Rev: 0 24-01-08 D E S C R I P T I O N UOM Manhour/Uom A- 1 Engineering D- 14 Detail Engineering G- 140 Detail Engineering CCTR- 14000 Detail Engineering Sub CCTR- 140000000 Tesing nos 23.0000 Sub CCTR- 140000001 Detail Drawings Eqv A-3 Size nos 10.0000 A- 2 Construction D- 21 Civil G- 211 Earth Work CCTR- 21110 Clearing / Grubbing / Stripping / Top Soil Removal Sub CCTR- 211100002 Grading / grubs / shrubs / stumps / hedges / bush (upto 15 cm depth) without compaction & haulag m2 0.0200 Sub CCTR- 211100004 Stripping / Top soil removal upto 30 cm depth without compaction and haulage m2 0.0300 Sub CCTR- 211100006 Stripping / Top soil removal from 30 to 50 cm depth without compaction and haulage m2 0.0300 Sub CCTR- 211100008 Sub-Grade Preparation (300mm thick) m2 0.0300 CCTR- 21120 General Open Section Excavation by Machine (without dewatering /shoring) Sub CCTR- 211200001 Open section Excavation in Medium soil (upto 2m depth) & haul upto stockpile area. (Within 1 km) m3 0.0200 Sub CCTR- 211200002 Open section Excavation in Medium soil (2 to 4 m depth) & haul upto stock pile (Within 1 km) m3 0.0200 Sub CCTR- 211200003 Open section Excavation in Hard soil (upto 2 m depth) & haul upto stockpile area. (Within 1 km) m3 0.0300 Sub CCTR- 211200004 Open section Excavation in Hard soil (2 to 4 m depth) & haul upto stockpile area (Within 1 km) m3 0.0300 Sub CCTR- 211200005 Open section Excavation (Restricted space) in rock with blasting & haul upto stockpile area (Wit m3 1.0000 Sub CCTR- 211200006 Open section Excavation (Free space) in rock with blasting & haul upto stockpile area (Within 1 m3 1.0000 Sub CCTR- 211200011 Dredging & haul upto stockpile area (Within 1 km) m3 0.5000 CCTR- 21122 Structural / Fixed Section Excavation by Machine (Without Dewatering / Shoring/Dressing) Sub CCTR- 211220001 Fixed section Excavation by machine in Medium soil (upto 2 m depth) & haul upto stockpile m3 0.8000 Sub CCTR- 211220002 Fixed section Excavation by machine in Medium soil (2 to 4 m depth) & haul upto stockpile m3 0.8000 Sub CCTR- 211220003 Fixed section Excavation by machine in Medium soil (below 4m depth) & haul upto stockpile m3 1.0000 Sub CCTR- 211220007 Fixed section Excavation in Hard soil (upto 2 m depth) & haul upto stockpile m3 2.0000 Sub CCTR- 211220008 Fixed section Excavation by machine in Hard (2 to 4 m depth) & haul upto stockpile m3 2.0000 Sub CCTR- 211220009 Fixed section excavation by machine in Hard soil (below 4 m) & haul upto stock area m3 2.0000 CCTR- 21124 Structural / Fixed Section Excavation by Hand (Without Dewatering / Shoring) Sub CCTR- 211240001 Fixed section Excavation by hand in Medium soil (upto 2 m) & haul upto stockpile m3 4.0000 Sub CCTR- 211240002 Fixed section Excavation by hand in Medium soil (from 2 to 4 m) & haul upto stockpile m3 5.0000 Sub CCTR- 211240003 Fixed section Excavation by hand in Medium soil (below 4 m) & haul upto stockpile m3 6.0000 Sub CCTR- 211240007 Fixed section Excavation by hand in Hard soil (upto 2 m) & haul upto stockpile m3 10.0000 Sub CCTR- 211240008 Fixed section Excavation by hand in Hard soil (from 2 to 4 m) & haul upto stockpile m3 12.0000 Sub CCTR- 211240009 Fixed section Excavation by hand in Hard soil (below 4 m) & haul upto stockpile m3 15.0000 CCTR- 21130 Back Filling General / Open section with compaction Sub CCTR- 211300001 General / Open section backfilling with excavated material (Hauled from stockpile) m3 0.1500 Sub CCTR- 211300002 General / Open section backfilling with borrow (sand, clay) material m3 0.1500 Sub CCTR- 211300003 General / Open section backfilling with borrow (granular) material m3 0.1500 CCTR- 21131 Back Filling Structural / Fixed Section with Compaction Sub CCTR- 211310010 Structural Fixed section back filling and compaction with Excavated material (Hauled from stock m3 2.8000 Sub CCTR- 211310020 Structural Fixed section back filling and compaction with Barrow material (Sand, clay) m3 2.8000 Sub CCTR- 211310030 Structural Fixed section back filling and compaction with Barrow material (Granular) m3 2.8000 CCTR- 21132 Formation of Embankment (with compaction ) Sub CCTR- 211320010 Formation of compacted Embankment with Excavated material (Hauled form Stockpile) m3 0.1500 Sub CCTR- 211320020 Formation of compacted Embankment with Barrow material (sand,clay) m3 0.1500 Sub CCTR- 211320030 Formation of compacted Embankment with Barrow material (Gravel, moorum)) m3 0.2000 CCTR- 21135 Fill without compaction Sub CCTR- 211350001 General fill by machine without compaction m3 0.0300 Sub CCTR- 211350002 General fill by hand without compaction m3 1.2000 Sub CCTR- 211350003 General fill by machine / hand without compaction m3 0.4000 CCTR- 21140 Disposal Sub CCTR- 211400001 Disposal of surplus soil / debris upto 5 Km m3 0.0100 Sub CCTR- 211400002 Disposal of surplus soil / debris 5 to 10 Km m3 0.0100 Sub CCTR- 211400030 Disposal of Surplus soil / debris 10 to 20 Km m3 0.0100 Sub CCTR- 211400040 Disposal of surplus soil / debris 20 to 30 Km m3 0.0100 Sub CCTR- 211400050 Disposal of surplus soil / debris 30 to 40 Km m3 0.0100 Sub CCTR- 211400060 Disposal of surplus soil / debris more than 40 Km m3 0.0100 CCTR- 21145 Compaction Sub CCTR- 211450001 Compaction of earth in Fixed section (150 mm depth) m3 0.2500 Sub CCTR- 211450002 Compaction of earth in Open section (150 mm depth) m3 0.1000 Sub CCTR- 211450003 Vibroflotation / Deep Vibration m 1.2000 CCTR- 21155 Shoring (Erection & Stripping) Sub CCTR- 211550001 Erection of Shoring for excavation Depth 2 ~ 4 meters m2 2.5000 Sub CCTR- 211550002 Erection of shoring for excavation Above 4 meters depth m2 4.0000 CCTR- 21160 Termite Proofing / Treatment Sub CCTR- 211600001 Termite Treatment m2 0.0200 CCTR- 21170 Dewatering Sub CCTR- 211700010 Extra over for excavation with dewatering (for soil below existing water level) m3 2.5000 CCTR- 21180 Boring / Drilling Sub CCTR- 211800010 Boring for pump installation Dia 4" to 6" depth up to 15 m m 0.2000 Sub CCTR- 211800020 Boring for Piles dia 300 mm to 600 mm depth up to 12 m m 0.2500 Sub CCTR- 211800030 Boring for Piles dia 600 mm to 1000 mm depth up to 12 m m 0.3000 Sub CCTR- 211800040 Boring for Piles dia 1000 mm to 1500 mm depth up to 12 m m 0.3500 Sub CCTR- 211800050 Extra over for Boring of pile dia 300 mm to 600 mm depth greater than 12 m m 0.3000 Sub CCTR- 211800060 Extra over for Boring of pile dia 600 mm to 1000 mm depth greater than 12 m m 0.3500 Sub CCTR- 211800070 Extra over for Boring of pile dia 1500 mm to 1500 mm depth greater than 12 m m 0.4000 G- 212 Concrete CCTR- 21210 Cement Concrete Production and Supply at Location Sub CCTR- 212100001 Conc. Production by Batch Plant, Cylinder Strength C15 (1:3:6) , OP m3 1.5000 Sub CCTR- 212100002 Conc. Production by Batch Plant, Cylinder Strength C20 (1:2:4) , OP m3 1.5000 Sub CCTR- 212100003 Conc. Production by Batch Plant, Cylinder Strength C40 (1:1:2) , OP m3 1.5000 Sub CCTR- 212100004 Conc. Production by Batch Plant, Cylinder Strength C15 (1:3:6) , SR m3 1.5000 Sub CCTR- 212100005 Conc. Production by Batch Plant, Cylinder Strength C20 (1:2:4) , SR m3 1.5000 Sub CCTR- 212100006 Conc. Production by Batch Plant, Cylinder Strength C40 (1:1:2) , SR m3 1.5000 Sub CCTR- 212100007 Conc. Production by Mixer Machine, Cylinder Strength C17 (1:2.5:5) , OP m3 5.0000 Sub CCTR- 212100008 Conc. Production by Mixer Machine, Cylinder Strength C20 (1:2:4) , OP m3 5.0000 Sub CCTR- 212100009 Conc. Production by Mixer Machine, Cylinder Strength C40 (1:1:2) , OP m3 5.0000 Sub CCTR- 212100010 Conc. Production by Mixer Machine, Cylinder Strength C17 (1:2.5:5) ,SR m3 5.0000 Sub CCTR- 212100011 Conc. Production by Mixer Machine, Cylinder Strength C20 (1:2:4) , SR m3 5.0000 Sub CCTR- 212100012 Conc. Production by Mixer Machine, Cylinder Strength C40 (1:1:2) , SR m3 5.0000

Overall Cctr

Embed Size (px)

DESCRIPTION

Overall cost center list

Citation preview

CCTR-AllRev: 0124-01-08D E S C R I P T I O NUOMManhour/UomA-1EngineeringD-14Detail EngineeringG-140Detail EngineeringCCTR-14000Detail EngineeringSub CCTR-140000000Tesingnos23.0000Sub CCTR-140000001Detail Drawings Eqv A-3 Sizenos10.0000A-2ConstructionD-21CivilG-211Earth WorkCCTR-21110Clearing / Grubbing / Stripping / Top Soil RemovalSub CCTR-211100002Grading / grubs / shrubs / stumps / hedges / bush (upto 15 cm depth) without compaction & haulagem20.0200Sub CCTR-211100004Stripping / Top soil removal upto 30 cm depth without compaction and haulagem20.0300Sub CCTR-211100006Stripping / Top soil removal from 30 to 50 cm depth without compaction and haulagem20.0300Sub CCTR-211100008Sub-Grade Preparation (300mm thick)m20.0300CCTR-21120General Open Section Excavation by Machine (without dewatering /shoring)Sub CCTR-211200001Open section Excavation in Medium soil (upto 2m depth) & haul upto stockpile area. (Within 1 km)m30.0200Sub CCTR-211200002Open section Excavation in Medium soil (2 to 4 m depth) & haul upto stock pile (Within 1 km)m30.0200Sub CCTR-211200003Open section Excavation in Hard soil (upto 2 m depth) & haul upto stockpile area. (Within 1 km)m30.0300Sub CCTR-211200004Open section Excavation in Hard soil (2 to 4 m depth) & haul upto stockpile area (Within 1 km)m30.0300Sub CCTR-211200005Open section Excavation (Restricted space) in rock with blasting & haul upto stockpile area (Within 1 km)m31.0000Sub CCTR-211200006Open section Excavation (Free space) in rock with blasting & haul upto stockpile area (Within 1 km)m31.0000Sub CCTR-211200011Dredging & haul upto stockpile area (Within 1 km)m30.5000CCTR-21122Structural / Fixed Section Excavation by Machine (Without Dewatering / Shoring/Dressing)Sub CCTR-211220001Fixed section Excavation by machine in Medium soil (upto 2 m depth) & haul upto stockpilem30.8000Sub CCTR-211220002Fixed section Excavation by machine in Medium soil (2 to 4 m depth) & haul upto stockpilem30.8000Sub CCTR-211220003Fixed section Excavation by machine in Medium soil (below 4m depth) & haul upto stockpilem31.0000Sub CCTR-211220007Fixed section Excavation in Hard soil (upto 2 m depth) & haul upto stockpilem32.0000Sub CCTR-211220008Fixed section Excavation by machine in Hard (2 to 4 m depth) & haul upto stockpilem32.0000Sub CCTR-211220009Fixed section excavation by machine in Hard soil (below 4 m) & haul upto stock aream32.0000CCTR-21124Structural / Fixed Section Excavation by Hand (Without Dewatering / Shoring)Sub CCTR-211240001Fixed section Excavation by hand in Medium soil (upto 2 m) & haul upto stockpilem34.0000Sub CCTR-211240002Fixed section Excavation by hand in Medium soil (from 2 to 4 m) & haul upto stockpilem35.0000Sub CCTR-211240003Fixed section Excavation by hand in Medium soil (below 4 m) & haul upto stockpilem36.0000Sub CCTR-211240007Fixed section Excavation by hand in Hard soil (upto 2 m) & haul upto stockpilem310.0000Sub CCTR-211240008Fixed section Excavation by hand in Hard soil (from 2 to 4 m) & haul upto stockpilem312.0000Sub CCTR-211240009Fixed section Excavation by hand in Hard soil (below 4 m) & haul upto stockpilem315.0000CCTR-21130Back Filling General / Open section with compactionSub CCTR-211300001General / Open section backfilling with excavated material (Hauled from stockpile)m30.1500328122.9670.820361809.714821751749.9919258706262.498788880626.249878888113.124939444Sub CCTR-211300002General / Open section backfilling with borrow (sand, clay) materialm30.1500Sub CCTR-211300003General / Open section backfilling with borrow (granular) materialm30.1500CCTR-21131Back Filling Structural / Fixed Section with CompactionSub CCTR-211310010Structural Fixed section back filling and compaction with Excavated material (Hauled from stock pile)m32.8000Sub CCTR-211310020Structural Fixed section back filling and compaction with Barrow material (Sand, clay)m32.8000Sub CCTR-211310030Structural Fixed section back filling and compaction with Barrow material (Granular)m32.8000CCTR-21132Formation of Embankment (with compaction )Sub CCTR-211320010Formation of compacted Embankment with Excavated material (Hauled form Stockpile)m30.1500328122.9670.820361809.714821751749.9919258706262.498788880626.249878888113.124939444Sub CCTR-211320020Formation