Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
OPERATIONAL PLAN 2012-2013
ADOPTED 25 JUNE 2012
OPERATIONAL PLAN
Contents Message from the Mayor and General Manager ......................................................................... 1
Your Elected Councillors ............................................................................................................... 4
Vision & Values ............................................................................................................................... 5
Future Directions ........................................................................................................................... 6
Organisational Profile .................................................................................................................... 8
Introduction .................................................................................................................................... 9
Measuring and Reporting Progress ............................................................................................. 10
The Operational Plan ................................................................................................................... 12 Health & Well-being .............................................................................................................................. 12 Education Training and Research ......................................................................................................... 42 Lifestyle ................................................................................................................................................... 49 Governance ............................................................................................................................................ 86 Business and Industry .......................................................................................................................... 115 Transport and Infrastructure .............................................................................................................. 140 Natural Resource Management .......................................................................................................... 165
2012/2013 Revenue Policy – Rates & Annual Charges ............................................................ 174 Rates...................................................................................................................................................... 174 Water Supply ....................................................................................................................................... 175 Sewerage Service ................................................................................................................................. 178 Waste Charges ..................................................................................................................................... 179 Other Charges and Rebates ................................................................................................................ 180
2012/2013 Revenue Policy – Fees & Charges ........................................................................... 183 General Administration ....................................................................................................................... 183 Roads ..................................................................................................................................................... 185 Environmental Services ....................................................................................................................... 185 Waste Disposal ..................................................................................................................................... 196 Discharge of Liquid Trade Waste To Sewerage System .................................................................. 198 Noxious Weeds .................................................................................................................................... 200 Cemetery .............................................................................................................................................. 200 Water .................................................................................................................................................... 202 Sewer .................................................................................................................................................... 204 Venue Hire ........................................................................................................................................... 204 Swimming Pool Admission ................................................................................................................. 206 Sportsfields Hire & Usage ................................................................................................................... 208 Banners and Street Signs .................................................................................................................... 209 Quarry Charges .................................................................................................................................... 209 Business Undertakings ......................................................................................................................... 209 Aerodrome ........................................................................................................................................... 209 Saleyards ............................................................................................................................................... 210 Library ................................................................................................................................................... 211 Private Works ...................................................................................................................................... 212
OPERATIONAL PLAN
2012/2013 Budget ....................................................................................................................... 213 Programs .............................................................................................................................................. 213 Budget - Summary By Program / Function ....................................................................................... 214 Consolidated Summary ....................................................................................................................... 216 General Manager's Operations ........................................................................................................... 217
Civic Activities ..................................................................................................................................................................................................... 217 Land Development ............................................................................................................................................................................................. 218 General Manager‟s Office ................................................................................................................................................................................. 219 Tourism ................................................................................................................................................................................................................. 220 Overheads & Employees‟ Leave & Entitlements......................................................................................................................................... 221
Corporate Services Department ........................................................................................................ 222 Corporate Services ............................................................................................................................................................................................ 222 General Purpose Revenue ................................................................................................................................................................................ 223 Other Revenue .................................................................................................................................................................................................... 224 Administration Building - Working Expenses ............................................................................................................................................. 225 Information Services........................................................................................................................................................................................... 226 Staff Maintenance ................................................................................................................................................................................................ 227 Loans ...................................................................................................................................................................................................................... 228 Library Services ................................................................................................................................................................................................... 229 Art Gallery ............................................................................................................................................................................................................ 230 Civic Centre ......................................................................................................................................................................................................... 231 Community Projects .......................................................................................................................................................................................... 232 Depreciation ......................................................................................................................................................................................................... 233 Corporate Services Overheads & Employees‟ Leave & Entitlements .................................................................................................. 234
Environmental Services Department ................................................................................................. 235 Ranger Services.................................................................................................................................................................................................... 235 Environmental Services ..................................................................................................................................................................................... 236 Environmental Services Overheads ............................................................................................................................................................... 237
Infrastructure & Operations Department ......................................................................................... 238 Infrastructure & Operations - Administration ............................................................................................................................................ 238 Technical Services ............................................................................................................................................................................................... 239 Plant & Depot Operations ............................................................................................................................................................................... 240 Plant Purchases .................................................................................................................................................................................................... 241 RMS Maintenance / Construction .................................................................................................................................................................. 242 Cowra Street Maintenance .............................................................................................................................................................................. 243 Cowra Street Construction ............................................................................................................................................................................. 244 Rural Roads Maintenance ................................................................................................................................................................................. 245 Rural Roads Construction ................................................................................................................................................................................ 246 Village Streets ....................................................................................................................................................................................................... 247 Bushfire & Emergency Services ....................................................................................................................................................................... 248 Culvert / Causeway Construction ................................................................................................................................................................. 249 Bridges .................................................................................................................................................................................................................... 250 Quarry Operations ............................................................................................................................................................................................. 251 Drainage................................................................................................................................................................................................................. 252 Private Works ...................................................................................................................................................................................................... 253 Noxious Plants ..................................................................................................................................................................................................... 254 Public Cemeteries ............................................................................................................................................................................................... 255 Public Amenities .................................................................................................................................................................................................. 256 Swimming Pool .................................................................................................................................................................................................... 257 Parks, Gardens & Reserves .............................................................................................................................................................................. 258 Sportsfields ............................................................................................................................................................................................................ 259 Village Parks .......................................................................................................................................................................................................... 260 Rural & Urban Trees .......................................................................................................................................................................................... 261 Aerodrome ........................................................................................................................................................................................................... 262 Caravan Park ........................................................................................................................................................................................................ 263 Saleyards ................................................................................................................................................................................................................ 264 Council Buildings And Structures Maintenance.......................................................................................................................................... 265 Infrastructure & Operations - Overheads & Employees‟ Leave & Entitlements ............................................................................... 266
Waste Operations ................................................................................................................................ 267 Waste Collection ................................................................................................................................................................................................ 267 Waste Disposal .................................................................................................................................................................................................... 268 Recycling ................................................................................................................................................................................................................ 269 Waste Overheads & Employees‟ Leave & Entitlements ........................................................................................................................... 270
Water Operations ................................................................................................................................ 271 Water ..................................................................................................................................................................................................................... 271
Sewer Operations ................................................................................................................................ 275 Sewer ...................................................................................................................................................................................................................... 275
Overheads Summary ........................................................................................................................... 278 Reserves Schedule ................................................................................................................................ 279 Loan Summary ..................................................................................................................................... 280
External Loans ..................................................................................................................................................................................................... 280 Internal Loans ....................................................................................................................................................................................................... 281
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 1
Message from the Mayor and General Manager
Following the gazettal of the Local Government Amendment (Planning and Reporting) Act 2009 all New
South Wales councils are introducing a new planning and reporting framework. During late 2011 Council
carried out community surveys and workshops to review the existing Community Strategic Plan that
articulates the community‟s vision and Council‟s mission for at least the next 10 years. That process
generally endorsed the guiding principles and strategies of the previous plan
The following values were endorsed to guide Council and the community:‐
In all our dealings we will….
show and grow leadership
be positive and work together
value each other and what we have
create opportunities for our next generations
These values set the framework for the Community Strategic Plan which is the overall planning
document for Cowra. It has a 20+ year timeframe and encompasses a broad range of goals that will need
input and support from a range of organisations and government agencies to achieve under the identified
future directions of:
Health and Wellbeing
Education, Training and Research
Lifestyle
Governance
Business and Industry
Transport and Infrastructure
Natural Resource Management
The Delivery Program 2012‐2017 is based on the Community Strategic Plan and outlines the actions that
Cowra Council will undertake to work towards addressing the goals and strategies.
The Operational Plan 2012‐2013 completes the planning documents and details the activities to be
undertaken during the financial year to deliver the commitments of the Delivery Program. The
Operational Plan also includes Council‟s detailed annual budget and revenue policy including fees and
charges.
This three tiered process ensures that there are clear links between the long terms goals of the
community and the activities of Council. It also ensures that there are clear long term strategies and
needs identified whilst still allowing for the day to day delivery of services.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 2
The new Delivery Program and Operational Plan were placed on public exhibition during May and June.
The community was invited to inspect the plans and to make written submissions during the public
review process so that Council could consider any such comments before the final Plans were adopted.
OPERATIONAL PLAN
A key element of the Operational Plan is the budget for 2012/2013 year. The budget exceeds
$35 million and includes a small budget surplus.
The budget is based on the 3.6% rate variation approved by the Independent Pricing and Regulatory
Tribunal.
Cowra remains in a sound financial position. However councils are finding it difficult to achieve balanced
budgets when the cost of wages, materials and utility charges are increasing at a greater rate than
income. In addition there has been long term cost shifting to local government from Federal and State
Governments where Councils are required to carry out additional activities without appropriate
compensation.
Adequate planning remains the key to a sustainable future for Council and 2012/2013 will see a
continuation on this path. Key actions planned for the coming year to achieve Delivery Program
strategies include:
Complete Local Environmental Plan
Complete CBD Masterplan
Complete installation of Darbys Falls water filtration plant
Develop a Cowra Council traineeship program
Develop a Road Asset Management Plan
Develop a Water Asset Management Plan
Develop a Wastewater Asset Management Plan
Complete Cowra Shire Economic Development Plan
Complete Cowra Shire Development Control Plan
Develop plan for heavy vehicle alternative route
Design and cost implementation plan for Cowra Regional Airport Masterplan
Conduct detailed energy audits of major council infrastructure
Continue development of water best practice suite of documents
The Works Program for 2012/2013 continues to place a strong emphasis on the maintenance of current
service standards and targeted improvements.
As a result of the floods over the last few years Council has a commitment to addressing the areas of
concern. The West Cowra flood study will be completed in 2012/2013 providing a detailed
implementation plan to alleviate the damage and disruption. The cost of works will be determined upon
finalisation of the study.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 3
A number of projects outside the scope of the West Cowra study have been identified and will be
undertaken in 2012/2013:
Target Car park drainage and Rowston Lane
Ranken Street Drainage
Taragala Street stormwater pipe flood flaps
Bennelong Place
Additional funding has been provided to ensure an adequate reseal program is implemented for the
streets and roads in the shire. The funding in the 2012/2013 and forward estimates is set at a level to
achieve an average reseal timeframe of 13 years.
Council will continue to roll out the Roads to Recovery program. In particular a decision will be made
on the appropriate structure to replace the Koorawatha-Greenethorpe bridge and the relevant funding
will be directed to that long awaited project.
The Integrated Plans including the Long Term Financial Plan, Delivery Program and Operational Plan
provide further details of the activities Council is carrying out. Members of the community are
encouraged to read the documents and submit comments that will be reviewed by Council.
Cr Bill West Paul Devery
Mayor General Manager
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 4
Your Elected Councillors
Back row, left to right: Councillor Jack Mallon, Councillor Rob Watt, Councillor Peter Wright,
Councillor Ray Walsh
Front row, left to right: Councillor Bruce Miller, Councillor Judi Smith, Councillor Bill West (Mayor),
Councillor Robert Bridges, Councillor Ian Brown (Deputy Mayor)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 5
Vision & Values
Vision
A leading, innovative and creative community, proud of our place in history, offering opportunity
with the best of country living.
Values
In all our dealings we will…..
show and grow leadership
be positive and work together
value each other and what we have
create opportunities for our next generations.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 6
Future Directions
The Community Strategic Plan 2012-2036 provides a strategic framework for Cowra. The identified
goals and the strategies will only be achieved through the collective input of government and non-
government agencies, businesses, community organisations and individuals. These goals are grouped into
seven themes:
Health and Wellbeing
To enjoy our unique country lifestyle and be fit and healthy, we need a range of facilities, services and
programs that cater for the needs of all age groups. We also need to take steps to prevent conditions
that could lead to loss of health and wellbeing. This will involve health, social and family care service
professionals, together with volunteers.
Education Training and Research
We must work to make Cowra a centre of excellence for education, training and research. Education,
training and research are key components for Cowra‟s present and future development. They provide a
sound basis for the economic improvement of individuals and businesses. They help build the capacity of
the community to get things done. We are challenged to create an environment where the concept of
„life long learning‟ is encouraged and supported.
Lifestyle
Cowra has a distinctive country lifestyle. Access to and enjoyment of our sporting, recreational, cultural
and heritage facilities together with our natural environment is key to a sense of community and
wellbeing. The range and quality of these many assets together with our history, heritage and indigenous
culture, provide an opportunity to fully develop Cowra‟s potential as a unique place to live and work.
Governance
Understanding the roles and responsibilities of key organisations within our community is the key to
working together. Communication between council, other levels of government and the community is
fundamental for effective consultation. Leadership is needed from council and from other organisations,
groups and individuals within Cowra. Planning is a shared responsibility and purposeful partnerships are
the way forward.
Business and Industry
Cowra needs a strong and vital economy to provide opportunity and build its desirable country lifestyle.
We will promote Cowra to the rest of the world as an area of agricultural excellence and opportunity
for a variety of businesses. We need to respond to the needs of new and existing businesses, encourage
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 7
innovation and high standards and develop ways to help businesses prosper. We must plan, develop and
implement the facilities and infrastructure needed for business to locate and expand in Cowra.
Transport and Infrastructure
Transport and infrastructure issues are critical for the future development of an access to Cowra. We
need to improve and develop our public infrastructure and associated services in a sustainable way.
Service delivery is challenged by new demands and a changing world. The diverse demands of public
health, community safety, access for all, population change and the reality of climate change will require a
range of innovative solutions for the future.
Natural Resource Management
Cowra looks forward to enjoying both a country lifestyle and economic growth, but not at any cost.
Our natural resource base is the foundation of Cowra today and tomorrow. Caring for our natural
resources means managing all the elements of land, water and air, now and for the future. It will require
expertise and commitment. In undertaking this task, Cowra will become a centre of natural resource
management excellence.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 8
Organisational Profile
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 9
Introduction
What is the Operational Plan?
The Operational Plan is one layer of the Planning and Reporting framework that all NSW Councils must
develop to meet the requirements of the Local Government Amendment (Planning & Reporting) Act
2009.
The Community Strategic Plan is the overall planning document for Cowra. It has a 10+ year timeframe
(2012-2036) and encompasses a broad range of goals that will need input and support from a range of
organisations and government agencies to achieve. It is supported by a 10 year Resourcing Strategy that
addresses Council‟s Asset Management, Long Term Financial Planning and Workforce Planning.
The Delivery Program 2012-2017 is based on the Community Strategic Plan and outlines the actions that
Cowra Council will undertake to work towards addressing the goals and strategies.
The Operational Plan 2012-2013 completes the planning documents and details the activities to be
undertaken during the financial year to deliver the commitments of the Delivery Program. The
Operational Plan also includes council‟s detailed annual budget. The 2012-2013 Fees and Charges are
available in a separate document.
This process ensures that there are clear links between the long term goals of the community and the
activities of council. The diagram below demonstrates these linkages, the Operational Plan coloured
dark orange.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 10
Measuring and Reporting Progress
Cowra Council is committed to providing open and honest feedback to the community about the
progress being made toward meeting community goals, and whether the desired results are being
achieved.
Different strategies will be utilised to measure progress, dependent on whether we are measuring 10+
year goals from the Community Strategic Plan, 5 year goals from the Delivery Program, or 1 year goals
from the Operational Plan. Council will focus on measuring in two key ways:
Outcomes: Are the strategies being undertaken and the services we are providing making a
difference? Has community satisfaction increased? Has the condition of our natural environment,
urban areas and lifestyle improved?
Outputs/inputs: Have we been delivering services and programs on time, within budget, and to
stated standards? What did we do and how often did we do it?
To report on the Operational Plan, the focus will be on outputs and inputs and whether or not council
has delivered its programs and services within budget and to timeframes.
The following diagram outlines the measuring and reporting framework that council will be adopting
across all the Integrated Planning documents and highlights the Operational Plan.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 11
Plan What are we
measuring?
What measures will be
used?
When will results be
reported to the community?
Community Strategic
Plan 2012 – 2036
What progress is being
made towards the goals
identified in the
Community Strategic
Plan that focus on the
theme areas of:
Health & Wellbeing;
Education Training &
Research; Lifestyle;
Governance; Business
& Industry; Transport
& Infrastructure; and
Natural Resource
Management
There are a range of
stakeholders working
towards these goals.
Measures that tell us
about the condition of the
natural environment, our
built infrastructure and
our human and social
assets.
We will use a range of
statistics, as well as results
from broad community
surveys and consultation.
A report will be prepared every
four years at the end of each
council term.
Delivery Program
2012-2017
The outcomes of the
council’s service
delivery – whether
the council is making
a positive difference
for the community
through its service
delivery.
Service outcome
measures that focus on
the condition of the
built assets council is
responsible for and
community satisfaction
with the services that
council provides.
We will use a range of
statistics, service
reports and targeted
satisfaction surveys.
A progress report will be
prepared every six months
and tabled in council.
Operational Plan
2012-2013
The outputs/inputs of
council‟s service delivery
– whether the council is
delivering its activities as
planned and within its
financial budget.
Service output/input
measures with a focus on
completion of activities on
time and within budget.
A progress report will be
prepared quarterly and tabled in
council.
An annual report (including
audited financial reports) will be
prepared at the end of the
financial year (and will include a
report on the state of the
environment every four years).
Supporting Documents:
Long Term Financial
Plan
Asset Management
Plan
Workforce Plan
The sustainability of
council. Whether we
are improving our overall
performance and viability
as an organisation.
Organisational
sustainability measures
with a focus on financial,
asset and human resource
measures.
A progress report will be
included in council‟s Annual
Report each year
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 12
The Operational Plan Health & Wellbeing
HEALTH and WELLBEING
H1 Research and identify the future needs of aged care accommodation and support services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H1.1
Cowra Access Committee to
include representatives from local
aged care accommodation and
support services
H1.1.a
In addition to existing members the
committee include a staff member
from Bilyara and Weroona Nursing
Homes
Active membership from Bilyara and Weroona Nursing
Homes achieved.
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 13
HEALTH and WELLBEING
H1 Research and identify the future needs of aged care accommodation and support services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H1.2
Improve access for aged persons in
high movement public
environments as well as shops,
offices and public buildings and
places
H1.2.a
Upgrade Cowra CBD to include
provision for aged and disabled
persons
Cowra CBD Masterplan makes provision for aged and
disabled persons throughout the CBD study area
DIO
H1.2.b
Maintain the Access Incentive Program
A number of incentive programs are completed and
completed and promoted in local media subject to
available budget
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 14
HEALTH and WELLBEING
H1 Research and identify the future needs of aged care accommodation and support services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H1.3
Increase public awareness and
tolerance of health related issues
particularly relevant to an aging
demographic, including need for
disabled parking, improved
pedestrian access, sharing the CBD
H1.3.a
Subsidise local promotion of health
related activities and needs
Provide funding within budget to local community groups
to help pay for media promotion of events and programs
DES
H1.3.b
Regular promotion of local activities
and events that are user friendly for
aged and disabled persons
Sports Council presentation to local sporting clubs
raising awareness of needs of aged and disabled persons
attending their events.
Facilities for aged and disabled persons provided in all
council run events.
DES
H1.3.c
Provide a Domestic Sharps Container
Waste Management Program
Program implemented and promoted in local media
DES
H1.3.d
Patrol disabled parking spaces to
ensure they are being correctly used
Regular patrols of disabled parking spaces in Cowra CBD
are conducted and reported in accordance with the
Cowra Ranger Services Contract Agreement.
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 15
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.1
Support and encourage programs
that promote health and wellbeing
H2.1.a
Provide transport subsidy support to
local health related activities and
events
A limited number of subsidised taxi vouchers are made
available to the Cowra Aquatherapy Group and Winter
Exercise Group for use by their members that cannot
drive to their sessions
DCS/DES
H2.1.b
Work with sporting groups to develop
programs and activities
Activities plan is developed, approved and implemented
DCS
H2.1.c
Work with health care professionals
to developed targeted activities for
aged and related groups
Activities plans are developed, approved and
implemented
DCS
H2.1.d
Respond to requests to participate in
agency programs within resources
Activities assisted
DCS
H2.1.e
Support and encourage participation in
sport, recreation and cultural
activities
Meet with sport, recreation and cultural groups to
develop and implement activities
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 16
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.2
Provide opportunities for staff to
participate in a range of health and
wellbeing programs
H2.2.a
Develop “Your Health” program for
employees
Program developed with Consultative Committee and
implemented
DCS
H2.2.b
Respond to health and wellbeing
initiatives within resources
Requests for ideas and projects considered and enacted
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 17
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.3
Support and participate in the
Cowra Interagency to contribute
to partnerships in community
wellbeing initiatives
H2.3.a
Attend meetings of Interagency group
Meetings attended on a regular basis and six monthly
report prepared for council
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 18
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.4
Work with the Cowra Access
Committee to assist in identifying
and addressing priority access
issues
H2.4.a
Provide administrative support to the
Cowra Access Committee
Procedural and administrative support provided at all
Committee Meetings
Technical support provided at all Committee Meetings
where requested
Minutes taken for all Committee meetings and reported
to council prior to the next Access Committee meeting
DES/DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 19
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.5
Improve access in line with actions
from the Pedestrian Access and
Mobility Plan (PAMP)
H2.5.a
Continue to identify access issues as
part of PAMP review
Appropriate access issues resolved and updated in
Pedestrian Access Mobility Plan
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 20
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.6
Inspect and enforce health
standards through a regular food
shop inspection program
H2.6.a
Maintain a food shop inspection
program that is proactive and
educational, but that also responds
appropriately to breaches of the
health standards.
All food premises in the Cowra Shire are inspected and
action taken to achieve compliance
NSW Food Authority is satisfied with Council‟s food
shop inspection program
Promotion of best practice food handling procedures,
equipment and training programs is undertaken via
council website and direct contact with food businesses
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 21
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.7
Provide companion animal
management services across the
shire
H2.7.a
Maintain a ranger service throughout
Cowra Shire that responds to
customer requests relating to
companion animals
Dog attacks and nuisance complaints are responded to in
accordance with Cowra Ranger Services Procedures
Manual and Council‟s Guarantees of Service
Regular patrols of Cowra and surrounding villages are
conducted and reported in accordance with the Cowra
Ranger Services Contract Agreement
DES
H2.7.b
Inspect all enclosures for dangerous
and restricted dogs to ensure
compliance with regulatory
requirements
All premises in the Cowra Shire where declared
dangerous and restricted breed dogs are normally kept
are inspected for compliance
DES
H2.7.c
Provide a companion animal re-
homing incentive program
Regular promotion of companion animals available for re-
homing is conducted in local media
Financial incentives available to persons wishing to own a
pound animal, including discounted micro-chipping and
registration fees
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 22
H2.7.d
Undertake public education of
companion animal owner
responsibilities
Regular education and promotion of companion animal
matters in local media
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 23
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.8
Ensure Workplace Health & Safety
compliance of both staff and
others in the workplace
H2.8.a
Review and implement risk
management plans, policies and
procedures
Plans and procedures are reviewed and presented to
Manex/Council for adoption on scheduled basis
DCS
H2.8.b
Develop strategies to minimise
Council‟s exposure to higher
Workers Compensation premiums
Conduct regular meetings with StateCover and meet
with internal Workers Compensation management group
to micro-manage associated matters
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 24
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.9
Maintain community safety by
management of public nuisance in
line with community expectations
H2.9.a
Maintain a ranger service throughout
Cowra Shire that responds to
customer requests
Telephone calls, CARS and written correspondence are
appropriately actioned in a timely manner
Regular patrols of Cowra and surrounding villages are
undertaken to identify, monitor and respond to public
nuisance complaints
DES
H2.9.b
Enforce ordinance signage to ensure
council requirements are being
complied with
Regular patrols of timed parking spaces in Cowra CBD
and school zones
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 25
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.10
Work with NSW Police to
implement „Safer by Design‟
protocols
H2.10.a
Provide Crime Prevention Through
Environmental Design training for
development assessment staff
CPTED training undertaken
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 26
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.11
Improve facilities for passive
recreation for all ages with their
companion animals
H2.11.a
Improve walking tracks/paths and road
crossings
Implement according to Peace Precinct Masterplan
subject to funding
Implement according to Riverbank Masterplan subject to
funding including leash free area
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 27
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.12
Maintain and improve the current
high standard of the Cowra
Aquatic
H2.12.a
Implement a “Satisfaction Level”
survey of users
Survey conducted and information collated for future
benchmarking
DIO
H2.12.b
Replace intake and delivery pump
system
Refurbishment completed prior to 2012/2013 swimming
season
DIO
H2.12.c
Maintain swimming pool water quality
compliance
Swimming pool water quality standards are met at all
times
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 28
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.13
Support the Woodstock
community in the maintenance and
improvement of Woodstock
Swimming Pool
H2.13.a
Support Community with donation
towards operation of Woodstock
swimming pool facility
Donation made and advice given if required
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 29
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.14
Maintain parks and gardens to the
current high standard
H2.14.a
Mow parks according to schedule
Adhere to adopted mowing standards
DIO
H2.14.b
Carry out weekly Horticultural works
in high profile areas eg. Rose Gardens
Gardens maintained to high standard especially high
profile areas
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 30
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.15
Work with the Cowra Sport and
Recreation Council to ensure
optimal use of Cowra sporting
facilities and programs
H2.15.a
Attend Sport and Recreation Council
meetings and conduct regular liaison
with sporting groups and Cowra
Services to ensure maximum usage of
facilities
Meetings are attended and issues addressed
DCS
H2.15.b
Identify and pursue funding
opportunities commensurate with
identified sporting and recreational
needs
Research undertaken in response to requests received
DCS/GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 31
HEALTH and WELLBEING
H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H2.16
Work with Police and other
stakeholders to support programs
improving community safety
H2.16.a
Participate in meetings and/or
discussions with police and other
stakeholders in relation to identified
programs
Attend and participate in discussions
GM/DCS
H2.16.b
Advocate for adequate operational
policing numbers in Cowra shire
Letters sent and lobbying of relevant Ministers
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 32
HEALTH and WELLBEING
H3 Investigate ways to attract and retain health professionals
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H3.1
Advocate for the development of
state of the art hospital facilities
and services
H3.1.a
Meet with Hospital Advisory Board to
support development of strategy for
determining future needs and whether
these are best pursued in existing
facilities or on a greenfield site
Meeting held with Hospital Advisory Board
Strategy developed
NSW Government endorsement of strategy
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 33
HEALTH and WELLBEING
H3 Investigate ways to attract and retain health professionals
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H3.2
Liaise with local medical and allied
health professionals to identify
community healthcare needs
H3.2.a
6 monthly meetings held with relevant
stakeholders to review gaps in
healthcare needs
Meetings held
Council undertakes appropriate advocacy to support
retention of or increases in services
GM
H3.2.b
Support the Centroc “Beyond the
Ranges” concept, a website based
application to attract professionals to
the region
Council‟s website incorporates link and relevant
information
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 34
HEALTH and WELLBEING
H3 Investigate ways to attract and retain health professionals
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H3.3
Advocate for and support the
provision of new medical facilities
H3.3.a
Work with local medical fraternity in
their endeavour to create a new
augmented medical practice for
Cowra
Provide assistance with infrastructure construction
GM/DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 35
HEALTH and WELLBEING
H3 Investigate ways to attract and retain health professionals
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H3.4
Maintain accommodation for
visiting healthcare professionals
H3.4.a
Manage lease of council properties for
health professionals
Accommodation occupancy rate
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 36
HEALTH and WELLBEING
H4 Support and encourage voluntary community services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H4.1
Work with Cowra Interagency and
other organisations to identify and
support the work of voluntary
community service providers
H4.1.a
Maintain regular contact with Cowra
Interagency
Respond positively to requests for information and
assistance within budget and resources
DCS
H4.1.b
Develop publicity and promotion of
volunteerism
Media and promotions program undertaken twice a year
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 37
HEALTH and WELLBEING
H4 Support and encourage voluntary community services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H4.2
Actively encourage community
volunteering
H4.2.a
Develop publicity and promotion of
volunteerism
Undertake six monthly media and promotions program
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 38
HEALTH and WELLBEING
H4 Support and encourage voluntary community services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H4.3
Continue to support the
community through provision of
Community Strategic Plan funding
H4.3.a
Provide funding for projects that
meet Community Strategic Plan
objectives
Funding delivered and projects implemented
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 39
HEALTH and WELLBEING
H4 Support and encourage voluntary community services
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H4.4
Provide support for emergency
services in Cowra as required
H4.4.a
Corporate services staff to be engaged
for LEMO needs
Staff asked to provide names on voluntary basis for
inclusion in Emergency management staffing procedures
DCS
H4.4.b
Council to chair Local Emergency
Management Committee
Meetings held quarterly with State Emergency Service,
Police, Rural Fire Service and others
DIO
H4.4.c
Council have Local Emergency Officer
available
Local Emergency Management Officer undertakes
administration during emergency events
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 40
HEALTH and WELLBEING
H5 Develop programs to meet the needs of Cowra’s young people
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H5.1
Continue to promote and support
the Cowra Youth Council
H5.1.a
Attend Youth Council Meetings held
on a monthly basis
Meetings attended, minutes taken and regular reports on
key issues reported to Manex and council
DCS
H5.1.b
Coordinate regular Youth Council
events
Events co-ordinated in conjunction with program
developed
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 41
HEALTH and WELLBEING
H5 Develop programs to meet the needs of Cowra’s young people
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
H5.2
Advocate for retention and
expansion of youth services as
appropriate
H5.2.a
Advocate for retention and/or
expansion of Headspace service in
Cowra
Letters of support provided
Media statements
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 42
Education Training and Research
EDUCATION TRAINING and RESEARCH
E1 Make Cowra a Learning Community
Delivery Program (5 years) Operational Plan (1year)
Strategy Action Performance Measure Responsibility
E1.1
Liaise with post school education
providers to improve access and
remove impediments for Cowra
residents seeking to further
skills/education
E1.1.a
Seek feedback from Cowra Business
Chamber and the community on
impediments for individuals accessing
educational institutions within and
beyond Cowra
Feedback sought and report developed detailing
constraints
Council seeks to work with educational institutions and
the Cowra community to remove or mitigate
impediments
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 43
EDUCATION TRAINING and RESEARCH
E1 Make Cowra a learning community
Delivery Program (5 years) Operational Plan (1year)
Strategy Action Performance Measure Responsibility
E1.2
Provide a Council Traineeship
program
E1.2.a
Research and develop a Cowra
Council traineeship program for
implementation in 2012/13
Program endorsed and implemented
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 44
EDUCATION TRAINING and RESEARCH
E1 Make Cowra a learning community
Delivery Program (5 years) Operational Plan (1year)
Strategy Action Performance Measure Responsibility
E1.3
Provide work experience
placement opportunities for
Cowra students
E1.3.a
Work Experience Program developed
for Secondary and Tertiary students
and “Job Seekers”
Program completed and approved for implementation in
2012/13
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 45
EDUCATION TRAINING and RESEARCH
E2 Maintain and develop learning infrastructure and programs to respond to education and training needs
Delivery Program (5 years) Operational Plan (1year)
Strategy Action Performance Measure Responsibility
E2.1
Continue to support Cowra
Library
E2.1.a
Manage operation of Library with
Central West Library Service (Orange
City Council) to operate Cowra
Library
Budget and management objectives are agreed to with
CWL
DCS
E2.1.b
Review equipment, service and asset
needs
Develop a priority list of assets, maintenance of
equipment and provision of services.
