AgendaAgenda

• Introductions

• Overview

• Setup

• Execution

• Costing

• Q&A

Page 3: osp Process Oracle R11i

OverviewOverview

What is Outside Processing?

A means of providing supplier-sourced components and processes as an integral

part of the manufacturing process

Page 4: osp Process Oracle R11i

OverviewOverview

• Outside processing (OSP)

– Consists of the use of inventory items and resources to model supplier-sourced services

– OSP resources are used to schedule and cost supplier-sourced services within manufacturing routings

– OSP allows for routing operation steps to be converted into purchase requisitions wherein the req line item is the OSP item

– WIP automatically requisitions material and purchase orders are charged directly to work orders

– Close loop, fully integrated solution

Page 5: osp Process Oracle R11i

OverviewOverview

• OSP Features

– Multiple OSP operations on a work order and multiple OSP resources per operation

– Supplier provided components are included in BOM and referenced as supply type = supplier

– Automatic requisition generation

– Full tracability of work orders on purchase orders, receipts, & receiving transactions

– Automatic resource charging and move transactions

– Automatic work order completions

Page 6: osp Process Oracle R11i

Overview: OSP Integration Overview: OSP Integration

Oracle Oracle PurchasingPurchasing

Oracle Work Oracle Work in Processin Process

OracleOracleInventoryInventory

OracleOracleBills of Bills of MaterialMaterial

Oracle Oracle Outside Outside

Processing Processing

Oracle Oracle Mobile Mobile Supply Supply ChainChain

Oracle Oracle Cost MgmtCost Mgmt

Page 7: osp Process Oracle R11i

Setup: InventorySetup: Inventory

• Item Master

– Create OSP item using item template = @Outside Processing

Page 8: osp Process Oracle R11i

Setup: InventorySetup: Inventory

• Item Attributes

– Item AttributesInventory Item Unchecked

Stockable Unchecked

Transactable Unchecked

Costing Enabled Unchecked

Inventory Asset Value Unchecked

Include in Rollup Unchecked

Purchased Checked

Purchasable Checked

Outside Processing Item Checked

Page 9: osp Process Oracle R11i

Setup: InventorySetup: Inventory

• Outside Processing Unit Type

– Assembly – OSP resource charges are based on the work order quantity

– Resource – OSP resource charges are based on the work order quantity x the resource run rate

• List Price

– Enter a list price

Page 10: osp Process Oracle R11i

Setup: ResourcesSetup: Resources

• Outside Processing Resource

Page 11: osp Process Oracle R11i

Setup: ResourcesSetup: Resources

• Standard Costing Considerations

– Type = Currency

– UOM = Dollars

• Average Costing Considerations

– Type = Amount

– UOM = Each

• Department Locations need to be setup

Page 12: osp Process Oracle R11i

Setup: RoutingsSetup: Routings

• Operation Resources

Page 13: osp Process Oracle R11i

Setup: BOMSetup: BOM

• Supply Type Supplier

Page 14: osp Process Oracle R11i

Setup: WIPSetup: WIP

• Shop Floor Status

– Allow Moves = Unchecked

Page 15: osp Process Oracle R11i

Setup: WIPSetup: WIP

• WIP Parameters

Page 16: osp Process Oracle R11i

Setup: WIPSetup: WIP

• WIP Parameters

Page 17: osp Process Oracle R11i

Setup: Cost Setup: Cost

• Cost Rollup

Page 18: osp Process Oracle R11i

Execution: WIP Execution: WIP

• Create and Release WIP Job

Page 19: osp Process Oracle R11i

Execution: WIP Execution: WIP

• Perform Move Operation

– Move material from operation 10, Queue, to operation 10, To Move

– Perform transaction save

– Remember, WIP Parameter

• Requisition Creation Time = @ Operation

Page 20: osp Process Oracle R11i

Execution: WIP Execution: WIP

• Perform Move Operation

Page 21: osp Process Oracle R11i

Execution: WIP Execution: WIP

• WIP Components

Page 22: osp Process Oracle R11i

Execution: WIP Execution: WIP

• WIP Components:Supplier

Page 23: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• Perform Requisition Import

Page 24: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• Perform Requisition Import

Page 25: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• WIP: Enable Outside Processing

– Yes Enable OSP workflows

– No Disable OSP workflows

Page 26: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• Requisition Summary

Page 27: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• Requisition Summary

– OSP item list price x work order assembly quantity

Page 28: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• Requisition Summary

– Approved Status

Page 29: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• AutoCreate Purchase Order & Approve

Page 30: osp Process Oracle R11i

Execution: PurchasingExecution: Purchasing

• AutoCreate Purchase Order & Approve

Page 31: osp Process Oracle R11i

Execution: ReceivingExecution: Receiving

• Receipts

Page 32: osp Process Oracle R11i

Execution: ReceivingExecution: Receiving

• Receipts: Outside Services Tab

Page 33: osp Process Oracle R11i

Execution: ReceivingExecution: Receiving

• Receiving Transaction Summary

Page 34: osp Process Oracle R11i

Costing: WIPCosting: WIP

• Resource Distribution at Standard

– Resource Type: Currency (USD)

– Outside Processing Unit Type: Assembly

– Operation Resource Usage: $ 5 (based on resource UOM)

– Assembly Quantity: 10

Resource Distribution = 10 units x $ 5/unit = $ 50

Page 35: osp Process Oracle R11i

Costing: WIPCosting: WIP

• Purchase Order Pricing

– List Price: $.60

– Outside Processing Unit Type: Assembly

– Assembly Quantity: 10

PO Extended Price = 10 units x $ .6/unit = $ 6

Page 36: osp Process Oracle R11i

Costing: WIPCosting: WIP

• Outside Processing Charging & Variances

– Differences between the standard resource charge and the actual OSP purchase price are are charged to the OSP variance account

01-000-1450-0000-000 $50 Debit to OSP inventory valuation01-540-1430-0000-000 $25 Debit to Overhead inventory valuation01-540-1450-0000-000 <$44> Credit to OSP variance account01-540-7405-0000-000 <$25> Credit to Overhead Absorption account01-540-1410-0000-000 <$6> Credit to OSP Absorption account

Page 37: osp Process Oracle R11i

Costing: WIPCosting: WIP

• WIP Value Summary

Page 38: osp Process Oracle R11i

Costing: WIPCosting: WIP

• WIP Value Summary: Distributions

Page 39: osp Process Oracle R11i

Costing: WIPCosting: WIP

• View Resource Transactions

Page 40: osp Process Oracle R11i

Costing: WIPCosting: WIP

• View Resource Transactions

Page 41: osp Process Oracle R11i

Costing: WIPCosting: WIP

• View Resource Transactions

Page 42: osp Process Oracle R11i

Costing: WIPCosting: WIP

• View Resource Transactions: Distributions

Page 43: osp Process Oracle R11i

Costing: WIPCosting: WIP

• View Resource Transactions: Distributions

Page 44: osp Process Oracle R11i