of compacted Embankment with Barrow material (sand,clay)m30.1500Sub CCTR-211320030Formation of compacted Embankment with Barrow material (Gravel, moorum))m30.2000CCTR-21135Fill without compactionSub CCTR-211350001General fill by machine without compactionm30.0300Sub CCTR-211350002General fill by hand without compactionm31.2000Sub CCTR-211350003General fill by machine / hand without compactionm30.4000CCTR-21140DisposalSub CCTR-211400001Disposal of surplus soil / debris upto 5 Kmm30.0100Sub CCTR-211400002Disposal of surplus soil / debris 5 to 10 Kmm30.0100Sub CCTR-211400030Disposal of Surplus soil / debris 10 to 20 Kmm30.0100Sub CCTR-211400040Disposal of surplus soil / debris 20 to 30 Kmm30.0100Sub CCTR-211400050Disposal of surplus soil / debris 30 to 40 Kmm30.0100Sub CCTR-211400060Disposal of surplus soil / debris more than 40 Kmm30.0100CCTR-21145CompactionSub CCTR-211450001Compaction of earth in Fixed section (150 mm depth)m30.2500Sub CCTR-211450002Compaction of earth in Open section (150 mm depth)m30.1000Sub CCTR-211450003Vibroflotation / Deep Vibrationm1.2000CCTR-21155Shoring (Erection & Stripping)Sub CCTR-211550001Erection of Shoring for excavation Depth 2 ~ 4 metersm22.5000Sub CCTR-211550002Erection of shoring for excavation Above 4 meters depthm24.0000CCTR-21160Termite Proofing / TreatmentSub CCTR-211600001Termite Treatmentm20.0200CCTR-21170DewateringSub CCTR-211700010Extra over for excavation with dewatering (for soil below existing water level)m32.5000CCTR-21180Boring / DrillingSub CCTR-211800010Boring for pump installation Dia 4" to 6" depth up to 15 mm0.2000Sub CCTR-211800020Boring for Piles dia 300 mm to 600 mm depth up to 12 mm0.2500Sub CCTR-211800030Boring for Piles dia 600 mm to 1000 mm depth up to 12 mm0.3000Sub CCTR-211800040Boring for Piles dia 1000 mm to 1500 mm depth up to 12 mm0.3500Sub CCTR-211800050Extra over for Boring of pile dia 300 mm to 600 mm depth greater than 12 mm0.3000Sub CCTR-211800060Extra over for Boring of pile dia 600 mm to 1000 mm depth greater than 12 mm0.3500Sub CCTR-211800070Extra over for Boring of pile dia 1500 mm to 1500 mm depth greater than 12 mm0.4000G-212ConcreteCCTR-21210Cement Concrete Production and Supply at LocationSub CCTR-212100001Conc. Production by Batch Plant, Cylinder Strength C15 (1:3:6) , OPm31.5000Sub CCTR-212100002Conc. Production by Batch Plant, Cylinder Strength C20 (1:2:4) , OPm31.5000Sub CCTR-212100003Conc. Production by Batch Plant, Cylinder Strength C40 (1:1:2) , OPm31.5000Sub CCTR-212100004Conc. Production by Batch Plant, Cylinder Strength C15 (1:3:6) , SRm31.5000Sub CCTR-212100005Conc. Production by Batch Plant, Cylinder Strength C20 (1:2:4) , SRm31.5000Sub CCTR-212100006Conc. Production by Batch Plant, Cylinder Strength C40 (1:1:2) , SRm31.5000Sub CCTR-212100007Conc. Production by Mixer Machine, Cylinder Strength C17 (1:2.5:5) , OPm35.0000Sub CCTR-212100008Conc. Production by Mixer Machine, Cylinder Strength C20 (1:2:4) , OPm35.0000Sub CCTR-212100009Conc. Production by Mixer Machine, Cylinder Strength C40 (1:1:2) , OPm35.0000Sub CCTR-212100010Conc. Production by Mixer Machine, Cylinder Strength C17 (1:2.5:5) ,SRm35.0000Sub CCTR-212100011Conc. Production by Mixer Machine, Cylinder Strength C20 (1:2:4) , SRm35.0000Sub CCTR-212100012Conc. Production by Mixer Machine, Cylinder Strength C40 (1:1:2) , SRm35.0000Sub CCTR-212100025Conc. Production by Batch Plant, Cylinder Strength C10 (1:4:8) , OPm31.5000Sub CCTR-212100026Conc. Production by Batch Plant, Cylinder Strength C10 (1:4:8) , SRm31.5000Sub CCTR-212100027Conc. Production by Mixer Machine, Cylinder Strength C10 (1:4:8) , OPm35.0000Sub CCTR-212100028Conc. Production by Mixer Machine, Cylinder Strength C10 (1:4:8) , SRm35.0000Sub CCTR-212100033Conc. Production by Batch Plant,Cylinder Strength C30 (1:1.5:3) , OPm31.5000Sub CCTR-212100034Conc. Production by Batch Plant, Cylinder Strength C30 (1:1.5:3) , SRm31.5000Sub CCTR-212100035Conc. Production by Mixer Machine, Cylinder Strength C30 (1:1.5:3) , OPm35.0000Sub CCTR-212100036Conc. Production by Mixer Machine, Cylinder Strength C30 (1:1.5:3) , SRm35.0000Sub CCTR-212100037Conc. Production by Batch Plant, Cylinder Strength C25 (1:1.75:3.5), OPm31.5000Sub CCTR-212100038Conc. Production by Batch Plant, Cylinder Strength C25 (1:1.75:3.5), SRm31.5000Sub CCTR-212100039Conc. Production by Mixer Machine, Cylinder Strength C25 (1:1.75:3.5), OPm35.0000Sub CCTR-212100040Conc. Production by Mixer Machine, Cylinder Strength C25 (1:1.75:3.5), SRm35.0000Sub CCTR-212100041Conc. Production by Batch Plant, Cylinder Strength C35 (1:1.25:2.5), OPm31.5000Sub CCTR-212100042Conc. Production by Batch Plant, Cylinder Strength C35 (1:1.25:2.5), SRm31.5000Sub CCTR-212100043Conc. Production by Mixer Machine, Cylinder Strength C35 (1:1.25:2.5), OPm35.0000Sub CCTR-212100044Conc. Production by Mixer Machine, Cylinder Strength C35 (1:1.25:2.5), SRm35.0000Sub CCTR-212100500Extra-over for Red-oxide (5 Kg/m3) added Concretem30.0100Sub CCTR-212100510Extra-over for Micro Silica in Concretem30.0100Sub CCTR-212100520Conc. Production by Batch Plant, Cylinder Strength C7 (1:6:12), OPm31.5000Sub CCTR-212100530Conc. Production by Batch Plant, Cylinder Strength C17 (1:2.5:5), OPm31.5000Sub CCTR-212100540Conc. Production by Mixer Machine, Cylinder Strength C7 (1:6:12), OPm35.0000Sub CCTR-212100550Conc. Production by Mixer Machine, Cylinder Strength C15 (1:3:6), OPm35.0000Sub CCTR-212100560Conc. Production by Batch Plant, Cylinder Strength C7 (1:6:12), SRm31.5000Sub CCTR-212100570Conc. Production by Batch Plant, Cylinder Strength C17 (1:2.5:5), SRm31.5000Sub CCTR-212100580Conc. Production by Mixer Machine, Cylinder Strength C7 (1:6:12), SRm35.0000Sub CCTR-212100590Conc. Production by Mixer Machine,Cylinder Strength C15 (1:3:6), SRm35.0000Sub CCTR-212100600Haulage only of concrete 1 to 5 km away from batching locationm30.0100CCTR-21215Supply of Ready Mix ConcreteSub CCTR-212150005Supply & Haul Ready Mix Concrete C-10 (OP)m30.0020Sub CCTR-212150010Supply & Haul Ready Mix Concrete C-10 (SR)m30.0020Sub CCTR-212150015Supply & Haul Ready Mix Concrete C-15 (OP)m30.0020Sub CCTR-212150020Supply & Haul Ready Mix Concrete C-15 (SR)m30.0020Sub CCTR-212150025Supply & Haul Ready Mix Concrete C-20 (OP)m30.0020Sub CCTR-212150030Supply & Haul Ready Mix Concrete C-20 (SR)m30.0020Sub CCTR-212150035Supply & Haul Ready Mix Concrete C-25 (OP)m30.0020Sub CCTR-212150040Supply & Haul Ready Mix Concrete C-25 (SR)m30.0020Sub CCTR-212150045Supply & Haul Ready Mix Concrete C-30 (OP)m30.0020Sub CCTR-212150050Supply & Haul Ready Mix Concrete C-30 (SR)m30.0020Sub CCTR-212150055Supply & Haul Ready Mix Concrete C-35 (OP)m30.0020Sub CCTR-212150060Supply & Haul Ready Mix Concrete C-35 (SR)m30.0020Sub CCTR-212150065Supply & Haul Ready Mix Concrete C-40 (OP)m30.0020Sub CCTR-212150070Supply & Haul Ready Mix Concrete C-40 (SR)m30.0020Sub CCTR-212150100Extra Over for Microsilicam30.0020Sub CCTR-212150105Extra Over for Red Colouring Concretem30.0020Sub CCTR-212150110Supply & Haul Ready Mix Fireproof Concrete (with aditive) rating 1 Hourm30.0500Sub CCTR-212150115Supply & Haul Ready Mix Fireproof Concrete (with aditive) rating 2 Hourm30.0500CCTR-21220Concrete Placing in Sub-StructureSub CCTR-212200001Concrete Placing in Substructure by Concrete Pump / Cranem36.0000Sub CCTR-212200002Concrete Placing in substructure by wheel barrowsm310.0000Sub CCTR-212200003Concrete Placing in substructure by chutem38.0000CCTR-21230Concrete Placing in Super StructureSub CCTR-212300001Concrete placing in superstructure by Concrete Pumpm310.0000Sub CCTR-212300002Concrete placing in superstructure by cranem312.0000Sub CCTR-212300003Concrete Placing in superstructure by Winch / Hoist / Wheel barrowm316.0000CCTR-21235Fire ProofingSub CCTR-212350001Placing of fire proof concrete (50 mm thk) by mortar panm20.1000Sub CCTR-212350003Supply & Placing Ready Mix fireproof concrete (1 hour rating) with guniting (complete job with reinforcement) by supplierm20.1000Sub CCTR-212350004Placing of fire proof concrete by spray application (Guniting without forms) on structure (50 mm thk)m20.1000Sub CCTR-212350005Placing of fire proof concrete on Equipments (50 mm thk) by mortar panm23.5000Sub CCTR-212350008Placing of fire proof concrete on structure (50 mm thk), by Cranem23.6000Sub CCTR-212350010Placing of fire proof concrete on Equipments (50 mm thk), by Cranem22.8500Sub CCTR-212350110Supply and placing of Ready mix fireproof concrete (2 hour rating) with guniting (complete job with reinforcement) by supplierm20.0800CCTR-21250Concrete Placing for Pre-Cast ElementsSub CCTR-212500030Concrete Placing for Precast panels / louvers / covers / windo sill (Excl. Formwork)m315.0000CCTR-21255Erection of Pre-cast ElementsSub CCTR-212550001Erection of Pre-cast pannels / louvers / covers / window sillm325.0000Sub CCTR-212550002Erection of Pre-cast Girdersm325.0000CCTR-21260Concrete Placing with Slipforms (including slipforms)Sub CCTR-212600010Concrete placing for silos with slipforming (incl running slipforms)m320.0000Sub CCTR-212600020Concrete placing for chimneys with slipforming (incl running slipforms)m340.0000CCTR-21270GroutingSub CCTR-212700001Place Ready mix non shrink Epoxy Grout (incl. Formwork)m3350.0000Sub CCTR-212700002Place Ready mix non shrink Cementious Grout (incl. Formwork)m3300.0000Sub CCTR-212700003Place Non Ready mix Non-shrink (with aditive) Cement sand (PCC) Grout (incl. Formwork)m3300.0000Sub CCTR-212700040Place PCC Grout without aditive (incl. Formwork)m3100.0000CCTR-21280Concrete Placing for PilesSub CCTR-212800010Concrete placing for pile by chute / pumpm38.0000Sub CCTR-212800020Concrete placing for pile by Sub contractorm30.2500G-213Form Work / ShutteringCCTR-21310Form Work Sub-StructureSub CCTR-213100001Erection & stripping of metal formwork for Substructurem26.5000Sub CCTR-213100002Erection & stripping of Plywood formwork for Substructurem25.0000CCTR-21320Form Work Super-StructureSub CCTR-213200001Erection & stripping of Metal formwork for Super-structurem210.0000Sub CCTR-213200002Erection & stripping of Plywood formwork for Super- structurem28.0000Sub CCTR-213200003Extra over for fair face formed surface (metal plate) for Super-structurem20.5000Sub CCTR-213200004Extra over for fair face formed surface (Ply wood) for Super-structurem22.0000CCTR-21330Form Work Repair and MaintenanceSub CCTR-213300010Form Work Repair and Maintenancem21.6000CCTR-21340Form Work for Pre-Cast ElementsSub CCTR-213400010Formwork for Pre-cast Elementsm26.0000G-214RebarCCTR-21410Steel RebarSub CCTR-214100025Cut, bend, shift, hoist & fix (BS -4449) Deformed Steel Gr-250ton90.0000Sub CCTR-214100026Cut, bend, shift, hoist & fix (BS -4449) Ribbed Tor Steel Gr-250ton90.0000Sub CCTR-214100027Cut, bend, shift, hoist & fix (BS -4449) Plain Steel Gr-250ton90.0000Sub CCTR-214100028Cut, bend, shift, hoist & fix (BS -4449) Epoxy Coated Deformed Steel Gr-250ton90.0000Sub CCTR-214100032Cut, bend, shift, hoist & fix (BS -4449) Deformed Steel Gr-460ton90.0000Sub CCTR-214100033Cut, bend, shift, hoist & fix (BS -4449) Ribbed Tor Steel Gr-460ton90.0000Sub CCTR-214100034Cut, bend, shift, hoist & fix (BS -4449) Epoxy Coated Deformed Steel Gr-460ton90.0000Sub CCTR-214100037Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO M-31) Deformed Steel Gr-40ton90.0000Sub CCTR-214100038Cut, bend, shift, hoist & fix (ASTM A-82/ AASHTO M-32) Ribbed Tor Steel Gr-40ton90.0000Sub CCTR-214100039Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO M-31) Plain Steel Gr-40ton90.0000Sub CCTR-214100040Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO M-31) Epoxy Coated Deformed Steel Gr-40ton90.0000Sub CCTR-214100044Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO M-31) Deformed Steel Gr-60ton90.0000Sub CCTR-214100045Cut, bend, shift, hoist & fix (ASTM A-82/ AASHTO M-32) Ribbed Tor Steel Gr-60ton90.0000Sub CCTR-214100046Cut, bend, shift, hoist & fix (ASTM A-615/ AASHTO M-31) Epoxy Coated Deformed Steel Gr-60ton90.0000Sub CCTR-214100049Fix Only Pre-Fabricated & Bended non epoxy coatedton50.0000Sub CCTR-214100050Fix Only Pre-Fabricated & Bended Rebar epoxy coatedton50.0000Sub CCTR-214100052Cut, bend (by machine) and Bind (at Yard) for Pilington40.0000Sub CCTR-214100053Posttensioning of steelton3.5000Sub CCTR-214100540Cut, bend, hoist & fix by sub contractor non coated rebarton2.7000Sub CCTR-214100550Cut, bend, hoist & fix by sub contractor epoxy coated rebarton2.7000CCTR-21420Welded Wire FabricSub CCTR-214200004Laying / Fixing of M.S welded wire fabricton40.0000Sub CCTR-214200005Laying / Fixing of Galvanized welded wire fabricton40.0000Sub CCTR-214200006Laying / Fixing of Epoxy Coated welded wire fabricton40.0000G-215Masonry Brick, Block and PlasteringCCTR-21510Masonry (Brick) WorkSub CCTR-215100001Brick masonry (Excluding wall ties) in sub - structurem320.0000Sub CCTR-215100002Brick masonry upto 5 m (Excluding wall ties) in super structurem323.5000Sub CCTR-215100004Brick masonry from 5 m to 10 m (Excluding wall ties) in super structurem324.2500Sub CCTR-215100006Brick masonry above 10 m (Excluding wall ties) in super structurem325.0000Sub CCTR-215100007Brick masonry above 10 m (with wall ties) in super structurem326.0000Sub CCTR-215100070Brick Masonry facing tile for wallm27.0000Sub CCTR-215100080Glass Block Workm20.2400Sub CCTR-215100090Installation of wall ties / dowels / anchorage / reinforcement incl. cut, bend & fixton90.0000CCTR-21520Masonry (Block) WorkSub CCTR-215200001Block masonry (Excluding wall ties) in sub structurem314.0000Sub CCTR-215200003Block masonry (Excluding wall ties) upto 5 m in super structurem320.0000Sub CCTR-215200004Block masonry (Excluding wall ties) 5 m to 10 m in super structurem320.0000Sub CCTR-215200006Block masonry (Excluding wall ties) above 10 m in super structurem320.0000Sub CCTR-215200070Preparation of Masonry Hollow Blocksm38.0000Sub CCTR-215200080Preparation of Masonry Solid Blocksm38.0000Sub CCTR-215200090Filling cavity of Hollow Blocksm316.0000CCTR-21525Plaster / Pointing WorkSub CCTR-215250001Plaster / Pointing for Height upto 5.0 metres (Excluding metal Lath) in wallsm22.0000Sub CCTR-215250002For Height upto 5.0 metres (with metal Lath) in wallsm22.2500Sub CCTR-215250003Plaster / Pointing for Height between 5.0 m to 10 m (Excluding metal lath) in wallsm22.2500Sub CCTR-215250005Plaster / Pointing for Height above 10 m (Excluding metal Lath) in wallsm22.5000Sub CCTR-215250007Plaster / Pointing for Ceiling at any heightm22.2500Sub CCTR-215250080Installation of metal lath / beeds on masonarym1.0000CCTR-21540Stone Pitching / Rip Rap / GabionSub CCTR-215400010Stone Pitching / Rip Rap / Gabion 6" deep (Grouted)m320.00001SupervisorSub CCTR-215400020Stone Pitching / Rip Rap / Gabion 6" deep (Non grouted)m315.00002ForemanG-216Flooring & Tiling4MasonCCTR-21610Flooring4LabourerSub CCTR-216100001Place concrete P.C.C / R.C.C for floor 2"thk (Excluding Joint Sealant)m36.00004Semi SkilledSub CCTR-216100002Place concrete P.C.C / R.C.C for floor 4" to 6" thk (Excluding Joint Sealant)m35.00004Skilled LabourSub CCTR-216100007Application of Hardening / Anti dust / Anti skid / Epoxy treatment (2 coats) incl surface preparationm20.60003Stone CutterSub CCTR-216100008Place cement topping / levelling mortar / screeding (30mm / 50mm)m36.0000Sub CCTR-216100009Prepare & Place Terrazo (cast - in - place) with Grinding & Polishingm25.0000Sub CCTR-216100010Lay Brick-on-edge paving with sand groutingm22.5000Sub CCTR-216100012Lay Brick Ballast 3" thkm20.4200Sub CCTR-216100013Installation of Raised / Floating floor with pivotm20.1800CCTR-21620Tiling / SkirtingSub CCTR-216200001Installation of PVC / VCT tiles for flooringm21.2500Sub CCTR-216200002Installation of AR/Anti acid tiles for flooringm24.5000Sub CCTR-216200003Installation of Marble / Granite tiles for flooring with polishing.m26.5000Sub CCTR-216200004Installation of Ceramic for flooringm24.5000Sub CCTR-216200006Installation of Terrazo tiles (pre-cast) for flooring with polishingm23.0000Sub CCTR-216200008Installation of Tuff/Inter locking tilesm21.5000Sub CCTR-216200010Installation of PVC tiles / strip for dado / skirtingm21.5000Sub CCTR-216200011Installation of Terrazo tiles for dado / skirtingm23.5000Sub CCTR-216200012Installation of Ceramic tiles for dado / skirtingm25.0000Sub CCTR-216200013Installation of Marble tiles for dado / skirtingm27.0000Sub CCTR-216200014Installation of Vinyl tiles for dado / skirtingm21.5000Sub CCTR-216200150Installation of AR / Anti Acid tiles for dado / skirtingm25.0000G-217RoadsCCTR-21710Granular Base / Sub Base for RoadSub CCTR-217100010Fill and compaction for Base of Roadm30.2000328122.9670.820361809.714821751749.9919258706349.998385174134.999838517417.4999192587Sub CCTR-217100020Fill and compaction for Sub Base of Roadm30.2000Sub CCTR-217100030Fill and compaction for Water Bound Maccadom of Roadm30.2000CCTR-21740Production of Asphalt Concrete and Supply at LocationSub CCTR-217400001Production of Binder course by Asphalt Batch plantm31.5000Sub CCTR-217400002Haulage of Asphalt mix up to 2 Km away / Kmm30.0250Sub CCTR-217400003Haulage of Asphalt mix above 2 Km to 5 Km away / Kmm30.2500Sub CCTR-217400004Haulage of Asphalt mix above 5 Km to 10 Km away / Kmm30.2500Sub CCTR-217400005Haulage of Asphalt mix above 10 Km to 30 Km away / Kmm30.2500Sub CCTR-217400006Production of Wear course by Asphalt Batch plantm31.5000Sub CCTR-217400011Production of Binder Course by mixer / Burnerm34.2500Sub CCTR-217400012Production of Wear Course by mixer / Burnerm34.2500Sub CCTR-217400013Supply, Lay & compact Ready Mix A.B.C from subcontractor at Locationm30.5000Sub CCTR-217400014Production of Asphalt Mastic by Batch Plant and supply at locationm30.3000Sub CCTR-217400015Production of Asphalt mastic by Mixer / Burnerm34.2500Sub CCTR-217400016Supply, Lay & compact Ready Mix A.W.C from subcontractor at Locationm30.5000CCTR-21745Placing and compaction of Asphaltic Concrete / masticSub CCTR-217450001Placing Binder course by paver incl. compaction, in unconfined aream32.0000Sub CCTR-217450002Placing Binder Course by paver incl. compaction, in confined aream33.0000328122.9670.166712561.6329909355.65212318521066.9563695555106.695636955553.3478184778Sub CCTR-217450003Placing Wear course by paver incl. compaction, in unconfined aream32.0000Sub CCTR-217450004Placing Wear Course by paver incl. compaction, in confined aream33.0000Sub CCTR-217450007Placing Asphalt mix by Cart / Wheel barrow incl. compactionm39.0000CCTR-21746Placing & compaction of DST / TSTSub CCTR-217460008Placing of T.S.T. incl. Primer, tack coat and compactionm20.5000Sub CCTR-217460010Placing D.S.T. incl . Primer , Tack coat and compactionm20.4000CCTR-21748Asphalt Tack / Prime CoatSub CCTR-217480006Primer Coat Applicationm20.0200Sub CCTR-217480009Tack Coat Applicationm20.0200Sub CCTR-217480030Supply & Application of Tack Coat By Sub-Contractorm20.0300Sub CCTR-217480040Supply & Application of Asphalt Prime Coat By Sub-Contractorm20.0300CCTR-21750Road Curb / MarkingSub CCTR-217500002Installation of kurb stone with lean haunch, groutm0.9000Sub CCTR-217500005Markings on main/internal straight road. (lines)m20.1000Sub CCTR-217500006Markings on main/internal curved road (lines)m20.100032810.3830.00003769.869106.734682899210.67346828991.0673468290.5336734145Sub CCTR-217500007Markings on main/internal straight road. (Arrow / letters)m20.1000Sub CCTR-217500008Markings on main/internal curved road. (Arrow / letters)m20.1000CCTR-21751Road Guard RailSub CCTR-217510120Installation of W-Beam Guard Rail with postsm2.00002000020000200004000059.701492537329.8507462687500CCTR-21752Road Signs/reflectors67000Sub CCTR-217520090install cat eyes / reflectors on roadnos0.1200Sub CCTR-217520100Install mile / km stone excl. other civil worksnos5.0000Sub CCTR-217520110Install traffic sign board with pole, excl. other civil worksnos4.00006700CCTR-21753Road Curb SupplySub CCTR-217530001Supply of ready made kurb stonem31.2500CCTR-21754Road Curb InstallationSub CCTR-217540002Installation of Kurb stone with lean haunch, groutm0.9000G-218Other Civil WorksCCTR-21805Roofing/ Cladding/ Siding/ Decking/ Partition wall/ False ceilingSub CCTR-218050010Roofing with metal sandwich pannel incl. flashing / ridge and sealant.m21.5000Sub CCTR-218050020Roofing with G.I / Asbestos sheet incl. ridge & accessoriesm20.5000Sub CCTR-218050030Wall cladding / siding with metal sandwich pannel incl. fixing prefab. flashing and sealantm22.5000Sub CCTR-218050040Roof decking with galvanized corrugated steel sheetsm20.9000Sub CCTR-218050050Wall cladding / siding with aluminium corrugated sheetm21.0000Sub CCTR-218050060Wall cladding / siding with galvanized corrugated sheetm21.0000Sub CCTR-218050070Install partition wall with metal studs.m21.2500Sub CCTR-218050080Erection of shear / connector boltsnos0.1000Sub CCTR-218050090Installation of false ceiling with aluminium supports & mineral fiber tilesm20.1000Sub CCTR-218050100Installation of false ceiling with Dumpa brand (perforated metal) tilesm20.1000Sub CCTR-218050110Installation of false ceiling with aluminium supports & gypsum board tilesm20.1000Sub CCTR-218050120Installation of false ceiling with aluminium supports & polystyrene board tilesm20.1000Sub CCTR-218050130Installation of false ceiling with aluminium supports & acoustic board tilesm20.1000CCTR-21810Doors, Windows, Cabinets, Hand RailSub CCTR-218100001Installation of wooden door framem0.5000Sub CCTR-218100002Installation of wooden / Ply wood door panels excluding iron mongriesm21.1000Sub CCTR-218100004Installation of fly/insect proof door (metal / wood)m21.0000Sub CCTR-218100005Installation of metal hollow frame incl. PCC grouting between wall & framem1.0000Sub CCTR-218100006Installation of metal door (single skin) excluding iron mongrym21.5000Sub CCTR-218100007Installation of metal door (double skin) excluding iron mongrym21.5000Sub CCTR-218100008Install metal folding (scissors type ) Door / gate.m24.5000Sub CCTR-218100009Install fire resistant door excluding iron mongriesm24.5000Sub CCTR-218100010Installation of Blast proof door excluding iron mongriesm25.0000Sub CCTR-218100012Installation of metal gate/access door (3000x5000) excluding iron mongriesm23.6000Sub CCTR-218100014Installation of rolling shutter incl. frame and accessoriesm28.0000Sub CCTR-218100015Installation of Al. door (swing/sliding) incl. frame.m21.2000Sub CCTR-218100017Installation of steel window / ventilator excluding iron mongriesm24.0000Sub CCTR-218100021Installation of steel grill for doors / windows / ventilatorsm21.2500Sub CCTR-218100026Install wooden window / ventilator excluding iron mongriesm24.0000Sub CCTR-218100027Install Aluminium window / ventilatorsm21.5000Sub CCTR-218100030Install window blinds (vertical / horizontal)m20.2500Sub CCTR-218100031Fixing clear / float / tinted/ wire/sheet/plain/patterned/reflective glassm21.6000Sub CCTR-218100032Fixing plastic / polycarbonate sheetm21.6000Sub CCTR-218100330Wall Cabinetm21.5000Sub CCTR-218100340Base Cabinetm21.0000CCTR-21815Non Structural steel (Chequired plate/C.I. Cover/Grating/Hand Rail, Guard Rail etc.)Sub CCTR-218150001Fabrication of chequered plate (52 Kg/M2)ton80.0000Sub CCTR-218150003Erection of Chequired plate (52 Kg/ m2)ton55.0000Sub CCTR-218150004Erection of C.I. cover / grating with frame incl. groutington50.0000Sub CCTR-218150050Installation of wooden hand rails (banister) with blusterm5.0000Sub CCTR-218150060Installation of Aluminium hand rails (banister) balusterm2.5000Sub CCTR-218150070fabrication and erection of M.S. / G.I Hand rail (banister) with blusterm3.5000Sub CCTR-218150080Erection of Guard rail with chainm0.7000Sub CCTR-218150090Erection of M.S rails for transformer / crane with expansion bolt & anchor (65 kg/m)m2.0000Sub CCTR-218150100Fabrication of stop barrier size (150 mm x 8M)nos15.0000Sub CCTR-218150110Erection of stop barrier (150 mm x 8M)nos7.5000CCTR-21820Plumbing and SanitationSub CCTR-218200001Fixing of wash basin (without faucet)nos5.0000Sub CCTR-218200002Fixing of waste pipe / wash basin pedestalnos1.5000Sub CCTR-218200003Fixing of bath room mirror (18" X 24")nos1.5000Sub CCTR-218200004Fixing of soap dish / dispenser / tooth brush holdernos1.0000Sub CCTR-218200005Fixing of towel railnos1.0000Sub CCTR-218200006Fixing of toilet