle ...................................... 26

LIST OF FIGURES:

Figure 1: Summary of Issues by Non-Conformance .................................................... 13

Page 6: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 2

LIST OF ANNEXURES:

Corrective Action Plan ...................................................................... 34 Annexure - I:

Non-Conformance Notices ............................................................... 38 Annexure - II:

EMP Compliance Checklist .............................................................. 42 Annexure - III:

Environmental Monitoring Results .................................................... 50 Annexure - IV:

Project Photos .................................................................................. 76 Annexure - V:

Page 7: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 3

ABBREVIATIONS

ADB Asian Development Bank

AIDS Acquired Immune Deficiency Syndrome

COC Conditions of Contract

CAA Corrective Actions Applied

CAP Corrective Action Plan

dB Decibel

DTL Deputy Team Leader

EMMP Environmental Management & Monitoring Plan

EMP Environmental Management Plan

EPA Environmental Protection Agency

ES Environment Specialist

ESU Environmental and Social Unit

GoP Government of the Pakistan

GOS Government of Sindh

GRC Grievance Redressal Committee

HIV Human Immunodeficiency Virus

HSE Health Safety and Environment

IA Implementation Agency

IEE Initial Environmental Examination

LPG Liquefied Petroleum Gas

MCC Metallurgical Corporation of China Ltd

NEQS National Environmental Quality Standards

OHS Occupational Health & Safety

OVI Objectively Verifiable Indicators

PAM Project Administration Manual

PD Project Director

PEAS Professional Engineering Associates

PMC Project Management Consultants

PMU Project Management Unit

PPEs Personal Protective Equipment

Page 8: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 4

RAMS Restoration & up grading the established Road Asset Management System

RE Resident Engineer

REA Rapid Environmental Assessment

RoW Right of Way

SC Supervision Consultant

SP Sindh Province

SPS Safeguard Policy Statement

SEQS Sindh Environmental Quality Standards

SSEMP Site Specific Environmental Management Plan

STI Sexually Transmitted Infections

TA Technical Assistance

TL Team Leader

UJC Umer Jan and Co.

UMA Umar Munshi Associates

WSD Works and Services Department

YEC Yooshin Engineering Corporation

Page 9: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 5

1. INTRODUCTION

1.1 Preamble

1. This report represents the Semi - Annual Environmental Monitoring Review

(SAEMR) for Sindh Provincial Road Improvement Project (SPRIP).

2. This report is the 4th EMR for the project and represents the project activities

related to environmental monitoring for the period from July-December 2018. This

report fulfils the requirements to monitor the effectiveness of ADB safeguards

policy, its implementation and process as well as to ensure sound environmental

planning. Potential environmental impacts are identified including indirect and

cumulative impacts, and their significance assessed. Report also includes

corrective action plans and recommendations for the future course of action.

1.2 Headline Information

3. The contractors on all the packages carried out the tasks and actions described in

their EMP successfully. Few of the issues related to PPEs, housekeeping, dust,

noise and signage were identified on package 4 and 6 in this reporting period for

which mutually agreed Corrective Action Plan (CAP) was practiced by the

contractor. The corrective action plan is attached as Annexure I of this report

Page 10: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 6

2. PROJECT DESCRIPTION AND CURRENT ACTIVITIES

2.1 Project Description

4. Government of Sindh with assistance of Asian Development Bank prepared the

project for improvement of 328 Km of inter district main roads connecting with

National / Main Highways, under the Project named as Sindh Provincial Road

Improvement Project (SPRIP).

5. ADB assigned the Feasibility Study to consultants M/s Engineering Consultants

International (Pvt.) Ltd; Karachi, under TA-8406-PAK. The T.A. Consultants

finalized the feasibility study and shortlisted six roads with cumulative length of 328

km with uniform width of 7.3m. In addition to the Investment component, the project

will also include some consultancy services and equipment for reform component

such as:

i. Project Management Consultant,

ii. Restoration and up grading the established Road Asset Management system

(RAMS),

iii. Preparation of the Sindh Road Network Master Plan, and

iv. Institutional strengthening and training for Works and services Department

WSD and provision of emergency response equipment for traffic police

Department of Government of Sindh. Loan agreement of Loan No.3305-PAK

signed on 30th August 2016.

6. The project is being administered by the Project Management Unit (PMU), Works

and Services Department (WSD) Government of Sindh (GOS), which is

represented by the Project Director, PMU has hired the Project Management

Consultant (PMC), for design review and construction supervision of the civil works.

7. PMU after the required process with the consultation of ADB hired the Project

Management Consultant consist of Engineering Consultants Firms i.e Yooshin

Engineering Corporation (Korea) in associates with Umar Munshi Associates

(UMA) and Professional Engineering Associates (PEAS) for “Design Review” and “Project Management & Construction Supervision Consultant”. The Consultancy Agreement between Project Management Consultants (PMC) and Project

Management Unit (PMU) of Works and Services Department, Government of Sindh

was made on 14th November 2016.

8. The roads (328 Km) in SPRIP are 3.65m, 5.5m and 7.3m wide traversing in 9

districts of Sindh i.e Kashmore/Kandhkot, Jacobabad, Shikarpur, Larkana, Tando

Muhammad Khan, Badin, Mirpurkhas, Sanghar, and Matiari. The roads with width

of 3.65m and 5.5m will be widened to 7.3m.

9. The Project roads have been divided into 6 road packages as table follows:

Page 11: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 7

Table 1: Road Packages

Sr.

No. Description No. of Package Total Length (km)

1 Thull to Kandhkot Road ICB-SPRIP-01 44.00

2 Sheranpur to Ratodero Road ICB-SPRIP-02 36.00

3 Khyber to Sanghar Road ICB-SPRIP-03 64.00

4 Sanghar to Mirpur Khas road ICB-SPRIP-04 63.00

5 Tando Mohammad Khan to Badin ICB-SPRIP-05 67.00

6 Digri to Naukot Road ICB-SPRIP-06 54.00

2.2 Project Contracts and Management

10. The Works and Services (W&S) Department Govt. of Sindh was the

implementation agency (IA) for roads and bridges rehabilitation component of

SPRIP.

11. The Project Management Consultants (PMC) is responsible to ensure the

implementation of the environmental management and monitoring requirements

and procedures for SPRIP under the overall guidance of Initial Environmental

Examination (IEE). The PMC’s primary role is to provide services for design review and construction supervision of roads in Sindh province to be rehabilitation

including Bridges & Culverts under SPRIP. PMC is responsible to serve as the

“Engineer” within the context of the Conditions of Contract (COC) and are required

to nominate Resident Engineer and other staff for the contract that are full-time

resident in the area or located in the proximity of project area.

12. Works & Services Department has established Environmental and Social Unit

(ESU). The ESU was responsible for environmental and social review based on the

selection criteria, preparation, submission, implementation and environmental

management & monitoring and evaluation of the sub projects. ADB has provided

Environmental specialist in order to have technical support to ESU.

13. Project Management Consultants (PMC) has been engaged by IA in order to

strengthen their procurement capacity, support and help monitor design and

construction supervision services, and support the preparation, implementation,

monitoring and compliance of environmental safeguard action plans including

consultation and social and gender analysis.

14. The Project Management Consultants (PMC) have established an office at

Hyderabad and sub offices at Mirpur Khas and Sukkur. Packages 1 & 2

construction sites are under Residence Engineer Sukkur, while Packages 3 & 4

Residence Engineer Sanghar, 5 & 6 are under Residence Engineer Mirpur Khas.

At all the construction sites, the contractors bare mobilized since January, 2017.

