13
OREGON DEPARTMENT OF TRANSPORTATION PRIME CONTRACTOR PREQUALIFICATION APPLICATION Submit application to : MEDFORD WATER COMMISSION 200 S. IVY STREET – ROOM 177 MEDFORD, OREGON 97501 Phone: (541) 774-2440 Fax: (541) 774-2555 Website: www.medfordwater.org Email: w[email protected] A. Date Application Prepared: _________________________________________________________________ B. Application of: ___________________________________________________________________________ Legal Business Name (As shown on your federal form W- 9) ___________________________________________________________________________ Assumed Business Name(s) (Complete Section 6) List previous business names of your organization: ____________________________________________ C. Business Structure (Check one): Individual Sole Proprietorship Limited Partnership (LP) General Partnership Limited Liability Company (LLC) Corporation Limited Liability Partnership (LLP) S-Corporation Joint Venture D. Address: Physical address, city, state, zip ______________________________________________________________ Mailing address, city, state, zip _______________________________________________________________ Phone ____________________________ Fax ______________________________________________ E-mail _____________________________ Contact person _____________________________________ E. Purpose of Application (Check one ): This is a biennial prequalification application as designated by the mandatory prequalification rules adopted by the Public Contracting Agency. This is a prequalification application for:_____________________________________________________ (Provide specific private developer project name; please note that many MWC projects require a separate prequalification for which this application does not apply) Service Installations (MWC conducts annual interviews and accepts applications during specified dates only) FOR OFFICE USE ONLY DATE RCVD BY MWC ADMIN __________________ INIT __________________ DATE REVIEWED BY OPS__________________ INIT__________________ APPROVED SMALL SVCS ONLY APPROVED THIS PROJECT ONLY: ____________________________ DECLINED DATE RETURNED TO MWC ADMIN__________________ INIT________________________ Prime Contractor Prequalification Application Revised June 2019

OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

OREGON DEPARTMENT OF TRANSPORTATION

PRIME CONTRACTOR PREQUALIFICATION APPLICATION

Submit application to:

MEDFORD WATER COMMISSION 200 S. IVY STREET – ROOM 177

MEDFORD, OREGON 97501

Phone: (541) 774-2440 Fax: (541) 774-2555 Website: www.medfordwater.org Email: [email protected]

A. Date Application Prepared: _________________________________________________________________

B. Application of: ___________________________________________________________________________Legal Business Name (As shown on your federal form W- 9)

___________________________________________________________________________Assumed Business Name(s) (Complete Section 6)

List previous business names of your organization: ____________________________________________

C. Business Structure (Check one):

Individual Sole Proprietorship Limited Partnership (LP) General Partnership Limited Liability Company (LLC) Corporation Limited Liability Partnership (LLP) S-Corporation Joint Venture

D. Address:

Physical address, city, state, zip ______________________________________________________________

Mailing address, city, state, zip _______________________________________________________________

Phone ____________________________ Fax ______________________________________________

E-mail _____________________________ Contact person _____________________________________

E. Purpose of Application (Check one only):

This is a biennial prequalification application as designated by the mandatory prequalification rules adopted by the Public Contracting Agency.

This is a prequalification application for:_____________________________________________________(Provide specific private developer project name; please note that many MWC projects require a separate prequalification for which this application does not apply)

Service Installations (MWC conducts annual interviews and accepts applications during specified dates only)

FOR OFFICE USE ONLY

DATE RCVD BY MWC ADMIN __________________ INIT __________________

DATE REVIEWED BY OPS__________________ INIT__________________

APPROVED SMALL SVCS ONLY APPROVED THIS PROJECT ONLY:

____________________________ DECLINED

DATE RETURNED TO MWC ADMIN__________________ INIT________________________ Prime Contractor Prequalification Application Revised June 2019

ycfinstad
Highlight
Page 2: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

MEDFORD WATER COMMISSION

PREQUALIFICATION FORM SUPPLEMENT

(Note: The information on this form may be used by Medford Water Commission to consider whether a bidder has met the standards of responsibility as set forth in ORS 279C.375. Bidder authorizes MWC to contact any person listed on this form for the purpose of investigating responsibility. Failure to provide complete information shall be grounds for bid rejection.)

1) List foreman or personnel that are experienced in the installation of ductile iron water pipe, who willbe on the job and wish to be prequalified:

2) List previous projects of similar size and scope where your firm and/or personnel have successfullycompleted ductile iron waterline work:

NAME OF PROJECT ADDRESS WATERLINE WORK

DESCRIPTION NAME OF REFERENCE TELEPHONE NUMBER

Prime Contractor Prequalification Application Page 1 Revised June 2019

Page 3: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

Signatures are preferredin blue ink

Signatures are preferred in blue ink

Page 4: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

Signatures are preferredin blue ink

Signatures are preferred in blue ink

Page 5: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

Signatures are preferred in blue ink)

Signatures are preferred in blue ink.