paper holder / dispensernos1.0000Sub CCTR-218200007Fixing of W.C. (European type) with flush cistern / tanknos6.0000Sub CCTR-218200008Fixing of W.C. (Indian type) without flush tanknos6.0000Sub CCTR-218200009Fixing of Urinalnos6.0000Sub CCTR-218200010Fixing of Faucetsnos1.5000Sub CCTR-218200011Fixing of Shower / Telephone or Muslim Showernos1.5000Sub CCTR-218200012Fixing of water heater (Geyser)nos8.0000Sub CCTR-218200013Fixing of Fiberglass tank (500 G ~ 2000 G)nos8.0000Sub CCTR-218200014Fixing of bathroom shelfnos1.5000Sub CCTR-218200015Fixing of bathroom Tub, complete with supportsnos10.0000Sub CCTR-218200016Fixing of hand dryernos2.0000Sub CCTR-218200017Fixing of accessory traynos1.0000Sub CCTR-218200018Fixing of waste receptaclenos1.0000Sub CCTR-218200019Fixing of Kitchen Sinknos8.0000Sub CCTR-218200020Fixing of Emergency Eye wash / Showernos8.0000Sub CCTR-218200021Fixing of Water filters ( Cartridge style, dirt & dust type)nos3.0000Sub CCTR-218200022Cast Iron gate valves dia 1"nos0.2000Sub CCTR-218200023Cast Iron gate valves dia 1-1/2"nos0.2500Sub CCTR-218200024Cast Iron gate valves dia 2"nos0.2500Sub CCTR-218200025Check valves dia 1"nos0.2000Sub CCTR-218200026Check valves dia 2"nos0.2000Sub CCTR-218200027Floor trap, gully 3" to 6" P, S or Q typenos1.2500Sub CCTR-218200028Mixer tap for wash basinsnos1.0000Sub CCTR-218200029Shower complete setnos1.500040200Sub CCTR-218200030Gas Cock (brass) 3/ 4 " dianos0.2500Sub CCTR-218200031Floor drain 3" to 6" dianos1.0000CCTR-21825Hard ware / Iron Mongries / ProtectionSub CCTR-218250002Fixing of Antipanic / escape devicenos2.0000Sub CCTR-218250004Fixing of Door closer / Springnos1.5000Sub CCTR-218250006Fixing of door /Windows handelsnos0.5000Sub CCTR-218250009Fixing of Straggle (One piece overlaping)m0.3300Sub CCTR-218250011fixing of Door mortise lockset / rim locknos1.0000Sub CCTR-218250022Misc. Doors / windows hard ware and accessoriesnos1.0000CCTR-21830Piping (Under Ground or Above Ground)Sub CCTR-218300001Laying, Jointing & hydrotest of RCC pipes dia 150mm excl. excavation, backfilling & Haunchingm1.5000Sub CCTR-218300002Laying, Jointing & hydrotesting of RCC pipes dia 200mm excl. excavation, backfilling and haunchingm1.5000Sub CCTR-218300003Laying, Jointing & hydrotesting of RCC pipes dia 250mm excl. excavation, backfilling and haunchingm2.5000Sub CCTR-218300004Laying, jointing & hydrotesting of RCC pipes dia 300mm excel. excavation, backfilling and haunchingm2.5000Sub CCTR-218300005Laying. jointing & hydrotesting of RCC pipes dia 400mm excl.excavation, backfilling & haunchingm2.5000Sub CCTR-218300006Laying, jointing & hydrotesting of RCC pipes dia 450mm excl. excavation, backfilling & haunchingm2.5000Sub CCTR-218300007Laying, jointing & hydrotesting of RCC pipes dia 500mm excl. excavation, backfilling & haunchingm2.5000Sub CCTR-218300008Laying, jointing & hydrotesting of RCC pipe dia 600mm excl. excavation. backfilling & haunchingm2.5000Sub CCTR-218300009Laying, jointing & hydrotesting of RCC pipes dia 750mm excl. excavation, backfilling & haunchingm3.0000Sub CCTR-218300010Laying, jointing & hydrotesting of RCC pipes dia 900mm excl. excavation, backfilling & haunchingm3.5000Sub CCTR-218300011Laying, jointing, & hydrotesting of RCC pipes dia 1000mm excl. excavation, backfilling & haunchingm4.0000Sub CCTR-218300012Laying, jointing & hydrotesting of RCC pipes dia 1200mm excl. excavation, backfilling & haunchingm4.5000Sub CCTR-218300013Laying & Jointing of PVC dia 19 mm pipes excl. excavation, casing or concretem0.5000Sub CCTR-218300014Laying & Jointing of PVC dia 25 mm pipes excl. excavation, casing or concretem0.5000Sub CCTR-218300015Laying & Jointing of PVC dia 37 mm pipes excl. excavation, casing or concretem0.1800Sub CCTR-218300016Laying & Jointing of PVC dia 50 mm pipes excl. excavation, casing or concretem0.5000Sub CCTR-218300017Laying & Jointing of PVC dia 75 mm pipes excl. excavation, casing or concretem1.0000Sub CCTR-218300018Laying & Jointing of PVC dia 100 mm pipes excl. excavation, casing or concretem1.0000Sub CCTR-218300019Laying & Jointing of PVC dia 150 mm pipes excl. excavation, casing or concretem0.6000Sub CCTR-218300020Laying & Jointing of PVC dia 200 mm pipes excl. excavation, casing or concretem1.0000Sub CCTR-218300021Laying & Jointing of PVC dia 250 mm pipes excl. excavation, casing or concretem1.0000Sub CCTR-218300022Laying & Jointing of PVC dia 300 mm pipes excl. excavation, casing or concretem1.0000Sub CCTR-218300047Laying of G.I pipes dia 12mm excl. excavation, backfillingm0.5000Sub CCTR-218300048Laying of G.I pipes dia 19mm excl. excavation, backfillingm0.5000Sub CCTR-218300049Laying of G.I pipes dia 25mm excl. excavation, backfillingm0.5500Sub CCTR-218300050Laying of G.I pipes dia 38mm excl. excavation, backfillingm0.7500Sub CCTR-218300051Laying of G.I pipes dia 50mm excl. excavation, backfillingm0.8500Sub CCTR-218300052Laying of G.I pipes dia 75mm excl. excavation, backfillingm1.0000Sub CCTR-218300053Laying of G.I pipes dia 100mm excl. excavation, backfillingm1.2500Sub CCTR-218300054Laying of G.I pipes dia 150mm excl. excavation, backfillingm1.7500Sub CCTR-218300091Laying of cast iron pipe dia 100mm excl. excavation, backfillingm1.5000Sub CCTR-218300092Laying of cast iron pipe dia 150mm excl. excavation, backfillingm1.5000Sub CCTR-218300093Laying of cast iron pipe dia 200mm excl. excavation, backfillingm2.0000Sub CCTR-218300094Laying of cast iron pipe dia 250mm excl. excavation, backfillingm2.5000Sub CCTR-218300095Laying of cast iron pipe dia 300mm excl. excavation, backfillingm3.0000CCTR-21840Water Proofing / Roof TreatmentSub CCTR-218400001Bitumen coating (Single coat)m20.3000Sub CCTR-218400002Laying craft paper single layerm20.7000Sub CCTR-218400004Laying polyethylene sheet one layerm20.0500Sub CCTR-218400005Water proofing (product item) single coatm20.4000Sub CCTR-218400007Lay Geotextile fabric / polypropylene (single layer)m20.1300Sub CCTR-218400010Water proofing of foundation with Synthaprufe (Under ground)m20.6000Sub CCTR-218400011Water proofing of foundation with epoxy (Above ground)m20.6000Sub CCTR-218400012Water proofing of foundation with Asphalt Bitumen Emulsionm21.2000Sub CCTR-218400013Waterproofing protection Hard Boardm20.2500Sub CCTR-218400080Fabricate and install metal (copper / G.I) water stopperm1.5000Sub CCTR-218400090Installation of EPDM / LDPE (self adhesive / non adhesive) single layerm23.0000Sub CCTR-218400100Bitumen coating with polyethylene sheet sand and tuff tile (grouted)m23.0000Sub CCTR-218400110Foam concrete incl. batching with mixer machine & haul / transport, place and finishm310.0000Sub CCTR-218400120Lay sand cushionm31.4000Sub CCTR-218400130Lay Thermopore sheetm20.1300Sub CCTR-218400140Cold applied bitumen emulsion single coatm20.7500Sub CCTR-218400150Install water stopper (PVC)m1.0000Sub CCTR-218400160Application of rubber lining in pitsm20.2500Sub CCTR-218400170Installation of bituminized felt single layerm20.4000Sub CCTR-218400200Place screed on Roof (20 to 60 mm thk)m310.0000Sub CCTR-218400210Spread pea gravel at top of roofm34.0000Sub CCTR-218400220Installation of brick tiles on roofm22.5000Sub CCTR-218400230Installation of Concrete Precast tiles on roofm22.0000Sub CCTR-218400240Grouting of roof tiles (concrete / clay)m20.6000Sub CCTR-218400250Install cant strip on roof (treated timber / foamglass) 4"x4" or 1-1/2"x5"m0.2500Sub CCTR-218400260Fixing of A.C / C.I / PVC Roof drain Pipe (4" to 6" dia)m0.4500Sub CCTR-218400270Fixing of Cowelsnos0.0600Sub CCTR-218400280Fixing of rain water down spout (4" to 6")nos2.0000Sub CCTR-218400290Fixing of Precast splash blocknos0.6000Sub CCTR-218400300Fixing of Roof scupper (6" to 8" dia)nos0.6000Sub CCTR-218400310Fabrication & erection of roof gutter with MS/G.I sheet (6" to 8") incl. supports & paintingm2.0000Sub CCTR-218400320Fabrication & erection G.I / SS coping on parapet (8" or 10")m0.5000Sub CCTR-218400330Erection of prefabricated G.I / SS coping on parapet (8" or 10" wide)m0.3000Sub CCTR-218400340Install precast concrete coping 10" widem0.5500Sub CCTR-218400350Installation of prefabricated metal flashing / Ridgem0.2000Sub CCTR-218400360Fabrication & erection of metal (MS/SS/G.I) flashingm0.5000Sub CCTR-218400370Supply and fixing of catch basinnos3.0000CCTR-21850Surface Preparation and Painting on Concrete / MasonrySub CCTR-218500001Primer & 2~3 coats upto 5.0 meter (Distemper)m21.2500Sub CCTR-218500002Primer & 2~3 coats above 5.0 meter (Distemper)m21.5000Sub CCTR-218500003Primer & 2~3 coats upto 5.0 meter ( White wash)m20.3000Sub CCTR-218500004Primer & 2~3 coats above 5.0 meter (White wash)m20.4000Sub CCTR-218500005Primer & 2~3 coats upto 5.0 meter (Emulsion)m22.5000Sub CCTR-218500006Primer & 2~3 coats above 5.0 meter (Emulsion)m22.7500Sub CCTR-218500007Primer & 2~3 coats upto 5.0 meter (Alkyd Enamel)m22.5000Sub CCTR-218500008Primer & 2~3 coats above 5.0 meter (Alkyd Enamel)m22.7500Sub CCTR-218500009Primer & 2~3 coats upto 5.0 meter (weather shield)m21.5000Sub CCTR-218500010Primer & 2~3 coats above 5.0 meter (weather shield)m21.7500Sub CCTR-218500011Sand blast on concrete surfacem21.8000Sub CCTR-218500012Primer & finish coat of chemical resistant paintm22.5000Sub CCTR-218500013Primer & finish coat of epoxy / coaltar epoxy paintm23.0000Sub CCTR-218500014Primer & finish coat of acid resistant paintm22.5000Sub CCTR-218500015Primer & paint (fluorescent) on chimney / silom210.0000Sub CCTR-218500016Primer & 2~3 coats at any height for ceilingm22.5000Sub CCTR-218500170Installation of wall paper up to 5 m heightm20.5000Sub CCTR-218500180Acid resistant coating with woven / tissue Glass cloth single layerm20.8000CCTR-21852Surface Preparation & Painting on metal / steel & woodSub CCTR-218520001Surface preparation, Primer & two coats Enamel Paint upto 10 m heightm22.5000Sub CCTR-218520002Surface preparation, primer & two coats Enamel Paint 10 m to 20 m heightm23.5000Sub CCTR-218520003Primer & two coats (upto10.0 meter)m21.0000Sub CCTR-218520005Only touch up to 20 meter heightm20.8000Sub CCTR-218520006Wood polish on Wooden Doors / Windows / Cabinets / Railingm20.0700Sub CCTR-218520007Fire Proof paint on Doorsm24.0000Sub CCTR-218520008Painting and lettering on Sign Boardm20.0300CCTR-21860FencingSub CCTR-218600001Installation of Fence post G.I Pipe 1-1/2" dia, for fence 2.5m high, without provision for barbed wire, excl. all other civil worksm1.6000Sub CCTR-218600002Installation of Fence post G.I Pipe 1-1/2" dia, for fence 2.5m high, with provision for barbed wire, excl. all other civil worksm1.6000Sub CCTR-218600003Installation of Fence post M.S/G.I Angle iron 60x60 mm, for fence 2.5 m high without provision for barbed wire, excl. all other civil worksm1.6000Sub CCTR-218600004Installation of Fence post M.S/G.I Angle iron 60x60 mm, for fence 2.5 m high above ground with provision for barbed wire, excl. all other civil worksm1.6000Sub CCTR-218600005Installation of Fence post R.C.C. precast for fence 2.5 m high, without provision of barbed wire, excl. all civil worksm1.6000Sub CCTR-218600006Installation of Fence post R.C.C. precast for fence 2.5 m high, with provision of barbed wire, excl. all civil worksm1.6000Sub CCTR-218600007Installation of Fence with (M.S post & intermediate profiles) for fence 2.5 m high, excl. all civil worksm4.7000Sub CCTR-218600008Installation of puller wire (single line) and accessories for fencem0.3000Sub CCTR-218600009Installation of G.I chain link fence height 2.5 mm1.4000Sub CCTR-218600010Installation of PVC coated chain link fence height 2.5 mm1.4000Sub CCTR-218600011Installation of vermin mesh single layer height up to 1.00 mm0.8000Sub CCTR-218600012Installation of Barbed wire single linem0.2500Sub CCTR-218600014Erection of fence personal gate (single leaf) 1.2 m wide with G.I pipe posts and chain link fence, excl. all other civil worksnos1.5000Sub CCTR-218600015Erection of Fence vehicular gate 4 m wide with G.I pipe posts and chain link fence, excl. all other civil worksm2.5000Sub CCTR-218600016Erection of Fence vehicular gate 8 m wide with G.I posts and chain link fence, excl. all other civil worksm4.0000CCTR-21868Expansion