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 46
EDUCATION TRAINING and RESEARCH
E2 Maintain and develop learning infrastructure and programs to respond to education and training needs
Delivery Program (5 years) Operational Plan (1year)
Strategy Action Performance Measure Responsibility
E2.2
Maintain Cowra Entrepreneur
Program
E2.2.a
Conduct a Entrepreneur Program
Program successfully undertaken with adequate
participation
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 47
EDUCATION TRAINING and RESEARCH
E3 Build a mutually supportive education sector
Delivery Program (5 years) Operational Plan (1year)
Strategy Action Performance Measure Responsibility
E3.1
Facilitate discussion between
educational institutions, business
and training providers to assist
students make the transition from
school to the workforce
E3.1.a
Attend meetings with relevant
stakeholders to discuss constraints
and opportunities for students and
prospective employers
Council represented at meetings and strategies
determined
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 48
EDUCATION TRAINING and RESEARCH
E4 Strengthen the role and use of local education and training providers
Delivery Program (5 years) Operational Plan (1year)
Strategy Action Performance Measure Responsibility
E4.1
Research and utilise appropriate
local service providers
E4.1.a
Utilise local training providers in
delivering staff training subject to cost
comparisons
Quotations sought from local providers for planned
training programs
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 49
Lifestyle
LIFESTYLE
L1 Build strong linkages with our indigenous community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L1.1
Acknowledge Cowra Shire is
Wiradjuri country
L1.1.a
Acknowledge Cowra Shire as
Wiradjuri Country at all civic
functions
Appropriate welcome delivered at functions
Aboriginal flag flown in accordance with Flag policy
Maintain Welcome to Wiradjuri signs at Cowra town
entries
GM/MAYOR
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 50
LIFESTYLE
L1 Build strong linkages with our indigenous community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L1.2
Work with the Aboriginal
community to promote stronger
links, identify common goals and
projects
L1.2.a
Work with aboriginal community to
determine plan for refurbishment of
bridge pylon murals
Plan for refurbishment agreed upon
Funding applications submitted
GM/DCS/DES
L1.2.b
Meet at least annually with Cowra
Local Aboriginal Land Council
Mayor and General Manager attend meetings
GM/MAYOR
L1.2.c
Consult with community on all
council works and projects that have
the potential to impact upon
aboriginal cultural heritage
Consultation undertaken in accordance with council
policy
GM/DIO/DES/DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 51
LIFESTYLE
L1 Build strong linkages with our indigenous community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L1.3
Identify mutually beneficial grant
funding opportunities for local
Aboriginal groups and assist in
completion of applications
L1.3.a
Work with aboriginal community to
lodge funding submissions for relevant
projects from the Lachlan Riverbank
Masterplan
At least one submission lodged annually
GM/DIO
L1.3.b
Work with aboriginal community to
lodge funding submissions for relevant
projects from the Peace Precinct
Masterplan
At least one submission lodged annually
GM/DIO
L1.3.c
Work with aboriginal community to
lodge funding submissions for projects
identified by the local aboriginal
community
At least one submission lodged annually
GM/DIO/DCS/DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 52
LIFESTYLE
L1 Build strong linkages with our indigenous community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L1.4
Improve Aboriginal access to
employment opportunities
L1.4.a
Develop Aboriginal Employment
program to reflect Cowra‟s
demographic mix with our workforce
mix
Program is developed and accepted by staff and
management and indigenous persons are employed
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 53
LIFESTYLE
L1 Build strong linkages with our indigenous community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L1.5
Liaise with Aboriginal stakeholders
on development proposals that
have potential to impact on known
cultural heritage sites
L1.5.a
Maintain a development assessment
process that consults with Aboriginal
stakeholders before determining
potential threatening proposals
All DA files includes assessment criteria that requires
consideration against Council‟s Aboriginal Consultation
Policy to determine whether consultation with Aboriginal
stakeholders is required
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 54
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.1
Develop and implement
celebratory program for the 70th
anniversary of the POW Breakout
in 2014
L2.1.a
Work with relevant stakeholders to
develop program for anniversary
Program developed in conjunction with relevant
stakeholders
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 55
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.2
Develop and implement
celebratory program for the 50th
anniversary of Cowra‟s Festival of
International Understanding in
2014
L2.2.a
Plan developed with stakeholder
groups
Plan completed and accepted by stakeholder groups and
submitted to council with recommendations
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 56
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.3
Develop and implement
celebratory program for the 125th
anniversary of local government in
Cowra – July 2013
L2.3.a
Work with relevant stakeholders to
develop program for anniversary
Program developed
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 57
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.4
Continuing to investigate
establishment of a Cowra Museum
L2.4.a
New body formed to investigate
feasibility of project
Committee formed and recommendation provided to
council
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 58
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.5
Continue to develop the
Cowra/Japan relationship and to
promote Cowra as a centre of
international understanding and
friendship
L2.5.a
Council delegation visit Japan to
strengthen ties
Visit undertaken
GM
L2.5.b
Maintain Saburo Nagakura Park
Park maintained to current high standard
DIO
L2.5.c
Participate in Nagakura Foundation
and continue to foster relations with
Kyushu Power Company as
appropriate
Council responds positively to any requests for
assistance with delegations visiting the park
GM
L2.5.c
Support Joetsu Staff Exchange
Program
Provide support to program within budget
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 59
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.6
Maintain a heritage advisory
service
L2.6.a
Employ a properly qualified and
experienced heritage advisor to
provide advisory services to council
and the wider community
Heritage advisor engaged
Submission of monthly report to council
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 60
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.7
Include Heritage Inventory in
Cowra Local Environmental Plan
(LEP)
L2.7.a
Draft Cowra Local Environmental Plan
includes an updated heritage inventory
An updated heritage inventory is included in the Draft
Cowra Local Environmental Plan
DES
L2.7.b
Raise community awareness of
heritage issues
Council‟s Heritage Adviser to conduct a community
forum
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 61
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.8
Work with the Cowra and District
Historical Society and Cowra
Family History Group
L2.8.a
The Heritage Advisor meets with the
Cowra and District Historical Society
and Cowra Family History Group on a
regular basis
The Heritage Advisor meet with the Cowra and District
Historical Society and Cowra Family History Group at
least once every quarter
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 62
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.9
Ensure new development
proposals do not impact on
heritage sites
L2.9.a
Maintain a development assessment
that properly assesses heritage sites
and potential threatening proposals
All DA files include assessment criteria that requires
consideration of heritage matters
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 63
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.10
Support Peace Bell Committee in
celebrating World Peace Day
L2.10.a
Work with Peace Bell Committee to
develop annual program
Program developed and event conducted successful
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 64
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.11
Develop the Cowra Peace Precinct
with a focus on the Aboriginal,
European and Military history
L2.11.a
Implement Cowra Peace Precinct
Masterplan
Works completed as funds become available
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 65
LIFESTYLE
L2 Find ways to tell Cowra’s story
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L2.12
Support program for 100 year
anniversary of significant World
War 1 events
L2.12.a
Assist relevant stakeholders in
development of program
Program developed
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 66
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.1
Maintain and improve the current
high standard of the Cowra
Aquatic Centre
L3.1.a
Implement a “Satisfaction Level”
survey of users
Survey conducted and information collated for future
benchmarking
DIO
L3.1.b
Replace intake and delivery pump
system
Refurbishment completed prior to 2012/2013 swimming
season
DIO
L3.1.c
Undertake “Level 2” Energy Audit of
Aquatic Centre.
Audit completed and grants applied for
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 67
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.2
Provide recreation opportunities
through the provision of attractive
parks and gardens
L3.2.a
Maintain parks and gardens to a high
standard for use of all recreation users
Recreational playgrounds and reserves (including
facilities) are maintained to a high standard and according
to compliance. Checks completed quarterly
DIO
L3.2.b
Develop the Gooloogong primitive
camping ground
Improvements carried out within budget to a satisfactory
standard
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 68
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.3
Provide good quality facilities to
meet the needs of sporting clubs
and users
L3.3.a
Maintain Sporting fields for all sporting
associations in Cowra
Sporting fields maintain to required standards
DIO
L3.3.b
Liaise with Sports Council to ensure
all sports are catered for
All users are catered for with high standard fields
provided. All works carried out as required by sporting
groups
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 69
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.4
Promote and support cultural and
artistic activities within the
community
L3.4.a
Develop and present a diverse
program of high quality exhibitions,
public events and workshop activities
at the Cowra Regional Art Gallery
Two year forward program developed and implemented
DCS
L3.4.b
Develop educational activities with
local schools and the Cowra Regional
Art Gallery
Develop and implement educational program.
DCS
L3.4.c
Develop and maintain the Gallery
website including the introduction of
the Calleen Collection online
Website will positively reflect the gallery‟s objectives and
programs
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 70
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.5
Develop the Lachlan River Precinct
as a major focal point for passive
recreation
L3.5.a
Start implementing Lachlan River
Precinct Masterplan
First year of Masterplan completed subject to funding
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 71
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.6
Develop the Cowra Peace Precinct
as a major focal point for passive
recreation and multicultural
awareness
L3.6.a
Implement Cowra Peace Precinct
Masterplan
First year of Masterplan completed subject to funding
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 72
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.7
Develop Cowra CBD as a major
shopping location and a place for
social interaction and investment
L3.7.a
Adopt and implement CBD
Masterplan
CBD Masterplan is adopted and commenced
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 73
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.8
Develop the Cowra Civic Square
Cultural Precinct
L3.8.a
Work with stakeholder groups to
develop master plan
Masterplan completed and presented to council
DCS/DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 74
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.9
Maintain and improve the Cowra
Civic Centre as Cowra‟s principal
performance venue
L3.9.a
Prepare Marketing/Business plan to
promote varied use of Civic Centre
Plan completed, considered by Manex and presented to
council
DCS/DIO
L3.9.b
Prepare and maintain a Civic Centre
improvements schedule
Detailed schedule prepared and costed and presented to
council for budgetary consideration
DCS/DIO
L3.9.c
Maintain Civic Centre as required to
meet venue requirements
Maintenance programme undertaken
Future requirements to be identified in Building AMP to
be developed in 2013/14
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 75
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.10
Maintain and improve facilities at
the Cowra Library
L3.10.a
Prepare and maintain a Library
improvements schedule
Develop a maintenance and improvements program
DCS/DIO
L3.10.b
Prepare a maintenance schedule
Schedule prepared in conjunction with Central Western
Library
DCS/DIO
L3.10.c
Maintain building as per required
standard
All programmed works completed
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 76
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.11
Maintain and improve the
Cowra Regional Art Gallery as
a major cultural feature of the
Cowra community
L3.11.a
Prepare and maintain an Art Gallery
Library improvements schedule
Schedule prepared in conjunction with Gallery Director,
Gallery Advisory Committee and considered by Manex
and presented to council for budgetary consideration
DCS/DIO
L3.11.b
Prepare a maintenance schedule
Schedule prepared in conjunction with Gallery Director,
Gallery Advisory Committee
DCS
L3.11.c
Maintain building to the required
standards
Programmed works completed
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 77
LIFESTYLE
L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L3.12
Maintain and operate the Cowra
Caravan Park to its current high
standard
L3.12.a
Work with lessee to maintain current
high standard
Park maintained within budget
DIO
L3.12.b
Monitor current lease agreement
Lease agreement received in accordance with agreement
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 78
LIFESTYLE
L4 Build participation in community life
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L4.1
Work with the government
departments and other agencies to
promote and support volunteer
involvement in community
activities
L4.1.a
Contact NSW and Commonwealth
Government to ascertain their range
of sponsored volunteer programs
Contact made and listings prepared and media produced
DCS/GM
L4.1.b
Contact local volunteers groups to
ascertain level of activities and
projects
Contact made and listings prepared and media produced
DCS/GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 79
LIFESTYLE
L4 Build participation in community life
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L4.2
Coordinate endorsed civic events
that are celebrated by our
community and recognise and
support our residents
L4.2.a
Plan and administer events determined
by council
Events administer and co-ordinated to agreed level and
satisfaction of the community
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 80
LIFESTYLE
L4 Build participation in community life
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L4.3
Review and update Social Plan
L4.3.a
Undertake and review plan, utilising
best practice and advice from
associated agencies and community
Plan completed and agreed to by stakeholder groups and
presented to council
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 81
LIFESTYLE
L4 Build participation in community life
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L4.4
Review and update the Cowra
Cultural Plan
L4.4.a
Undertake and review plan utilising
best practice and advice from
associated agencies and community
Plan completed and agreed to by stakeholder groups and
presented to council
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 82
LIFESTYLE
L5 Continue to develop our unique country lifestyle
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L5.1
Promote Cowra Shire as a
desirable place to live and work
L5.1.a
Complete new Cowra Shire Economic
Development Plan
Plan adopted by council
GM
L5.1.b
Attend Country Week advertising
Cowra and the opportunities that
exist
Attendance at Country Week
GM
L5.1.c
Complete review of New Residents
Kit
Review completed and new collateral produced
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 83
LIFESTYLE
L5 Continue to develop our unique country lifestyle
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L5.2
Promote Cowra Shire as a
desirable place to visit
L5.2.a
Attend Country Week advertising
Cowra and the opportunities that
exist
Attendance at Country Week
GM
L5.2.b
Complete Cowra Shire Economic
Development Plan
Plan adopted by council
GM
L5.2.c
Complete review of New Residents
Kit
Review completed and new collateral produced
GM
L5.2.d
Provide financial support to Cowra
Tourism Corporation
Annual contribution provided
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 84
LIFESTYLE
L6 Recognise and grow the talent in our community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L6.1
Support Australia Day Citizen of
the Year and related awards
L6.1.a
Work with Australia Day Committee
and administer events for Australia
Day
Events are well planned and executed to satisfaction of
committee and community
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 85
LIFESTYLE
L6 Recognise and grow the talent in our community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
L6.2
Maintain donation policy to
support community development
L6.2.a
Respond to requests for donations in
accordance with policy.
Request are processed in accordance with policy
guidelines and submitted to council and paid within
allocated budget for year
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 86
Governance
GOVERNANCE
G1 Develop and implement a council community communication and consultation strategy
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G1.1
Maintain and improve appropriate
mechanisms to consult with key
community groups and
stakeholders
G1.1.a
Hold village community meetings
At least one meeting held in each village annually
GM
G1.1.b
Provide online feedback opportunities
for key council initiatives
Website developed to cater for online feedback
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 87
GOVERNANCE
G1 Develop and implement a council community communication and consultation strategy
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G1.2
Provide an interactive up to date
website that services community
needs
G1.2.a
New website developed to replace
existing website
Website development planned, development undertaken
and completed to satisfaction of council , management
and internal/external customers
DCS
G1.2.b
Monitor and update website on
regular basis
Website administration becomes part of normal
operating procedures
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 88
GOVERNANCE
G1 Develop and implement a council community communication and consultation strategy
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G1.3
Maintain and improve Council's
ongoing corporate communication
activities
G1.3.a
Issue regular media releases informing
the community of council decisions,
activities and programs
Press release issued outlining key items from each
council meeting within one week of each council meeting
GM
G1.3.b
Maintain Weekly Noticeboard
production
Noticeboard produced every week and distributed to
appropriate media outlets
GM
G1.3.c
Maintain production of Cowra
Quarterly
Cowra Quarterly produced each quarter
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 89
GOVERNANCE
G1 Develop and implement a council community communication and consultation strategy
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G1.4
Improve communication of council
information and decisions
G1.4.a
Issue regular media releases informing
the community of council decisions
and where appropriate the rationale
for those decision
Press release issued outlining key items from each
council meeting within one week of each council
meeting
GM
G1.4.b
Persons with matters requiring
council determination are advised of
council‟s decision in a timely manner
Relevant parties advised of decisions within one week of
council meeting
GM/DIO/DES/DCS
G1.4.c
Council resolutions acted upon in a
timely manner
Monthly report on progress in implementing Council
decisions is provided
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 90
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.1 Provide responsible financial
management
G2.1.a
Prepare a Resource Strategy, that
includes a long term Financial Plan, an
Asset Management Plan and a
Workforce Plan
Plans prepared and adopted
DCS
G2.1.b
Maintain long term financial
sustainability by providing key financial
information and advice to Manex and
council
Advice via detailed reports prepared and provided to
Manex and council
DCS
G2.1.c
Establish council‟s current
commitments and proposed initiatives
Research completed and provided to Manex
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 91
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.2
Develop a new system of land-use
planning to guide growth and
development in the Shire
G2.2.a
Complete Draft Cowra Local
Environmental Plan 2012
Cowra Local Environmental Plan 2012 signed by Minister
and gazetted in government gazette
DES
G2.2.b
Complete Draft Cowra Shire
Development Control Plan 2012
Cowra Shire Development Control Plan 2012 adopted
by Council
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 92
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.3
Develop a council workforce that
supports our corporate values and
meets the organisations present
and future skill needs
G2.3.a
Prepare and maintain a Workforce
Management Plan
Plan prepared and presented to Manex
DCS/GM
G2.3.b
Review and adopt Workforce Plan
detailing threats and opportunities for
the council workforce
Workforce Plan adopted
DCS
G2.3.c
Provide skills and professional
development training for staff
Every member of staff undertakes at least one
skills/professional development course annually
DCS
G2.3.d
Develop and implement a corporate
Performance Management system in
consultation with staff and relevant
unions
New system developed and implemented
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 93
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.4
Develop an integrated Risk
Management Plan and develop and
implement supporting processes to
ensure ongoing integration of risk
management principles into council
operations
G2.4.a
Develop and sustain an enterprise risk
management culture within the
Organisation
Cultural change is accepted as a normal operating
procedure within entire council organisation
DCS
G2.4.b
Provide risk management and
assurance advice
RMO and Insurance officer liaise with insurers to provide
best advice to satisfaction of management
DCS
G2.4.c
Incorporate an enterprise risk
management template in the project
management guidelines
RMO and DCS work with Manex to complete template
for adoption
DCS
G2.4.d
Complete a risk management
assessment of all services and Review
and implement improvements to
enterprise risk
management reports and reporting to
Six monthly review completed and submitted to council
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 94
the Audit Committee
G2.4.e
Manage insurance and claims to
reduce risk and contain premiums
Staff administer system in conjunction with insurers to
satisfaction of Director.
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 95
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.5
Review and implement Council‟s
Planning Instruments
G2.5.a
Complete Draft Cowra Local
Environmental Plan 2012
Cowra Local Environmental Plan 2012 signed by Minister
and gazetted in government gazette
DES
G2.5.b
Complete Draft Cowra Shire
Development Control Plan 2012
Cowra Shire Development Control Plan 2012 adopted
by council
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 96
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.6
Undertake asset management
planning to ensure that council‟s
infrastructure is maintained and
improved
G2.6.a
Undertake review of Road Asset
Management Plan
Review completed
DIO
G2.6.b
Review Strategic Water Program and
develop Water Asset Management
Plan
Water Asset Management Plan adopted
DIO
G2.6.c
Review Wastewater Strategic Plan &
develop new Wastewater Asset
Management Plan
Wastewater Asset Management Plan adopted
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 97
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.7
Develop strategies to position
Cowra for a low carbon emission
environment
G2.7.a
Prepare a brief to undertake a strategy
to optimally position Cowra in a low
carbon emission future
Brief prepared and endorsed by council
DES
G2.7.b
Provide administrative support to the
Cowra NRM Advisory Committee
Procedural and administrative support provided at all
Committee meetings
Minutes taken for all committee meetings and reported
to council prior to next committee meeting
DES
G2.7.c
Implement strategies under the RSAP
Projects completed in accordance with RSAP
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 98
GOVERNANCE
G2 Develop a planning framework that responds to changing community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G2.8
Maintain a current Equal
Employment Opportunity Plan
G2.8.a
Review current Equal Employment
Opportunity Plan
Plan reviewed and adopted by council
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 99
GOVERNANCE
G3 Strengthen partnerships with government and other agencies
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G3.1
Liaise with relevant government
and other agencies to provide
appropriate levels of resources and
assistance to shire communities
G3.1.a
Liaise with key agencies on a regular
basis to gather information on funding
programs and provide information on
opportunities
Six monthly meetings held with key agencies
GM/DCS
G3.1.b
Respond to approaches from the
community to address shortfalls in
commonwealth or state government
service delivery to residents
Relevant ministers are approached advocating on behalf
of residents
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 100
GOVERNANCE
G3 Strengthen partnerships with government and other agencies
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G3.2
Work with the NSW Rural Fire
Service to prevent and control
bushfires
G3.2.a
Undertake roadside slashing
Hazard reduction completed according to budget and
claimed for
DIO
G3.2.b
Support RFS with building
developments
Project financed with funding recuperated from Rural
Fire Service
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 101
GOVERNANCE
G3 Strengthen partnerships with government and other agencies
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G3.3
Continue to develop council‟s
relationship with other local
government bodies
G3.3.a
Mayor, Councillors and senior staff
meet with Kogarah representatives to
share ideas and discuss projects of
mutual benefit
Council representatives meet at least annually with
Mayor, councillors and senior staff of Kogarah City
Council
GM
G3.3.b
Participate in staff exchange/program
collaboration to foster relations and
ideas and as a professional
development opportunity
Council staff meet with or visit Kogarah City Council
At least one joint project delivered annually
GM
G3.3.c
Maintain relationship with Centroc
Attend and participate in all Centroc meetings and
appropriate activities
GM
G3.3.d
Maintain the Cowra Council / Joetsu
City Staff Exchange program
Host Joetsu City employee
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 102
G3.3.e
Maintain relationships with local
government bodies including the
Cowra Lines Rail Group and Joint
Audit Committee
Participate in meetings as appropriate
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 103
GOVERNANCE
G3 Strengthen partnerships with government and other agencies
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G3.4
Council undertake appropriate
research and investigation to
respond to government inquiries
and initiatives to consider reform
in the local government industry
G3.4.a
Participate in responding to
Destination 2036 outcomes
Council position determined and submission(s) lodged
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 104
GOVERNANCE
G4 Maximise funding opportunities
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G4.1
Maintain and improve Council‟s
revenue raising and collection so
as to resource the Delivery
Program
G4.1.a
Review current revenue streams to
ensure cash flow maximisation
Collections and bad debt follow up procedures achieve
established goals
DCS
G4.1.b
Investigate new sources of revenue
Research undertaken to identify potential new sources of
revenue and report provided to council
DCS
G4.1.c
Review future requirements to
establish loan borrowing
commitments and effect on future
budgets
Research undertaken and report submitted to council.
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 105
GOVERNANCE
G4 Maximise funding opportunities
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G4.2
Capitalise on grant funding
opportunities for council
G4.2.a
Respond to available grant funding
opportunities with projects that are
endorsed in council‟s planning
framework
All funding opportunities that council is eligible for are
capitalised on and a submission lodged
At least one successful funding submission annually
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 106
GOVERNANCE
G4 Maximise funding opportunities
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G4.3
Work with community groups to
locate funding opportunities
consistent with the Community
Strategic Plan
G4.3.a
Undertake workshop to assist
community groups in sourcing funding
opportunities and developing
submissions
Workshop conducted
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 107
GOVERNANCE
G5 Develop leadership skills across the community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G5.1
Work with and support council
355 Committees
G5.1.a
Support the Saleyards committee in
fulfilling its delegated role for council
Council provide appropriate administrative support.