The Contractors at each site have hired Environmentalists, who worked with the

help of Contractors` support staff (Site Engineers, Inspectors, etc).

Page 12: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 8

Table 2: Project Environmental Key Personnel

S/No Name Designation Telephone No

1 Aziz ul Haque Siddiqui Deputy Director- PMU 0333 2706007

2 Aleem Butt Environment Specialist- PMC 0321 4260133

3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110

4 Abdul Ghafar Assistant Engineer – PMU 0301 3461977

5 Waqas Muhammad Environmentalist- Contractor

Package 3 and 5 0345 3595199

6 Naveed Bhali

Environmentalist-

Contractor

Package 1 and 2

03214989420

7 Jauhar Shah

Environmentalist –

Contractor

Package 6

0313 9248132

8 Najeeb Soomro

Environmentalist –

Contractor

Package 4

03348961884

15. The 6 road packages have been awarded to the following contractors

Table 3: Contractor Packages Detail

Sr. No. Package Number and Name Contractor

1 Package No. ICB-SPRIP-01 Thull to

Kandhkot Road 44 km

Metallurgical Corporation of China

Ltd. (MCC) - M/S Umer Jan & Co

(UJC) [JV]

2 Package No. ICB-SPRIP-02 Sheranpur to

Ratodero road 36 km

Xi'an Industrial Development Co.

Ltd of China Road and Bridge

Corporation - Sardar M Ashraf D.

Baloch (Pvt) Ltd. [JV]

3 Package No. ICB-SPRIP-03 Khyber to

Sanghar road 64 km

Xinjiang Beixin Road & Bridge

Group Co. Ltd

4 Package No. ICB-SPRIP-04 Sanghar to

Mirpur Khas Road 63 km

Xinjiang Beixin Road & Bridge

Group Co. Ltd

5

Package No. ICB-SPRIP-05 Tando

Mohammad Khan to Badin road 67 km

Xi'an Industrial Development Co.

Ltd of China Road and Bridge

Corporation - Sardar M Ashraf D.

Baloch (Pvt.) Ltd. [JV]

6 Package No. ICB-SPRIP-06 Digri to

Naukot 54 km

Xinjiang Beixin Road & Bridge

Group Co.Ltd

Page 13: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 9

2.3 Project Activities During Current Reporting Period

Table 4: Project Activities during Current Reporting Period

Name of Package Main Construction

Activities

Active Work Site

Chainage

Number of Workers

Involved

ICB-SPRIP-01: Thull

to Kandhkot Section

(44.0Km)

Complete COMPLETE COMPLETE

ICB-SPRIP-02:

Sheranpur to

Ratodero Section

(36.0Km)

Bridge 45+345 15 WORKERS

Stone Pitching 53+200 20 WORKERS

ICB-SPRIP-03:

Khyber to Sanghar

Section (64.0Km)

Tuff Paver In Jhole City 53+200 to 54+140 25 WORKERS

Culvert Work In Jhole

City 53+780 10 WORKERS

ICB-SPRIP-04:

Sanghar to

Mirpurkhas Section

(63.0Km)

Asphaltic Wearing

Course (ACWC) Km. 53+500 to 64+300 20 WORKERS

Shoulder (Aggregate +

Earthen) Km. 23+000 to 24+000 12 WORKERS

Side Drain Km. 63+600 to 64+300 06 WORKERS

ICB-SPRIP-05:

Tando Mohammad

Khan to Badin

Section (67.0Km)

Road Line Marking 25+000 to 45+000 L/s 15 WORKERS

Urban Drain 44+395 to 44+444 R/s

44+265 to 44+315 L/s 45 WORKERS

Riprap (Stone Pitching) 49+300 to 49+315 R/s

49+150 to 49+400 L/s 65 WORKERS

ICB-SPRIP-06: Digri

to Naukot Section

(54.0Km)

Stone Pitching (Rip Rap) Km. 16+000 to 17+000 08 WORKERS

Line Marking Km. 17+000 to 19+000 07 WORKERS

Aggregate Base Course

Shoulder Km. 43+000 to 46+000 07 WORKERS

16. The progress up to the reporting period i.e. December 2018 of the Rehabilitation

Projects SPRIP envisages 328 kms Roads including culverts and bridges. Total

progress (%) of each project is given below

Package 01 99.50 %

Package 02 88.39 %

Package 03 99.50 %

Package 04 77.92 %

Package 05 86.60 %

Package 06 80.64 %

2.4 Description of Any Changes to Project Design

17. No changes. All the projects have been commenced/constructed on the same

design and route which is given in IEEs/EIAs.

Page 14: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 10

3. ENVIRONMENTAL SAFEGUARD ACTIVITIES

3.1 General Description of Environmental Safeguard Activities

18. Environmental Specialist - PMC has carried out monthly environmental compliance

monitoring of the project to ensure the environmental mitigation measures or

conditions are adequately addressed. The monthly environmental monitoring report

has been submitted to PMU.

19. The deputy director - PMU also did the few surprise visit of the sites during this

reporting period and any non-conformance noted were immediately pass to the

contractor and PMC Environmental Specialist.

20. Environmental Specialist -PMC have also guided the contractor and its

environmental specialist on compliance of the non-conformances identified during

the reporting period

21. The contractor environmental specialists has conducted the regular field

inspections and compliance were checked through Environment Checklist which

were then shared with the contractor and Environmental Specialist (PMC). The

staff trainings, tool box talks and environmental testing through 3rd party

environmental laboratory were also performed on site.

22. The contractor environmental specialists submit the environmental progress of the

site though monthly environmental compliance report to the environmental

specialist of PMC.

3.2 Site Audits

23. The contractor environmental specialists have conducted the regular field

inspections with the internal audits. The results of the internal audit have been

shared with the contractor staff itself and to the PMC-Environmental Specialist.

24. The PMC-Environmental Specialist also undertaken the monthly site audits of all

the packages. The detail of site audits and its significant findings is given in table

below-

Table 5: Site Audits with Significant Findings

Site Audit Date Packages Significant Findings

3rd Week of July 2018 1, 2,3, 4, 5 and 6 There is the weak implementation of PPEs

identified on all the packages.

Few of the signage on package 6 has

placed wrong in order

No containment is present for fuel storage

tanks on package I and II.

Few of the bifurcation are missing at

package VI

The labels on the chemicals and

Page 15: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 11

Site Audit Date Packages Significant Findings

instructions to handle the chemicals is

missing from all the packages

2nd Week of August

2018

1, 2,3, 4, 5 and 6 There is the weak implementation of PPEs

identified on package 1,2,3 and 4

The construction of containment of fuel

storage tanks is still pending on package I

and II.

The bifurcation are missing at package I

and II

4th Week of September

2018

1, 2,3, 4, 5 and 6 weak implementation of PPEs identified

on package 1,2, 4 and 6

3rd Week of October

2018

1, 2,3, 4, 5 and 6 The issues related to PPEs,

housekeeping, dust, noise and signage

has been identified on package 4 and 6

2nd Week of November

2018

1, 2,3, 4, 5 and 6 Signage missing from package 4 and 6

Dust emission from asphalt plant package

6

3rd Week of December

2018

1, 2,3, 4, 5 and 6 Week implementation of PPEs from

package 4 and 6

Few of the bifurcation missing from

package 4 and 6

25. Few of the common issues were identified during current and previous reporting

period summarizes as under-:

a) The Contractor have provided the PPEs to the workforce but week

implementation is found mostly on package 1,2,4 and 6. The contractor were

instructed to train / motivate the workforce for the use of PPEs and

responsibility should be given to the site in charge for proper implementation

in wearing.

b) The dust from asphalt and signage issue were also common on package 4

and 6 during both reporting periods. The Corrective Action Plan (CAP) has

been prepared and enforced for package IV and VI. The site supervisors take

care of these issues after CAP has been enforced.

