Overall Work Program Fiscal Year 2020-21

Formal Amendment 3

Amended April 21, 2021

Resolution 20-32

Planning for Tomorrow’s Transportation Needs Today

--THIS PAGE LEFT INTENTIONALLY BLANK--

This report was prepared by the

Stanislaus Council of Governments (StanCOG) with financial assistance from

the Federal Highway Administration, the Federal Transit Administration and

the California Department of Transportation

1111 I Street, Suite 308 Modesto, California 95354 Telephone: 209.525.4600

Fax: 209.558.7833 www.stancog.org

StanCOG Overall Work Program Fiscal Year 2020/21

TABLE OF CONTENTS OVERALL WORK PROGRAM OVERVIEW PAGE

A. INTRODUCTION ....................................................................................................................................... 1 B. PURPOSE ................................................................................................................................................. 2 C. STANISLAUS COUNTY REGIONAL ISSUES ................................................................................................ 2 D. ORGANIZATIONAL STRUCTURE ............................................................................................................... 4 E. AREAWIDE PLANNING ............................................................................................................................. 7 F. STAFFING ................................................................................................................................................. 8 G. COORDINATION STATEMENT ................................................................................................................ 10 H. EQUAL OPPORTUNITY/EQUAL RIGHTS ................................................................................................. 11

METROPOLITAN TRANSPORTATION PLANNING METROPOLITAN TRANSPORTATION PLANNING PROGRAM ................................................................. 14 012 PUBLIC INVOLVEMENT .......................................................................................................................... 15 021 OVERALL WORK PROGRAM (OWP) ....................................................................................................... 18 023 METROPOLITAN PLANNING ORGANIZATION (MPO) COORDINATION ................................................. 20 026 INTERREGIONAL BICYCLE TOURISM PLAN (IBTP) ................................................................................. 22 113 TRANSPORTATION MODELING, ANALYSIS, FORECASTING AND GIS .................................................... 24 203 HUMAN SERVICES COORDINATION PLAN ............................................................................................. 27 300 REGIONAL TRANSPORTATION PLAN (RTP) ............................................................................................ 29 302 ENVIRONMENTAL JUSTICE (EJ)/TITLE VI ............................................................................................... 33 321 TRANSIT (MASS TRANSPORTATION) ..................................................................................................... 36 323 FTA ADMINISTRATION FEE FOR JOBS ACCESS REVERSE COMMUTE (JARC) ........................................ 39 330 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) ............................................................................ 40 338 PERFORMANCE BASED PLANNING........................................................................................................ 43 410 AIR QUALITY PLANNING ........................................................................................................................ 46 411 CONGESTION MANAGEMENT PROCESS (CMP) .................................................................................... 49 CONSOLIDATED REGIONAL PLANNING CONSOLIDATED REGIONAL PLANNING PROGRAM ............................................................................... 52 013 ABANDONED VEHICLE SERVICE AUTHORITY ......................................................................................... 53 022 TRANSPORTATION DEVELOPMENT ACT (TDA) FUND ADMINISTRATION ............................................. 54 029 REGIONAL BICYCLIST AND PEDESTRIAN SAFETY AND EDUCATION CAMPAIGN ................................... 57 200 SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 18/19 ........................................................................ 60 201 SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 19/20 ........................................................................ 63 202 SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 20/21: TRANSIT TRANSITION PLAN .......................... 69 204 SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 20/21: COMMUNITY TRANSPORTATION NEEDS ...... 72 308 REGIONAL HOUSING NEEDS (RHNA) ..................................................................................................... 74 322 TRANSPORTATION DEMAND MANAGEMENT (TDM) ........................................................................... 76 332 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) PROJECT DELIVERY ................................ 78 336 PAVEMENT MANAGEMENT PROGRAM (PMP) ..................................................................................... 79 388 SAN JOAQUIN VALLEY (SJV) RURAL TRANSIT ALTERNATIVES/VALLEY FLEX PILOT ............................... 81

StanCOG Overall Work Program Fiscal Year 2020/21 401 LOCAL TRANSPORTATION AUTHORITY (MEASURE L) ........................................................................... 84 499 LEGISLATIVE PROGRAM ........................................................................................................................ 87 500 OTHER REGIONAL PLANNING ACTIVITIES IN THE STANISLAUS AREA ................................................... 88

APPENDIX

I. StanCOG BOARD MEMBERS, COMMITTEES AND STAFF ....................................................................... 89

II. OWP TABLE A – FUNDING SOURCES FY 2020/21 ........................................................................... 91-93

III. OWP TABLE B – EXPENDITURES BY PERFORMING AGENCY FY 2020/21 .............................................. 94

IV. OWP PERSON MONTHS SCHEDULE ................................................................................................ 95-96

V. CALTRANS INFORMATION ELEMENT .................................................................................................... 97

VI. FUNDING SOURCES ............................................................................................................................... 98

VII. FIXING AMERICA’S SURFACE TRANSPORTATION (FAST) ACT PLANNING FACTORS MATRIX........ 99-100

VIII. CERTIFICATION DOCUMENTS ............................................................................................................. 101

• FHWA METROPOLITAN TRANSPORTATION PLANNING PROCESS CERTIFICATION – Appendix A (Standard Form)

• FTA CERTIFICATIONS AND ASSURANCES – Appendix B (Standard Form)

• CALIFORNIA DEPARTMENT OF TRANSPORTATION DEBARMENT AND SUSPENSION CERTIFICATION FOR FY 2020/21 – Appendix C (Standard Form)

• EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES—Appendix D (Standard For

StanCOG Overall Work Program Fiscal Year 2020/21

1

OVERALL WORK PROGRAM OVERVIEW A. INTRODUCTION The Stanislaus Council of Governments (StanCOG) is a Joint Powers Agency created originally as the Stanislaus Area Association of Governments (SAAG) on May 11, 1971 by the County of Stanislaus and the Cities of Ceres, Hughson, Modesto, Newman, Riverbank, Turlock, Oakdale, Patterson, and Waterford and operates in accordance with (1) the Joint Powers Agreement (JPA), which its member agencies have signed; (2) its Bylaws; and (3) the Appendices to the Bylaws. The JPA was rewritten to update language and confirm that StanCOG is an independent agency on March 27, 2001. Moreover, the agency officially adopted the new name Stanislaus Council of Governments or StanCOG on June 1, 2001. The JPA has been amended several times with the last amendment being on November 13, 2018. As the federally-designated Metropolitan Planning Organization (MPO) and state-designated Regional Transportation Planning Agency (RTPA) for the Stanislaus County region, StanCOG is designated by law to have lead responsibility for the development of the area's transportation plans and to coordinate the transportation planning process. All urban areas with a population exceeding 50,000 are required to have an MPO if local agencies spend federal funds on transportation improvements. The planning process includes making informed predictions about future transportation needs, investigating and assessing alternative actions for meeting those needs, and making recommendations about which course of action to pursue. The information generated by this process is used by decision-makers to select transportation policies and programs from the choice of alternatives. As a result of the passage of Measure L (Local Roads First Transportation Funding Measure) on November 8, 2016 with 71.95% voter approval, StanCOG is also the Local Transportation Authority (LTA) for the Stanislaus region. This measure provides for the implementation of the Expenditure Plan, as approved and adopted by StanCOG, which will result in countywide local street and road improvements, arterial street widening, signalization, bicyclist, pedestrian, and driver safety, regional projects, and transit improvements. These needed improvements shall be funded by a one-half of one percent retail transactions and use tax established for a twenty-five-year period. The Operative date of this Measure is April 1, 2017 and shall expire on March 31, 2042. Over the course of the 25-year Expenditure Plan, it is conservatively estimated that $960 million dollars in sales tax revenue will be generated for transportation investments throughout Stanislaus County. The Overall Work Program (OWP) is a comprehensive inventory of proposed work activities and responsibilities, updated each fiscal year that guides and coordinates the regional transportation planning process of StanCOG. One purpose of the OWP is contractual, between StanCOG and its funding agencies. However, the most important purpose is the scheduling and distribution of work, especially the allocation of resources needed to address the tasks required by the agency. In effect, this work program constitutes a set of instructions for the administration, project management and planning of work to be carried out by staff and/or supplemented by consultants if necessary. It serves as a guide for StanCOG, its member agencies, the public, Caltrans, the Federal Highway Administration (FHWA), and the Federal Transit Administration (FTA). The Fiscal Year 2020/21 OWP describes activities that will be performed during Fiscal Year 2020/21 and it assigns institutional responsibility for these tasks. The OWP identifies, within one document, the major activities of regional and interregional significance, which are planned and scheduled for the upcoming fiscal year.

StanCOG Overall Work Program Fiscal Year 2020/21

2

B. PURPOSE The OWP is an annual statement of work identifying the planning priorities and activities to be carried out within StanCOG’s metropolitan planning area. The OWP includes a description of the planning work and resulting products, who will perform the work, time frames for completing the work, the cost of the work and the source of the funds. C. STANISLAUS COUNTY REGIONAL ISSUES The Stanislaus County Region faces its share of issues related to growth. Concerns about the environment and quality of life, a slow recovery from the 2008 Recession, a shortage of employment opportunities, rapidly expanding population base, the desire to increase opportunities, the needs of a deteriorating infrastructure, and the decline of stable funding all contribute to the challenges that StanCOG must undertake as the region’s transportation planning agency. The following presents these issues and examples of ongoing and potential strategies that StanCOG must embark on to meet the transportation challenges of the region. 1. Paying for Needed Transportation Improvements Identifying and acquiring funds for the maintenance, rehabilitation, and expansion of Stanislaus County’s transportation infrastructure is a critical regional issue. The Regional Transportation Plan (RTP) will continue to carry the region’s transportation goals and values for long-term transportation planning, identifying these issues, and presenting strategies that are grounded with a realistic, financially constrained list of projects. 2. Air Quality Air Quality conformity continues to be a top-ranking issue, and one that affects transportation planning and transportation choices. Stanislaus County is one of the eight counties in the San Joaquin Valley Air Basin, which is currently designated as a non-attainment area with respect to federal air quality conformity standards for ozone and particulate matter under 2.5 microns in diameter (PM 2.5). 3. Goods Movement StanCOG has long been supportive of intra and interregional goods movement, participating in several joint regional planning efforts in the San Joaquin Valley for the purpose of evaluating infrastructure needs and developing project priorities, strategic programs, and policies to guide goods movement planning in the region. The San Joaquin Valley Goods Movement Sustainable Implementation Plan, identified first and last mile connectors, truck routing and parking needs, rural priority corridors, and a goods movement performance and modeling framework for the San Joaquin Valley. The San Joaquin Valley Interstate and State Route 99 Goods Movement Corridor study identified the freight clusters (intermodal facilities, distribution centers, large manufacturing facilities, etc.) responsible for a large percentage of truck trips within the Valley and to and from other regions in California. It also identified and evaluated the feasibility of specific projects and programs for mitigating traffic congestion and addressing freight traffic safety and other issues. 4. East-West Connectivity Two other significant freight movement projects; the State Route 132 West Freeway/Expressway (SR 132 West) and the North County Corridor (NCC) have been undertaken to independently address freight movement issues along two highly traveled transportation corridors. The SR 132 West project has advanced to the Construction Phase, which officially started on December 20, 2019. The State Route 132 West Freeway/Expressway proposes a four lane freeway/expressway, grade separated structures at various local road crossings, a State Route 99/State Route 132 interchange, and State Route 99 corridor connectivity improvements. The project is being built in two phases. Phase 1, currently under construction, will build a two lane expressway on a new alignment. Phase 2, will construct the remaining portion

StanCOG Overall Work Program Fiscal Year 2020/21

3

of the proposed four lane freeway/expressway, the proposed State Route 132/Carpenter Road interchange, the proposed State Route 99/State Route 132 freeway to freeway interchange, and State Route 99 corridor connectivity improvements. The project is intended to improve regional and interregional circulation, relieve traffic congestion along existing State Route 132 (Maze Boulevard), and enhance safety and operations for the transportation network in the area. The North County Corridor (NCC) is a proposed east-west expressway serving directly the communities of Oakdale, Riverbank, and Modesto with interregional connectivity to promote goods movement and safe travel for our entire community. The purpose of the project is to identify a roadway alignment for an east-west facility from SR-108 (McHenry Avenue) north of the City of Modesto to SR-120 approximately six miles east of the City of Oakdale. This new roadway would be approximately 18 miles in length from a location on SR-219 (Kiernan Avenue) to a location on State Route 120, approximately six miles east of the City of Oakdale. The project would serve as a bypass for the cities of Riverbank, Oakdale, and Modesto. The North County Corridor Transportation Expressway Authority anticipates that the ultimate facility would be planned as a multi-lane, access-controlled expressway/freeway with interchanges, at-grade intersections, grade-separated railroad crossings, irrigation district crossings, frontage roads, and local street alignments. The project is in the final stages of the Project Approval/Environmental Document (PA/ED) phase. Final approval of the Environmental Document is anticipated to occur in the Winter of 2020. Immediately following approval, the county will commence the Final Design phase with the preparation of detailed, working drawings/plans, specifications and estimates (PS&E). 5. Public Transportation Service Transit services are provided individually by the Cities of Ceres, Turlock, Modesto, and the County of Stanislaus. Due to the unique combination of factors impacting the Region, each transit operator has faced significant challenges meeting performance standards while protecting services for transit dependent populations. The operators will continue to pursue opportunities to cooperate and coordinate programs to provide the best possible services with the available resources. StanCOG strives to find new opportunities to support transit and is currently participating in an innovative transit pilot project known as Valley Flex. StanCOG is also sponsoring regional projects to ease the burden on transit operators.

6. Economic Development StanCOG participates in the California Partnership for the San Joaquin Valley (Partnership) addressing economic development matters, such as San Joaquin Rail Service and Greenhouse Gas Reduction Funding. StanCOG is currently providing outreach support to the California State University, Fresno Office of Community and Economic Development in their work with the San Joaquin Valley Regional Broadband Consortium. The Consortium was established by the Partnership to impact change in the lack of high-speed broadband infrastructure throughout the San Joaquin Valley, particularly in rural agricultural communities. StanCOG is coordinating an outreach event so that they may solicit input from local member agency engineers and public works representatives and city/county managers and water districts to support their work to achieve the 98% deployment goal.

StanCOG has championed support of passenger rail in the valley, including assisting the City of Modesto in identifying funding to make much needed multimodal station and safety improvements prior to the extension of ACEforward to Modesto. The investments in rail that are being made will not only improve rail efficiency and performance and reduce Vehicle Miles Traveled and pollutant emissions, but will bring much needed intercity and commuter services, connecting the San Joaquin Valley with Sacramento and the Bay Area, and the station enhancements will have a strong potential for acting as a catalyst for urban revitalization.

StanCOG Overall Work Program Fiscal Year 2020/21

4

D. ORGANIZATIONAL STRUCTURE The Policy Board The Policy Board of StanCOG is comprised of sixteen voting members (each with one vote), including five members of the Stanislaus County Board of Supervisors, three council representatives for the City of Modesto, and one council representative from each of the other cities in the County. A Caltrans District 10 representative serves in an “ex-officio” capacity on the Policy Board and actively participates in the discussions. Caltrans is provided time on each Policy Board agenda for a report on transportation issues that could affect StanCOG. Transit within Stanislaus County is represented on the Policy Board through a designated Transit Representative from among Policy Board members. The following are the StanCOG standing committees: Executive Committee The Executive Committee consists of five members of the StanCOG Policy Board: two representatives from the Stanislaus County Board of Supervisors, one representative from the City of Modesto, and two representatives from among the other Cities. The Chairperson and Vice-Chairperson of the Policy Board are ex-officio two of the five members of the Executive Committee, representing their respective Member Agencies, and serve as the Chairperson and Vice-Chairperson of the Executive Committee. This committee reviews and makes recommendations to the Policy Board regarding executive level financial and administrative matters. Management and Finance Committee (MFC) The Management and Finance Committee is composed of each City Manager/Administrator from the nine cities in Stanislaus County and the Chief Administrative Official for the County of Stanislaus. The MFC provides input to the StanCOG Policy Board on financial matters related to transportation projects and programs in the Stanislaus region. Technical Advisory Committee (TAC) The Technical Advisory Committee includes the Public Works and Transit staff from the local jurisdictions in Stanislaus County. This group meets regarding technical matters related to transportation projects and programs. Planning and Programming Working Group (PPWG) The Planning and Programming Working Group, an ad hoc group of planning, public works and transit staff from the local jurisdictions, is convened as needed to discuss matters regarding the programming of transportation projects and programs. Citizens Advisory Committee (CAC) The Citizens Advisory Committee is a standing committee of StanCOG that is comprised of ten residents of Stanislaus County. The CAC provides feedback to the Policy Board from the viewpoint of the public on matters related to transportation activities in the Stanislaus region. The ten members of the CAC consist of a representative from each of the ten jurisdictions in the region. Social Services Transportation Advisory Council (SSTAC) In addition to its committees that were created by the Bylaws, StanCOG also maintains the Social Services Transportation Advisory Council. In 1988, SB 498 statutorily created the SSTAC, which meets monthly. The primary focus of the SSTAC is to review any potential unmet transit needs and to advise StanCOG on transit issues. Public comment is taken at the individual meetings. The SSTAC then makes an annual recommendation to the StanCOG Policy Board regarding unmet transit needs that it feels are reasonable to meet. This information is utilized by the Policy Board as one means for its annual unmet transit needs determination and finding. Through the efforts of the SSTAC, numerous transit improvements have been realized or are in the process of being implemented. The activities of the SSTAC are part of StanCOG’s formal public participation procedures.

StanCOG Overall Work Program Fiscal Year 2020/21

5

Mobility Advisory Committee (MAC) The Mobility Advisory Committee was formed to provide ad hoc support to StanCOG’s Consolidated Transportation Services Agency (CTSA), now known as MOVE. MAC works with MOVE on identifying and addressing the transit needs of Stanislaus County’s senior and disabled populations. Representatives from local social service agencies, public transit operators, and the elderly and disabled communities make up the MAC, which meets as needed. Bicycle Pedestrian Advisory Committee (BPAC) The Bicycle Pedestrian Advisory Committee is a standing committee of StanCOG that is composed of ten residents of Stanislaus County. The BPAC provides input to the Policy Board on matters related to bicycle and pedestrian needs or concerns. It also provides advice on the development of the StanCOG Non-Motorized Transportation Plan. The ten members of the BPAC consist of a representative from each of the ten jurisdictions in the region. Valley Vision Stanislaus Steering Committee (VVS) The Valley Vision Stanislaus Steering Committee is a standing committee of StanCOG. It advises the StanCOG Policy Board on issues related to the development of the Sustainable Communities Strategy (SCS) as part of the Regional Transportation Plan (RTP). It consists of up to 21 members. Tier I members include one representative from each of the 10 StanCOG Member Agencies, one representative from Local Agency Formation Commission, and one representative from the StanCOG Policy Board. Tier II members are appointed as needed from the Citizens Advisory Committee, Health Industry, Agriculture Industry, Environment/Conservation, Economic Development, Building Industry, Education, Environmental Justice and a Transit User/Provider. Measure L Oversight Committee (MLOC) The Measure L Oversight Committee is an advisory committee of StanCOG that is composed of ten residents of Stanislaus County - one representative from each municipal agency. The MLOC provides an enhanced level of accountability for expenditures made under the Measure L Expenditure Plan to ensure that all voter mandates are carried out and that the financial integrity and performance of the program is maintained.

StanCOG Overall Work Program Fiscal Year 2020/21

6

StanCOG Overall Work Program Fiscal Year 2020/21

7

E. AREAWIDE PLANNING StanCOG’s planning jurisdiction includes all of Stanislaus County. Location Stanislaus County is located in the San Joaquin Valley region of California, which extends from San Joaquin County on the north to Kern County on the south, and from the foothills of the Sierra Nevada on the east to the Coastal Range on the west. The valley is agriculturally-oriented, and the central cities of each county are separated by agricultural land. Commuting patterns have developed extensively between Stanislaus County and the Bay Area, the greater Sacramento area and, to a lesser degree, between other Valley and foothill counties. Existing Regional Agencies Several planning challenges related to transportation, water supply, and air quality transcend county boundaries and require a multi-county approach to address them. In recognition of the need for a multi-county approach to air quality issues, and regional issues in general, StanCOG has joined with the other Valley counties to form the San Joaquin Valley Regional Planning Agencies Directors Committee. This was formalized through a Memorandum of Understanding (MOU) with the other seven Valley transportation planning agencies for a cooperative work program (part of the MOU with Caltrans). The committee provides a forum for the executive directors of the eight valley MPOs/RTPAs to discuss and collaborate on issues of regional importance, and that impact the larger multi-county region. In FY 2008/09 this relationship was further enhanced when the eight county MOU was amended to create the San Joaquin Valley Regional Policy Council. The Council is composed of two Board Members plus an alternate from each of the eight MPO Governing Boards. The Council’s purpose is to further the relationship between the regions, to provide a forum for the Valley to work on issues of mutual concern, and to develop a joint-valley perspective. The Council provides a mechanism and opportunity for the Valley to speak with one united voice; especially in statewide and federal settings. San Joaquin Valley Air Pollution Control District StanCOG also participates with these agencies and with Caltrans District 10 and Caltrans Headquarters in transportation planning studies and activities including the development and update of the Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), Federal Transportation Improvement Plan (FTIP), the State Transportation Improvement Program (STIP), the Congestion Management Process (CMP), and other regional planning efforts. StanCOG has also entered into agreements with the regional transportation planning agencies in the other two northern San Joaquin Valley counties – Merced and San Joaquin. These efforts have included a strengthened three-county agreement that resulted in the creation of a Three-County Transportation Model, enhancing further cooperation in regional and interregional planning. The three-county agreements have established a framework for a broader regional approach to comprehensive planning. StanCOG, San Joaquin, and Merced Policy Board members have met in the past to discuss common problems. The Principles of Cooperation were previously approved where these agencies agreed to (a) submit appropriate clearinghouse notices to each other, (b) exchange information on a regular basis, (c) undertake joint projects when topics of mutual interest are identified, and (d) exchange personal resources when it is mutually beneficial to do so. During the past several years, StanCOG has been involved in other various interregional planning efforts covering the entire San Joaquin Valley area with the eight Valley regional transportation planning agencies, including the Valleywide Goods Movement Studies and the San Joaquin Valley Model Improvement Plan - Phase

StanCOG Overall Work Program Fiscal Year 2020/21

8

2, a Three-County Model (TCM) 2015 Update project undertaken to develop a 2015 base year model to support the development of 2018 regional transportation plans for Stanislaus Council of Governments (StanCOG), San Joaquin Council of Governments (SJCOG), and Merced County Association of Governments (MCAG). F. STAFFING StanCOG currently has an approved staff of twenty as listed below: 1 – Executive Director 2 – Senior Planners 1 – General Counsel 5 – Associate/Assistant Planners 1 – Deputy Director of Planning & Programming 1 – Planning Technician 1 – Manager of Financial Services 2 – Senior/Financial Services Specialist II 1 – Manager of Administrative Services 1 – Administrative Assistant 1 – Executive Administrative Assistant 1 – Administrative Clerk 1 – Principal Planner 1 – Executive Management Analyst Administration supervision of StanCOG is provided by the Executive Director, under the direction of the Policy Board through the Executive Committee.

StanCOG Overall Work Program Fiscal Year 2020/21

9

StanCOG Overall Work Program Fiscal Year 2020/21

10

G. COORDINATION STATEMENT Intergovernmental coordination is a significant function of StanCOG. A major portion of StanCOG staff’s effort is devoted to this function. From StanCOG’s perspective, four levels of intergovernmental cooperation can be identified: (a) between StanCOG and local agencies, (b) between StanCOG and other regional agencies (c) between StanCOG and the state and (d) between StanCOG and the federal government. 1. Local Agencies StanCOG’s membership, which includes participation from each local government agency within Stanislaus County (including the County government and cities), ensures coordination on local inter-governmental activities. 2. Regional Agencies StanCOG and the neighboring COGs in Merced and San Joaquin Counties, as well as the other five San Joaquin Valley COGs have established several MOUs among themselves, with Caltrans, and with the San Joaquin Valley Air Pollution Control District that foster coordination among the agencies. The Air District is informed of local planning activities and issues and is invited to comment on StanCOG documents. 3. State Agencies StanCOG maintains a working relationship with Caltrans, particularly its District 10 office in Stockton. The two agencies have signed an MOU pertaining to transportation planning activities. Additional MOUs have been developed to define clearinghouse responsibilities, and most recently, project delivery activities consistent with StanCOG’s and Caltrans’ responsibilities under SB 45. Caltrans is represented at the Management and Finance Committee, the Technical Advisory Committee, and the Policy Board. StanCOG also keeps state agencies updated and informed on the local planning activities. StanCOG’s major documents, such as the OWP, RTP, and TIP, are submitted to state agencies in addition to Caltrans, including the California Air Resources Board (CARB) and the State Clearinghouse. 4. Federal Agencies StanCOG meets with FHWA and FTA in an “Annual Meeting” to review the Overall Work Program and discuss upcoming transportation planning issues. With recent federal legislative, policy and technical requirements, there is a need for closer interaction directly with federal staff. In addition, there are also interregional forums for coordinated discussions through the Interagency Consultation (IAC) process, the Caltrans Federal Programming Group (CFPG), and the California Transportation Commission’s (CTC) Regional Transportation Planning Agencies (RTPA) forum that deals with air quality, programming, and planning issues. FHWA staff also participates in the San Joaquin Valley’s Executive Directors meetings and the various sub-committees, such as: The San Joaquin Valley Model Coordinating Committee, consisting of representatives of all eight San Joaquin Valley transportation planning agencies, Caltrans, the San Joaquin Valley Air Pollution Control District, the California Air Resources Board, EPA, FTA and the FHWA, teleconference monthly to discuss air quality/transportation related issues. The Model Coordinating Committee reports to the San Joaquin Valley COG Directors and advises them on significant issues. The San Joaquin Valley Interagency Consultation (IAC) Group, consisting of representatives of all eight San Joaquin Valley transportation planning agencies, Caltrans, the San Joaquin Valley Unified Air Pollution Control District, the California Air Resources Board, EPA, FTA and the FHWA, teleconference monthly to discuss transportation programming issues. The Programming Working Group reports to the San Joaquin Valley COG Directors and advises them on significant issues.

StanCOG Overall Work Program Fiscal Year 2020/21

11

H. EQUAL OPPORTUNITY/EQUAL RIGHTS Title VI – Stanislaus Council of Governments (StanCOG) is committed to a policy of nondiscrimination in the conduct of its business, including its Title VI responsibilities, and to the delivery of equitable and accessible transportation services. Employment – StanCOG is an equal opportunity employer. Contracts – StanCOG has adopted a Disadvantaged Business Enterprises (DBE) program for contracts involving federal funds. The StanCOG Policy Board adopted the DBE Plan. DBE-qualified firms are identified from the Caltrans DBE listing and specifically included in our mailing for contract opportunities. Caltrans’ current DBE goal is 17.6% (4.2% race-neutral and 13.4% race-conscious). StanCOG will make efforts to reach a DBE goal that complements Caltrans. Core Planning Functions The Overall Work Programs (OWP) must identify the Core Planning Functions and what work will be done during the program year to advance those functions. The Core Functions typically include:

• Overall Work Program • Public Participation and Education • Regional Transportation Plan • Federal Transportation Improvement Program • Congestion Management Process (required for TMAs) • Annual Listing of Projects

Transportation legislation provided metropolitan transportation planning program funding for the integration of transportation planning processes in the MPA (i.e. rail, airports, seaports, intermodal facilities, public highways and transit, bicycle and pedestrian, etc.) into a unified metropolitan transportation planning process, culminating in the preparation of a multimodal transportation plan for the MPA. Metropolitan Planning Organizations (MPOs) review the Overall Work Plan (OWP) development process to ensure all activities and products mandated by the metropolitan transportation planning regulations are a priority. The FHWA and FTA provide combined planning grant funding opportunities to the region. The MPO OWP work elements and work tasks are developed to clearly explain the purpose and results of the work to be accomplished.

Performance Management Since MAP-21 was passed in 2012, Caltrans and California’s MPOs have developed performance measures that inform their Regional Transportation Plans (RTPs) and Federal Transportation Improvement Programs (FTIPs). The FAST Act continues MAP-21’s overall performance management approach, within which States and MPOs invest resources in projects that collectively will make progress toward the achievement of the national goals. The DOT, in consultation with States, metropolitan planning organizations (MPOs), and other stakeholders, are required to establish performance measures in the areas listed below:

• Safety - To achieve a significant reduction in traffic fatalities and serious injuries on all public roads. • Infrastructure Condition - To maintain the highway infrastructure asset system in a state of good

repair • Congestion Reduction - To achieve a significant reduction in congestion on the National Highway

System

StanCOG Overall Work Program Fiscal Year 2020/21

12

• System Reliability - To improve the efficiency of the surface transportation system • Freight Movement and Economic Vitality - To improve the national freight network, strengthen

the ability of rural communities to access national and international trade markets, and support regional economic development.

• Environmental Sustainability - To enhance the performance of the transportation system while protecting and enhancing the natural environment.

• Reduced Project Delivery Delays - To reduce project costs, promote jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices

Performance measures are used as the foundation to assess the operational condition of the regional roadway system and assist in determining the value of the project in improving the operational condition. This relationship assists in the overall prioritization of projects in the RTP which is also reflected in the CMP and the FTIP. State of Good Repair MPO’s are required to evaluate their transportation system to assess the capital investment needed to maintain a State of Good Repair for the region’s transportation facilities and equipment. MPO’s shall coordinate with the transit providers in their region to incorporate the Transit Asset Management Plans (TAM’s) prepared by the transit providers into the Region Transportation Plan (RTP). Analysis of State of Good Repair needs and investments shall be part of any RTP update and must be included in the Overall Work Program task for developing the Regional Transportation Plan. MPO’s are expected to regularly coordinate with transit operators to evaluate current information on the state of transit assets; understand the transit operators transit asset management plans; and ensure that the transit operators are continually providing transit asset information to support the MPO planning process. Federal Planning Factors The Metropolitan Planning program under MAP-21 provided funding for the integration of transportation planning processes in the Metropolitan Planning Organizations (MPOs) into a unified metropolitan transportation planning process, culminating in the preparation of a multimodal transportation plan for the MPO. Title 23 of the United States Code, section 134(f) describes Federal Planning Factors issued by Congress to emphasize planning factors from a national perspective. Under the FAST Act ten planning factors (for both metro and statewide planning) are identified as follows:

1. Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency.

2. Increase the safety of the transportation system for motorized and non-motorized users. 3. Increase the security of the transportation system for motorized and non-motorized users. 4. Increase the accessibility and mobility of people and for freight. 5. Protect and enhance the environment, promote energy conservation, improve the quality of life, and

promote consistency between transportation improvements and State and local planned growth and economic development patterns.

6. Enhance the integration and connectivity of the transportation system, across and between modes, people, and freight.

StanCOG Overall Work Program Fiscal Year 2020/21

13

7. Promote efficient system management and operation. 8. Emphasize the preservation of the existing transportation system. 9. Improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater

impacts of surface transportation. 10. Enhance travel and tourism coordination.

Each of these planning areas and factors are addressed in the OWP, many by multiple work elements. Please see Appendix VII for the FAST Act Planning Factors Matrix

StanCOG Overall Work Program Fiscal Year 2020/21

14

METROPOLITAN TRANSPORTATION PLANNING PROGRAM As the Metropolitan Planning Organization (MPO) for the Stanislaus County region, StanCOG’s primary function is the development of the area's transportation plans and to coordinate the transportation planning process. StanCOG works with its member agencies to prioritize and allocate funds to transportation projects through a planning and programming process. StanCOG must be on the forefront of coordinated regional transportation planning activities. The Work Elements of the Metropolitan Transportation Planning Work Program reflect the activities necessary to successfully accomplish the transportation planning goals and objectives required of the agency and established by the StanCOG Policy Board. METROPOLITAN TRANSPORTATION PLANNING WORK ELEMENTS 012 Public Involvement 021 Overall Work Program 023 Metropolitan Planning Organization (MPO) Coordination 026 Interregional Bicycle Tourism Plan (IBTP) 113 Transportation Modeling, Analysis, Forecasting & GIS 203 Human Services Coordination Plan 300 Regional Transportation Plan (RTP) 302 Environmental Justice (EJ)/Title VI 321 Transit (Mass Transportation) 323 FTA Administration Fee for Jobs Access Reverse Commute (JARC) 330 Transportation Improvement Program (TIP) 338 Performance Based Planning 410 Air Quality Planning 411 Congestion Management Process (CMP)

StanCOG Overall Work Program Fiscal Year 2020/21

15

(012) PUBLIC INVOLVEMENT PURPOSE StanCOG strives to include the public through outreach and education and by providing an avenue for involvement in the planning process. PREVIOUS WORK StanCOG actively encourages citizen participation in the planning process and has adopted formal Public Participation Plan procedures that were last updated in June 2018. The Public Participation Plan sets forth the public involvement process for StanCOG. It outlines the many opportunities for the public (including traditionally underrepresented and underserved populations) to become involved in the transportation planning process. This includes transit users, transportation providers, community organizations, agencies, and minority (i.e. Black, Hispanic, Asian American, American Indian/Alaskan Native, and Pacific Islander), elderly, disabled, and low to moderate-income groups, and any private citizen or agency representative. StanCOG’s goal is to provide citizens with complete information, timely notification, and full public access to key decisions. Public Notices are published in area newspapers in English and in Spanish. Notices of public advisory committee and Policy Board meetings are posted on the StanCOG website as well as outside the StanCOG offices in both English and in Spanish. Information about public meetings is also provided to the media, including newspapers that serve the non-English speaking public. Policy Board Agenda packets are sent to the thirteen public libraries in the region for availability to the public. Additional public education and involvement activities are provided through the StanCOG website (www.stancog.org) and via StanCOG social media sites such as Facebook. StanCOG has standing committees that are comprised of public citizens from each of the local jurisdictions in Stanislaus County who provide their input from the public’s perspective to the Policy Board. The Citizens Advisory Committee (CAC) provides input on agenda items related to transportation that are presented to the Policy Board each month, the Bicycle Pedestrian Advisory Committee (BPAC) addresses the needs of the non-motorized transportation community, and the Social Services Transportation Advisory Council (SSTAC) is focused on transit-related issues in the region. Public Outreach meetings, events, and/or workshops have been utilized to address specific concerns of the community. The StanCOG Rideshare Program, Dibs, is a sponsor along with the Cities of Hughson, Modesto, Turlock, Newman, Oakdale and Patterson in highly-attended public events focusing on Bike to Work Week in May and Rideshare Week in October. To increase awareness in the community of what StanCOG is and what it does, StanCOG participates in community organization meetings such as El Concilio, and other service organizations as well as meetings of the local Chambers of Commerce. In FY 2018/19, StanCOG increased its outreach for the 2018 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) to include more public workshops, presentations to community organizations, and to each of the City Councils in the Stanislaus region. A dedicated website, linked to the www.stancog.org website, was also developed for the RTP/SCS effort entitled, ‘Valley Vision Stanislaus,’ where all information regarding this project was housed. Key items included on this site were presentations that were provided at public workshops held and surveys that allowed for the public to express their views on the future of the region which were utilized in the development of the plan. Additionally, an email list of nearly 30,000 high-propensity voters was developed to reach out to the public in the RTP/SCS process.

StanCOG Overall Work Program Fiscal Year 2020/21

16

(012) Public Involvement – Page 2

In FY 2015/16, the StanCOG Policy Board adopted a policy on the use of social media. As a result, StanCOG has incorporated the use of social media in its public involvement process.

DESCRIPTION OF WORK StanCOG uses a combination of committees, fully-noticed public hearings, workshops, forums, surveys, publications, the Internet, social media, early access to and consultation with resource agencies and focus groups to inform, gauge, and respond to regional issues and public questions and concerns. Stakeholders and interested individuals are involved through StanCOG’s committees, mail, email, social media, public hearings, public workshops, and early outreach and consultation. Transportation plans and documents are circulated monthly to the committees for review and comment which include:

• The Citizens Advisory Committee (CAC) - serves as an advisory group to the Policy Board;

• Social Services Transportation Technical Advisory Council (SSTAC) - addresses the needs of the underrepresented members of the community, and is specifically charged with addressing Unmet Transit Needs;

• The Bicycle/Pedestrian Advisory Committee (BPAC) - involves members of the local jurisdictions in the non-motorized transportation process and provide a forum to address the needs of pedestrians and commuter/recreational bicyclists;

• Valley Vision Stanislaus (VVS) Steering Committee - Focuses on the Sustainable Communities Strategy of the Regional Transportation Plan; and the

• Management and Finance Committee - serves as an advisory group to the Policy Board

WORK ACTIVITIES 012.1 Citizens Advisory Committee Meetings

012.2 Bicycle/Pedestrian Advisory Committee Meetings

012.3 Social Services Transportation Advisory Council Meetings

012.4 Public Outreach and Education

• Participate in community committees and events, including those of traditionally underrepresented and underserved populations

• Work with local media

012.5 Document outreach efforts and meetings with traditionally underrepresented and underserved populations

012.6 Referencing Environmental Justice (EJ) activities, continue to conduct coordinated public outreach, including the traditionally underrepresented and underserviced populations, such as the elderly, disabled, low-income, and minority (i.e. Black, Hispanic, Asian American, American Indian/Alaskan Native, and Pacific Islander) communities/groups and community leaders

012.7 Staff Reports

012.8 Agenda packages for public meetings posted and provided to public

012.9 Public Hearings and Notices

StanCOG Overall Work Program Fiscal Year 2020/21

17

(012) Public Involvement – Page 3

012.10 Public Workshops and Meetings

012.11 Surveys

012.12 Press Releases

012.13 Maintain Public Participation Plan

012.14 Legal Notices

012.15 Responding to Comment Forms

012.16 Participation in Caltrans District 10 Working Groups and Public Workshops such as Active Transportation Plans, Rail and other.

Products End Date Citizens Advisory Committee Meetings – Monthly on the First Wednesday of the Month 06/2021 Bicycle Pedestrian Advisory Committee Meetings-Monthly on the First Wednesday of the Month 06/2021 Social Services Transportation Advisory Committee Meetings-Monthly on the First Tuesday of the Month 06/2021 Public Hearing and Notices – Quarterly 06/2021 Staff Reports – Monthly 06/2021 Outreach efforts and meetings with traditionally underrepresented populations – Quarterly 06/2021 Agenda Packages for Public Meetings Posted and Provided to Public – Monthly 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

Toll Credit Match

STANCOG $3,000 FTA 5303 $157,141 $172,000 $37,752

Total $157,141 $175,000 $37,752

Staffing In Person Months STANCOG 5.0

StanCOG Overall Work Program Fiscal Year 2020/21

18

(021) OVERALL WORK PROGRAM PURPOSE To develop, monitor and administer the Overall Work Program (OWP) and Budget consistent with state and federal funding priorities and responsive to local agency needs; to involve local technical staff and administrative officers in the transportation planning process. PREVIOUS WORK The work completed in FY 2019/20 included administration and monitoring of the OWP, as well as, preparation of the 2020/21 OWP. DESCRIPTION OF WORK The Overall Work Program is prepared by StanCOG staff and reflects federal and state funding priorities balanced against local agency needs for transportation planning services. The OWP is the Agency’s core budget document. As such, it serves as a management tool identifying the tasks and products that the Agency will undertake to deliver during the fiscal year. In addition, the OWP serves as the Agency’s primary grant funding mechanism for the fiscal year. WORK ACTIVITIES 021.1 Review Federal and State guidelines

021.2 Initiate OWP Process through Management Meetings and Discussions

021.3 Prepare Draft OWP and Budget, and Indirect Cost Allocation Plan

021.4 Develop and Supervise Staff Work Plan

021.5 Preparing Annual OWP Meeting with Funding Partners

021.6 Develop and Submit Draft OWP for State and Federal review

021.7 Adopt Final OWP following local agency, Federal and State review

021.8 Process Formal and Administrative Amendments as needed.

021.9 Prepare Quarterly Progress Reports for work identified in OWP

021.10 Prepare OWP Status Reports to monitor fiscal resources related to planning

Products End Date

Final Quarterly Progress Report for FY 2019/20 07/2020 Prepare FY 2019/20 Certification of Expenditures 08/2020 OWP FY 2020/21 Amendment 1 – Program Certified Carry Over from FY 2019/20 09/2020 Quarterly Progress Report #1 10/2020 Quarterly Progress Report #2 01/2021 Draft FY 2021/22 OWP, Budget and Cost Allocation Plan to Caltrans, FTA & FHWA 03/2021 Quarterly Progress Report #3 04/2021 Final OWP and Budget 04/2021 OWP Amendments - As Needed 04/2021 Adopted FY 2021/22 OWP 05/2021

StanCOG Overall Work Program Fiscal Year 2020/21

19

(021) Overall Work Program – Page 2

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Toll Credit Match

FHWA PL $85,734 $9,834 STANCOG $1,000

Total $86,734 $9,834

Staffing In Person Months STANCOG 4.0

StanCOG Overall Work Program Fiscal Year 2020/21

20

(023) METROPOLITAN PLANNING ORGANIZATION (MPO) COORDINATION PURPOSE To enhance coordination of regional planning activities among the Metropolitan Planning Organizations (MPOs) and Regional Transportation Planning Agencies (RTPAs) in the San Joaquin Valley (SJV), the Bay Area and Sacramento, as well as the San Joaquin Valley Unified Air Pollution Control District, Caltrans, and other governmental agencies. PREVIOUS WORK StanCOG coordinates with the SJV MPOs in the update of the RTP, on a Valley-wide template to maintain consistency in planning activities and related air quality efforts. DESCRIPTION OF WORK In 1992, the MPOs/RTPAs in the San Joaquin Valley began the process of coordinating transportation planning efforts. The MPOs/RTPAs represent Fresno, Kern, Kings, Madera, Merced, San Joaquin, Stanislaus, and Tulare counties. Later that year, the Boards of Directors of the MPOs/RTPAs approved and signed a Memorandum of Understanding (MOU) that committed each agency to coordinate efforts during the execution and preparation of Regional Transportation Plans, Transportation Improvement Programs, Congestion Management Programs, and other transportation systems studies required to address interregional issues. In addition, the MOU called for cooperation when working with the San Joaquin Valley Unified Air Pollution Control District and Caltrans. The MOU also provided for coordination during the development of consistent transportation and traffic data base information for transportation modeling and related emissions modeling. The MOU has been revised on occasion, most recently to create the San Joaquin Valley Regional Transportation Planning Agencies Policy Council (Policy Council). The Policy Council is composed of two Policy Board members from each of the eight San Joaquin Valley planning agencies governing boards and one representative from the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD). To implement the MOUs between the MPOs/RTPAs, Air District, and Caltrans, an eight county Cooperative Work Program was developed and is updated as needed. The 2010 Census identified two Urbanized Areas in Stanislaus County, Modesto and Turlock. The Modesto Urbanized Area consists of the cities of Modesto, Ceres, Hughson, Riverbank, and Oakdale, and further includes the unincorporated communities of Salida, Keyes, and Del Rio. The Turlock Urbanized Area includes the community of Delhi, and City of Livingston, which are both located in Merced County. For those transportation funds granted to the Turlock Urbanized Areas, StanCOG works with the Merced County Association of Governments as needed. State Highways and other significant County routes extend across the Stanislaus County boundary into adjacent counties. Where improvements are proposed on those routes, StanCOG coordinates with all appropriate agencies. WORK ACTIVITIES 023.1 Eight County Cooperative Work Program

023.2 Coordination of Valley-wide RTP development

StanCOG Overall Work Program Fiscal Year 2020/21

21

(023) Metropolitan Planning Organization (MPO) Coordination – Page 2

023.3 Coordinate Intelligent Transportation System (ITS)-related activities / Continue to support a valley wide ITS program

023.4 Coordinate efforts relative to the regional planning process for Federal Transportation Improvement Program, Air Quality, Regional Transportation Planning and Congestion Management Plans

023.5 Coordination of Valley-Wide SR 99 Activities

Products End Date Valley-wide RTP Coordination– Monthly/Quarterly 06/2021 Regional Executive Directors Committee Meetings – Monthly 06/2021 Regional Policy Conference - Annually 06/2021 Regional Policy Council Meetings – Quarterly 06/2021

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs FHWA PL $158,778 STANCOG $20,571

Total $179,349

Staffing In Person Months STANCOG 3.9

StanCOG Overall Work Program Fiscal Year 2020/21

22

(026) INTERREGIONAL BICYCLE TOURISM PLAN (IBTP) PURPOSE Support the development of the Interregional Bicycle Tourism Plan (IBTP). BACKGROUND StanCOG, in conjunction with the Tuolumne County Transportation Council (TCTC), the Calaveras Council of Governments (CCOG), the San Joaquin Council of Governments (SJCOG), the Alpine County Local Transportation Commission (Alpine LTC), and the California Bicycle Coalition, has partnered with Caltrans to develop an interregional active transportation plan to advance bicycle tourism and promote safe multimodal travel in the five-county region. PREVIOUS WORK StanCOG has provided matching funds to support project development. StanCOG staff has reviewed and commented on TCTC’s proposed scope of work, outreach plan, and Request for Proposal (RFP) for consultant services. StanCOG staff reviewed and scored each consultant response to the RFP and highlighted key bicycle tourism routes in Stanislaus County to be analyzed in the final document. StanCOG staff also participated at each of the project’s steering committee meetings to date, including the Steering Committee kickoff meeting held June 28, 2019, and coordinated to set future meetings. DESCRIPTION OF WORK The five-county IBTP project team will continue to work together to identify and analyze priority routes for enhancing bicycle tourism, with a focus on improving travel conditions for all modes, and the travel needs of both residents and visitors. An annotated map and list of recommendations for priority improvements will be developed based on expert analysis and extensive community outreach to area residents, including business and property owners, travel bureaus, local policy makers, bike shops and bicycle clubs, and other stakeholders. Strategies will be developed to promote the region’s bicycle tourism opportunities and cultivate a regional bicycle tourism economy. All findings will be compiled into a final report. This project includes the counties of Stanislaus, Tuolumne, Calaveras, San Joaquin, and Alpine, with TCTC serving as the administrative lead. The California Bicycle Coalition is the project lead and manager, with StanCOG, TCTC, CCOG, SJCOG, and Alpine LTC overseeing plan development in their respective jurisdictions. WORK ACTIVITIES 026.1 Staff Coordination for Interregional Bicycle Tourism Plan

026.2 IBTP Staff Reports

026.3 Review draft and final Interregional Bicycle Tourism Plan Documents

Products End Date Draft and Final Interregional Bicycle Tourism Plan 02/2021 Interregional Bicycle Tourism Staff Reports as needed 02/2021

StanCOG Overall Work Program Fiscal Year 2020/21

23

(026) Interregional Bicycle Tourism Plan (IBTP) – Page 2

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

STATE PPM $32,077 Total $32,077

Staffing In Person Months

STANCOG 1.9

StanCOG Overall Work Program Fiscal Year 2020/21

24

(113) TRANSPORTATION MODELING, ANALYSIS, FORECASTING & GIS PURPOSE Current federal planning requirements call for Metropolitan Planning Organizations (MPOs) to consider land use and economic development impacts in their transportation planning processes. StanCOG’s Transportation Modeling program supports key planning activities in the region, including the Regional Transportation Plan/Sustainable Communities Strategies development and Air Quality Conformity Analyses. StanCOG’s Transportation Modeling program also supports regional transportation planning studies, environmental justice analysis, and traffic impact studies. Additionally, the modeling program also supports the general plans and land use studies of the local jurisdictions. Transportation, land use, and air quality are intrinsically linked through the Regional Transportation Planning process. The purpose of StanCOG’s model program is to maintain state of the art tools to measure such relationships addressed by the Fixing America's Surface Transportation Act or "FAST Act,” California Clean Air Act, and the Federal Clean Air Amendments. StanCOG coordinates its technical program with federal, state and local partners, the Central Valley COGs, and the San Joaquin Valley Air Pollution Control District. Travel forecasts generated by StanCOG’s travel demand model provide guidance and communication tools for decision makers to consider the potential impact of their decisions regarding transportation, air quality, and land use. A geographic information system (GIS) is a system designed to capture, store, manipulate, analyze, manage, and present spatial or geographic data. GIS is employed to analyze and communicate transportation, land use and other data/information to the public. PREVIOUS WORK StanCOG maintains a regional travel demand model that contains a detailed road and highway network for Stanislaus County, its cities and its communities. StanCOG has maintained a regional model for the benefit of its partners since 1985 through regular updates of the land use database, travel assumptions, and validation processes. In 1993 and 2000, StanCOG staff rebuilt the major components of the model. Through the San Joaquin Valley Model Improvement Program (VMIP), StanCOG, in conjunction with San Joaquin Council of Governments (SJCOG) and Merced County Association of Governments (MCAG), created a three-county transportation model to address requirements of SB 375 and the Sustainable Communities Strategies (SCS), and to continue to improve forecasting for the Regional Transportation Plan. The StanCOG model has provided critical information to general plan and specific plan updates; it has been used frequently in corridor and traffic studies. It has provided essential information to the Regional Transportation Plan (RTP) and to previous Congestion Management Process (CMP) updates and the Environmental Justice Report. The model program also provides key information for the accompanying RTP Environmental impact report (EIR) and Air Quality Conformity Analyses (Work Element 410 of this Overall Work Program). With the Environmental Justice Report, the model has been used to associate 2010 Census information with Traffic Analysis Zones (TAZ). The San Joaquin Valley Model Improvement Plan (VMIP) began in 2010 and made substantial enhancements to the modeling capabilities of the Valley MPOs. Due to the timing of the development of the VMIP, many data sources necessary to understand and model travel behavior were not available. As such, older data sources were

StanCOG Overall Work Program Fiscal Year 2020/21

25

(113) Transportation Modeling, Analysis, Forecasting & GIS – Page 2 employed to supplement data for the base year, making calibration and validation difficult due to the economic downturn relative to the 2001/2003 California Household Travel Survey (CHTS) and 2000 Census, which were collected before the calibration efforts began. In the technical evaluations of the Valley’s SCS documents, areas of improvement were identified, including updates to the travel demand model. The Valley has responded to this feedback through a model update involving the development of a San Joaquin Valley Model Improvement Plan, Phase 2 (VMIP2). VMIP2 utilizes the most recent 2010 Census, American Community Survey, California Household Travel Survey data, and the model structure enhancements developed as part of the VMIP. In addition to the updated data, VMIP2 implements changes to the model structure based on the Air Resources Board (ARB) feedback. Key enhancements to model sensitivity and usability include:

• Land Use: simplified residential and employment categories • Socio-economic: the employee salary and household income relationship for home-work trips • Interregional Travel: updated based on the newly released California Statewide Transportation Demand

Model, and based on place and purpose, rather than having internal and interregional travel combined and distributed based on time/cost of travel

• Modified Assumptions: adjustments to employment density, intersection density, and access to jobs and housing

The Valley Model Improvement Program is continuously refined with state of the art enhancements to better support the eight San Joaquin Valley MPOs in complying with the requirements of SB 375. The enhancements are made with the aim of improved coordination of land use and transportation planning to support the achievement of mandated greenhouse gas emission reductions. In preparation of the next update to the RTP/SCS, the model will be enhanced to include codes for ACE extension and possible bus service enhancements, new land use input, new codes to account for bicycle and pedestrian infrastructure, and scripts that allow for the model to account for autonomous vehicles on the network. WORK ACTIVITIES 113.1 Continued Travel Demand Model development activities, include model maintenance, update of model

networks and demographic data using street and centerline files and detailed traffic analysis zones

113.2 Create a census clearinghouse section on the StanCOG website to serve as a repository of census data

113.3 Obtain Demographic Forecast with population, employment, household and housing unit forecasts for Stanislaus County to support modeling effort

113.4 Ensure validation results demonstrate that the model is consistent with local counts, transit ridership surveys, and the Highway performance Monitoring System (HPMS)

113.5 Maintain and update calibration (highway and transit) standards consistent with statewide and local travel surveys, gateway surveys for use in air quality conformity, regional transportation plans and studies, congestion programs and alternative transportation studies, as needed

113.6 Provide GIS transportation-based data and mapping and other informational support to member agencies

StanCOG Overall Work Program Fiscal Year 2020/21

26

(113) Transportation Modeling, Analysis, Forecasting & GIS – Page 3

113.7 Continue to consult with the other San Joaquin Valley COGS, Caltrans and local agencies on model practice and programs that use transportation models

113.8 Prepare related staff reports and attend regional, state, and federal meetings about modeling and modeling related programs

113.9 Coordinate with Three County Model MPOs in joint transportation modeling improvement activities to address state guidance and requirements

113.10 Provide support for continued update and enhancement of the three-county model

Products End Date Model runs to address local jurisdictional needs on transportation projects and studies 06/2021 Model runs and conformity determinations for RTP/FTIP amendments 06/2021 Model enhancements to the existing Three County Model 06/2021 Data analysis of census products 06/2021 Maps to visually display census data products 06/2021 Census Clearinghouse Website Development 06/2021 Staff Reports, as needed 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

Toll Credit Match

FHWA PL $222,695 $28,613 FTA $26,765 STATE PPM $100,000 $5,474

Total $349,460 $5,474 $28,613

Staffing In Person Months STANCOG 11.4

StanCOG Overall Work Program Fiscal Year 2020/21

27

(203) HUMAN SERVICES COORDINATION PLAN PURPOSE Caltrans’ Sustainable Transportation Planning (STP)Grant Program was created to support the State’s mission to provide a safe, sustainable, integrated, and efficient transportation system that enhances the state’s economy and livability. This grant program may be utilized to update and enhance transportation planning documents such as The Public Transit-Human Services Coordination Plan (Coordinated Plan). The process of updating the Coordinated Plan provides an opportunity for a diverse range of stakeholders, with a common interest in human service transportation, to convene and collaborate on how best to provide transportation services for the targeted populations of older adults, persons with disabilities, persons of low income, and veterans. PREVIOUS WORK Initiated by the passage of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users, Public Law 109-059, and continued with the Fixing America’s Surface Transportation (FAST) Act, each region must locally adopt a Coordinated Plan in order to leverage and extend scarce transportation resources. StanCOG last adopted a Coordinated Plan in 2015. Since 2015, several changes have occurred that significantly impact the accessibility and availability of transportation in the Stanislaus region. In 2019 StanCOG staff prepared an STP grant application to support development of a plan update. DESCRIPTION OF WORK Through a competitive bidding process, StanCOG acquire the services of professional consultant to support the development of a Public Transit-Human Services Coordination Plan. StanCOG, with consultant support, will conduct extensive stakeholder outreach to bring together human service organizations and public transit agencies. StanCOG will oversee the work and will participate in Project Management meetings and project activities to ensure the project is conducted in accordance with the contract scope of work and is completed within budget and on schedule with a successful outcome. Staff will provide quarterly updates to the StanCOG committees and Policy Board as needed to promote communication and collaboration from the stakeholders in the region.

StanCOG staff will continue all work activities throughout FY 2021/22 to complete the Final Draft.

WORK ACTIVITIES 203.1 Participate in project management meetings, via conference call or in person, with the consultant,

Caltrans, and MOVE

203.2 Implement a Competitive bidding process to

203.3 Assist in all planning activities and participate in stakeholder and public outreach

203.4 Review work products

203.5 Perform Title VI/Limited English Proficiency (LEP) on-going compliance activities

203.6 Complete and submit a quarterly invoice packages to Caltrans District 10

203.7 Complete and submit quarterly reports to Caltrans District 10

203.8 Prepare and present staff reports

203.9 Update standing committees on progress of the project on a quarterly basis, or as needed.

StanCOG Overall Work Program Fiscal Year 2020/21

28

(203) SB1 Sustainable Communities Projects FY20/21: Human Services Coordination Plan – Page 2

Products End Date

Consultant Contract 02/2021 Notes from Project Management Meetings 06/2021 Quarterly Invoicing 06/2021 Quarterly Reports 06/2021 Handouts from Presentations to StanCOG Committees and Policy Board 06/2021 Handouts from Public Outreach 06/2021

FY 20-21

WE - Project Resources By Funding Agency

Staff & Miscellaneous

Direct Costs Consultant Costs 203 FTA 5304 $59,661 $201,370 203 STANCOG $10,732 $26,090

Total $70,393 $227,460

Staffing In Person Months STANCOG 3.0

StanCOG Overall Work Program Fiscal Year 2020/21

29

(300) REGIONAL TRANSPORTATION PLAN (RTP) PURPOSE StanCOG is federally mandated, per Title 23 United States Code (U.S.C) Section 134 and Code of Federal Regulations (CFR) 450.300, to prepare a Regional Transportation Plan (RTP) that is consistent with federal transportation planning requirements. StanCOG is required to prepare and periodically update the RTP, which defines the policies, plans and programs for the coordination and programming of transportation improvements throughout Stanislaus County. StanCOG has developed an RTP according to the provisions of MAP-21/FAST Act, as specified in the Planning Final Rule and which conforms to the 2017 Regional Transportation Plan Guidelines for Metropolitan Planning Organizations developed by the California Transportation Commission. BACKGROUND The RTP is the agency’s comprehensive transportation planning document that outlines an approximate twenty-five-year investment strategy and policy guidance for the Stanislaus County region. The RTP is intended to serve as the blueprint for future transportation improvements and investments based on specific transportation goals, objectives and actions defined by the community and its elected officials. The RTP is to be developed through a performance-driven, outcome-based approach to planning. PREVIOUS WORK In August 2018, the Policy Board adopted the 2018 RTP. During planning effort, StanCOG Staff coordinated closely with our member agencies on land use, development and other plan elements such as demographic forecasts, revenue projections, project lists and goals and objectives. StanCOG continually sought input from the public to establish a vision for the region and develop and identify a preferred land use/transportation scenario. Based on the analysis and public input, the StanCOG Policy Board identified the preferred land use and transportation scenario, referred to as Scenario 2 (Preferred Scenario/Infill Redevelopment). In December 2018, the FHWA and FTA provided their joint air quality conformity determination for the 2018 RTP. Extensive community outreach presentations were conducted to showcase the 2018 RTP scenarios during the months of October 2017 and November 2017. Four major public workshops were held in the cities of Modesto, Newman, Ceres, and Riverbank. In addition to the above public workshops, extensive outreach efforts were conducted at stakeholder and community group meetings in the region. Additional presentations were also provided at City Council meetings held by the City of Ceres, Patterson, Hughson, Riverbank, Modesto, Waterford, Oakdale, and Turlock. The associated Environmental Impact Report (EIR) for the RTP was prepared in accordance with the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). The Final 2018 RTP EIR identifies strategies to avoid or mitigate those environmental impacts where warranted. The Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) promote the use of an objectives-driven, performance-based approach to planning for operations as an effective way to integrate operations into planning and programming. This approach focuses on short- and long-term system performance rather than simply focusing on implementation of projects as a measure of success. MPOs are required to establish targets for safety (PM1), bridge and pavement condition (PM2), air quality, freight movement, and for performance of the National Highway System (PM3) and to use the performance measures to track their progress toward meeting those targets.