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DIO
G5.1.b
Support the Cowra Youth Council in
fulfilling its delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 108
G5.1.c
Support the Friends of the Cowra
Regional Art Gallery in fulfilling its
delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DCS
G5.1.d
Support the Museum committee in
fulfilling its delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
Council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DCS
G5.1.e
Support the Noonbinna Village
committee in fulfilling its delegated
role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 109
G5.1.f
Support the Natural Resource
Management Advisory Committee in
fulfilling its delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
Council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DES
G5.1.g
Support the Tidy Towns and Urban
Landcare committee in fulfilling its
delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DIO
G5.1.h
Support the Access committee in
fulfilling its delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DES/DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 110
G5.1.i
Support the Australian Chapter of
World Peace Bell Association in
fulfilling its delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DCS
G5.1.j
Support the Cowra Breakout
Association in fulfilling its delegated
role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
Council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DCS/GM
G5.1.k
Support the Cowra Cultural Council
in fulfilling its delegated role for
council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
Council meeting in a timely manner
Minutes from all 355 committee meetings provided to
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 111
council in a timely manner
G5.1.l
Support the Cowra Festival of
International Understanding
committee in fulfilling its delegated
role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DCS
G5.1.m
Support the Cowra Italy Friendship
Association in fulfilling its delegated
role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DCS
G5.1.n
Support the Cowra Regional Art
Gallery committee in fulfilling its
delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
Council meeting in a timely manner
Minutes from all 355 committee meetings provided to
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 112
council in a timely manner
G5.1.o
Support the Cowra Sport and
Recreational Council in fulfilling its
delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 113
GOVERNANCE
G5 Develop leadership skills across the community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G5.2
Provide support for the continued
professional development of
councillors
G5.2.a
Work with incoming Council to
identify training/skill development
requirements
Development Plan completed
GM
G5.2.b
Provide details of
training/skill/professional development
opportunities to councillors
Council is kept regularly informed of all opportunities
Attendance is sought in accordance with council Policy
GM
G5.2.c
Provide training for prospective
councillors prior to election
Training provided
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 114
GOVERNANCE
G5 Develop leadership skills across the community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
G5.3
Work with community groups to
help them improve their overall
operational standard
G5.3.a
Respond to community requests
Community projects officers respond to requests within
budget and time resources to satisfaction of community
DCS
G5.3.b
Research ways of assisting community
groups to function more effectively
(i.e. meeting procedures, executive
training for committees)
Information provided to community groups as outreach
activity
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 115
Business and Industry
BUSINESS and INDUSTRY
B1 Plan for business and industry growth and change
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B1.1
Provide infrastructure to meet
business and industry need
B1.1.a
Identify council infrastructure to cater
for business and industry needs
Appropriate infrastructure included in Asset Management
Plans
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 116
BUSINESS and INDUSTRY
B1 Plan for business and industry growth and change
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B1.2
Explore and promote
opportunities for the attraction
and retention of industry, retail
and Government Services
B1.2.a
Finalise the Cowra Shire Economic
Development Plan
Plan adopted by council
GM
B1.2.b
Develop prospectus for prospective
business operators to distribute at
relevant events
Prospectus developed
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 117
BUSINESS and INDUSTRY
B1 Plan for business and industry growth and change
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B1.3
Work with Cowra Business
Chamber and business operators
to ensure that council services and
facilities are keeping pace with
business community requirements
B1.3.a
Review council‟s Guarantees of
Service to ensure high customer
service levels are maintained
Customer Service Guarantees reviewed in consultation
with community and key stakeholders
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 118
BUSINESS and INDUSTRY
B1 Plan for business and industry growth and change
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B1.4
Develop a new system of land-use
planning to guide growth and
development in the Cowra Shire
B1.4.a
Complete Draft Cowra Local
Environmental Plan 2012
Cowra Local Environmental Plan 2012 signed by Minister
and gazetted in government gazette
DES
B1.4.b
Complete Draft Cowra Shire
Development Control Plan 2012
Cowra Shire Development Control Plan 2012 adopted
by council
DES
B1.4.c
Improve access to development
assessment information
All development related forms and policies placed on
council website
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 119
BUSINESS and INDUSTRY
B1 Plan for business and industry growth and change
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B1.5
Identify council‟s role in business
and industry growth in Cowra
Shire
B1.5.a
Finalise the Cowra Shire Economic
Development Plan
Plan adopted by council
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 120
BUSINESS and INDUSTRY
B1 Plan for business and industry growth and change
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B1.6
Develop the Cowra CBD to make
it the major focus of business and
investment in Cowra Shire
B1.6.a
Complete CBD Masterplan
CBD Masterplan adopted and commenced
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 121
BUSINESS and INDUSTRY
B1 Plan for business and industry growth and change
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B1.7
Position Cowra Shire to prosper in
a low carbon emission future
B1.7.a
Prepare a brief to undertake a strategy
to optimally position Cowra in a low
carbon emission future
Brief prepared and endorsed by council
DES
B1.7.b
Implement strategies under the
Regional Sustainability Action Plan
Projects completed in accordance with RSAP
DES
B1.7.c
Provide administrative support to the
Cowra NRM Advisory Committee
Procedural and administrative support provided at all
committee meetings
Minutes taken for all committee meetings and reported
to council prior to next committee meeting
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 122
BUSINESS and INDUSTRY
B2 Tell the world about the opportunities and benefits of Cowra
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B2.1
Work with state and federal
funding bodies to support business
opportunities in Cowra Shire
B2.1.a
Ensure Cowra businesses are aware of
and have access to Central West
Regional Development Authority
(RDA)
Council co-ordinates annual attendance of RDA
representatives at meeting of Cowra Business Chamber
GM
B2.1.b
Ensure Cowra businesses are aware of
and have access to NSW Trade and
Investment (T&I)
Council co-ordinates annual attendance of T & I
representatives at meeting of Cowra Business Chamber
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 123
BUSINESS and INDUSTRY
B2 Tell the world about the opportunities and benefits of Cowra
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B2.2
Promote Cowra Shire as a
desirable location for business
development at relevant trade
shows and industry events
B2.2.a
Maintain presence at Country Week
exhibition
Attendance at exhibition
Report provided to council
GM
B2.2.b
Develop prospectus for prospective
business operators to distribute at
relevant events
Prospectus developed
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 124
BUSINESS and INDUSTRY
B2 Tell the world about the opportunities and benefits of Cowra
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B2.3
Provide a website that makes it
easy to do business in Cowra Shire
B2.3.a
Website development incorporates
business requirements
Website development planned, development undertaken
and completed to satisfaction of local businesses
DCS
B2.3.b
Updates for business access
Website administration to ensure business component is
updated is part of normal operating procedures
DCS
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 125
BUSINESS and INDUSTRY
B3 Add value and support to our existing businesses and industries
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B3.1
Support Cowra businesses by
making relevant programs available
B3.1.a
Deliver Cowra Entrepreneur Program
to provide business skills to existing
Cowra business operators
At least one CEP group conducted
GM
B3.1.b
Work with Cowra Business Chamber,
State Government and other agencies
to provide appropriate
information/skills programs and
workshops
At least one program identified by Cowra Business
Chamber provided with assistance from council
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 126
BUSINESS and INDUSTRY
B3 Add value and support to our existing businesses and industries
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B3.2
Liaise with the Cowra Business
Chamber to assist with their
initiatives
B3.2.a
Respond to initiatives of Cowra
Business Chamber
Respond to initiatives presented in a timely manner
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 127
BUSINESS and INDUSTRY
B4 Link and connect Cowra to the world
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B4.1
Liaise with Cowra and Central
West Business Chambers to
promote business links and
opportunities
B4.1.a
Support Cowra businesses in
accessing resources through the local
and regional Business Chambers
Council representation at local and regional Business
Chamber meetings
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 128
BUSINESS and INDUSTRY
B4 Link and connect Cowra to the world
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B4.2
Provide adequate transport
infrastructure that links Cowra to
other regions
B4.2.a
Develop plan for Heavy Vehicle
Alternative Route through Cowra
Transportation study completed including the public
exhibition process
DIO
B4.2.b
Advocate for Darbys Falls Road to be
classified as a regional road
Submission made to Roads and Maritime Services and
relevant Minister
DIO
B4.2.c
Advocate for reopening of Blayney to
Demondrille Rail Line and Inland Rail
Participate in Rail Group
GM
B4.2.d
Develop Cowra Airport as a regional
aviation centre
Develop and commence implementation plan for airport
development
GM/DIO
B4.2.e
Advocate for construction of Bells
Line Expressway
Attend and participate in Bells Line Expressway Group
meetings
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 129
B4.2.f
Advocate for upgrading of the Lachlan
Valley Way
Submission made to Roads and Maritime Services and
relevant Minister
GM/DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 130
BUSINESS and INDUSTRY
B4 Link and connect Cowra to the world
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B4.3
Improve communication
infrastructure in Cowra Shire
B4.3.a
Liaise with mobile phone providers to
ascertain their plans for coverage in
the Shire
Responses received from mobile phone providers
indicating their plans for Cowra Shire
GM/DCS
B4.3.b
Advocate for rollout of the National
Broadband Network in Cowra Shire
Cowra‟s timetable for the rollout is determined
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 131
BUSINESS and INDUSTRY
B5 Grow Cowra as a centre for excellence in agriculture, research and innovation
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B5.1
Maintain Cowra‟s position as a
premier livestock producing region
B5.1.a
Maintain saleyards to the required
standards to meet regional demand
Standards are maintained and improved to meet demand
Saleyards promoted as a regional livestock facility
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 132
BUSINESS and INDUSTRY
B5 Grow Cowra as a centre for excellence in agriculture, research and innovation
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B5.2
Promote retention and
improvement of an Agricultural
Research Station that supports the
local agricultural sector
B5.2.a
Meet with representatives of Research
Station to determine support that
council can offer
Advocate for retention and improvement of facility
Seek feedback from DPI regarding research conducted at
Cowra Agricultural Research Station
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 133
BUSINESS and INDUSTRY
B5 Grow Cowra as a centre for excellence in agriculture, research and innovation
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B5.3
Develop a council policy toward
mining development
B5.3.a
Create a council policy that identifies
and values high quality food lands
Policy developed
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 134
BUSINESS and INDUSTRY
B5 Grow Cowra as a centre for excellence in agriculture, research and innovation
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B5.4
Support initiatives to grow and
show our local agricultural sector
B5.4.a
Provide appropriate support to
identified programs and events.
Support provided
Link to Cowra Council website
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 135
BUSINESS and INDUSTRY
B5 Grow Cowra as a centre for excellence in agriculture, research and innovation
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B5.5
Support and encourage forums for
encouraging excellence and
innovation in the agricultural
sector
B5.5.a
Provide administration and conference
management support to the Cowra
NRM Advisory Committee
Support at next Futures Forum provided to satisfaction
of Committee Chairman and council
DES
B5.5.b
Provide appropriate support to
identified forums
Support provided to Agricultural Shows and other events
within the shire
GM/DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 136
BUSINESS and INDUSTRY
B6 Identify and develop profitable and sustainable tourism products for Cowra
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B6.1
Provide resources and financial
assistance to Cowra Tourism
Corporation to effectively support
and grow the Shire‟s tourism
sector
B6.1.a
Support Cowra Tourism in
accordance with Memorandum of
Understanding
Provide annual financial contribution to Cowra Tourism
Corporation
GM
B6.1.b
Provide two representatives on
Cowra Tourism Board
Council representatives attend board meetings and
report back key issues to council
GM
B6.1.c
Respond to initiatives and requests
from Cowra Tourism Corporation
Respond to initiatives/requests in a timely manner
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 137
BUSINESS and INDUSTRY
B6 Identify and develop profitable and sustainable tourism products for Cowra
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B6.2
Work with the board of the
Cowra Japanese Garden and
Cultural Centre Inc to ensure the
long-term future of the facility
B6.2.a
Provide board member (Mayor) to
company
Mayor attends board meetings and report key issues to
council
GM
B6.2.b
Respond to initiatives and requests
from the Cowra Japanese Garden and
Cultural Centre Inc
Respond to initiatives/requests in a timely manner
Requests requiring Council determination referred to
council meeting process in a timely manner
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 138
BUSINESS and INDUSTRY
B6 Identify and develop profitable and sustainable tourism products for Cowra
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B6.3
Develop the Lachlan River Precinct
as an attractive tourist destination
B6.3.a
Implement Lachlan River Precinct
Masterplan
Masterplan implemented subject to budget
Inform community and business of progress
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 139
BUSINESS and INDUSTRY
B6 Identify and develop profitable and sustainable tourism products for Cowra
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
B6.4
Develop the Cowra Peace Precinct
as an attractive tourist destination
B6.4.a
Encourage walking and travelling
through Peace Precinct
Works completed as per Masterplan and within budget
Inform community and business of progress
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 140
Transport and Infrastructure
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.1
Maintain local and regional road
networks to enable the safe and
efficient movement of traffic at the
lowest life-cycle cost
T1.1.a
Develop and implement works
program for maintenance of roads and
bridges
Roads and bridges maintained to satisfactory standard
within budget
DIO
T1.1.b
Review Road Asset Management Plan
Review completed of Road Asset Management Plan
DIO
T1.1.c
Provide a safe road network
Respond to identified safety issues in a timely manner
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 141
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.2
Work with Roads and Maritime
Services (RMS) to enable the safe
and efficient movement of traffic
on the state owned road network
within Cowra Shire
T1.2.a
Work with Roads & Maritime Services
to agree on improvements required to
state owned road networks
Program agreed and council engaged as principal
contractor to carry out works
DIO
T1.2.b
Maintain working relationship with
Roads & Maritime Services
Regular meetings held and recommendations addressed
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 142
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.3
Maintain ancillary road facilities
(e.g. signs, delineation and
associated structures) to enable
the safe and efficient movement of
traffic
T1.3.a
Review of signage to be undertaken
Signage amended according to recommendations for
review
DIO
T1.3.b
Street lighting efficiency audit
undertaken
Audit completed and options presented
DIO
T1.3.c
Ancillary road facilities to be
maintained
Facilities maintained according to agreed standards
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 143
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.4
Source road making materials in an
environmentally responsible
manner
T1.4.a
Investigate program to address
Environmental Protection Authority
condition for council quarries
All conditions are complied with i.e.
Dust monitoring
Water discharge from quarry floor
Adhering to time of operation
Bird boxes erected
DIO
T1.4.b
Reconstruct entrance to Gospel Oak
Quarry
Revised entrance way is completed
DIO
T1.4.c
Review operating season for Gospel
Oak to meet compliance
Sufficient gravel is stockpiled to avoid operating during a
Parrot Breeding Season (CPA requirement)
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 144
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.5
Maintain, improve and develop
footpaths and walkways to ensure
the safe and efficient movement of
users, including access for aged and
disabled persons
T1.5.a
Maintain footpaths to user standards
All complaints investigated and appropriate remedial
works completed within timeframe
DIO
T1.5.b
Improve walkways
Peace Precinct and Riverbank Masterplan implemented in
accordance with budget
DIO
T1.5.c
Review footpaths and road crossings
for rideability of mobility scooters
Repairs undertaken according to review and within
allocated budget
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 145
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.6
Improve local traffic conditions
within the Cowra CBD
T1.6.a
Develop plan for Heavy Vehicle
Alternative Route through Cowra
Transportation study completed including the public
exhibition process
DES/ DIO
T1.6.b
Complete CBD Masterplan
CBD Masterplan adopted and commenced
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 146
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.7
Develop cycleways in Cowra Shire
T1.7.a
Review cycleway‟s policy
Policy is reviewed
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 147
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.8
Plan for an alternative heavy
vehicle route for Cowra
T1.8.a
Develop plan for Heavy Vehicle
Alternative Route through Cowra
Transportation study completed including the public
exhibition process
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 148
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.9
Maintain and improve Cowra
Airport as a certified aerodrome
and a place of aviation related
business
T1.9.a
Market Cowra Airport as a regional
aviation facility
Include airport in Cowra Shire Economic Development
Plan
GM
T1.9.b
Undertake investigation and liaise with
potential regular passenger transport
operators
Business opportunity presented to prospective operators
and proposals invited
GM
T1.9.c
To maintain sealed runway
Undertake crack sealing as required
Plan to re-seal in 2013/2014
DIO
T1.9.d
Taxiways are improved to meet
compliance
100% compliance is met
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 149
T1.9.e
Prepare business case for
development
Development program approved by council
upgrades carried out in a timely manner determined by
need
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 150
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.10
Be an active supporter and
advocate of regional and inland rail
T1.10.a
Work with relevant government and
industry stakeholders to reopen the
Blayney-Demondrille rail line
NSW Government commits to reopen the line
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 151
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.11
Advocate for construction of Bells
Line Expressway
T1.11.a
Attend at least on BLEG meeting
annually
Attend and participate in meeting
GM
T1.11.b
Participate in co-ordinated Centroc
media on the route
Media statements
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 152
TRANSPORT and INFRASTRUCTURE
T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T1.12
Advocate for improvements to the
Lachlan Valley Way as a major
regional road
T1.12.a
Make representations to appropriate
Members of Parliament
Representations made and response received
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 153
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.1
Maintain and improve shire‟s water
supply network to meet consumer
demand and satisfy health
requirements at the lowest life-
cycle cost
T2.1.a
Support Centroc (CWUA) to achieve
best practice
Plans are completed for Council adoption:
Demand Management Plan
Drought Management Plan
DIO
T2.1.b
Improve water supply network
Develop and adopt water Asset Management Plan
Renewal program developed
Complete installation of Darbys Falls Water Filtration
Plant
DIO
T2.1.c
Water samples taken as per Health
Department requirements
Water samples tested and meet health standards
(Australian Drinking Water Standards)
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 154
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.2
Work with NSW Government to
determine the feasibility of
establishing a council operated
Wyangala village sewerage system
T2.2.a
Work with NSW Government and
Wyangala community to progress
establishment of Wyangala village
sewerage system
Respond to request from NSW Office of Water
Council position presented to NSW Government
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 155
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.3
Provide a treated waste water
system that meets environmental
standards with maximum
opportunity for re-use
T2.3.a
Operate wastewater network
effectively
Network operated within budget
DIO
T2.3.b
Improve network for robustness
Renewal programs developed for future expansion
DIO
T2.3.c
Discharge from wastewater treatment
plant to meet EPA sensitive water
standards
100% compliance achieved
DIO
T2.3.d
Undertake Re-use study
Re-use study completed (Including Public Exhibition
Process)
DIO
T2.3.e
Minimise odour emissions from Waste
Water Treatment Facility
Less than 5 odour complaints received per year
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 156
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.4
Maintain and improve the
collection and removal of
stormwater to minimise damage
and public nuisance throughout the
shire
T2.4.a
Manage stormwater network to public
satisfaction
A community satisfaction Survey undertaken
Develop and adopt stormwater AMP
DIO
T2.4.b
Identify and implement stormwater
projects
Projects are completed as budget allows
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 157
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.5
Maintain and improve Council
buildings to support operational
requirements
T2.5.a
Inspect council buildings for
Maintenance program
Inspections undertaken and maintenance recommended
DIO
T2.5.b
Implement repairs and Maintenance of
Buildings
Buildings maintained to required standards
DIO
T2.5.c
Develop register for council buildings
and properties
Report to council on surplus
property
Register is developed and updated
Recommendations made to Council
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 158
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.6
Maintain and improve other
council assets to meet operational
requirements
T2.6.a
Maintain all public facilities to required
standards
All works are completed within budget
Community satisfaction survey is to be completed
DIO
T2.6.b
Develop plan for the expansion of
Cowra Cemetery
Design and costing for expansion are completed
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 159
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.7
Provide and maintain plant of an
appropriate type, size and number
to undertake council operations
T2.7.a
Develop 10 year program
Program completed annually and within budget
DIO
T2.7.b
Review high maintenance plant
Recommendations made to replace high maintenance
plant as soon as practical in next financial year
DIO
T2.7.c
Identify improvements to Cowra
Council Depot
Approved improvements completed
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 160
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.8
Work with government and
relevant telecommunication
providers to deliver equitable
access to communication and
technology for our entire shire
T2.8.a
Research mobile phone coverage in
the shire and advocate for extension
of service with providers
Research undertaken and approaches made to providers
seeking commitments to extend coverage
GM
T2.8.b
Advocate for rollout of the NBN in
Cowra Shire
Cowra‟s timetable for the rollout is determined
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 161
TRANSPORT and INFRASTRUCTURE
T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T2.9
Undertake research and
development to improve energy
efficiency of council buildings, plant
and equipment
T2.9.a
Conduct level 2 Energy Audit of Civic
Centre / Administration Building/
Waugoola House
Recommendations for increasing energy efficiency
included for consideration in 2013/2014 Operational Plan
DIO
T2.9.b
Conduct Level 2 Energy Audit of
Major Water Infrastructure
Recommendations for increasing energy efficiency
included for consideration in 2013/2014 Operational Plan
DIO
T2.9.c
Conduct Level 2 Energy Audit for
Major Wastewater Infrastructure
Recommendations for increasing energy efficiency
included for consideration in 2013/2014 Operational Plan
DIO
T2.9.d
Participate in Centroc Energy review
Report on options for increased energy efficiency
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 162
TRANSPORT and INFRASTRUCTURE
T3 Secure Cowra’s water supply
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T3.1
Provide a secure water supply for
community needs and
contingencies
T3.1.a
Test readiness of supply between
Central Tablelands Water and Cowra
No faults in network operation
DIO
T3.1.b
Development Water Quality
Management Plan
Water Quality Management Plan developed to
Department of Health requirements
DIO
T3.1.c
Investigate suitability of existing intake
infrastructure
Recommendations are made for improvements
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 163
TRANSPORT and INFRASTRUCTURE
T3 Secure Cowra’s water supply
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T3.2
Maintain Cowra Council as the
principal water supply authority for
Cowra
T3.2.a
Work with Centroc Water Utilities
Alliance to achieve best practice
Regular attendance of meetings and participation in
CWUA projects
DIO
T3.2.b
Mayor, councillors and staff advocate
at appropriate forums
Advocacy undertaken
GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 164
TRANSPORT and INFRASTRUCTURE
T3 Secure Cowra’s water supply
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
T3.3
Provide a land-use planning
framework to identify and protect
vulnerable aquifers
T3.3.a
Incorporate water sensitive lands
mapping in new Local Environmental
Plan
Local Environmental Plan includes environmentally
sensitive lands for mapping for water
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 165
Natural Resource Management
NATURAL RESOURCE MANAGEMENT
N1 Make Cowra a centre of environmental excellence
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N1.1
Position Cowra to grow and
prosper in a low carbon emission
environment
N1.1.a
Prepare a brief to undertake a strategy
to optimally position Cowra in a low
carbon emission future
Brief prepared and endorsed by council
DES
N1.1.b
Implement strategies under the RSAP
Projects completed in accordance with RSAP
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 166
NATURAL RESOURCE MANAGEMENT
N1 Make Cowra a centre of environmental excellence
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N1.2
Investigate opportunities for the
use of renewable/alternative
energy sources for council
infrastructure
N1.2.a
Undertake energy efficiency strategy
in collaboration with Centroc and
neighbouring councils
Energy efficiency strategy completed
DES/ DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 167
NATURAL RESOURCE MANAGEMENT
N1 Make Cowra a centre of environmental excellence
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N1.3
Lead on NRM initiatives and
projects in the region
N1.3.a
Support to the Cowra NRM Advisory
Committee to lead on NRM initiatives
and projects
A least one NRM initiative/project is carried out to the
satisfaction of committee Chairman and council
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 168
NATURAL RESOURCE MANAGEMENT
N2 Build partnerships with people who work with and care for the land to secure a healthy environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N2.1
Support Lachlan Catchment
Management Authority (LCMA),
Livestock Health and Pest
Authorities (LHPA), Department
of Primary Industries (DPI), NSW
Farmers and other authorities to
deliver their environmental
management programs for non-
urban environs
N2.1.a
Attend strategy meetings as requested
LCMA Local Government Advisory Group attendance
Timely response to government authority referrals
DES/DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 169
NATURAL RESOURCE MANAGEMENT
N2 Build partnerships with people who work with and care for the land to secure a healthy environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N2.2
Liaise with the local Aboriginal
community to identify suitable
projects, key sites and projects
that improve environmental
outcomes
N2.2.a
Meet at least annually with Cowra
Local Aboriginal Land Council
Mayor and General Manager attend meetings with Land
Council
At least one collaborative project identified annually
DES/GM
N2.2.b
Support the Cowra Local Aboriginal
Land Council to undertake
environmental projects
At least one environmental based indigenous project is
carried out to the satisfaction of the Cowra Local
Aboriginal Land Council and council
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 170
NATURAL RESOURCE MANAGEMENT
N2 Build partnerships with people who work with and care for the land to secure a healthy environment
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N2.3
Work with LCMA, other agencies,
community groups and other
stakeholders to deliver
environmental improvement
projects and programs in urban
environments and other council
managed land
N2.3.a
Provide small grants for community
groups to undertake environmental
improvement projects
Environmental Improvements Grant Scheme established.
At least one project is funded under the new scheme.
DES/GM
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 171
NATURAL RESOURCE MANAGEMENT
N3 Promote practices to encourage Cowra to be an environmentally responsible community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Strategy Performance Measure Responsibility
N3.1
Work with the community to
maximise re-cycling
N3.1.a
Continue with Recycling Education
Strategy (RES)
Recycling has increased through education – Recycling
Educating Strategy
Waste watchers program implemented through schools
DIO
N3.1.b
Investigate expansion of Cowra
Material Recycling Facility to operate
as a regional facility
Investigations undertaken and reported to council
Increased volume through Material Recycling Facility is
achieved
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 172
NATURAL RESOURCE MANAGEMENT
N3 Promote practices to encourage Cowra to be an environmentally responsible community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N3.2
Support Tidy Towns Committee
and other groups conducting
environmental awareness
programs/events
N3.2.a
Support the NRM Advisory
Committee and other environmental
based organisations to advance
environmental awareness
Support the NRM Advisory Committee‟s Futures Forum
Events
DES
N3.2.b
Support the Tidy Towns and Urban
Landcare committee in fulfilling its
delegated role for council
Council provide appropriate administrative support
within available resources
Requests requiring Council determination referred to
council meeting in a timely manner
Minutes from all 355 committee meetings provided to
council in a timely manner
DES
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 173
NATURAL RESOURCE MANAGEMENT
N3 Promote practices to encourage Cowra to be an environmentally responsible community
Delivery Program (5 years) Operational Plan (1 year)
Strategy Action Performance Measure Responsibility
N3.3
Investigate opportunities for the
use of renewable/alternative
energy sources for council
infrastructure
N3.3.a
Undertake energy efficiency strategy
in collaboration with Centroc and
neighbouring councils
Energy efficiency strategy completed
DIO
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 174
2012/2013 Revenue Policy – Rates & Annual Charges
Rates
The rating system provides for the net funding requirements of Council‟s programs as stated in the
Management Plan.
Any increase in the Rates is reviewed annually after having regard to the maximum provided under the
State Government‟s rate pegging legislation. For 2012/2013 the maximum allowable rate increase has
been announced by the Minister for Local Government as 3.6%.
Ordinary Rates:
The ordinary rating structure for 2012/2013 is detailed below (2011/2012) charges shown in brackets.
Rate Category % of total
$ to be raised
% to be Raised by
$ to be Raised by Number of Base
$ to be Raised by 2011 Ad Valorem
Rate Yield
by category
Base Amount
Base Amount Assessments Amount Ad Valorem Land Value cents in $
Residential 4.64% $269,776 48 $129,492 808 160 140,284 32,795,660 0.00427750
Village & Others
(155)
(0.00388141)
Residential - Cowra 25.68% $1,491,414 48 $715,879 3688 193 775,535 178,021,401 0.00435642
(189)
(0.00421760)
Residential - Rural 5.38% $312,528 40 $125,011 385 325 187,517 33,901,670 0.00553120
(313)
(0.00527480)
Farmland 44.03% $2,557,466 20 $511,493 1779 288 2,045,973 657,444,605 0.00311201
(277)
(0.00310020)
Business 18.97% $1,101,759 0 $- 411 0.0000 1,101,758 35,888,789 0.03069922
(0.03143070)
Mining 1.30% $75,768 0 $- 1 0.0000 75,768 1,015,000 0.07464828
(0.07066180)
100.00% $5,808,710
$1,481,876 7072
$4,326,834 939,067,125
Land Categories:
All rateable land in the shire is required to be classified into one of the categories detailed below. This
task was initially undertaken in 1994 and is continued as applications and/or determinations are made.