3.3 Issues Tracking (Based on Non-Conformance Notices)

26. The issues found during this reporting period is given as under-:

There is week implementation of PPEs found on all the packages although

the contractors were provided the PPEs to the work force and therefore

negligence at the workers end. The contractor were given instruction that site

supervisor should take care of these issues and enforce the use of PPEs

Page 16: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 12

during construction activities. After the instruction the situation on packages

were much improved except package IV and VI.

No containment is present on fuel storage tank on package I and II. The

contactor were given instructions after which the containment were formed

and issue is closed.

The issue of the housekeeping, dust and signage were found on asphalt plant

of package IV and VI. The Corrective Action Plan (CAP) has been prepared

and enforced for these issues after which the contractor has taken the

measures and issues were successfully closed.

The issue of signage and bifurcation were also found on package IV and VI

for which the corrective action plan has been prepared and enforce. After the

enforcement of Corrective Action Plan, the signage were improved although

bifurcation were still missing form few of the active construction sites.

27. The summary of the issues is given as under-:

Table 6: Summary of Issues Tracking Activity for Current Period

Package Name

To

tal n

um

be

r o

f

issu

es

fo

r th

e p

roje

ct

Nu

mb

er

of

op

en

issu

es

Nu

mb

er

of

Clo

sed

Issu

es

Pe

rce

nta

ge

clo

se

d

Issu

es

Op

en

th

is

rep

ort

ing

peri

od

Issu

es

Clo

se

d t

his

rep

ort

ing

peri

od

ICB-SPRIP-01: Thull to Kandhkot

Section (44.0Km) 2 0 2 100 2 2

ICB-SPRIP-02: Sheranpur to Ratodero

Section (36.0Km) 2 1 1 50 2 1

ICB-SPRIP-03: Khyber to Sanghar

Section (64.0Km) 1 1 1 100 1 1

ICB-SPRIP-04: Sanghar to Mirpurkhas

Section (63.0Km) 6 2 4 66 6 4

ICB-SPRIP-05: Tando Mohammad

Khan to Badin Section (67.0Km) 1 1 1 100 1 1

ICB-SPRIP-06: Digri to Naukot Section

(54.0Km) 6 2 4 66 6 4

Page 17: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 13

Figure 1: Summary of Issues by Non-Conformance

3.4 Trends

28. The information from previous period reports and the current period information are

used to identify trends in conformance and issues. The overall conformance status

of the project improved expect for Package IV and VI where conformance level is

neither positive nor negative.

29. The letter issued on the non-conformances is attached as Annexure II of this

report.

3.5 Unanticipated Environmental Impacts or Risks

30. No unanticipated environmental impacts and risks have been identified during the

current period. Details of all the impacts which have been aggravated during the

reporting period and their mitigation measures are discussed in the project’s IEE.

Major, 10

Minor, 8

N/A, 0 NON CONFORMANCE LEVEL

Page 18: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 14

4. RESULTS OF ENVIRONMENTAL MONITORING

4.1 Overview of Monitoring Conducted during Current Period

31. Internal environmental monitoring consists of two types. The first type consists of

visual inspections of things such as soil erosion, restoration of vegetation, solid

waste disposal and so on. The second type requires field sampling and lab analysis

for example water quality, air quality and noise levels. The field sampling and lab

analysis has been conducted, including air and noise and water quality during the

reporting period. Field inspections have been undertaken by the on-site

environmental and Health Safety team of Project Management Consultant including

one ARE and one Inspector headed by Resident Engineer and Environmental

Specialist on a regular basis. As far as contractors are concerned overall 4

members team at each sub project implement and monitor the Environmental,

Health and Safety that includes the Project Manager, Construction Manager, Site

Engineer and Site HSE Engineer.

32. The environmental monitoring was carried out by using, daily, weekly and monthly

EMP compliance (checklists) as well as through visual observations to get

information on the actual nature and extent of key impacts and the effectiveness on

mitigation and enhancement measures outlined in the Site Specific Environmental

Management Plans (SSEMP) and agreed by the Contractors under the contracts.

The SSEMP covered all the aspects mentioned in the project specific EMPs for

each project. The monitoring of noise and vibration, surface and groundwater, air

quality, flora and fauna, camp sites, top soil erosion, cultural heritage and safety

provisions are discussed in this section. All the subprojects are category B projects

and environmental approval from ADB was obtained.

33. A monthly monitoring checklist was prepared to assess the environmental impacts

of the projects on the surrounding environment. On careful review of this form,

inconsistencies and duplication of questions were corrected such that any “yes” answer indicates compliance and any “no” indicates no compliance. The “NA” or not applicable answers were also tallied; however, no reasons for non-applicability

were included, thus making these results less useful. To date the contractors have

prepared checklists till December, 2018 which have been checked by the site

Environment Specialist and submitted to the PMC. The analysis showed that non-

compliance was most often in the areas of traffic management, dust pollutions,

health and safety and contractors good housekeeping. The possible instruction

related to the non-compliance have been given to the contractors by Environmental

Specialist of PMC which the contractor rectified within given time frame. The

sample monthly monitoring checklist has been attached as Annexure III of this

report.

Page 19: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 15

4.1.1 Air Quality

34. The major sources of air emissions are running vehicles on the road as well as

construction equipment and construction vehicles. The vehicles delivering granular

and/or fine materials to the sites, few are found not properly covered with tarpaulin

sheets. Overloading of these vehicles have also been seen at some places.

Vehicle speeds are generally controlled on construction sites, except package 3,

because of heavy traffic. Proper maintenance of vehicles and diesel equipment,

and avoidance of unnecessary running of vehicle and equipment engines are

adopted to reduce emissions. During the reporting period the monthly dust

emissions was checked at all construction sites including the sensitive areas. The

result has been annexed as Annexure IV.

35. The road on the construction sites are sprayed regularly by water trucks to

suppress dust. It requires daily schedule spraying, taking weather conditions into

consideration.

36. The potential sources of air pollution during construction are the vehicles, kick-off

dust, asphalt plant and crusher. Visual observations were noted to monitor water

sprinkling at dust prone areas during the construction activities. The occasional

sprinkling of water observed at all sites. The concerned contractors were advised to

take care to control the dust emissions. Visual observations were also made for

fitness of the vehicles to minimize the smoke emissions. The contractors’ environment specialists of each packages ensured that the dust should be reduced

to maximum possible level so that it may not affect the workers and the

surrounding environment including the native people.

37. Test Results of Ambient Air Quality from these different places are presented in

Annexure IV.

38. The result for ambient air quality monitoring shows the PM10, SPM, SO2, & NOX

concentrations of the ambient air. All the results are well with in SEQS limits.

39. During the month of October, the high particulate emissions were observed from

the asphalt plant installed at package 4 and 6. This was due to the chocking/failure

of the wet scrubber. The corrective action plan was made in order to control the

emission attached as Annexure I. The contractor successfully did the maintenance

of wet scrubber in given time frame.

40. Diesel vehicles were moving around, but the measured NOx level is under the

standard level. PM2.5 is composed of a mixture of primary and secondary particles,

Primary particles are emitted directly into the atmosphere and include soil-related

particles and carbon particles from fossil fuel combustion, and secondary particles

are Sulphate, nitrate, organic and elemental carbon, trace elements, ammonium

etc.