StanCOG Overall Work Program Fiscal Year 2020/21

30

(300) Regional Transportation Plan (RTP) - Page 2 The performance based planning activities require regular coordination with federal, state, and local agency officials, outreach to local stakeholders, and integration of the performance based approach into planning and programming processes, including the RTP and Federal Transportation Improvement Program (FTIP). To help meet the targets set for PM1, PM2 and PM3, StanCOG has recently launched a Bicyclist and Pedestrian Safety and Education Campaign and is updating its Non-Motorized Transportation Plan; will soon begin work on a regional Pavement Management Program to inform pavement improvement decisions; and updated its CMP to report on the PM3 reliability measures. DESCRIPTION OF WORK StanCOG continues to expand the scope of this work element to include significant staff work necessary to implement the RTP. StanCOG will continue to work to identify and secure available funding to support the implementation of the 2018 RTP. StanCOG will continue to advance multimodal plans to ensure effective implementation of strategies identified that support the goals and objectives of the RTP that not only considers various modes (walking, cycling, automobile, public transit, etc.) but the connections among modes. Additionally, StanCOG will continue updating plans/projects, such as the Non-Motorized Transportation Plan and the regional Bicycle and Pedestrian Safety and Education Campaign and anticipates completing the Congestion Management Process Update by February 2020. These plans/projects will provide valuable information to support the development of the 2022 RTP update, as the outcomes of these planning efforts will guide StanCOG and its member agencies in considering strategies to address safety, pavement and bridge condition and air quality/congestion related needs. Additionally, the findings of these planning efforts will be considered in the development a project prioritization methodology for the RTP. As part of RTP implementation, there are continuous monitoring of planning activities consistent with advancing RTP goals, objectives, and performance. Other activities will include monitoring and updating project cost estimates and project schedules to ensure compliance with RTP financial planning and air quality conformity and to support RTP implementation. Beginning in FY 20/21, StanCOG will commence with activities for development of the 2022 RTP Update and associated EIR. StanCOG will initiate stakeholder outreach working in close coordination with our local member agencies and other stakeholders to identify goals and objectives of the plan, develop potential project lists, calculate project costs, develop a funding estimate, generate and review demographic forecasts, develop and review deliverables and conduct other activities associated with plan development.

WORK ACTIVITIES 300.1 Continued engagement of RTP Valley Vision Stanislaus Committee, as needed

300.2 Participate in regional, state, federal meetings regarding RTP policies, requirements, guidance, best practices and emerging issues

300.3 Attend workshops and training that supports 2018 RTP implementation and development of the next update

StanCOG Overall Work Program Fiscal Year 2020/21

31

(300) Regional Transportation Plan (RTP) - Page 3

300.4 Continue to develop funding and implementation strategies and seek and secure funding for near-term significant projects identified in 2018 RTP that provide regional benefit and reflect support other programs/plans

300.5 Liaison with goods movement industry and the business community concerned with the goods movement activities that support the StanCOG RTP

300.6 Outreach to local agency representatives regarding Planning and Environment Linkages (PEL) approach for promoting a collaborative and integrated approach to transportation decision-making that encourages use of the information, analysis, and products developed during regional planning efforts to inform the local agency project environmental review process

300.7 Prepare RTP amendments, as necessary

300.8 Ensure continued compliance with federal and state RTP guidelines

300.9 Engage a broad spectrum of stakeholders throughout Stanislaus County to gather input throughout the development of the plan

300.10 Draft and Final Public Participation Plan development and review

300.11 RTP project website development

300.12 Goals and Policies review and approval

300.13 Develop and review demographic forecast

300.14 Develop and review revenue forecast

300.15 Develop methodology for project prioritization

300.16 Compile a comprehensive list of potential projects for the development of the 2022 RTP

300.17 Develop public hearing announcements for RTP activities

Products End Date

Staff Reports – As needed 06/2021 RTP Amendments, as needed 06/2021 Draft and Final Public Outreach Plan 06/2021 Project Website 06/2021 Goals and Policies 06/2021 Demographic Forecast 06/2021 Revenue Forecast 06/2021 Project Prioritization Methodology 06/2021 Development of Comprehensive RTP Project List and Funding Estimate 06/2021 Public Notices 06/2021

StanCOG Overall Work Program Fiscal Year 2020/21

32

(300) Regional Transportation Plan (RTP) - Page 4

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

Toll Credit Match

FHWA PL $612,341 486,915 $70,236 FTA $84,179 $9,655 STATE PPM $147,090 STANCOG 45,995

Total $696,520 $680,000 $79,891

Staffing In Person Months STANCOG 49.3

StanCOG Overall Work Program Fiscal Year 2020/21

33

(302) ENVIRONMENTAL JUSTICE (EJ)/TITLE VI PURPOSE The Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) have maintained an emphasis on Civil Rights, in particular, Environmental Justice (EJ) and Title VI Nondiscrimination, concepts born from the 1964 Civil Rights Act. EJ principles require that no single population consistently bears the burden or benefit of government activity while Title VI requires that, "No person in the United States shall, on the ground of race, color, or national origin be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance.” To support these nondiscrimination principles, agencies receiving federal transportation funding must work to ensure the full and fair participation by all potentially affected communities, especially minority and low-income populations in the transportation decision-making process. Recognizing that no two regions are identical, FHWA and FTA have granted latitude to metropolitan planning organizations (MPOs), such as StanCOG, regarding their approach to EJ/Title VI within the planning process. PREVIOUS WORK StanCOG continues to strive to fully incorporate these fairness and nondiscrimination principles in all areas of federally funded activities. In 2018, StanCOG updated both the Public Participation Plan and the Regional Transportation Plan incorporating further application of EJ and Title VI principles in their development and approval. These reports provide a substantive review of the extent to which transportation planning activities burden or benefit identified EJ/Title VI communities. StanCOG will continue to use, and improve upon, the Transportation Model Program, which uses demographic data to estimate travel patterns and other information to non-objectively weigh equity in the forecasting process. In addition, StanCOG’s outreach efforts have been increased and focused towards those populations that are typically underrepresented during all planning processes as detailed in the Public Participation Plan adopted March 18, 2018. Since the adoption of the 2018 StanCOG RTP/Sustainable Communities Strategy (SCS), and associated Environmental Justice Analysis, StanCOG, as identified in Work Element 300, has monitored the performance of the Plan, in particular for EJ emphasis. Staff utilizes the collected information to ensure that StanCOG makes achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of its programs, policies, and activities on minority populations and low-income populations as the result of the planning or implementation of projects. In 2017-2018, StanCOG updated the Title VI Compliance Report and Limited English Proficiency (LEP) Plan to meet changes in the regulatory requirements. As these program changes were significant, StanCOG received approval of the updated program in FY 2018-2019. DESCRIPTION OF WORK The intent of this Work Element is to reaffirm an Environmental Justice process within StanCOG’s established Overall Work Program and all of its planning efforts. The Executive Order on EJ covers people who are low-income and minorities. Civil Rights Title VI covers all people based on race, color, and national origin. StanCOG is committed to continual outreach to the public and our local agencies to better inform and prepare them for the next planning activities. Translating required new critical into Spanish, translating other documents

StanCOG Overall Work Program Fiscal Year 2020/21

34

(302) Environmental Justice (EJ)/Title VI - Page 2 upon request, providing verbal interpretation services at requested public meeting, and participating in specific outreach activities to identified populations are the anticipated priorities for this work element in 2020/21. In addition, StanCOG staff will continue to require compliance of transit operators as outlined in Transit Work Element 321. Caltrans’ current DBE goal is 17.6% (4.2% race-neutral and 13.4% race conscious). StanCOG will make efforts to reach a DBE goal that complements Caltrans. WORK ACTIVITIES 302.1 Maintain StanCOG’s commitment to Environmental Justice/Title VI in all planning and work activities

through Standing Committees such as the Social Services Transportation Advisory Council (SSTAC), the Citizens Advisory Committee (CAC), the Bicycle and Pedestrian Advisory Committee (BPAC), and the Valley Vision Stanislaus (VVS) Committee

302.2 Continue to conduct coordinated public outreach in accordance with federal and state regulations, including the traditionally underrepresented and underserviced populations, such as the elderly, disabled, low-income, and minority (i.e. Black, Hispanic, Asian American, American Indian/Alaskan Native, and Pacific Islander) communities/groups and community leaders

302.3 Translating agency’s public documents

302.4 Providing interpreter services for public meetings when requested

302.5 Staff outreach/participation in meetings of organizations focused on EJ Communities

302.6 Prepare for impact of new transit service modes within the region

302.7 Maintain compliance of Title VI/Limited English Proficiency

302.8 Launch mini grant program for community agencies to host workshops for public outreach to EJ/Title VI communities (especially minority and low-income populations). The program will be established to award funding to community-based organizations (e.g. non-governmental, non-profit, non-political organizations), schools, and other groups to support outreach to enhance StanCOG’s public outreach efforts.

302.9 Assist with efforts to encourage DBE participation

302.10 Update Title VI as needed

Products End Date Workshop PowerPoint presentations and handouts 03/2021 Agenda, handouts, and/or presentation from EJ community meetings 06/2021 Translated planning documents and materials 06/2021 Title VI Document 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

Toll Credit Match

FTA 5303 $51,875 $15,000 $5,950 STANCOG $1,721

Total $51,875 $15,000 $7,671

StanCOG Overall Work Program Fiscal Year 2020/21

35

(302) Environmental Justice (EJ)/Title VI - Page 3

Staffing In Person Months STANCOG 1.9

StanCOG Overall Work Program Fiscal Year 2020/21

36

(321) TRANSIT (MASS TRANSPORTATION) PURPOSE The availability of mass transportation is a crucial part of the solution to the Stanislaus region’s socioeconomic, energy, and environmental challenges and helps to nurture a better quality of life. For this reason, StanCOG provides technical assistance to transit operators and administrator agencies to increase the usability, efficiency, effectiveness, safety, and security of transit and paratransit services in the Stanislaus region in keeping with guidance provided by the Federal Transit Administration (FTA) and the goals and objectives of the 2018 Regional Transportation Plan (RTP). PREVIOUS WORK The most crucial project accomplished in 2018 year was the passage of California Senate Bill 903 (Canella) (SB 903) which authorized the StanCOG Policy Board the opportunity to provide relief of fare recovery penalties to transit operators during the next two fiscal years. Also associated with SB 903 is the Transit Efficiency Study which was developed in 2018 and completed in Fall 2019. The FTA required transit operators to develop a Transit Asset Management (TAM) Plan by 1, 2018 for maintaining a state of good repair of their vehicles, facilities, and other capital assets. Transit operators were also required to set performance targets and report information related to the condition of their assets to the National Transit Database. Consistent with FTA guidance, staff: coordinated with the transit providers to ensure TAM Plans were prepared and performance targets were set; regularly coordinated with transit operators to evaluate current information on the state of transit assets; to understand the transit operators transit asset management plans; and to ensure that the transit operators continually provide transit asset information to support the MPO planning process. On July 19, 2018, FTA published the Public Transportation Agency Safety Plan (PTASP) Final Rule, which requires each Stanislaus County transit operator to develop a safety plan. The plan must include the processes and procedures to implement Safety Management Systems (SMS), include safety performance targets, certify they have a safety plan in place meeting the requirements of the rule by July 20, 2020, and be updated on a yearly basis. In preparation for the July 2020 deadline, StanCOG staff has worked closely with the operators to facilitate the process and develop these plans. As StanCOG prepares for the Altamont Corridor Express (ACE) extension to the City of Ceres, StanCOG continues to sit as an Ex-Officio on the San Joaquin Regional Rail Commission (SJRRC) Board. StanCOG staff regularly participates in the SJRRC Board Meetings. In addition, Amtrak services governed by San Joaquin Joint Powers Authority (SJJPA) are being evaluated for expansion and possible required coordination with the ACE expansion. As such, StanCOG staff will continue to participate in SJJPA regional meetings and will participate in other public outreach opportunities as available. DESCRIPTION OF WORK StanCOG staff provides ongoing planning and technical assistance to transit agencies and human service organization administrators to increase the usability, efficiency, effectiveness, safety and security of transit and paratransit operations, including resolving ADA-related issues. Activities include conducting monthly transit manager meetings to support coordination activities and improve interagency communication, with the assistance of the region’s Consolidated Transportation Services Agency (CTSA) called MOVE. Furthermore, staff provides technical assistance and planning support for the Technical Advisory Committee (TAC) and the Social Services Transportation Advisory Council (SSTAC). Staff also attends and/or co-hosts grant program workshops

StanCOG Overall Work Program Fiscal Year 2020/21

37

(321) Transit (Mass Transportation) – Page 2 and training seminars sponsored by the Federal Transit Administration (FTA) or Caltrans and can provide grant application assistance and/or coordination as requested by member agencies. Annually, pursuant to the California Transportation Development Act (TDA), StanCOG conducts the Unmet Transit Needs assessment. Comments regarding the quality of transit service are solicited from the general public through online surveys and comment forms, with targeted outreach to transit dependent and transit disadvantaged populations, such as the elderly, persons of limited means, and persons with disabilities.

StanCOG continues to monitor changes to the FTA’s grant programs and ensure that local public transit and private human service agencies are notified of all FTA or Caltrans funding opportunities. When these transit operators or human service agencies apply and are awarded FTA grant funding, staff will assist with programming the projects into the Regional Transportation Plan (RTP) and Federal Transportation Improvement Plan (FTIP). In preparation for upcoming changes to rail services offered within our region, staff will continue to participate in the SJRRC and SJJPA Board Meetings to ensure that our region’s priorities are adequately represented in decisions impacting services throughout the valley. WORK ACTIVITIES 321.1 Assist with Federal Grants such as FTA Sections 5307 and 5339, including coordinating meetings with the

local transit operators regarding funding; providing grant application assistance to the local transit agencies, preparing split letters, letters of concurrence, and letters of support.

321.2 Assist in Community Outreach Activities for the Unmet Transit Needs process

321.3 Provide program updates to local transit operators through presentations at Committee and Policy Board meetings, transit operators meetings and on the StanCOG website

321.4 Meet, as needed, with transit providers in San Joaquin and Merced Counties, as well as Amtrak and ACE officials, to ensure coordination of services in Stanislaus County

321.5 Coordinate ongoing evaluation of Transit Asset Management Plans and progress towards performance targets

321.6 Planning of Regional Transit Operators Coordination meetings (City of Ceres Transit, City of Modesto Transit, City of Turlock Transit, County of Stanislaus Transit and the Consolidated Transportation Service Agency-MOVE)

321.7 Prepare public notices for Program of Projects for all FTA programs through the Federal Transportation Improvement Program process

321.8 Interregional Transit Coordination for Passenger Rail, including participation in the San Joaquin Rail Working Group, San Joaquin Regional Rail Commission meetings and San Joaquin Joint Powers Authority

321.9 Title VI/Limited English Proficiency (LEP) on-going compliance efforts

321.10 Continually research changes to the FTA programs and implement as needed. Participate in Federal/State workshops for the implementation of FAST Act and grant programs

321.11 Work closely with each transit agency to complete their PTASP and update as needed

321.12 Prepare Staff Reports

StanCOG Overall Work Program Fiscal Year 2020/21

38

(321) Transit (Mass Transportation) – Page 3

Products End Date Letters of Support and Concurrence 06/2021 Split Letters 06/2021 Public Notices 06/2021 Notes and Handouts from FTA and Caltrans Workshops 06/2021 Unmet Transit Needs Analysis report 04/2021 Handouts from Public Outreach and Agency Meetings 06/2021 Staff Reports 06/2021

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs Consultant

Costs Toll Credit

Match FTA 5303 $27,058 $30,000 $3,104 STANCOG $8,000 $3,441

Total $35,058 $30,000 $6,545

Staffing In Person Months STANCOG 1.3

StanCOG Overall Work Program Fiscal Year 2020/21

39

(323) FTA ADMINISTRATION FEE FOR JOBS ACCESS REVERSE COMMUTE (JARC) PURPOSE The FTA Administrative fee for StanCOG to execute its role as the designated recipient for FTA 5316 Jobs Access Reverse Commute (JARC) Program funds for the Modesto Urbanized area will be used for the Consolidated Transportation Services Agency’s Mobility Management project. DESCRIPTION OF WORK With the passing of MAP-21 in 2012, the FTA Section 5316 (JARC) program was consolidated with JARC-type projects as eligible activities under rural (Section 5311) and urban (Section 5307) funding provisions. Although the JARC program is no longer active, there are JARC funds still remaining that have been allocated to the region requiring administration. StanCOG will continue to administer these remaining program funds until all program funds are spent. This administration process shall include, but is not limited to, monitoring the subrecipient’s implementation of the grant program of projects and report to the FTA as required. Staff will also attend applicable transportation workshops or training webinars to maintain an understanding of grant funding programs under the FAST Act. WORK ACTIVITIES 323.1 Implement Public Transit – Human Services Coordination Plan

323.2 Provide management/oversight of the JARC Program of Projects

323.3 Review JARC project reimbursement requests for program compliance

323.4 Provide administrative support to sub-recipient designee

323.5 FTA Grant management via the Transit Award Management System (TrAMS) on a quarterly basis

323.6 FTA Funding Programming and Planning

323.7 Provide staff coordination of and support to the Mobility Advisory Committee (MAC)

323.8 Prepare and Present Staff Reports

Products End Date Mobility Advisory Committee Meetings 06/2021 Quarterly Progress Reports to FTA 06/2021 Staff Reports 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

FTA 5316 $14,548 $161,780 Total $14,548 $161,780

Staffing In Person Months

STANCOG 0.7

StanCOG Overall Work Program Fiscal Year 2020/21

40

(330) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) PURPOSE The Transportation Improvement Program (TIP) contains all capital and non-capital transportation projects or identified phases of transportation projects in the Stanislaus County Region proposed to receive federal funding under the Federal Transit Act and Title 23 of the United States Code. Additionally, the TIP includes all projects deemed regionally significant regardless of the funding source. PREVIOUS WORK The 2019 TIP was developed and adopted by the Policy Board on August 15, 2018 and adopted statewide by FTA and FHWA on December 17, 2018. The 2018 Regional Transportation Improvement Program (RTIP) was completed and adopted by the StanCOG Policy Board on November 15, 2017.

DESCRIPTION OF WORK The StanCOG 2021 TIP programming activities include maintaining the 2020 State Transportation Improvement Program (STIP) and all federal funds FFY 2020/21 through FFY 2023/24. StanCOG will prepare Formal Amendments as well as Administrative Modifications to the Federal Transportation Improvement Program (FTIP), as needed. StanCOG staff will work with local agencies in the preparation of amendments and modifications to ensure that their projects are programmed accurately and in a timely manner. StanCOG staff will coordinate with local agencies to provide program assistance regarding project phase activities for federal and state funded projects and support member agencies through project programming activities. StanCOG staff is working in collaboration with local, state, and federal officials to ensure the continued implementation of the current federal transportation bill "Fixing America’s Surface Transportation" (FAST) Act. StanCOG serves as an information clearinghouse for local agencies and the general public. Staff disseminates policy and program updates, notices and changes ensuring that local agencies and the general public are kept current regarding legislative and programming issues. StanCOG Staff participates in regularly scheduled meetings of the California Federal Programming Group (CFPG) and the Regional Transportation Planning Agencies (RTPA) Group. StanCOG endeavors to meet our responsibilities to our member agencies by providing technical training and assistance to complete the necessary paperwork for federal aid projects. WORK ACTIVITIES 330.1 Provide program notices, updates and general information to member agencies, the State, Federal

Highway Administration (FHWA), Federal Transit Administration (FTA) and the general public

330.2 Maintain a tracking and management system of all federally funded projects

330.3 Develop and process FTIP/RTP Amendments and Modifications

330.4 Program projects in RTIP and FTIP

330.5 Manage and maintain regional financial constraint

330.6 Manage CTIPS Database

330.7 Manage regional project lists

330.8 Develop Regional Policies

StanCOG Overall Work Program Fiscal Year 2020/21

41

(330) Transportation Improvement Program (TIP) – Page 2

330.9 Coordinate with the Planning and Programming Working Group (PPWG) to review the regional project screening and ranking process and programming guidelines to ensure comprehensive cost/benefit analysis of all project types is considered

330.10 Ensure the accuracy of project listings consistent with the development of the Air Quality Conformity Determination and Regional Transportation Plan/Sustainable Communities Strategies (RTP/SCS)

330.11 Provide enhanced updates through presentations at the Policy Board meetings, speakers' bureau, and on the StanCOG website

330.12 Provide material for meetings and presentations to the StanCOG Policy Board, member jurisdictions, transit operators, and county transportation agencies on federal and state funding and programming requirements

330.13 Participate in Interagency Consultation (IAC) activities in the coordination of FTIP

330.14 Referencing Environmental Justice activities, continue to conduct coordinated public outreach in accordance with the FAST Act, including the traditionally underrepresented and underserviced populations, such as the elderly, disabled, low-income, and minority (i.e. Black, Hispanic, Asian American, American Indian/Alaskan Native, and Pacific Islander) communities/groups and community leaders

330.15 Staff Reports

330.16 Complete update of the existing TIP to reflect new or revised transportation investment strategies and priorities. Required at least once every four years, but StanCOG has been updating at least once every two years

330.17 Coordinate Meetings with Caltrans and regional agencies to ensure the flow and timely processing of all paperwork needed to secure federal and state funding

330.18 Assist local agencies in preparing allocation requests

330.19 Track allocation/delivery of RTIP Projects

330.20 Support and assist local agencies to ensure project delivery/performance of federally funded projects

330.21 Manage and track the STIP

330.22 Follow the process and secure regional Obligation Authority

330.23 Complete Congestion Management and Air Quality (CMAQ) Improvement Program annual report

330.24 Implement FAST Act guidance per FHWA and Caltrans

Products End Date Annual Listing of Federally Obligated Projects 12/2020 CMAQ Annual Report 12/2020 Develop and process TIP Amendments & Modifications – As Needed 06/2021 Update Financial Constraint – As Required 06/2021 Monthly Project Status Reports (Support Project Delivery/Performance) – Monthly 06/2021 Staff Reports – As Needed 06/2021

StanCOG Overall Work Program Fiscal Year 2020/21

42

(330) Transportation Improvement Program (TIP) – Page 3

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Toll Credit Match

FHWA PL $287,790 $33,010 STBGP $150,000 $17,205 STANCOG $10,000

Total $447,790 $50,215

Staffing In Person Months STANCOG 19.6

StanCOG Overall Work Program Fiscal Year 2020/21

43

(338) PERFORMANCE BASED PLANNING PURPOSE Establish a performance based planning approach for activities, associated with the Regional Transportation Plan, Transportation Improvement Program (TIP), and Congestion Management Process (CMP), through a performance-driven, outcome-based approach to planning for measuring the progress supported by investment decisions. BACKGROUND The Moving Ahead for Progress in the 21st Century (MAP-21) Act and Fixing America's Surface Transportation (FAST) Act have transformed the Federal Aid Highway Program by establishing new performance management requirements to ensure that Metropolitan Planning Organizations (MPOs) improve project decision-making through performance-based planning and programming to choose the most efficient investments for Federal transportation funds. The national performance goals for the federal highway programs are as follows:

• Safety • Infrastructure Condition • Congestion Reduction • System Reliability • Freight Movement and Economic Vitality • Environmental Sustainability • Reduced Project Delivery Delays

PREVIOUS WORK Previous work has included integrating performance goals and standards into StanCOG’s continuous, comprehensive and cooperative planning process. For example, StanCOG identified goals, objectives and performance measures for evaluating its 2018 Regional Transportation Plan (RTP), which played a critical role in driving a performance-based approach to decision-making in the development of the Plan. As part of Plan development, a variety of investment scenarios were developed and the relationship between each investment scenario and future expected performance was analyzed. Performance of scenarios were then compared and presented to the RTP Steering Committee and Policy Board to identify a preferred alternative. The approach provided information to StanCOG and its decision makers to help them better understand the consequences of different levels of investment, including trade-offs. StanCOG staff has been involved in the target setting processes for Safety, Pavement and Bridge and System Performance, Freight, and CMAQ Performance Measures by attending and participating in workshops in various locations including Caltrans Headquarter offices. Information from these meetings has helped StanCOG coordinate with the State and local agencies on the target setting process. The State of California set its Safety Performance Management targets on August 31, 2017 (to establish 2018 targets), 2018 (to establish 2019 targets), and 2019 (to establish 2020 targets). The StanCOG Policy Board has supported the State’s 2018 and 2019 Safety Performance targets and decided on target setting for the 2020 Performance targets in February 2020. The State has also set its first round of Bridge and Pavement and System Performance, Freight, CMAQ performance measures on May 20, 2018. The StanCOG Policy Board moved to support both Bridge and Pavement and System Performance, Freight, CMAQ performance measures on November 14, 2018.

