18
© 2004 The MITRE Corporation. All rights reser NOTICE This technical data was produced for the U.S. Government under Contract No. 50-SPNA-9-00010, and is subject to the Rights in Technical Data - General clause at FAR 52.227-14 (JUN 1987) Approved for public release; distribution Overview and Status of HDF in NPOESS & NPP Alan M. Goldberg MITRE / NPOESS Integrated Program Office October 2004

Overview and Status of HDF in NPOESS & NPP

Embed Size (px)

DESCRIPTION

Overview and Status of HDF in NPOESS & NPP. Alan M. Goldberg MITRE / NPOESS Integrated Program Office October 2004. Outline. NPOESS / NPP Overview Role for HDF5 Status - PowerPoint PPT Presentation

Citation preview

Page 1: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

NOTICE

This technical data was produced for the U.S. Government under Contract No. 50-SPNA-9-00010, and is subject to the Rights in Technical Data - General clause at FAR 52.227-14 (JUN 1987)

Approved for public release; distribution unlimited

Overview and Status of HDF in NPOESS & NPP

Alan M. Goldberg

MITRE / NPOESS Integrated Program Office

October 2004

Page 2: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Outline

NPOESS / NPP Overview Role for HDF5 Status

The NPOESS Integrated Program Office and its principal contractors -- Raytheon and Northrop-Grumman -- are prepraring for the launch of the NPP risk-reduction mission in 2006. This presentation will review program status, and how HDF will be used to deliver NPOESS products at the domestic weather centrals and worldwide field terminals.

Page 3: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Concept of Operations

Reliable and timely collection, Reliable and timely collection, delivery, and processing of delivery, and processing of quality environmental dataquality environmental data

Reliable and timely collection, Reliable and timely collection, delivery, and processing of delivery, and processing of quality environmental dataquality environmental data

1.Sense Phenomena

2.Downlink Raw Data

3.Transport Raw Data to Centrals For Processing

4.Process Raw Data into EDRs and Deliver to Centrals

• Monitor and Control Satellites and Ground Elements

Source: Wittman (Raytheon)

Page 4: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

NPOESS Architecture

NESDISAFWAFNMOCNAVO

SpaceSegment

C3SegmentC3Segment

1330 1730 2130

FieldTerminal SegmentFieldTerminal Segment

GPS

CLASS

NPOESS Stored Mission Data

SvalbardPrimary T&CNPP SMD

SvalbardPrimary T&CNPP SMD

TDRSS

Residuals NPOESSSpacecraft

LaunchSupportSegment

LaunchSupportSegment

NPP (1030)

NPP (1030)

MMC at SuitlandMission Operations Team• Enterprise Management• Mission Management• Satellite Operations• Data Monitoring & Recovery

White Sands ComplexLEO & A Backup T&C

White Sands ComplexLEO & A Backup T&C

TDRSS

ADCS

SARSAT

HRDField

Terminal

HRDField

Terminal

LRDField

Terminal

LRDField

Terminal

Schriever MMCContingency Operations Team

SDS

ADS

Data Handling Node, Front End ProcessorOne full set resides in each of the 4 Centrals

15 Globally DistributedReceptor Sites Interconnectedby Commercial Fiber

15 Globally DistributedReceptor Sites Interconnectedby Commercial Fiber

NPP Stored Mission Data Command and Telemetry

Interface Data Processing SegmentInterface Data Processing SegmentOne full set resides in each of the 4 CentralsOne full set resides in each of the 4 Centrals

Data MgtData MgtInfraInfra

IngestIngest

DQMDQM

Proc

ess

Proc

e ss

Data DelData Del

Data MgtData MgtInfraInfra

IngestIngest

DQMDQM

Proc

ess

Proc

e ss

Data DelData Del

Data MgtData MgtInfraInfra

IngestIngest

DQMDQM

Proc

ess

Proc

e ss

Data DelData Del

Data MgtData MgtInfraInfra

IngestIngest

DQMDQM

Proc

ess

Proc

e ss

Data DelData Del

* Patent Pending

*

Source: Wittman (Raytheon)

Page 5: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Mission Data Flow

Space Vehicle 2

C3SDHN &

FEP(@ IDPS)

C3S

Sensors Bus

Space Vehicle 1

Centrals

Field Terminals (LRD, HRD)

FieldTerminalSoftware

SARSAT, ADCSTerminals

CONUS Gateways

(4x)

SMD

LRD

HRD

Space Vehicle 3Ground

Receptor

GroundStation

Mission Management Center

Space Vehicle 2

Stored Mission Data flow forCentrals and Science Data Users

C3SDHN &

FEP(@ IDPS)

