ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

ORANGE PUBLIC SCHOOLS

FACILITIES PRESENTATION August 14, 2018

Facilities Project & Maintenance

Issues

Page 2: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

STEM Building Renovation (Phase II)

Summer Project:

The Phase II:- Lower Level Renovation

• Demolition certain non-load bearing walls, to create larger classroom spaces

• Remove and relocate certain number of lockers

• Determine a suitable location for Green House (either on flat roof or grass area behind the convent building).

• Installation of new LED lights

• Sparkling, Painting & Finishing of classroom walls

• Install Carpet Tiles and or VCT Tiles where applicable

Long Term Project:

• Upgrade of Electrical power, new A/C units (Sanyo)

• Handicap upgrade (chair lift installation)

UPDATE: (a) Asbestos Abated (b) Demolition of walls 90% completed

Page 3: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

STEM BUILDING RENOVATION Phase II – Wall demolition

Page 4: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

STEM BUILDING RENOVATION Wall Demolition

Page 5: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

STEM BUILDING RENOVATION Wall Demolition

Page 6: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

STEM BUILDING RENOVATION Wall Demolition

Page 7: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OHS: Demolition of Buildings for Parking Lots – Clarendon Pl., etc.

• Bid has been awarded, demolition of 396 Clarendon Pl is awaiting approval of permit.

• Grading and Repaving of School Lots (Pending)

• Renovation of OHS interior Court yard remove and replace rotted wood, cut trees & weeds, clean and power wash (In Progress)

• Installation of new air conditioners (8 units already installed)

Page 8: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OHS Interior Courtyard

Page 9: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OHS Interior Courtyard

Page 10: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Playgrounds Renovation

The renovation of the following schools was scheduled to be done this summer:

• Central Elementary School (In Progress)

• Forest Street School (Completed)

• Heywood Avenue School (In Progress)

• Oakwood Avenue School (In Progress)

• Our Lady of Mt. Carmel (Preschool playground) In Progress

Page 11: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Forest Elem Playground

Page 12: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Heywood Elem Playground

Page 13: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Gym Floors Renovation .

• Central Elm School Gym Floor:- floor was ripped by PCI maintenance services to locate the source of water damage prior to fixing the floor.( Renovation is Completed)

.

• Heywood Gym Floor is partially renovated because the source of water damage has not been fixed.

Page 14: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Central Elem Gym Floor (Before)

Page 15: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Central Elem Gym Floor (Installation In Progress)

Page 16: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Central Elem Gym Floor (Installation In Progress)

Page 17: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Central Elem Gym (After)

Page 18: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Central Elem Gym (After)

Page 19: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Cleveland Elementary School (Move to Our Lady of The Valley)

SDA Renovation of OLV is in progress (Expected completion date – August 15, 2018).

PCI has commenced renovation of 3rd floor

District has started prepping the kitchen (Kitchen hood filters cleaned, tagged, Grease trap cleaned, Old oven disconnected to be replaced by oven at Cleveland, other work in progress)

Page 20: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OLV – 3rd Floor (Before)

Page 21: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OLV – 3rd Floor (Before)

Page 22: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OLV – 3rd Floor (Before)

Page 23: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OLV – 3rd Floor (Before)

Page 24: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OLV – 3rd Floor (Renovation In Progress)

Page 25: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OLV – 3rd Floor (Renovation In Progress)

Page 26: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

OLV – 3rd Floor (Hallway painted)

Page 27: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Rosa Parks Main Hot Water Line (Before)

Page 28: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Rosa Parks Main Hot Water Line – (After)Fixed

Page 29: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) Forest Boiler-Section is Leaking

Page 30: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) Forest Boiler-Mud leg leaking

Page 31: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) Oakwood Boiler – Union leaking

Page 32: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) Oakwood -Release Valve - Inoperable

Page 33: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) Park – Boiler leaking at nipple

Page 34: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) OPA- Boiler refractory deteriorated

Page 35: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) OPA Boiler– Tubes to be installed

Page 36: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) OPA Boiler- Drain line corroded

Page 37: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) OPA Boiler-rear corroded & leaking

Page 38: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) OHS Tank – outlet union leaking

Page 39: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Boiler Repairs (Pending) OPA-water tank-pipe leaking

Page 40: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

Oakwood Trailers Demolition

• Contents of both Trailers have been emptied • Power and Sewer lines disconnection are in progress.

Page 41: ORANGE PUBLIC SCHOOLS Facilities Project & Maintenance ......ORANGE PUBLIC SCHOOLS FACILITIES PRESENTATION August 14, 2018 Facilities Project & Maintenance Issues

RPCS Sink Hole