41. To reduce the generation of dust owing to movement of construction materials

including vehicles, water sprinkling must be carried out at all construction sites.

Movement of construction debris is to be covered while hauled and stored, and

Page 20: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 16

roads should be properly cleaned and water sprayed in order to minimize dust in

air.

4.1.2 Water Quality

42. All the surface and ground water were being monitored to assess the damage

caused by the construction activities. The implementation of the preventive and

corrective measures which were mentioned in SSEMP, were monitored and

assessed in the field visits and environmental audits.

43. Arrangements for proper storage and disposal of solid waste were devised. Camp

areas were selected where adequate natural drainage was available. No surface

water or ground water contamination was reported due to oil spillages, solid waste

dumping or asphalt lying during the reporting period. Potable water was supplied to

the workers working at the sites. The compliance to the SSEMP was ensured

Monitoring of potable water for drinking purpose was being carried out. Whereas

the contractors have also agreed to arrange the guard rails around the water tanks,

to avoid any accident of spillage during the work course. Whenever, the landfills

are available, the scarified asphalt is to be disposed in the landfills.

44. The monitoring of drinking water has not been performed during this reporting

period.

45. The waste water from the labour camps have been disposed of properly through

septic tank. All the labour camps have provision of septic tanks.

4.1.3 Noise and Vibration

46. The contractors have taken measures to reduce noise levels and selected all the

equipment that generates low levels of noise however, all the construction

machinery should be properly maintained in order to have noise levels within

SEQS. Noise reduction devices or methods (e.g., hoarding) may be applied where

piling equipment is operating within 500 m of sensitive sites such as schools or

other receptors identified in SSEMPs of all sites. Concrete-mixing plants and

similar activities are located at least 300 m away from sensitive areas such as

residences, schools and hospitals. The noise quantity at construction site was also

measured at all the sub projects, which are within the permissible limits.

47. Implementation of the mitigation measures recommended in SSEMP to reduce the

impact of Noise and Vibration were observed. Construction activities situated close

to populated areas were limited to daylight hours only to minimize the impact of

noise. Prayer timings and school timings were observed specially in the areas

close to the mosques and schools along the carriageway during the construction

activities. Camp sites were established away from the residential areas.

Contractors were advised to keep their earth moving equipment in good condition

and to provide personal protective equipment like ear-plugs to the working staff at

noise generating sites. No noise and vibration related complaints from public or

workers were registered during the reporting period. As these projects are category

Page 21: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 17

B projects, in addition to the above measures, compliance to the SSEMP. Special

field visits were carried out in order to assess the effectiveness of the protective

equipment used by the contractors for the workers. The safety signs and signage

were arranged by the contractors in order to warn people about the high intensity or

level of noise being generated by the machinery.

4.2 Trends

48. During the last reporting period the concentration of PM at package 4 and 6 was

slightly above the SEQS (Sindh Environmental Quality Standards) by which the

contractor was instructed to increase the water spraying frequency at the spotted

sites. During this reporting period, the concentration of PM found within the SEQS

limit. So the trend towards air quality is positive.

49. The result of noise quality remained same during this and previous reporting period

4.3 Summary of Monitoring Outcomes

50. The results of ambient air quality, noise shows the compliance with the SEQS. As

the project is towards the finishing stage and this is the last biannual report

therefore no additional monitoring is suggested.

4.4 Material Resources Utilization

4.4.1 Current Period

51. Key water using processes on construction sites are considered to be

accommodation at workers camp, site construction activities such as asphalt,

wearing course etc, Dust suppression and on site offices. The water consumption

is estimated for workers camp, dust suppression and site offices. Due to lack of

data the water useage for the asphalt wearing course or other construction activity

is not reported. The water consumption is given in Table 7

52. The diesel fuel consumption is considered on asphalt plant, road site construction

vehicles and backup power generation in site offices. The fuel consumption is given

in Table 8

Table 7: Water Consumption during Current Period

Sr. No. Activity

Water Consumption in

meter cube for period July

2018 to December 2018

Package 1

1 Accommodation at workers camp 288

2 Dust Suppression Activity 0

3 Site Office 432

Package 2

Page 22: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 18

Sr. No. Activity

Water Consumption in

meter cube for period July

2018 to December 2018

4 Accommodation at workers camp 720

5 Dust Suppression Activity 600

6 Site Offices 580

Package 3

7 Accommodation at workers camp 800

8 Dust Suppression Activity 200

9 Site Offices 600

Package 4

10 Accommodation at workers camp 920

11 Dust Suppression Activity 800

12 Site Offices 650

Package 5

13 Accommodation at workers camp 860

14 Dust Suppression Activity 520

15 Site Offices 600

Package 6

16 Accommodation at workers camp 880

17 Dust Suppression Activity 520

18 Site Offices 650

Total Water Consumption 10620

Table 8: Fuel Consumption during Current Period

Sr. No. Activity

Fuel Consumption in meter

cube for period July 2018

to December 2018

Package 1

1 Asphalt plant 15

2 Road Site Construction Vehicles 30

3 Backup power Generation at site offices 2.0

Package 2

4 Asphalt plant 50

5 Road Site Construction Vehicles 96

6 Backup power Generation at site offices 2.2

Package 3

Page 23: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 19

Sr. No. Activity

Fuel Consumption in meter

cube for period July 2018

to December 2018

7 Asphalt plant 20

8 Road Site Construction Vehicles 40

9 Backup power Generation at site offices 2.4

Package 4

9 Asphalt plant 55

10 Road Site Construction Vehicles 102

11 Backup power Generation at site offices 2.6

Package 5

12 Asphalt plant 50

13 Road Site Construction Vehicles 98

14 Backup power Generation at site offices 2.5

Package 6

15 Asphalt plant 56

16 Road Site Construction Vehicles 100

17 Backup power Generation at site offices 2.6

Total 726.3

4.4.2 Cumulative Resource Utilization

53. The cumulative water consumption of all the packages excluding construction

activities is given in Table 9

Table 9: Cumulative Water Consumption for Project life

Sr. No. Activity

Water Consumption in

meter cube for period

whole project life

Package 1

1 Accommodation at workers camp 388,800

2 Dust Suppression Activity 324,000

3 Site Office 270,000

Package 2

4 Accommodation at workers camp 432,000

5 Dust Suppression Activity 330,000

6 Site Offices 290,000

Package 3

7 Accommodation at workers camp 430,000

8 Dust Suppression Activity 325,000

Page 24: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 20

Sr. No. Activity

Water Consumption in

meter cube for period

whole project life

9 Site Offices 288,000

Package 4

10 Accommodation at workers camp 435,000

11 Dust Suppression Activity 332,000

12 Site Offices 292,000

Package 5

13 Accommodation at workers camp 428000

14 Dust Suppression Activity 330,000

15 Site Offices 288,000

Package 6

16 Accommodation at workers camp 434,000

17 Dust Suppression Activity 324,000

18 Site Offices 291,000

Total Water Consumption 62,31,800

54. The cumulative fuel consumption of all the packages is given in Table 10

Table 10: Cumulative Fuel Consumption for Project Life

Sr. No. Activity

Fuel Consumption in

meter cube for period July

2018 to December 2018

Package 1

1 Asphalt plant 27000

2 Road Site Construction Vehicles 51,840

3 Backup power Genration at site offices 1080

Package 2

4 Asphalt plant 27100

5 Road Site Construction Vehicles 54,000

6 Backup power Genration at site offices 1100

Package 3

7 Asphalt plant 25000

8 Road Site Construction Vehicles 52000

9 Backup power Genration at site offices 1090

Package 4

9 Asphalt plant 28000

10 Road Site Construction Vehicles 55000

Page 25: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 21

Sr. No. Activity

Fuel Consumption in

meter cube for period July

2018 to December 2018

11 Backup power Genration at site offices 1200

Package 5

12 Asphalt plant 27200

13 Road Site Construction Vehicles 53000

14 Backup power Genration at site offices 1100

Package 6

15 Asphalt plant 28000

16 Road Site Construction Vehicles 55000

17 Backup power Genration at site offices 1200

Total 4,89,910

4.5 Waste Management

55. The construction waste from the project site consists of asphalt waste, batteries,

containers/drums, excavated natural material, oil filters, motor oil, scrap material

and concrete waste. The waste from offices and labour camp consists of the

municipal waste both solid and liquid effluent.