Page 6: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

Signatures are preferred in blue ink.

Signatures are preferred in blue ink.

Page 7: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

5 If doing business as a sole proprietorship, complete this section DNA

Name of individual liable for all obligations of the business:

If applicant is a sole proprietor using an assumed business name, please list name below:

Secretary of State registration date: Expiration date:

Printed name and title Signature

(Additional dcx:umentation may be required by the public contracting agency)

6 If doing business under an aaaumed business name, complete this section DNA

Assumed business name:

Owner's name and address:

Oregon Secretary of State Corporation Division's Registration Renewal Number: l httcs://sos.oreaon. aov/business/caaes/default.ascx) Date:

Assumed business name:

Owner's name and address:

Oregon Secretary of State Corporation Division's Registration Renewal Number: l httcs://sos.oreaon.aov/business/caaes/default.ascx) Date:

If you have additional aaaumed business names, attach a sheet with business information.

Prima Conlraclor P111qualilication Application PagaB Raviaad June 2019

Page 8: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

7 OWNERSHIP AND CONTROL (A, B, and C)

A) Are there any parent companies, corporations, or individuals with at least 10% ownership interest in applicant's firm? D Yes D No If yes, please list below in space provided

B) Are there any subsidiary companies or corporations owned or controlled by the applicant doing business in Oregon under another name? For the purposes of this information, the applicant includes the applicant's officers, directors, or partners, or other entity in which the applicant is an officer, director, or partner. D Yes D No If yes, please list below in space provided

C) Are there any other personnel in applicant's organization who have a financial interest in or serve as officers or partners in another firm prequalified to bid in this or another state? D Yes D No If yes, please list below in space provided.

Individual's Name Present Position or Other Finn or Finns Position in Other State of Other Office Finn(sl Finn(sl

Prime Contractor Praqualification Application Page7 Revised June 2019

Page 9: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

8 LICENSES AND REGISTRATIONS

Oregon Secretary of State Corporation Division - Active Busin889 Registry No.: https:/Jsos.oregon.govlbusiness/pages/default.aspx Phone: 503-986-2200

Oregon Construction Contractors Board No.: www.oregon.gov/CCB/Pages/lndex.aspx Phone: 503-378-4621

W-9 Taxpayer Identification Number: Submit a current dated W-9 with application.

Oregon Busine88 Landscape Contractors License No. and company name: Individual Landscape Contractor License No. and name: www.oregon.gov/LCB/pages/index.aspx Phone: 503-967-6291

Oregon Electrical Contractor License No. and company name: Supervisor's License No. and name: www.oregon.gov/BCD/pages/index.aspx Building Codes Division phone: 503-378-4133

Oregon Plumbing Business License No. and company name: Journeyman's License No. and name:

Oregon Boiler/Pressure Vassel Business License No. and company name: www.oregon.gov/BCD/pages/index.aspx Building Codes Division phone: 503-378-4133

Other License No. and name or type:

Prima Conlraclor P111qualilication Application

Rsquirud fer Legal BusinB811 Name, Asuumed Bueiness Name (page 1, Section B), Corporations, LLCs, LLPs, and LPs. Required prior to conlract exeaition.

Rsquirud prier to bid opening fer state-funded prcjects or prior to contract execution for federally-flJnded prcjects (not required fer Aggregate Production or L.and&caping wor1c: categories).

Required with all Applications.

PagaB Rwiaed June 2019

Page 10: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

9 SUPPLEMENTAL QUESTIONS A) Within the last five years has the applicant, or any parent, subsidiary or affiliate, been denied prequalification

or had prequalification suspended or revoked by any state, local or federal agency in this or any other state? D Yes D No If yes, please attach an explanation.

BJ Within the last five years has the applicant, or any parent, subsidiary or affiliate, been debarred from bidding on contracts by any state, local or federal agency in this or any other state under any state or federal law?

D Yes D No If yes, please attach an explanation. CJ Has any officer or partner of the applicant, or of any parent, subsidiary or affiliate, ever applied for

prequalification with ODOT under a different name? D Yes D No If yes, please attach an explanation.

DJ Within the last five years has the applicant, or any parent, subsidiary or affiliate, failed to complete a state, local or federal public improvement (works) contract?

D Yes D No If yes, please attach an explanation. E) Within the last five years has any officer or partner of the applicant, or of any parent, subsidiary or affiliate,

been found in breach of a local, state or federal contract? D Yes D No If yes, please attach an explanation.

F) Within the last five years has the applicant, or any officer, partner, agent or employee of applicant, or any parent, subsidiary or affiliate, been found to have violated any state or federal prevailing wage statute or regulation (including the federal Davis-Bacon and related Acts and ORS 279C.800 et. seq.), or any provision requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the United States Department of Labor, by any other state or federal agency, or by any court of competent jurisdiction?