Farmland: (Section 515)
Land is to be categorised as farmland if it is a parcel of rateable land valued as one assessment and its
dominant use is for farming or agricultural production. Rural residential land is not categorised as
farmland.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 175
Residential: (Section 516)
Land is to be categorised as residential if it is a parcel of rateable land valued as one assessment and its
dominant use is for residential accommodation or rural residential land or if it is vacant land and zoned
or otherwise designated for use under an environmental planning instrument for residential purposes.
Council has three sub-categories for Residential being:-
(i) Residential – Cowra: Land defined as being within the boundaries of the Cowra township, and;
(ii) Residential – Rural: Land is to be categorised Rural Residential if the land is more than 2 hectares and less than 40
hectares with the primary use being for residential purposes.
(iii) Residential/Villages And Others: Land that is deemed residential but not falling into categories (i) and (ii) above.
Mining: (Section 517)
Land is to be categorised as mining if it is a parcel of rateable land valued as one assessment and its
dominant use is for mining.
Business: (Section 518)
Land is to be categorised as business if it cannot be categorised as farmland or residential. Caravan parks
and manufactured home communities are to be categorised as business.
Water Supply
The following pricing structure has been adopted for 2012/2013:-
RESIDENTIAL 2012/2013 2011/2012
Access Charges Meter Size
20mm $ 287.00 $ 280.00
25mm $ 448.00 $ 438.00
32mm $ 735.00 $ 717.00
40mm $ 1,148.00 $ 1,120.00
50mm $ 1,794.00 $ 1,750.00
80mm $ 2,219.00 New Charge
Usage Charges Consumption per kl
First 400 kl $ 2.05 $ 1.93
Balance $ 2.95 $ 2.83
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 176
NON-RESIDENTIAL
(rural, commercial, government/non-business consumers)
2012/2013
2011/2012
Access Charges Meter Size
20mm $ 288.00 $ 280.00
25mm $ 450.00 $ 438.00
32mm $ 737.00 $ 717.00
40mm $ 1,152.00 $ 1,120.00
50mm $ 1803.00 $ 1,750.00
80mm $ 2,219.00 $ 2,154.00
100mm $ 3,466.00 $ 3,365.00
150mm $ 7,799.00 $ 7,572.00
Usage Charges Consumption per kl
First 400 kl $ 2.00 $ 1.93
Balance $ 1.45 $ 1.40
NON-RESIDENTIAL
(Industrial consumers)
2012/2013 2011/2012
Access Charges Meter Size
20mm $ 288.00 $ 283.00
25mm $ 450.00 $ 442.00
32mm $ 737.00 $ 724.00
40mm $ 1,152.00 $ 1,132.00
50mm $ 1,803.00 $ 1,751.00
80mm $ 2,219.00 $ 2,154.00
100mm $ 3,466.00 $ 3,365.00
150mm $ 7,799.00 $ 7,572.00
Usage Charges All consumption
per kl
$ 0.78 $ 0.74
RAW WATER 2012/2013 2011/2012
Access Charges Meter Size
20mm $ 288.00 $ 280.00
25mm $ 450.00 $ 438.00
32mm $ 737.00 $ 717.00
40mm $ 1,152.00 $ 1,120.00
50mm $ 1,803.00 $ 1,750.00
80mm $ 2,219.00 $ 2,154.00
100mm $ 3,466.00 $ 3,365.00
150mm $ 7,799.00 $ 7,572.00
Usage Charges All consumption
per kl
$ 1.20 $ 1.10
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 177
Wholesale Nurseries
WHOLESALE NURSERIES
Serviced by the Cowra Shire Council water supply system
2012/2013
2011/2012
Access Charges Meter Size
20mm $ 288.00 $ 283.00
25mm $ 450.00 $ 442.00
32mm $ 737.00 $ 724.00
40mm $ 1,152.00 $ 1,132.00
50mm $ 1,803.00 $ 1,751.00
80mm $ 2,219.00 $ 2,154.00
100mm $ 3,466.00 $ 3,365.00
150mm $ 7,799.00 $ 7,572.00
Usage Charges All consumption
per kl
$ 0.92 $ 0.77
User charges per kl to be incremented by 20% per annum until parity reached with second step of the
Non-Residential (Rural Commercial).
Education
The Education Tariff will apply to the Education Providers listed below and serviced by the Cowra Shire Council Water Supply system:
Cowra High School Woodstock Public School Mulyan Public School Wyangala Dam Public School St Raphael‟s School Koorawatha Public School Holman Place School Greenethorpe Public School Cowra Public School Bendick Murrell School Cowra TAFE Holmwood School Gooloogong Public School MET School – Cowra Campus
EDUCATION TARIFF 2012/2013 2011/2012
Access Charges Meter Size
20mm $ 288.00 $ 283.00
25mm $ 450.00 $ 442.00
32mm $ 737.00 $ 724.00
40mm $ 1,152.00 $ 1,132.00
50mm $ 1,803.00 $ 1,751.00
80mm $ 2,219.00 $ 2,154.00
100mm $ 3,466.00 $ 3,365.00
150mm $ 7,799.00 $ 7,572.00
Usage Charges All consumption
per kl
$ 1.10 $ 1.00
User charges per kl to be incremented by 10% per annum until parity reached with Non-Residential
(Rural Commercial).
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 178
Water Access Charge - Refunds
Council will provide a refund of 100% of the applicable Water Access Charges to the following bodies in recognition of Council‟s Community Service Obligation:
Cowra Showground
Cowra District Hospital Council will provide a refund of 100% of the applicable Water Access Charges for Windsor Farm Foods and the Cowra Abattoir as an industry incentive.
Vacant Properties
A $288 availability charge will be applied to all vacant un-metered properties as a contribution towards
infrastructure costs.
Sewerage Service
The following pricing structure has been adopted for 2012/2013:-
Residential 2012/2013 2011/2012 Increase Access Charge $ 618.00 $ 597.00 3.51%
Usage Charge* $ 137.00 $ 132.00 3.78%
*The Usage Charge is based on an average residential water consumption of 206 kilolitres per annum and a sewer Discharge factor of 0.6 (i.e. 60%).
Non-Residential
Non-Residential Sewerage charges in 2012/13 will be calculated differently from 2011/12 as directed by the NSW Office of Water. Non-Residential Sewer Accounts will be charged on a User-Pays basis calculated on the total water consumption multiplied by a Sewerage Discharge Factor which identifies the percentage of water consumed that goes to the sewer. The following charges are in addition to Liquid Trade Waste charges which are the specific Trade Wastes in the course of a business activity.
Non-Residential 2012/2013 2011/2012 Increase
Access Charge $ $597.00
20mm service $ $618.00 Not Applicable 3.51%
25mm service $ $637.00 Not Applicable
32mm service $ $656.00 Not Applicable
40mm service $ $676.00 Not Applicable
50mm service $ $696.00 Not Applicable
80mm service $ $717.00 Not Applicable
100mm service $ $739.00 Not Applicable
150mm service $ $761.00 Not Applicable
Commercial - per cistern $ Not applicable in 2012/13 $ 66.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 179
Non-Residential 2012/2013 2011/2012 Increase
- minimum charge $ Not applicable in 2012/13 $ 132.00
User Charge $ $0.71 per kilolitre is charged to sewer $
Total yield in 2012/2013 from the Access Charges for the shire‟s sewerage system is estimated to be $2,303,283. Total yield in 2012/2013 from the Usage Charge for the shire‟s sewerage system is estimated to be $553,340.
Vacant properties
A $618 Access Charge will be applied to all properties where sewer is available but not connected. This
charge will be levied on the annual rate notice
Waste Charges
Domestic Waste Management Charge
The domestic waste management charge is a single charge with two components being the „garbage
service‟ and the „recycling service‟.
Council has a strong commitment to a recycling program for the Shire, to reduce the amount of waste
material going to landfill at its Materials Recycling Facility and to maximise the sale of recyclable products.
As a component of Council‟s waste management charges, Council will levy under Section 496 of the
Local Government Act, a recycling charge of $97.00 ($94.00 in 2011/12) for a fortnightly pickup service
for a 240 litre recycling bin. That charge will be added to the charge for each property depending upon
whether they have a 240 litre ($430) or a 120 litre ($249) garbage bin service. See the table below.
The charge will be applicable for all serviced properties within the township of Cowra and the villages of
Darbys Falls, Wyangala, Woodstock, Wattamondara, Gooloogong, Noonbinna, Billimari and Morongla.
The domestic waste service is available upon request and by agreement, to a limited number of
properties situated on the main access roads between Cowra township and the above villages.
In accordance with Section 496 of the Local Government Act 1993, Council proposes to levy charges on
properties for which the domestic waste service is available. For 2012/2013 the following charges are to
be levied:
DOMESTIC WASTE 2012/2013 2011/2012 1 x 240 litre garbage bin (1 pick-up per week) and
1 x 240 Litre Recycling Bin (fortnightly pickup)
Total
$
$
430.00
97.00
527.00
$
$
415.00
94.00
509.00
1 x 120 litre garbage bin (1 pick-up per week) and
1 x 240 Litre Recycling Bin (fortnightly pickup)
Total
$
$
$
249.00
97.00
346.00
$
$
$
240.00
94.00
334.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 180
The total yield from the Domestic Waste Management Charge in 2012/2013 is estimated to be
$1,468,481. In accordance with Section 496 and having regard to the criteria in Section 539 of the 1993
Local Government Act, Council has reviewed the Domestic Waste Management (DWM) Charges for
Vacant Land and has decided to charge $0 for 2012/2013. The total revenue raised in 2012/2013
through DWM for vacant land will be $0.
Commercial Waste Management Charge
Council will levy under Section 501 of the 1993 Local Government Act, a Waste Management Charge on commercial properties for which a waste service is provided. For 2012/2013 the following charges are to be levied:
COMMERCIAL WASTE 2012/2013 2011/2012
1 x 240 litre bin (1 pick-up per week) $ 430.00 $ 415.00
1 x 120 litre bin (1 pick-up per week) $ 249.00 $ 240.00
Commercial Recycling Management Charge
In addition to the above charge, Council will levy under Section 501 of the 1993 Local Government Act,
a Commercial Recycling Management Charge. A Commercial Recycling service will continue to be rolled
out in 2012/2013 for all commercial properties wishing to utilise the service.
COMMERCIAL RECYCLING 2012/2013 2011/2012
1 x 240 litre recycling bin (1 pick-up per week) $ 195.00 $ 188.00
Subsequent and additional bins $ 97.00 $ 94.00
The total yield from the Commercial Waste Management Charge in 2012/2013 is estimated to be $191,709. In accordance with Section 496 and having regard to the criteria in Section 539 of the 1993 Local Government Act, Council has reviewed the Commercial Waste Management Charges for Vacant Land and has decided to charge $0 for 2012/2013. The total revenue raised in 2011/2012 through Commercial Waste Management for vacant land will be $0.
Other Charges and Rebates
Pensioner Rebates:
In accordance with Section 575 of the Local Government Act 1993, Council provides a rate reduction of 50% of the amount of the rate levy. Of this rate reduction 55% is reimbursed by the NSW Government and the remaining 45% is written off by the Council.
The maximum reductions and estimated costs are as follows:
PENSIONER REBATES MAXIMUM REDUCTION ESTIMATED COSTS
(to be abandoned) General Rates (including Domestic Waste) $ 250.00 $ 212,108
Water $ 87.50 $ 119,471
Sewer Availability & Service Charges $ 87.50 $ 80,032
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 181
Interest - Overdue Rates & Charges
Interest will be calculated at 10% on a daily basis using the simple interest method. The rate of interest is the rate specified by the Minister and published in the Government Gazette.
Private Works Rate
In accordance with Section 67(1) of the Local Government Act 1993, Council may by agreement with the owner or occupier of any private land carry out on the land any kind of work that may lawfully be carried out on the land. The rates proposed to be adopted by Council are set to recover the full estimated cost (including on cost) to Council in providing the works on private land plus a profit margin of 20%.
Proposed Borrowings
It is Council‟s policy to only borrow to fund capital projects that have a life expectancy beyond the term for repayment of the loan. All loans are secured over the income of the Council. It is also Council‟s policy to invite quotes for the provision of loan funds from lending institutions and the most competitive quotation is accepted. The following loan is proposed for 2012/2013:
LOAN AMOUNT
Water Treatment Plant Automation $ 500,000
Drainage $ 250,000
It is anticipated that borrowings may be required for Airport Masterplan development
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 182
Fees and Charges
In accordance with Section 608 of the Local Government Act 1993, Council may charge and recover an approved fee for any service it provides other than a service provided, or proposed to be provided, on an annual basis for which it may make an annual charge under Section 501. A list of the fees proposed to be charged by Council for the financial year ending June 30, 2013 is set out in the attached Schedule of Fees. The fees shown in the Schedule of Fees are arrived at after allowing for normal inflationary growth in the cost of providing these services. However, where the fee is based on the costs of providing the service and those costs increase extraordinarily during the year, Council reserves the right to amend the fees to recover the cost increase. Council‟s general pricing policy is to ensure that all fees and charges with respect to the goods and services provided by it are levied equitably.
Pricing Policies are adopted as follows:
Fees and charges for Council‟s business activities are set in accordance with the prevailing market to maximise Council‟s return;
Fees and charges for community facilities such as swimming pools, sporting fields and cemeteries are set at what Council considers to be a reasonable cost for the user to bear, the balance being met from general revenues;
Fees and charges fixed by legislation and regulations such as zoning certificates, building certificates and building approvals are statutory charges;
Fees and charges such as town planning consents, subdivision fees and dog registrations have maximum fees prescribed by regulation and Council, at its discretion, adopts amounts at or below the maximum fee prescribed;
Section 94 contributions are fixed in accordance with the relevant Contribution Plan;
Fees and charges for all other goods and services are fixed on a cost recovery basis.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 183
2012/2013 Revenue Policy – Fees & Charges
Code for Fees and Charges
Charge set by Council =1
Charge set by Statue =2
Maximum charge set by statue and Council charges less than maximum =3
Charge set by Council in accordance with statutory guidelines =4
Set by Central West Library =5
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
General Administration
Miscellaneous Charges (including Interest on Overdue Rates)
Interest on Overdue Rates & Charges
Accrual of interest on Rates and Charges (refer s566 Local Government Act 1993)
N 2 0.11 10%
Returned Cheques
Fee for Returned Cheques Each instance
Y 1 $ 66.75 $ 69.15
Photocopying, Printing & Document Copies
Photocopying
Photocopies - A4 black & white Per copy Y 1 $ 0.75 $ 0.75
Photocopies - A3 black & white Per copy Y 1 $ 0.95 $ 1.00
Photocopies - A4 colour Per copy Y 1 $ 1.40 $ 1.45
Photocopies - A3 colour Per copy Y 1 $ 1.80 $ 1.85
Plan Copies - AO size Per copy Y 1 $ 13.45 $ 14.00
Plan Copies - A1 size Per copy Y 1 $ 12.40 $ 12.85
Plan Copies - A2 size Per copy Y 1 $ 8.65 $ 9.00
Large documents Per document
Y 1 POA POA
Map Production
Coloured A1 & AO maps – plan printer
Per copy Y 1 $ 43.05 $ 44.60
Black and white A1 & AO maps – plan printer
Per copy Y 1 $ 26.95 $ 27.90
Coloured A2 & A3 maps – plan printer
Per copy Y 1 $ 26.95 $ 27.90
Black and white A2 & A3 maps – plan printer
Per copy Y 1 $ 15.10 $ 15.60
Coloured A4 maps – laser printer Per copy Y 1 $ 1.60 $ 1.65
Document Copies
Rate Notice Copies Per rate year
Y 1 $ 5.50 $ 5.70
Publication Documents
Combined draft Delivery Program, Operational Plan & Long Term Financial Plan documents
Adopted Delivery Program, Operational Plan & Long Term Financial Plan documents
Annual Report
Annual Financial Statements
Per hard copy
Y 1 $ 16.75 $ 17.35
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 184
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Publication CD
Combined draft Delivery Program, Operational Plan & Long Term Financial Plan documents
Adopted Delivery Program, Operational Plan & Long Term Financial Plan documents
Annual Report
Annual Financial Statements
Per Item - CD copy
Y
1
$
5.60
$
5.80
Public Documents - Environmental Services
Swimming Pool Resuscitation Chart Each Y 1 $ 20.65 $ 21.40
Document Lodging and Transmission
Fax Sending Australia
First Page Per page Y 1 $ 3.55 $ 3.70
Subsequent Pages Per page Y 1 $ 0.25 $ 0.25
Fax Receiving Australia
First Page Per page Y 1 $ 3.55 $ 3.70
Subsequent Pages Per page Y 1 $ 0.25 $ 0.25
Fax Sending International
First Page Per page Y 1 $ 5.75 $ 5.95
Subsequent Pages Per page Y 1 $ 1.15 $ 1.20
Fax Receiving International
First Page Per page Y 1 $ 5.70 $ 5.90
Subsequent Pages Per page Y 1 $ 1.15 $ 1.20
Electronic Lodgement
A4 or less per page Per sheet Y 1 $ 2.20 (maximum $50)
$ 2.30
(maximum 50) A3 or larger per page Per sheet Y 1 $ 17.80
(maximum $200)
$ 18.45 (maximum
200)
Laminating Maps and Plans
AO (per sheet) Each Y 1 $ 17.85 $ 18.50
A1 (per sheet) Each Y 1 $ 14.45 $ 15.00
A2 (per sheet) Each Y 1 $ 10.10 $ 10.45
A3 (per sheet) Each Y 1 $ 6.75 $ 7.00
A4 (per sheet) Each Y 1 $ 5.60 $ 5.80
Hiring of Equipment
Hire of Data Projector Per day Y 1 $ 69.40 $ 71.90
Hire of Slide Projector Per day Y 1 $ 17.85 $ 18.50
Hire of Overhead Projector Per day Y 1 $ 24.55 $ 25.40
Rates and Charges Certificate (Section 603)
Section 603 Certificate Per certificate
N 2 $ 65.00 $ 65.00
Section 603 Certificate – urgent 1 day processing additional fee
Per certificate
Y 1 $ 39.10 $ 40.50
Government Information (Public Access)
Access to Records by Person regarding their personal affairs
Application Fee - Includes up 20hrs processing time
Per application
N 2 $ 30.00 $ 31.10
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 185
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 Per hour of employee time after 20hrs Per
application /Per hour
N 2 $ 30.00 $ 31.10
Non Personal Information Access by Persons or Corporations regarding Non-personal affairs
Application Fee - Includes the 1st hour
of employee time
Per application
N 1 $ 30.00 $ 31.10
Processing charge after the first hour Per hour N 1 $ 30.00 $ 31.10
Internal Review of Refusal of Access Per application
N 1 $ 40.00 $ 41.45
Roads
Roads Fees (Section 138)
Section 138 Application fee (Traffic
Control Plan is supplied by applicant)
N 1 $ 122.70 $ 127.10
Section 138 Application fee (erect minor
structures and perform works within the
road where Traffic Control Plan Not
Required)
N 1 $ 43.70 $ 45.25
Section 138 Application fee (when TCP
is to be supplied by Council)
N 1 $ 351.50 $ 364.15
Road Usage
Road Opening Permit Y 1 $ 84.70 $ 87.75
Rent Of Unused Public Roads
Fees and costs will vary depending on
the size and use of the land. Licence max
5 years
Application Fee Each Y 1 $ 109.20 $ 113.15
Advertising fee Each Y 1 $ 92.55 $ 95.90
Notification fee Each Y 1 $ 92.55 $ 95.90
Amounts invoiced in 2011/12 will be increased by the following percentage rate over the 2012/13
Y I 3.5% 3.5%
Traffic Control Plan
Prepare and Print Traffic Control Plan
(TCP)
Each Y 1 $ 228.80 $ 237.00
Sign Rental (for implementing TCP) Per sign/Per
day
Y 1 $ 5.75 $ 5.95
Roads - Public Events
Road Event Permit (Roads Act 1993 -
Div 4, C1 144) Each Y 1 $ 91.50 $ 94.80
Resident notification for road event
Each Y 1 $ 322.40 $ 334.00
Environmental Services
Approval Fees (Local Government
Act)
Application fee for Approvals under Section 68
Solid Fuel Heating Appliance Approval
Application fee
N 1 $ 201.75 $ 209.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 186
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Amusement Devices (shows, fairs, functions)
All amusement devices (includes one
inspection fee)
Per device N 1 $ 46.80 $ 48.50
Install moveable dwelling
Install a manufactured home, moveable
dwelling or associated structure in
caravan park, manufactured home estate
or the like and where existing
development consent for such purpose is
in place (includes two compliance
inspection fees)
N 1 $ 327.60 $ 339.40
Install a manufactured home, moveable
dwelling or associated structure on land
other than caravan park or manufactured
home estate or the like.
(includes two compliance inspection
fees)
N 1 $ 762.80 $ 790.25
Install temporary structure
Install a temporary structure on land
(includes inspection fee)
N 1 $ 201.75 $ 209.00
Hoist goods over public road
Swing or hoist goods across or over any
part of a public road by means of a lift,
hoist or tackle projecting over the
footway (includes one inspection fee)
N 1 $ 201.75 $ 209.00
Awnings
Expose or allow to be exposed (whether
for sale or otherwise) any article in or
on or so as to overhang any part of the
road or outside a shop window or
doorway abutting the road, or hang an
article beneath
an awning over the road (includes one
inspection fee)
N 1 $ 201.75 $ 209.00
Annual approval fee for existing approval
to expose or allow to be exposed
(whether for sale or otherwise) any
article in or on or so as to overhang any
part of the road or outside a shop
window or doorway abutting the road,
or hang an article beneath an awning
over the road (includes one inspection
fee)
N 1 $ 43.70 $ 45.25
Plumbing and Drainage
Plumbing and Drainage Approval Permit-
includes approval, inspections and
compliance certificate issue (includes one
inspection fee)
N 1 $ 201.75 $ 209.00
Plumbing and Drainage Approval Permit
minor alterations and repairs- includes
approval, inspections and compliance
certificate issue
N 1 $ 43.70 $ 45.25
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 187
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Footpath Dining
Engage in a trade or business on
community land application fee e.g.
footpath dining, display goods for sale,
portable signage (includes one inspection
fee)
N 1 $ 201.75 $ 209.00
Annual renewal fee for existing approval
to engage in a trade or business on
community land.
N 1 $ 43.70 $ 45.25
Waste Storage Container
Place a waste storage container in a
public place-application fee (includes one
inspection fee)
N 1 $ 201.75 $ 209.00
Busking
Play a musical instrument or sing on
community land for fee or reward-
application fee
N 1 $ 18.70 $ 19.35
Caravan Park /Manufactured Home Estate Approval Fees
Application for Approval –per site N 1 $ 8.05 $ 8.35
Renewal fee – per site N 1 $ 5.20 $ 5.40
Annual Compliance Inspection – per site N 1 $ 5.20 $ 5.40
Inspection other than annual inspection
including reinspection for non
compliance – per half hour or part
thereof
N 1 $ 129.00 $ 133.65
On-Site Sewerage Management Systems
Application to install and operate –
includes approval, inspections and
compliance certificate issue (includes one
inspection fee)
N 1 $ 201.75 $ 209.00
Alteration to Existing Approved OSSM N 1 $ 43.70 $ 45.25
Application for Approval to Operate
Existing OSSM N 1 $ 43.70 $ 45.25
Registration of existing approved OSSM N 1 $ 43.70 $ 45.25
Inspection fee to verify compliance of
existing system
N 1 $ 129.00 $ 133.65
Additional Inspection Fee
Additional inspection fee for compliance
inspections relating to Section 68
approvals
N 1 129.00 133.64
Mortuary/Undertakers
Application to Operate a
Mortuary/Undertakers Business
N 1 $ 201.75 $ 209.00
Other
Other S68 Approval not listed
(application fee includes one inspection
fee)
Per application
N 1 $ 201.75 $ 209.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 188
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Miscellaneous Environmental Service Fees
Section 608 Fee for Advice/Service
Fee for certificate Y 1 $ 83.20 $ 86.20
Fee for certificate (inspection required) Y 1 $ 126.90 $ 131.45
Copy of drainage diagram Y 1 $ 33.30 $ 34.50
Rural Addressing
Rural Addressing Plate Each Y 1 $ 18.40 $ 19.05
Food Services
Food Premises Annual Administration
Fee (only where inspection of premises
carried out)
Per annum N 3 $ 31.00 $ 32.00
Inspection Fee Per hour N 3 $ 146.19 $ 150.00
Additional inspection time over first half
hour
Per half hour
N 3 $ New Charge $ 100.00
Improvement Notice Fee Per notice N 2 $ 330.00 $ 330.00
Mobile food premises inspection fee Per hour N 3 $ 146.19 $ 150.00
Public Health Act
Compliance inspection fee for premises
regulated under Public Health Act. E.g.
skin penetration premises
N 1 $ 122.70 $ 127.10
Swimming Pools
Clause 12 - Exemption Application N 3 $ 70.00 $ 70.00
Clause 24 - Certificate of Compliance N 3 $ 70.00 $ 70.00
Animals - Companion
Companion Animals Act
Registration desexed animal N 2 $ 40.00 $ 40.00
Registration recognised Breeder N 2 $ 40.00 $ 40.00
Pensioner with a desexed animal N 2 $ 15.00 $ 15.00
Non-desexed animal N 2 $ 150.00 $ 150.00
Note:
Dogs only need to be microchipped
and registered if they have been
purchased or born since 1 July 1999
Assistance Animals are required to
be microchipped and registered but
there is no registration fee
Working dogs are not required to be
microchipped and registered but it is
recommended for the protection of
the dog
Greyhounds registered with the
Greyhound Racing Authority Act
1985 are not required to be
microchipped and registered but it is
recommended for the protection of
the dog
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 189
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Pound Release fees
Possum/Cat Traps Per trap – refundable
deposit only
Y 1 $ 56.20 $ 58.20
Dog/Cat N 1 $ 11.45 $ 11.45
Sustenance per day impounded-Dog/Cat N 1 $ 5.70 $ 5.70
Large Animals N 1 $ 53.55 $ 55.50
Sheep, goats, pigs & similar size animals N 1 $ 11.45 $ 11.85
Sustenance per day impounded-horses &
cattle
N 1 At Cost At Cost
Sustenance per day impounded-sheep,
goats, pigs N 1 At Cost At Cost
Conveyance of animals to pound N 1 At Cost At Cost
Release impounded shopping trolleys N 1 $ 44.70 $ 46.30
Environmental Clean Up and Noise Control
Administrative cost of prepare and giving
clean up notice Clause 60
N 2 $ 455.00 $ 466.00
Administrative cost of prepare and giving
prevention notice Clause 61 N 2 $ 455.00 $ 466.00
Administrative cost of prepare and giving
noise control notice Clause 61A
N 2 $ 455.00 $ 466.00
Building (Environmental Planning and Assessment)
Development Application Fees
Development involving the erection of a
building, the carrying out of work or the
demolition of a work or a building based
on estimated cost of development. Based
on cost of works as determined under
section 255 EPAR (2000).
Minor work under $5000 N 3 $ 110.00 $ 110.00
$5,001–$50,000 N 3 $ $170, plus an
additional $3
for each
$1,000 (or
part of
$1,000) of the
estimated
cost.
$ 170, plus an
additional 3
for each
1,000 (or part
of 1,000) of
the estimated
cost.
$50,001–$250,000 N 3 $ $352, plus an
additional
$3.64 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$50,000.
$ 352, plus an
additional
3.64 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
50,000.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 190
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 $250,001–$500,000 N 3 $ $1,160, plus
an additional
$2.34 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$250,000.