Joint SealantSub CCTR-218680010Install Foam Rod / Thixafoam / Beaker rod / Jumbolan in expansion jointsm0.2000Sub CCTR-218680020Application of primer for joint sealant on joint sidesm20.3000Sub CCTR-218680030Application of joint sealantm3400.0000Sub CCTR-218680040Fill Bituminous Mastic in Expansion jointsm3500.0000Sub CCTR-218680050Sealing joints by installation G.I flushing sheetm22.0000Sub CCTR-218680060Sealing joint by installation Aluminium flushing sheetm22.0000Sub CCTR-218680070Cutting grove in RCC / PCC 5 mm wide, 50 mm deep by machine for Expansion jointsm1.1000Sub CCTR-218680080Installation of Bitumious imprignated Fiber Boardm20.5000CCTR-21870Embedded Items ( Anchor Bolts and Profiles)Sub CCTR-218700001Fabrication of MS profile / plates for embedimentston175.0000Sub CCTR-218700002Erection of MS profile / plates for embedimentston125.0000Sub CCTR-218700003Fabrication of pipe sleeves (dia 150 mm x Length 450mm)nos1.2500Sub CCTR-218700004Erection of pipe sleeves (dia 150 mm x Length 450 mm)nos1.5000Sub CCTR-218700005Erection of plates / halfenton275.0000Sub CCTR-218700006Fab. & erection of MS / SS rod (rungs) for ladders (1000mm)nos1.5000Sub CCTR-218700007Erection of Anchor Boltston300.0000Sub CCTR-218700008Supply of Non-galvanized Anchor boltston1.0000Sub CCTR-218700009Supply of Galvanized Anchor Boltston1.0000Sub CCTR-218700011Fabricate & Install wooden pocketsnos2.0000Sub CCTR-218700012Installation & removal of pockets (Boxout)nos1.1500Sub CCTR-218700013Fabricate & Install Steel Pockets with wire gauzenos1.2000Sub CCTR-218700014Installation of Expansion boltsnos0.2000Sub CCTR-218700015Erection of MS profile / plateskg0.1500Sub CCTR-218700150Installation of Bolts with chemical capsulesnos0.5000CCTR-21875Steel Piles Supply, Driving and TestingSub CCTR-218750010Driving Steel Pile small Size without Load Test & Mob/ Demob by Sub Contractorm0.5000Sub CCTR-218750020Driving Steel Pile large size without Load Test & Mob/Demob by Sub Contractorm0.6000Sub CCTR-218750030Pile Driving Equipment - Mob/Demob to/from Sitem0.0200Sub CCTR-218750040Movement of Piling Equipment - Between Pilesnos3.0000Sub CCTR-218750050Steel Pile Load Testnos120.0000CCTR-21880DemolitionSub CCTR-218800001Demolition of Reinforced Structures/ Walls (With Equipment)m36.0000Sub CCTR-218800002Demolition of Pile Head (With Chisel)m330.0000Sub CCTR-218800003Demolition of Plain Concrete Structuresm38.0000Sub CCTR-218800004Demolition of Block/ Brick/ Stone Masonrym35.0000Sub CCTR-218800005Demolition of Road/ Bituminous Paving (10 Cm Thick)m20.2800Sub CCTR-218800006Demolition of Fence Including Foundation (2 m to 3 m High)m0.5000Sub CCTR-218800007Demolition of RCC Floor/ Slab on Grade (Upto 150 mm Thick)m20.4500Sub CCTR-218800008Removal of False Ceillingm20.2000Sub CCTR-218800009Demolition of R.C.C Pipes (Including relevant works)m0.7000Sub CCTR-218800010Demolition of Door/ Windowm20.5500Sub CCTR-218800011Demolition of Sanitary Fixtures / Fittingsnos0.8000Sub CCTR-218800012Demolition of Roofing (Built up)m20.3500Sub CCTR-218800013Demolition of R.C.C / Masonry Buildings (Complete)m30.2000Sub CCTR-218800014Removal of Trees (Not Exceeding 800 mm girth) by Toolsnos2.0000Sub CCTR-218800015Removal of Trees (Between 800 mm to 1500 mm girth) by Toolsnos6.0000Sub CCTR-218800016Demolition of Plasterm20.2500Sub CCTR-218800019Demolition of Hand Rails (upto 1.25m high)m0.3000Sub CCTR-218800020Removal of Raised Floorm20.0000CCTR-21885Miscellaneous Civil worksSub CCTR-218850005Fixing of wall / roof exhaust fannos2.5000Sub CCTR-218850016Laying glass wool / polystyrene in masonry ( insulation )m20.1200Sub CCTR-218850041Restoration Work (Wooden Barrier Wall)m3.5000Sub CCTR-218850047Supply and Fix Elastomeric bearing padsm3600.0000Sub CCTR-218850470Load testing for pilesnos80.0000Sub CCTR-218850480mobilization cost for subcontractorLot0.0000Sub CCTR-218850490Material Supplynos1.0000Sub CCTR-218850500Installationnos5.0000Sub CCTR-218850510Subcontracted work---0.1000Sub CCTR-218850511Cable Trench Warning Tapem0.1000CCTR-21886LandscapingSub CCTR-218860001Landscaping (Scarifying, Dressing, Soiling, Seeding, Watering, Maintaining until established)m20.6500Sub CCTR-218860002Spreading & levelling of Gravel / chippings. (100mm thick layer)m20.1000CCTR-21887Ducting and Expanded steel meshSub CCTR-218870017Fabrication of G.I ducting ( 7kg / m2 ) including supports, joints, fittingm24.7000Sub CCTR-218870018Erection of prefabricated G.I ducting ( 7kg / m2 ) including supports, joints , fitting & Leak test. ( without insulation & painting)m23.8500Sub CCTR-218870038Installation of Galvanized expanded steel mesh.m20.1500CCTR-21888Concrete RepairsSub CCTR-218880040Concrete Repairing with productm22.5000Sub CCTR-218880046Mortar Finishing Worksm21.5000CCTR-21889Hydro TestingSub CCTR-218890019Hydro Testing ( pit / ponds / reservoir / sumps / basin )m32.5000CCTR-21890Complete Civil Works (Lump Sum)Sub CCTR-218900010Construction of Complete Building (one Story) with all Finishesm22.0000Sub CCTR-218900020Construction of Yard area (incl. Foundations, trenches, Pits,Gravel,Fence) Completem20.0000Sub CCTR-218900030Client FacilitiesLot0.0000G-219Extra Work, Day Work, Idling and SupplyCCTR-21910Extra Work CivilSub CCTR-219100000Extra Work Civil-0.0000D-22MechanicalG-221Steel StructureCCTR-22110Fabrication of Steel StructureSub CCTR-221101010Fabrication of Steel Profiles (Plate Built-up) Extra Heavyton90.0000Sub CCTR-221101045Fabrication of Steel Structure, Bolted, Extra Heavy (201 kg/m & above)ton60.0000Sub CCTR-221101050Fabrication of Steel Structure, Bolted, Heavy (121 to 200 kg/m)ton80.0000Sub CCTR-221101060Fabrication of Steel Structure, Bolted, Medium (61 to 120 kg/m)ton110.0000Sub CCTR-221101065Fabrication of Steel Structure, Bolted, Light ( 31 to 60 kg/m)ton140.0000Sub CCTR-221101070Fabrication of Steel Structure, Bolted, Extra Light (up to 30 kg/m)ton200.0000Sub CCTR-221101090Fabrication of Steel Structure, Building (31 to 120 kg/m)ton125.0000Sub CCTR-221101100Fabrication of Steel Structure, Pipe Rackston100.0000Sub CCTR-221101110Fabrication of Platforms (up to 30 kg/m)ton180.0000Sub CCTR-221101120Fabrication of Railings (up to 30 kg/m)ton250.0000Sub CCTR-221101130Fabrication of Stairs/Ladders (up to 15kg/m)ton250.0000Sub CCTR-221101140Fabrication of Gratings ( 47 kg/m2 )ton250.0000Sub CCTR-221101160Hot Dip Galvanizing (35 m2/ton)ton20.0000CCTR-22111Fabrication of Built up Steel ProfilesSub CCTR-221110000Fabrication of Built up Steel Profileston150.0000CCTR-22120Erection of Steel StructureSub CCTR-221201045Erection of Steel Structure, Bolted, Extra Heavy (201 kg/m & above)ton30.0000Sub CCTR-221201050Erection of Steel Structure, Bolted, Heavy (121 to 200 kg/m)ton40.0000Sub CCTR-221201060Erection of Steel Structure, Bolted, Medium (61 to 120 kg/m)ton50.0000Sub CCTR-221201065Erection of Steel Structure, Bolted, Light (31 to 60 kg/m)ton70.0000Sub CCTR-221201070Erection of Steel Structure, Bolted, Extra Light (up to 30 kg/m)ton90.0000Sub CCTR-221201090Erection of Steel Structure, Building (31 to 120 kg/m)ton60.0000Sub CCTR-221201100Erection of Steel Structure, Pipe Rackston45.0000Sub CCTR-221201110Erection of Platforms / Stairs (up to 30 kg/m)ton60.0000Sub CCTR-221201120Erection of Railings (30 kg/m)ton120.0000Sub CCTR-221201130Erection of Ladders, Safety Cage (15 kg/m)ton120.0000Sub CCTR-221201140Erection of Gratings (47 kg/m2)ton60.0000Sub CCTR-221201150Erection of Cladding, Roofing, Decking (9 kg/m2)m24.0000Sub CCTR-221201170Grouting of Steel Structure (Plain Cement Sand Grout)m3100.0000Sub CCTR-221201180Grouting of Steel Structure (Non Shrink Grout)m3100.0000Sub CCTR-221201190Dismantling of Steel Structureton25.0000Sub CCTR-221201200Cutting Opening in Grating ( Cut Length)m3.0000CCTR-22121Erection of Pre Heater Steel StructureSub CCTR-221210000Erection of Pre Heater Steel Structureton70.0000CCTR-22130Fabrication of Pipe SupportsSub CCTR-221301010Fabrication of Pipe Supports C.S Up to 5 Kgton240.0000Sub CCTR-221301020Fabrication of Pipe Supports C.S >6 Kg Up to 10 Kgton200.0000Sub CCTR-221301030Fabrication of Pipe Supports C.S > 10 Kg Up to 15 Kgton150.0000Sub CCTR-221301040Fabrication of Pipe Supports C.S >15 Kg Up to 20 Kgton110.0000Sub CCTR-221301050Fabrication of Pipe Supports C.S > 20 Kgton70.0000Sub CCTR-221301060Fabrication of Pipe Supports S.S Up to 5 Kgton300.0000Sub CCTR-221301070Fabrication of Pipe Supports S.S > 6 Kg Up to 10 Kgton250.0000Sub CCTR-221301080Fabrication of Pipe Supports S.S > 10 Kg Up to 15 Kgton190.0000Sub CCTR-221301090Fabrication of Pipe Supports S.S > 15 kg Up to 20 Kgton140.0000Sub CCTR-221301100Fabrication of Pipe Supports S.S > 20 Kgton90.0000CCTR-22140Erection of Pipe SupportsSub CCTR-221401010Erection of Pipe Supports C.S Up to 5 Kgton300.0000Sub CCTR-221401020Erection of Pipe Supports C.S > 6 Kg Up to 10 kgton250.0000Sub CCTR-221401030Erection of Pipe Supports C.S > 10 kg Up to 15 Kgton200.0000Sub CCTR-221401040Erection of Pipe Supports C.S > 15 kg Up to 20 Kgton170.0000Sub CCTR-221401050Erection of Pipe Supports C.S > 20 Kgton110.0000Sub CCTR-221401060Erection of Pipe Supports S.S Up to 5 Kgton370.0000Sub CCTR-221401070Erection of Pipe Supports S.S > 6 Kg Up to 10 Kgton300.0000Sub CCTR-221401080Erection of Pipe Supports S.S > 10 Kg Up to 15 Kgton230.0000Sub CCTR-221401090Erection of Pipe Supports S.S > 15 Kg Up to 20 Kgton170.0000Sub CCTR-221401100Erection of Pipe Supports S.S > 20 Kgton110.0000Sub CCTR-221401110Grouting of Pipe Supports (Plain Cement Sand Grout)m3250.0000Sub CCTR-221401120Grouting of Pipe Supports (Non Shrink Grout)m3250.0000Sub CCTR-221401130Dismantling of Pipe Supportston80.0000G-222EquipmentCCTR-22210Stationary EquipmentSub CCTR-222100001Installation of Equipment Stationary (Up to 1.0 ton)ton80.0000Sub CCTR-222101005Installation of Equipment Stationery ( >1.0 to 5 ton )ton60.0000Sub CCTR-222101010Installation of Equipment Stationery (>5 to 20 ton)ton50.0000Sub CCTR-222101020Installation of Equipment Stationary (>21 up to 50 ton)ton35.0000Sub CCTR-222101030Installation of Equipment Stationary (>51 up to 100 ton)ton20.0000Sub CCTR-222101035Installation of Equipment Stationery (>100 to 200 ton)ton16.0000Sub CCTR-222101040Installation of Equipment Stationary (>200 to 300 ton)ton12.0000Sub CCTR-222101045Installation of Equipment Stationary (>300 to 400 ton)ton10.0000Sub CCTR-222101050Installation of Equipment Stationary (>400 to 500 ton)ton9.0000Sub CCTR-222101060Installation of Equipment Stationary (>500 ton)ton8.0000Sub CCTR-222101070Installation of Equipment Internalston70.0000Sub CCTR-222101100Filling of Pal Ringston25.0000Sub CCTR-222101110Filling of Catalystston25.0000Sub CCTR-222101120Erection of Internal Traysm210.0000Sub CCTR-222101130Erection of Demister Padston70.0000Sub CCTR-222101150Erection of small verticle equipmentton60.0000Sub CCTR-222101200Erection of Siloston100.0000Sub CCTR-222101210Erection of Skid Mounted Unitston40.0000Sub CCTR-222101220Grouting of Stationary Equipment (Plain Cement Sand Grout)m3300.0000Sub CCTR-222101230Grouting of Stationary Equipment (Non Shrink Grout)m3300.0000Sub CCTR-222101240Dismantling of Equipment Stationary Smallton15.0000Sub CCTR-222101250Dismantling of Equipment Stationary Mediumton12.0000Sub CCTR-222101260Dismantling of Equipment Stationary Heavyton8.0000CCTR-22220Rotary EquipmentSub CCTR-222201010Installation of Rotry Equip. Assemb. (up to 1 ton)ton120.0000Sub CCTR-222201020Installation of Rotry Equip. Assemb. (>1 to 5 ton)ton90.0000Sub CCTR-222201030Installation of Rotry equip. Assemb. (>5 to 10 ton)ton75.0000Sub CCTR-222201040Installation of Rotry Equip. Assemb. (>10 to 50 ton)ton50.0000Sub CCTR-222201045Installation of Rotry. Assemb. (>50 ton)ton40.0000Sub CCTR-222201050Installation of Rotry Equip. Knock Down (up to 10 ton)ton120.0000Sub CCTR-222201060Installation of Rotry Equip. Knock Down (>10 to 50 ton)ton90.0000Sub CCTR-222201070Installation of Rotry Equip. Knock Down ( >50 to 100 ton)ton50.0000Sub CCTR-222201080Installation of Rotry Equip. Knock Down (>100 ton)ton40.0000Sub CCTR-222201120Installation of Gas Turbine Small Size (up to 15 ton)ton70.0000Sub