StanCOG Overall Work Program Fiscal Year 2020/21

44

(338) Performance Based Planning – Page 2 StanCOG will continue to provide updates and set targets annually for all Performance Management Targets. StanCOG along with other MPOs and the State have coordinated to develop a reporting process between the State and MPOs. StanCOG will work to integrate the performance based approach into planning and programming processes and plans. Additionally, the FTA requires transit operators to develop a Transit Asset Management (TAM) Plan for maintaining a state of good repair of their vehicles, facilities, and other capital assets. Transit operators are also required to set performance targets and report information related to the condition of their assets to the National Transit Database. Consistent with FTA guidance, staff will coordinate with the transit providers to ensure TAM Plans are prepared and performance targets are set. StanCOG will also regularly coordinate with transit operators to evaluate current information on the state of transit assets; to understand the transit operators transit asset management plans; and to ensure that the transit operators are continually providing transit asset information to support the MPO planning process. DESCRIPTION OF WORK The USDOT encourages state DOTs and MPOs to further develop and implement a performance management approach to transportation planning and programming that supports the achievement of transportation system performance outcomes. This use of transportation performance measures, establishing targets, the monitoring of and reporting on performance, and identification of targeting investments that achieve desired performance outcomes. The performance based planning activities require regular coordination with federal, state, and local agency officials; outreach to local stakeholders; identification of nationally-available or other (e.g. state) data sources, data collection; analysis, identification of reasonable and achievable targets, development of a monitoring plan and reporting process; and integration of the performance based approach into planning and programming processes, including the Regional Transportation Plan (RTP) and Federal Transportation Improvement Program (FTIP). StanCOG will be taking the next step as described in work element 300 to integrate the TPM into the RTP/FTIP. As part of work element 338, StanCOG will coordinate closely with its Federal, State, and local agency planning partners to gather and compile the necessary baseline data to generate maps, tables and other illustrations to assist StanCOG in measuring progress toward supporting the state PM targets. WORK ACTIVITIES 338.1 Coordinate with the FHWA regarding federal requirements, readily available data, and guidance

338.2 Coordinate with the State DOT regarding state requirements, readily available data, and target establishment

338.3 Collaborate with local agency representatives and other stakeholders regarding goals, objectives, measures and targets

338.4 Gather, compile and analyze data for evaluating targets and monitoring performance

338.5 Work in coordination with local agencies in the development of planning documents related to developing targets and reporting progress on meeting targets, and all other reporting requirements of FHWA Rules as they relate to Pavement Condition, Bridge Condition, the National Highway System, Freight Movement, CMAQ, and Safety

338.6 Establish performance targets and report process for the RTP and FTIP

StanCOG Overall Work Program Fiscal Year 2020/21

45

(338) Performance Based Planning – Page 3

Products End Date

Performance based approach integrated into planning and programming process and plans – Monthly 06/2021 Performance targets and monitoring and reporting 06/2021

Safety Performance Measure MPO Targets Submittal to Caltrans (PM1) 02/2021 OR 180 Days after State sets targets**

Pavement and Bridge Performance Measure MPO Target Submittal to Caltrans (PM2)

180 days after State sets targets**

System Performance, Freight, CMAQ Performance Measure MPO Target Submittal to Caltrans (PM3)

180 days after State sets targets**

Transit Asset Management (TAM) Target Coordination 06/2021 Compilation of past and current Performance Management Data 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Toll Credit Match

FHWA PL $12,473 $1,431 FTA 12,017 $1,378

Total $24,490 $2,809

Staffing In Person Months STANCOG 1.2

StanCOG Overall Work Program Fiscal Year 2020/21

46

(410) AIR QUALITY PLANNING PURPOSE Coordinate with the other San Joaquin Valley MPOs, the San Joaquin Valley Air Pollution Control District (SJVAPCD), the California Air Resources Board (ARB), and the Environmental Protection Agency (EPA), to resolve air quality issues to meet State and Federal regulations. Analyze air quality impacts from mobile source (i.e. cars and trucks) emissions and inform member agencies about air quality programs and Federal air quality regulations. BACKGROUND In 1982, the Stanislaus Air Quality Plan was adopted by the StanCOG Policy Board. At that time local governments implemented travel reduction measures to improve air quality. StanCOG monitored the efforts. In 1990, at the request of the Citizen’s Advisory Committee, the County Board of Supervisors voted to implement a vehicle inspection and maintenance program. Since 1990, with the passage of the California Clean Air Act and the Federal Clean Air Act, StanCOG has monitored and responded to the air quality conformity regulations for the region. In 1991, when the San Joaquin Valley Unified Air Pollution Control District (hereinafter referred to as the “Air District”) was formed, the San Joaquin Valley was designated as an eight-county air basin. Currently, the San Joaquin Valley (or portions thereof) is designated as extreme nonattainment with respect to Federal air quality standards for ozone, and nonattainment for particulate matter under 2.5 microns in diameter (PM2.5); and has a maintenance plan for particulate matter under 10 microns in diameter (PM-10). Therefore, transportation plans and programs for the nonattainment areas for Stanislaus County area must satisfy the requirements of the Federal transportation conformity regulation. The federal transportation conformity regulations (40 CFR Parts 51 and 93) specify criteria and procedures for conformity determinations for transportation plans, programs, and projects and their respective amendments. The Federal transportation conformity regulation has been revised several times since its initial release to reflect both EPA rule changes and court opinions. The conformity regulation applies nationwide to “all nonattainment and maintenance areas for transportation-related criteria pollutants for which the area is designated nonattainment or has a maintenance plan” (40 CFR 93.102). The eight county MPOs adopted a Memorandum of Understanding to establish coordination of plans for traffic and transportation, emissions modeling, and transportation planning to meet clean air requirements. Today, the eight Valley MPOs and the Air District continue to work together to meet State and Federal clean air mandates and maintain consistency between key planning documents, such as the Regional Transportation Plan, the Federal Transportation Improvement Plan, the Air Quality Conformity Analysis and the State Implementation Plan. The Valley MPOs are working together with the Air District to address greenhouse gas emissions and elements of Senate Bill (SB) 375 and Assembly Bill (AB) 32. Due to the multi-jurisdictional and non-attainment designations of the San Joaquin Valley Air Basin, the Valley’s MPOs work closely to coordinate Valley-wide compliance with the requirements of both the Federal and State Clean Air Acts. Due to the unique requirements pertaining to multi-jurisdictional/multi-pollutant and non-attainment status of the San Joaquin Valley MPOs, the individual action of one MPO may affect the compliance status of all other MPOs in the Valley. The San Joaquin Valley Interagency Consultation (IAC) Group plays an essential role in facilitating communication between Valley MPOs and their planning partners (including FHWA, FTA, Caltrans and EPA). StanCOG regularly participates on IAC calls held with Valley MPOs and the regional air quality liaison consults with these participants on project and regional conformity issues and follows the formal transportation conformity interagency consultation process.

StanCOG Overall Work Program Fiscal Year 2020/21

47

(410) Air Quality Planning – Page 2 PREVIOUS WORK StanCOG participates in frequent interagency meetings as part of a Valley wide Modeling and Air Quality Coordination Committee to address specific air quality issues affecting transportation and funding. The meetings address attainment of National Ambient Air Quality Standards, transportation conformity budgets and changing rules and plans relative to SIP development, interagency consultation on PM2.5 and PM10 Hotspot Analyses and other topics related to air quality conformity. In 2019 StanCOG performed an Air Quality Conformity determination using Emission Factors (EMFAC) 2014 for the StanCOG 2018 RTP Amendment No.1 and the 2019 FTIP Amendment No. 9. The 2019 FTIP and 2018 RTP, as amended were found to be in conformity and therefore support requirements of the Federal Clean Air Act Amendments and applicable State Implementation Plans for air quality. StanCOG also performed an additional Air Quality Conformity determination specifically for the 2015 ozone standard. The results of the 2015 ozone standard analysis demonstrated a finding of conformity for 2008 and 2015 8-hour ozone for total regional on-road vehicle-related emissions associated with the implementation of the 2019 FTIP, and the 2018 RTP and it was adopted by the Policy Board in March of 2019. StanCOG was involved throughout the latest round of target setting undertaken by the California Air Resources Board (ARB) for meeting the requirements established as a result of Senate Bill (SB) 375, the Sustainable Communities and Climate Protection Act of 2008. StanCOG, in close coordination with the other Valley MPOs, use current data and assumptions on demographics and travel behavior in order to forecast regional per capita greenhouse gas emissions reductions in future years such as 2020 and 2035. The ARB solicited input from all the MPOs within the state on target recommendations with the intent of adopting new targets that would be effective starting on October 12018. StanCOG coordinated closely with the Valley MPOs to develop StanCOG’s GHG target recommendations. The California Air Resources Board, through Resolution 18-12, updated the regional greenhouse gas reduction targets for 2020 and 2035 applicable to the next update of StanCOG’s future Regional Transportation Plan and Sustainable Communities Strategy (RTP/SCS). The greenhouse gas reduction targets for StanCOG’s next RTP/SCS update are 12 and 16 percent for the years 2020 and 2035, respectively. StanCOG will continue to coordinate with other San Joaquin Valley MPOs and ARB, as ARB plans to work closely with the MPOs to identify supportive strategies and metrics with a focus on implementation. StanCOG continues to coordinate through the valley wide air quality consultant through a contract administered by the San Joaquin Council of Governments. This support assists the San Joaquin Valley COGs in meeting Clean Air Act requirements and National Ambient Air Quality Standards (NAAQS). StanCOG is also receiving support from this consultant, separately through a purchase order/contract to obtain supplemental support for addressing SB 375. WORK ACTIVITIES 410.1 Work with San Joaquin Valley Air Quality Consultant to assist staff with coordination of air quality

analyses between Stanislaus County and the other Valley MPOs, EPA and ARB

410.2 Develop emissions budgets with the SJVAPCD, the Air Resource Board ARB and the US Environmental Planning Agency (EPA)

410.3 Provide the SJVAPCD, ARB, and EPA with transportation model activity data

410.4 Confer with representatives from the FHWA, EPA and ARB about Air Quality

Conformity Analyses, greenhouse gas emissions and targets, and other air quality related issues

StanCOG Overall Work Program Fiscal Year 2020/21

48

(410) Air Quality Planning – Page 3

410.5 Provide air quality information for the public and assist member agencies and planning partners with air

quality rules and regulations

410.6 Monitor and report on greenhouse gas requirements under SB 375 and AB 32

410.7 Participate in Interagency Consultation (IAC) activities in the coordination of Air Quality related activities

410.8 Use EMFAC 2014 on the travel demand model outputs to get data on 2018 RTP/SCS Conformity and FTIP as needed and transition to EMFAC 2017

410.9 Attend ARB meetings/workshops regarding target setting and strategies and metrics for reducing greenhouse gas emissions

Products End Date Coordinate methods and analyses to be used by MPO staff to perform Air Quality Conformity Analysis and Regional Greenhouse Gas Emissions Analyses – Monthly 06/2021 Attend AQ meetings with Valley MPO staff, Air District, ARB, FHWA and Caltrans – Monthly/Quarterly 06/2021 Work with local member agencies to prepare IAC memos and assist them with submittal of their PM2.5 and PM10 Hotspot Analyses to the IAC group 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

STANCOG $112,549 Total $112,549

Staffing In Person Months STANCOG 3.0

StanCOG Overall Work Program Fiscal Year 2020/21

49

(411) CONGESTION MANAGEMENT PROCESS (CMP) PURPOSE The Congestion Management Process (CMP) is a systematic and regionally accepted approach for managing congestion that provides accurate up-to-date information on transportation system performance and assesses alternative strategies for addressing traffic congestion that meets state and federal requirements. The CMP is an iterative process generally defined by the following steps.

1. Define and Identify Congestion 2. Identify Strategies for Addressing Congestion 3. Implement Strategies 4. Evaluate Performance

The CMP provides a framework for structured formal planning process, which includes the following activities/tasks.

1. Identifying Regional Goals/Objectives 2. Updating the Congestion Monitoring Network 3. Defining Multimodal System 4. Developing Performance Measures 5. Monitoring Performance 6. Identifying and Evaluating Strategies 7. Implementing Activities (includes identifying a schedule and potential funding sources) 8. Evaluating Effectiveness of Implemented Strategies

BACKGROUND The Safe Accountable Flexible Efficient Transportation Equity Act - A Legacy for the Users (SAFETEA-LU) stipulated the requirement for the use of the Congestion Management Process (CMP) in Transportation Management Areas (TMA). A CMP is required in metropolitan areas with population exceeding 200,000, known as Transportation Management Areas (TMAs). Federal requirements also state that in all TMAs, the CMP shall be developed and implemented as an integrated part of the metropolitan transportation planning process. In TMAs designated as nonattainment for ozone or carbon monoxide, pursuant to the Clean Air Act, Federal funds may not be programmed for any project that will result in a significant increase in the carrying capacity for Single Occupant Vehicles (SOV) (i.e., a new general purpose highway on a new location or adding general purpose lanes, with the exception of safety improvements or the elimination of bottlenecks), unless the project is addressed through a congestion management process meeting the requirements of 23 CFR 450.320. PREVIOUS WORK Since 1992, Stanislaus County and its member agencies have maintained a Congestion Management Process (CMP), through StanCOG, to meet State and Federal requirements. In 2008 and 2009, StanCOG updated its CMP, including its region-wide congestion monitoring network and its CMP performance monitoring tools. StanCOG updated the CMP in FY 2010-11 and in 2014 as part of the 2014 Regional Transportation Plan (RTP).

StanCOG Overall Work Program Fiscal Year 2020/21

50

(411) Congestion Management Process (CMP) – Page 2 In 2016, StanCOG staff established a CMP Steering Committee, comprised of representatives of the cities of Ceres, Hughson, Modesto, Newman, Patterson, Riverbank, Turlock and Waterford, Stanislaus County, FHWA, and Caltrans. The CMP Steering Committee attended an FHWA led workshop on the CMP purpose, regulatory requirements, and process. In 2018, StanCOG acquired the services of a traffic engineering firm specializing in traffic data analytics and transportation system performance monitoring for updating the CMP. StanCOG staff has coordinated with the CMP steering committee to identify performance measures, establish a data collection approach, collect traffic data, identify deficiencies on the CMP network and develop strategies to address them. The work culminated in a CMP report that documents the methodology, analyses, results, findings and conclusions in a final deliverable and was approved by the StanCOG Board on February 19, 2020. As part of the 2020 CMP update, StanCOG also developed a Geographic Information System (GIS) web map that contains the results of the analysis. This has been made available via the StanCOG website. The 2020 CMP analysis used metrics that rely on “big data” (INRIX and the National Performance Management Research Data Set (NPMRDS) data) to identify causes of traffic congestion on the StanCOG monitoring network. INRIX data is based on GPS-enabled vehicles and devices that track a combination of continuous and segmented trips within a transportation corridor. NPMRDS is a monthly archive of average travel times, reported every 5 minutes when data is available, on the National Highway System. The travel times are based on vehicle probe-based data. The INRIX and NPMRDS datasets were cleaned, processed, and aggregated. Python/R (computer programming language) scripts were applied to process the data. DESCRIPTION OF WORK The transportation system performance evaluation information provided by the CMP serves as one of the inputs to the RTP process. StanCOG will integrate the CMP results and project information for development of the 2022 RTP Project List. StanCOG’s CMP Steering Committee will continue to meet quarterly, to help guide the future monitoring and data collection of the CMP, as needed. WORK ACTIVITIES 411.1 Conduct Congestion Management Process Steering Committee meetings with Caltrans, FHWA and local

member agencies

411.2 Conduct single occupant vehicles (SOV) restriction analyses, as needed

411.3 Prepare staff reports and technical reports to document the process, as needed

411.4 Identify projects and strategies to feed into the 2022 RTP/SCS update

Products End Date

Conduct quarterly CMP Steering Committee meetings, as needed 06/30/2021 Staff reports, as needed 06/30/2021 CMP Project List for 2022 RTP/SCS 06/30/2021

StanCOG Overall Work Program Fiscal Year 2020/21

51

(411) Congestion Management Process (CMP) – Page 3

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

FHWA PL $4,770 STANCOG $618

Total $5,388

Staffing In Person Months STANCOG 0.2

StanCOG Overall Work Program Fiscal Year 2020/21

52

CONSOLIDATED REGIONAL PLANNING PROGRAM As the Regional Transportation Planning Agency (RTPA) for the Stanislaus County region, StanCOG’s primary function is the development of the area’s transportation plans and to coordinate the transportation planning process. The Consolidated Regional Planning Program documents StanCOG Work Elements associated with the agency’s operational function with regards to other regional planning activities, project coordination and local agency support functions. CONSOLIDATED REGIONAL PLANNING WORK ELEMENTS 013 Abandoned Vehicle Service Authority 022 Transportation Development Act (TDA) Fund Administration 029 Bike and Pedestrian Education and Encouragement Safety Campaign 200 SB1 Sustainable Communities Projects FY 18/19 201 SB1 Sustainable Communities Projects FY 19/20 202 SB1 Sustainable Communities Projects FY 20/21 204 Community Transportation Needs Assessment 308 Regional Housing Needs Allocation (RHNA) 322 Transportation Demand Management (TDM) 332 State Transportation Improvement Program (STIP) Project Delivery 388 San Joaquin Valley (SJV) Rural Transit Alternatives/Valley Flex Pilot 401 Local Transportation Authority (Measure L) 499 Legislative Program 500 Other Regional Planning Activities in the Stanislaus Region

StanCOG Overall Work Program Fiscal Year 2020/21

53

(013) ABANDONED VEHICLE SERVICE AUTHORITY PURPOSE Administer the Abandoned Vehicle Abatement (AVA) Program and Plan. PREVIOUS WORK This task is an on-going function that involves the administration of AVA funds for each jurisdiction within Stanislaus County. StanCOG’s AVA Program was scheduled to sunset on 4/30/12. During FY 2011/12, staff worked with member agencies and the Board of Supervisors on obtaining resolutions of support for a ten-year extension of the program. The AVA Program sunset date was extended to 4/30/22. DESCRIPTION OF WORK In October 1991, StanCOG was designated as the local Abandoned Vehicle Service Authority (AVSA) to administer the AVA Program and Plan. The program is funded by an assessment of a $1 additional vehicle registration fee to be used exclusively for the purpose of abandoned vehicle abatement within Stanislaus County. StanCOG’s responsibility is to ensure that funds are distributed and expended in accordance with current statutory and administrative requirements. WORK ACTIVITIES 013.1 Prepare agenda packets for quarterly AVA meetings

013.2 Attend quarterly AVA meetings

013.3 Review AVA Quarterly Reports submitted by local jurisdictions

013.4 Prepare StanCOG Quarterly Report

013.5 Disburse payments to local jurisdictions

013.6 Prepare and submit AVA Annual Report

013.7 Staff reports

Products End Date

AVA Annual Report 10/2020 AVA Quarterly Reports 06/2021 Staff Reports – As Needed 06/2021

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs AVA $8,969

Total $8,969

Staffing In Person Months STANCOG 0.5

StanCOG Overall Work Program Fiscal Year 2020/21

54

(022) TRANSPORTATION DEVELOPMENT ACT (TDA) FUND ADMINISTRATION PURPOSE The California Transportation Development Act (TDA) is a funding source for the development and support of public transportation needs that exist in California. The California Department of Transportation (Caltrans) is responsible for oversight of the TDA program on a statewide basis. StanCOG, as the Regional Transportation Planning Agencies (RTPA), is responsible for implementing the TDA—administering the distribution of funds to local TDA recipients (claimants) and monitoring the subsequent use of those funds to ensure conformity with all state and local requirements. Funds are allocated to areas of the county based on population, taxable sales, and transit performance. The TDA provides funding for use by local jurisdictions and agencies for a variety of transportation purposes with public transportation as the first priority. Other eligible purposes are regional transportation planning & programming and bicycle and pedestrian projects when certain conditions are met. The main purpose and priority of TDA, however, is to provide funding for public transportation. PREVIOUS WORK The TDA was signed into law on November 4, 1971 and became effective July 1, 1972. Several bills have amended the TDA over time including SB903. This measure was sought by StanCOG in 2018 and led the legislature to initiate a statewide task force to re-examine the TDA. In 2019, StanCOG staff served on the task force committees and sub-committees in addition to coordinating a local transit efficiency and innovations study.

• TDA Apportionments • Estimated funds for FY 2020/21 • Create and present staff reports and Resolutions

• TDA Allocations • Reviewed and Processed FY 2020/21 Claims • FY 2019/20 Resolutions

• Processed FY 2019/20 TDA Instructions/Payments • Administered Transit Cost Sharing Procedures • Worked with StanCOG’s Management and Finance Committee to revise Transit Cost Sharing Procedures • Prepared FY 2018/19 TDA Annual State Controller’s Report • Assisted with the legislative amendment to the TDA SB903 for Stanislaus Region’s Farebox Recovery Ratio • Executed SB903’s Implementation Policies & Procedures • Initiated Consolidation Implementation working group for Stanislaus Region • Provided Fiscal Oversight and Technical Assistance

• Provided technical TDA interpretation assistance to the transit operators • Reviewed farebox ratios performance of the transit operators • Monitored and reconciled of all TDA trust funds • Monitored Local Transportation Fund sales tax receipts on a monthly basis • Monitored State legislation for Transportation Development Act Fund Changes • Prepared monthly LTF staff reports to the Management and Finance Committee

DESCRIPTION OF WORK As occurs every year StanCOG will perform necessary task for apportionment, allocation and reporting for TDA related activities. For the second year, StanCOG staff will participate in the TDA task force to help shape law changes. In addition, much of the work effort will focus on TDA compliance issues that may be addressed through consolidation of regional transit operations. Staff will continue to engage in community outreach activities to asses local program effectiveness and identify unmet needs.

StanCOG Overall Work Program Fiscal Year 2020/21

55

(022) Transportation Development Act (TDA) Fund Administration – Page 2 WORK ACTIVITIES 022.1 TDA Apportionments

• Estimate funds for FY 2021/22 • Amend FY 2020/21 Apportionments as needed • Prepare and present Staff Reports and Resolutions

022.2 TDA Allocations • Review and Process FY 2021/22 Claims • FY 2021/22 Resolutions

022.3 Fiscal Oversight

• Report Local Transportation Fund (LTF) sales tax receipts on a monthly basis • Monthly and year-end reconciliation of the TDA trust funds

022.4 Process FY 2020/21 TDA Instructions/Payments 022.5 Administer Transit Cost Sharing Procedures 022.6 Prepare FY 2019/20 TDA Annual State Controller’s Report 022.7 Consolidated Transportation Services Agency (CTSA) Oversight 022.8 Update the Unmet Transit Needs Definition as needed 022.9 Assist in Community Outreach Activities as needed for the Unmet Transit Needs Process 022.10 Development of Unmet Transit Needs Analysis Report 022.11 Provide staff support to the Social Services Transportation Advisory Council (SSTAC) 022.12 Implement the Expected TDA Revisions Resulting from Task Force Report 022.13 Provide oversight of the Stanislaus Region Transit Consolidation Implementation Working Group

• Review Project Status Reports from Consultant

• Present Project Updates to the Transit Operators 022.14 Staff Reports

StanCOG Overall Work Program Fiscal Year 2020/21

56

(022) Transportation Development Act (TDA) Fund Administration – Page 3

Products End Date LTF Supplemental Apportionments 09/2020 Transit Efficiency & Innovations Study Due to StanCOG Staff (draft) 09/2020 Transit Efficiency & Innovations Implementations 06/2021 Unmet Needs Transit Outreach and Public Hearing 11/2020 – 03/2021 TDA Funding Estimate for FY 2021/22 02/2021 Unmet Transit Needs Report and Final Determination 03/2021 TDA Report to State Controller 03/2021 Transit Cost Sharing Committee Meeting 04/2021 Policy Board Adopts FY 2021/22 Transit Claims 06/2021 Policy Board Adopts Apportionments for Other Purposes 06/2021 CTSA Annual Report 06/2021 Social Services Transportation Advisory Council Agendas and Minutes – Monthly 06/2021 TDA Task Force Meetings 06/2021 Implementation of Expected TDA Revisions Resulting from Task Force 06/2021 LTF staff reports to the Management and Finance Committee – Monthly 06/2021

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs Consultant

Costs STANCOG $255,813 $129,819

Total $255,813 $129,819

Staffing In Person Months STANCOG 5.2

StanCOG Overall Work Program Fiscal Year 2020/21

57

(029) REGIONAL BICYCLIST AND PEDESTRIAN SAFETY AND EDUCATION CAMPAIGN

PURPOSE Develop and implement a creative bicyclist and pedestrian safety education and encouragement campaign, a transportation safety summit, open streets events, and a planning and implementation toolkit to promote and increase the safe use of active transportation across Stanislaus County. BACKGROUND Stanislaus County is ranked among the most dangerous communities to drive, bike, or walk. According to the Office of Traffic Safety’s most recent statistics, the county ranks third-worst in the State of California in total crashes involving a fatality or injury and worse than its peers with respect to crashes involving pedestrians, bicyclists, and underage drinking. Additionally, the San Joaquin Valley (or portions thereof) is designated as extreme nonattainment with respect to Federal air quality standards for ozone, and nonattainment for particulate matter under 2.5 microns in diameter (PM2.5); and has a maintenance plan for particulate matter under 10 microns in diameter (PM-10)., therefore, Stanislaus County must reduce GHGs emitted from single-occupancy automobiles and promote active transportation options, including biking and walking. By increasing local knowledge and combatting misperceptions on proper traveling behavior, as well as building awareness about the many benefits of active transportation, the Regional Bicyclist and Pedestrian Safety and Education Campaign will increase awareness, empathy, and understanding toward active transportation to improve road safety and increase walking and bicycling rates across the region.

PREVIOUS WORK In 2016 StanCOG applied for a Caltrans’ Active Transportation Program (ATP) grant to implement a county-wide Bike Bicyclist and Pedestrian Safety and Education Campaign. The project did not receive the competitive grant award but was allocated funding through the 2017 MPO Cycle 3 Component of the ATP by the StanCOG Policy Board on October 11, 2017. In FY 18/19, StanCOG staff began meeting with local member agency staff and developed a scope of work, conducted bicyclist and pedestrian counts and prepared a Request for Proposal (RFP). In FY 19/20, StanCOG was allocated the ATP funds and staff issued the RFP, convened an evaluation committee, scored and shortlist firms based on the evaluation criteria listed in the RFP, conducted interviews with shortlisted firms, and executed a contract with the highest-scoring firm. The StanCOG Bicyclist and Pedestrian Education and Encouragement Safety Campaign is being managed by StanCOG staff. StanCOG staff has also convened and regularly met with a project advisory committee to guide and support the campaign. StanCOG staff and the consultant conducted focus group interviews with both English- and Spanish-speaking audiences, distributed public surveys, developed train-the-trainer session plans, identified sites both for Open Street events and a transportation safety summit, and worked with local firms and organizations to identify additional activities for each event. StanCOG staff also worked with consultant staff to develop creative advertising collateral for the campaign.

StanCOG has also submitted regular project progress reports to Caltrans per the SB1 Accountability and Transparency Guidelines.

DESCRIPTION OF WORK StanCOG staff will continue to manage the Bicyclist and Pedestrian Safety and Education Campaign and continue its coordination and project management meetings with the consultant, Project Advisory Committee and other

StanCOG Overall Work Program Fiscal Year 2020/21

58

(029) Regional Bicyclist and Pedestrian Safety Campaign – Page 2 standing committees that will provide input and guidance throughout the course of the project. Additionally, StanCOG will provide reporting and invoicing progress reports to Caltrans. StanCOG staff will review and finalize various deliverables during this period including the Open Street Event Summary Report, Active Transportation Toolkit, and the project’s Draft and Final Report. The Active Transportation Toolkit will summarize findings from the project in a case study format that will include stories of success and lessons learned throughout the process to inform future community activities. The toolkit will include maps, presentations, creative campaign examples, photographs, and fact sheets developed over the course of the project. At the conclusion of all project tasks, activities, and deliverables, a Final Report will be developed that documents the events held throughout the campaign and summarizes the stakeholders involved, the number of events held, residents who participated, and all outcomes associated with the project. In addition, the Final Report will include information that demonstrates the outcomes and impacts of the project. A separate Final Delivery Report will be developed per ATP guidelines that will include information that demonstrates the outcomes and impacts of the project. StanCOG staff will submit the Final Delivery Report to Caltrans. WORK ACTIVITIES 029.1 Project Management Meetings

029.2 Staff Reports

029.3 Open Streets Summary Report

029.4 Active Transportation Toolkit

029.5 Draft and Final Report

029.6 Invoicing

029.7 Quarterly Reports

029.8 Develop and submit Final Delivery Report to Caltrans

Products End Date Open Streets Summary Report 08/2020 Invoicing 09/2020 Quarterly Reports 09/2020 Project management meetings 09/2020 Active Transportation Toolkit 09/2020 Draft and Final Report 09/2020 Submit Final Delivery Report to Caltrans 10/2020 Staff Reports, as needed 06/2021

StanCOG Overall Work Program Fiscal Year 2020/21

59

(029) Regional Bicyclist and Pedestrian Safety Campaign – Page 3

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

ATP GRANT $52,386 $150,981 Total $52,386 $150,981

Staffing In Person Months STANCOG 1.4

StanCOG Overall Work Program Fiscal Year 2020/21

60

(200) SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 18/19 PROJECT 001: NON-MOTORIZED PLAN UPDATE PURPOSE Update the StanCOG Non-Motorized Transportation Plan to guide regional efforts to improve bicycling and walking conditions and support grant opportunities for local agencies. BACKGROUND The Stanislaus region is largely rural, with agricultural lands and open space. Its communities feature lower density development and in many cases are dispersed and disconnected. Residents overwhelmingly rely on automobiles and often drive themselves, contributing to increased traffic congestion, increased greenhouse gas emissions, and safety concerns for bicyclists and pedestrians. Facilitating the development of bicycle- and pedestrian-friendly infrastructure expands the community’s transportation options, helps curb GHG emissions, reduces congestions, and maintains Stanislaus’ unique community characteristics. To support compact, environmentally friendly growth patterns, the Stanislaus region requires a transportation system that provides safe and effective non-motorized transportation options. The NMTP will set goals, assess existing conditions, and identify opportunities to improve non-motorized travel options and increase access to public transportation with opportunities for public and stakeholder input throughout the process. It will identify and prioritize bicycle and pedestrian facilities that enhance regional connectivity and mitigate existing barriers such as railways, freeways, and waterways. PREVIOUS WORK In FY 2008/09, StanCOG adopted a Non-Motorized Transportation Plan (NMTP) and established the Bicycle and Pedestrian Advisory Committee (BPAC) to advise the StanCOG Policy Board on bicycle and pedestrian related issues. In FY 2012/13, the StanCOG Non-Motorized Transportation Plan was updated and adopted. In FY 18/19, StanCOG initiated an NMTP update. StanCOG staff conducted a kickoff and coordination meeting with Caltrans, issued an RFP to acquire the services of a qualified consultant, and selected a consultant to provide technical support to develop the NMTP. In FY 19/20, StanCOG staff held the NMTP project kickoff meeting with StanCOG staff, the consultant, and Caltrans. StanCOG staff coordinated and conducted bi-weekly project management meetings with the consultant. StanCOG launched a robust public outreach process by organizing pop-up booths at local events, distributing and analyzing a public-facing survey that solicited input on regional non-motorized transportation attitudes and needs, and published an interactive mapping tool on StanCOG’s website to highlight existing barriers and potential improvements to the regional non-motorized transportation network. StanCOG staff also presented draft goals and objectives and project updates to the Technical Advisory Committee, Bicycle/Pedestrian Advisory Committee, and Policy Board. Staff also reviewed consultant’s deliverables, including a regional and local plans and policies review, existing conditions assessment, and an analysis of the region’s non-motorized transportation gaps, barriers, and needs. Public outreach activities identified for the project include a community-wide online survey, stakeholder interviews, an online interactive web map, project promotion via a webpage and ongoing social media advertising, and 12 pop-up events. To date, StanCOG has completed 4 of the 12 pop-up events throughout the Stanislaus region, engaging more than 140 community members by leveraging attendance at existing local events and key activity centers. An online survey has been employed to ask Stanislaus residents for input on the same

StanCOG Overall Work Program Fiscal Year 2020/21

61

(200) SB1 Sustainable Communities Projects FY 18/19 – Page 2 topics as the pop-up input stations and garnered 195 responses. A series of 8 stakeholder interviews engaged more than 40 stakeholders representing the public, transportation and cycling advocates, and local jurisdiction representatives. Finally, as a follow-up to the stakeholder interviews, StanCOG employed an interactive web map that allowed participating stakeholders to identify locations where they enjoy walking and biking and where they are likely to avoid using active modes of transportation throughout the Stanislaus region. That activity generated more than 100 comments regarding active transportation needs. DESCRIPTION OF WORK StanCOG will continue to manage the NMTP and coordinate with the consultant and its standing advisory committees. Using the data gathered in previous tasks, StanCOG will identify alternative transportation strategies that reduce vehicles miles traveled (VMT) and GHG emissions and improve safety and mobility. Strategies will be considered that enhance non-motorized connectivity to affordable housing, employment centers, education opportunities, commercial and retail centers, healthcare facilities, public transit, and other origins/destinations. Strategies will also be considered to fill gaps in the non-motorized transportation system. The NMTP will include a financial element containing planning-level project cost estimates, available funding sources, and implementation timeframes. StanCOG’s public outreach approach was adjusted in light of the COVID-19 pandemic to employ virtual outreach events, where necessary and with Caltrans approval, to employ an online interactive web map, project promotion via a webpage and social media advertising, and virtual public engagement events. The remaining outreach for the NMTP will be held through online virtual public engagement that will permit the project to proceed without posing a public health risk due to COVID-19 and will provide an opportunity to broaden the project’s reach and capture perspectives from the public. StanCOG will transition the remaining 8 in person pop-up events into 6 virtual “pop-in” presentations and 2 virtual community dialogues. The dialogues will be held with local stakeholders, representatives of disadvantaged communities, members of community based organizations, and others to discuss the top 25 bike and pedestrian corridors identified by the project team. All remaining events will be delivered through a virtual meeting platform. The 6“pop-in” presentations will be conducted with community based organizations during one hour long virtual outreach meetings to provide an overview of the project, share project findings to date, and describe how the community can join a more in-depth discussion at the virtual community dialogues. The two virtual community dialogues will be 2-hour online events that will delve deeper and provide opportunities to discuss the details of the proposed Countywide improvements. Additionally, an online web map will permit the meeting participants and others to vote on non-motorized transportation priorities. The map will be accessible on StanCOG’s website and via social media. The methodologies, analyses results, findings and recommendations, as well as documentation of the public outreach effort, will be presented in an internal administrative draft NMTP and a public draft final NMTP. Additionally, StanCOG will prepare quarterly reports and process invoices throughout the project.