56. The liquid waste from camp offices has been disposed of by using the septic tank.

The septic tank is present at all the packages and liquid waste has been disposed

properly.

57. Each type of solid waste has been managed separately and is discussed

in Table 11

Table 11: General Waste Management Practice

Sr. No Type of Waste Mode of Disposal/Use

1 Asphalt Waste

Reuse in applications such as base, and sub-

base and some is blended for use in new

asphalt

2 Batteries Sold to the Scrap metal recyclers

3 Empty Containers/drums Sold to the Scrap metal recyclers

4 Excavated natural material Reused offsites

5 Oil filters Sold to Recyclers

6 Motor Oil Sold to oil recycler for reprocessing and

recovery.

7 Scrap material Sold to the Scrap metal recyclers

8 Concreate Waste Reuse in pavement base and sub-base

9 Municipal Solid Waste Disposed in Landfill site

Page 26: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 22

Page 27: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 23

4.5.1 Current Period

Table 12: Waste Genration and Management during Current Reporting Period

Sr.

No Type of Waste Classification

Waste

Source Quantity

Mode of

Disposal/Use

1 Asphalt Waste

General solid

waste (non-

putrescible)

Road

Construction,

culverts

construction

10 cubic

meter (All

Packages)

Reuse in

applications

such as base,

and sub-base

and some is

blended for use

in new asphalt

2 Batteries Hazardous

Power using

products

such as

construction

vehicles and

generators

100 Nos.

(All

Packages)

Sold to the

Scrap metal

recyclers

3

Empty

Containers/

drums

Non-Hazardous

(residues have

been removed by

washing or

vacuuming)

Use to

Transport

and storage

Fuel and

lubricants

180 Nos.

(All

Packages)

Sold to the

Scrap metal

recyclers

4 Excavated

natural material Non-Hazardous

From

Excavation

of Soil

7500 cubic

meter (All

Packages)

Reused offsites

5 Oil filters

General solid

waste (non-

putrescible)

From

Machinery,

Construction

Vehicles and

Generators

300 Nos.

(All

Packages)

Sold to

Recyclers

6 Motor Oil Hazardous

From

Machinery,

Construction

Vehicles and

Generators

2400

Litres

(All

Packages)

Sold to oil

recycler for

reprocessing

and recovery.

7 Scrap material

General solid

waste (non-

putrescible)

Scrape yard 6 ton (All

Packages)

Sold to the

Scrap metal

recyclers

8 Concreate

Waste

General solid

waste (non-

putrescible)

culverts

construction

75 cubic

meter (All

Packages)

Reuse in

pavement base

and sub-base

9 Municipal Solid

Waste

General solid

waste

Offices,

Camp Site

43 Ton

(All

Packages)

Disposed in

Landfill site

Page 28: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 24

4.5.2 Cumulative Waste Generation

Table 13: Cumulative Waste Genration and Management of Project Life

Sr.

No Type of Waste Classification

Waste

Source Quantity

Mode of

Disposal/Use

1 Asphalt Waste

General solid

waste (non-

putrescible)

Road

Construction,

culverts

construction

40 cubic

meter (All

Packages)

Reuse in

applications

such as base,

and sub-base

and some is

blended for use

in new asphalt

2 Batteries Hazardous

Power using

products

such as

construction

vehicles and

generators

320 Nos.

(All

Packages)

Sold to the

Scrap metal

recyclers

3

Empty

Containers/

drums

Non-Hazardous

(residues have

been removed by

washing or

vacuuming)

Use to

Transport

and storage

Fuel and

lubricants

600 Nos.

(All

Packages)

Sold to the

Scrap metal

recyclers

4 Excavated

natural material Non-Hazardous

From

Excavation

of Soil

30,000

cubic meter

(All

Packages)

Reused offsites

5 Oil filters

General solid

waste (non-

putrescible)

From

Machinery,

Construction

Vehicles and

Generators

1000 Nos.

(All

Packages)

Sold to

Recyclers

6 Motor Oil Hazardous

From

Machinery,

Construction

Vehicles and

Generators

7500

Litres

(All

Packages)

Sold to oil

recycler for

reprocessing

and recovery.

7 Scrap material

General solid

waste (non-

putrescible)

Scrape yard 24 ton (All

Packages)

Sold to the

Scrap metal

recyclers

8 Concreate

Waste

General solid

waste (non-

putrescible)

culverts

construction

300 cubic

meter (All

Packages)

Reuse in

pavement base

and sub-base

9 Municipal Solid

Waste

General solid

waste

Offices,

Camp Site

130 Ton

(All

Packages)

Disposed in

Landfill site

Page 29: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 25

58. The waste from empty container can be reduced if the transport fuel could be used

in tankers instead of containers. The tankers are more safe to transport in

comparison with containers.

59. Municipal solid waste can be reduce by using good practices such as going

paperless in offices, reduce the plastic bottles and reduce the amount of packaging

product. Moreover, the kitchen waste could be composted and use as manure in

gardening.

4.6 Health and Safety

4.6.1 Community Health and Safety

60. The safety of the local people is a major concern at the construction sites. The

contractor has placed the safety signs (speed limits, safety cautions, safety cones,

safety tapes etc.) on active construction sites. Few of the safety signs were placed

wrong in order on package IV and VI for which the corrective action plan has been

enforced. The related corrective action plan is attached as Annexure I. After the

implementation of corrective action plan, the contractor successfully placed the

safety signs at right places and directions in given time frame. Contractors also did

regular water sprinkling at all the sites. No minor or major accident were reported

from all the packages during this reporting period. The traffic operations are well on

all sites, since no complaint is received from the community in this regard.

Furthermore, no complaints have been received of damage to public/community

assets and infrastructure.

4.6.2 Worker Safety and Health

61. Implementation of EMP recommendations regarding the use of PPEs by

contractor’s site staff was also poor on all the packages. The Contractor have provided the PPEs to the workforce but there is lack of implementation in wearing

of PEEs. The contractor were instructed to train / motivate the workforce for the use

of PPEs and responsibility should be given to the site in charge for proper

implementation in wearing. However, no accident at any project has been reported

during the reporting period.

62. First Aid Kits were available at camp sites and work sites. A follow up visit was also

carried out to ensure compliance to the findings of previous audit. All non-

compliance matters and observations were addressed. It was advised to equip the

workers with proper protective equipment, and the safety signs to be display all

over the area.

63. The internal training on firefighting, tool box talks, PPEs wearing and first aid was

delivered to the contractor’s staff, and a fire drills were also carried out to demonstrate the use of different fire safety equipment.

Page 30: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 26

4.7 Training

64. Regular internal HSE trainings were given to workforce by the contractor's

environmentalist. However, during this reporting period the external training on

HSE and Environmental Protection were only given at package 1 and 2.

