22
Prefabrication, deep retrofits and the municipal perspective Oliver Ottinger, Energy Management Da-Di-Werk OutPHit

OutPHit Prefabrication, deep retrofits and the municipal

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OutPHit Prefabrication, deep retrofits and the municipal

Prefabrication, deep retrofits

and the municipal perspective

Oliver Ottinger,

Energy Management Da-Di-Werk

OutPHit

Page 2: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Outline

• Who we are

• School buildings‘ specifics

• Retrofit examples

• Prefabricated wooden constructions for new school buildings

• Wishes to OutPHit

Page 3: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

County Darmstadt-Dieburg in numbers …

290.000 inhabitants

81 schools with 475 buildings

Sustainability

2008 School building and retrofit program

Guidelines for sustainable buildings: Built to the PH standard

Da-Di-Werk: 80 office workers, 80 caretakers, Energy management 4 employees

Prefab communal perspective

3

Darmstadt

Page 4: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

School buildings‘ specifics

High occupation densityHohe Belegungsdichte

Head load per person: 80..100 W 2-2,5 kW

Ventilation:

Large air exchange rates (compared with residential buidlings) 3-4 h-1

Intermittent operation: 7-17 Uhr

Ventilation during summer window ventilation

Time of use

During daytime of working days only

Longer holidays – partly used only

Oppupaction phase expanding – all-day school

4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Montag

Dienstag

Mittwoch

Donnertag

Freitag

Samstag

Sonntag

Page 5: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

CO2 concentration in class room with minimal ventilation

-0,5

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

5,5

6

6,5

7

7,5

8

8,5

9

9,5

10

10,5

11

11,5

12

12,5

13

13,5

14

14,5

15

0

500

1000

1500

2000

2500

3000

8:00 12:00 16:00 20:00 0:00 4:00 8:00

CO

2-G

eh

alt

de

r R

aum

luft

CO2 Konzentration, 20 Schüler

CO2 Gehalt

Anwesenheit

Lüftungslaufzeit

Anwesenheit

Luftvolumenstrom:60 m³/h Während Unterricht300 m³/h in Pausen

5

Goal CO2 <1000-

1200 ppm

• Window ventilation

during brakes not

sufficient

• Measured

concentrations up to

3500 ppm

Page 6: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

CO2-concentration with mech. ventilation (heat recovery)

6

-0,5

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

5,5

6

6,5

7

7,5

8

8,5

9

9,5

10

10,5

11

11,5

12

12,5

13

13,5

14

14,5

15

0

200

400

600

800

1000

1200

8:00 12:00 16:00 20:00 0:00 4:00 8:00

CO

2-G

eh

alt

de

r R

aum

luft

CO2 Konzentration, 30 Schüler + 1 Lehrer

CO2 Gehalt

Anwesenheit

Lüftungslaufzeit

Anwesenheit

Luftvolumenstrom:450 m³/h Während Unterricht

Volume flow: 450 m³/h

• Very good air

quality with

mech. ventilation

Goal CO2 <1000-

1200 ppm

Page 7: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

School buildings‘ specificsSummer comfort – heat fluxes

O. Ottinger, Energiemanagement

Da-Di-Werk

7

Heat transported by air

n = 2 h-1, Te = Ti + 5 K

Solar gains

Mean daily solar radiation,

small window area

IHS: pupils presence

Exterior

shading

Intirior

shadingWithout

shading

Heat

flux

[W]

Ventilation

Solar gains

IHG

Page 8: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Summer comfort with consequent shading, nightventilation and thermal massesExample: Hessenwaldschule

8

AtriumNight vent opening

Burglary protection, shading, weather protection, ….

Page 9: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

User recommendations

O. Ottinger, Energiemanagement

Da-Di-Werk

9

www.ladadi.de/

Aktuelles – Gutes Raumklima in Sommer

und Winter

Page 10: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Econmics for new build project

Max-Planck-Gymnasium

• New PH building with classrooms

• Hybrid construction with wooden

elements

Prefab communal perspective

10

Page 11: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Economics

Cost overrun Lower costs Overall balance

Invest for improved efficiency 82.000 €

Funding state of Hesse* 398.900 €

Energy savings 84.000 €

82.000 € 482.900 € 400.900 €

11

* Kommunalrichtlinie Hessen 2017, Zuwendungsbescheid vom 04.10.2018

Funding compensates

ventilation

being necessary anyway

Page 12: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Retrofit examples

Albrecht-Dürer-Schule

Full retrofit to EnerPHit standard

Built in 1970/74

Area: 10.670 m² (1500 m²)

20 Mio. €, KG 300+400

Pellet district heating

O. Ottinger, Energiemanagement

Da-Di-Werk

12

Construction: dismantling of the whole building

and reconstruction

Finalizes inner courtyard

Page 13: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Retrofit examples

Albrecht-Dürer-Schule

Construction period: 2015-2018

Heating demand: 25 kWh/m²a

Air thightness: n50 = 0,63 h-1

O. Ottinger, Energiemanagement

Da-Di-Werk

13

Outer view during construction Finished out view

Page 14: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Retrofit examples

Ventilation units > 35.000 m³/h

Tripple glazed windows

Exterior insolation U 0,105 W/m²K

Roof insulation U=0,13 W/m²K

LED lighting

Prefab communal perspective

14

Old fassade with baldy insulated aluminium

windows

New fassade with tripple glased wood-aluminium

windows in PH-quality (Uw~0,8 W/m²K)

Page 15: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

NEW Class room building in Schaafheim

Framework contract for „better

containers“ was upgraded here to

a permanent school building

• Ventilation

• Tripple windows

• Heat pump heating system

Prefab communal perspective

15

Corridor with staircase in contrast colours Class room with integrated ventilation unit in

furnitures at left side

Page 16: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

NEW Class room building in Schaafheim

Framework contract for „better

containers“ was upgraded here to

a permanent school building

• Ventilation

• Tripple windows

• Heat pump heating system

Prefab communal perspective

16

Outer view of wooden construction New Pedagogical concepts with central flexible

areas

Page 17: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

NEW Class room building in Schaafheim

Wooden element construction,

outer shell complete

Interior construction onsite

Prefab communal perspective

17

Page 18: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

School cafeteria buildingJ.-F.-Kennedy school

Cafeteria for 100 pupils

Warm-up kitchen for 300 meaks

Prefab communal perspective

18

Cafeteria area with ventilation ducts

Hood above washing mashine – contrast between

wooden construction and kitchen

Page 19: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Primary school in planing phase

• 2-story school building including mensa and

office area

• Approx. 6000 m²

• Passive House standard

• Wooden space cells

• Central part as massive construction

Prefab communal perspective

Page 20: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

SaP Retrofit?

• Built in 1970s

• Concrete sandwitch

construction

• Complete retrofit necessary

Prefab communal perspective

20

Facade elements uninsulated

Windows partly out of order

Building services to be renewed

Fire protection issues

Page 21: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

Wishes to OutPHit

Constriction time 6 weeks (holidays)

Integration of

• Ventilation

• Heating & Cooling

• Electric installation…

How to renew our SaP

Prefab communal perspective

21

Page 22: OutPHit Prefabrication, deep retrofits and the municipal

Landkreis Darmstadt-Dieburg Da-Di-Werk Gebäudemanagement

THANKS

Contact:

[email protected]

Prefab communal perspective

22

Working for our future