14
P5 and the HEP Program A. Seiden Fermilab June 2, 2003

P5 and the HEP Program A. Seiden Fermilab June 2, 2003

Embed Size (px)

Citation preview

Page 1: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

P5 and the HEP Program

A. Seiden

Fermilab

June 2, 2003

Page 2: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

2

The P5 Subpanel of HEPAP was formed based on the November 6, 2002 letter to HEPAP from the DOE and the National Science Foundation. The P5 committee membership was chosen soon after. Our first report will be in response to the January 21, 2003 letter to P5 and is due around the time of the next HEPAP meeting at the end of July, 2003.

Page 3: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

3

A major task of P5 is to translate the scientific vision of the field into a facilities roadmap, which will provide the agencies and the scientific community with a twenty year plan of potential world class science projects. The roadmap includes approximate time windows needed for the R&D, construction, and facility utilization in order to reap the scientific benefits of each project. The roadmap is maintained on a public web site at

http://doe-hep.hep.net/P5/Roadmap.html

Page 4: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

4

Page 5: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

5

Along with members of HEPAP, our first task was to participate on a facilities committee, chaired by Fred Gilman. This resulted in the report:

High-Energy Physics Facilities Recommended for the DOE Office of Science Twenty-Year Roadmap.

This was part of a broad Office of Science planning exercise. I anticipate that we will find out more about the Office of Science plan later this year.

Page 6: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

6

Project Type Physics Cost Scientific Potential

Proposed Facility

State of Readiness

Possible Time Scale

Linear Collider

Facility Energy Frontier $5B - $7B Absolutely

Central Absolutely

Central R&D

2015 Operation

LHC Luminosity

Upgrade Facility Energy Frontier

$150M (US Part)

Absolutely Central

Absolutely Central

R&D 2014

Operation

LHC Energy Upgrade

Facility Energy Frontier Unknown Don’t Know Enough Yet

Don’t Know Enough Yet

R&D Decision in

Next Decade

SNAP Experiment Cosmology $400M - $600M

Absolutely Central

Absolutely Central

R&D 2009

Launch

BTEV Experiment Quark Physics $120M Important Important Ready for

Decision on Construction

2008 Operation

CKM Experiment Quark Physics $100M Important Important Ready for

Decision on Construction

2008 Operation

Super-B Factory

Facility Quark Physics Unknown Don’t Know Enough Yet

Don’t Know Enough Yet

R&D Decision

Later This Decade

Double-Beta Decay

Experiment Neutrino Physics

$100M Absolutely

Central Don’t Know Enough Yet

R&D 2005

Prototype

Off-Axis Neutrino Detector

Experiment Neutrino Physics

$120M Important Important Project

Engineering and Design

2010 Operation

Neutrino Super Beam

Facility Neutrino Physics

$250M - $500M

(Accelerator and Beam

Only)

Absolutely Central

Don’t Know Enough Yet

Project Engineering and Design

Decision Later This

Decade

Underground Detector

Facility Neutrino

Physics and Proton Decay

$500M Absolutely

Central Don’t Know Enough Yet

R&D Decision

Later This Decade

Neutrino Factory

Facility Neutrino Physics

Unknown Don’t Know Enough Yet

Don’t Know Enough Yet

R&D Decision in

Next Decade

HEP Facilities Summary Table

Page 7: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

7

To be considered absolutely central, we require that the intrinsic potential of the science be such as to change our view of the universe. This is an extremely high standard, at the level at which Nobel Prizes are awarded.

Our standard for facilities that we judge to be important is that they be world class. Moreover, a set of experiments that are individually important can together change our view of the universe. This has happened repeatedly in the past and we expect that it will be the case with the future facilities we are considering. For example, a diverse set of quark physics experiments carried out over several decades have together led to a picture in which just a few fundamental parameters explain all the weak interactions of quarks and matter-antimatter asymmetries seen in the laboratory up to now. These experiments led to absolutely central science.

Page 8: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

8

The highest priority for the U.S. program has clearly been indicated by the Long-Range Planning Subpanel based on the expectation that the Linear Collider will be the next major step forward in exploring physics at the energy frontier. Along with the LHC it will provide a sweeping view and incredible precision, with the discoveries of each accelerator used to great advantage in extracting and extending the physics results of the other. The Long-Range Planning Subpanel therefore recommended, as its highest priority, that the U.S. participate in such a project, wherever it is located in the world, and that the U.S. prepare to bid to host the facility.

Page 9: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

9

Since this recommendation was made, several suggestions contained in the subpanel report have moved ahead. This includes the formation of a U.S. steering group and a process for a technology selection, which is expected in the coming year. A clear plan for the required remaining R&D is being fleshed out.

Page 10: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

10

In the intermediate term the roadmap includes projects either in construction or that could soon be in construction and that would provide an exciting physics program later in this decade. It is important that we develop a plan for this time period which will provide the best science within budget limitations. P5 will try to work with the agencies on defining such a program.

Page 11: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

11

As an example, such a program might include, by physics theme:

1) The LHC, which will be the energy frontier program, with potential impact on all major goals of the field.

2)  BTeV, potentially the best quark flavor physics experiment into the next decade.3)    SNAP, which could map the dark energy content of

the universe as it evolved. Along with GLAST, Ice-Cube, and dark matter searches it would provide new capabilities for studies of the cosmos.

4)    The Numi-Minos program, the first high statistics accelerator based neutrino experiment able to carefully measure neutrino oscillations. There are also likely to be additional opportunities in the area of neutrino physics, based on the discoveries of the last few years.

Page 12: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

12

Such a program would be diverse, addresses the primary physics goals of the field, and has important connections to other fields. We need help from the community in defining such a program and broadly conveying the importance of the science.

Page 13: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

13

The roadmap includes projects that have already received endorsement from the appropriate peer-review advisory body and are ready to move into construction phase. Based on an explicit request for prioritization from the agencies for a number of such projects in the $50M to $600M range, P5 is charged with providing an evaluation of the relative merits among these projects. This includes a broad evaluation of costs, schedule, and scientific potential. The first P5 report will include an evaluation of three projects ready for construction at Fermilab:

1.   The CDF and D0 detector upgrades for Run IIB of the Tevatron Collider,

2.     The BTeV experiment that would carry out very high sensitivity studies of the decays of B hadrons, and

3.    The CKM experiment, which has as its primary goal the study of the very rare decay K+→π+vv.

Page 14: P5 and the HEP Program A. Seiden Fermilab June 2, 2003

14

P5 conducted its review of these projects at a two day meeting at Fermilab on March 26 and 27, 2003. The meeting included presentations from the projects and the laboratory as well as follow-up questions and committee discussion. The meeting was preceded by examination of a large number of documents that record the history of previous reviews of the projects. The proponents also were requested to answer a number of questions. We are now waiting for Fermilab to complete its review and plans for the Tevatron.

P5 will finish its report at a meeting on July 17 and 18.