Upload
nancy-ward
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
Page 2
Harmonisation approach
NDBlarger scale
NDB similar scale
EuroRegionalMapNat.
Harm. Core
Nat. Harm. Core
Nat. Harm. Core
NDB1
NDB2
• Determining a reference dataset to producers, which is the in term of harmonisation
1. Data that we have in
2. Harmonise them at the most useful and cost efficient to do so
3. maintenance and derivation
Page 3
Harmonisation approach
• Map resolution allowed
• Data content restricted to usually
maintained by mapping agencies
• Basic spatial analysis requirements
• of transport and water network
• of administrative boundaries
Page 4
General Technical CharacteristicsCompliant to INSPIRE
Resolution 1:250 000
Related Vmap level 1
Data Catalogue Standard DIGEST FACC
Conceptual Data Model Close to DIGEST VPF
Implementation Platform independent
Geodetic reference system (H,V) ETRS89 , MSL
Coordinate System Geographic Decimal Degrees
• Administrative boundaries • Geographical names
• Hydrography • Miscellaneous
• Transportation • Vegetation and Soil
• Settlement
Page 5
Conceptual Model
• Level 3 topology• Node-to-edge, Face-to-edge
• Simple primitive
• Feature Class• Set of features sharing a
homogeneous set of attributes
• Point, area, line, text
• FACC DIGEST except italics*
Feature Class Name Feature class Type Feature Codes Attributes
WATERCRSL Line BH502 EXS, HOC, HYC,
LOC,NAM, NA2, NLN,
NLN2, WD7, WD8 *
Page 6
Administrative boundaries
Geo-spatial analysis
Visualisation
Location
BNDNET (arc, poly)
Mandatory
Consistent geometry with water network ( at least for international boundary *)
3, full topology
•Lowest level (commune)
• Integration of SABE attributes with relate tables SABE.NAM and SABE.ISN
User Purpose
Arc/Info Model
Requirement
Requirement
Topology
Content
Page 7
Water Network
Geo-spatial analysis
Visualisation
Location
HYDRONET ( arc, poly,node)
HYDROPOINT ( point )
Most Mandatory
Full connectivity by portraying fictitious axis in open water andunderground network
3, full topology
•Water Network (BH502)
• Navigability,Name, Classification (WD7,WD8)
• Water area, ice
• Ponctual features
User Purpose
Arc/Info Model
Requirement
requirement
Topology
Content
Page 8
Vegetation and Soil
Visualisation, cartographic applications
VEGPOLY (poly)
Woods mandatory
Nothing specific
3, full topology
•Trees, Orchard, Sand area
User Purpose
Arc/Info Model
Requirement
requirement
Topology
Content
Page 9
Miscellaneous
Visualisation, cartographic applications, location (name)
MISCPOLY (poly)
MISCLINK (arc,point)
Most optional Natural parks mandatory
Nothing specific
3, full topology
•Power lines
•Building, Landmarks, Industrial el., Towers, Physical el.
• Natural parks
User Purpose
Arc/Info Model
Requirement
requirement
Topology
Content
Page 10
Transport
Intelligent transport systems, Location based services,
Map display , visualisation
TRANSNET (arc, poly)
TRANSLINK (arc, node,point)
Most Mandatory
Full connectivity of road and railway network
3, full topology
•Road network
•Railway network
•Airfields, Harbours
•Ferry lines,
•Stations, parkings, level crossings, interchanges
User Purpose
Arc/Info Model
Requirement
Requirement
Topology
Content
Page 11
Settlement
Visualisation, LBS, Planning
POPPOLY (poly)
POPPOINT (point)
Mandatory
Selection consistent with the road network
3, full topology
Built up area:
• Name
• population
• population range (PP1 PP2 )
• Named location
User Purpose
Arc/Info Model
Requirement
Requirement
Topology
Content
Page 12
Production Work Flow
Validation Tools
Technical Docs
NDB1 Harmonisation of
National Components
local
NDB2
local
ERM harmonised
nationalcomponent
Validation Phase
A/IIGNB
ERM final
Product
Assembly Phase
Y
Final Approval
N
On-lineDelivery
System
Delivery Formats
Installing on
ODS A/I
BKGERM
Stored Data
OracleBKG
1. Harmonisation of NDBs 2. Using specifications and technical guide , the validation tools are available for national validation3. The result is the ERM national data component4. Final validation by the technical management team5. Corrections performed until final approval6. Assembly phase with edge-matching to create the ERM final product7. Designing the product in varied delivery formats and installing it on the ODS
Page 13
National responsibilities
1. Finding agreement for a common international boundary with
neighbours
2. Proceeding the harmonisation of national territory
3. Controlling the consistency for cross-border data with neighbour
territories ( data selection )
4. Proceeding own validation phase