www.Inspection-for-Industry.com Project: Client: Report No.: ORIFICE FLANGE GRINDING RECORD Contractor: Date: Ref. Standard: Page 1 of 1 Doc. No.: Test Package No.: Quality Control TPI Inspection Client Name: Sign: Date Name: Sign: Date Name: Sign: Date: Row Line No. ISO No. Sheet Joint Report Welding Check for Inside Grinding Check for Outside Grinding Remark 1 2 3 4 5 Remark:

Orifice Flange Grinding Quality Control and Inspection Report Form

Embed Size (px)

Citation preview

Page 1: Orifice Flange Grinding Quality Control and Inspection Report Form

www.Inspection-for-Industry.com Project:

Client: Report No.:

ORIFICE FLANGE GRINDING RECORD

Contractor: Date: Ref. Standard: Page 1 of 1 Doc. No.:

Test Package No.:

Quality Control TPI Inspection Client Name: Sign: Date

Name: Sign: Date

Name: Sign: Date:

Row Line No. ISO No. Sheet Joint Report

Welding

Check for Inside

Grinding

Check for Outside Grinding

Remark

1

2

3

4

5

Remark: