Upload
clement-perkins
View
216
Download
0
Tags:
Embed Size (px)
Citation preview
Our Presenters Today:
Charles G. Hardy, GSA-Deputy Director, Office of Property Development. Chicago
Jonathan Wilch-Principal, NBBJ, Columbus
Jan Reinhardt, Program Manager, Virtual Design & Construction, Turner Construction, Reston, Va.
Richard T. La Jeunesse, Esq. Moderator, Graydon, Hear & Ritchey LLP, Cincinnati
Ben Uwakweh Obinero, CIC Director, UC College of Applied Science, Construction Science Dept.
Owner
Contractor
S F S
Architect
E SE
User
BIM
slide courtesy of Autodesk
An Industry Overview
Vocabulary Building Information Models -- or
Modeling (BIM): Models of project product, focus on design
Virtual Design and Construction (VDC): Models of project Product (i.e., facilities), Work Processes
and Organization Intent, form (design choices), behavior (predicted,
observed) BIM a subset of VDC
VDC Phases Visualization Automated Prediction Technical Integration Automation
4D: Visual animation of construction schedule 5D, 6D, XD….
2004
US Dept. of Commerce, Bureau of Labor Statistics
An Industry Overview
2004
NIST Study$15.8 billion / year lost in construction industry due to lack of interoperability
NIST
An Industry Overview
PD SD CD PR CA OPDDTime
Eff
ort
/Eff
ect
PD: Pre-designSD: Schematic designDD: Design developmentCD: Construction documentationPR: ProcurementCA: Construction AdministrationOP: Operation
Graphic originated by Patrick MacLeamy, AIA / HOK
Ability to impact cost and functional capabilities
1
1
Cost of design changes
2
2Traditional design process3 3Preferred design process
4
4
• Owner Leadership
• Integrated Project Structure
• Open Information Sharing
• Virtual Building Models
Graphic by Patrick MacLeamy, FAIA
GSA National 3D-4D BIM Program
BIM Overview 3D geometric models
Geometric representation of building components and typically serve as an aid for visualization and design/construction coordination.
4D models (3D + time) Include information which can inform and analyze project
phasing, tenant sequencing, and construction scheduling. BIM models include not only 3D geometric models (and,
therefore, 2D and 3D drawings), but also more specific product information on a wide range of building elements and systems associated with a proposed building
GSA National 3D-4D BIM Program
For all major projects funded in October 2007 and beyond, GSA will require spatial program BIMs be the minimum requirements for submission for Final Concept approvals by the PBS Commissioner and the Chief Architect.
Triforma
\08 3D Models\consultants\korda\kordastructure-000000
Structural Frame
\08 3D Models\shell\shell-concept-000000
Shell