65. The cumulative external trainings on all the packages are given in table below-:

Table 14: Cumulative External Training for Project Life Cycle

Sr.

No Training Package Biannual Period

1

Training on Safe work Practices,

Fire Fighting and Environmental

Protection

Package 3 and

Package 5

1st Biannual (January

2017 to June 2017)

2 Training on HSE and

Environmental Protection

Package 3,4,5 and

6

2nd Biannual (July 2017

to December 2017)

3 Training on HSE and

Environmental Protection Package 1 and 2

4th Biannual (January

2018 to June 2018)

Page 31: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 27

5. FUNCTIONING OF THE SEMP

5.1 SEMP Review

66. The objective of establishing SSEMP is not only to propose appropriate mitigation

measures, but also to recommend establishment of institutions or mechanisms to

monitor and ensure compliance with environmental regulations and implementation

of the proposed mitigation measures with implementation schedule.

67. The contractor is mostly complying with the conditions mentioned in SSEMP,

However few lacking's were observed discussed below-:

There is week implementation of PPEs found on all the packages although

the contractors were provided the PPEs to the work force and therefore

negligence at the workers end. The contractor were given instruction that site

supervisor should take care of these issues and enforce the use of PPEs

during construction activities. After the instruction the situation on packages

were much improved except package IV and VI.

The monthly dust and noise monitoring is recommended in SSEMP, however

the dust and noise monitoring was not conducted for package 1,2,4 and 6 for

the month October to December.

The biannual monitoring of drinking water and ambient air is recommended in

SSEMP, however, this monitoring were also not conducted at all the

packages.

In the SEMPs, use of LPG cylinders was recommended, whereas use of

wood as fuel was discouraged. Use of wood was observed at different camp

site due to non-availability of LPG cylinders. Contractors were advised to

avoid any wood burning.

68. The SSEMP covered all the aspects and has been effective and also the project is

on finishing stage therefore no change is recommended.

Page 32: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 28

6. GOOD PRACTICE AND OPPORTUNITY FOR IMPROVEMENT

6.1 Good Practice

69. During reporting period no examples of good practice could be presented. All

performance was implemented within planned activities.

6.2 Opportunities for Improvement

70. Contingency and miscellaneous cost has been allocated in the EMP Mitigation and

Monitoring cost. As the project is towards finishing stage and this cost is not yet

used, therefore it is recommended to use this cost in indigenous tree plantation

along the sides of the road.

Page 33: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 29

7. SUMMARY AND RECOMMENDATIONS

7.1 Summary

71. During this reporting period, activities of road works constructions are in progress.

At the start of the construction, the contractors have partially fulfilled their duties

about Environment, Health and Safety issues but now things are better and

contractor is giving full attention to the mitigation measures and implementation of

environmental management and monitoring plan.

72. Environmental provisions have been incorporated into contracts of the works

constructions.

73. Field inspections by the Contractor, Management Consultants and PMU were

regularly made. Each of these has assigned manager in charge of environmental

management. They also serve as grievance focal points.

74. Project and contact information has been posted in the bulletin boards at all

construction sites. Public complaints can also be lodged in register and telephone.

To date, all the public compliant received has been resolved efficiently.

75. The monthly dust and noise monitoring is recommended in SSEMP, however the

dust and noise monitoring was not conducted for package 1,2,4 and 6 for the

month October to December. However, for the rest the dust and noise found within

SEQS limits

76. No containment is present on fuel storage tank on package I and II. The contactor

were given instructions after which the containment were formed and issue is

closed.

77. The issue of the housekeeping, dust and signage and bifurcation were found on

asphalt plant of package IV and VI. The Corrective Action Plan (CAP) has been

prepared and enforced for these issues after which the contractor has taken the

measures and issues were successfully closed.

78. Main Contractors camps and labour camps, storage areas and vehicle/machinery

places are being maintained according to prevailing Environment, health and safety

standards at all packages

79. All the HSE component status, during reporting period is satisfactory. No major

complaint and accident has been reported.

80. Copy of the, Camp site Guidelines, Grievance register and monthly SSEMP

Compliance Checklists was available at all the sub projects. A person designated

from the contractor’s side was present at each site to coordinate implementation of SSEMP recommendations and any first aid related issues.

81. No noise and vibration related complaints from public or workers were registered.

Page 34: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 30

82. Construction activities close to populated areas were limited to daylight hours only

to minimize the impact of noise. The contractors should adhere to the agreement to

avoid any social conflict.

83. No surface water or ground water contamination was reported due to oil spillages,

solid waste dumping or asphalt lying during the reporting period. However, it is

recommended spill control equipment should be ensured at each campsite.

84. No flora and fauna was disturbed by the construction activity. No mortality of wild

animal was reported.

85. No cultural heritage sites/ wetland/ protected area/ mangrove/ estuarine lies in

RoW of any of the sub project alignment.

86. No damage to the agricultural land due to borrow pits or topsoil erosion was

reported.

87. Use of PPEs by contractor’s site staff still requires improvement. The Contractor

have provided the PPEs to the workforce but instructed to train / motivate the

workforce for the use of PPEs and responsibility should be given to the site in

charge for proper implementation in wearing.

88. During construction, special attention has been given in the areas where there are

encroachments on the roads side, to minimize the impact on the livelihood of the

locals. The contractors have aware of the problem and working accordingly.

89. The construction waste from the project site consists of asphalt waste, batteries,

containers/drums, excavated natural material, oil filters, motor oil, scrap material

and concrete waste. The waste from offices and labour camp consists of the

municipal waste both solid and liquid effluent. All waste has been disposed of as

per the plan described in section 4.5

90. Traffic management and safety is being given the top most priority in the overall

project corridor.

91. Child labor was not observed on any subproject. Contractors were advised to

discourage child labor in future as well. It was advised that Identity verification

should be carried out prior to hiring and the record should be maintained.

92. No complaints regarding transmission of Communicable diseases (such as STI’s and HIV/AIDS) were reported.

93. No ozone depleting substances are used. Only approved substances (chemicals

and technologies) are used having negligible significance to the climate change.

94. Overall no major conflict with the community was observed. Cordial liaison has

been maintained with local community.

95. Only one grievance has been received from package 5 during this reporting period

which were effectively resolved and all the complaints are closed.

Page 35: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 31

7.2 Recommendations

96. Currently the contractor of Package 1,2,4 and 6 shows negligence towards regular

environmental monitoring program as per SSEMP. Semi-annually monitoring of

drinking water, monthly monitoring of PM10 and PM2.5 at all active construction

site and quarterly monitoring of ambient air quality (24 hours) at asphalt plant is

required at these packages to monitor air and water quality as per SSEMP.

97. All the plans established in SSEMP(s) must be implemented in full swing..

98. Regular internal and external audits are required along with routine visual

inspections and monitoring.

99. Contractors of all subprojects are required to arrange proper external training of

staff and maintain its record. During this reporting period, the external training was

only given on Package 1 and 2

100. Contractors are advised to motivate and train staff for the use of PPEs.

101. Traffic management and safety should be the top most priority in the overall project

corridor. The Traffic Management Plan should be available at all sites.