$ 1,160, plus an
additional
2.34 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
250,000.
$500,001–$1,000,000 N 3 $ $1,745, plus
an additional
$1.64 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$500,000.
$ 1,745, plus an
additional
1.64 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
500,000.
$1,000,001–$10,000,000 N 3 $ $2,615, plus
an additional
$1.44 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$1,000,000.
$ 2,615, plus an
additional
1.44 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
1,000,000.
More than $10,000,000 N 3 $ $15,875, plus
an additional
$1.19 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$10,000,000.
$ 15,875, plus
an additional
1.19 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
10,000,000.
Outdoor Advertisement N 3 $ $285+ $93 for
each
additional
advertisement
in excess of
one
$ 285 plus 93
for each
additional
advertisement
in excess of
one
Dwelling House <$100,000 N 3 $ 455.00 $ 455.00
Additional fee residential flat buildings
where SEPP 65 applies
N 3 $ 760.00 $ 760.00
Class 1 & 10 buildings $5,000 to $50000
value
N 3 $ 150.00 $ 150.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 191
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 Development being change of use (NOT
involving the erection of a building,
NOT involving the carrying out of a
work, NOT involving the subdivision of
land or NOT involving the demolition of
a building or work)
N 3 $ 285.00 $ 285.00
Subdivision Fees
Subdivision of land involving opening of
public road N 3 $ 665.00 $ 665.00
Plus per each additional lot created N 3 $ 65.00 $ 65.00
Subdivision of land not involving opening
of public road
N 3 $ 330.00 $ 330.00
Plus per each additional lot created N 3 $ 53.00 $ 53.00
Subdivision of land for Strata Title N 3 $ 330.00 $ 330.00
Plus per each additional lot created N 3 $ 65.00 $ 65.00
Note: For example, a plan of subdivision
that provides for 5 lots over land that
has previously comprised 2 lots will
result in the creation of 3 additional lots,
and so attract a fee that includes a base
amount of $665 or $330, as the case
requires, together with a further amount
of $65 or $53, as the case requires, for
each of the 3 additional lots.
Subdivision Certificate Application N 3 $ 150.00 $ 150.00
Compliance Certificate Fees (Including Subdivision)
per inspection required determined by
PCA
1. Water Y 1 $ 57.20 $ 59.25
2. Sewer Y 1 $ 57.20 $ 59.25
3. Roads, kerb & gutter, Footpath Y 1 $ 57.20 $ 59.25
4. Access Y 1 $ 57.20 $ 59.25
5. Drainage Y 1 $ 57.20 $ 59.25
Designated Development additional fee
(in addition to DA fee and other
applicable fees)
N 3 $ 715.00 $ 920.00
Fees for Advertising of Development
Advertising Fee for Designated
Development N 3 $ 2,220.00 $ 2,220.00
Advertising Fee for Advertised
Development
N 4 $ 500.00 $ 500.00
Advertising fee for development for
which an environmental planning
instrument or development control plan
requires notice to be given
N 3 $ 100.00 $ 100.00
Note: Consent authority must refund so
much of the fee paid under this clause as
is not spent in giving the notice
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 192
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Additional fees for approvals requiring referral
Additional fee for application requiring
Concurrence Referral
N 3 $ 140.00 $ 140.00
Concurrence fee payable to a
Concurrence Authority N 3 $ 320.00 $ 320.00
Additional fee for application requiring
Integrated Referral
N 3 $ 140.00 $ 140.00
Integrated Authority approval fee
payable to Integrated Approval Authority N 3 $ 320.00 $ 320.00
Fee for application to review Development Application Determination under S82(A)EPAA
Development involving the erection of a
building, the carrying out of work or the
demolition of a work or a building based
on estimated cost of development. Based
on cost of works as determined under
Cl 255 EPAR.
Up to $5,000 N 3 $ 55.00 $ 55.00
$5,001–$250,000 N 3 $ $85, plus an
additional
$1.50 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$5,000.
$ 85, plus an
additional
1.50 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
5,000.
$250,001–$500,000 N 3 $ $500, plus an
additional
$0.85 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$250,000.
$ 500, plus an
additional
0.85 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
250,000.
$500,001–$1,000,000 N 3 $ $712, plus an
additional
$0.50 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$500,000.
$ 712, plus an
additional
0.50 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
500,000.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 193
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 $1,000,001–$10,000,000 N 3 $ $987, plus an
additional $0.40 for each
$1,000 (or part of
$1,000) by which the estimated
cost exceeds $1,000,000.
$ 987, plus an additional
0.40 for each 1,000 (or part
of 1,000) by which the estimated
cost exceeds 1,000,000.
More than $10,000,000 N 3 $ $4,737, plus
an additional
$0.27 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$10,000,000.
$ 4,737, plus an
additional
0.27 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
10,000,000.
Review change of use application N 3 50% of the
original fee
50% of the
original fee
Review of Development Application for
Dwelling House <$100000
N 2 $ 190.00 $ 190.00
Fee for application to modify a consent for local development or State significant development
Modification for Dwelling house
<$100,000 N 3 $ 190.00 $ 190
Modifications involving minor error,
misdescription or miscalculation
N 3 $ 71.00 $ 71
Application for modifications involving
minimal environmental impact and the
development to which the consent as
modified relates is substantially the same
development as the development for
which the consent was originally granted
N 3 $ $645 or 50 %
of the fee for
the original
development
application
fee, whichever
is the lesser
$ 645 or 50 %
of the fee for
the original
development
application
fee, whichever
is the lesser
Application for modification which, in the
opinion of the consent authority, is not
of minimal environmental impact. Where
the original fee for the original
application was less than $100
N 3 50% of
original fee.
50% of
original fee.
Application for modifications under 96 (2) of the Act, or under section 96AA (1) of the Act in respect of a modification which, in the opinion of the consent authority, is not of minimal environmental impact. Based on cost of works as determined under Cl 255 EPAR.
Up to $5,000
N 3 $ 55.00 $ 55.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 194
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 $5,001–$250,000 N 3 $ $85, plus an
additional
$1.50 for each
$1,000 (or
part of
$1,000) of the
estimated
cost.
$ 85, plus an
additional
1.50 for each
1,000 (or part
of 1,000) of
the estimated
cost.
$250,001–$500,000 N 3 $ $500, plus an
additional
$0.85 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$250,000.
$ 500, plus an
additional
0.85 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
250,000.
$500,001–$1,000,000 N 3 $ $712, plus an
additional
$0.50 for
each $1,000
(or part
of $1,000) by
which the
estimated
cost exceeds
$500,000.
$ 712, plus an
additional
0.50 for
each 1,000
(or part
of 1,000) by
which the
estimated
cost exceeds
500,000.
$1,000,001–$10,000,000 N 3 $987, plus an
additional
$0.40 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$1,000,000.
987, plus an
additional
0.40 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
1,000,000.
More than $10,000,000 N 3 $4,737, plus
an additional
$0.27 for each
$1,000 (or
part of
$1,000) by
which the
estimated
cost exceeds
$10,000,000.
4,737, plus an
additional
0.27 for each
1,000 (or part
of 1,000) by
which the
estimated
cost exceeds
10,000,000.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 195
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 Plus an additional amount if notice of
the application is required to be given
under section 96 (2) or 96AA (1) of the
Act.
N 3 $ 665.00 $ 665.00
Plus an additional fee for modification of consent for residential flat buildings where SEPP 65 applies
N 3 $ 760.00 $ 760.00
Note: The consent authority must
refund so much of the additional amount
as is not spent in giving the notice under
section 96 (2) or 96AA (1) of the Act.
The consent authority must refund the
additional fee paid under subclause (2A)
if the development is not referred to a
design review panel.
Planning Certificates
Section149(2) N 2 $ 53.00 $ 53.00
Section149(5) N 2 $ 80.00 $ 80.00
Section 121ZP / 735A N 1 $ 72.30 $ 74.90
Building Certificate Fee Section 149A
Same for each dwelling contained in the
building or in any other building on the
allotment.
Class 1 and 10 buildings Per dwelling
N 2 $ 250.00 $ 250.00
Any other class of Building not exceeding
200m2
N 2 $ 250.00 $ 250.00
Any other class of Building exceeding 200m2 but not exceeding 2,000m2
• base fee N 2 $ 250.00 $ 250.00
• plus per m2 over 200m2 N 2 $ 0.50 $ 0.50
Any other class of Building exceeding 2000m2
• base fee N 2 $ 1,165.00 $ 1165.00
• plus per m2 over 2000m2 N 2 $ 0.08 $ 0.075
Subsequent Inspections N 2 $ 90.00 $ 90.00
Copy of Building Certificate N 2 $ 13.00 $ 13.00
The prescribed fee for a certified copy of
a document, map or plan referred to in
section 150 (2) of the Act
N 2 $ 53.00 $ 53.00
Fees for lodgement of Certificates (by Private Certifier)
Fee for lodgement of Complying
Development Certificate
N 2 $ 36.00 $ 36.00
Fee for lodgement of Part 4A certificates
• construction certificate-per certificate N 2 $ 36.00 $ 36.00
• occupation certificate-per certificate N 2 $ 36.00 $ 36.00
• subdivision certificate-per certificate N 2 $ 36.00 $ 36.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 196
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Complying Development Certificate (CDC) Assessment Fee
Complying Development Certificate fee
base amount (note CDC fee plus the
corresponding Construction Certificate
Fee)
Y 1 $ 58.75
plus CC fee
$ 60.90
plus CC fee
Construction Certificate Assessment fee
Cost not exceeding $5000 Y 1 $ 79.05 $ 81.90
Cost Exceeding $5000: 1
• First $5000 Y 1 $ 79.05 $ 81.90
• Plus each additional $1000 over $5000
up to $100000 – per $1000
Per $1000 Y 1 $ 4.90 $ 5.10
• Plus each additional $1000 over
$100000 up to $250000 – per $1000 Per $1000 Y 1 $ 2.80 $ 2.90
• Plus each additional $1000 over
$250000 – per $1000
Per $1000 Y 1 $ 1.45 $ 1.50
Construction Certificate Modification Fee
Classes 1 & 10
• Minor change Y 1 $ 35.90 $ 37.20
Class 2-9
• Minor change Y 1 $ 79.05 $ 81.90
Inspection Fee
Inspection fee Y 1 $ 129.00 $ 133.65
Inspection carried out on behalf of PCA Y 1 $ 245.00 $ 253.80
Guideline for charging at CC lodgement
stage: Base charge 4 inspections plus
Occupation certificate fee for class 1
buildings new dwelling, dwelling additions
and the like. Base charge 2 inspections
plus Occupation Certificate for class 10
buildings garage carport, swimming pools
and the like. Commercial and industrial
buildings charge base 4 plus OC. Note:
Additional inspection fees may be
charged over and above base number
per inspection.
Occupation Certificate Fee
per application Y 1 $ 129.00 $ 133.65
Assessment of Alternative Solution
per performance clause-not fire Y 1 $ 129.00 $ 133.65
Waste Disposal
Waste
Any materials disposed at this facility
which are generated from a regulated
waste area will attract the appropriate
EPA levies
All commercial transactions are to be
weighed and the appropriate waste
stream tonnage charge applied
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 197
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
MRF Charges
Plastics only – PET, HDPE, PVE N/A N/A - No Charge No Charge
Cans – steel & aluminium N/A N/A - No Charge No Charge
Paper & cardboard N/A N/A - No Charge No Charge
Glass – brown, green & clear N/A N/A - No Charge No Charge
Clean Green Waste
Minimum Charge Each Y 1 $ 5.80 $ 6.00
Sedan and/or station wagon Per Load Y 1 $ 5.80 $ 6.00
Ute and/or single axle trailer 1/4 Load Y 1 $ 5.80 $ 6.00
1/2 Load Y 1 $ 5.80 $ 6.00
3/4 Load Y 1 $ 8.65 $ 8.95
Full load Y 1 11.50 11.90
Large trucks and large trailers Per tonne Y 1 $ 60.00 $ 62.15
Large tree trunks & roots Per tonne Y 1 $ 121.00 $ 125.35
Fill (as determined by Site Attendant)
Clean N/A N/A 1 No Charge No Charge
Inert Fill New Charge $ 60.00
Contaminated Per tonne Y 1 $ 247.90 $ 255.35
Residential Waste (to landfill)
Sedan and/or station wagon Per Load Y 1 $ 5.90 $ 6.10
Ute and/or trailer - 1/4 Load Y 1 $ 13.70 $ 14.20
1/2 Load Y 1 $ 27.40 $ 28.40
3/4 Load Y 1 $ 41.15 $ 42.65
Full load Y 1 $ 54.85 $ 56.85
Large trucks and large trailers Per tonne Y 1 $ 150.00 $ 155.40
Council garbage truck Per tonne Y 1 $ 146.45 $ 151.70
Commercial Trade Per tonne Y 1 $ 185.25 $ 190.00
Document Security Disposal Per Item Y 1 $ 23.40 $ 24.25
Mattress (new charge) Per Item Y 1 $ New Charge $ 10.00
Commercial Waste - 240L MGB - One Off
Waste disposal per 240L MGB (includes
delivery & pick-up) Per MGB Y 1 $ 12.75 $ 13.20
Bin Hire Per MGB Y 1 $ 4.55 $ 4.70
Collection Fee Per MGB Y 1 $ 8.20 $ 8.50
Tyres
Push Bike Each Y 1 $ 2.60 $ 2.70
Motor Bike and/or Car Each Y 1 $ 19.15 $ 19.85
Light Truck and/or 4WD Each Y 1 $ 23.00 $ 23.85
Heavy Truck Each Y 1 $ 35.70 $ 37.00
Tractor Front Each Y 1 $ 35.70 $ 37.00
Tractor Rear Each Y 1 $ 96.80 $ 100.30
Metal (Attendant‟s discretion to
volume)
Car Bodies Each Y 1 No Charge No Charge
Steel/black iron Per tonne Y 1 No Charge No Charge
White goods Per unit Y 1 $ 6.35 $ 6.60
Fencing wire Per tonne Y 1 No Charge No Charge
200 litre drums (empty & clean) Each Y 1 No Charge No Charge
20 litre drums (empty & clean) Each Y 1 No Charge No Charge
Water tanks (empty & clean) Each Y 1 No Charge No Charge
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 198
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Building materials (clean)
Bulk demolition Per tonne Y 1 $ 100.00 $ 103.60
Asbestos Per tonne Y 1 $ 410.40 $ 425.15
Bricks and/or concrete Per tonne Y 1 $ 61.00 $ 63.20
Timber Per tonne Y 1 As per Green
Waste
Charge
As per Green
Waste
Charge
All types of oils Each Y 1 No Charge No Charge
Batteries (vehicles, cars etc.) Each Y 1 No Charge No Charge
Hospital Contamination Waste
Minimum charge Y 1 $ 51.00 $ 52.85
Assorted Waste Per m3 Y 1 $ 51.00 $ 52.85
Private Needle Disposal Each Y 1 No Charge No Charge
Animal Disposal
Horses, Cows, Bulls & Bullocks Per animal Y 1 $ 57.70 $ 59.80
Calves and foals Per animal Y 1 $ 51.00 $ 52.85
Sheep, goats, deer, pigs, kangaroos etc. Per animal Y 1 $ 36.60 $ 37.70
Dogs, cats, possums etc. Per animal Y 1 $ 13.85 $ 14.35
Offal Per m3 Y 1 $ 23.10 $ 23.95
Hazardous Waste
Liquid Per litre Y 1 $ 19.15 $ 19.85
Solid Per tonne Y 1 $ 359.15 $ 372.10
Recycled Material Charges
Sale of topsoil Per tonne Y 1 $ 37.45 $ 38.80
Sale of topsoil to wholesalers Per tonne Y 1 $ 20.70 $ 21.45
Sale of garden mulch Per m3 Y 1 $ 12.75 $ 13.20
MGB Replacement Charges
240 litre bin (New) Per Bin Y 1 $ 114.35 $ 118.45
120 litre bin (New) Per Bin Y 1 $ 102.05 $ 105.70
240 litre bin (Second Hand) Per bin Y 1 $ 56.50 $ 58.50
120 litre bin (Second Hand) Per Bin Y 1 $ 51.00 $ 52.85
Discharge of Liquid Trade
Waste To Sewerage
System
Application Fee Application fee N 4 $ 78.00 $ 80.00
Annual trade waste fee
Category 1 discharger N 4 $ 80.00 $ 83.00
Category 2/2S discharger N 4 $ 160.00 $ 165.00
Catergory 3 discharger N 4 $ 535.00 $ 555.00
Re-inspection Fee N 4 $ 73.00 $ 75.00
Trade Waste usage Charge $/kL N 4 $ 1.46 $ 1.51
Trade Waste usage Charge for
dischargers where appropriate pre-
treatment facilities are not installed or
maintained.
$/kL N 4 $ 13.39 $ 13.82
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 199
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Substances
Excess Mass Charges U value for substance (see section 3.5.5 of Council's policy 3.60)
Acid demand, pH>10 $/kg N 4 $ 0.66 $ 0.68
Alkali demand, pH<7 $/kg N 4 $ 0.66 $ 0.68
Aluminium $/kg N 4 $ 0.66 $ 0.68
Ammonia (as N) $/kg N 4 $ 1.95 $ 2.01
Arsenic $/kg N 4 $ 65.73 $ 67.86
Barium $/kg N 4 $ 32.87 $ 33.93
BOD $/kg N 4 $ 0.66 $ 0.68
Boron $/kg N 4 $ 0.66 $ 0.68
Bromine $/kg N 4 $ 13.15 $ 13.57
Cadmium $/kg N 4 $ 304.33 $ 314.18
Chloride $/kg N 4 $ 0.00 $ 0.00
Chlorinated Hydrocarbons $/kg N 4 $ 32.87 $ 33.93
Chlorinated Phenolics $/kg N 4 $ 1,314.68 $ 1,357.24
Chlorine $/kg N 4 $ 1.34 $ 1.38
Chromium $/kg N 4 $ 21.91 $ 22.62
Herbicides/Defoliants $/kg N 4 $ 657.34 $ 678.62
Cobalt $/kg N 4 $ 13.39 $ 13.82
Copper $/kg N 4 $ 13.39 $ 13.82
Cyanide $/kg N 4 $ 65.73 $ 67.86
Fluoride $/kg N 4 $ 3.29 $ 3.39
Formaldehyde $/kg N 4 $ 1.34 $ 1.38
Total Oil and Grease $/kg N 4 $ 1.18 $ 1.22
Lead $/kg N 4 $ 32.87 $ 33.93
Lithium $/kg N 4 $ 6.57 $ 6.79
Manganese $/kg N 4 $ 6.57 $ 6.79
Mercaptans $/kg N 4 $ 65.73 $ 67.86
Mercury $/kg N 4 $ 2,191.14 $ 2,262.06
Methylene Blue Active Substances
(MBAS)
$/kg N 4 $ 0.66 $ 0.68
Molybdenum $/kg N 4 $ 0.66 $ 0.68
Nickel $/kg N 4 $ 21.91 $ 22.62
Total kjeldahl Nitrogen $/kg N 4 $ 0.17 $ 0.18
Organoarsenic Compounds $/kg N 4 $ 657.34 $ 678.62
Pesticides General (excludes
organochlorines and organophosphates) $/kg N 4 $ 657.34 $ 678.62
Petroleum Hydrocarbons (non-
flammable)
$/kg N 4 $ 2.19 $ 2.26
Phenolic Compounds (non-chlorinated) $/kg N 4 $ 6.57 $ 6.79
Total Phosphorous $/kg N 4 $ 1.34 $ 1.38
Polynuclear Aromatic Hydrocarbons
(PAHs)
$/kg N 4 $ 13.39 $ 13.82
Selenium $/kg N 4 $ 46.26 $ 47.75
Silver $/kg N 4 $ 1.22 $ 1.26
Sulphate (SO4) $/kg N 4 $ 0.13 $ 0.14
Sulphide $/kg N 4 $ 1.34 $ 1.38
Sulphite $/kg N 4 $ 1.46 $ 1.51
Suspended Solids $/kg N 4 $ 0.84 $ 0.87
Thiosulphate $/kg N 4 $ 0.23 $ 0.24
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 200
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 Tin $/kg N 4 $ 6.57 $ 6.79
Total Dissolved Solids $/kg N 4 $ 0.05 $ 0.05
Uranium $/kg N 4 $ 6.57 $ 6.79
Zinc $/kg N 4 $ 13.39 $ 13.82
Excess Mass Charges C Value for
BOD>600mg/L
(see section 3.5.5 of Council's policy
3.60)
C - Value N 4 $ 0.66 $ 0.68
Food waste disposal charge per bed N 4 $ 24.35 $ 25.13
Non-compliance
Non-compliance Charges (see
section 3.5.7 of Council's policy 3.60)
Non-compliance pH charge k value N 4 $ 0.37 $ 0.38
Non-compliance excess mass charge (Values as for excess mass charge)
Discharge of stormwater to the
sewerage system
$/kL N 4 $ 13.39 $ 13.82
Portable toilet waste $/kL N 4 $ 14.61 $ 15.08
Septic tank and pan waste disposal
charge (where accepted with prior
arrangement from Council)
$/kL N 4 $ 2.31 $ 2.39
Septic tank sludge (where accepted with
prior arrangement of Council) $/kL N 4 $ 19.48 $ 20.11
Noxious Weeds
Noxious Weeds Certificate Per application
Y 1 $ 52.10 $ 54.00
Cemetery
Columbarium (Ashes only)
Reservation Fee: (Selected position)
(Note: Accepted as deposit and to be
deducted from amount of charges at
time of Interment)
Each Y 1 $ 318.00 $ 329.45
Interment of Ashes: Includes niche for
casket, installation and perpetual mtc and
including plaque (to a standard amount
of inscription)
Each Y 1 $ 499.40 $ 517.50
Memorial Tree (Ashes only)
Reservation Fee: (Selected position) (Note: Accepted as deposit and to be deducted from amount of charges at time of Interment)
Each Y 1 $ 503.50 $ 521.60
Interment of Ashes: Provision of tree, reception and Interment of ashes if desired, perpetual mtc and plaque (to a standard amount of inscription)
Each Y 1 $ 726.60 $ 752.75
Additional Interment(s) of Ashes: Existing tree – includes reception and Interment of ashes if desired, perpetual mtce. And plaque (to a standard amount of inscription) Note: See Misc. Items for cost of Plaques, Vases, Weekends etc.
Each Y 1 $ 498.35 $ 516.30
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 201
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Lawn Sections
Reservation Fee: (Selected position)
(Note: Accepted as deposit and to
be deducted from amount of charges
at time of Interment)
Interment Fee: Land for each grave,
first Interment, perpetual mtc, and
large concrete headstone, and
provision for and including bronze
plaque (to a standard amount of
inscription)
Each Y 1 $ 562.50 $ 582.75
New Lawn/Old Lawn Each Y 1 $ 2,287.35 $ 2,369.70
Catholic Lawn Section (larger plaque) Each Y 1 $ 2,351.50 $ 2,436.15
Children‟s Lawn Each Y 1 $ 1,016.40 $ 1,053.00
Interment of ashes in existing grave Each Y 1 $ 423.30 $ 450.00
Extra depth (Below 1.6m to make
provision for a second interment)
Each Y 1 $ 303.25 $ 326.00
Re-opening of grave for second
interment and provision for and including
bronze plaque (to a standard amount of
inscription)
Each Y 1 $ 1,001.90 $ 1,038.00
Interment of ashes into new lawn plot Each Y 1 $ 1,842.00 $ 1,908.30
Monumental Garden Section
Reservation Fee: (Selected position)
(Note: Accepted as deposit and to be
deducted from amount of charges at
time of interment)
Each Y 1 $ 405.72 $ 420.30
Interment Fee: Land for each grave, first
interment, perpetual mtc, Each Y 1 $ 2,035.30 $ 2,108.60
Extra depth (Below 1.6m to make
provision for a second interment)
Each Y 1 $ 314.65 $ 326.00
Re-opening of grave for second
interment Each Y 1 $ 609.10 $ 634.00
Interment of ashes into new plot including perpetual maintenance.
Each Y 1 New Charge $ 1858.00
Interment of ashes into an existing grave Each Y 1 New Charge $ 450.00
Monumental Section & Villages
Reservation Fee: (Selected position)
(Note: Accepted as deposit and to be
deducted from amount of charges at
time of interment)
Each Y 1 $ 408.30 $ 423.00
Interment fee: land for each grave, first
interment, perpetual maintenance Each Y 1 $ 1,275.10 $ 1,321.00
Extra depth (Below 1.6m to make
provision for a second interment)
Each Y 1 $ 316.20 $ 326.00
Re-opening of grave for second
interment Each Y 1 $ 612.70 $ 634.00
Interment of Ashes
Exclusive use includes land for each
grave, first interment, perpetual
maintenance
Each Y 1 $ 996.20 $ 1,032.00
Existing Grave Each Y 1 $ 434.20 $ 438.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 202
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Saturday & Public Holidays
Lawn/Monumental Sections (Note:
Additional payment over and above
normal weekday Interment fee)
Each Y 1 $ 883.90 $ 915.70
Columbarium/Memorial Sections (Note:
additional payment over and above
normal weekday Interment fee)
Each Y 1 $ 281.00 $ 291.10
Monument Applications
All applications to Council for approval Each N 1 $ 66.75 $ 50.00
Headstones
Large concrete headstone Each Y 1 $ 122.10 $ 126.50
Small concrete headstone Each Y 1 $ 51.25 $ 53.10
Plaque
Children's:
Lawn/Memorial/Tree/Columbarium
Sections 149mm x 111mm bronze die
cast plaque – standard of nine lines
inscription
Each Y 1 $ 268.60 $ 278.30
New Lawn/Old Lawn Sections 254mm x
203mm bronze die cast plaque –
standard of five lines inscription
Each Y 1 $ 469.40 $ 486.30
Catholic Lawn Section 279mm x
381mm bronze die cast plaque –
standard of eight lines inscription
Each Y 1 $ 549.05 $ 568.80
Ultra Image Photographs
5x7 Each Y 1 $ 193.00 $ 200.00
7x9 Each Y 1 $ 225.10 $ 233.20
True to Life Photographs
5x7 Each Y 1 $ 351.40 $ 351.40
7x9 Each Y 1 $ 394.30 $ 394.30
Colour Ceramic photographs
5 x 7 Each Y 1 $ 364.30 $ 364.30
7 x 9 Each Y 1 $ 408.30 $ 408.30
Vases
Concrete block surround with chrome
insert Each Y 1 $ 61.00 $ 61.00
Chrome insert for vase Each Y 1 $ 55.90 $ 45.00
Niche Strap vase Each Y 1 $ 61.00 $ 63.20
Cemetery/Information (Excluding Funeral Directors)
Search Fee Per hour Y 1 No Charge No charge
Water
Standpipe Bulk Water Sales
Avdata Access Key (accounts) - no
refund available Per key Y 1 $ 42.00 $ 43.50
Avdata Access Key (pre-paid) - key price
is a refundable deposit if returned in
good condition
Y 1 $ 42.00 $ 43.50
Rate per kl inclusive of Avdata Charge
Per kl N 1 $ 3.65 $ 3.80
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 203
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Connections (New) (Applications and Connections to
Council's Water Supply System
- A capital contribution charge is
applicable
New service and meter
< 4m N 1 $ 899.00 $ 931.30
N 1 $ 1,184.00 $ 1,226.60
> 4m < 15m Cowra N 1 $ 1,485.50 $ 1,539.00
N 1 $ 1,894.50 $ 1,962.70
Villages N 1 $ 1,571.50 $ 1,628.00
N 1 $ 1,975.50 $ 2,046.60
> 15m < 30m Cowra N 1 $ 1,733.00 $ 1,795.40
N 1 $ 2,314.50 $ 2,397.80
Villages N 1 $ 2,136.50 $ 2,213.40
N 1 $ 2,702.00 $ 2,799.50
(i) New meter and service greater than
30mm diameter
N 1 POA POA
(ii) Meter installation only – 20mm N 1 $ 183.00 $ 189.60
Non Payment of Account
Disconnection/Reconnection N 1 $ 120.50 $ 124.50
Existing Connections - Disconnection
Urban – Cowra, Noonbinna Each instance
N 1 $ 81.00 $ 83.90
Village – Rural Each instance
N 1 $ 120.50 $ 124.80
Existing Connections - Reconnection
Urban – Cowra, Noonbinna Each instance
N 1 $ 115.50 $ 119.65
Village – Rural Each instance
N 1 $ 120.50 $ 124.85
(i) New meter and service other than
20mm and 25mm diameter N 1 POA POA
(ii) Meter installation only – 20mm N 1 $ 184.00 $ 190.60
Fee to provide quotation for change in
water meter size
Y 1 $ 34.50 $ 35.75
Meter Size Change N 1 POA POA
Ancillary Services
Meter Testing (for accuracy) -
- Cowra Each instance
N 1 $ 80.75 $ 83.65
- Other Each instance
N 1 $ 111.80 $ 115.80
Flow & Pressure Tests - Cowra Each instance
N 1 $ 67.75 $ 70.20
Flow & Pressure Tests - Other Each instance
N 1 $ 111.30 $ 115.30
Flow & Pressure Tests - for fire rating
purposes & report
Each instance
N 1 $ 124.30 $ 128.75
Special one-off meter reads - Cowra Each instance
N 1 $ 54.00 $ 55.95
Special one-off meter reads – Other
Each
instance N 1 $ 78.05 $ 80.85
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 204
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Capital Contribution
Capital contribution charge for
developments on existing unconnected
lots, not subject to subdivision (in-fill
blocks) and not previously paying water
availability charge. This charge is in
addition to the connection fee.