CCTR-222201130Installation of Gas Turbine Medium Size (16 to 50 ton)ton50.0000Sub CCTR-222201140Installation of Gas Turbine Large Size (> 50 to 100 ton)ton35.0000Sub CCTR-222201145Installation of Gas Turbine Large Size (>100 ton)ton25.0000Sub CCTR-222201150Installation of Gas Turbine Exhaust Systemton80.0000Sub CCTR-222201160Installation of Gas Turbine Accessorieston90.0000Sub CCTR-222201170Installation of Steam Turbine Small Size ( up to 15 ton)ton90.0000Sub CCTR-222201180Installation of Steam Turbine Medium Size (16 to 50 ton)ton60.0000Sub CCTR-222201190Installation of Steam Turbine Large Size (>50 to 100 ton)ton40.0000Sub CCTR-222201195Installation of Steam Turbine Large Size (>100 ton)ton40.0000Sub CCTR-222201200Installation of Steam Turbine Accessorieston90.0000Sub CCTR-222201210Installation of Power Generators Small Size ( up to 15 ton)ton50.0000Sub CCTR-222201220Installation of Power Generators Medium Size (16 to 50 ton)ton35.0000Sub CCTR-222201225Installation of Power Generators Large Size (>50 to 100 ton)ton30.0000Sub CCTR-222201230Installation of Power Generators Large Size (>100 ton)ton20.0000Sub CCTR-222201235Installation of Power Generators Accessorieston80.0000Sub CCTR-222201260Grouting of Rotary Equipment (Non Shrink Grout)m3250.0000Sub CCTR-222201270Grouting of Rotary Equipment (Epoxy Grout)m3250.0000Sub CCTR-222201280Dismantling of Rotary Equipment Smallton30.0000Sub CCTR-222201290Dismantling of Rotary Equipment Largeton20.0000CCTR-22221Misc. Items/EquipmentSub CCTR-222210001Expansion Joints in Ducts Fabric Typejoints150.0000Sub CCTR-222210002Expansion Joint in Ducts Mechanical Flanged Prefabricatedjoints80.0000CCTR-22225Fire Fighting and Misc. Items/EquipmentSub CCTR-222251010Installation of Fire Extingusher 2 kgnos4.0000Sub CCTR-222251020Installation of Fire Extingusher 6 kgnos4.0000Sub CCTR-222251030Installation of Fire Extingusher 12 kgnos3.0000Sub CCTR-222251040Installation of Fire Extingusher 25 kgnos4.0000Sub CCTR-222251050Installation of Double Piller Fire Hydrantnos15.0000Sub CCTR-222251060Installation of Sprinklernos2.0000Sub CCTR-222251080Installation of Hose Boxnos10.0000Sub CCTR-222251090Installation of Safety Showernos30.0000Sub CCTR-222251100Installation of Eye Washernos30.0000Sub CCTR-222251110Installation of Information/Risk Warning Signsnos10.0000CCTR-22230Furnace, Heaters, BoilersSub CCTR-222301010Erection of Boilers/HRSG (Modular Type)ton40.0000Sub CCTR-222301020Erection of Boiler Structure and Casington65.0000Sub CCTR-222301030Erection of Boilers Heating Surface Moduleton22.0000Sub CCTR-222301040Erection of Boilers Drum Tubes and Mounting with weldington120.0000Sub CCTR-222301050Erection of Boilers Buckstayton60.0000Sub CCTR-222301070Erection of Boilers Accessorieston125.0000Sub CCTR-222301080Erection of Furnaces (Modular Type)ton22.0000Sub CCTR-222301090Erection of Furnaces Structure and Casington55.0000Sub CCTR-222301100Erection of Furnaces Coils and Tubeston75.0000Sub CCTR-222301110Erection of Furnaces Accessories (Burner and Blowers)ton150.0000Sub CCTR-222301120Refractory (Brick Lining)m320.0000Sub CCTR-222301130Refractory (Castable)m380.0000Sub CCTR-222301140Refractory (Gunitting)m360.0000Sub CCTR-222301150Dismantling of Boiler/ Furnaceston30.0000Sub CCTR-222301160NON DESTRUCTIVE TESTING OF FURNACEnos0.8000CCTR-22240Heating, Ventilation & Air ConditioningSub CCTR-222401010Installation of Ventilation / Heating Systemton120.0000Sub CCTR-222401030Installation of A/C Units (Windows Type)ton20.0000Sub CCTR-222401040Installation of A/C Units (Split Type)ton60.0000Sub CCTR-222401050Fabrication of Ducts for HVACton300.0000Sub CCTR-222401060Erection of Ducts for HVACton120.0000Sub CCTR-222401070Dismantling of HVACton40.0000CCTR-22250Stacks, Flares, Ducts, Chute, Bins, HoppersSub CCTR-222501010Fabrication of Stack / Flareton120.0000Sub CCTR-222501020Erection of Stack / Flareton60.0000Sub CCTR-222501030Fabrication of Chutes, Bins, Hoppers, Cyclones & Troughston150.0000Sub CCTR-222501040Erection of Chutes, Bins, Hoppers, Cyclones & Troughston60.0000Sub CCTR-222501050Fabrication of Ductston120.0000Sub CCTR-222501060Erection of Ductston50.0000Sub CCTR-222501070Dismantling of Stack/ Flare/ Ductston30.0000CCTR-22260Condensers / Heat Exchangers / Air CoolersSub CCTR-222601010Erection of Surface Condenser up to 1.0 Tonton110.0000Sub CCTR-222601020Erection of Surface Condenser > 1.0 to 5 Tonton95.0000Sub CCTR-222601030Erection of Surface Condenser > 5 Ton to 10 Tonton80.0000Sub CCTR-222601040Erection of Surface Condenser > 10 Ton to 20 Tonton65.0000Sub CCTR-222601050Erection of Surface Condenser > 20 Ton to 50 Tonton50.0000Sub CCTR-222601060Erection of Surface Condenser > 50 Ton to 100 Tonton40.0000Sub CCTR-222601070Erection of Surface Condenser > 100 Tonton30.0000Sub CCTR-222601080Erection of Surface Condenser Partial Assembledton50.0000Sub CCTR-222601090Erection of Surface Condenser Knock Downton65.0000Sub CCTR-222601100Erection of Heat Exchangers S/T up to 1.0 Tonton90.0000Sub CCTR-222601110Erection of Heat Exchangers S/T > 1.0 to 5 Tonton75.0000Sub CCTR-222601120Erection of Heat Exchangers S/T > 5 to 10 Tonton65.0000Sub CCTR-222601130Erection of Heat Exchangers S/T > 10 Ton to 20 Tonton55.0000Sub CCTR-222601140Erection of Heat Exchangers S/T > 20 Ton to 50 Tonton45.0000Sub CCTR-222601150Erection of Heat Exchangers S/T >50 Ton to 100 Tonton35.0000Sub CCTR-222601160Erection of Heat Exchangers S/T > 100 Tonton25.0000Sub CCTR-222601170Erection of Heat Exchangers Plate Type up to 1.0 Tonton180.0000Sub CCTR-222601180Erection of Heat Exchangers Plate Type > 1.0 to 5 Tonton150.0000Sub CCTR-222601190Erection of Heat Exchangers Plate Type >5 Ton to 10 Tonton120.0000Sub CCTR-222601200Erection of Heat Exchangers Plate Type > 10 Ton to 20 Tonton100.0000Sub CCTR-222601210Erection of Heat Exchangers Plate Type > 20 Ton to 50 Tonton80.0000Sub CCTR-222601220Erection of Heat Exchangers Plate Type >50 Ton to 100 Tonton60.0000Sub CCTR-222601230Erection of Heat Exchangers Plate Type > 100 Tonton50.0000Sub CCTR-222601240Erection of Air Cooler up to 5 Tonton120.0000Sub CCTR-222601250Erection of Air Cooler > 5 Ton to 10 Tonton100.0000Sub CCTR-222601260Erection of Air Cooler > 10 Ton to 20 Tonton80.0000Sub CCTR-222601270Erection of Air Cooler > 20 Ton to 50 Tonton65.0000Sub CCTR-222601280Erection of Air Cooler > 50 Tonton50.0000CCTR-22270Cooling TowersSub CCTR-222701040Erection of Cooling Tower Drift Eliminators & Supportston250.0000Sub CCTR-222701050Installation & Gluing of Fill / Packton80.0000Sub CCTR-222701070Erection of Cooling Tower Distribution Systemton180.0000Sub CCTR-222701080Dismantling of Colling Towerton25.0000CCTR-22280Classified EquipmentSub CCTR-222801010Fabrication of Crane Beams/Gantryton80.0000Sub CCTR-222801020Erection of Crane Beams/Gantryton60.0000Sub CCTR-222801030Erection of Overhead Craneston100.0000Sub CCTR-222801040Erection of Weighing Equipment (Weigh Bridge)ton60.0000Sub CCTR-222801050Fabrication and Erection of Fire Fighting Network Ave. Dia 8"ton150.0000Sub CCTR-222801060Fabrication and Erection of Steam Tracing Lineston500.0000Sub CCTR-222801070Fabrication and Erection of Jacketed Pipington400.0000Sub CCTR-222801160Installation of Laboratory Equipmentton160.0000CCTR-22290Cement PlantSub CCTR-222901010Erection of Chutes, Bins, Hoppers, Cyclones & Troughston100.0000Sub CCTR-222901020Erection of Conveyors (Belt Conveyors)ton150.0000Sub CCTR-222901030Erectation of Elevators (Bucket Type)ton150.0000Sub CCTR-222901040Erection of Liftston75.0000Sub CCTR-222901050Erection of Crusherston30.0000200Sub CCTR-222901060Erection of Reclaimers and Scrapperston90.0000Sub CCTR-222901070Erection of Stackerston90.0000Sub CCTR-222901080Erection of Sampling Stationton50.0000Sub CCTR-222901090Erection of Grinding Millston50.0000Sub CCTR-222901100Erection of Raw Millston50.0000Sub CCTR-222901110Erection of Rotary Kilnton90.0000Sub CCTR-222901120Erection of Pre-Heaters (Without Refractory)ton130.0000Sub CCTR-222901130Erection of Clinker Cooler (Without Supporting Structure)ton140.0000Sub CCTR-222901140Erection of Fin Fan Coolerton140.0000Sub CCTR-222901150Erection of Electrostatic Precipitator (Without Insulation)ton150.0000Sub CCTR-222901160Erection of Air Separatorston100.0000Sub CCTR-222901170Erection of De-dusting Equipment / Filterston140.0000Sub CCTR-222901180Erection of Siloston100.0000Sub CCTR-222901190Loading of Grinding Madiaton25.0000Sub CCTR-222901220Commissioningmhr1.0000CCTR-22291Erection of Equipment KilnSub CCTR-222910000Erection of Equipment Kilnton100.0000CCTR-22292Erection of Equipment Pre HeaterSub CCTR-222920000Erection Of Equipment Pre Heaterton130.0000G-223TanksCCTR-22310Fabrication of Tanks (CS)Sub CCTR-223101010Fabrication of Floating Roof Tank (Capacity upto 800 m3)ton123.0000Sub CCTR-223101020Fabrication of Floating Roof Tank (Capacity upto 1000 m3)ton101.0000Sub CCTR-223101030Fabrication of Floating Roof Tank (Capacity upto 2000 m3)ton74.0000Sub CCTR-223101040Fabrication of Floating Roof Tank (Capacity upto 3000 m3)ton62.0000Sub CCTR-223101050Fabrication of Floating Roof Tank (Capacity upto 5000 m3)ton52.0000Sub CCTR-223101060Fabrication of Floating Roof Tank (Capacity upto 7000 m3)ton46.0000Sub CCTR-223101070Fabrication of Floating Roof Tank (Capacity upto 10000 m3)ton36.0000Sub CCTR-223101080Fabrication of Floating Roof Tank (Capacity upto 20000 m3)ton31.0000Sub CCTR-223101090Fabrication of Floating Roof Tank (Capacity upto 30000 m3)ton28.0000Sub CCTR-223101100Fabrication of Floating Roof Tank (Capacity upto 50000 m3)ton25.0000Sub CCTR-223101110Fabrication of Floating Roof Tank (Capacity upto 80000 m3)ton24.0000Sub CCTR-223101120Fabrication of Floating Roof Tank (Capacity upto 100000 m3)ton23.0000Sub CCTR-223101130Fabrication of Conical Roof Tank (Capacity upto 40 m3)ton153.0000Sub CCTR-223101140Fabrication of Conical Roof Tank (Capacity 50 m3)ton128.0000Sub CCTR-223101150Fabrication of Conical Roof Tank (Capacity 100 m3)ton117.0000Sub CCTR-223101160Fabrication of Conical Roof Tank (Capacity 200 m3)ton109.0000Sub CCTR-223101170Fabrication of Conical Roof Tank (Capacity 300 m3)ton101.0000Sub CCTR-223101180Fabrication of Conical Roof Tank (Capacity 500 m3)ton79.0000Sub CCTR-223101190Fabrication of Conical Roof Tank (Capacity 800 m3)ton74.0000Sub CCTR-223101200Fabrication of Conical Roof Tank (Capacity 1000 m3)ton63.0000Sub CCTR-223101210Fabrication of Conical Roof Tank (Capacity 2000 m3)ton54.0000Sub CCTR-223101220Fabrication of Conical Roof Tank (Capacity 2000 m3)ton47.0000Sub CCTR-223101230Fabrication of Conical Roof Tank (Capacity 5000 m3)ton40.0000Sub CCTR-223101240Fabrication of Conical Roof Tank (Capacity 7000 m3)ton36.0000Sub CCTR-223101250Fabrication of Conical Roof Tank (Capacity 10000 m3)ton31.0000Sub CCTR-223101260Fabrication of Conical Roof Tank (Capacity 20000 m3)ton30.0000Sub CCTR-223101270Fabrication of Conical Roof Tank (Capacity 30000 m3)ton26.0000Sub CCTR-223101280Fabrication of Conical Roof Tank (Capacity 50000 m3)ton24.0000Sub CCTR-223101290Fabrication of Dom Roof Tanks (Capacity upto 50 m3)ton128.0000Sub CCTR-223101300Fabrication of Dom Roof Tanks (Capacity 100 m3)ton117.0000Sub CCTR-223101310Fabrication of Dom Roof Tanks (Capacity 200 m3)ton109.0000Sub CCTR-223101320Fabrication of Dom Roof Tanks (Capacity 300 m3)ton101.0000Sub CCTR-223101330Fabrication of Dom Roof Tanks (Capacity 500 m3)ton79.0000Sub CCTR-223101340Fabrication of Dom Roof Tanks (Capacity 800 m3)ton74.0000Sub CCTR-223101350Fabrication of Dom Roof Tanks (Capacity 1000 m3)ton71.0000Sub CCTR-223101360Fabrication of Dom Roof Tanks (Capacity 2000 m3)ton60.0000Sub CCTR-223101370Fabrication of Dom Roof Tanks (Capacity 3000 m3)ton55.0000Sub CCTR-223101380Fabrication of Dom Roof Tanks (Capacity 5000 m3)ton46.0000Sub CCTR-223101390Fabrication of Dom Roof Tanks (Capacity 7000 m3)ton41.0000Sub CCTR-223101400Fabrication of Dom Roof Tanks (Capacity 10000 m3)ton38.0000Sub CCTR-223101410Fabrication of Dom Roof Tanks (Capacity 20000 m3)ton35.0000Sub CCTR-223101420Fabrication of Dom Roof Tanks (Capacity 30000 m3)ton31.0000Sub CCTR-223101430Fabrication of Dom Roof Tanks (Capacity 