102. Spill control equipment should be ensured at each campsite.

Page 36: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 32

ANNEXURES

Page 37: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 33

ANNEXURE – I

CORRECTIVE ACTION PLAN

Page 38: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 34

CORRECTIVE ACTION PLAN ANNEXURE - I:

ICB-04-Corrective Action Plan (CAP) (1)

Page 39: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 35

ICB-06-Corrective Action Plan (CAP)

Page 40: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 36

Page 41: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 37

ANNEXURE – II

NON-CONFORMANCE NOTICES

Page 42: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 38

NON-CONFORMANCE NOTICES ANNEXURE - II:

1160-Direction with Respect to Non-Compliance of SSEMP (1)

Page 43: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 39

1183-Direction to Non Compliances of SSEMP

Page 44: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 40

1185-Direction with Respect to Shortcoming in Compliance of SSEMP

Page 45: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 41

ANNEXURE – III

EMP COMPLIENCE CHECKLIST

Page 46: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 42

EMP COMPLIANCE CHECKLIST ANNEXURE - III:

As per the contract, contractor of each sub project has to prepare and submit monthly

environmental compliance reports to review EMP compliance of the project. This compliance

report should be part of the overall monthly project progress report. It was envisaged that

each contractor may opt different reporting format while submitting the monthly

environmental compliance. After discussion with the Team Leader and PMU it was decided

that a standard monthly progress report format may please be developed to monitor EMP

compliance of the sub projects. Contractors were also requested to submit their suggestions

for developing the reporting format. A format was thus developed and provided to each

Contractor. However, Contractors of Package 1, 2, 3 and 5 appointed Environmentalists in

July 2017, who are supposed to submit MPR regularly, based on the monthly environmental

compliance reports a six monthly environmental progress report should be prepared and

submitted to ADB.

This Semi-annual monitoring report is based on inspections, meetings with Contractor staff,

consultation and visual observations of Consultant’s Environmental Experts and environmental monitoring report from environmental laboratories

Simple checklist comprising 60 questions was developed to monitor monthly environmental

compliance of sub-projects. The checklist is generally based on the recommended

mitigations measures given in the EMP for environmental safeguard at different stages of the

project. Consultant identified about any impact on any environmental concern categorized in

the form of 1 for yes, 0 partially done and -1 for no for each month. Abstract of all of the

observations is presented as Annex II

Ideally each Contractor should compliance all of the mitigation measures. However,

considering the ground realities, i-e start of the project activities, unavailability of

Environmental and HSE staff with contractors following key is established to assess the

current compliance status.

60 = Excellent

50 – 59 = Good

40 – 49 = Average

30 – 39 = Below Average

> 30 = Unsatisfactory

Page 47: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 43

EMP Compliance Checklist

Sr.

No. Description

Package No.

Yes

(1)

No

(-1)

Partial

(0) Remarks

Camp Site

1 Copy of the Site specific EMP is provided at the

camp site/contractors office?

2 The EMP instructions are understood?

3 An individual is nominated for implementation of

EMP?

4 Contractors is following the safety precautions as

per ILO convention no.62?

5 Contractors provided PPE to their workforce?

6 PPE are used by workforce?

7 Potable water is available to labor?

8 No wood being used as a fuel?

9 LPG cylinders are provided for cooking or heating

purposes?

10 First Aid Kit is provided at camp and individual

nominated for addressing emergency?

11 Campsite is fenced to prevent trespassing?

12 Contractors maintained Environmental Monitoring

Record and submits monthly monitoring reports?

13 Contractors maintained Grievances Log and

registered the complaints from community?

14 Camp area has adequate natural drainage?

15 Arrangement for proper storage and disposal for

solid waste is planned?

16 Septic Tank and Soak Pits are designed for

treatment of effluents?

17 Contractors provided training to workers to

effectively implement project specific EMP?

18 Contractors prohibited child labor or forced labor?

19 Contractors hiring of local labor?

20 Contractors has shown HSE plan and Emergency

Response Procedures to REs?

21

Contractors properly disposes debris materials in

approved barren land, preferably recycling, reuse

process?

22

No complaint filed regarding transmission of

Communicable diseases (such as STI’s and HIV/AIDS)

Topsoil Erosion due to Borrow Pits

23 Natural areas with high elevation are selected as

borrow areas?

Page 48: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 44

Sr.

No. Description

Package No.

Yes

(1)

No

(-1)

Partial

(0) Remarks

24 Borrow areas identified, having suitable material

and approved by design team?

25 Borrow Pits not established in RoW

26 No damage to the agriculture land due to borrow

pits on agriculture land?

27 Top 15 cm are stripped and stockpiled for

redressing?

28 Top 0.5 m is stripped of and stockpiled when

deep ditching is carried out?

29

Ditch is filled with non-toxic or hazardous

construction debris and levelled with stockpiled

topsoil layer to maintain the landscape?

30 Borrow area is leased and the landowner is

compensated as per a lease agreement?

Encroachment on rural communities and means of livelihood

31 No shops or houses inside ROW?

32 No impact on the means of livelihood of the

community as a result of the work?

Encroachment of Precious Ecology

33 No loss of forests and intrusion into wetlands?

34 Fuel/oil storage areas are away from

watercourses?

35 Asphalt Treatment restricted to dry-weather days

Encroachment Historical/ Cultural / Archaeological sites

36

No damage to the Archaeological

/Religious/Cultural or Historical sites?

Impact on Vegetation

37

No vegetation cover aside from that required as

part of construction and inside the RoW

removed?

38 Tree cutting restricted to RoW and shoulder areas

only?

Surface and Ground water contamination / Drainage

39 No Contamination of surface or GW by oil

spillage, solid waste dumping or asphalt laying

40 Fuel/oil storage areas, at least 200m away from

watercourses?

41 Additional cross drainage is provided as needed?

Impact on adjacent communities

42 Project site is fenced to prevent trespassing?

Page 49: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 45

Sr.

No. Description

Package No.

Yes

(1)

No

(-1)

Partial

(0) Remarks

43 Community consultation has been carried out for

project activities/concerns?

44 Project activities are displayed at proper

locations?

45 No complaint registered in the Grievance Log

Dust generation

46 Dust Generation during construction well

managed and record exists

47 Proper sprinkling is done on regular basis?

48 Water Sprinkling Record is available

Impact on human settlements and wildlife habitat

49 Site selected for camp is 100 m from the human

settlements and wildlife habitats?

Safety impacts due to road constructions

50 Safety signs are properly displayed?

51 Construction machinery parked at designated

areas?

52 Traffic issues managed well, no complaints on

record

Noise and Vibration

53 No complaints were made due to noise and

vibration?

54 Construction activities carried out in daylight to

reduce the impact of noise?

Damage to Services

55 No damage reported to public services like

electric, water, gas, sewer or telephone lines?

Transportation of construction materials

56

Transport trucks are weighed to verify that they

don’t exceed the bridge and pavement structure weight limit?

Asphalt plants

57 Asphalt material is taken from existing approved

plants?

57 Asphalt Plant properly managed, no complaints

58 Asphalt Plant properly managed, no complaints

59 No New Quarry site Opened

60 No complaint registered about the quarry sites?

Total Weigtage (out of 60)

Page 50: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 46

Summary Environmental Monitoring Checklist: Abstract

Sr.

No

.

Description Package No.