C3S

Bus

Space Vehicle 1

Science Users

Field Terminals (LRD, HRD)

FieldTerminalSoftware

FieldTerminalSoftware

HRD, LRD Data flow for Field Users

Field Users

CONUS Gateways

(4x)

Space Vehicle 3Ground

Receptor

GroundStation

Mission Management Center

Deliver DataProducts

Long TermArchive

Deliver DataProducts

Sensors

IDP@

Centrals

IDPS

IDP@

Centrals

IDP@

Centrals

IDPS

SMDSMD

Source: Wittman (Raytheon)

Page 6: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

NPOESS Satellite

CMIS

VIIRS

CrIS

ATMS

ERBSOMPS

NPOESS 1330 Configuration

1330 1730 2130

VIIRS X X X

CMIS X X X

CrIS X X

ATMS X X

SESS X

OMPS X

ADCS X X

SARSAT X X X

ERBS X

SS X X X

ALT X

TSIS X

APS X

Source: Wittman (Raytheon)

Page 7: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

NPOESS EDR-to-Sensor Mapping

Precipitation Type/Rate

Sea SFC Height/TOPO

Solar IrradianceSupra-Therm-Aurora PropSurface Type

Suspended MatterTotal Water ContentVegetative Index

Surface Wind Stress

Snow Cover/Depth

Cloud Top PressureCloud Top TemperatureDown LW Radiance (Sfc)Down SW Radiance (Sfc)Electric Fields

Energetic IonsGeomagnetic Field

In-situ Plasma FluctuationIn-situ Plasma Temp

Med Energy Chgd Parts

Net Solar Radiation (TOA)Neutral Density ProfileOcean Color/ChlorophyllOcean Wave CharacterOutgoing LW Rad (TOA)O3 – Total Column Profile

Electron Density Profile

Ionospheric Scintillation

Ice Surface Temperature

Land Surface TempNet Heat Flux

Imagery

Sea Surface Winds

Aerosol Refractive IndexAlbedo (Surface)Auroral BoundaryAuroral Energy DepositionAuroral Imagery

Cloud Cover/LayersCloud Effective Part SizeCloud Ice Water PathCloud Liquid WaterCloud Optical ThicknessCloud Particle Size/DistribCloud Top Height

Atm Vert Moist ProfileAtm Vert Temp Profile

Sea Surface Temperature

Cloud Base Height

VIIRS (24)CMIS (19)

CrIS/ATMS (3)

SESS (13)OMPS (1)

TSIS (1)ERBS (5)

ALT (3)APS (4)

LEGEND

- Key Performance Parameters

Precipitable Water

Soil MoistureAerosol Optical ThicknessAerosol Particle Size

Pressure (Surface/Profile)Sea Ice Characterization

Active Fires (Application product)

Page 8: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Average Data Latency

Latency (minutes)

Source: Wittman (Raytheon)

Page 9: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Interface Data Processing Segment (IDPS) Functional Diagram

Data Delivery Subsystem

DataFormatting

Production Schedulingand Control

Infrastructure Subsystem

Data ManagementSubsystem

On-LineData Storage

Processing Subsystem

SDR/TDRGeneration

EDRGeneration

Ingest Subsystem

Sensor DataAncillary DataAuxiliary Data

CentralSystems

Long Term

Archive

Science Data

Segment

Command,Control, and

CommunicationsSegment

StoredMission

Data

RawData

RecordsData

Records

Sensor/TempData

Records

RawData

Records

EnvironmentalData

Records

FormattedData

Products

IDPOperator

Data Quality MonitoringSubsystem

GIS Based Visualization and Analysis Toolkit

Data Quality Engineer

FormattedData Products

Source: Wittman (Raytheon)

Formatted DataProducts to

Ingest

HDF5 appears at inputs, outputs, & limited interior points

Page 10: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Field Terminal Segment Architecture

SignalProcessingSubsystem

(SPS)

Mission ApplicationSubsystem

(MAS)

Data ProcessorElement

(DPE)

NPOESS HRD or LRDNPP HRD

FT Technical Specification

Internet

Mission SupportData Server

Field Terminal Segment

= NPOESS Provided Software

FormattedData

Products

Source: Wittman (Raytheon)

Page 11: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Data Product Flow - NPP

Source: Barth (Raytheon), Thompson, & Mulvey (NGST)