StanCOG Overall Work Program Fiscal Year 2020/21

62

(200) SB1 Sustainable Communities Projects FY 18/19 – Page 3 WORK ACTIVITIES 200.1 Staff coordination with project team and advisory committees

200.2 Conduct public outreach, including survey administration, promotion via a project website, and online engagement activities including virtual “pop-in” events and community dialogues

200.3 Identify and Prioritize Non-Motorized Transportation Strategies to address needs and develop a list of potential projects

200.4 Financial Analysis and Planning-Level Cost Estimates

200.5 Develop Administrative Draft, Draft Final, and Final StanCOG Non-Motorized Transportation Plan

200.6 Invoicing

200.7 Quarterly Reports

200.8 Staff Reports

Products End Date Non-Motorized Project Financial Analysis 09/2020 Non-Motorized Project Prioritization 09/2020 Draft, Draft Final and Final StanCOG NMTP 02/2021 NMTP Coordination and Project Management 02/2021 Invoicing 02/2021 Quarterly Reports 02/2021 Staff Reports, as needed 02/2021

Resources By Funding Agency Consultant

Costs SB1 SUSTAINABLE COMMUNITIES $161,013 STANCOG $20,861

Total $181,874

Staffing In Person Months STANCOG 0.0

StanCOG Overall Work Program Fiscal Year 2020/21

63

(201) SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 19/20

PURPOSE Develop a zero-emission vehicle (ZEV) infrastructure investment study for the Stanislaus region.

Support the implementation of recommendations derived from a transit efficiency and innovations study.

Support activities associated with the StanCOG Bike and Pedestrian Education and Encouragement Safety Campaign. BACKGROUND PROJECT 002: ZEV INFRASTRUCTURE INVESTMENT STUDY As demand for zero-emission vehicles (ZEVs) grows throughout California, so too does the need for infrastructure to fuel ZEVs. The Stanislaus region will be impacted by several external and internal pressures from the ZEV market. It lies between two burgeoning EV markets – the Fresno and Sacramento metropolitan areas – and contains State Route 99, through which nearly 10,000 commuters drive daily. Electrify America, a Volkswagen subsidiary, will invest up to $800 million across California to promote EVs and establish a system of EV charging networks, especially in metropolitan areas, through 2027. In 2018, Governor Brown issued Executive Order B-48-18, which called for 5 million zero-emission vehicles by 2030, and the installation of 250,000 electric vehicle chargers and 200 hydrogen refueling stations by 2025. At the same time, ZEV’s are growing more popular within the County. Nearly 1,200 Stanislaus County residents have registered ZEVs with the California Air Resource Board’s Clean Vehicle Rebate Project since 2010, and hundreds more are likely on the road. As consumers trend toward ZEVs, it is imperative that the region and StanCOG’s local member agencies be prepared for the unique infrastructural demands associated with widespread ZEV utilization.

PROJECT 003: TRANSIT EFFICIENCY AND INNOVATIONS STUDY IMPLEMENTATION StanCOG works closely with the four transit operators within Stanislaus County – Ceres Area Transit (CAT), Modesto Area Express (MAX), Turlock Transit, and Stanislaus Regional Transit, which serves Stanislaus County with Fixed Route, Dial-A-Ride, and Runabouts within the county. In the 2010 census, the population of Stanislaus County exceeded the 500,000-population threshold in TDA law, thus requiring transit operators serving the County to increase their farebox recovery ratios (FFR) by 10% (from 10% to 20%). As a result, despite attempts to optimize service, the transit operators in the County have struggled to meet their farebox recovery requirements, resulting in a lack of access to funding to maintain existing service.

PROJECT 004: BIKE AND PEDESTRIAN EDUCATION AND ENCOURAGEMENT SAFETY CAMPAIGN ACTIVITIES Stanislaus County is ranked among the most dangerous communities to drive, bike, or walk. According to the Office of Traffic Safety’s most recent statistics, the county ranks third-worst in the State of California in total crashes involving a fatality or injury and worse than its peers with respect to crashes involving pedestrians, bicyclists, and underage drinking. Additionally, the San Joaquin Valley (or portions thereof) is designated as extreme nonattainment with respect to Federal air quality standards for ozone, and nonattainment for particulate matter under 2.5 microns in diameter (PM2.5); and has a maintenance plan for particulate matter under 10 microns in diameter (PM-10)., therefore, Stanislaus County must reduce GHGs emitted from single-occupancy automobiles and promote

StanCOG Overall Work Program Fiscal Year 2020/21

64

(201) SB1 Sustainable Communities Projects FY 19/20 – Page 2

active transportation options, including biking and walking. By increasing local knowledge and combatting misperceptions on proper traveling behavior, as well as building awareness about the many benefits of active transportation, the Regional Bicyclist and Pedestrian Safety and Education Campaign will increase awareness, empathy, and understanding toward active transportation to improve road safety and increase walking and bicycling rates across the region. PREVIOUS WORK ZEV Infrastructure Investment Study

In 2014, the San Joaquin Valley Air Pollution Control District and the California Center for Sustainable Energy produced a report identifying optimal charging location stations within a half-mile of Highway 99 throughout the Central Valley and within significant cities, including the City of Modesto. To date, however, this project represents the most significant effort to evaluate the region’s overall EV readiness and supports the objectives of the RTP/SCS.

On July 1, 2019 The California Department of Transportation (Caltrans) awarded StanCOG FY2019/20 formula grant funds through the Sustainable Communities Program. StanCOG is using the formula funds from FY 2019/20 to develop the Zero Emission Vehicle (ZEV) Infrastructure Investment Study. StanCOG staff has conducted a kickoff meeting with Caltrans officials to review funding guidelines and invoicing practices. StanCOG staff also has developed and published a Request for Proposal for consultant services to assist with technical tasks associated with the project.

Transit Efficiency and Innovations Study Implementation

StanCOG secured a consultant through a competitive RFP process to complete a study that analyzes the transit operators throughout the county and provides solutions to maintain transit services. The study will analyze the performance and costs associated with the region’s paratransit services and fixed-route services, identify opportunities to integrate micro-transaction opportunities into the transit network, and develop recommendations to improve inter-agency efficiency and coordination and meet farebox recovery ratios. The project has been completed and the StanCOG Policy Board adopted the final plan document on October 23, 2019.

Bike and Pedestrian Education and Encouragement Safety Campaign Activities

In 2016 StanCOG applied for a Caltrans’ Active Transportation Program (ATP) grant to implement a county-wide Bike Bicyclist and Pedestrian Safety and Education Campaign. The project did not receive the competitive grant award but was allocated funding through the 2017 MPO Cycle 3 Component of the ATP by the StanCOG Policy Board on October 11, 2017. In FY 18/19, StanCOG staff began meeting with local member agency staff and developed a scope of work, conducted bicyclist and pedestrian counts and prepared a Request for Proposal (RFP). In FY 19/20, StanCOG was allocated the ATP funds and staff issued the RFP, convened an evaluation committee, scored and shortlist firms based on the evaluation criteria listed in the RFP, conducted interviews with shortlisted firms, and executed a contract with the highest-scoring firm. The StanCOG Bicyclist and Pedestrian Education and Encouragement Safety Campaign is being managed by StanCOG staff.

StanCOG Overall Work Program Fiscal Year 2020/21

65

(201) SB1 Sustainable Communities Projects FY 19/20 – Page 3

StanCOG staff has also convened and regularly met with a project advisory committee to guide and support the campaign. StanCOG staff and the consultant conducted focus group interviews with both English- and Spanish-speaking audiences, distributed public surveys, developed train-the-trainer session plans, identified sites both for Open Street events and a transportation safety summit, and worked with local firms and organizations to identify additional activities for each event. StanCOG staff also worked with consultant staff to develop creative advertising collateral for the campaign.

StanCOG has also submitted regular project progress reports to Caltrans per the SB1 Accountability and Transparency Guidelines.

DESCRIPTION OF WORK ZEV Infrastructure Investment Study

StanCOG will form and evaluation committee to review proposals, interview shortlisted firms, and award a contract to the highest-performing firm. StanCOG will hold a project kickoff meeting with the consultant to officially launch project activities. StanCOG will coordinate with the successful consultant through project management meetings to coordinate tasks, assign responsibilities, and ensure the timely production of all major deliverables. A ZEV infrastructure investment study will build upon the region’s earlier work with more detailed analysis to identify individual sites for proposed public infrastructure improvements, review ZEV-related policies and programs throughout the County, develop recommendations, and engage with regional stakeholders to determine the need for and locations of potential investments. The objectives of the study are to:

- Identify and evaluate current ZEV infrastructure throughout the county, including the locations of direct-current fast chargers and both Level 1 and Level 2 charging stations

- Identify and track key stakeholders through a stakeholder outreach list - Assess demand for ZEV infrastructure with available data and meaning public engagement - Connect the Stanislaus region to a growing statewide ZEV network and position it for future ZEV

investment opportunities - Identify sites for future ZEV infrastructure investment - Investigate site characteristics to determine site development needs and costs - Identify funding sources - Develop a financial plan and implementation strategy - Recommend investment strategies and sites to close network gaps, expand network access, and prepare

the region for further EV investment

StanCOG will procure a qualified consultant to complete the study through a competitive bidding process but will serve as the agency project manager and administrator. Findings and recommendations, including the public outreach results, will be presented at StanCOG committee meetings, Policy Board meetings, and in a final report document.

Transit Efficiency and Innovations Study Implementation

StanCOG staff will work to implement the recommendations identified in the final Transit Efficiencies and Innovations Study and adopted by the Policy Board. Potential recommendations include transit operator

StanCOG Overall Work Program Fiscal Year 2020/21

66

(201) SB1 Sustainable Communities Projects FY 19/20 – Page 4

consolidation, route realignment, elimination, or replacement, and incorporating new technologies and methodologies for ongoing evaluation of fixed route and demand response systems. Staff will coordinate with local transit operators, develop a timeline for proposed action items, and procure professional consultant services as needed to aid implementation activities.

WORK ACTIVITIES ZEV Infrastructure Investment Study

201.1 Caltrans coordination and kick-off meeting

201.2 Consultant Procurement

201.3 Project kick-off meeting

201.4 Development of ZEV Project Development Team

201.5 Stakeholder Outreach List

201.6 Regular project management and staff coordination meetings

201.7 Public outreach to identify needs, routes, and improvement locations

201.8 Develop regional ZEV growth projections and expected demand analysis

201.9 Assessment of existing ZEV infrastructure and investments

201.10 Map of prioritized ZEV infrastructure investment locations

201.11 Site characterization to identify development needs and costs

201.12 Development of a financial plan and implementation strategy

201.13 Administrative Draft, Draft Final, and Final ZEV Study

201.14 Invoicing

201.15 Quarterly Reports

Transit Efficiency and Innovations Study Implementation

201.16 Develop implementation plan, including proposed timeline for recommended action items

201.17 Consultant procurement as needed

201.18 Attend monthly coordination meetings with local transit operators

201.19 Staff reports

201.20 Invoicing

201.21 Quarterly Reports

StanCOG Overall Work Program Fiscal Year 2020/21

67

(201) SB1 Sustainable Communities Projects FY 19/20 – Page 5

Regional Bicyclist and Pedestrian Safety and Education Campaign

201.22 Project Management Meetings

201.23 Staff Reports

201.24 Open Streets Summary Report

201.25 Active Transportation Toolkit

201.26 Draft and Final Report

201.27 Invoicing

201.28 Quarterly Reports

201.29 Develop and submit Final Delivery Report to Caltrans

Products – Zero Emissions Vehicles End Date ZEV Study Consultant Procurement 10/2020 ZEV Project Kick-off Meeting 11/2020 ZEV Coordination and Project Management 06/2021 Quarterly Reports 06/2021

Products - Transit Efficiency and Innovations Study Implementation End Date Staff Reports, minutes from monthly meetings 06/2021 Invoicing 06/2021 Quarterly Reports 06/2021

Products - Regional Bicyclist and Pedestrian Safety and Education Campaign End Date Open Streets Summary Report 08/2020 Invoicing 09/2020 Quarterly Reports 09/2020 Project management meetings 09/2020 Active Transportation Toolkit 09/2020 Draft and Final Report 09/2020 Submit Final Delivery Report to Caltrans 10/2020 Staff Reports, as needed 06/2021

StanCOG Overall Work Program Fiscal Year 2020/21

68

(201) SB1 Sustainable Communities Projects FY 19/20 – Page 6

Funding by Project

FY 20-21

WE - Project

Resources By Funding Agency

Staff & Miscellaneous

Direct Costs Consultant

Costs

201.2 SB1 SUSTAINABLE COMMUNITIES $30,986 $177,060

201.2 STANCOG $4,014 $22,940

Total $35,000 $200,000

201.3 SB1 SUSTAINABLE COMMUNITIES $27,308

201.3 STANCOG $3,639 Total $30,947

201.4 SB1 SUSTAINABLE COMMUNITIES

201.4 STANCOG Total

Total $65,947 $200,000

Staffing In Person Months STANCOG 3.0

StanCOG Overall Work Program Fiscal Year 2020/21

69

(202) SB1 SUSTAINABLE COMMUNITIES FY 2020/21: TRANSIT TRANSITION PLAN PURPOSE StanCOG staff is responsible for collaborating with the region’s four transit operators from its member agencies, Ceres Area Transit (CAT), Modesto Area Express (MAX), Turlock Transit, and Stanislaus Regional Transit, which serves Stanislaus County with Fixed Route, Dial-A-Ride and Runabouts within the county. This includes technical and management staff in order to ensure the implementation of regional policies and transportation funding. In this capacity, StanCOG is further responsible for coordinating with the region's funding sponsor agencies such as the Federal Highways Administration (FHWA), Federal Transit Administration (FTA), and Caltrans. Furthermore, StanCOG staff facilitates public involvement by collaborating with various community groups and service agencies to identify transportation needs and solutions.

PREVIOUS WORK After a Request for Proposals (RFP) process was completed in September 2018, the StanCOG Policy Board awarded a contract with the consulting firm, McGuire Management Consultancy, to prepare an independent study of the transit systems in Stanislaus County. McGuire Management Consultancy teamed with Nelson\Nygaard Consulting Associates to focus on fixed route efficiencies and data management issues.

The Transit Efficiency and Integration Study was submitted and accepted by the StanCOG Policy Board October 23, 2019. Transit Consolidation was a key issue to be evaluated throughout the study. The analysis of all operations resulted in the recommendation for the formation of a Joint Powers Authority to consolidate all four operators into a single transit operating agency. A Joint Powers Authority would create a new transit agency with a dedicated transit policy Board. Consolidation of services would increase efficiencies for contract negotiations, standardize fares throughout the region and allow for more effective route planning and reduction of duplicated services. Additionally, the newly formed JPA would become responsible for meeting state and federal performance mandates, alleviating concerns faced by the current Transit Operators to meet the Fare Recovery Ratio, and remove potential Fare Box Recovery penalties from being imposed on local jurisdictions that are part of the JPA.

In FY 2019/20, StanCOG Policy Board directed staff to begin preliminary steps for full consolidation of the transit agencies in Stanislaus County. The contract with McGuire Management Consultancy was extended for a period of eighteen months with a target date for a new JPA of July 1, 2021. A working group consisting of both staff and Policy Board members has been formed to address each step during the process and make recommendations for consideration throughout the process for critical decisions that will be made as the project progresses.

Technical Memo #1 Progress Toward Agency Formation was completed in FY 2019/20.

DESCRIPTION OF WORK StanCOG staff will work with the consultant to support collection of documents and data from current transit agencies, coordinate Working Group meetings, maintain documentation of the process and provided updates as needed to the StanCOG Policy Board, planning groups, committees and/or City Councils. A number of work products will be prepared to support the transition process. They will take the form of a series of Technical Memos on specific implementation topics. These Technical Memos will be compiled into the final Transition Plan at the conclusion of the process. Certain of these Memos will serve as documentation of technical data or decisions regarding key implementation steps. Others will be provided to the StanCOG Policy Board for action

StanCOG Overall Work Program Fiscal Year 2020/21

70

(202) SB1 Sustainable Communities FY 2020/21: Transit Transition Plan– Page 2

to formalize certain policy decisions. All Technical Memo subjects and content are subject to refinement through the process as implementation decisions adjust overall direction.

A critical step in the transition process will be the preparation of a Regional Transit Plan. This Plan will contribute to the fulfillment of the region’s Sustainable Communities efforts through the identification of opportunities for much more efficient deployment of all transit assets in the region. This will include streamlining service to reduce transfer requirements, better use of physical assets including rolling stock and support facilities, implementation of system-wide passenger information and wayfinding materials to substantially improve the appeal of the transit system to the riding public and consequently increase transit usage with offsetting reduction in vehicular usage. Further contributing to the growth in transit usage will be the integration of the Altamont Corridor Express (ACE) into the local transit network. This advances directives to meet Green House Gas (GHG) requirements in the county to extend opportunities for multimodal transportation improvements within the region. As Stanislaus County emerges as a watershed for interregional travel, the full coordination of the local transit system with ACE is expected to be a major factor in reducing interregional vehicular traffic. The Regional Transit Plan will be the mechanism for defining and programming these system refinements. This will enhance mode shifts, provide recommendations for implementing operational efficiencies.

The formation of a new regional transit agency supported by the findings of the Regional Transit Plan will improve access to the system through the enhancements defined above. It is also expected to contribute to the economic viability of the area through improved access to employment, education, and other vital destinations. Finally, the new agency will be governed by a dedicated Board of Directors whose sole focus will be public transit in contrast to the current structure whereby local government jurisdictions manage transit among an entire array of other public services. The improved accessibility of the transit governing board will allow for much greater participation in transit decision-making by members of the community.

The Transit Transition Plan meets the objectives of the Sustainable Communities Grant in planning to advance the community’s efforts to reduce single occupancy vehicle trips and transportation that contribute to GHG. The transition to a new agency will contribute to this critical objective through strategies including advancing mode shift, improving operational efficiency, enhancing accessibility, and refining connections to future employment and land use.

The Regional Transit Plan will identify strategies to increase transit ridership and integration of transit, new emerging technologies and mobility services. The planning process will address all aspects of the transit system including fleet and facility needs, operating costs and revenues, and new transit services or projects. These elements will be incorporated into a fully integrated regional transit plan. This will provide transit-oriented development to benefit businesses and residents, low-income and disadvantaged communities within the region.

WORK ACTIVITIES 202.1 Facilitate meetings of the Transit Implementation Working Group and any subsequently established

advisory/planning groups or committees

202.2 Provide support to collect critical documents and information from local transit operators

202.3 Provide support for assembling materials needed for Working Group and Planning meetings

StanCOG Overall Work Program Fiscal Year 2020/21

71

(202) SB1 Sustainable Communities FY 2020/21: Transit Transition Plan – Page 3

202.4 Attend meetings of Working Group and Planning meetings with member agencies and public outreach

202.5 Organize public outreach efforts for transparency and public awareness with general public as changes are made to the transit systems

202.6 Prepare public notices as necessary

202.7 Make presentations and staff reports to the StanCOG Policy Board and member agencies for consideration for critical decisions throughout the process

202.8 Provide legal counsel to StanCOG Policy Board and staff regarding agency formation, jurisdiction relationships, and Joint Powers Authority (JPA) legal framework and authority

202.9 Develop criteria and prepare Request for Proposals for a Regional Transit Plan

202.10 Award Contract for Regional Transit Plan; provide technical assistance to the planning process to ensure full integration of all modes including local fixed route and dial-a-ride services with interregional service operated by ACE

202.11 Assist with formation of JPA for new consolidated agency

Products End Date Technical Memo #2: Issues of Local Control, Agency Governance 07/2020 Technical Memo #3: Financing of Administrative Functions 07/2020 Technical Memo #4: Regional Agency Staffing 07/2020 Technical Memo #5: Asset Management, Capital Plan 07/2020 Technical Memo #6: Regional Transit Agency Budget 07/2020 Technical Memo #7: Operating Contract Transition 08/2020 Technical Memo #8: Final Implementation Issues 10/2020 Transit Transition Plan 12/2020 Regional Transit Plan 06/2021 Bylaws of newly formed JPA 06/2021

Resources By Funding Agency

Staff & Miscellaneous

Direct Costs Consultant

Costs SB1 SUSTAINABLE COMMUNITIES $172,731 $119,515 STANCOG $22,379 $15,485

Total $195,110 $135,000

Staffing In Person Months STANCOG 8.9

StanCOG Overall Work Program Fiscal Year 2020/21

72

(204) SB1 SUSTAINABLE COMMUNITIES COMPETITVE PROJECTS FY 20/21: COMMUNITY TRANSPORTATION NEEDS ASSESSMENT

PURPOSE The Community Transportation Needs Assessment will be a community-driven study supported by robust public engagement that assesses transportation needs in two select areas of Stanislaus County’s unincorporated Disadvantaged Communities. The Needs Assessment will identify recommendations and needs for future investments that will increase mobility across all ages and abilities in Stanislaus County’s unincorporated communities. BACKGROUND Although the Census-Designated Places in the unincorporated County are home to between 9% and 10% of the Stanislaus region’s population, they have traditionally lacked significant investments in public infrastructure, especially to support alternative transportation modes. Many roadways in these communities lack sidewalks, ADA-compliant crosswalks, gutters, and/or bicycling infrastructure. They are bound by wide, high-speed thoroughfares, many of which serve as state routes with heavy freight and rail traffic, such as State Routes 132, 99, and 120. Consequentially, these communities are already among the most impoverished in all of California, have limited opportunities to walk or bike, and remain dependent on automobiles as their primary means of transportation. The built environment has contributed to high levels of obesity (per the Department of Public Health, Stanislaus County ranked 40th out of 44 measured counties) and low levels of active transportation. The infrastructure in these communities is crumbling, creating unsafe avenues even for drivers, who must contend with haphazard signage, cracking concrete, and unstriped roadways. Unlike traveling in a private vehicle, use of public transportation requires a significant amount of understanding, planning and coordination by the rider. This includes understanding what transportation services are available, when they operate and how to access them. This can sometimes present significant challenges for residents in disadvantaged communities. A safer, more usable transportation network will improve access to and incentivize the use of local and regional transit services that connect to the region's more urban employment centers, including Stanislaus Regional Transit and Modesto Area Express. PREVIOUS WORK In October of 2019, StanCOG staff submitted an application for the Sustainable Transportation Planning Grant. Award announcements are expected in Spring of 2020. DESCRIPTION OF WORK The proposed Community Transportation Needs Assessment include extensive public outreach to solicit input on conditions and needs to assess local roadway networks and will recommend strategies to address needs for the Disadvantaged Communities to promote bicycling and walking, increase mobility for all modes, remove transportation barriers, decrease transportation-related fatalities and injuries, and reduce greenhouse gas (GHG) emissions. The assessment will focus on two of the region’s most disadvantaged communities, which will be specified upon funding award. This planning effort will also coincide with and succeed StanCOG’s Non-Motorized Transportation Plan and Caltrans District 10’s Active Transportation Plan and build upon those efforts to identify potential future investments addressing the needs of the two Disadvantaged Communities in Stanislaus County. StanCOG will issue an RFP to obtain the services of a qualified consultant to support this work. StanCOG will oversee and review all deliverables associated with the Community Transportation Needs Assessment. StanCOG will coordinate with local agencies, stakeholders (including advocacy and special interest groups and the general public), and the project consultant(s) to maximize public participation and ensure project delivery within scope and budget. StanCOG will employ a competitive procurement process to acquire the services of a qualified consultant

StanCOG Overall Work Program Fiscal Year 2020/21

73

(204) SB1 Sustainable Communities Competitive Projects FY 20/21: Community Transportation Needs Assessment – Page 2

WORK ACTIVITIES 204.1 Caltrans Kick-off Meeting and Coordination

204.2 Community Transportation Needs Assessment Consultant Procurement

204.3 Consultant Kick-off Meeting

204.4 Project Coordination and Management Meetings

204.5 Develop Public Participation Plan

204.6 Invoicing

204.7 Submit Quarterly Reports to Caltrans

Products End Date Project Kick-off 09/2020 Consultant Procurement 12/2020 Consultant Kick-off Meetings 01/2021 Public Participation Plan 03/2021 Coordination and Project Management 06/2021 Invoicing 06/2021 Quarterly Reports 06/2021

FY 20-21

WE - Project Resources By Funding Agency

Staff & Miscellaneous

Direct Costs Consultant

Costs 204 SB1 SUSTAINABLE COMMUNITIES $42,322 $183,197 204 STANCOG $8,865 $23,735

Total $51,187 $206,932

Staffing In Person Months STANCOG 1.9

StanCOG Overall Work Program Fiscal Year 2020/21

74

(308) REGIONAL HOUSING NEEDS ALLOCATION (RHNA) PURPOSE To develop the Regional Housing Needs Allocation (RHNA) methodology and Regional Housing Needs Plan (RHNP).