The base capital charge;
A – Darbys Falls, Wyangala, Cowra,
Billimari N 1 $ 3,352.00 $ 3,473.00
B – 1C1 Zone N 1 $ 8,590.00 $ 8,900.00
C – Southern Section N 1 $ 6,771.00 $ 7,015.00
D – CTW N 1 $ 8,757.00 $ 9,072.00
Headworks Charge/ET (as per DSP (Section 64 LGA, Section
306 WMA)
A – Darbys Falls, Wyangala, Cowra,
Billimari
N 1 $ 3,352.00 $ 3,473.00
B – 1C1 Zone N 1 $ 8,590.00 $ 8,900.00
C – Southern Section N 1 $ 6,771.00 $ 7,015.00
D – CTW N 1 $ 8,757.00 $ 9,072.00
Sewer
Supply and install new junction Each instance
N 1 POA POA
Inspect line with camera Per hour Y 1 $ 140.00 $ 145.00
Pipe cleaning with water jet Per hour Y 1 $ 196.50 $ 203.60
Headworks Charge/ET (as per DSP ( Section 64 LGA, Section 306 WMA)
Cowra N 1 $ 5,005.00 $ 5,185.00
Wyangala N 1 $ 5,005.00 $ 5,185.00
Venue Hire
Multi-Purpose Room
Hire of Multi-Purpose Room for
community or non profit groups
Per hour Y 1 No Charge No Charge
Cleaning Fee if room not left in clean and
tidy condition Y 1 53.80 55.75
Lost key fee will be charged for any keys
lost or damaged.
Y 1 20.80 21.55
Public Meeting Room
Hire of Public Meeting Room for
commercial purposes
Per hour Y 1 $ 26.95 $ 27.90
Bookings for community or non profit
groups No Charge No Charge
Cleaning Fee if room not left in clean and
tidy condition
Y 1 $ 32.30 $ 33.45
Lost key fee will be charged for any keys
lost or damaged
Y 1 $ 20.80 $ 21.55
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 205
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Civic Centre - Auditorium (includes use of auditorium. Dance floor and front of house amenities)
Catered Functions (eg: wedding
reception, balls, parties, dinners)
Single hire Y 1 $ 451.00 $ 467.25
Non-Catered Functions (ie: where no
food or drink is served) Single hire Y 1 $ 331.00 $ 342.90
Council functions (charged to relevant
department) (maximum $348 per day)
Per hour Y 1 $ 58.00 $ 60.10
Civic Centre - Stage Production (includes use of auditorium, front of house amenities, stage, sound and lighting and back of stage amenities)
Local Organisations Single hire Y 1 $ 331.00 $ 342.90
Non-Local Organisations Single hire Y 1 $ 499.00 $ 517.00
Additional charges for use of Tarkett
Dance Matt
Single hire Y 1 $ 267.00 $ 276.60
Civic Centre - Theatrette (where required with or without use of the auditorium)
Catered Functions Single hire Y 1 $ 236.00 $ 244.50
Non-Catered Funcitons (ie: where no
food or drink is served) Single hire Y 1 $ 175.00 $ 181.30
Council functions (charged to relevant
department) (maximum $178.00 per day)
Per hour Y 1 $ 35.50 $ 36.80
Civic Centre - Additional Charges
Kitchen (includes use of vain-marie, urns,
stoves/ovens, refrigerators)
Single hire Y 1 $ 175.00 $ 181.30
Bar - alcohol served (includes use of
fridges, urn, glass, washes) Single hire Y 1 $ 175.00 $ 181.30
Rehersals or Set Up Per hour Y 1 $ 32.20 $ 33.35
Additional charge if spot or floodlighting
required at rehersals
Per hour Y 1 $ 57.10 $ 59.15
Foyer (where no other part of the hall is
required)
Single hire Y 1 $ 175.00 $ 181.30
Additional charge for each session above
one on the same day (auditorium or
stage booking)
Single hire Y 1 $ 175.00 $ 181.30
Deposits
All bookings must be accompanied by a
deposit as per the following:
- Auditorium/Stage Productions - $200
deposit
- Theaterette Functions - $100 deposit
Bookings will not be processed until
this deposit is paid
Cancellation
Notification of any cancellation is to be
made in writing at least 14 days prior to
the event date otherwise the deposit is
forfeited. *GST payable if deposit
forfeited.
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 206
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
After Hours
Failure to vacate hall after 1.30 a.m. -
$345.00 per hour or part thereof.
Multiple Bookings
Any organisation hiring the hall for a
minimum of 5 events over a 12 month
period (at least 3 of which must be full
performances as which admission fees
are charged) maybe eligible for a 50%
rebate on the total hire charge.
Swimming Pool Admission
Conditions
Daily Pass It is proposed that daily pass outs be
available, for use on the day of purchase
only, and at no extra charge other than
initial cost of entry. Daily pass outs are
to be issued by the pool customer
service staff and are to be non-
transferable between customers
(enforced through digital photo id linking
the customer with the card)
Ticket Classification
• Family tickets (including pensioner
family season ticket) comprise two
(2) adults (either parents or
grandparents of the children) and
two nominated children
• Child tickets refer to children of
school age through to the age of 18
years.
• Children under school age are
admitted free of charge.
Reduced Rate Entry
Aged, Disability Support and/or Veterans
Affairs card must be shown to receive
Pensioner entry.
Concessions
The definition of a Pension cardholder is
as follows:
• Person(s) in possession of a
Department of Verterans Affairs or
Centrelink Pension Card as shown in
Attachement B that displays any of
the following codes:
- AGE
- DSP
- DVA
To receive entry at a reduced rate an
application must be completed at the
pool. Eligible criteria includes: holders of
Aged, Veterans Affairs and Disability
Pension Cards or Families with
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 207
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 Centrelink Low Income Cards. On
approval an Aquatic Centre Concession
Card will will be issued to be shown on
entry. This card would be valid for one
season, renewable annually, and be
shown on entry to the Aquatic Centre
Admission
General Admission
Adult Per person Y 1 $ 4.50 $ 4.50
Child Per person Y 1 $ 2.50 $ 2.50
Pensioner (aged, invalid & Veterans
Affairs only)
Per person Y 1 $ 2.50 $ 2.50
Family ticket Per “Family”
Y 1 $ 13.00 $ 13.00
Non-swimmer/Spectator Per person Y 1 $ 2.50 $ 2.50
Daily Pass Outs N/A - No Charge No Charge
School Students completing regular
structured classes/ carnivals Per student Y 1 $ 2.00 $ 2.00
Low Income Card Daily Tickets
The definition of Low Income Family
cardholder is as follows: Person(s) in
possession of a Centrelink Health Care
Card with listed dependants.
Low Income Admission
Adult Per person Y 1 $ 2.50 $ 2.50
Child Per person Y 1 $ 2.50 $ 2.50
Family Ticket Per "Family"
Y 1 $ 8.50 $ 8.50
Season Tickets
Adult Per person Y 1 $ 145.00 $ 145.00
Child Per person Y 1 $ 75.00 $ 75.00
Family Per “Family”
Y 1 $ 265.00 $ 265.00
Pensioner Family Per “Family”
Y 1 $ 125.00 $ 125.00
Non-swimmer/Spectator Per person Y 1 $ 75.00 $ 75.00
Pensioner (aged, invalid & Veterans
Affairs only)
Per person Y 1 $ 75.00 $ 75.00
Low Income Card Season Tickets
Adult Per person Y 1 $ 75.00 $ 75.00
Child Per person Y 1 $ 75.00 $ 75.00
Family Ticket Per "Family"
Y 1 $ 125.00 $ 125.00
Other Entry
School based Learn-to-Swim (10 Day Program)
Child Per person/Per
day
Y 1 $ 2.00 $ 2.00
10 Entry Pass
Adult Per person Y 1 $ 39.00 $ 39.00
Child Per person Y 1 $ 20.00 $ 20.00
Family Per Y 1 $ 120.00 $ 120.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 208
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 “Family”
Pensioner (aged, invalid & Veterans
Affairs only)
Per person Y 1 $ 20.00 $ 20.00
Non-swimmer/Spectator Per person Y 1 $ 20.00 $ 20.00
The 10 entry pass is valid for the duration of the season in which it was purchased and can be re-activated with another 10 entries upon payment. The cards are non-transferable between customers (enforced through digital photo id linking the customer with the card).
Hire of Aquatic Centre for School Carnivals
With the exception of the Cowra Swimming Club & all Learn to Swim Classes, use of the pool for the purpose of conducting private Aquatic classes for the public (where a fee is being charged to participants)
Per person, per day
Y 1 $ 1.00 $ 1.00
Locker Hire
Per Day Each Y 1 $ 2.00 $ 2.00
Per Week Each Y 1 $ 10.00 $ 10.00
Per Season Each Y 1 $ 120.00 $ 120.00
Lost or damaged pool Season Cards
Per card Y 1 $ 6.00 $ 6.00
Sportsfields Hire & Usage
Variations to Sports Field season fees should be calculated according to the following formula: padlock charge + capital maintenance charge + kiosk (if used) + amenities (if used) + mowing (base rate X frequency X no. fields) + wicket preparation (base rate X frequency X no. wickets) = Season Fee."
One off hire of facility/Special Event
(junior, school and charities exempt) Each event Y 1 $ 75.40 $ 78.10
Additional fees for use of facilities at
venue and/or work required e.g. wicket
preparation Maximum fee payable
Each event Y 1 $ 272.70 $ 282.50
Netball - Summer Per season Y 1 $ 829.00 $ 858.80
Netball - Winter Per season Y 1 $ 655.15 $ 678.75
Touch Football Per season Y 1 $ 1,427.25 $ 1,478.60
7-a-side Soccer Per season Y 1 $ 889.50 $ 1,200.00
Senior Soccer Per season Y 1 $ 957.90 $ 992.40
Cricket Per season Y 1 $ 9,127.15 $ 9,456.00
AFL Per season Y 1 $ 1,526.60 $ 1,581.50
Hockey Per season Y 1 $ 1,495.60 $ 1,300.00
Twilight Hockey Per season Y 1 $ 968.75 $ 1,003.60
Rugby League Per season Y 1 $ 1,476.40 $ 1,529.55
Linemarking Fees
Netball Per field Y 1 $ 32.10 $ 33.25
Soccer Per field Y 1 $ 155.25 $ 160.85
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 209
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 Touch Football Per field Y 1 $ 32.10 $ 33.25
AFL Per field Y 1 $ 155.25 $ 160.85
Hockey Per field Y 1 $ 155.25 $ 160.85
Rugby League Per field Y 1 $ 155.25 $ 160.85
7 - A-Side Soccer Per field Y 1 $ 155.25 $ 160.85
Other
Lights Per hour Y 1 $ 72.15 $ 74.75
Cleaning/Litter collection when cleaning is not carried out by the hirer to the satisfaction of Council
Per hour Y 1 $ 102.05 $ 105.70
Waste disposal per 240L MGB Per MGB Y 1 $ 12.75 $ 13.20
Covering/uncovering Cricket Pitches for Summer/Winter
Cricket: 1 x charge
N/A 1 No Charge No charge
Covering/uncovering Cricket Pitches for Summer/Winter
AFL: 1 x charge
N/A 1 No Charge No charge
Erection & dismantle of facility equipment - e.g. goal posts etc.
Each instance
N/A 1 No Charge No charge
Padlock/Key Deposit Each instance
Y 1 $ 59.90 $ 62.10
Banners and Street Signs
Fee to erect directional sign (Community based non-profit and religious organisations only)
Each sign Y 1 $ 159.90 $ 165.70
Installation & Dismantling fee - all groups including charities - one off cost per hire period for site
Y 1 $ 349.30 $ 361.90
Daily rate commercial enterprises Per day/Site
Y 1 $ 34.95 $ 36.20
Community & Sporting Groups Per day/Site
N/A 1 FREE FREE
Registered Charities - upon receipt of appropriate documentation
N/A 1 FREE FREE
Quarry Charges
Cost of production for each quarry as determined and varied each quarter from analysis of real cost of production. (Commercial Advantage) These costs do not include loading or transport which will be provided on application
Houghton's Quarry $/m3 Y 1 $ 30.00 $ 30.00
Gospel Oak $/m3 Y 1 $ 30.00 $ 30.00
Holmwood $/m3 Y 1 $ 30.00 $ 30.00
Business Undertakings
Camping Sites Woodstock Showground Per Event Y 1 $ 53.80 $ 55.75
Annual Fee
In village areas - Average land value of adjoining lands based on latest VG valuations
Ha Y 1 0.05 TBA
In rural areas - Average land value of adjoining lands based on latest VG valuations
Ha Y 1 0.05 TBA
Aerodrome
Landing Charge - Emergency aircraft: N/A - No Charge No Charge
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 210
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 (Careflight, Child Flight, Health Admin
Corp of NSW, Air Ambulance Service,
NSW Department Health, NSW Police
Service, Sydney Helicopter Rescue
Service, Sydney Helicopter Rescue) and
any defence force aircraft.
Annual Fee - Locally owned or regular
aircraft: (in accordance with written
agreement with Council)
Per annum Y 1 $ 571.30 $ 591.90
Local passenger aircraft & Country Connections:
landing fees Per passenger
N/A - No Charge $6.60
minimum fee Each N/A - No Charge No Charge
terminal rental Per week N/A - No Charge No Charge
• all other aircraft - per tonne in excess
of 7 tonnes M.T.O.W.
Per
tonne
Y 1 New Charge $ 11.00
Aero Club:
room rent Per annum Y 1 $ 372.60 $ 386.00
hangar rent Per annum Y 1 $ 154.20 $ 159.75
Aerodrome Hire Fee Each event Y 1 $ 775.20 $ 803.10
Land and Terminal Lease Agreements
(refer to individual contracts for details)
Saleyards
Advertising Fee Per application
Y 1 On
Application
On
Application
Auctioneer's Permit
Regular sales Per agent Y 1 $ 62.90 $ 65.15
Special sales Per agent Y 1 $ 62.88 $ 65.15
NLIS levy for cattle Per head Y 1 $ 0.83 $ 0.86
NLIS levy for sheep Per head Y 1 $ 0.05 $ 0.05
Saleyard Fees (cents per head per day including GST)
Regular & Special Sales:
Cattle/Head Per head Y 1 $ 5.95 $ 6.15
Sheep/Head Per head Y 1 $ 0.83 $ 0.86
Pigs/Head Per head Y 1 $ 2.17 $ 2.25
Horses/Head Per head Y 1 $ 4.25 $ 4.40
Special Use of Yards (no scales)
Minimum Charge Per head Y 1 $ 11.07 $ 11.45
Cattle/Head Per head Y 1 $ 2.90 $ 3.00
Sheep/Head Per head Y 1 $ 0.41 $ 0.42
Horses/Head Per head Y 1 $ 4.25 $ 4.40
Pigs/Head Per head Y 1 $ 2.23 $ 2.30
NOTE: Additional to special sales and
special use of yards (where used)
Cattle Crush (per head) Per head Y 1 $ 4.25 $ 4.40
Truck Wash Key Per key Y 1 $ 42.00 $ 42.00
Truck-Wash (per minute) Per minute Y 1 $ 0.70 $ 0.70
Truck-Wash turn on fee Each Y 1 $ 3.77 $ 3.90
Saleyard Scales Private Use Per head Y 1 $ New Charge $ 5.00
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 211
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013
Re-transporting of Stock
Minimum charge Per load Y 1 $ 11.07 $ 11.45
Cattle/Head Per head Y 1 $ 2.79 $ 2.90
Sheep/Head Per head Y 1 $ 0.31 $ 0.32
Horses/Head Per head Y 1 $ 2.79 $ 2.90
Pigs/Head Per head Y 1 $ 2.07 $ 2.15
Disposal of Dead Animals
Sheep/Head Per head Y 1 $ 48.90 $ 50.65
Sale Cattle/Head Per head Y 1 $ 133.00 $ 137.80
Horse/Head Per head Y 1 $ 133.00 $ 137.80
Pigs/Head Per head Y 1 $ 48.90 $ 50.65
NOTE: A cow and calf offered for sale
together shall be charged the fee
applicable for one head only. Per day
means any continuous period of 24
hours from arrival of stock at saleyards.
Per head 1 $ 2.80 $ 2.90
The charges shall apply to openings made
by Public Utility Bodies, Plumbers and
Drainers
Each Y 1 $ 81.55 opening
fee plus an
additional
restoration
charge
$ 84.50 opening
fee plus an
additional
restoration
charge
Library
General
Overdue Items
Videos, DVDs and CD ROMs - per item
per day
Per Item / Day
Y 1 $ 1.00 $ 1.05
Other Library Material Per Item / Day
Y 1 $ 0.55 $ 0.55
Lost Borrower Card
Lost or damaged material - replacement
cost and processing fee
Per Item Y 1 $ 2.20 $ 2.30
Reservations
Per Item Y 1 $ 1.00 $ 1.05
Lost or damaged library materials Per Item Y 1 Replacement
cost plus
processing fee
22.70
Replacement
cost plus
processing fee
23.50
Inter Library Loans
Search Fee Per Item Y 1 $ 5.50 $ 5.70
Lending library imposed fee Per Item Y 1 Various Various
Copying
Photocopying and Printing
- Photocopies A4 black & white Per sheet Y 1 $ 0.20 $ 0.20
Facsimile Transmission
Fax Sending Australia
First Page Per page Y 1 $ 3.40 $ 3.50
Subsequent Pages Per page Y 1 $ 0.20 $ 0.20
Fax Receiving Australia
First Page Per page Y 1 $ 3.40 $ 3.50
Subsequent Pages Per page Y 1 $ 0.20 $ 0.20
Fax Sending International
First Page Per page Y 1 $ 5.50 $ 5.70
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 212
Function/Activity Unit of
Measure GST Code
Total Charge
2011/2012 Total Charge
2012/2013 Subsequent Pages Per page Y 1 $ 1.10 $ 1.15
Fax Receiving International
First Page Per page Y 1 $ 5.50 $ 5.70
Subsequent Pages Per page Y 1 $ 1.10 $ 1.15
Other
Email Access Per 10 minutes
Y 1 $ 2.00 $ 2.05
Local History Research Per hour Y 1 $ 25.00 $ 25.90
School Holiday Activities Per activity Y 1 POA POA
Private Works
Private Works - Payment required
upfront in accordance with Debt
Recovery Plan 1.10
Y 1 Cost +20% TBA
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 213
2012/2013 Budget
Programs
Program Name
Program Name
Summary Infrastructure & Operations
Administration
General Manager's Operations Technical Services Civic Activities Plant & Depot Operations Land Development Plant Purchases General Manager's Office RMS Maintenance / Construction Tourism Cowra Street Maintenance Overheads & Employees‟ Leave & Entitlements Cowra Street Construction
Rural Road Maintenance
Corporate Services Rural Road Construction Corporate Services Village Streets General purpose revenue Bushfire & Emergency Services Other Revenue Culvert / Causeway Construction Administration - Building Working Exp. Bridges Information Services Quarry Operation Staff Maintenance Drainage Loans Private Works Library Noxious Plants Art Gallery Public Cemeteries Civic Centre Public Amenities Community Projects Swimming Pool Depreciation Parks & Gardens Ground Maintenance Overheads Sportsfields
Village Parks
Environmental Services Rural & Urban Trees Ranger Services Aerodrome Environmental Services Caravan Park Environmental Services Overheads Saleyards
Buildings/Structures Maintenance
Operations Overheads & Employee‟s Leave & Entitlements
Waste Water Sewer Overheads Summary Reserves Loan Schedule
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 214
Budget - Summary By Program / Function
Program / Function 2011/2012 Original Estimate
2012/2013 Est. Total
Result
General Manager's Operation
Civic Activities 310,598 347,758
Land Development 0 0
General Manager's Office 549,101 575,903
Tourism 240,717 228,793
Overheads & Employees‟ Leave & Entitlements 146,122 133,311
Total - General Manager's Operations 1,246,538 1,285,765
Corporate Services
Corporate Services 1,624,489 1,714,790
General Purpose Revenue (10,185,372) (10,674,547)
Other Revenue (1,622,177) (1,700,529)
Administration Building Working Expenses 100,191 112,500
Information Services 496,342 505,253
Staff Maintenance 137,203 137,967
Loans 208,587 208,587
Library 254,619 220,180
Art Gallery 185,037 192,855
Civic Centre 229,735 231,708
Community Projects 149,842 161,053
Depreciation 0 0
Overheads & Employees‟ Leave & Entitlements 505,614 433,458
Total - Corporate Services (7,915,890) (8,456,724)
Environmental Services
Ranger Services 112,900 125,190
Environmental Planning 504,466 525,575
Overheads & Employees‟ Leave & Entitlements 199,751 180,720
Total - Environmental Services 817,117 831,485
Infrastructure & Operations
Infrastructure & Operations Administration 325,193 344,665
Technical Services 552,254 796,157
Plant Operations (1,263,937) (1,236,213)
Plant Purchases 0 0
RTA Maintenance / Construction 0 0
Cowra Street Maintenance 507,360 522,945
Cowra Street Construction 166,650 110,300
Rural Road Maintenance 444,479 520,076
Rural Road Construction 1,004,318 1,149,344
Culvert / Causeway Construction 30,725 31,647
Village Streets 97,034 230,637
Bridges 44,000 14,420
Quarry Operation (0) (0)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 215
Program / Function 2011/2012 Original Estimate
2012/2013 Est. Total
Result
Drainage 113,873 116,018
Private Works (92,818) (95,603)
Noxious Plants 176,650 183,384
Bushfire & Emergency Services 186,250 191,762
Tidy Towns 0 0
Public Cemeteries 2,335 8,706
Public Amenities 122,407 125,112
Amenities - Other 0 0
Swimming Pool 311,616 410,266
Parks & Gardens Grounds Maintenance 804,212 903,762
Sportsfields 207,134 209,968
Village parks 35,315 36,000
Rural & Urban Trees 293,746 279,777
Aerodrome 128,597 129,102
Caravan Park 0 (0)
Saleyards 0 0
Buildings & Structures Maintenance 145,349 126,456
Cowra Operations Overheads & Employees‟ Leave & Entitlements 1,464,940 1,200,457
Total - Infrastructure & Operations 5,807,683 6,309,146
Waste
Waste Collection (296,196) (293,885)
Waste Disposal (52,679) (49,828)
Recycling 137,053 171,191
Waste Operations Overheads & Employees‟ Leave & Entitlements 211,822 172,523
Total - Waste 0 0
Water
Water Supply 0 (0)
Total - Water 0 (0)
Sewer
Sewerage 0 (0)
Total - Sewer 0 (0)
Total - General (44,553) (30,330)
Total - Consolidated (44,553) (30,330)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 216
Consolidated Summary
Description 2011/2012 Employee
Costs Borrowing
Costs Materials & Contracts Depreciation
Internal Plant Hire
Legal Costs Consultants
Other Expenditure
Estimate for 2012/13
Expenditure General fund 25,603,142 8,798,505 387,859 7,562,706 5,329,262 2,157,300 55,438 36,500 1,992,584 26,320,153
Water supply 6,058,553 816,831 440,580 1,307,857 1,442,000 127,061 0 0 2,111,634 6,245,964 Sewerage services 2,729,792 341,447 687,766 573,328 314,150 44,954 0 0 717,235 2,678,881 Waste 2,899,128 840,725 63,321 748,840 227,630 599,491 0 20,000 479,893 2,979,901
Total operating expense 37,290,615 10,797,509 1,579,526 10,192,732 7,313,042 2,928,806 55,438 56,500 5,301,347 38,224,899
Description 2011/2012
Rates & Annual
Charges
User Charges &
Fees
Interest and Investment Revenue
Other Revenue
Grants & Contributions
Net Gain Disposal
of Assets Depreciation
Estimate for 2012/13
Revenue General fund (25,994,294) (5,713,262) (5,135,705) (871,464) (5,807,655) (4,500,305) 0 (5,329,261) (22,399) (27,380,052)
Water supply (6,405,284) 0 (5,155,444) 0 0 0 0 (1,442,000) 0 (6,597,444) Sewerage services (3,102,990) (2,278,196) (640,892) (20,600) 0 0 0 (314,150) 0 (3,253,838) Waste (3,162,313) (1,602,144) (1,407,715) (19,694) 0 0 0 (227,630) 0 (3,257,183)
Total operating revenue (38,664,881) (9,593,602) (911,758) (5,807,655) (4,500,305) 0 (7,313,041) (22,399) (40,488,516)
General fund operating result before capital amounts (391,152)
(1,059,899) Water fund operating result before capital amounts (346,731)
(351,480)
Sewer fund operating result before capital amounts (373,198)
(574,957) Waste fund operating result before capital amounts (263,185)
(277,282)
Total operating result before capital amounts (1,374,266)
(2,263,618)
Capital result General fund 346,600
1,029,570
Water 346,731
351,479 Sewerage 373,198
574,957
Waste 263,185
277,283
Total capital result 1,329,713 2,233,288
Estimated consolidated (surplus) / deficit (44,553)
(30,330)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 217
General Manager's Operations
Civic Activities
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10051 Mayoral Expenses 8,434 8,687
10050 Mayoral Allowance 21,770 22,423
10061 Mayor -Vehicle Running Expenses 20,461 21,075
10053 Cr. Travelling 12,049 12,410
10136 Cr. Telephone/Facsimile expenses 3,119 3,213
10137 Cr. Conference/Seminar attendance 10,000 10,300
10138 Cr. Training/Skill Development 5,000 5,150
10139 Cr. Interstate Visits 3,899 4,016
10141 Cr. Partners/Spouses expenses 3,000 3,090
New Councillor Induction 0 5,000
10142 Cr. Carers Expenses 500 515
10078 S.355 Committee Training 1,035 1,066
10054 Meeting/Function Expenses 14,637 15,076
10056 Member's Insurance 1,871 1,927
10021 LG&SA Membership 22,496 23,171
10062 CENTROC Contributions 16,141 16,625
Section 356 Donations 20,000 30,000
LG&SA - Contribution Fund 0 4,342
12105 Inf. & N/Hood Centre Contr. 8,606 8,864
10057 Election Expenses 0 100,000
10089 Cowra / Japan Relationship 15,000 25,000
10134 Cowra/Kogarah Relationship 5,000 5,150
10036 LGSA - Legal Costs 2,500 2,575
10058 Civic Receptions 5,175 5,330
10066 Civic Expenses 5,175 5,330
10052 Member's Fees 89,730 92,422
TOTAL OPERATING EXPENDITURE 295,598 432,758
CAPITAL EXPENDITURE
Transfer to Election Reserve 15,000 15,000
TOTAL CAPITAL EXPENDITURE 15,000 15,000
TOTAL EXPENDITURE 310,598 447,758
OPERATING REVENUE
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
Tr. from Election Reserve 0 (100,000)
Tr. from Carryover Reserve
0
TOTAL CAPITAL REVENUE 0 (100,000)
TOTAL REVENUE 0 (100,000)
NET COST OF SERVICES 310,598 347,758
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 218
Land Development
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
Loan No. 232 - External - Land Dev. 4,786 947
TOTAL OPERATING EXPENDITURE 4,786 947
CAPITAL EXPENDITURE
Loan No. 232 - External - Land Dev. 62,876 31,065
Dividend 0 0
23185 Valley View - Stage 3 (16 blocks) 0 0
12119 Holding Costs 0 0
TOTAL CAPITAL EXPENDITURE 62,876 31,065
TOTAL EXPENDITURE 67,662 32,012
