Upload
naeem-ullah
View
220
Download
0
Embed Size (px)
Citation preview
7/23/2019 Optimization and Planning File
1/1
1. About the stats that are received from the OMC to check the Swap activity
before the site swap and after the site is swap in order to check TCh
availability on all three sector to check all the parameter of call drop, call
block and utiliation to TC! and from these stats we can optimie our
networks
". #e can check all these parameter throu$h e%cel sheet by takin$ OMC statsand open in e%cel and then take $raph and the all $raphs of three sector
&.