BACKGROUND The Department of Housing and Community Development (HCD) uses Department of Finance (DOF) population projections to estimate the region’s anticipated housing needs and issues the RHNA Determination, which is the total number of units that jurisdictions within Stanislaus County must collectively plan for in their respective housing elements. Per State law (Government Code sections 65580 et seq.), MPOs must develop and adopt a methodology that allocates a portion of the Determination to each jurisdiction in the region. Once a RHNA methodology has been formally adopted, MPOs are required to develop and issue a RHNP that describes the RHNA process and officially assigns the RHNA allocations to each jurisdiction. The RHNP is required by law to further State housing objectives, which include:

1. Increasing the housing supply and the mix of housing types, tenure, and affordability in all cities and counties within the region in an equitable manner;

2. Promoting infill development and socioeconomic equity, the protection of environmental and agricultural resources, the encouragement of efficient development patterns, and the achievement of the region’s greenhouse gas reductions targets;

3. Promoting an improved intraregional relationship between jobs and housing; 4. Allocating a lower proportion of housing need to an income category when a jurisdiction already has a

disproportionately high share of households in that income category; 5. Affirmatively furthering fair housing.

The fifth cycle RHNP (2014-2023) was adopted in June 2014, and local jurisdictions are currently implementing their Housing Elements.

PREVIOUS WORK StanCOG last adopted a RHNA methodology and issued a RHNP to the region’s local jurisdictions on June 18, 2014, to coincide with the 2014 RTP/SCS. StanCOG staff has coordinated with local agency staff and attended meetings to determine uses for State funding, including SB2 Planning Grants and Regional Early Action Planning Program funds, intended to help meet upcoming Sixth Cycle allocations. DESCRIPTION OF WORK The sixth cycle RHNP will cover the years 2023-2031. The RHNP development process will begin in 2020 and is anticipated that the RHNP will be taken to the Policy Board for consideration of adoption in June 2022. Valley Vision Stanislaus (VVS), was established in to serve as the committee for RTP and RHNA development. The VVS will reconvene for this planning effort and will meet regularly to discuss housing-related legislative changes, identify and compile available population- and housing-related data throughout the region, determine opportunities and barriers to housing production, and coordinate housing-related planning activities. The group will collectively complete the required RHNA Planning Factors survey to be incorporated into the draft RHNA methodology.

StanCOG Overall Work Program Fiscal Year 2020/21

75

(308) Regional Housing Needs Allocation (RHNA) – Page 2

StanCOG will procure the services of a qualified consultant to collect and analyze housing-related data and utilize RHNA Planning Factor survey responses to develop a RHNA methodology in coordination with the VVS. The consultant and StanCOG staff will consult with HCD to resolve any discrepancies between the RHNA Determination and StanCOG Regional Demographic Growth Forecast to be included in the 2022 Regional Transportation Plan/Sustainable Communities Strategies.

StanCOG staff will present updates to its standing advisory committees, Policy Board, and member jurisdiction City Councils, as needed throughout the RHNA methodology and RHNP development process. As required by State law, a public hearing on the draft RHNA methodology will be held prior to adoption.

WORK ACTIVITIES 308.1 Regular meetings with Valley Vision Stanislaus committee.

308.2 Staff reports to Valley Vision Stanislaus, StanCOG standing committees, Policy Board, and member jurisdiction City Councils or Board of Supervisors

308.3 Regular consultation and coordination with HCD

308.4 Local Agency RHNA Planning Factors Survey

308.5 Develop Draft

308.6 Hold Public Hearing on Draft RHNA Methodology

Products End Date

Valley Vision Stanislaus Staff Reports and Meeting Minutes 06/2021 Local Agency RHNA Planning Factors Survey 06/2021 Other committee Staff Reports and presentations 06/2021 Draft RHNA Methodology 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

SJV REAP HOUSING $47,805 $200,000 Total $47,805 $200,000

Staffing In Person Months STANCOG 2.5

StanCOG Overall Work Program Fiscal Year 2020/21

76

(322) TRANSPORTATION DEMAND MANAGEMENT (TDM) PURPOSE StanCOG’s Transportation Demand Management (TDM) program aims at reducing the dependence on motorized travel, particularly single occupancy vehicles, on the transportation network. This program helps address some of the region’s biggest concerns, such as traffic congestion, air quality, livable communities, public health, dependence on fossil fuels, environmental health, climate change, and greenhouse gas (GHG) emissions. PREVIOUS WORK StanCOG staff continued management and administration of the San Joaquin Council of Governments contract, which implements the Stanislaus Region’s TDM program, known as the Dibs (formerly called Commute Connection). Staff participated in bi-monthly project meetings with Dibs staff to better coordinate services in the region and attended local events as needed to help promote program involvement. Staff also participated in monthly CalVan’s Board Meeting and Technical Advisory Committee meetings. DESCRIPTION OF WORK There are effective, alternative options to highway capacity expansion for relieving traffic congestion and meeting increased travel demand. StanCOG’s TDM program increases system efficiency by managing and reducing single-occupancy vehicle trip demand and maximizing the movement of people and goods. TDM strategies include regional ridesharing programs, such as carpooling and vanpooling, promoting alternative work schedules, travel-time shifting (out of the peak period), telecommuting and increasing bicycle, pedestrian, and transit use. StanCOG's TDM program is designed to provide commuters convenient alternatives to driving alone such as promoting the use of carpooling, vanpooling, bicycling, walking or riding mass transit. The mission of the program is to help reduce traffic congestion and emissions while improving public health and promoting livable communities, and transportation network safety. The program includes free services such as a commuter ride-matching database, the Guaranteed Ride Home Program, Employer promotional support services, and annual campaigns, such as Rideshare Week and Bike to Work Week. Dibs serves Stanislaus, Merced, and San Joaquin counties. StanCOG staff will continue to participate in bi-monthly project management meetings with Dibs staff, and support outreach efforts to promote ride-share options in the County. The TDM program includes a new monthly subsidy for the vanpool program. A vanpool is a group of up to 15 people who lease a van for the purpose of commuting to and from work together and live at least 20 miles from their workplace. StanCOG provides riders with a monthly subsidy to help offset any cost incurred when leasing the vans. As an incentive to increase theuse of the vanpool program improving reduction of greenhouse gas emissions. In addition to the vanpools offered through Dibs, vanpools will now also be offered through CalVans. This will add another non-exclusive option to the current vanpool provider pool through the CalVans’ Farmworker Vanpool and General Public Vanpool programs. Staff will continue to participate in CalVans monthly Board meetings and Technical Advisory meetings and provide management and administrative support to CalVans staff. WORK ACTIVITIES 322.1 Management and Administrative Support for Dibs and CalVans

322.2 Community and Employer Outreach

StanCOG Overall Work Program Fiscal Year 2020/21

77

(322) Transportation Demand Management (TDM) – Page 2

322.3 Staff participation in annual Rideshare Week and Bike to Work Week events

322.4 Promotion of Transportation Alternatives

322.5 Education and Marketing of Service

322.6 Regional Policy Development

322.7 Participate in bi-monthly Dibs project management meetings

332.8 Provide information for meetings and presentations to the public/stakeholder, the StanCOG Policy Board, member jurisdictions, transit operators, and county transportation agencies regarding TDM programs

322.9 Participate in CalVans monthly meetings and coordinate with Calvans to ensure promotion of the program within Stanislaus County

322.10 Provide information for meetings and presentations to the public/stakeholder, the StanCOG Policy Board, member jurisdictions, transit operators, and county transportation agencies regarding CalVans programs

322.11 Prepare and present staff reports

Products End Date Quarterly Rideshare Program Assessment 06/2021 Presentations/Staff Reports to StanCOG Policy Board and Committees 06/2021 Community/Employer Outreach 06/2021 Education/Promotion/Marketing of Services 06/2021 Participation and publicizing events (e.g. annual campaigns such as Rideshare Week and Bike to Work Week) 06/2021 Bi-monthly Project Management Meetings 06/2021 Monthly CalVans Board and Technical Advisory Committee Meetings 06/2021

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

Toll Credit Match

CMAQ $27,446 $354,629* $15,807 STANCOG $3,556 $28,091

Total $31,002 $382,720 $15,807 *Dibs

Staffing In Person Months STANCOG 0.4

StanCOG Overall Work Program Fiscal Year 2020/21

78

(332) STATE TRANSPORTATION IMPROVEMENT (STIP) PROJECT DELIVERY PURPOSE To manage State Transportation Improvement Program project deliveries. PREVIOUS WORK StanCOG prior work on regionally significant projects includes the following:

• Oversight of the SR 132 West Expressway Project • Oversight, as the ex-officio member, of the North County Corridor – JPA (Cities of Modesto, Riverbank,

Oakdale, and Stanislaus County) • Oversight of the McHenry Avenue Widening from Ladd Road / Patterson Road (State Route 108) to south

end of the McHenry Bridge Project

DESCRIPTION OF WORK StanCOG continues to work cooperatively with Caltrans and local agencies to assist in the project delivery construction of major transportation projects, specifically those state highway projects that are funded through the State Transportation Improvement Program (STIP). In 2008-09, StanCOG embarked on two very important, interregional projects based on the information developed in the completed SR-132 East / West Connectivity Feasibility Study and the North County Corridor Feasibility Study. The SR 132 West Freeway/Expressway PS&E and PA/ED phases are complete and construction of phase 1 has begun. The North County Corridor project is in the final stage of PA/ED with PS&E in development. WORK ACTIVITIES 332.1 Participation in JPA and PDT Meetings

332.2 Review project costs, technical materials and other work products

332.3 Staff Reports

Products End Date Regular project status reports – As Needed 06/2021

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs STATE PPM $20,000 STANCOG $15,729

Total $35,729

Staffing In Person Months STANCOG 2.0

StanCOG Overall Work Program Fiscal Year 2020/21

79

(336) PAVEMENT MANAGEMENT PROGRAM (PMP) PURPOSE Pavement Management is the process of planning the maintenance and repair of a network of roadways or other paved facilities in order to optimize pavement conditions over the entire network. A pavement management program is a systematic method of inspecting and rating the pavement condition in a given area. The program performs cost effectiveness analysis of various maintenance and rehabilitation strategies, which assists jurisdictional staff in making the best decision on use of available resources. The overall purpose of the program is to keep up with maintaining and rehabilitating assets to maximize their lifespan in a cost-efficient manner. PREVIOUS WORK A county-wide pavement survey (visual field inspection) was completed in 2013 using specialized equipment which evaluated the condition of all street pavement within Stanislaus County. This information was used to analyze where pavement management funds should be spent to gain the most long-term benefit. DESCRIPTION OF WORK StanCOG will coordinate with its member jurisdictions to conduct a pavement survey. The work will include visual field inspections, rating of specific segments of streets and collection of that data into a preferred database. Street conditions are rated into four classes: excellent/very good; good; fair/poor; very poor/failed. The results are ranked on a Pavement Condition Index where 100 would be excellent and 0 would be failing. After field inspections and data collection is complete, the information will be documented in a Pavement Management Plan Final Report. The report shall include the pavement network and current condition, budget information, potential budget scenarios, maintenance practices, GIS maps and conclusions of the report. WORK ACTIVITIES 336.1 Coordination with local jurisdictions

336.2 Prepare and issue a Request for Proposal

336.3 Scoring and reviewing Request for Proposal

336.4 Prepare related Staff Reports

336.5 Manage consultant contract

336.6 Pavement Management Report Development and Review

336.7 Pavement Data and GIS Maps

Products End Date

Staff Reports 06/2021 Prepare and issue Request for Proposal 07/2020 Proposal Evaluation 08/2020 Pavement Management Plan Draft and Final Reports 06/2021 Pavement Data and GIS Maps 06/2021

StanCOG Overall Work Program Fiscal Year 2020/21

80

(336) Pavement Management Program (PMP) – Page 2

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs Consultant

Costs OTHER LOCAL $600,000 STANCOG $22,079

Total $22,079 $600,000

Staffing In Person Months STANCOG 0.8

StanCOG Overall Work Program Fiscal Year 2020/21

81

(388) SAN JOAQUIN VALLEY (SJV) RURAL TRANSIT ALTERNATIVES / VALLEY FLEX PILOT

PURPOSE California’s Senate Bill 535 directs 25% of the money from the Greenhouse Gas (GHG) Reduction Fund (cap and trade) to projects that benefit disadvantaged communities. In response to this legislation and in an effort to cost effectively expand low-carbon transportation options in disadvantaged rural communities, the eight San Joaquin Valley MPOs are working in partnership with the Institute of Transportation Studies at UC Davis to develop a pilot program that leverages new shared-use mobility services (such as ride-sourcing, ridesharing, car sharing, ride-hailing and bike sharing) to enhance and/or complement traditional fixed-route and Dial-A-Ride (DAR) transit serving rural disadvantaged communities. The San Joaquin Valley faces three key challenges that result from the high cost of providing transit services to low density populations that span large geographic areas: (1) no transit service, (2) infrequency of fixed route service, and (3) difficulty accessing high quality transit service. Many areas offer DAR transit to meet the most basic needs of residents who, due to a physical or mental disability, are unable to use traditional fixed route transit service; however, the cost of such services in some areas is extremely high. There is a demand for more frequent and extended service hours to meet the needs of students, workers, and persons with disabilities throughout the region. PREVIOUS WORK The SJV Rural Transit Alternatives Study was initiated in 2016 to explore new shared-use mobility options to address these challenges. These options include Transportation Network Companies (TNCs) like Uber and Lyft, shared TNCs (e.g., UberPool and Lyft line), peer-to-peer ridesharing, car sharing, bike sharing, and microtransit. During Phase I of the study, an initial analysis was undertaken of new mobility conceptual programs that could be applied to specific communities in the San Joaquin Valley to reduce costs, better meet the travel needs, and reduce GHG emissions (phase 2 of the project). Other StanCOG supported activities included:

1. Identification of rural disadvantaged census tracts in each county; 2. Focus group meetings to learn about technology barriers; 3. Interviews of new mobility vendors and agencies that are piloting relevant programs to obtain detailed

information on the requirements and feasibility of alternative concepts; 4. Stakeholder interviews to determine if there is institutional support for new mobility programs, 5. Identification of potential pilot locations and technology driven transit alternatives for implementing new

mobility alternatives; 6. Development of an existing conditions report (the Rural Transportation Needs and Opportunities for

Shared-Use Mobility) identifying the demographic and travel characteristics of rural disadvantaged communities in the San Joaquin Valley; and

7. Supported development of a California Air Resources Board (CARB) Mobility Options Grant application.

As a member of the project’s Technical Advisory Committee, StanCOG provided continued technical support to the Institute of Transportation Studies at UC Davis in their development of a detailed plan for a technology driven, shared-access-pilot program, known as Valley Flex, to address the needs of specific communities or sub-regions in the San Joaquin Valley.

StanCOG Overall Work Program Fiscal Year 2020/21

82

(388) San Joaquin Valley (SJV) Rural Transit Alternatives / Valley Flex Pilot– Page 2

The study team, with the San Joaquin Valley Air Pollution Control District as the lead agency, submitted an application with a request for $2.25 million in funding from the California Air Resources Board for Fiscal Year 2016-2017 Car Sharing Pilot Project (referred to as Miocar) and Mobility Options Pilot Project (referred to as Valley FLEX) and was selected for an award. The Valley Flex pilot project launched operations in Spring 2019 with a smartphone-enabled application, VAMOS, that provides smart-travel options to plan inter-and intra-county fixed-route trips across San Joaquin and Stanislaus counties. In December 2019, the program began offering volunteer ride-hailing services, VOGO, to conduct first-and last-mile trips to residents in and around Riverbank area without replacing existing public transit services. UC Davis was able to secure additional gap funding through CARB to extend the Vamos and VOGO pilot through December 2020. StanCOG and UC Davis continue to seek additional funding opportunities to expand the Valley Flex initiatives further into Stanislaus County. In 2019 StanCOG provided technical support for a grant application to FTA’s Integrated Mobility Innovation Demonstration Program to support the expansion of Miocar into the Stanislaus region. Staff participated in community outreach meetings to promote and encourage the use of both the smartphone application and volunteer driving pilot program. Staff also participated in monthly project management meeting with key partners and member agencies. DESCRIPTION OF WORK Through extensive public and stakeholder outreach, StanCOG will encourage and promote the use of VAMOS and VOGO. StanCOG staff will continue to seek additional funding opportunities to support the expansion of Miocar into the Stanislaus region. StanCOG will continue to provide technical assistance, coordinate with Stanislaus MOVE and other project partners, to support the pilot projects throughout development and implementation. WORK ACTIVITIES 388.1 Participate in Technical Advisory Committee Meetings

388.2 Review Work Products

388.3 Provide pilot project implementation support

388.4 Conduct Public and stakeholder outreach

388.5 Prepare and Present Staff Reports

388.6 Provide StanCOG standing committees and the Policy Board with biannual updates

338.7 Participate in Monthly Project Management Conference Calls

338.8 Identify and Pursue funding opportunities to support Valley Flex initiatives in Stanislaus County

338.9 Identify and Pursue funding opportunities to expand Miocar pilot project to Stanislaus County

StanCOG Overall Work Program Fiscal Year 2020/21

83

(388) San Joaquin Valley (SJV) Rural Transit Alternatives / Valley Flex Pilot– Page 3

Products End Date Valley Flex Pilot- Valley wide Coordination 06/2021 Technical Advisory Committee Meetings 06/2021 Pilot Project Implementation 06/2021 Staff Reports – As Needed 06/2021

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs STANCOG $19,025

Total $19,025

Staffing In Person Months STANCOG 1.0

StanCOG Overall Work Program Fiscal Year 2020/21

84

(401) LOCAL TRANSPORTATION AUTHORITY (MEASURE L) PURPOSE Continued establishment of project operational details and implementation of Measure L – Local Roads First Transportation Funding and the related Expenditure Plan that guides the utilization of the one-half of one percent retail transactions and use tax that was approved by the Stanislaus County voters in November 2016. BACKGROUND Measure L – Local Roads First Transportation Funding passed on November 8, 2016. It achieved 71.95% voter approval. This measure provides for the implementation of the Expenditure Plan, as approved and adopted by StanCOG, which results in countywide local street and road improvements, arterial street widening, signalization, bicyclist, pedestrian, and driver safety, regional projects, and transit improvements. These needed improvements are funded by a one-half of one percent retail transactions and use tax established for a 25-year period. The Operative date of this Measure is April 1, 2017 and expires on March 31, 2042. Over the course of the 25-year Expenditure Plan, it is conservatively estimated that $960 million dollars will be generated to transportation investments throughout Stanislaus County. This funding serves as an investment that leverages future local, State, and Federal grant opportunities. Funds are being used for all phases of project implementation, including: planning, environmental, and design, right-of-way, and/or construction capital and operations projects. PREVIOUS WORK StanCOG provided the necessary documents and contracted with the State Board of Equalization to perform all functions for the administration and operation of this Measure. In November 2017, Measure L Policies & Procedures were developed, adopted and implemented to provide guidance for administering funds from the ordinance. Master Funding Agreements with member agencies were developed, approved and implemented by the StanCOG Policy Board. Funds to member agencies were distributed in accordance with the ordinance and Measure L Policies & Procedures. The Citizen’s Oversight Committee, which was formed in 2017, continued with their quarterly meeting schedule to receive status updates on the progress of projects throughout the region and funding reports. The Measure L Oversight Committee (MLOC) provides an enhanced level of accountability for expenditures made with Measure L sales tax funds to ensure that voter mandates are carried out as intended. A 10-year Measure L Strategic Plan was implemented to prioritize projects and maximize funding opportunities for local projects. The Measure L Strategic Plan was adopted on March 29, 2018 and is to be updated at least every two years. In FY2018/19, Regional Projects Policies & Procedures were developed, and the Strategic Plan was updated. In September 2018, a new Measure L website was created with information regarding projects, programs and actions taken as part of the implementation of Measure L. The link to Measure L website is: http://stanislausmeasurel.com/ In December 2018, the first FY 2017/2018 Measure L Annual Report was completed that identifies the actions and accomplishments of the Authority in meeting the adopted Expenditure Plan.

StanCOG Overall Work Program Fiscal Year 2020/21

85

(401) Local Transportation Authority (Measure L) – Page 2 DESCRIPTION OF WORK StanCOG, as the Regional Transportation Planning Agency is responsible for administering the Measure L and the related Expenditure Plan. StanCOG’s responsibility is to ensure that funds are apportioned, allocated and expended according to Measure L Provisions and the Expenditure Plan. WORK ACTIVITIES 401.1 Program FY 2020/21 funding updates to the Measure L Expenditure Program and to the 2019 Federal

Transportation Improvement Program

401.2 Review/Update Strategic Implementation Plan in the Spring of 2021

401.3 Administer funds through the approved process to apportion and allocate local controlled funds to the 9 cities and Stanislaus County according to Measure L and Expenditure Plan

401.4 Review and Update Measure L Project reporting process to ensure the 9 cities and Stanislaus County expend the funds according to Measure L and the Expenditure Plan

401.5 Administer funds through the approved process to apportion and allocate funds to member agencies with cooperative agreements for programs and projects associated to Measure L

401.6 Review periodic reports submitted by all agencies to tracking projects, costs, timelines and completion dates

401.7 Update Measure L’s website with information regarding projects, programs and actions taken as part of the implementation of Measure L

401.8 Provide staff support for the Measure L Citizen Oversight Committee

401.9 Obtain a Measure L and related Expenditure Plan independent audit

401.10 Prepare a Measure L Project Delivery Policy for Regional, Rail, and Community Connection

projects included in the Measure L Expenditure Plan

401.11 Prepare staff reports

Products End Date

Citizen’s Oversight Committee Meetings – Quarterly 06/2021 Update Measure L Strategic Plan – Annually 04/2021 Report to Policy Board on Funds Disbursed – Quarterly 06/2021 Review Reports for the 10 Agencies – Monthly 06/2021 Measure L Audits - Annually 03/2021 Measure L Annual Report – Annually 06/2021 Measure L Cooperative Agreements 06/2021

StanCOG Overall Work Program Fiscal Year 2020/21

86

(401) Local Transportation Authority (Measure L) – Page 3

Resources By Funding Agency

Staff & Miscellaneous Direct Costs

Consultant Costs

LTA - MEASURE L $684,100 $40,000 Total $684,100 $40,000

Staffing In Person Months STANCOG 27.5

StanCOG Overall Work Program Fiscal Year 2020/21

87

(499) LEGISLATIVE PROGRAM PURPOSE To brief State and Federal legislators on matters related to transportation, air quality and various other regional issues, and to allow for Policy Board and StanCOG staff representation at Federal, State and Valley-wide conferences and meetings to further transportation planning and funding knowledge. PREVIOUS WORK

• StanCOG attendance at National Association of Regional Councils Conferences (NARC) • CalCOG meetings and conferences • StanCOG delegates to One Voice Washington D.C. • StanCOG delegates to One Voice Sacramento • Planning Directors Workshop • San Joaquin Valley Policy Conferences • San Joaquin Valley Coordinator Contract

DESCRIPTION OF WORK Participate in annual conferences, events, meetings, and activities regarding federal and state transportation issues in order to enhance knowledge of topics that impact the Stanislaus region. WORK ACTIVITIES 499.1 Professional organization conferences and meetings

499.2 National and State Conferences

499.3 One Voice Program – Washington D.C.

499.4 Valley Voice Program – Washington D.C.

499.5 Valley Voice Program – Sacramento

Products End Date

Professional organization conferences and meetings – Monthly 06/2021 Memberships to professional organizations – Annual 06/2021 National and State Conferences – Annual 06/2021 Valley Wide Coordinator – Annual 06/2021

Resources By Funding

Agency Staff & Miscellaneous

Direct Costs STANCOG $768,005

Total $768,005

Staffing In Person Months STANCOG 7.5

StanCOG Overall Work Program Fiscal Year 2020/21

88

(500) OTHER REGIONAL PLANNING ACTIVITIES IN THE STANISLAUS AREA PURPOSE This work element provides additional information on StanCOG’s regional and interregional planning activities dealing with transportation and air quality in coordination with other agencies, which are not already covered under other Work Elements. PREVIOUS WORK Work activities included are active and continuous. DESCRIPTION OF WORK This work element summarizes other regional planning activities in the Stanislaus area, although these activities are not under the direct administration of StanCOG. See also WE 023 and WE 410 of this Overall Work Program for discussion of Valley-wide studies and issues. WORK ACTIVITIES 500.1 ACE TRAIN EXTENSION INTO STANISLAUS COUNTY

The State of California has provided partial funding to extend the ACE train service to Modesto. Discussion will continue with the San Joaquin Regional Rail Commission, the State of California, the Union Pacific (UP), the County of Stanislaus and local cities, and other involved parties (including StanCOG) in FY 2020/21

500.2 CALIFORNIA PARTNERSHIP FOR THE SAN JOAQUIN VALLEY

The California Partnership for the San Joaquin Valley brings state agency secretaries and San Joaquin Valley representatives together to make recommendations to the Governor regarding changes that would improve the economic well-being of the Valley and the quality-of-life to its residents

The major goals of the Partnership are:

• Identify projects and programs that best utilize public dollars and most quickly improve the economic vitality of the Valley

• Work with members of the state’s Congressional delegation and federal officials • Partner with University of California, California State University, community colleges, and the state’s

other research and educational institutions, as well as private foundations • Review state policies and regulations to ensure they are fair and appropriate for the state’s diverse

geographic regions • Recommend to the Governor changes that would improve the economic well-being of the Valley and

the quality-of-life of its residents

StanCOG Overall Work Program Fiscal Year 2020/21

89

APPENDIX I - STANCOG BOARD MEMBERS, COMMITTEES AND STAFF

City of Ceres Mayor Javier Lopez City of Turlock Councilmember Pam FrancoCity of Hughson Mayor George Carr City of Waterford Mayor Jose AldacoCity of Modesto Councilmember Jenny Kenoyer Stanislaus County Supervisor Vito Chiesa*City of Modesto Councilmember Tony Madrigal Stanislaus County Supervisor Buck ConditCity of Modesto Councilmember Bill Zoslocki* Stanislaus County Supervisor Chance ConditCity of Newman Councilmember Nick Candea Stanislaus County Supervisor Mani GrewalCity of Oakdale Councilmember Ericka Chiara* Stanislaus County Supervisor Terry Withrow**City of Patterson Mayor Dennis McCord Caltrans (Ex-Officio) Dennis Agar, District 10 City of Riverbank Mayor Richard O'Brien**Executive Committee Member**Public Transit Provider Representative

City of Ceres Tom Westbrook City of Patterson Ken IrwinCity of Hughson Merry Mayhew City of Riverbank Sean ScullyCity of Modesto Joe Lopez City of Turlock Gary HamptonCity of Newman Michael Holland City of Waterford Mike PitcockCity of Oakdale Bryan Whitemyer Stanislaus County Raul Mendez

Representing Hughson Stephen Qualls Representing Riverbank John DinanRepresenting Modesto Sue Stevens Representing Stanislaus County Lana MooreRepresenting Oakdale Lee Adams Representing Turlock Elizabeth ClaesRepresenting Patterson Zach Keller

City of Ceres City of Oakdale Stanislaus County Sara Lytle-Pinhey (LAFCO)City of Hughson City of Patterson City of Waterford John Beckman (Building Industry) City of Modesto City of Riverbank Chris Esther (CAC) Edgar Garibay (Environmental Justice)City of Newman City of Turlock Mayor Richard O'Brien (Policy Board)

Stacie Morales MOVE George Sharp Transit RiderLillian Castigliano Commission on Aging Carla Strong Howard Training CenterAdam Barth Transit OperatorsMohamed Rashid DRAIL

City of Ceres Vacant City of Patterson Peter La Torre Jr.City of Hughson Mike Day City of Riverbank Cary PopeCity of Modesto Craig Lewis City of Turlock Joel BernardCity of Newman Vacant City of Waterford VacantCity of Oakdale William Bowker Stanislaus County Roman Acosta

BICYCLE PEDESTRIAN ADVISORY COMMITTEE (BPAC)Representing Hughson Minn Thein Representing Riverbank Jim DosenbachRepresenting Modesto Kyle Fliflet Representing Turlock Ann StrahmRepresenting Oakdale Larry White Representing Waterford Kari CaseyRepresenting Patterson Shivaugn Alves Representing Stanislaus County John Gerling

MANAGEMENT AND FINANCE COMMITTEE (MFC)

CITIZENS ADVISORY COMMITTEE (CAC)

POLICY BOARD

VALLEY VISION STEERING COMMITTEE (VVS)

SOCIAL SERVICES TRANSPORTATION ADVISORY COUNCIL (SSTAC)

MEASURE L OVERSIGHT COMMITTEE (MLOC)

StanCOG Overall Work Program Fiscal Year 2020/21

90

Rosa De León Park Executive Director Lydia Worden Sr. Financial Services SpecialistMonica Streeter General Counsel Stephanie Mora Financial Services Specialist IIKaren Kincy Manager of Financial Services Isael Ojeda Senior PlannerCindy Malekos Manager of Administrative Services Vacant Senior PlannerElisabeth Hahn Deputy Director of Planning & Programming Melany Arriola Assistant PlannerVacant Principal Planner Samuel Becker Assistant PlannerVacant Executive Management Analyst Debbie Trujillo Assistant PlannerJosephine Oshana Executive Administrative Assistant Vacant Assistant PlannerCarla Alviso Administrative Assistant Edith Robles Assistant PlannerVacant Administrative Clerk Vacant Planning Technician