50000 m3)ton31.0000Sub CCTR-223101440Fabrication of Sphere Tanks-Propane (Capacity upto 40 m3)ton219.0000Sub CCTR-223101450Fabrication of Sphere Tanks-Propane (Capacity 50 m3)ton219.0000Sub CCTR-223101460Fabrication of Sphere Tanks-Propane (Capacity 100 m3)ton204.0000Sub CCTR-223101470Fabrication of Sphere Tanks-Propane (Capacity 200 m3)ton173.0000Sub CCTR-223101480Fabrication of Sphere Tanks-Propane (Capacity 300 m3)ton160.0000Sub CCTR-223101490Fabrication of Sphere Tanks-Propane (Capacity 500 m3)ton150.0000Sub CCTR-223101500Fabrication of Sphere Tanks-Propane (Capacity 800 m3)ton144.0000Sub CCTR-223101510Fabrication of Sphere Tanks-Propane (Capacity 1000 m3)ton109.0000Sub CCTR-223101520Fabrication of Sphere Tanks-Butane (Capacity upto 100 m3)ton274.0000Sub CCTR-223101530Fabrication of Sphere Tanks-Butane (Capacity 200 m3)ton246.0000Sub CCTR-223101540Fabrication of Sphere Tanks-Butane (Capacity 300 m3)ton235.0000Sub CCTR-223101550Fabrication of Sphere Tanks-Butane (Capacity 500 m3)ton219.0000Sub CCTR-223101560Fabrication of Sphere Tanks-Butane (Capacity 800 m3)ton196.0000Sub CCTR-223101570Fabrication of Sphere Tanks-Butane (Capacity 1000 m3)ton186.0000Sub CCTR-223101580Fabrication of Sphere Tanks-Butane (Capacity 2000 m3)ton156.0000Sub CCTR-223101590Fabrication of Sphere Tanks-Butane (Capacity 3000 m3)ton133.0000Sub CCTR-223101600Fabrication of Sphere Tanks-Butane (Capacity 5000 m3)ton117.0000CCTR-22320Erection of Tanks (CS)Sub CCTR-223201010Erection of Floating Roof Tanks (Capacity upto 800 m3)ton300.0000Sub CCTR-223201020Erection of Floating Roof Tanks (Capacity 1000 m3)ton245.0000Sub CCTR-223201030Erection of Floating Roof Tanks (Capacity 2000 m3)ton180.0000Sub CCTR-223201040Erection of Floating Roof Tanks (Capacity 3000 m3)ton150.0000Sub CCTR-223201050Erection of Floating Roof Tanks (Capacity 5000 m3)ton125.0000Sub CCTR-223201060Erection of Floating Roof Tanks (Capacity 7000 m3)ton113.0000Sub CCTR-223201070Erection of Floating Roof Tanks (Capacity 10000 m3)ton81.0000Sub CCTR-223201080Erection of Floating Roof Tanks (Capacity 20000 m3)ton75.0000Sub CCTR-223201090Erection of Floating Roof Tanks (Capacity 30000 m3)ton68.0000Sub CCTR-223201100Erection of Floating Roof Tanks (Capacity 50000 m3)ton63.0000Sub CCTR-223201110Erection of Floating Roof Tanks (Capacity 80000 m3)ton58.0000Sub CCTR-223201120Erection of Floating Roof Tanks (Capacity 100000 m3)ton55.0000Sub CCTR-223201130Erection of Conical Roof Tanks (Capacity upto 40 m3)ton300.0000Sub CCTR-223201140Erection of Conical Roof Tanks (Capacity 50 m3)ton250.0000Sub CCTR-223201150Erection of Conical Roof Tanks (Capacity 100 m3)ton230.0000Sub CCTR-223201160Erection of Conical Roof Tanks (Capacity 200 m3)ton215.0000Sub CCTR-223201170Erection of Conical Roof Tanks (Capacity 300 m3)ton200.0000Sub CCTR-223201180Erection of Conical Roof Tanks (Capacity 500 m3)ton158.0000Sub CCTR-223201190Erection of Conical Roof Tanks (Capacity 800 m3)ton145.0000Sub CCTR-223201200Erection of Conical Roof Tanks (Capacity 1000 m3)ton125.0000Sub CCTR-223201210Erection of Conical Roof Tanks (Capacity 2000 m3)ton108.0000Sub CCTR-223201220Erection of Conical Roof Tanks (Capacity 3000 m3)ton93.0000Sub CCTR-223201230Erection of Conical Roof Tanks (Capacity 5000 m3)ton76.0000Sub CCTR-223201240Erection of Conical Roof Tanks (Capacity 7000 m3)ton70.0000Sub CCTR-223201250Erection of Conical Roof Tanks (Capacity 10000 m3)ton60.0000Sub CCTR-223201260Erection of Conical Roof Tanks (Capacity 20000 m3)ton58.0000Sub CCTR-223201270Erection of Conical Roof Tanks (Capacity 30000 m3)ton53.0000Sub CCTR-223201280Erection of Conical Roof Tanks (Capacity 50000 m3)ton48.0000Sub CCTR-223201290Erection of Dome Roof Tanks (Capacity upto 50 m3)ton250.0000Sub CCTR-223201300Erection of Dome Roof Tanks (Capacity 100 m3)ton230.0000Sub CCTR-223201310Erection of Dome Roof Tanks (Capacity 200 m3)ton215.0000Sub CCTR-223201320Erection of Dome Roof Tanks (Capacity 300 m3)ton200.0000Sub CCTR-223201330Erection of Dome Roof Tanks (Capacity 500 m3)ton158.0000Sub CCTR-223201340Erection of Dome Roof Tanks (Capacity 800 m3)ton145.0000Sub CCTR-223201350Erection of Dome Roof Tanks (Capacity 1000 m3)ton140.0000Sub CCTR-223201360Erection of Dome Roof Tanks (Capacity 2000 m3)ton118.0000Sub CCTR-223201370Erection of Dome Roof Tanks (Capacity 3000 m3)ton108.0000Sub CCTR-223201380Erection of Dome Roof Tanks (Capacity 5000 m3)ton90.0000Sub CCTR-223201390Erection of Dome Roof Tanks (Capacity 7000 m3)ton83.0000Sub CCTR-223201400Erection of Dome Roof Tanks (Capacity 10000 m3)ton75.0000Sub CCTR-223201410Erection of Dome Roof Tanks (Capacity 20000 m3)ton68.0000Sub CCTR-223201420Erection of Dome Roof Tanks (Capacity 30000 m3)ton63.0000Sub CCTR-223201430Erection of Dome Roof Tanks (Capacity 50000 m3)ton60.0000Sub CCTR-223201440Erection of Sphere Tanks-Propane (Capacity upto 40 m3)ton350.0000Sub CCTR-223201450Erection of Sphere Tanks-Propane (Capacity 50 m3)ton350.0000Sub CCTR-223201460Erection of Sphere Tanks-Propane (Capacity 100 m3)ton325.0000Sub CCTR-223201470Erection of Sphere Tanks-Propane (Capacity 200 m3)ton275.0000Sub CCTR-223201480Erection of Sphere Tanks-Propane (Capacity 300 m3)ton255.0000Sub CCTR-223201490Erection of Sphere Tanks-Propane (Capacity 500 m3)ton240.0000Sub CCTR-223201500Erection of Sphere Tanks-Propane (Capacity 800 m3)ton230.0000Sub CCTR-223201510Erection of Sphere Tanks-Propane (Capacity 1000 m3)ton175.0000Sub CCTR-223201520Erection of Sphere Tanks-Butane (Capacity upto 100 m3)ton350.0000Sub CCTR-223201530Erection of Sphere Tanks-Butane (Capacity 200 m3)ton315.0000Sub CCTR-223201540Erection of Sphere Tanks-Butane (Capacity 300 m3)ton300.0000Sub CCTR-223201550Erection of Sphere Tanks-Butane (Capacity 500 m3)ton280.0000Sub CCTR-223201560Erection of Sphere Tanks-Butane (Capacity 800 m3)ton250.0000Sub CCTR-223201570Erection of Sphere Tanks-Butane (Capacity 1000 m3)ton238.0000Sub CCTR-223201580Erection of Sphere Tanks-Butane (Capacity 2000 m3)ton200.0000Sub CCTR-223201590Erection of Sphere Tanks-Butane (Capacity 3000 m3)ton170.0000Sub CCTR-223201600Erection of Sphere Tanks-Butane (Capacity 5000 m3)ton150.0000G-224InsulationCCTR-22410Hot InsulationSub CCTR-224100001Hot Insulation of Piping, Single Layerm23.6000Sub CCTR-224100002Hot Insulation of Piping, Double Layerm25.6000Sub CCTR-224100003Hot Insulation of Valves, Single Layerm24.2000Sub CCTR-224101040Hot Insulation of Valve, Double Layerm26.7000Sub CCTR-224101050Hot Insulation of Equipment, Single Layerm23.0000Sub CCTR-22410144AHot Insulation of Equipment, Double Layerm24.8000CCTR-22420Cold InsulationSub CCTR-224201010Cold Insulation of pipe , Single layerm27.0000Sub CCTR-224201020Cold Insulation of pipe , Double layerm211.2000Sub CCTR-224201030Cold Insulation of Valves, Single Layerm28.4000Sub CCTR-224201040Cold Insulation of Valves, Double Layerm213.4000Sub CCTR-224201050Cold Insulation of Equipment, Single Layerm26.0000Sub CCTR-224201060Cold Insulation of Equipment, Double Layerm29.6000CCTR-22430Insulation Jacketing / CladdingSub CCTR-224301010Insulation Jacketing / Cladding Work Of Pipingm23.6000Sub CCTR-224301020Insulation Jacketing / Cladding Work of Pipe Fittings and Valvesm25.0000Sub CCTR-224301030Insulation Jacketing / Cladding Work of Equipmentm23.0000Sub CCTR-224301040Dismantling of Insulation/ Claddingm22.0000CCTR-22440Fire ProofingSub CCTR-224400010Placing of fire proofing on equipment (50 mm thk) by cranem22.8500Sub CCTR-224400020Placing of fire proofing on structure (50 mm thk) by cranem23.6000Sub CCTR-224400030Grouting of Steel Structure (Plain Cement Sand Grout)m3250.0000Sub CCTR-224400040Grouting of Steel Structure (Non Shrink Grout)m3250.0000Sub CCTR-224400050Grouting of Pipe Supports (Plain Cement Sand Grout)m3250.0000Sub CCTR-224400060Grouting of Pipe Supports (Non Shrink Grout)m3250.0000Sub CCTR-224400070Grouting of Equipment (Plain Cement Sand Grout)m3225.0000Sub CCTR-224400080Grouting of Equipment (Non Shrink Grout)m3225.0000Sub CCTR-224400090Grouting of Equipment (Epoxy Grout)m3250.0000Sub CCTR-224400100Refractory (Brick Lining) Exculding Enchoringm320.0000Sub CCTR-224400110Refractory ( Castable ) Exculding Enchoringm380.0000Sub CCTR-224400120Refractory (Gunitting) Exculding Enchoringm360.0000Sub CCTR-224400130Refractory (Performed/Block) Exculding Enchoringm345.0000Sub CCTR-224400140Fire Proofing of Equipment (50 mm thk)m25.0000Sub CCTR-224400150Fire Proofing of Structure (50 mm thk)m26.5000CCTR-22450DismantlingSub CCTR-224500010Dismantling of Steel Structureton25.0000Sub CCTR-224500020Dismantling of Pipe Supportston80.0000Sub CCTR-224500030Dismantling of Equipment Stationary Smallton15.0000Sub CCTR-224500040Dismantling of Equipment Stationary Mediumton12.0000Sub CCTR-224500050Dismantling of Equipment Stationary Heavyton8.0000Sub CCTR-224500060Dismantling of Rotary Equipment Smallton30.0000Sub CCTR-224500070Dismantling of Rotary Equipment Largeton20.0000Sub CCTR-224500080Dismantling of Boiler / Furnaceston30.0000Sub CCTR-224500090Dismantling of HVACton40.0000Sub CCTR-224500100Dismantling of Stack/ Flare / Ductston30.0000Sub CCTR-224500110Dismantling of Colling Towerton25.0000Sub CCTR-224500120Dismantling of Insulation / Claddingm22.0000Sub CCTR-224500130Dismantling of Conveyorston25.0000Sub CCTR-224500140Dismantling of Elevatorston25.0000Sub CCTR-224500150Dismantling of Piping Dia less Than 2"ton100.0000Sub CCTR-224500160Dismantling of Piping Dia 2" and aboveton30.0000Sub CCTR-224500170Dismantling of Misc. Itemston100.0000G-225Surface Preparation/Painting/Coating/LiningCCTR-22510Surface PreparationSub CCTR-225101020Surface Preparation : Power Tool Cleaning at Groundm20.6000Sub CCTR-225101040Surface Preparation : Near White Metal Sa 2.5 at Groundm20.6000Sub CCTR-225101050Surface Preparation : White Metal Sa 3.0 at Groundm20.8000Sub CCTR-225101070Surface Preparation : Power Tool Cleaning at Fieldm20.8000Sub CCTR-225101090Surface Preparation : Near White Metal Sa 2.5 at Fieldm20.7000Sub CCTR-225101100Surface Preparation : White Metal Sa 3.0 at Fieldm21.0000CCTR-22520PaintingSub CCTR-225201110Painting : Single Coat with Brush/Roller at Groundm20.2500Sub CCTR-225201120Painting : Single Coat with Spray Gun at Groundm20.1500Sub CCTR-225201150Painting : Single Coat with Brush/Roller at Fieldm20.4000Sub CCTR-225201160Painting : Single Coat with Spray Gun at Fieldm20.2000Sub CCTR-225201170Application of Fusion Bonded Epoxy Coatingm20.4500CCTR-22530Coat/Wrap/Rubber Lining/Cement Lining (Excluding Surface PreparationSub CCTR-225301010Coat/Wrap Polyken Tape Inner and Outer Wrap (Excluding Surface Preparation)m22.4000Sub CCTR-225301020Bitumen Coat/Wrap (Excluding Surface Preparation)m23.0000Sub CCTR-225301030Heat Shrink Coating (Excluding Surface Preparation)m21.8000Sub CCTR-225301040Rubber Lining (Excluding Surface Preparation)m23.0000Sub CCTR-225301050Cement Lining (Excluding Surface Preparation)m24.0000Sub CCTR-225301060Application of Phenolic internal Pipe Coatingm20.4500G-226Cross Country PipelineCCTR-22605Pipeline Dia 04"Sub CCTR-226051240Dewateringm0.0750CCTR-22690Pipeline Dia 24"Sub CCTR-226900010Stringing Pipeton3.0000Sub CCTR-226900050Lowering inm0.1875Sub CCTR-226900070Anchor Flangesnos20.0000G-227Conveyors & ElevatorsCCTR-22710Conveyors ErectionSub CCTR-227101010Erection of Conveyors (Belt Conveyors)ton150.0000Sub CCTR-227101020Erection of Conveyors (Chain Conveyors)ton150.0000Sub CCTR-227101030Erection of Conveyors (Screw Conveyors)ton75.0000Sub CCTR-227101050Erection of Conveyors (Air Slide Conveyors)ton75.0000Sub CCTR-227101060Erection of Conveyors (Apron Feeder)ton75.0000Sub CCTR-227101070Dismantling of Conveyorston25.0000CCTR-22720Elevator ErectionSub CCTR-227201010Erection of Elevators (Belt Elevators)ton75.0000Sub CCTR-227201020Erection of Elevators (Bucket Elevators)ton75.0000Sub CCTR-227201030Erection of Liftston75.0000Sub CCTR-227201040Dismantling of Elevatorston25.0000G-228Precommissioning & CommissioningCCTR-22810PrecommissioningSub CCTR-228100001Precommissioningmhr1.0000Sub CCTR-228100002Chemical CleaniningLot0.0000CCTR-22820CommissioningSub CCTR-228200001Commissioningmhr100.0000G-229Test & CalibrationCCTR-22900Inspection/Testing/Flushing & CalibrationSub CCTR-229001010Pressure Testing of Piping (Hydro Testing)lbs0.0000Sub CCTR-229001020Pressure Testing of Equipment (Hydro Testing)nos50.0000Sub CCTR-229001030Pressure Testing of Equipment (Pneumatic Testing)nos40.0000Sub CCTR-229001050Calibration of Tanksnos10.0000Sub CCTR-229001055Hydro Testing of Tanksm30.2500Sub CCTR-229001060Pigging and Flushing Pipelineton0.0000Sub CCTR-229001070Pigging and Flushing Pipelinelbs0.0000Sub CCTR-229001080Purging and Blankinglbs0.0000Sub CCTR-229001090Chemical Cleaning and Flushingm34.0000Sub CCTR-229001100Flushing and Drying-0.0000Sub CCTR-229001110Post Weld Heat Treatment (Stress Reliving) of Pipingnos30.0000Sub CCTR-229001120Post Weld Heat Treatment (Stress Reliving) of Tanksm24.0000Sub CCTR-229001130Holiday Detectionm20.2500Sub CCTR-229001140Magnetic Particle Testnos0.0000Sub CCTR-229001150Hardness Testm0.0000CCTR-22910Hydrotesting of TanksSub CCTR-229100001Hydrotesting of Tanks More than 2500 cubic meterm30.2500CCTR-22940Non Destructive Testing of TanksSub CCTR-229400010NON DESTRUCTIVE TEST OF TANKSnos0.8000CCTR-22950Non Destructive Testing of EquipmentSub CCTR-229500001Non Destructive Testing of Equipmentm20.0000CCTR-22960Dye Penetrant Test of TanksSub CCTR-229600001Dye Penetrant Test of Tanksm20.0000D-23PipingG-231Piping Carbon SteelCCTR-23110Fabrication and Erection of Piping Around EquipmentSub CCTR-231100000Fabrication and Erection of Piping Around Equipmentton0.0000Sub CCTR-231100001Erection of CS Piping Dia less than 2" (To be Deleted)ton600.0000Sub CCTR-231100002Equipment for Special Criteria CS Piping Dia less than 2"ton0.0000Sub CCTR-231100003Dismantling of Piping Dia less Than 2"ton100.0000Sub CCTR-231100110Fabrication and Erection of CS piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) Around Equipmentton1,100.0000Sub CCTR-231100210Fabrication and Erection of CS piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) At Rackton800.0000Sub CCTR-231100310Fabrication and Erection of CS piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) At Sleeperton700.0000Sub CCTR-231100410Fabrication and Erection of CS piping Dia Less Than 2" (Avg. Dia 1-1/4" SWT) Under Groundton850.0000Sub CCTR-231109999Special Criteria for Erection of CS Fitting and Valvesnos0.0000CCTR-23120Fabrication of CS Piping Dia 2" and Above.Sub CCTR-231200000Fabrication and Erection of Piping At Rackton0.0000Sub CCTR-231200001Fabrication of C.S. Piping Dia 2" and above.ton110.0000Sub CCTR-231200002Equipmen for Special Criteria Fabrication of CS Piping Dia 2" and aboveton0.0000Sub CCTR-231200010Fabrication of CS piping Dia 2"- 6" (Avg. Dia 4" SWT)ton140.0000Sub CCTR-231200020Fabrication of CS piping Dia 8"-12" (Avg. Dia 10" SWT)ton110.0000Sub CCTR-231200030Fabrication of CS piping Dia 14"-18" (Avg. Dia 16" SWT)ton80.0000Sub CCTR-231200040Fabrication of CS piping Dia 20"-24" (Avg. Dia 22" SWT)ton50.0000Sub CCTR-231200050Fabrication of CS piping Dia 26"-30" (Avg. Dia 28" SWT)ton40.0000Sub CCTR-231200060Fabrication of CS piping Dia 32"-40" (Avg. Dia 36" SWT)ton36.0000Sub CCTR-231200065Fabrication of CS piping Sch. 40 (Std.)inch dia1.6000Sub CCTR-231200070Fabrication of CS piping Sch. 80inch dia2.0000Sub CCTR-231200075Fabrication of CS piping Sch. 120inch dia2.6000Sub CCTR-231200080Fabrication of CS piping Sch. 160inch dia3.4000Sub CCTR-231200085Fabrication of CS piping Sch. XXSinch dia4.4000Sub CCTR-231209999Special Criteria for Erection of CS Fitting and Valvesnos0.0000CCTR-23130Erection of CS Piping Dia 2" and Above.Sub CCTR-231300000Fabrication and Erection of Piping At Sleeperton0.0000Sub CCTR-231300001Erection of CS. Piping Dia 2" and above.ton117.0000Sub CCTR-231300002Equipment for Special Criteria Erection of CS Piping Dia 2" and above.ton0.0000Sub CCTR-231300003Tie-innsinch dia4.0000Sub CCTR-231300004Dismantling of Piping Dia 2" and aboveton30.0000Sub CCTR-231300110Erection of CS Piping Dia 2"- 6" (Avg. Dia 4" SWT) Around Equipmentton280.0000Sub CCTR-231300120Erection of CS Piping Dia 8"-12" (Avg. Dia 10" SWT) Around Equipmentton220.0000Sub CCTR-231300130Erection of CS Piping Dia 14"-18" (Avg. Dia 16" SWT) Around Equipmentton160.0000Sub CCTR-231300140Erection of CS Piping Dia 20"-24" (Avg. Dia 22" SWT) Around Equipmentton110.0000Sub CCTR-231300150Erection of CS Piping Dia 26"-30" (Avg. Dia 28" SWT) Around Equipmentton90.0000Sub CCTR-231300160Erection of CS Piping Dia 32"-40" (Avg. Dia 36" SWT) Around Equipmentton80.0000Sub CCTR-231300165Erection of CS Piping Sch.40 Around Equipmentinch dia7.0000Sub CCTR-231300170Erection of CS Piping Sch.80 Around Equipmentinch dia8.0000Sub CCTR-231300175Erection of CS Piping Sch.120 Around Equipmentinch dia9.0000Sub CCTR-231300180Erection of CS Piping Sch. 160 Around Equipmentinch dia10.0000Sub CCTR-231300185Erection of CS Piping Sch. XXS Around Equipmentinch dia12.0000Sub CCTR-231300210Erection of CS Piping Dia 2"- 6" (Avg. Dia 4" SWT) At Rackton180.0000Sub CCTR-231300220Erection of CS Piping Dia 8"-12" (Avg. Dia 10" SWT) At Rackton140.0000Sub CCTR-231300230Erection of CS Piping Dia 14"-18" (Avg. Dia 16" SWT) At Rackton100.0000Sub CCTR-231300240Erection of CS Piping Dia 20"-24" (Avg. Dia 22" SWT) At Rackton80.0000Sub CCTR-231300250Erection of CS Piping Dia 26"-30" (Avg. Dia 28" SWT) At Rackton70.0000Sub CCTR-231300260Erection of CS Piping Dia 32"-40" (Avg. Dia 36" SWT) At Rackton60.0000Sub CCTR-231300265Erection of CS Piping Sch. 40 At Rackinch dia5.6000Sub CCTR-231300270Erection of CS Piping Sch. 80 At Rackinch dia6.4000Sub CCTR-231300275Erection of CS Piping Sch. 120 At Rackinch dia7.2000Sub CCTR-231300280Erection of CS Piping Sch. 160 At Rackinch dia8.0000Sub CCTR-231300285Erection of CS Piping Sch. XXS At Rackinch dia9.6000Sub CCTR-231300310Erection of CS Piping Dia 2"- 6" (Avg. Dia 4" SWT) At Sleeperton150.0000Sub CCTR-231300320Erection of CS Piping Dia 8"-12" (Avg. Dia 10" SWT) At Sleeperton120.0000Sub CCTR-231300330Erection of CS Piping Dia 14"-18" (Avg. Dia 16" SWT) At Sleeperton90.0000Sub CCTR-231300340Erection of CS Piping Dia 20"-24" (Avg. Dia 22" SWT) At Sleeperton70.0000Sub CCTR-231300350Erection of CS Piping Dia 26"-30" (Avg. Dia 28" SWT) At Sleeperton60.0000Sub CCTR-231300360Erection of CS Piping Dia 32"-40" (Avg. Dia 36" SWT) At Sleeperton50.0000Sub CCTR-231300365Erection of CS Piping Sch. 40 At Sleeperinch dia5.1000Sub CCTR-231300370Erection of CS Piping Sch. 80 At Sleeperinch dia5.8000Sub CCTR-231300375Erection of CS Piping Sch. 120 At Sleeperinch dia6.5000Sub CCTR-231300380Erection of CS Piping Sch. 160 At Sleeperinch dia7.2000Sub CCTR-231300385Erection of CS Piping Sch. XXS At Sleeperinch dia8.6000Sub CCTR-231300410Erection of CS Piping Dia 2"- 6" (Avg. Dia 4" SWT) Under Groundton225.0000Sub CCTR-231300420Erection of CS Piping Dia 8"-12" (Avg. Dia 10" SWT) Under Groundton175.0000Sub CCTR-231300430Erection of CS Piping Dia 14"-18" (Avg. Dia 16" SWT) Under Groundton125.0000Sub CCTR-231300440Erection of CS Piping Dia 20"-24" (Avg. Dia 22" SWT) Under Groundton100.0000Sub CCTR-231300450Erection of CS Piping Dia 26"-30" (Avg. Dia 28" SWT) Under Groundton90.0000Sub CCTR-231300460Erection of CS Piping Dia 32"-40" (Avg. Dia 36" SWT) Under Groundton80.0000Sub CCTR-231309999Special Criteria for Erection of CS Fitting and Valvesnos0.0000CCTR-23140Fabrication and Erection of PipingSub CCTR-231400000Fabrication and Erection of Piping Under Groundton0.0000G-232Piping Alloy SteelCCTR-23210Fabrication and Erection of AS Piping Dia Less than 2"Sub CCTR-232100000Fabrication of Piping Dia 2" and Above.ton0.0000Sub CCTR-232100001Erection of AS Piping Dia less than 2"ton1,000.0000Sub CCTR-232100002Equipment for Special Criteria, AS Piping Dia less than 2"ton0.0000Sub CCTR-232100110Fabrication and Erection of AS Piping Dia less Then 2" (Avg. Dia 1-1/4" SWT) Around Equipmentton1,800.0000Sub CCTR-232100210Fabrication and Erection of AS Piping Dia less Then 2" (Avg. Dia 1-1/4" SWT) At Rackton1,300.0000Sub CCTR-232100310Fabrication and Erection of AS Piping Dia less Then 2" (Avg. Dia 1-1/4" SWT) At Sleeperton1,100.0000Sub CCTR-232100410Fabrication and Erection of AS Piping Dia less Then 2" (Avg. Dia 1-1/4" SWT) Under Groundton1,400.0000Sub CCTR-232109999Special Criteria for Erection of AS Fittings and Valvesnos0.0000CCTR-23220Fabrication of AS Piping Dia 2" and above.Sub CCTR-232200000Special Criteria for A.S. Piping Fabrication Greater than 2" Diaton0.0000Sub CCTR-232200001Fabrication of A.S. Pipe greater than 2" Dia Pipeton180.0000Sub CCTR-232200002Equipment for Special Criteria, Fab. AS piping greater than 2" Diaton0.0000Sub CCTR-232200010Fabrication of AS Piping Dia 2 "- 6" (Avg. Dia 4" SWT)ton220.0000Sub CCTR-232200020Fabrication of AS Piping Dia 8"-12" (Avg. Dia 10" SWT)ton180.0000Sub CCTR-232200030Fabrication of AS Piping Dia 14"-18" (Avg. Dia 16" SWT)ton130.0000Sub CCTR-232200040Fabrication of AS Piping Dia 20"-24" (Avg. Dia 22" SWT)ton80.0000Sub CCTR-232200050Fabrication of AS Piping Dia 26"-30" (Avg. Dia 28" SWT)ton70.0000Sub CCTR-232200060Fabrication of AS Piping Dia 32"-40" (Avg. Dia 36" SWT)ton60.0000Sub CCTR-232200065Fabrication of AS piping Sch. 40 (Std.)inch dia3.2000Sub CCTR-232200070Fabrication of AS piping Sch. 80inch dia4.0000Sub CCTR-232200075Fabrication of AS piping Sch. 120inch dia5.2000Sub CCTR-232200080Fabrication of AS piping Sch. 160inch dia6.8000Sub CCTR-232200085Fabrication of AS piping Sch. XXSinch dia8.8000Sub CCTR-232209999Special Criteria for Erection of AS Fitting and Valvesnos0.0000CCTR-23230Erection of AS Piping Dia 2" and Above.Sub CCTR-232300000Special Criteria for Erection of A.S. Pipe greater than 2" Diaton0.0000Sub CCTR-232300001Erection of A.S. Pipe greater than 2" Diaton151.0000Sub CCTR-232300002Equipment for Special Critera, Erect. AS piping greater than 2" Diaton0.0000Sub CCTR-232300110Erection of AS Piping Dia 2"- 6" (Avg. Dia 4" SWT) Around Equipmentton450.0000Sub CCTR-232300120Erection of AS Piping Dia 8"-12" (Avg. Dia 10" SWT) Around Equipmentton350.0000Sub CCTR-232300130Erection of AS Piping Dia 14"-18" (Avg. Dia 16" SWT) Around Equipmentton260.0000Sub CCTR-232300140Erection of AS Piping Dia 20"-24" (Avg. Dia 22" SWT) Around Equipmentton180.0000Sub CCTR-232300150Erection of AS Piping Dia 26"-30" (Avg. Dia 28" SWT) Around Equipmentton150.0000Sub CCTR-232300160Erection of AS Piping Dia 32"-40" (Avg. Dia 36" SWT) Around Equipmentton130.0000Sub CCTR-232300165Erection of AS Piping Sch. 40 Around Equipmentinch dia8.8000Sub CCTR-232300170Erection of AS Piping Sch. 80 Around Equipmentinch dia10.0000Sub CCTR-232300175Erection of AS Piping Sch. 120 Around Equipmentinch dia11.5000Sub CCTR-232300180Erection of AS Piping Sch. 160 Around Equipmentinch dia13.1000Sub CCTR-232300185Erection of AS Piping Sch. XXS Around Equipmentinch dia15.0000Sub CCTR-232300210Erection of AS Piping Dia 2"- 6" (Avg. Dia 4" SWT) At Rackton290.0000Sub CCTR-232300220Erection of AS Piping Dia 8"-12" (Avg. Dia 10" SWT) At Rackton225.0000Sub CCTR-232300230Erection of AS Piping Dia 14"-18" (Avg. Dia 16" SWT) At Rackton160.0000Sub CCTR-232300240Erection of AS Piping Dia 20"-24" (Avg. Dia 22" SWT) At Rackton130.0000Sub CCTR-232300250Erection of AS Piping Dia 26"-30" (Avg. Dia 28" SWT) At RackTton110.0000Sub CCTR-232300260Erection of AS Piping Dia 32"-40" (Avg. Dia 36" SWT) At Rackton100.0000Sub CCTR-232300265Erection of AS Piping Sch. 40 At Rackinch dia7.0000Sub CCTR-232300270Erection of AS Piping Sch. 80 At Rackinch dia8.0000Sub CCTR-232300275Erection of AS Piping Sch. 120 At Rackinch dia9.2000Sub CCTR-232300280Erection of AS Piping Sch. 160 At Rackinch dia10.5000Sub CCTR-232300285Erection of AS Piping Sch. XXS At Rackinch dia12.0000Sub CCTR-232300310Erection of AS Piping Dia 2"- 6" (Avg. Dia 4" SWT) At Sleeperton240.0000Sub CCTR-232300320Erection of AS Piping Dia 8"-12" (Avg. Dia 10" SWT) At Sleeperton190.0000Sub CCTR-232300330Erection of AS Piping Dia 14"-18" (Avg. Dia 16" SWT) At Sleeperton150.0000Sub CCTR-232300340Erection of AS Piping Dia 20"-24" (Avg. Dia 22" SWT) At Sleeperton110.0000Sub CCTR-232300350Erection of AS Piping Dia 26"-30" (Avg. Dia 28" SWT) At Sleeperton100.0000Sub CCTR-232300