D Yes D No If yes, provide copies of the final order(s) or judgment in which this occurred and explain in detail:

(a) the circumstances behind any violation, including the amount(s) not paid (b) whether the amount(s) have now been paid (c) the reasons for the violation (d) all efforts undertaken to ensure that future violations will not occur

G) Within the last five years has the applicant, or any officer, partner, agent or employee of applicant been found to have violated any state or federal environmental statute or regulation (including but not limited to Environmental Protection Agency, Department of Environmental Quality, US Fish and Wildlife Service, Department of Fish and Wildlife, US Army Corps of Engineers, Division of State Lands, Department of Agriculture or Department of Interior), or any permit issued by one of these agencies, in any agency Final Order or by any court of competent jurisdiction?

D Yes D No If yes, provide copies of the final order(s) or judgment in which this occurred and explain in detail:

(a) the circumstances behind any violation, including the amount(s) not paid (b) whether the amount(s) have now been paid (c) the reasons for the violation (d) all efforts undertaken to ensure that future violations will not occur

Comments:

Prime Contractor Praqualification Application Page9 Revised June 2019

Page 11: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

10 CLASSES OF WORK

Fill in the dasses of work on which you wish to be pre-qualified to bid. Classes of work indude, but are not limited to, work listed in parentheses. A more detailed listing of bid items can be found at: https://www.oregon.gov/ODOT/Business/Documentsfl018 Bid Item List.xlsx

For Each Class of Work:

An applicant who wishes to add a new clau or claues of work in which they have not been previously prequalified must provide at least three references for each new work class. Reference instructions and fonns can be found at: httcs://www.oregon.gov/odot/business/procurement/oages/bid award.aspx

List all other states where applicant is currently qualified to perform work or has been qualified within the last three (3) years.

Class of Work

D (AB) Aggregate Bases

D (AC) Rock Production (Aggregate Crushing, Sanding Rock)

D (ACP) Asphalt Concrete Paving and Oiling (Paving, Chip Sealing, Crack Sealing, Slurry Sealing, Fog Sealing)

D (BLD1) Buildings (Toilets, Bathhouses, Maintenance, Sand Sheds)

D (EARn Earthwork and Drainage (Clearing, Earthwork, Blasting, Riprap, Culverts, Manholes, Inlets, Storm Sewers, Sanitary Systems)

D (ELEC) Electrical (Traffic Signals, Illumination, Ramp Meters, Roadway Weather Information Systems (RWIS), Variable Message Signs (VMS), Traffic Cameras)

D (LS) Landscaping (Roadside Seeding, Lawns, Shrubs, Trees, Irrigation Systems, Topsoil, Temporary and Permanent Erosion Control)

D (MHA) Miscellaneous Highway Appurtenances (Guardrail, Barrier, Curbs, Walks, Fences, Protective Screening, Impact Attenuators, Cold Plane Pavement Removal, Rumble Strips)

D (PAl1) Painting (Bridges and Buildings)

D (PAVE) Pavement Markings (Permanent - Painted, Durable, Markers, Delineators)

D (PCP) Portland Cement Concrete Paving

D (REIN) Bridges and Structures (Concrete, Steel, and Timber Bridges; Retaining Walls and Sound walls; Seismic Retrofit; Box Culverts; Structural Plate Pipe, and Pipe Arches)

D (SIGN) Signing (Permanent)

D (TTC) Temporary Traffic Control (All Temporary Traffic Control Items Including Flaggers and Pilot Cars)

D (OTH1) Other (List specific class)

Prima Conlraclor P111qualilication Application Paga 10

States qualified within tha last (3) years

You may list "OTHER" (OTH1) dasses of work; however, ODOT does not normally solicit bids under this class. This class of work is typically used by Local Agencies (Cities, Counties, etc.)

Raviaad June 2019

Page 12: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

11 EXPERIENCE

A. How many years has applicant been in business under present name?

Aa a prime contractor? AB a subcontractor?

B. How many years' experience in construction work has applicant had?

Aa a prime contractor? Aa a subcontractor?

12 EXPERIENCE - Continued

What is the construction experience of all owners, officers, partners and principal individuals in applicant's organization?

!Attach additional sheets. if needed Years of Magnitude and Individual's Name Present Position or Office Construction

Ex...,rience Type of Work

13 GENERAL REMARKS Use the following space for general remarks and explanations pertaining to the foregoing prequalification statements. Explain here any claimed experience of a business organization or entity other than the applicant or principals, including that of any business entity which was a predecessor of applicant or which has been acQuired bv aoolicant.

Prime Contractor Prciqualification Application Page11 Revised June 2019

Page 13: OREGON DEPARTMENT OF TRANSPORTATION PRIME ... Prequalification...requiring prompt payment to subcontractors, in any Final Order of the Oregon Bureau of Labor and Industries or the

Notary Seal or

Stamp