CURRENT STANCOG STAFF TITLES

StanCOG Overall Work Program Fiscal Year 2020/21

91

APPENDIX II – OWP TABLE A – FUNDING SOURCES FY 2020/21

Part I

APPENDIX II OWP TABLE A FUNDING SOURCES

FISCAL YEAR 2020/21 Formal Amendment #3

TC = Toll Credit Match Work ElementLM = Local Match

Total STBGP TC

Match CMAQ TC

Match CMAQ

Carryover LM METRO TRANSPORTAION PLANNING012 Public Involvement 332,141 133,511 195,630 - - - - - - - - 021 OWP 86,734 - - - 14,990 - 70,744 - - - - 023 MPO Coordination 179,349 - - - - - - 158,778 - - - 026 Interregional Bicycle Tourism Plan 32,077 - - - - - - - - - - 113 Transportation Modeling and GIS 354,934 26,765 - - 208,165 - 14,530 - - - - 203 FY 20-21 SB1: Human Services Coordination Plan 297,853 - - 261,031 - - - - - - - 300 RTP 1,376,520 10,871 73,308 - 99,928 486,915 512,413 - - - - 302 Environmental Justice 66,875 50,275 16,600 - - - - - - - - 321 Transit 65,058 26,421 30,637 - - - - - - - - 323 JARC 176,328 - - - - - - - 176,328 - - 330 TIP 447,790 - - - 287,790 - - - - 150,000 - 338 Performance Based Planning 24,490 - 12,017 - - - 12,473 - - - - 410 Air Quality 112,549 - - - - - - - - - - 411 Congestion Mgmt Process 5,388 - - - - 4,770 - - - - - CONSOLIDATED REGIONAL PLANNING013 Abandoned Vehicle Abatement 8,969 - - - - - - - - - - 022 TDA Admin 385,633 - - - - - - - - - - 029 Regional Bicylst and Pediestrian Safefy and Educati 203,367 - - - - - - - - - - 200 FY18-19 SB 1 Sustainable Communities 181,874 - - - - - - - - - - 201 FY19-20 SB 1 Sustainable Communities 265,947 - - - - - - - - - - 202 FY20-21 SB 1 Sustainable Communities 330,110 - - - - - - - - - - 204 FY 20-21 SB1: Community Transportation Needs 258,119 - - - - - - - - - - 308 Regional Housing Needs 248,747 - - - - - - - - - - 322 Transp. Demand Mgmt 413,722 - - - - - - - - - 137,809 244,266 332 STIP Project Delivery 35,729 - - - - - - - - - - 336 Pavement Management Program Update 622,079 - - - - - - - - - - 388 Rural Transit Alternatives Study 19,025 - - - - - - - - - - 401 Measure L 724,100 - - - - - - - - - - 499 Legislative Program 768,005 - - - - - - - - - -

TOTAL 8,023,509 247,843 328,192 261,031 610,873 491,685 610,160 158,778 176,328 150,000 137,809 244,266

Available - New 5,809,485 251,290 - 261,031 610,873 508,552 - - 314,915 150,000 137,809 320,000 Available - Carryover 3,188,813 - 328,192 - - - 607,065 158,778 - - 22,500 Available - Total 8,998,298 251,290 328,192 261,031 610,873 508,552 607,065 158,778 314,915 150,000 137,809 342,500

- Balance 974,789 3,447 0 (0) - 16,867 (3,095) - 138,587 - - 98,234

Toll Credits (TC) 239,135 28,428 37,644 - 70,067 - 69,985 - - 17,205 15,807

TC = Toll Credit Match `LM = Local Match

FTA Sect 5316

Federal

FTA 5303 Estimated TC

Match

FTA Sect 5303 Carryover TC

Match

FHWA-PL Estimate TC

Match FHWA-PL

Estimate LM FTA Sect 5304

Local Match FHWA-PL

Carryover TC FHWA-PL

Carryover LM

StanCOG Overall Work Program Fiscal Year 2020/21

92

APPENDIX II – OWP TABLE A – FUNDING SOURCES FY 2020/21

Part II

APPENDIX II OWP TABLE A FUNDING SOURCES

FISCAL YEAR 2020/21 Formal Amendment #3

TC = Toll Credit Match Work ElementLM = Local Match

Total PPM MiscMETRO TRANSPORTAION PLANNING012 Public Involvement 332,141 - - - - - - - 3,000 - - - 021 OWP 86,734 - - - - - - - 1,000 - - - 023 MPO Coordination 179,349 - - - - - - - 20,571 - - - 026 Interregional Bicycle Tourism Plan 32,077 - - - - 32,077 - - - - - - 113 Transportation Modeling and GIS 354,934 - - - - 105,474 - - - - - - 203 FY 20-21 SB1: Human Services Coordination Plan 297,853 - - - - - - - 36,821 - - - 300 RTP 1,376,520 - - - - 147,090 - - - 45,995 - - 302 Environmental Justice 66,875 - - - - - - - - - - - 321 Transit 65,058 - - - - - - - - 8,000 - - 323 JARC 176,328 - - - - - - - - - - - 330 TIP 447,790 - - - - - - - - 10,000 - - 338 Performance Based Planning 24,490 - - - - - - - - - - - 410 Air Quality 112,549 - - - - - - - - 112,549 - - 411 Congestion Mgmt Process 5,388 - - - - - - - - 618 - - CONSOLIDATED REGIONAL PLANNING013 Abandoned Vehicle Abatement 8,969 - - - - - 8,969 - - - - - 022 TDA Admin 385,633 - - - - - - - 385,633 - - - 029 Regional Bicylst and Pediestrian Safefy and Educat 203,367 - - - 203,367 - - - - - - - 200 FY18-19 SB 1 Sustainable Communities 181,874 - 161,013 - - - - - 20,861 - - - 201 FY19-20 SB 1 Sustainable Communities 265,947 - 238,408 - - - - - 27,539 - - - 202 FY20-21 SB 1 Sustainable Communities 330,110 - 292,247 - - - - - - 37,864 - - 204 FY 20-21 SB1: Community Transportation Needs 258,119 - - 225,519 - - - - 32,600 - - - 308 Regional Housing Needs 248,747 200,000 - - - - - - 48,747 - - - 322 Transp. Demand Mgmt 413,722 - - - - - - - - 31,647 - - 332 STIP Project Delivery 35,729 - - - - 20,000 - - - 15,729 - - 336 Pavement Management Program Update 622,079 - - - - - - - - 22,079 600,000 - 388 Rural Transit Alternatives Study 19,025 - - - - - - - - - 19,025 - 401 Measure L 724,100 - - - - - - 724,100 - - - - 499 Legislative Program 768,005 - - - - - - - - 681,305 70,000 16,700

TOTAL 8,023,509 200,000 691,668 225,519 203,367 304,641 8,969 724,100 576,772 965,786 689,025 16,700

Available - New 5,809,485 607,000 300,605 225,519 - 214,000 9,000 400,000 245,000 735,000 640,000 16,700 Available - Carryover 3,188,813 - 450,945 - 203,460 97,649 - 342,504 335,000 270,000 150,955 - Available - Total 8,998,298 607,000 751,550 225,519 203,460 311,649 9,000 742,504 580,000 1,005,000 790,955 16,700

Balance 974,789 407,000 59,882 (0) 93 7,008 31 18,404 3,228 39,214 101,930 -

Toll Credits (TC) 239,135 - - - - - - - - -

TC = Toll Credit MatchLM = Local Match

Local

Abandoned Vehicle LTF Admin LTF Local Other Local

State

ATP SB1 Sustainable

Communities Formula

SB1 Sustainable Communities Competitive SJV REAP Housing Measure L

StanCOG Overall Work Program Fiscal Year 2020/21

93

APPENDIX II – OWP TABLE A – FUNDING SOURCES FY 2020/21

Part III

APPENDIX II OWP TABLE A FUNDING SOURCES

FISCAL YEAR 2020/21 Formal Amendment #3

TC = Toll Credit Match Work ElementLM = Local Match

Total CMAQ TC Match STBGP TC Match

METRO TRANSPORTAION PLANNING012 Public Involvement 332,141 37,752 - - 15,314 22,439 - - 021 OWP 86,734 9,834 - - - - 1,719 8,114 023 MPO Coordination 179,349 - - - - - - - 026 Interregional Bicycle Tourism Plan 32,077 - - - - - - - 113 Transportation Modeling and GIS 354,934 28,613 - - 3,070 - 23,877 1,667 203 FY 20-21 SB1: Human Services Coordination Plan 297,853 - - - - - - - 300 RTP 1,376,520 79,891 - - 1,247 8,408 11,462 58,774 302 Environmental Justice 66,875 7,671 - - 5,767 1,904 - - 321 Transit 65,058 6,545 - - 3,030 3,514 - - 323 JARC 176,328 - - - - - - - 330 TIP 447,790 50,215 - 17,205 - - 33,010 - 338 Performance Based Planning 24,490 2,809 - - - 1,378 - 1,431 410 Air Quality 112,549 - - - - - - - 411 Congestion Mgmt Process 5,388 - - - - - - - CONSOLIDATED REGIONAL PLANNING013 Abandoned Vehicle Abatement 8,969 - - - - - - - 022 TDA Admin 385,633 - - - - - - - 029 Regional Bicylst and Pediestrian Safefy and Educat 203,367 - - - - - - - 200 FY18-19 SB 1 Sustainable Communities 181,874 - - - - - - - 201 FY19-20 SB 1 Sustainable Communities 265,947 - - - - - - - 202 FY20-21 SB 1 Sustainable Communities 330,110 - - - - - - - 204 FY 20-21 SB1: Community Transportation Needs 258,119 - - - - - - - 308 Regional Housing Needs 248,747 - - - - - - - 322 Transp. Demand Mgmt 413,722 15,807 15,807 - - - - - 332 STIP Project Delivery 35,729 - - - - - - - 336 Pavement Management Program Update 622,079 - - - - - - - 388 Rural Transit Alternatives Study 19,025 - - - - - - - 401 Measure L 724,100 - - - - - - - 499 Legislative Program 768,005 - - - - - - -

TOTAL 8,023,509 239,135 15,807 17,205 28,428 37,644 70,067 69,985

Available - New 5,809,485 Available - Carryover 3,188,813 Available - Total 8,998,298

Balance 974,789

Toll Credits (TC) 239,135

TC = Toll Credit MatchLM = Local Match

-

FTA Carryover TC Match

FHWA PL Estimate TC

FHWA PL Carryover TC

FTA Estimate TC Match

Toll Credit Match Calculations

Total Toll Cedit Match (TC)

StanCOG Overall Work Program Fiscal Year 2020/21

94

APPENDIX IIIOWP TABLE B - EXPENDITURES BY PERFORMING AGENCY

FISCAL YEAR 2020/21Amendment 3

DescriptionWork Element

TotalStanCOG Staff & Misc Direct Consultant

METROPOLITAN TRANSPORTATION PLANNING012 Public Involvement 332,141 157,141 175,000 021 OWP 86,734 86,734 - 023 MPO Coordination 179,349 179,349 - 026 Interregional Bicycle Tourism Plan 32,077 32,077 - 203 Human Services Coordinated Plan 297,853 70,393 227,460 113 Transportation Modeling and GIS 354,934 349,460 5,474 300 RTP 1,376,520 696,520 680,000 302 Environmental Justice 66,875 51,875 15,000 321 Transit 65,058 35,058 30,000 323 JARC 176,328 14,548 161,780 330 TIP 447,790 447,790 - 338 Peformance Based Planning 24,490 24,490 - 410 Air Quality 112,549 112,549 - 411 Congestion Mgmt Process 5,388 5,388 -

Subtotal 3,558,085 2,263,371 1,294,714

CONSOLIDATED REGIONAL PLANNING013 Abandoned Vehicle Abatement 8,969 8,969 - 022 TDA Admin 385,633 255,813 129,819 029 Regional Bicyclist & Pedestrian Safety 203,367 52,386 150,981 200 FY18-19 SB 1 Sustainable Communities 181,874 - 181,874 201 FY19-20 SB 1 Sustainable Communities 265,947 65,947 200,000 202 FY20-21 SB 1 Sustainable Communities 330,110 195,110 135,000 204 Community Transportation Needs 258,119 51,187 206,932 308 Regional Housing Needs 248,747 48,747 200,000 322 Transp. Demand Mgmt 413,722 31,002 382,720 332 STIP Project Delivery 35,729 35,729 - 336 Pavement Management Program 622,079 22,079 600,000 388 Rural Transit Alternatives Study 19,025 19,025 - 401 Measure L 724,100 684,100 40,000 499 Legislative Program 768,005 768,005 -

Subtotal 4,465,425 2,238,098 2,227,327

Totals 8,023,509 4,501,469 3,522,040

StanCOG Overall Work Program Fiscal Year 2020/21

95

APPENDIX IV – OWP PERSON MONTHS SCHEDULE

STANISLAUS COUNCIL OF GOVERNMENTSFISCAL YEAR 2020/21 BUDGETPerson - Months Schedule

2096 2096 2096 2096 2176 2096 2176 2176 2176

Deputy Executive Admin Admin Finance AssociateFinance SvsWork Element Plnng & ProgMngmt. Analyst Manager Assist Manager Planner Specialist I

012 Public Involvement 1.7 0.0 0.0 1.8 1.2 0.0 0.0 0.0 0.0

021 OWP 0.1 0.0 0.0 0.2 0.0 1.2 0.0 0.0 2.5

023 MPO Coordination 3.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0

026 Interregional Bicycle Tourism Plan 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

113 Transportation Modeling and GIS 0.0 0.0 0.0 0.0 0.0 0.0 6.9 0.0 0.0

203 Human Services Coordinated Plan 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0

300 RTP 0.3 6.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0

302 Environmental Justice 0.0 0.0 0.0 0.2 0.0 0.0 0.5 0.0 0.0

321 Transit 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

323 JARC 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.4

330 TIP 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0

338 Performance Based Planning 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0

410 Air Quality 0.0 1.2 0.0 0.0 0.0 0.0 0.6 0.0 0.0

411 Congestion Mgmt Process 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

013 Abandoned Vehicle 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5

022 TDA Admin 0.0 0.0 0.0 0.0 0.0 2.1 0.0 1.8 0.0

029 Regional Bicyclist & Pedestrian 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0

200 FY18-19 SB 1 Sustainable Communities 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

201 FY19-20 SB 1 Sustainable Communities 0.1 0.2 0.0 0.0 0.0 0.5 0.0 0.0 0.0

202 FY20-21 SB 1 Sustainable Communities 0.5 0.0 0.0 0.0 0.0 3.3 0.0 2.0 0.0

204 Transportation Needs Assesment 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0

308 Regional Housing Needs 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0

322 Transp. Demand Mgmt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

332 STIP Project Delivery 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

336 Pavement Management Program 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0

388 Rural Transit Alternatives Study 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

401 Measure L 0.6 0.6 8.1 0.2 0.0 1.7 0.0 2.4 1.2

499 Legislative Program 3.7 0.3 0.2 0.0 0.0 0.0 1.9 0.0 0.0

Subtotal 10.1 10.1 8.8 2.8 1.2 9.0 10.6 6.2 4.5

Administration 0.1 0.1 3.1 7.4 9.3 1.2 0.0 4.4 6.0

Leave Hours 1.8 1.8 0.0 1.8 1.9 1.8 1.9 1.9 1.9

Subtotal Admin 1.9 1.9 3.1 9.2 11.2 3.0 1.9 6.2 7.9

Total 12.0 12.0 12.0 12.0 12.4 12.0 12.4 12.4 12.4

Senior/ Finance Svcs II

Executive Director

StanCOG Overall Work Program Fiscal Year 2020/21

96

APPENDIX IV – OWP PERSON MONTHS SCHEDULE

STANISLAUS COUNCIL OF GOVERNMENTSFISCAL YEAR 2020/21 BUDGETPerson - Months Schedule

2096 2096 2176 2176 524 2176 2176 2176 2176 2176 2176 30428

Senior Principal Senior Assoc/Asst General Assoc/Asst Assoc/Asst Assoc/Asst Planning Executive Admin Work Element Planner Planner Planner Planner Counsel Planner Counsel Planner Tech Admin Asst Asst Total

012 Public Involvement 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 5.0

021 OWP 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0

023 MPO Coordination 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.9

026 Interregional Bicycle Tourism Plan 0.0 0.0 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9

113 Transportation Modeling and GIS 0.2 0.0 0.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.4

203 Human Services Coordinated Plan 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0 0.0 3.0

300 RTP 5.7 2.7 7.5 1.1 0.0 4.6 0.0 0.0 10.6 10.6 0.0 49.3

302 Environmental Justice 0.0 0.1 0.0 0.3 0.1 0.0 0.0 0.6 0.0 0.0 0.0 1.9

321 Transit 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 1.3

323 JARC 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.7

330 TIP 0.0 1.9 0.0 0.0 0.0 3.7 9.1 0.0 0.0 0.0 4.4 19.6

338 Performance Based Planning 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2

410 Air Quality 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0

411 Congestion Mgmt Process 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2

013 Abandoned Vehicle 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5

022 TDA Admin 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 5.2

029 Regional Bicyclist & Pedestrian 0.6 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4

200 FY18-19 SB 1 Sustainable Communities 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

201 FY19-20 SB 1 Sustainable Communities 0.4 0.0 0.0 1.2 0.0 0.0 0.0 0.5 0.0 0.0 0.0 3.0

202 FY20-21 SB 1 Sustainable Communities 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0.0 0.0 0.0 8.9

204 Transportation Needs Assesment 0.8 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9

308 Regional Housing Needs 0.8 0.0 0.0 1.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 2.5

322 Transp. Demand Mgmt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.4

332 STIP Project Delivery 0.0 0.0 0.0 0.1 0.0 1.2 0.6 0.0 0.0 0.0 0.0 2.0

336 Pavement Management Program 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8

388 Rural Transit Alternatives Study 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 1.0

401 Measure L 0.0 3.1 2.5 0.0 0.3 0.0 0.6 0.0 0.0 0.0 6.2 27.5

499 Legislative Program 0.0 0.0 0.0 0.0 0.9 0.5 0.0 0.0 0.0 0.0 0.0 7.5

Subtotal 10.6 8.5 10.6 11.6 1.3 10.6 10.6 10.6 10.6 10.6 10.6 169.2

Administration 0.0 3.3 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 36.4

Leave Hours 1.9 0.1 1.9 0.9 0.3 1.9 1.9 1.9 1.9 1.9 1.9 30.9

Subtotal Admin 1.9 3.5 1.9 0.9 1.7 1.9 1.9 1.9 1.9 1.9 1.9 67.4

Total 12.4 12.0 12.4 12.4 3.0 12.4 12.4 12.4 12.4 12.4 12.4 236.6

StanCOG Overall Work Program Fiscal Year 2020/21

97

APPENDIX V

Stanislaus Council of Governments 2020/21 Overall Work Program (OWP)

Information Element

Stanislaus Council of Governments

2020-2021 Overall Work Program (OWP) Information Element

State Route Product

Activity Description Performed By Status of

Product

Expected Date of

Completion

99 Multimodal Corridor Study Stanislaus, San Joaquin, and

Merced Counties

Initiate corridor study and build model simulations

Caltrans District 10 System Planning

and Goods Movement In process 2021

All District 10 Active Transportation Plan

Engage in gaps and barrier analysis, public engagement

with local agencies, and develop project needs

prioritization

Caltrans District 10 System Planning and Goods Movement

In process January 2021

All District 10 Climate Change Adaptation Plan

Develop plan with input from local agency partners

Caltrans District 10 System Planning and Goods Movement

In process December 2020

StanCOG Overall Work Program Fiscal Year 2020/21

98

APPENDIX VI

FUNDING SOURCES Several State and Federal agencies provide funds to supplement local resources to finance the work in the OWP. Each of these sources has constraints and requirements to be accommodated. Federal Highway Administration (FHWA) (PL 1% funds) – These Federal funds are available through Caltrans for transportation planning and related activities. A non-federal match of 11.47% is required. Federal Congressional Grant funds – These federal funds have been earmarked for a State Route 132 West Expressway. Federal Transit Administration (FTA) (Section 5303 funds) – These Federal funds are used for transit planning and related activities. A nonfederal match of 11.47% is required. Surface Transportation Block Grant Program (STBGP) funds – These Federal funds are used by our local governments for a wide variety of transportation projects. Congestion Mitigation and Air Quality (CMAQ) funds – These Federal funds are specifically for projects and programs that will contribute to the attainment of national ambient air quality standards. SB1 Sustainable Communities Formula Grants – These are state funds are specifically for projects that plan for GHG and VMT and/or integrate Land Use and Transportation planning. Planning, Programming, and Monitoring funds – These State funds are made available by Senate Bill (SB) 45 of 1997. They are limited to 5% of total Regional Improvement Program funds available to the Stanislaus region. Abandoned Vehicle Service Authority (AVA) (Administration) – Funds required to administer the Abandoned Vehicle Abatement Program are collected by the state and returned to Stanislaus County. These funds result from collection of an additional $1 in vehicle registration fees. Local Transportation Funds (LTF) (Administration) – Funds requires to administer the Transportation Development Act (TDA) are deducted before apportionments are made to jurisdictions. Local Transportation Funds (LTF) (Planning) – StanCOG receives funds for transportation planning and related activities. Under SB 344 of 1997, these funds are deducted before apportionments are made to jurisdictions. These funds provide the primary source to match the Federal Funds Local Transportation Authority (Measure L) – In November 2016 Stanislaus County voters passed a 25 year half cent sales tax to fund specified transportation projects. StanCOG’s administration of that program statutorily cannot exceed 1% of receipts. Other local – StanCOG dues, interest on funds, and projects specific funds from other local agencies provide the balance of the funds required to finance the OWP.

StanCOG Overall Work Program Fiscal Year 2020/21

99

APPENDIX VII

FIXING AMERICA’S SURFACE TRANSPORTATION (FAST) ACT PLANNING FACTORS MATRIX

WE

12

21

23

26

113

300

302

321

323

330

338

410

411

WORK ELEMENT

METROPOLITAN TRANSPORTATION PLANNING PROGRAM

PUBLIC INVOLVEMENT

OVERALL WORK PROGRAM

METROPOLITAN PLANNING ORGANIZATION (MPO) COORDINATION

INTERREGIONAL BICYCLE TOURISM PLAN (IBTP)

TRANSPORTATION MODELING, ANALYSIS, FORECASTING AND GIS

REGIONAL TRANSPORTATION PLAN (RTP)

ENVIRONMENTAL JUSTICE (EJ)/TITLE VI

TRANSIT (MASS TRANSPORTATION)

FTA ADMINISTRATION FEE FOR JOBS ACCESS REVERSE COMMUTE (JARC)

TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

PERFORMANCE BASED PLANNING

AIR QUALITY PLANNING

CONGESTION MANAGEMENT PROCESS (CMP)

FAST ACT PLANN

ING

ELEMEN

TS

1SUPPO

RT THE ECONO

MIC VITALITY O

F THE METRO

POLITAN AREA, ESPECIALLY BY

ENABLING GLOBAL CO

MPETITIVENESS, PRO

DUCTIVITY, AND EFFICIENCYx

Xx

xx

xX

xx

x

2INCREASE THE SAFETY O

F THE TRANSPORTATIO

N SYSTEM FO

R MO

TORIZED AND NO

N-M

OTO

RIZED USERSx

Xx

xx

Xx

3INCREASE THE SECURITY O

F THE TRANSPORTATIO

N SYSTEM FO

R MO

TORIZED AND NO

N-M

OTO

RIZED USERSx

Xx

xx

Xx

4INCREASE ACCESSIBILITY AND M

OBILITY O

F PEOPLE AND FREIGHT

xX

Xx

xx

xx

Xx

5

PROTECT AND ENHANCE THE ENVIRO

NMENT, PRO

MO

TE ENERGY CONSERVATIO

N, IM

PROVE THE Q

UALITY OF LIFE, AND PRO

MO

TE CONSISTENCY BETW

EEN (REGIONAL)

TRANSPORTATIO

N IMPRO

VEMENTS AND STATE AND LO

CAL PLANNED GROW

TH AND ECO

NOM

IC DEVELOPM

ENT PATTERNS

xX

xx

xX

xx

x

6ENHANCE THE INTEGRATIO

N AND CONNECTIVITY O

F THE TRANSPORTATIO

N SYSTEM,

ACROSS AND BETW

EEN MO

DES, FOR PEO

PLE AND FREIGHTx

XX

xx

xX

xx

7PRO

MO

TE EFFICIENT SYSTEM M

ANAGEMENT AND O

PERATION

xX

xx

xX

xx

x8

EMPHASIZE THE PRESERVATIO

N OF THE EXISTING TRANSPO

RTATION SYSTEM

xx

xX

xx

x

9IM

PROVE THE RESILIENCY AND RELIABILITY O

F THE TRANSPORTATIO

N SYSTEM AND

REDUCE OR M

ITIGATE STORM

WATER IM

PACTS OF SURFACE TRANSPO

RTATION

xx

Xx

10ENHANCE TRAVEL AND TO

URISMx

XX

x

X

StanCOG Overall Work Program Fiscal Year 2020/21

100

APPENDIX VII

FIXING AMERICA’S SURFACE TRANSPORTATION (FAST) ACT PLANNING FACTORS MATRIX

WE

13

22

29

200

201

202

203

204

308

322

332

336

388

401

499

500

WORK ELEMENT

CONSOLIDATED REGIONAL PLANNING

ABANDONED VEHICLE SERVICE AUTHORITY

TRANSPORTATION DEVELOPMENT ACT (TDA) FUND ADMINISTRATION

BIKE AND PEDESTRIAN EDUCATION AND ENCOURAGEMENT SAFETY CAMPAIGN

SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 18/19

SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 19/20

SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 20/21

SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 20/21: HUMAN SERVICES COORDINATION PLAN

SB1 SUSTAINABLE COMMUNITIES PROJECTS FY 20/21: COMMUNITY TRANSPORTATION NEEDS

REGIONAL HOUSING NEEDS (RHNA)

TRANSPORTATION DEMAND MANAGEMENT (TDM)

STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) PROJECT DELIVERY

PAVEMENT MANAGEMENT PROGRAM (PMP)

SAN JOAQUIN VALLEY (SJV) RURAL TRANSIT ALTERNATIVES/VALLEY FLEX PILOT

LOCAL TRANSPORTATION AUTHORITY (MEASURE L)

LEGISLATIVE PROGRAM

OTHER REGIONAL PLANNING ACTIVITIES IN THE STANISLAUS AREA

FAST ACT PLANNING ELEMENTS

1SUPPORT THE ECONOM

IC VITALITY OF THE METROPOLITAN AREA, ESPECIALLY BY

ENABLING GLOBAL COMPETITIVENESS, PRODUCTIVITY, AND EFFICIENCY

xX

xx

Xx

XX

2INCREASE THE SAFETY OF THE TRANSPORTATION SYSTEM

FOR MOTORIZED AND NON-

MOTORIZED USERS

xX

XX

XX

3INCREASE THE SECURITY OF THE TRANSPORTATION SYSTEM

FOR MOTORIZED AND NON-

MOTORIZED USERS

xX

Xx

xX

4INCREASE ACCESSIBILITY AND M

OBILITY OF PEOPLE AND FREIGHTx

XX

Xx

xX

Xx

Xx

X

5

PROTECT AND ENHANCE THE ENVIRONMENT, PROM

OTE ENERGY CONSERVATION, IM

PROVE THE QUALITY OF LIFE, AND PROMOTE CONSISTENCY BETW

EEN (REGIONAL) TRANSPORTATION IM

PROVEMENTS AND STATE AND LOCAL PLANNED GROW

TH AND ECONOM

IC DEVELOPMENT PATTERNS

XX

Xx

xX

Xx

6ENHANCE THE INTEGRATION AND CONNECTIVITY OF THE TRANSPORTATION SYSTEM

, ACROSS AND BETW

EEN MODES, FOR PEOPLE AND FREIGHT

XX

Xx

xX

xx

X

7PROM

OTE EFFICIENT SYSTEM M

ANAGEMENT AND OPERATION

xX

xx

Xx

XX

8EM

PHASIZE THE PRESERVATION OF THE EXISTING TRANSPORTATION SYSTEMx

Xx

xX

x

9IM

PROVE THE RESILIENCY AND RELIABILITY OF THE TRANSPORTATION SYSTEM AND

REDUCE OR MITIGATE STORM

WATER IM

PACTS OF SURFACE TRANSPORTATIONX

X

10ENHANCE TRAVEL AND TOURISM

XX

XX

StanCOG Overall Work Program Fiscal Year 2020/21

101

APPENDIX VIII

CERTIFICATION DOCUMENTS

• FHWA METROPOLITAN TRANSPORTATION PLANNING PROCESS CERTIFICATION – Appendix A (Standard Form)

• FTA CERTIFICATIONS AND ASSURANCES – Appendix B (Standard Form)

• CALIFORNIA DEPARTMENT OF TRANSPORTATION DEBARMENT AND SUSPENSION CERTIFICATION FOR FY 2020/21 – Appendix C (Standard Form)

• EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES – Appendix D (Standard Form)

January 2020

FY 2020/2021 FHWA and FTA Metropolitan Transportation Planning Process Self-Certification

In accordance with 23 CFR part 450, the California Department of Transportation and _______________________________________, the designated Metropolitan Planning Organization for the _________________________________ urbanized area(s), herby certify that the transportation planning process is being carried out in accordance with all applicable requirements including:

1) 23 U.S.C. 134, 49 U.S.C. 5303, and subpart C of 23 CFR part 450;2) In nonattainment and maintenance areas, sections 174 and 176(c) and (d) of the Clean Air Act,

as amended (42 U.S.C. 7504, 7506(c) and (d)) and 40 CFR part 93;3) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d–1) and 49 CFR part 21;4) 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex,

or age in employment or business opportunity;5) Section 1101(b) of the FAST Act (Pub. L. 114-94) and 49 CFR part 26 regarding the involvement

of disadvantaged business enterprises in USDOT funded projects;6) 23 CFR part 230, regarding the implementation of an equal employment opportunity program

on Federal and Federal-aid highway construction contracts;7) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and 49

CFR parts 27, 37, and 38;8) The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis

of age in programs or activities receiving Federal financial assistance;9) Section 324 of title 23 U.S.C. regarding the prohibition of discrimination based on gender; and10) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding

discrimination against individuals with disabilities.