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
Property Sales 0 0
Tr. From Land Development Reserve (67,662) (32,012)
TOTAL CAPITAL REVENUE (67,662) (32,012)
TOTAL REVENUE (67,662) (32,012)
NET COST OF SERVICES 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 219
General Manager’s Office
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10030 Salaries 325,640 346,217
10037 Vehicle Running Expenses 20,461 21,075
10004 Advertising 70,000 62,100
10038 Public Relations 10,000 10,300
10047 Sponsorship 5,000 5,150
Promote Our Regional Towns & Shires Project 6,000 0
11709 Cowra Business Officer Working Expenses 27,945 28,783
11711 Business Development (1) 100,000 0
11752 Business Assistance 15,500 15,965
New Residents / Marketing
10,000
11761 Community Strategic Plan Funding 25,000 25,750
Community / Customer Surveys 0 10,000
Economic Development Plan 20,000 6,000
10039 Legal Expenses/Opinions 12,855 13,241
10220 Training 10,350 10,661
10031 Office Expenses 10,350 10,661
TOTAL OPERATING EXPENDITURE 659,101 575,903
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 659,101 575,903
OPERATING REVENUE
1875 DSRD - Grant - Business Promotion 0 0
Grant - Economic development Plan (10,000) 0
1882 Business Promotion Income 0 0
TOTAL OPERATING REVENUE (10,000) 0
CAPITAL REVENUE
Tr. From Carryover Reserve (100,000) 0
TOTAL CAPITAL REVENUE (100,000) 0
TOTAL REVENUE (110,000) 0
NET COST OF SERVICES 549,101 575,903
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 220
Tourism
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11700 Cowra Tourism Contribution 212,175 218,965
11703 Visitor's Centre Maintenance 10,000 10,300
Visitor's Centre - Update Hologram 19,000 0
11710 Japanese Garden Raw Water ( until 2021 ) 10,712 11,033
Depreciation Charge
Depreciation 9,202 9,478
TOTAL OPERATING EXPENDITURE 261,089 249,776
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 261,089 249,776
OPERATING REVENUE
1822 Japanese Garden Rent (1,478) (1,522)
1820 Visitor's Centre Rent (9,692) (9,983)
Depreciation Write-back (9,202) (9,478)
TOTAL OPERATING REVENUE (20,372) (20,983)
TOTAL REVENUE (20,372) (20,983)
NET COST OF SERVICES 240,717 228,793
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 221
Overheads & Employee’s Leave & Entitlements
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
19046 Superannuation 68,365 71,010
19047 Public Holidays 12,798 11,562
19048 Workers Comp. Insurance 24,106 9,167
19050 Annual Leave 32,682 33,258
19049 Sick Leave 8,171 8,314
TOTAL OPERATING EXPENDITURE 146,122 133,311
TOTAL EXPENDITURE 146,122 133,311
OVERHEADS & ELE
CAPITAL REVENUE
Tr. From LSL Provision
0
Tr. From Carryover Reserve
0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 146,122 133,311
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 222
Corporate Services Department
Corporate Services
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10000 Salaries 862,617 902,102 10003 Vehicle Running Expenses 33,744 34,756 10005 Printing & Stationery 66,900 68,907 10006 Postages 31,066 32,000 10090 Office Equipment Maintenance/Supplies 56,561 58,258 10007 Telephones 31,066 32,000 10008 Working Expenses 4,821 4,966 10048 Accounting Software 4,178 9,000
Consultants 10,000 20,000
10010 Fringe Benefits Tax 12,196 12,562 10011 Bank Charges 36,963 38,072 10012 Interest on Overdraft 1,500 1,545 10013 Valuer General Land Value Fee 47,550 48,977 10014 Audit Fees 32,137 33,101
Internal Audit 22,000 22,660
10041 Debt Recovery Expenses 5,356 5,517 10042 Write off Bad & Doubtful Debts 5,356 5,517
Insurance
- Valuations 0 0 10017 - Fidelity Guarantee 2,957 1,757 10018 - Public Liability/Professional Indemnity 215,039 182,000 10019 - Property/Industrial Special Risks 128,004 183,148 10020 - Miscellaneous 9,029 9,932 10016 - Insurance Legal Expenses 13,138 13,532
TOTAL OPERATING EXPENDITURE 1,632,178 1,720,307
CAPITAL EXPENDITURE
Tr. To Risk Management Reserve 17,595 20,526
TOTAL CAPITAL EXPENDITURE 17,595 20,526
TOTAL EXPENDITURE 1,649,773 1,740,833
OPERATING REVENUE
Statewide - Insurance Rebates (11,130) (11,464) Statecover - Performance rebate (8,798) (9,062) TOTAL OPERATING REVENUE (19,928) (20,526)
CAPITAL REVENUE
Tr. From Bad & Doubtful Debts Provision (5,356) (5,517)
Tr. From Carryover Reserve
TOTAL CAPITAL REVENUE (5,356) (5,517)
TOTAL REVENUE (25,284) (26,043)
NET COST OF SERVICES 1,624,489 1,714,790
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 223
General Purpose Revenue
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
RATE REVENUE
1000 Residential - Cowra (1,425,748) (1,491,414)
1005 Residential (258,634) (269,776)
1004 Residential - Rural (301,425) (312,528)
1002 Farmland (2,468,259) (2,557,466)
1042 Mining (73,135) (75,768)
1003 Business (1,063,023) (1,101,759)
1007 Interest on Overdue Rates (27,563) (28,390)
1020 Income - Rate Legal Action (5,356) (5,517)
1019 Pensioner Rates Subsidy (113,262) (116,659)
1006 Pensioner Rates Abandoned 205,930 212,108
TOTAL RATE REVENUE (5,530,475) (5,747,169)
OTHER GENERAL PURPOSE REVENUE
1012 Interest on Investments (655,500) (800,000)
1856 Financial Assistance Grant - Local Roads (1,276,461) (1,317,308)
1018 Financial Assistance Grant - General (2,722,936) (2,810,070)
TOTAL REVENUE (10,185,372) (10,674,547)
NET COST OF SERVICES (10,185,372) (10,674,547)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 224
Other Revenue
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING REVENUE
1014 Interest on Internal Loans (49,037) (43,074)
AODE Distribution (1,441,091) (1,512,794)
1025 S.603 Certificates (16,630) (17,129)
Waste Dividend (43,264) (44,562)
Saleyards Dividend (16,068) (16,550)
Caravan Park Dividend (45,000) (55,000)
1155 S.611 Charges - Water (774,928) (798,176)
1155 S.611 Charges - Sewer (133,631) (137,640)
Tr. S.611 charges to Water & Sewer 908,559 935,816
Land Development Dividend 0 0
1026 Sundry (11,087) (11,420)
TOTAL OPERATING REVENUE (1,622,177) (1,700,529)
TOTAL REVENUE (1,622,177) (1,700,529)
NET COST OF SERVICES (1,622,177) (1,700,529)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 225
Administration Building - Working Expenses
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10081 Offices Cleaning 28,800 30,000
10082 Rates, Lighting ,Power & Operating Expenses 69,000 80,000
10083 Security Services 2,391 2,500
Depreciation Charge
Building 30,516 31,431
TOTAL OPERATING EXPENDITURE 130,707 143,931
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 130,707 143,931
OPERATING REVENUE
Depn. W/Back - Office Building (30,516) (31,431)
TOTAL OPERATING REVENUE (30,516) (31,431)
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (30,516) (31,431)
NET COST OF SERVICES 100,191 112,500
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 226
Information Services
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10103 Salaries 114,134 117,009
10100 Computer Equipment Maintenance 25,000 25,750
10101 Licensing & Maintenance Agreements 176,208 181,494
10102 Operating Lease 171,000 171,000
10107 Authority - Consulting & Implementation 0 0
TOTAL OPERATING EXPENDITURE 486,342 495,253
CAPITAL EXPENDITURE
Tr. To IT Reserve 10,000 10,000
TOTAL CAPITAL EXPENDITURE 10,000 10,000
TOTAL EXPENDITURE 496,342 505,253
OPERATING REVENUE
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICE 496,342 505,253
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 227
Staff Maintenance
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10221 Training - Corporate Services 15,533 15,999
10244 Risk Management Officer 63,357 58,906
10248 Risk Management Expenses 2,678 2,758
10219 Contr. To Centroc HR /OHS Training 3,996 4,116
10228 Employee Service Awards 1,393 1,435
10229 Consultative Committee 1,071 1,103
10230 Employee Assistance Program 5,892 6,069
10231 Indoor Staff Uniforms 12,000 12,360
Defibrillation Devices 0 3,000
Vehicle Running Expenses 20,000 20,600
10233 Pre-Employment Expenses 11,283 11,621
TOTAL OPERATING EXPENDITURE 137,203 137,967
TOTAL EXPENDITURE 137,203 137,967
OPERATING REVENUE
TOTAL REVENUE 0 0
NET COST OF SERVICES 137,203 137,967
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 228
Loans
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE ( INT)
Loan No. 235 ( External - Admin Building) - Cash Back Internal Reserves 79,994 71,920
TOTAL OPERATING EXPENDITURE 79,994 71,920
CAPITAL EXPENDITURE (PRIN.)
Loan No. 235 ( External - Admin Building) - Cash Back Internal Reserve 128,593 136,667
TOTAL CAPITAL EXPENDITURE 128,593 136,667
TOTAL EXPENDITURE 208,587 208,587
CAPITAL REVENUE
Loan Funding
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 208,587 208,587
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 229
Library Services
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10900 Contr. To Regional Library 234,308 216,924
10902 Building Maintenance 15,000 15,450
10903 Cleaning 10,080 10,382
Loan No. 224-Library-External 50% 3,118 2,364
Loan No.226-Library (1)-Internal 50% 10,349 9,922
10901 Working Expenses 11,034 15,000
Depreciation Charge
Library 30,889 31,816
TOTAL OPERATING EXPENDITURE 314,778 301,858
CAPITAL EXPENDITURE
Loan No. 224-Library-External 50% 10,517 11,272
Loan No.226-Library (1)-Internal 50% 5,342 5,770
Installation - New Front Door 20,000 0
TOTAL CAPITAL EXPENDITURE 35,859 17,041
TOTAL EXPENDITURE 350,637 318,899
OPERATING REVENUE
1500 Library Subsidy (53,836) (55,451)
1501 Sundry Income (5,293) (5,452)
Depn. W/Back - Library (30,889) (31,816)
TOTAL OPERATING REVENUE (90,018) (92,719)
CAPITAL REVENUE
Grant Funding -Special Projects (6,000) (6,000)
TOTAL CAPITAL REVENUE (6,000) (6,000)
TOTAL REVENUE (96,018) (98,719)
NET COST OF SERVICES 254,619 220,180
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 230
Art Gallery
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10908 Building Maintenance 0 0 10904 Salaries 80,903 84,004
New Employee - Program Assistant 0 0
Gallery-Building & utilities 39,300 40,479
10912 Gallery-Administration & Marketing Expenses 14,858 15,304 10881 Gallery - Council Rates 1,500 1,545 10887 Gallery - Friends Postage & Printing 1,000 1,030 10890 Gallery - Collection Storage & Conservation 1,300 1,339 10911 Gallery - Art Awards 4,500 4,635 10907 Gallery - Exhibitions Expenses 17,140 17,654
Gallery - Exhibition Development 1,000 1,030
Gallery - Exhibition Public Programs/Outreach 7,010 9,220
Gallery - Shop/Art Sales Expenses 8,500 8,755
Gallery - Grant Expenditure - 20111 ITEG-MGNSW 4,400 4,532
10893 Gallery - Exhibitions Public Program Expenses 0 0 10898 Gallery - Special Event Expenses 0 0
Loan No. 224-Gallery-External 50% 3,118 2,364
Loan No. 226-Gallery (1)-Internal 50% 10,349 9,922
TOTAL OPERATING EXPENDITURE 194,878 201,813
CAPITAL EXPENDITURE
Loan No. 224-Gallery-External 50% 10,517 11,272
Loan No. 226-Gallery (1)-Internal 50% 5,342 5,770
Gallery - Foyer Upgrade 10,000 0
TOTAL CAPITAL EXPENDITURE 25,859 17,042
TOTAL EXPENDITURE 220,737 218,855
OPERATING REVENUE
Gallery Income (25,700) (26,000)
TOTAL OPERATING REVENUE (25,700) (26,000)
CAPITAL REVENUE
Tr. From Gallery Reserve (7,000) 0
Tr. From Gallery Trust (3,000) 0
TOTAL CAPITAL REVENUE (10,000) 0
TOTAL REVENUE (35,700) (26,000)
NET COST OF SERVICES 185,037 192,855
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 231
Civic Centre
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10920 Working Expenses/Maintenance 25,500 26,265
10921 Contractor Payments 42,849 44,134
10092 Minor Improvements 15,500 15,965
10923 Fee Donations 5,543 5,709
Loan No. 244-Civic Centre Refurbishment 108,671 105,413
Loan No. 245-Civic Centre Refurbishment 18,982 18,041
Loan No. 231-Roof- External 3,611 3,082
Depreciation Charge
Depreciation 3,624 3,733
TOTAL OPERATING EXPENDITURE 224,280 222,343
CAPITAL EXPENDITURE
Loan No. 231-Roof- External 7,327 7,856
Loan No. 244-Civic Centre Refurbishment 21,968 25,225
Loan No. 245-Civic Centre Refurbishment 5,246 6,243
TOTAL CAPITAL EXPENDITURE 34,541 39,324
TOTAL EXPENDITURE 258,821 261,667
OPERATING REVENUE
1510 Civic Centre Hire Fees (25,462) (26,226)
Depreciation Write-back (3,624) (3,733)
TOTAL OPERATING REVENUE (29,086) (29,959)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (29,086) (29,959)
NET COST OF SERVICES 229,735 231,708
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 232
Community Projects
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11011 Showground Trust Contribution 37,115 38,228 11012 Regional Arts Contribution 6,591 6,789 11023 Youth Week 2,588 2,666
NAIDOC Week 1,035 1,066
11025 Social Plan Implementation 5,356 5,517 11048 Cultural Plan Implementation 5,356 5,517 11068 Sport / Recreation Plan Implementation 0 0 11026 Seniors Week 1,000 1,030
Contribution - Youth Council 2,000 4,000
11014 Australia Day Celebrations 5,356 6,000 11049 Pardey collection project 2,142 2,206
Community Projects Office
11015 - Salaries 61,588 65,389 11018 - Working Expenses 7,724 7,956 11017 Festival Operations 16,455 20,000
TOTAL OPERATING EXPENDITURE 154,306 166,363
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 154,306 166,363
OPERATING REVENUE
1031 Youth Week Grant (1,250) (2,000) 1536 Festival Revenue (3,214) (3,310) 1037 Seniors Week Grant 0 0
TOTAL OPERATING REVENUE (4,464) (5,310)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (4,464) (5,310)
NET COST OF SERVICES 149,842 161,053
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 233
Depreciation
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
Depreciation Charge
Buildings 84,135 86,659
Other Assets 292,716 301,498
Office Equipment 26,310 27,099
Furniture & Fittings 31,569 32,516
TOTAL OPERATING EXPENDITURE 434,730 447,772
TOTAL EXPENDITURE 434,730 447,772
OPERATING REVENUE
Depreciation Write-back (434,730) (447,772)
TOTAL OPERATING REVENUE (434,730) (447,772)
TOTAL REVENUE (434,730) (447,772)
NET COST OF SERVICES 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 234
Corporate Services Overheads & Employees’ Leave & Entitlements
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
19028 Superannuation 150,794 150,396
19029 Public Holidays 45,297 42,016
19030 Workers Comp. Insurance 125,352 49,502
19032 Annual Leave 104,137 108,631
19033 Long Service Leave 0 0
19031 Sick Leave 26,034 27,158
TOTAL OPERATING EXPENDITURE 451,614 377,703
CAPITAL EXPENDITURE
Tr. To LSL Provision 54,000 55,755
Tr. To W/Comp Reserve
TOTAL CAPITAL EXPENDITURE 54,000 55,755
TOTAL EXPENDITURE 505,614 433,458
CAPITAL REVENUE
Tr. From LSL Provision 0 0
Tr. From Workers Comp Reserve 0 0
Tr. From Carryover Reserve
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 505,614 433,458
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 235
Environmental Services Department
Ranger Services
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10310 Ranger's Contract 162,500 175,000
Dangerous/Restricted Dog Audit
15,000
10312 Pound Maintenance 2,142 5,000
10313 Sundries/Safety Equipment 4,166 4,291
10357 Companion Animal Incentive Scheme 3,416 3,518
10317 Waste Disposal Costs 1,553 1,600
10316 Infringement Processing Expense 7,499 8,250
Depreciation Charge 0 0
Depreciation 858 884
TOTAL OPERATING EXPENDITURE 182,134 213,543
CAPITAL EXPENDITURE
CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 182,134 213,543
OPERATING REVENUE
1070 Companion Animals Reimbursement (8,035) (8,276)
1071 Dog Impounding Fees (673) (1,000)
1073 Pound Rental (2,070) (5,000)
Dangerous/Restricted Dog Audit Sales
(5,000)
1072 Infringement Notice - Fines (56,925) (67,500)
1075 Animal Impounding Fees (673) (693)
Depreciation - Write-back (858) (884)
TOTAL OPERATING REVENUE (69,234) (88,353)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (69,234) (88,353)
NET COST OF SERVICES 112,900 125,190
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 236
Environmental Services
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10511 Salaries 564,078 630,057 10223 Staff Training 20,000 20,600 10401 Vehicle Running Expenses 57,846 59,581 10402 Office Expenses / DA Advertising 31,500 32,445 10403 Legal Expenses 28,000 26,090 10412 Shire-Wide Development Control Plan 5,000 5,150
State of the Environment Report 2,750 2,750
10419 Working Expenses 5,000 5,150 11038 Heritage Advisor 16,500 16,500
CBD Traffic Management Study - Carryover 10,000 0
DA & Complying Development Shopfront 10,000 0
Planet Footprint ( LGETS) - Carryover 2,000 0
Regional Sustainability Action Plan Implimentation 10,000 15,000
Cowra Household Sharps Management Program 0 2,000
10416 Disabled Access Incentive Fund 5,000 5,150
TOTAL OPERATING EXPENDITURE 767,674 820,473
CAPITAL EXPENDITURE
Tr. To Developer Contribution Reserve 50,000 51,500
TOTAL CAPITAL EXPENDITURE 50,000 51,500
TOTAL EXPENDITURE 817,674 871,973
OPERATING REVENUE
1092 Food Act Administration Fee (8,500) (8,755) 1603 Registration of Pt 4A Certificates (70,000) (70,000) 1131 Planning & Building Cert. Application Fee (30,000) (32,000) 1130 DA Fees (55,000) (65,000) 1606 Sundry (850) (876) 1135 Rural Addressing Sales (1,035) (600) 1139 Heritage Advisors Grant (5,500) (5,665) 1600 Construction Certificate Application Fee (40,000) (41,200) 1136 Subdivision Certificate Building Compliance Certificate (2,000) (2,060) 1604 Long Service Levy Commission (2,070) (2,132)
1619 Public Health Act Registration/Compliance Inspection (500) (150)
1620 Roads Act Section 138 Application (1,035) (1,066) 1621 Swimming Pool Act Compliance/Exemption Application (500) (150) 1625 Complying Dev Cert Applications (13,000) (13,390) 1615 Section 68 Application Fee (15,525) (15,991) 1617 Drainage Diagrams (5,693) (5,864)
Subsidy - Aboriginal Traineeship Program
(30,000)
TOTAL OPERATING REVENUE (251,208) (294,898)
CAPITAL REVENUE
Section 94 Contributions (50,000) (51,500)
Tfr from Main Street Reserve 0 0
Grant Funding - Floodplain Management Plan 0 0
Grant Funding - Cowra Bike Racks Project 0 0
Tfr from Carryover Reserve (12,000) 0
TOTAL CAPITAL REVENUE (62,000) (51,500)
TOTAL REVENUE (313,208) (346,398)
NET COST OF SERVICES 504,466 525,575
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 237
Environmental Services Overheads
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
19034 Superannuation 57,867 67,355
19035 Public Holidays 22,369 21,060
19036 Workers Comp. Insurance 53,033 22,001
19038 Annual Leave 53,186 56,243
19039 Long Service Leave 0 0
19037 Sick Leave 13,296 14,061
TOTAL OPERATING EXPENDITURE 199,751 180,720
TOTAL EXPENDITURE 199,751 180,720
CAPITAL REVENUE
Tr. From LSL Provision 0 0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 199,751 180,720
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 238
Infrastructure & Operations Department
Infrastructure & Operations - Administration
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11420 Salaries - Administration 631,685 663,727
11421 Vehicle Running Expenses 62,345 64,215
11422 Phone & Fax 11,248 11,585
11423 Office Expenses 5,356 5,517
11424 Training 13,497 13,902
11206 Staff Uniforms 5,175 5,330
Depreciation Charge
Depreciation - Roads Infrastructure 3,088,354 3,181,005
TOTAL OPERATING EXPENDITURE 3,817,660 3,945,280
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 3,817,660 3,945,280
OPERATING REVENUE
Salary Contribution from Sewer (127,678) (131,828)
Salary Contribution from Water (127,678) (131,828)
Salary Contribution from Waste (70,459) (75,113)
Salary Contribution from RTA (61,808) (63,817)
1901 Training Subsidy (4,326) (4,467)
Salary Contribution from Saleyards (12,164) (12,559)
Depreciation Write-back (3,088,354) (3,181,005)
TOTAL OPERATING REVENUE (3,492,467) (3,600,615)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (3,492,467) (3,600,615)
NET COST OF SERVICES 325,193 344,665
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 239
Technical Services
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10097 Salaries 600,856 670,039
10093 Staff Training 9,035 16,225
10098 Vehicle Running Expenses 27,479 28,303
10099 Telephone 5,346 4,000
10111 Computer Software 12,024 12,550
10096 Working Expenses 5,356 5,500
10157 Operating Lease - Survey Equipment 9,701 9,701
Design Equipment Supplies 4,477 0
10112 Equipment Supplies 5,712 13,100
10128 Asset Mment Software-Maintenance 13,390 8,800
10113 LEMO & SES 5,892 6,000
10114 Asset Modelling & Research 15,000 20,000
Alternative Route Investigation 0 50,000
10122 Legal & Land matters 20,000 40,000
TOTAL OPERATING EXPENDITURE 734,268 884,218
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 734,268 884,218
OPERATING REVENUE
Salary Contribution from Sewer (160,267) (65,662)
Contribution from SES for LEMO (21,747) (22,399)
TOTAL OPERATING REVENUE (182,014) (88,061)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (182,014) (88,061)
NET COST OF SERVICES 552,254 796,157
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 240
Plant & Depot Operations
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10212 Salaries & Wages 156,752 195,366
10200 Plant Operating Expenses 1,631,214 1,676,011
10201 Plant Insurance 74,016 47,412
10213 Light Fleet Vehicle Costs 68,200 84,625
10214 Training 5,717 5,717
10215 Office Equipment Software & Hardware 5,718 7,100
10216 Telephone & Fax Costs 3,706 3,820
10205 Depot Working Expenses 66,163 76,100
Depreciation Charge
- Plant 744,871 767,217
- Depot 27,580 28,407
TOTAL OPERATING EXPENDITURE 2,783,937 2,891,775
CAPITAL EXPENDITURE
Tr. To Plant Reserve 400,000 450,000
Depot Redevelopment Design 0 0
TOTAL CAPITAL EXPENDITURE 400,000 450,000
TOTAL EXPENDITURE 3,183,937 3,341,775
OPERATING REVENUE
1900 Plant Hire (3,528,173) (3,642,264)
1902 Fuel Tax Credits (77,250) (68,000)
1950 Leaseback Contribution (70,000) (72,100)
Depn. W/Back - Plant & Depot (772,451) (795,624)
TOTAL OPERATING REVENUE (4,447,874) (4,577,988)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (4,447,874) (4,577,988)
NET COST OF SERVICES (1,263,937) (1,236,213)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 241
Plant Purchases
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
CAPITAL EXPENDITURE
New/Additional Plant
0
0
Replacement Plant
Light Vehicles 0 166,000
Small Plant (<$15k) 0 60,000
Minor Plant (>$15k<$150k) 0 86,000
Major Plant (>$150k) 0 565,000
Plant - all categories 610,000 0
TOTAL CAPITAL EXPENDITURE 610,000 877,000
TOTAL EXPENDITURE 610,000 877,000
CAPITAL REVENUE
Tr. From Plant Reserve (610,000) (877,000)
TOTAL CAPITAL REVENUE (610,000) (877,000)
TOTAL REVENUE (610,000) (877,000)
NET COST OF SERVICE 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 242
RMS Maintenance / Construction
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
REGIONAL ROAD WORKS
Single Invitation Contract Works 500,200 1,055,783
Regional Rd (Block) - Road Component 281,000 289,430
Regional Rd (Block) - Supplementary 108,000 111,240
Regional Rd (Block) - Traffic Component 52,000 53,560
Regional Rd (Block) - Repair Grant 70,000 0
Heavy Patching 215,000 221,450
Resealing State Roads 800,000 824,000
Contribution to Administration Salaries 61,808 63,817
TOTAL OPERATING EXPENDITURE 2,088,008 2,619,280
CAPITAL EXPENDITURE
Tr. To Plant Reserve 159,963 164,631
Tr. To Works Reserve 0 0
Transfer to Warranty Reserve 28,229 29,052
TOTAL CAPITAL EXPENDITURE 188,192 193,683
TOTAL EXPENDITURE 2,276,200 2,812,963
PROGRAM
OPERATING REVENUE
RMS Payments (2,276,200) (2,812,963)
TOTAL OPERATING REVENUE (2,276,200) (2,812,963)
CAPITAL REVENUE
Tr. From Warranty Reserve 0 0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (2,276,200) (2,812,963)
NET COST OF SERVICES 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 243
Cowra Street Maintenance
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10130 Supervisor - Maintenance 81,669 84,323
10123 Vehicle Running Expenses - Supervisor 17,306 17,825
10129 Maintenance Engineer 62,105 64,124
10615 Banner Poles/Town Entry Signs 5,225 5,382
50006 Sealed Street Pavement Repairs 42,434 43,707
50014 Unsealed Streets Maintenance 7,047 7,259
50500 Line Marking 32,562 33,539
50504 K & G & Drains Maintenance 40,306 41,515