1 2 3 4 5 6

Camp Site

1 Copy of the Site specific EMP is provided at the camp

site/contractors office? 1 1 1 1 1 1

2 The EMP instructions are understood? 1 1 1 1 1 1

3 An individual is nominated for implementation of EMP? 1 1 1 1 1 1

4 Contractors is following the safety precautions as per ILO

convention no.62? 1 1 1 1 1 1

5 Contractors provided PPE to their workforce? 1 1 1 1 1 1

6 PPE are used by workforce? 0 0 0 0 0 0

7 Potable water is available to labor? 1 1 1 1 1 1

8 No wood being used as a fuel? 0 0 1 1 1 1

9 LPG cylinders are provided for cooking or heating purposes? 0 0 1 1 1 1

10 First Aid Kit is provided at camp and individual nominated for

addressing emergency? 1 1 1 1 1 1

11 Campsite is fenced to prevent trespassing? -1 -1 1 -1 1 1

12 Contractors maintained Environmental Monitoring Record and

submit monthly monitoring reports? 1 1 1 1 1 1

13 Contractors maintained Grievances Log and registered the

complaints from community? 1 1 1 1 1 1

14 Camp area has adequate natural drainage? 1 1 1 1 1 1

15 Arrangement for proper storage and disposal for solid waste is

planned? 1 1 1 1 1 1

16 Septic Tank and Soak Pits are designed for treatment of

effluents? 1 1 1 1 1 1

17 Contractors provided training to workers to effectively

implement project specific EMP? 1 1 0 -1 0 -1

18 Contractors prohibited child labor or forced labor? 1 1 1 1 1 1

19 Contractors hiring of local labor? 1 1 1 1 1 1

20 Contractors has shown HSE plan and Emergency Response

Procedures to REs? 1 1 1 1 1 1

21 Contractors properly disposes debris materials in approved

barren land, preferably recycling, reuse process? 1 1 1 1 1 1

22 No complaint filed regarding transmission of Communicable

diseases (such as STI’s and HIV/AIDS) 1 1 1 1 1 1

Topsoil Erosion due to Borrow Pits

23 Natural areas with high elevation are selected as borrow

areas? 1 1 1 1 1 1

24 Borrow areas identified, having suitable material and approved

by design team? 1 1 1 1 1 1

25 Borrow Pits not established in RoW 1 1 1 1 1 1

Page 51: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 47

Sr.

No

.

Description Package No.

1 2 3 4 5 6

26 No damage to the agriculture land due to borrow pits on

agriculture land? 1 1 1 1 1 1

27 Top 15 cm are stripped and stockpiled for redressing? N

A

N

A

N

A

N

A

N

A

N

A

28 Top 0.5 m is stripped of and stockpiled when deep ditching is

carried out?

N

A

N

A

N

A

N

A

N

A

N

A

29

Ditch is filled with non-toxic or hazardous construction debris

and levelled with stockpiled topsoil layer to maintain the

landscape?

N

A

N

A

N

A

N

A

N

A

N

A

30 Borrow area is leased and the landowner is compensated as

per a lease agreement? 1 1 1

N

A 1

N

A

31 No shops or houses inside ROW? 1 1 1 1 1 1

32 No impact on the means of livelihood of the community as a

result of the work?

N

A

N

A

N

A

N

A

N

A

N

A

Encroachment of Precious Ecology

33 No loss of forests and intrusion into wetlands? 1 1 1 1 1 1

34 Fuel/oil storage areas are away from watercourses? 1 1 1 1 1 1

35 Asphalt Treatment restricted to dry-weather days 1 1 1 1 1 1

Encroachment Historical/ Cultural / Archaeological sites

36 No damage to the Archaeological /Religious/Cultural or

Historical sites?

N

A

N

A

N

A

N

A

N

A

N

A

Impact on Vegetation

37 No vegetation cover aside from that required as part of

construction and inside the RoW removed? 1 1 1 1 1 1

38 Tree cutting restricted to RoW and shoulder areas only? 1 1 1 1 1 1

Surface and Ground water contamination / Drainage

39 No Contamination of surface or GW by oil spillage, solid waste

dumping or asphalt laying 1 1 1 1 1 1

40 Fuel/oil storage areas, at least 200m away from watercourses? 1 1 1 1 1 1

41 Additional cross drainage is provided as needed? 1 1 1 1 1 1

Impact on adjacent communities

42 Project site is fenced to prevent trespassing? -1 -1 1 -1 1 -1

43 Community consultation has been carried out for project

activities/concerns? 1 1 1 1 1 1

44 Project activities are displayed at proper locations? 1 1 1 0 1 0

45 No complaint registered in the Grievance Log 1 1 1 1 1 1

Dust generation

46 Dust Generation during construction well managed and record

exists 1 1 1 -1 1 -1

47 Proper sprinkling is done on regular basis? 1 1 1 1 1 1

Page 52: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 48

Sr.

No

.

Description Package No.

1 2 3 4 5 6

48 Water Sprinkling Record is available 0 0 0 0 0 0

Impact on human settlements and wildlife habitat

49 Site selected for camp is 100 m from the human settlements

and wildlife habitats? 1 1 1 1 1 1

Safety impacts due to road constructions

50 Safety signs are properly displayed? 1 0 1 0 1 1

51 Construction machinery parked at designated areas? 1 1 1 1 1 1

52 Traffic issues managed well, no complaints on record 1 1 -1 0 1 0

Noise and Vibration

53 No complaints were made due to noise and vibration? 1 1 1 1 1 1

54 Construction activities carried out in daylight to reduce the

impact of noise? 1 1 1 1 1 1

Damage to Services

55 No damage reported to public services like electric, water, gas,

sewer or telephone lines? 1 1 1 1 1 1

Transportation of construction materials

56 Transport trucks are weighed to verify that they don’t exceed the bridge and pavement structure weight limit?

1 1 1 1 1 1

Asphalt plants

57 Asphalt material is taken from existing approved plants? 1 1 1 1 1 1

57 Asphalt Plant properly managed, no complaints 1 1 1 -1 1 -1

58 Asphalt Plant properly managed, no complaints 1 1 1 -1 1 -1

59 No New Quarry site Opened 1 1 1 1 1 1

60 No complaint registered about the quarry sites? 1 1 1 1 1 1

Total Weightage (out of 60) 51 50 54 49 55 49

Key (1= Compliance, -1=Non-Compliance, 0=Partial Compliance, NA=not applicable at this

stage)

Page 53: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 49

ANNEXURE – IV

ENVIRONMENTAL MONITORING

REPORTS

Page 54: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 50

ENVIRONMENTAL MONITORING RESULTS ANNEXURE - IV:

ICB-SPRIP-01: Thull to Kandhkot

Page 55: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 51

Page 56: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 52

Page 57: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 53

Page 58: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 54

ICB-SPRIP-02: Sheranpur to Ratodero

Page 59: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 55

Page 60: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 56

Page 61: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 57

ICB-SPRIP-03 Khyber to Sanghar

Page 62: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 58

Page 63: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 59

Page 64: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 60

Page 65: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 61

Page 66: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 62

ICB-SPRIP- 04: Sanghar to Mirpurkhas

Page 67: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 63

Page 68: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 64

Page 69: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 65

Page 70: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 66

Page 71: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 67

ICB-SPRIP-05: Tando Muhammad Khan to Badin

Page 72: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 68

Page 73: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 69

Page 74: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 70

Page 75: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 71

Page 76: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 72

ICB-SPRIP-06: Digri to Naukot

Page 77: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 73

Page 78: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 74

Page 79: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 75

ANNEXURE – V

PHOTOGRAPHS

Page 80: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 76

PROJECT PHOTOS ANNEXURE - V:

Package 02: SheranKot to Ratodero

Page 81: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 77

Package 03: Khyber to Sanghar

Page 82: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 78

Package 04: Sanghar to Mirpurkhas

Page 83: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 79

Package 05: T M Khan to Badi

Page 84: PAK: Sindh Provincial Road Improvement Project (SPRIP) · 2 Aleem Butt Environment Specialist- PMC 0321 4260133 3 Shehbaz Shah Assistant Engineer- PMU 0333 2762110 4 Abdul Ghafar

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT

Sindh Provincial Road Improvement Project (SPRIP)

July to December 2018 80

Package 06: Digri to Naukot Road