________________________________ _________________________________________ MPO Authorizing Signature Caltrans District Approval Signature

________________________________ _________________________________________ Title Title

________________________________ _________________________________________ Date Date

Stanislaus Council of GovernmentsStanislaus County

Executive Director D10 DDD PLAE Div.

4/13/20

Certifications and Assurances Fiscal Year 2020

1

FEDERAL FISCAL YEAR 2020 CERTIFICATIONS AND ASSURANCES FOR FTA ASSISTANCE PROGRAMS

(Signature pages alternate to providing Certifications and Assurances in TrAMS.)

Name of Applicant:_____________________________________________________

The Applicant certifies to the applicable provisions of categories 01–20. _______

Or,

The Applicant certifies to the applicable provisions of the categories it has selected:

Category Certification

01 Certifications and Assurances Required of Every Applicant

02 Public Transportation Agency Safety Plans

03 Tax Liability and Felony Convictions

04 Lobbying

05 Private Sector Protections

06 Transit Asset Management Plan

07 Rolling Stock Buy America Reviews and Bus Testing

08 Urbanized Area Formula Grants Program

09 Formula Grants for Rural Areas

10 Fixed Guideway Capital Investment Grants and the Expedited Project Delivery for Capital Investment Grants Pilot Program

11 Grants for Buses and Bus Facilities and Low or No Emission Vehicle Deployment Grant Programs

Stanislaus Council of Governments

X

Certifications and Assurances Fiscal Year 2020

2

12 Enhanced Mobility of Seniors and Individuals with Disabilities Programs

13 State of Good Repair Grants

14 Infrastructure Finance Programs

15 Alcohol and Controlled Substances Testing

16 Rail Safety Training and Oversight

17 Demand Responsive Service

18 Interest and Financing Costs

19 Construction Hiring Preferences

20 Cybersecurity Certification for Rail Rolling Stock and Operations

FEDERAL FISCAL YEAR 2020 FTA CERTIFICATIONS AND ASSURANCES SIGNATURE PAGE

(Required of all Applicants for federal assistance to be awarded by FTA in FY 2020)

AFFIRMATION OF APPLICANT

Name of the Applicant:

BY SIGNING BELOW, on behalf of the Applicant, I declare that it has duly authorized me to make these Certifications and Assurances and bind its compliance. Thus, it agrees to comply with all federal laws, regulations, and requirements, follow applicable federal guidance, and comply with the Certifications and Assurances as indicated on the foregoing page applicable to each application its Authorized Representative makes to the Federal Transit Administration (FTA) in federal fiscal year 2020, irrespective of whether the individual that acted on his or her Applicant’s behalf continues to represent it.

FTA intends that the Certifications and Assurances the Applicant selects on the other side of this document should apply to each Award for which it now seeks, or may later seek federal assistance to be awarded during federal fiscal year 2020.

The Applicant affirms the truthfulness and accuracy of the Certifications and Assurances it has selected in the statements submitted with this document and any other submission made to FTA, and acknowledges that the Program Fraud Civil Remedies Act of 1986, 31 U.S.C. § 3801 et seq., and implementing U.S. DOT regulations, “Program Fraud Civil Remedies,” 49 CFR part 31, apply to any certification, assurance or submission made to FTA. The criminal provisions of 18 U.S.C. § 1001 apply to any certification, assurance, or submission made in connection with a federal public transportation program authorized by 49 U.S.C. chapter 53 or any other statute

Stanislaus Council of Governments

Certifications and Assurances Fiscal Year 2020

3

In signing this document, I declare under penalties of perjury that the foregoing Certifications and Assurances, and any other statements made by me on behalf of the Applicant are true and accurate.

Signature Date:

Name Authorized Representative of Applicant

AFFIRMATION OF APPLICANT’S ATTORNEY

For (Name of Applicant):

As the undersigned Attorney for the above-named Applicant, I hereby affirm to the Applicant that it has authority under state, local, or tribal government law, as applicable, to make and comply with the Certifications and Assurances as indicated on the foregoing pages. I further affirm that, in my opinion, the Certifications and Assurances have been legally made and constitute legal and binding obligations on it.

I further affirm that, to the best of my knowledge, there is no legislation or litigation pending or imminent that might adversely affect the validity of these Certifications and Assurances, or of the performance of its FTA assisted Award.

Signature Date:

Name Attorney for Applicant

Each Applicant for federal assistance to be awarded by FTA must provide an Affirmation of Applicant’s Attorney pertaining to the Applicant’s legal capacity. The Applicant may enter its electronic signature in lieu of the Attorney’s signature within TrAMS, provided the Applicant has on file and uploaded to TrAMS this hard-copy Affirmation, signed by the attorney and dated this federal fiscal year.

Rosa De León Park

Stanislaus Council of Governments

Monica Streeter

April 9, 2020

RLO
Stamp

January 2020

Fiscal Year 2020/2021 California Department of Transportation Debarment and Suspension Certification

As required by U.S. DOT regulations on governmentwide Debarment and Suspension

(Nonprocurement), 49 CFR 29.100:

1) The Applicant certifies, to the best of its knowledge and belief, that it and its contractors,

subcontractors and subrecipients:

a) Are not presently debarred, suspended, proposed for debarment, declared

ineligible, or voluntarily excluded from covered transactions by any Federal

department or agency;

b) Have not, within the three (3) year period preceding this certification, been

convicted of or had a civil judgment rendered against them for commission of fraud

or a criminal offense in connection with obtaining, attempting to obtain, or

performing a public (Federal, state, or local) transaction or contract under a public

transaction, violation of Federal or state antitrust statutes, or commission of

embezzlement, theft, forgery, bribery, falsification or destruction of records,

making false statements, or receiving stolen property;

c) Are not presently indicted for or otherwise criminally or civilly charged by a

governmental entity (Federal, state, or local) with commission of any of the

offenses listed in subparagraph (1)(b) of this certification; and

d) Have not, within the three (3) year period preceding this certification, had one or

more public transactions (Federal, state, and local) terminated for cause or default.

2) The Applicant also certifies that, if Applicant later becomes aware of any information

contradicting the statements of paragraph (1) above, it will promptly provide that

information to the State.

3) If the Applicant is unable to certify to all statements in paragraphs (1) and (2) of this

certification, through those means available to Applicant, including the General Services

Administration’s Excluded Parties List System (EPLS), Applicant shall indicate so in its

applications, or in the transmittal letter or message accompanying its annual certifications

and assurances, and will provide a written explanation to the State.

January 2020

DEPARTMENT OF TRANSPORTATION DEBARMENT AND SUSPENSION CERTIFICATION

FISCAL YEAR 2020/2021 SIGNATURE PAGE

In signing this document, I declare under penalties of perjury that the foregoing certifications and

assurances, and any other statements made by me on behalf of the Applicant are true and correct.

Signature Date

Printed Name

As the undersigned Attorney for the above named Applicant, I hereby affirm to the Applicant that

it has the authority under state and local law to make and comply with the certifications and

assurances as indicated on the foregoing pages. I further affirm that, in my opinion, these

certifications and assurances have been legally made and constitute legal and binding obligations

of the Applicant.

I further affirm to the Applicant that, to the best of my knowledge, there is no legislation or

litigation pending or imminent that might adversely affect the validity of these certifications and

assurances or of the performance of the described project.

AFFIRMATION OF APPLICANT’S ATTORNEY

For (Name of Applicant)

Signature Date

Printed Name of Applicant’s Attorney

Rosa De León Park, Executive Director

Stanislaus Council of Governments

Monica Streeter

April 8, 2020

RLO
Stamp

Approved by OMB 0348-0046

Disclosure of Lobbying Activities Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352

(See reverse for public burden disclosure)

1. Type of Federal Action:a. contract

____ b. grant c. cooperative agreementd. loane. loan guaranteef. loan insurance

2. Status of Federal Action:a. bid/offer/application

_____ b. initial award c. post-award

3. Report Type:a. initial filing

_____ b. material change

For material change only: Year _______ quarter _______ Date of last report___________

4. Name and Address of Reporting Entity: ____ Prime _____ Subawardee

Tier______, if Known:

Congressional District, if known:

5. If Reporting Entity in No. 4 is Subawardee,Enter Name and Address of Prime:

Congressional District, if known: 6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable: ____________

8. Federal Action Number, if known: 9. Award Amount, if known:$

10. a. Name and Address of Lobbying Registrant(if individual, last name, first name, MI):

b. Individuals Performing Services (including address ifdifferent from No. 10a) (last name, first name, MI):

11. Information requested through this form is authorized bytitle 31 U.S.C. section 1352. This disclosure of lobbyingactivities is a material representation of fact upon whichreliance was placed by the tier above when this transactionwas made or entered into. This disclosure is requiredpursuant to 31 U.S.C. 1352. This information will be reportedto the Congress semi-annually and will be available for publicinspection. Any person who fails to file the requireddisclosure shall be subject to a civil penalty of not less than$10,000 and not more than $100,000 for each such failure.

Signature: __________________________________

Print Name: _____

Title: _____

Telephone No.: ____________ Date: _______

Federal Use Only Authorized for Local Reproduction Standard Form - LLL (Rev. 7-97)

b b

x1 CA Department of Transportation

1120 N St.Sacramento, CA 95814

Federal Highway Administration 20.505

CA CPG Allocation

Simon & Company, Inc.1600 L Street NW Suite 501Washington, DC 22036

Rosa De León Park

Executive Director

209-525-4600

Approved by OMB 0348-0046

Disclosure of Lobbying Activities Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352

(See reverse for public burden disclosure)

1. Type of Federal Action:a. contract

____ b. grant c. cooperative agreementd. loane. loan guaranteef. loan insurance

2. Status of Federal Action:a. bid/offer/application

_____ b. initial award c. post-award

3. Report Type:a. initial filing

_____ b. material change

For material change only: Year _______ quarter _______ Date of last report___________

4. Name and Address of Reporting Entity: ____ Prime _____ Subawardee

Tier______, if Known:

Congressional District, if known:

5. If Reporting Entity in No. 4 is Subawardee,Enter Name and Address of Prime:

Congressional District, if known: 6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable: ____________

8. Federal Action Number, if known: 9. Award Amount, if known:$

10. a. Name and Address of Lobbying Registrant b. Individuals Performing Services (including address ifdifferent from No. 10a) (last name, first name, MI):

11. Information requested through this form is authorized bytitle 31 U.S.C. section 1352. This disclosure of lobbyingactivities is a material representation of fact upon whichreliance was placed by the tier above when this transactionwas made or entered into. This disclosure is requiredpursuant to 31 U.S.C. 1352. This information will be reportedto the Congress semi-annually and will be available for publicinspection. Any person who fails to file the requireddisclosure shall be subject to a civil penalty of not less than$10,000 and not more than $100,000 for each such failure.

Signature: __________________________________

Print Name: _____

Title: _____

Telephone No.: ____________ Date: _______

Federal Use Only Authorized for Local Reproduction Standard Form - LLL (Rev. 7-97)

b b

x1 CA Department of Transportation

1120 N St.Sacramento, CA 95814

Federal Highway Administration 20.505

CA CPG Allocation

(if individual, last name, first name, MI):

Khouri Consulting1215 K Street, Suite 1700Sacramento, CA 95814

Rosa De León Park

Executive Director

209-525-4600

STANISLAUS COUNCIL OF GOVERNMENTS RESOLUTION 20-32

APPROVING THE FY 2020/21 BUDGET AND OVERALL WORK PROGRAM (OWP) AMENDMENT #3

WHEREAS, the Stanislaus Council of Governments (StanCOG) is a Regional Transp01iation Planning Agency (RTPA) and a Metropolitan Planning Organization (MPO), for the Stanislaus Region pursuant to State and Federal designation; and

WHEREAS, the Stanislaus Council of Governments (StanCOG) has an adopted Line Item Budget and Overall Work Program (OWP) for Fiscal Year 2020/21; and

WHEREAS, there is a need to amend the FY 2020/21 Line Item Budget and OWP;

WHEREAS, funds of $85,000 will be transfe1Ted from the Local Transportation Fund (LTF) Reserves, as allowed by the StanCOG Transit Cost Sharing Procedures which provides StanCOG funding every third fiscal year to conduct triennial performance audits as required by Transp01iation Development Act (ADA) regulations 99246; and

NOW, THEREFORE BE IT RESOLVED that the FY 2020/21 Budget and Overall Work Program (OWP) Amendment #2 is hereby adopted as reflected in Schedules 1, 2, 3 and 4, attached hereto.

BE IT FURTHER RESOLVED that the Executive Director is authorized to make administrative changes, as needed, to ensure that the Overall Work Program is implemented in the most efficient and cost-effective manner possible.

The foregoing Resolution was introduced at a special meeting of the Stanislaus Council of Governments, on the 21st day of April, 2021. A motion was made and seconded to adopt the foregoing Resolution. Motion ca1Tied and the Resolution was adopted.

MEETING DATE: April 21, 2021

ATTEST:

ROSAD

STANISLAUS COUNCIL OF GOVERNMENTS

Operating Expenditure Budget

FY 2020/21

Amendment 3

SCHEDULE #1

FY 2020/21 FY 2020/21 Increase Description Amend 2 Amend 3 (Decrease) Notes

SALARIES & BENEFITS 2,656,987 2,729,790 72,803

SERVICES AND SUPPLIES Administrative Services 13,000 13,000 0

Communications 27,204 27,204 0

Travel, Education, Training and Registrations 225,000 163,000 (62,000}

County Departmental Costs Allocated 31,350 31,350 0

Equipment Maintenance 2,300 2,300 0

Equipment and Technology Purchase 257,000 287,000 30,000

Equipment Rents and Leases 11,800 11,800 0

Insurance 23,000 25,000 2,000

Rideshare Local Incentives 22,778 22,778 0

Memberships 25,000 25,000 0

Office Expense 53,214 53,214 0

Postage/Mail Services 1,000 1,000 0

Printing 18,000 18,000 0

Publications/Legal Notices 20,000 20,000 0

Structures and Grounds - Maintenance 3,320 3,320 0

Structures and Grounds - Rents and Leases 121,950 121,950 0

Utilities 8,500 8,500 0

SERVICES AND SUPPLIES 864,416 834,416 (30,000}

OPERATING CONTRACTS Financial Audit & related svcs. 55,500 55,500 0

Triennial Performance Audit (FY 2019-2021} 85,000 85,000 Triennial Performance Audit

Translation Services 15,000 15,000 0

Legal Counsel 200,000 100,000 (100,000) Contract Reduction

SJ Valley Policy Council Coordinator 24,000 24,000 0

DBE Consultant/ Support Services 30,000 30,000 0

IT Support Contract 150,000 150,000 0

Financial Srategic Planning & Advising 90,000 90,000 0

Consulting Services 114,480 114,480 0

Temporary Support Services 20,000 20,000 0

Traffic Modeling Support 190,990 150,000 (40,990) Reallocated for FY 2021/22

Valley wide Air Quality Coordinator 35,210 35,210 0

Legislative Advocacy 140,000 140,000 0

TOTAL OPERATING CONTRACTS 1,065,180 1,009,190 (55,990)

CONTINGENCIES , 50,000 50,000 0

EXIGENCIES 20,000 20,000 0

TOTAL CONTINGENCIES 70,000 70,000 0

TOTAL CASH EXPENDITURES 4,626,583 4,643,396 16,813

NON-CASH ADJUSTMENTS Depreciation Expense 7,588 7,588 0 I

Indirect Cost Carry forward Amount Prior Years (149,515) (149,515) 0

jTOTAL OPERATING BUDGET II 4,484,656114,501,469 II 16,8131

SCHEDULE#2

Description

CONTRACTS

Area wide Ridesharing Services

Measure L Project Management

Mini Grants - Outreach

FY 18/19 SB1 Formula - Non-Motorized FY 19/20 SB1 Formula - Electrification

Study FY 20/21 SB1 Competitive Transit

Needs Asssessment Human Services Coordinated Plan

Update

Pavement Management Program AB101/RNHA Housing - Land

Consultant

ATP Bike & Ped Education

Transit Study & Implementation

SCS Technical Support

RTP / SCS Update

Regional Travel Model Update

Three County Model Base Year Update

Public Outreach and Education Congestion Management Program

Update Transit Consultant - Valley Flex

MOVE-JARC

TOTAL PROJECT BUDGET

OPERATING BUDGET - SCHEDULE 1

TOTAL STANCOG BUDGET

STANISLAUS COUNCIL OF GOVERNMENTS Project Expenditure Budget

FY 2020/21 Amendment3

FY 2020/21 FY 2020/21 Increase

Amend 2 Amend3 (Decrease)

307,000 382,720 75,720

40,000 40,000 0

15,000 15,000 0

181,874 181,874 0

200,000 200,000 0

206,932 206,932 0

227,460 227,460 0

600,000 600,000 0

200,000 200,000 0

150,981 150,981 0

264,819 264,819 0 30,000 30,000 0

650,000 650,000 0

0 0 0

5,474 5,474 0

175,000 175,000 0

0 0 0

30,000 30,000 0 161,780 161,780 0

3,446,320 3,522,040 75,720

4,484,656 4,501,469 16,813

7,930,977 8,023,509 92,533

Notes

STANISLAUS COUNCIL OF GOVERNMENTS

Operating and Project Revenues

FY 2020/21 Amendment 3

SCHEDULE #3

FY 2020/21 FY 2020/21

Description Amend 2 Amend 3

FEDERAL REVENUE

Federal - FHWA PL 1,184,962 1,103,176

Federal - FHWA PL carryover 765,842 768,938

Federal - FTA Section 5303 261,456 247,843

Federal - FTA Section 5303 carryover 328,181 328,192

Federal - FTA Section 5304 261,031 261,031

Federal - FTA Section 5316 169,341 176,328

Federal -STBGP 150,000 150,000

Federal - CMAQ 11,112 137,809

Federal - CMAQ Carry Over 289,346 244,266

TOTAL FEDERAL REVENUE 3,421,271 3,417,582

STATE REVENUE

State - PPM 214,000 214,000

State - PPM Carryover 97,649 90,641

State -ATP Grant Carry over 203,459 203,367

State - SBl Sustainable Competitive 225,519 225,519

State - FY18/19 SBl Sustainable Communities Carry Over 161,013 161,013

State - FY19/20 SBl Sustainable Communities Carry Over 238,408 238,408

State - FY20/21 SBl Sustainable Communities 290,706 292,248

State - SJV Housing (REAP) 247,805 200,000

TOTAL STATE REVENUE 1,678,559 1,625,195

LOCAL REVENUE

Local - Abandoned Vehicle 9,000 8,968

Local - TDA Ad min 560,173 576,772

Local - LTF Planning 1,002,690 965,168

Local Transportation Authority - Measure L 546,240 724,100

Local - Non-StanCOG 656,343 619,025

Local - Interest 2,500 2,500

Local - Dues 40,000 70,000

Miscellaneous Reimbursements 14,200 14,200

lnterund Revenue - -

TOTAL LOCAL REVENUE 2,831,147 2,980,732

TOTAL-STANCOG REVENUE 7,930,977 8,023,509

Increase

(Decrease)

(81,786)

3,096

(13,613)

11

-6,987

-126,697

(45,080)

(3,689)

-

(7,008)

(92)

(0)

-

-

1,542

(47,805)

(53,364)

(32)

16,599

(37,522)

177,860

(37,318)

-

30,000

-

-

149,586

92,533

APPENDIX II OWP TABLE A FUNDING SOURCES FISCAL YEAR 2020/21 Formal Amendment #3

TC= Toll Credit Match LM = Local Match

METRO TRANSPORTAION PLANNING 012 Public Involvement 021 OWP 023 MPO Coordination 026 Interregional Bicycle Tourism Plan 113 Transportation Modeling and GIS 203 FY 20-21 SB1: Human Services Coordination Plan 300 RTP 302 Environmental Justice 321 Transit 323JARC 330 TIP 338 Performance Based Planning 410 Air Quality _ 411 Congestion Mgmt Process ---------CONSOLIDATED REGIONAL PLANNING 013 Abandoned Vehicle Abatement 022 TOA Admin 029 Regional Bicylst and Pediestrian Safefy and Educati 200 FY1 8-19 SB 1 Sustainable Communities 201 FY19-20 SB 1 Sustainable Communities 202 FY20-21 SB 1 Sustainable Communities 204 FY20-21 SB1: Community Transportation Needs 308 Regional Housing Needs 322 Transp. Demand Mgmt 332 STIP Project Delivery 336 Pavement Management Program Update 388 Rural Transit Alternatives Study 401 Measure L 499 Legislative Program

TOTAL

Available - New Available - Carryover Available - Total

Balance

Toll Credits (TC)

TC = Toll Credit Match LM = Local Match

FTA 5303 FT A Sect 5303 Estimated TC Carryover TC FT A Sect 5304

Match Match Local Match

133,511 195,630

26,765 261,031

10,871 73,308 50,275 16,600 26,421 30,637 -

- 12,017 --

--------------------- -----------

-

- - -

-

- -

247,843 328,192 261,031

251,290 261,031 - 328,192

251,290 328,192 261,031

3,447 0 (0)

28,428 37,644

Page 1 of 3

~eaeraI

FHWA-PL Estimate TC FHWA-PL FHWA-PL FHWA-PL FTA Sect STBGPTC CMAQTC CMAQ

Match Estimate LM Carryover TC Carryover LM 5316 Match Match Carryover LM

14,990 70,744 158,778

208,165 14,530 -

99,928 486,915 512,413

-176,328

287,790 150,000 -12,473 - -

- -5,388 ------ -- -- ------------------ ------------------

- - - ---

- - --

- - -

137,809 244,266

-- -

- - -

610,873 492,303 610,160 158,778 176,328 150,000 137,809 244,266

610,873 508,552 314,915 150,000 137,809 320,000 607,065 158,778 22,500

610,873 508,552 607,065 158,778 314,915 150,000 137,809 342,500

16,249 (3,095) 138,587 98,234

70,067 69,985 17,205 15,807

APPENDIX II

OWP TABLE A FUNDING SOURCES FISCAL YEAR 2020/21 Formal Amendment #3

TC= Toll Credit Match LM = Local Match

METRO TRANSPORTAION PLANNING 01 2 Public Involvement 021 OWP 023 MPO Coordination 026 Interregional Bicycle Tourism Plan 113 Transportation Modeling and GIS 203 FY 20-21 SB1 : Human Services Coordination Plan 300 RTP 302 Environmental Justice 321 Transit 323 JARC 330 TIP 338 Performance Based Planning 41 O Air Quality 411 Congestion Mgmt Process CONSOLIDATED REGIONAL PLANNING 013 Abandoned Vehicle Abatement 022 TOA Admin 029 Regional Bicylst and Pediestrian Safefy and Educi 200 FY18-19 SB 1 Sustainable Communities 201 FY19-20 SB 1 Sustainable Communities 202 FY20-21 SB 1 Sustainable Communities 204 FY 20-21 SB1 : Community Transportation Needs 308 Regional Housing Needs 322 Transp. Demand Mgmt 332 STIP Project Delivery 336 Pavement Management Program Update 388 Rural Transit Alternatives Study 401 Measure L 499 Legislative Program

TOTAL

Available - New Available - Canyover Available • Total

Balance

Toll Credits (TC)

TC = Toll Credit Match LM = Local Match

State

SB 1 Sustainable SB 1 Sustainable Communities

SN REAP Housing Communities Foonula Competitive ATP

.

.

.

··-- ······--·

.

. 203,367

. 161,013 238,408

. 292,247

. 225,519 200,000

.

. .

. .

.

200,000 691,668 225,519 203,367

607,000 300,605 225,519 450,945 203,460

607,000 751,550 225,519 203,460

407,000 59,882 (0) 93

Page 2/3

Loca l

Abandoned PPM Vehicle Measure L LTF Admin LTF Local Other Local Misc

3,000 . 1,000 . .

. 20,571 . .

32,077 . . .

105,474 . . .

36,821 . .

147,090 . 45,995 .

. .

. 8,000 . . .

10,000 .

. . .

112,549 .

. ------------------- ------- ------ ----------

. 8,969 . .

. 385,633 . .

. .

. 20,861 . .

. 27,539 . .

. 37,864 . .

. . 32,600 . . .

. 48,747 . .

. 31,647 20,000 15,729 .

. . 22,079 600,000 19,025

. 724,100 .

. 681,305 70,000 16,700

304,641 8,969 724,100 576,772 965, 168 689,025 16,700

214,000 9,000 400,000 245,000 735,000 640,000 16,700 97,649 342,504 335,000 270,000 150,955

311 ,649 9,000 742,504 580,000 1,005,000 790,955 16,700

7,008 31 18,404 3,228 39,832 101,930

.

APPENDIX II OWP TABLE A FUNDING SOURCES FISCAL YEAR 2020/21 Formal Amendment #3

TC ::: Toll Credit Match LM ::: Local Match

METRO TRANSPORTAION PLANNING 012 Public Involvement 021 OWP 023 MPO Coordination 026 Interregional Bicycle Tourism Plan 113 Transportation Modeling and GIS 203 FY 20-21 SB 1: Human Services Coordination Plan 300 RTP 302 Environmental Justice 321 Transit 323 JARC 330 TIP 338 Performance Based Planning 410 Air Quality

_ 411_ Congestion Mgmt Process ___________________________ CONSOLIDATED REGIONAL PLANNING 013 Abandoned Vehicle Abatement 022 TOA Ad min 029 Regional Bicylst and Pediestrian Safefy and Educa 200 FY18-19 SB 1 Sustainable Communities 201 FY19-20 SB 1 Sustainable Communities 202 FY20-21 SB 1 Sustainable Communities 204 FY 20-21 SB1 : Community Transportation Needs 308 Regional Housing Needs 322 Transp. Demand Mgmt 332 STIP Project Delivery 336 Pavement Management Program Update 388 Rural Transit Alternatives Study 401 Measure L 499 Legislative Program

TOTAL

Total Toll Cedit Match (TC) CMAQ TC Match

37,752 -9,834 -

- -- -

28,613 "

" "

79,891 "

7,671 "

6,545 "

" -50,215 "

2,809 "

" "

- -------------------- ·------------------

- "

- -- "

" "

- -- "

- "

" "

15,807 15,807 " "

" "

" "

" "

" "

239,135 15,807

Page 3/3

1011 uemt Match Calculations

FTA Eslimate TC FTA Carryover TC FHWA PL Estimate FHWAPL STBGP TC Match Match Match TC Carryover TC

- 15,314 22,439 - -- - - 1,719 8,114 - - " " -- - " - "

" 3,070 " 23,877 1,667 " - " " -" 1,247 8,408 11,462 58,774 " 5,767 1,904 " -- 3,030 3,514 - "

" " " - "

17,205 - " 33,010 "

" " 1,378 " 1,431 " - " - "

- " - " -------------------- ------------------ ------------------- -------- ---------- -------------------

- " " " -- " " " -" " " " -- " - - -" " " " "

" - " " -" - " - -" - " - -" " " " "

- - " - -" " " - "

" - " " -" " " - "

" - " " -

17,205 28,428 37,644 70,067 69,985