Page 12: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

NPP / NPOESS Phased Incremental Approach For EDR Refinement & Validation

Prelaunch Post-Launch

Long-Term Monitoring Operations, Maintenance,

and Upgrades

Calibration and characterization

on-orbit

Algorithm tuning and upgrades

Verification ofoperational algorithm

EDR qualityand latency

Long-term calibration and

validation

Validation of operational EDR

quality and latency

RDR/SDR validation

Operational EDRs

PDRR

C1launch

NPPlaunch

C2launch

C1operational

EDR Verification RDR/SDR/EDR Validation

EMD NPP NPOESS

Heritage sensor data,

design analysis

Sensor Characterization and Calibration

Calibration and characterization

ground tests

Verification of science

algorithm EDR quality and

latency

EDR Maturity/Performance

NPOESS Mission DurationSource: Wilczynski (IPO), Schwer (NASA)

Page 13: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

NPOESS Motivation for HDF5

Several product types representing different processing levels

Many specific products Complex products High data rates

– Source ~3 x 15 Mbps

– Delivery >10x higher Interoperability with user systems Interface consistency User community familiarity Maturity Performace Sustainability

Page 14: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

For NPP/NPOESS Users

IDPS distributes data at “wholesale”, our users redistribute at “retail”; provide value-added and product integration

– Users are operational weather Centrals; field terminals operators; archives (CLASS); and research community

Interface Control Documents and subsidiary configuration management documents between users and NPOESS will establish the details

Looking for honest balance between NPOESS requirements & user requirements

– Within allowed program scope

– FOM is overall program cost

Page 15: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

Development status

Mostly done– Defined application scope

– Data model

– Method for incorporating NSDI metdata into data model

– Concept for query metadata in User Block In work

– Styles/conventions for all products

– Consistent product design How much reformatting of heritage products?

– Test data sets

– Compound or heterogeneous data product files Open issues

– User utility features & tools

– Continuity of support

Page 16: Overview and Status of HDF in NPOESS & NPP

NPOESS Preparatory Project (NPP) Level 1 Joint Master Schedule Status as of 6/30/04

Baseline Approval Signatures:

IPO NPP Project Manager________Original Signed by ___ 12/12/03 NASA NPP Project Manager_________ Original Signed by ____ 12/12/03 Peter A. Wilczynski Date James G. Watzin Date

IPO System Program Director____ Original Signed by ____12/12/03 NASA EOS Program Manager _______ Original Signed by ____ 12/16/03

John D. Cunningham Date George W. Morrow Date

Controlled Milestone

Critical Path

Baseline date (if slipped)Revised from last month

LEGEND:

UNDER REVIEW(Reflects proposed Satellite integration plan)

Calendar Year

CRITICAL MILESTONES

SPACE SEGMENT

VIIRS Instrument (IPO)

CrIS Instrument (IPO)

ATMS Instrument (NASA)

S/C Development (NASA)

LAUNCH SUPPORT SEGMENT (NASA)

COMMAND, CONTROL & COMM SEGMENT (IPO)

INTERFACE DATA PROCESSING SEGMENT (IPO)

SCIENCE DATA SEGMENT (NASA)

ARCHIVE & DISTRIBUTION SEGMENT (NESDIS)

OMPS Instrument (IPO)

MISSION SYSTEM INTEGRATION (NASA)

MPDR

OpsEMD

Awd

GroundReady

3/06

SRR SFR IDR PDRRFP

EMD

OpsEMD

Awd

GroundReady

3/06

SRR SFR IDR PDRRFP

EMD

SRR

Rel.

0.0 5/05

SRR

Q4Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32000 2001 2002 2003 2004 2005 2006

VIIRS

ORR

10/06

Launch

PSRR

Awd

Study 1

Awd

Study 2

SDR

Study 2 PDR

RFO Awd

S/C

Bus/IRR

2/05

NLS

Awd

LRD

Awd 10/06

LaunchATMSMSRR MOR ORR

MRR

EMDFIA

PSR11/05

VIIRS FU1PDR Awd CDR

CDR EDU

Del.

S/SSR Sys DDR

Detailed Design EDU PER

PSR

PDR Awd

Implementation

CDRATMS PFM3/05

ATP LV

Ready

ICD

Rel.

1.0

B1.2 B1.4

ATP OMPS PFM7/05

B1.3

CDR

2.0/2.1

Rel.

3.0 4.0

EDU2

PSR

EDU

Del.

PSR

EtEComplete

B1.1 B1.2 B1.4B1.3

MCR

NRA

Rel.

CrIS FU1

EDUTest

Complete

CDR PER

CDA

CDA

B1.1

MCDR

10/05

Rel.

FIA

NCT1 NCT3 NCT4ORT

NCT2

Page 17: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

The NPP Spacecraft (as of August 2004)

Page 18: Overview and Status of HDF in NPOESS & NPP

© 2004 The MITRE Corporation. All rights reserved

?

Questions