OUCC 2015Inspiring Innovation

Presentation: We think it was time: Therehabilitation of infrastructure at Waterloo Presenter: Jason GorrieDate: Monday, May 4, 2015 12:45 - 13:35

AgendaEC2 Data CentreNetapp 7mode -> CDOT

-History

-Timeline

-Implementation

-Future

DC - History On-campus Co-lo Planning Blackberry Purchase

EC2 DC - Room SpecificsSize: 2,000 ft^2

Generation: 3 x 300 kVA bifuel with ATS

UPS: 160kVA, 300kVA online UPS with 60+ min battery

Cooling: 4 x 30T Direct Expansion CRAC

EC2 EC - What Changed & Why Upgrade CRAC units Remove “legacy” PDU Electrical Distribution – Re-fed a PDU Networking Cold Isle containment

EC2 DC – Cost $805,598.76 Cable $199,206.68

Containment $49,186.19

CRAC $15,180.00

Electrical $44,048.45

Fire $7,160.00 **

General $12,999.00

Netapp $75,246.00 **

Networking $364,839.80

Security $21,006.46

Servers $16,726.18

EC2 DC - TransitionOctober 2014: Room “complete”

December 2014: Netapp logical move

February/March 2015: Emptied Co-lo

March 2015: Group moved buildings

EC2 DC - Future Migrate servers from Primary Complete fire suppression / detection EC5

NetApp – Historical perspectiveImportant Dates 1999 2003/4 2010 2014

Netapp – CDOT Cluster system created by HA pairs Nodes communicate with 10G switched links “Single” management of common options Virtual placement of network interfaces No more 7-mode

NetApp - Current EnvironmentMain

FAS3270HA 115T User Data, Vmware, iSCSI for MS SQL

FAS3220 30T Vmware for dev machines

FAS3270 88T DR

Oracle 7130 10T RMAN

NetApp - “New” EnvironmentClusters

2x FAS8040HA 270T User data, VMware, MS SQL

2x FAS8040HA 260T Oracle,Research,VMware

FAS8020HA 040T Security Cameras

FAS8020HA 040T RMAN

FAS2552HA 020T PCI

FAS3020 160T Off-campus Valut

NetApp - Migration Phases1: User home, profiles, spool

2: Departmental data

3: VMs from DR site

4: VMs from primary site

5: MS SQL (iSCSI)

NetApp - Planning2013: Investigated

2014: Testing & Trial

December 2014: Go-live – Phase 1

February 2015: Go-live – Phase 2

March 2015: Go-live – Phase 3 && double down

May 2015: Go-live – Phase 4

June 2015: Go-live – Phase 5

Pre-conversion Planning & Testing First one to move Simulator Verification Process Unstable Feature set Swing Space Cabling

NetApp – Design HA Pair SnapMirror

Conversion Issues 32-bit vs. 64 bit Apple + MS Office SNMP

NetApp - Future Have 95% of “everything” virtual by Jan 01, 2017 Finally do SnapVault Use Snap Products to replace MS DPM