50506 Footpaths Maintenance 47,412 48,835
50507 Fence Maint. & Repairs 1,000 1,030
50513 Street Lighting ( Electricity ) 185,000 190,550
50512 Disabled Crossings Maintenance 6,539 6,735
50508 Carparks Maintenance 11,200 11,536
50975 Urban Signs Maintenance 29,659 30,549
Loan 227-Busby Place Carpark (1)-Internal Interest 4,693 2,437
TOTAL OPERATING EXPENDITURE 574,157 589,346
CAPITAL EXPENDITURE
Loan 227-Busby Place Carpark (1)-Internal Principal 28,203 30,459
TOTAL CAPITAL EXPENDITURE 28,203 30,459
TOTAL EXPENDITURE 602,360 619,805
OPERATING REVENUE
Traffic Route Lighting Subsidy (61,000) (62,830)
Banner Pole Income (1,000) (1,030)
TOTAL OPERATING REVENUE (62,000) (63,860)
CAPITAL REVENUE
Carpark Levy (33,000) (33,000)
TOTAL CAPITAL REVENUE (33,000) (33,000)
TOTAL REVENUE (95,000) (96,860)
NET COST OF SERVICES 507,360 522,945
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 244
Cowra Street Construction
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for
2012/13
OPERATING EXPENDITURE
50050 Cowra Street & Lane Reseals 196,650 110,300
50050 Cowra Street & Lane Reseals - Carryover 190,000 0
TOTAL OPERATING EXPENDITURE 386,650 110,300
CAPITAL EXPENDITURE
S94 Urban Road Expenditure 125,000 125,000
Roads to Recovery Expenditure 532,200 0
Roads to Recovery Expenditure - Carryover 0 170,736
Pedestrian Refuge - Brisbane / Liverpool Street 0 0
TOTAL CAPITAL EXPENDITURE 657,200 295,736
TOTAL EXPENDITURE 1,043,850 406,036
OPERATING REVENUE
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
Tr. From S94 Urban Roads (125,000) (125,000)
Roads to Recovery Grant (359,200) (170,736)
Tr. From Works Reserve 0 0
Tr. From Carryover Reserve (393,000) 0
TOTAL CAPITAL REVENUE (877,200) (295,736)
TOTAL REVENUE (877,200) (295,736)
NET COST OF SERVICES 166,650 110,300
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 245
Rural Roads Maintenance
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
50104 Gravelling & Grading 364,592 375,529
50113 Line Marking 15,000 15,450
50108 Sealed Roads Maintenance 121,000 124,630
50970 Rural Signs Maintenance 19,337 19,917
TOTAL OPERATING EXPENDITURE 519,929 535,526
CAPITAL EXPENDITURE
Flood Damage - Rehabilitation 856,000.00 0
TOTAL CAPITAL EXPENDITURE 856,000 0
TOTAL EXPENDITURE 1,375,929 535,526
OPERATING REVENUE
1750 Rent of Dedicated Roads (15,450) (15,450)
1754 Road Opening Permits 0 0
TOTAL OPERATING REVENUE (15,450) (15,450)
CAPITAL REVENUE
Flood Damage Subsidy (856,000) 0
Transfer from Works Reserve (60,000) 0
TOTAL CAPITAL REVENUE (916,000) 0
TOTAL REVENUE (931,450) (15,450)
NET COST OF SERVICES 444,479 520,076
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 246
Rural Roads Construction
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
50106 Gravel Resheeting 375,020 386,271
50200 Rural Reseals 324,266 500,000
50200 Rural Reseals - Carryover 273,000 0
10135 Supervisor - Construction 81,851 84,511
10124 Vehicle Running Expenses - Construction 15,134 15,588
10133 Construction Engineer 74,048 76,454
50203 Table Drain Maintenance 84,000 86,520
TOTAL OPERATING EXPENDITURE 1,227,318 1,149,344
CAPITAL EXPENDITURE
Flood Repairs
450,000
Roads To Recovery Expenditure 478,800 690,389
Roads To Recovery Expenditure - Carryover 0 312,089
Rural Roads - Heavy Patching 50,000 0
Capital Contribution Works: 190,000 0
23343 - Clements Rd Construction 86,000 100,000
- Kentucky Rd Construction 0 0
Kangarooby Rd
21,263
Pride of Oak Rd
13,031
Section 94 Works 65,000 0
TOTAL CAPITAL EXPENDITURE 869,800 1,586,772
TOTAL EXPENDITURE 2,097,118 2,736,116
OPERATING REVENUE
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
Tr. From Developer Cont.Reserve (65,000) 0
Grant - Flood repairs
(450,000)
Tr. From Works Reserve 0 0
Tr. From Carryover Reserve (463,000) 0
Capital Contributions (276,000) (134,294)
Roads to Recovery Grant (288,800) (1,002,478)
TOTAL CAPITAL REVENUE (1,092,800) (1,586,772)
TOTAL REVENUE (1,092,800) (1,586,772)
NET COST OF SERVICES 1,004,318 1,149,344
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 247
Village Streets
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
MAINTENANCE
50300 Billimari 7,092 7,305
50302 Darbys Falls 7,092 7,305
50304 Noonbinna 7,092 7,305
50306 Wattamondara 10,064 10,366
50308 Wyangala 11,005 11,336
50310 Gooloogong 13,117 13,510
50312 Woodstock 13,117 13,510
50350 Village Reseals 28,457 160,000
Village Reseals - Carryover 50,046 0
TOTAL OPERATING EXPENDITURE 147,082 230,637
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 147,082 230,637
CAPITAL REVENUE
Tr. From Carryover Reserve (50,048) 0
TOTAL CAPITAL REVENUE (50,048) 0
TOTAL REVENUE (50,048) 0
NET COST OF SERVICE 97,034 230,637
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 248
Bushfire & Emergency Services
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10300 Contr. To NSW Fire Brigade 28,463 29,317
Contribution for LEMO Salary 21,747 22,399
10299 RFS Utility Expense 2,070 2,132
11207 RFS Hazard Reduction 59,275 57,270
10301 Contr. To RFS 109,633 112,922
Contr. To SES 24,323 25,053
10350 SES Expenses 4,140 4,264
Depreciation Charge
Depn. - Bushfire Equipment 245,879 253,255
TOTAL OPERATING EXPENDITURE 495,530 506,613
CAPITAL EXPENDITURE
Bushfire Equipment Allocation 171,784 462,144
Tr. To Fire Mitigation Reserve 2,500 2,500
TOTAL CAPITAL EXPENDITURE 174,284 464,644
TOTAL EXPENDITURE 669,814 971,257
OPERATING REVENUE
1053 Rent of Fire Control Centre (6,626) (6,825)
1956 RFS Hazard Reduction Mechanical Activity (59,275) (57,270)
Depn. W/Back - Bushfire Equipment (245,879) (253,255)
TOTAL OPERATING REVENUE (311,780) (317,350)
CAPITAL REVENUE
Bushfire Equipment Subsidy (171,784) (462,144)
Tr. From Developer Contribution Reserve 0 0
TOTAL CAPITAL REVENUE (171,784) (462,144)
TOTAL REVENUE (483,564) (779,494)
NET COST OF SERVICES 186,250 191,762
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 249
Culvert / Causeway Construction
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
CAPITAL EXPENDITURE
23320 Small culverts/causeways 30,725 31,647
TOTAL CAPITAL EXPENDITURE 30,725 31,647
TOTAL EXPENDITURE 30,725 31,647
CAPITAL REVENUE
Roads to Recovery 0 0
Tr. From carryover Reserve
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 30,725 31,647
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 250
Bridges
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
50400 Low Level Bridge 10,000 10,300
50417 Pennsylvania Rd Bridge 4,000 4,120
TOTAL OPERATING EXPENDITURE 14,000 14,420
CAPITAL EXPENDITURE
Koorawatha/Greenethorpe Bridge Replacement 30,000 0
TOTAL CAPITAL EXPENDITURE 30,000 0
TOTAL EXPENDITURE 44,000 14,420
OPERATING REVENUE
1752 Boundary Bridges 0 0
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 44,000 14,420
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 251
Quarry Operations
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10633 Working Expenses 5,356 20,000
10635 OH & S Compliance 5,356 0
DA Compliance Expenses 120,000 120,000
Loan 239-Houghtons Quarry)-Interest 9,901 8,065
New Loan - Holmwood Access Rd - Interest 10,033 0
TOTAL OPERATING EXPENDITURE 150,646 148,065
CAPITAL EXPENDITURE
Loan 239- Houghtons Quarry-Principal 26,903 28,739
New Loan - Holmwood Access Rd - Principal 8,020 0
23396 Holmwood Quarry access roadworks 0 0
Transfer to Quarry Reserve 47,746 51,743
TOTAL CAPITAL EXPENDITURE 82,669 80,482
TOTAL EXPENDITURE 233,315 228,547
OPERATING REVENUE
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
Tr. From Quarry Reserve (175,668) (169,171)
1951 Oncost on Gravel Issues (57,647) (59,376)
Loan Funds 0 0
TOTAL CAPITAL REVENUE (233,315) (228,547)
TOTAL REVENUE (233,315) (228,547)
NET COST OF SERVICES (0) (0)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 252
Drainage
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
Depreciation - Stormwater 414,464 426,898
Loan 236-Vaux St-External 78 % 17,223 16,403
Loan 241 - Vaux St West 11.67% 9,853 9,713
Proposed Loan - Drainage Works - Interest
18,185
Design Expenses - Flood Study 20,000 0
10590 Kerb Inlets Maintenance 51,419 52,962
TOTAL OPERATING EXPENDITURE 512,959 524,162
CAPITAL EXPENDITURE
Drainage - Flood Remediation 0 250,000
Proposed Loan - Drainage Works - Principal
2,417
Loan 236-Vaux St- External 78 % 12,779 13,599
Loan 241-Vaux St West 11.67% 2,599 2,739
TOTAL CAPITAL EXPENDITURE 15,378 268,754
TOTAL EXPENDITURE 528,337 792,916
OPERATING REVENUE
Depreciation Write-back (414,464) (426,898)
TOTAL OPERATING REVENUE (414,464) (426,898)
CAPITAL REVENUE
Loan Funding
(250,000)
TOTAL CAPITAL REVENUE 0 (250,000)
TOTAL REVENUE (414,464) (676,898)
NET COST OF SERVICES 113,873 116,018
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 253
Private Works
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
13000 Private Works Expenditure 464,092 478,015
TOTAL OPERATING EXPENDITURE 464,092 478,015
CAPITAL EXPENDITURE
Transfer to Works Reserve 0 0
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 464,092 478,015
OPERATING REVENUE
1851 Private Works Revenue (464,092) (478,015)
Private Works Profit (92,818) (95,603)
TOTAL OPERATING REVENUE (556,910) (573,618)
TOTAL REVENUE (556,910) (573,618)
NET COST OF SERVICES (92,818) (95,603)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 254
Noxious Plants
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10450 Wages 89,111 97,209
10451 Vehicle Running Expenses 66,952 68,961
10453 Working Expenses 42,459 43,733
Contractor / Labour Hire 33,000 30,000
10459 Staff Training 2,142 2,206
TOTAL OPERATING EXPENDITURE 233,664 242,109
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 233,664 242,109
OPERATING REVENUE
1100 Grants (55,943) (57,622)
1102 Regulatory Fees & Fines (1,071) (1,103)
TOTAL OPERATING REVENUE (57,014) (58,725)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (57,014) (58,725)
NET COST OF SERVICES 176,650 183,384
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 255
Public Cemeteries
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10600 Working Expenses 53,310 54,909
Private Cemeteries
10602 Plaques 31,827 32,782
10601 Wages 64,432 74,351
10604 Staff Training & Conferences 2,679 2,759
10605 Plant Running Costs 41,349 42,589
10606 Replacement Trees 2,070 0
AODE 23,578 24,732
Depreciation Charge
Depreciation 1,222 1,259
TOTAL OPERATING EXPENDITURE 220,467 233,382
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 220,467 233,382
OPERATING REVENUE
1220 Cemetery Fees (155,328) (159,988)
1222 War Graves Contribution (13,377) (13,778)
1221 Plaques & Vases (48,205) (49,651)
Depreciation Write-back (1,222) (1,259)
TOTAL OPERATING REVENUE (218,132) (224,676)
CAPITAL REVENUE
0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (218,132) (224,676)
NET COST OF SERVICES 2,335 8,706
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 256
Public Amenities
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10616 Salaries & Wages 40,938 41,199
10617 Plant Running Expenses 18,854 19,420
10612 Working Expenses 25,795 26,569
10621 Carer's Rest Centre - Maintenance 8,409 8,661
10620 Carer's Rest Centre - Contractor 28,411 29,263
Depreciation Charge
Depreciation 414 426
TOTAL OPERATING EXPENDITURE 122,821 125,538
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 122,821 125,538
OPERATING REVENUE
Depreciation Write-back (414) (426) TOTAL OPERATING REVENUE (414) (426)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (414) (426)
NET COST OF SERVICES 122,407 125,112
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 257
Swimming Pool
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10931 Working Expenses 88,805 91,469
10977 License - Pool Software 4,178 4,303
10930 Wages 190,340 188,673
11061 Staff Training 5,356 5,517
Loan 220-Refurbishment-External 3,052 1,832
Loan 234-Amenities- External 66,729 62,623
Depreciation Charge
Depreciation 79,399 81,781
TOTAL OPERATING EXPENDITURE 437,859 436,198
CAPITAL EXPENDITURE
Loan 220-Refurbishment-External 18,054 19,274
Plant Room Upgrade
70,000
Loan 234-Amenities- External 69,649 73,754
TOTAL CAPITAL EXPENDITURE 87,703 163,028
TOTAL EXPENDITURE 525,562 599,227
OPERATING REVENUE
1520 User Fees & Charges (128,547) (101,000)
Kiosk Income (6,000) (6,180)
Depreciation Write-back (79,399) (81,781)
TOTAL OPERATING REVENUE (213,946) (188,961)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (213,946) (188,961)
NET COST OF SERVICES 311,616 410,266
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 258
Parks, Gardens & Reserves
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11200 Plant Running Expenses 156,667 161,367
11201 Working Expenses 180,000 185,400
Contractor Mowing 40,000 41,200
11202 Wages 340,684 342,860
10575 Tidy Towns Maintenance 6,963 7,172
Peace Precinct 15,000 50,000
Lachlan River Precinct Master Plan
50,000
11203 Vandalism 9,641 9,930
11205 Staff Training 10,712 11,033
10947 Water Charges 60,000 61,800
TOTAL OPERATING EXPENDITURE 819,667 920,762
CAPITAL EXPENDITURE
Peace Precinct Works - Stage 1 (RCLIP) 177,000 0
TOTAL CAPITAL EXPENDITURE 177,000 0
TOTAL EXPENDITURE 996,667 920,762
OPERATING REVENUE
Grant - Crown Reserve Maintenance (15,455) (17,000)
Grant - Peace Precinct
TOTAL OPERATING REVENUE (15,455) (17,000)
CAPITAL REVENUE
Grant - Peace Precinct Works - Stage 1 (RCLIP) (177,000) 0
TOTAL CAPITAL REVENUE (177,000) 0
TOTAL REVENUE (192,455) (17,000)
NET COST OF SERVICES 804,212 903,762
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 259
Sportsfields
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
10961 Working Expenses 39,635 40,824
10968 Plant Running Expenses 44,777 46,120
Loan 236-River Park Amenities-External 22 % 4,858 4,627
Loan 243-WCRG Amenities ($160k @7.4% 30yrs) 9,774 8,611
Loan 242b-Mulyan Oval Amenities-External 6.88 % 6,148 6,058
10960 Wages 92,877 93,470
10969 Staff Training 2,142 2,206
10962 Vandalism 3,749 3,861
TOTAL OPERATING EXPENDITURE 203,960 205,778
CAPITAL EXPENDITURE
Loan 236-River Park Amenities-External 22 % 3,604 3,835
Loan 243-WCRG Amenities ($160k @7.4% 30yrs) 13,850 15,013
Loan 242b-Mulyan Oval Amenities-External 6.8 % 1,306 1,396
TOTAL CAPITAL EXPENDITURE 18,760 20,244
TOTAL EXPENDITURE 222,720 226,022
OPERATING REVENUE
1524 User Charges (15,586) (16,054)
TOTAL OPERATING REVENUE (15,586) (16,054)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (15,586) (16,054)
NET COST OF SERVICES 207,134 209,968
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 260
Village Parks
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
Village Parks Maintenance 0 36,000
10985 Gooloogong 8,570 0
10986 Woodstock 8,570 0
10988 Billimari 3,214 0
10989 Wattamondara 3,214 0
10987 Woodstock Showground 3,214 0
11019 Morongla Showground 1,071 0
10993 Wyangala 1,035 0
10990 Darbys Falls 4,285 0
10991 Koorawatha 2,142 0
TOTAL OPERATING EXPENDITURE 35,315 36,000
CAPITAL EXPENDITURE
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 35,315 36,000
OPERATING REVENUE
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 35,315 36,000
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 261
Rural & Urban Trees
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11000 Working Expenses 106,410 69,000
11050 Training 5,356 5,517
11004 Vandalism 5,356 5,517
11051 Plant Running Expenses 79,485 81,870
11001 Wages 92,318 92,908
10125 Remove Dead Trees 0 20,000
11003 National Tree Day 4,821 4,966
TOTAL OPERATING EXPENDITURE 293,746 279,777
CAPITAL EXPENDITURE
23401 New tree plantings 0 0
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 293,746 279,777
OPERATING REVENUE
TOTAL OPERATING REVENUE 0 0
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 293,746 279,777
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 262
Aerodrome
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11501 Working Expenses 40,396 41,608
11500 Wages 62,316 60,833
Airport Promotion 5,000 5,150
11508 Contractor Inspections 10,921 11,249
11506 Plant Running Expenses 23,567 24,274
11507 Staff Training 3,750 3,863
Depreciation Charge
Depreciation 19,427 20,000
TOTAL OPERATING EXPENDITURE 165,377 166,976
CAPITAL EXPENDITURE
Airport Development 0 0
TOTAL CAPITAL EXPENDITURE 0 0
TOTAL EXPENDITURE 165,377 166,976
OPERATING REVENUE
1801 Rents & Fees (5,234) (5,391)
1802 Land Leases (12,119) (12,483)
Depreciation Write-back (19,427) (20,000)
TOTAL OPERATING REVENUE (36,780) (37,874)
CAPITAL REVENUE
Tr. From Airport Reserve 0 0
Loan funding
0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (36,780) (37,874)
NET COST OF SERVICES 128,597 129,102
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 263
Caravan Park
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11600 Maintenance/Operating Expenses 7,500 10,000
Dividend 45,000 55,000
Depreciation Charge
Depreciation 22,147 22,147
TOTAL OPERATING EXPENDITURE 74,647 87,147
CAPITAL EXPENDITURE
Tr. To Caravan Park Reserve 41,530 36,215
TOTAL CAPITAL EXPENDITURE 41,530 36,215
TOTAL EXPENDITURE 116,177 123,362
OPERATING REVENUE
1812 Fixed Lease Fee (53,540) (55,146)
1813 Commission Lease Fee (40,490) (46,069)
Depreciation Write-back (22,147) (22,147)
TOTAL OPERATING REVENUE (116,177) (123,363)
CAPITAL REVENUE
Tr. From Caravan Park Reserve
0
Tr. From Unexpended Grants Reserve
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (116,177) (123,363)
NET COST OF SERVICES 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 264
Saleyards
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11800 Wages 135,611 135,549
Contribution to Admin Salaries 12,164 12,559
Dividend 16,068 16,550
AODE 47,933 51,458
11801 Working Expenses/Maintenance 54,979 56,628
11810 Utilities 26,781 27,584
11803 Plant Running Expenses 13,476 13,880
11805 Advertising 5,356 5,517
11804 Staff Training/ Conferences 2,142 2,206
Overheads 32,194 33,240
Loan 246 - Effluent Screens 17,070 16,390
Loan 233 Saleyards-External Interest 9,561 8,940
Depreciation Charge
Depreciation 21,118 21,752
TOTAL OPERATING EXPENDITURE 394,453 402,255
CAPITAL EXPENDITURE
Loan 233 Saleyards-External Principal 9,854 10,475
Loan 246 - Effluent Screens 8,850 9,530
Tr. To Saleyards Reserve 30,294 45,208
TOTAL CAPITAL EXPENDITURE 48,998 65,213
TOTAL EXPENDITURE 443,451 467,468
OPERATING REVENUE
1830 Fees (388,073) (399,715)
1831 Truck Wash (34,260) (46,000)
Depreciation Write-back (21,118) (21,752)
TOTAL OPERATING REVENUE (443,451) (467,467)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (443,451) (467,467)
NET COST OF SERVICES 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 265
Council Buildings And Structures Maintenance
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
11301 Salaries & Wages 86,624 86,966 10080 Administration Building 24,103 24,826 11702 Rose Garden Café 6,427 6,620 11307 Information & Neighbourhood Centre 4,285 4,414 12103 Senior Citizens Building 6,427 6,000 11309 House - Cnr Darling & Bartlett Avenue 3,214 3,310 11310 House - Bourke Street 8,034 8,275 11311 Liverpool Street House & Flat 14,234 14,661 11312 Public Toilets 25,390 26,152 12120 118 Kendal Street & Waugoola House 5,000 5,150 11319 Bus Shelters 5,356 5,517 10086 Darbys Falls TV Tower 5,356 0
Bealieu - House 5,356
11323 Airport Rd House - RFS 5,356 5,517 50982 Radio tower 6,963 7,172 12107 Council Property Rates 16,068 16,550 12102 Other Property Maintenance 10,712 11,033 11320 Council Depot 6,427 6,620 11321 Woodstock Grandstand 1,071 0
TOTAL OPERATING EXPENDITURE 246,403 238,782
CAPITAL EXPENDITURE
Extension - Visitors' Centre Kiosk 0 0
Senior Citizens Building - Toilet Upgrade 16,000 0
CAPITAL EXPENDITURE 16,000 0
TOTAL EXPENDITURE 262,403 238,782
OPERATING REVENUE
1840 Rent of Council Properties (18,722) (19,284) 1823 Rose Garden Kiosk Rent (24,486) (25,221) 1884 House cnr Darling & Bartlett Ave (11,646) (11,995) 1885 House Bourke St (7,431) (7,654) 1886 House Liverpool St (18,978) (19,547) 1888 118 Kendal St (27,791) (28,625)
TOTAL OPERATING REVENUE (109,054) (112,326)
CAPITAL REVENUE
Contribution - Lessee Kiosk
0
Grant - Senior Citizens Building - Toilet Upgrade (8,000) 0
TOTAL CAPITAL REVENUE (8,000) 0
TOTAL REVENUE (117,054) (112,326)
NET COST OF SERVICES 145,349 126,456
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 266
Infrastructure & Operations - Overheads & Employee’s Leave & Entitlements
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
19040 Superannuation 619,960 623,354
19041 Public Holidays 165,160 155,638
19042 Workers Comp. Insurance 452,659 183,339
19044 Annual Leave 381,740 395,773
19045 Long Service Leave 0 0
19043 Sick Leave 93,935 98,943
Saleyards Overheads Contra (32,194) (33,240)
TOTAL OPERATING EXPENDITURE 1,681,260 1,423,807
TOTAL EXPENDITURE 1,681,260 1,423,807
OPERATING REVENUE
1855 Oncost on RTA Works (216,320) (223,350)
TOTAL OPERATING REVENUE (216,320) (223,350)
CAPITAL REVENUE
Tr. From LSL Povision 0 0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (216,320) (223,350)
NET COST OF SERVICES 1,464,940 1,200,457
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 267
Waste Operations
Waste Collection
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
AODE 193,643 203,120
10530 Operator's Wages 51,069 54,128 10549 Working Expenses 23,508 24,213 10531 Plant Running Expenses 158,000 162,740 10532 MGB Maintenance 1,680 1,730 10832 Donations - DWMC 1,622 1,671 23149 MGB Replacements 21,632 22,281 10533 Deliver New Waste/Recycling Bins 4,702 4,843
Dividend 43,264 44,562
10536 MGB Disposal Costs (Weighbridge) - Internal 436,588 449,686
Street Sweeping - Cowra & Villages
0
10546 Salaries & Wages 39,755 42,239 10547 Plant Running Expenses 79,444 81,827 10548 Maintenance/Consumables 5,877 6,053
Cleaning Cowra CBD
0
10537 Salaries & Wages 43,449 46,164 10538 Plant Running Expenses 56,027 57,708 10539 Maintenance/Consumables 6,997 7,207
Depreciation Charge
Depreciation - Waste 221,000 227,630
TOTAL OPERATING EXPENDITURE 1,388,257 1,437,803
CAPITAL EXPENDITURE
Tr. To Waste Reserve 107,026 113,536
TOTAL CAPITAL EXPENDITURE 107,026 113,536
TOTAL EXPENDITURE 1,495,283 1,551,339
OPERATING REVENUE
1200 Domestic Waste Management Charge (1,425,710) (1,468,481) 1215 Commercial Waste Management Charge (186,125) (191,709) 1214 Interest on Overdue Charges (15,000) (15,450) 1210 Pensioner Rates Abandoned 125,235 128,992 1209 Pensioner Subsidy (68,879) (70,946)
Depreciation Write-back (221,000) (227,630)
TOTAL OPERATING REVENUE (1,791,479) (1,845,224)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (1,791,479) (1,845,224)
NET COST OF SERVICES (296,196) (293,885)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 268
Waste Disposal
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
Contribution to Administration Salaries 70,459 75,113
Landfill
10542 - Wages 42,848 45,526
10540 - Working Expenses 13,860 14,276
10541 - Plant Running Expenses 99,764 102,757
10567 DEC Licence Fees 4,990 5,140
Village Tips
10544 - Wages 33,978 36,101
10543 - Working Expenses 9,978 10,277
10553 Plant Running Expenses 6,406 6,598
AODE 47,191 49,501
10545 Clean Up Australia Day 4,435 4,568
TOTAL OPERATING EXPENDITURE 333,909 349,857
CAPITAL EXPENDITURE
Tr. To Cell Construction Reserve 50,000 50,000
TOTAL CAPITAL EXPENDITURE 50,000 50,000
TOTAL EXPENDITURE 383,909 399,857
OPERATING REVENUE
1216 MGB Disposal (Weighbridge) (436,588) (449,686)
TOTAL OPERATING REVENUE (436,588) (449,686)
CAPITAL REVENUE
Tr. From Waste Reserve 0 0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (436,588) (449,686)
NET COST OF SERVICES (52,679) (49,828)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 269
Recycling
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
COLLECTION 10550 Wages 114,085 121,212
10569 Working Expenses 5,821 5,996
10619 Recycling - Education 21,425 22,068
Waste to Art - Netwaste 5,000 5,000
10551 Plant Running Expenses 92,219 94,986
10552 Crate Replacement 0 0
TOTAL COLLECTION COSTS 238,550 249,261
MRF OPERATION
10560 Wages 303,847 322,832
10561 Plant Running Expenses 90,170 92,875
10562 Working Expenses 141,694 145,945
10609 Waste Software Maintenance 2,357 2,428
10574 Staff Training/Conferences/Meetings 16,631 17,130
Old Tip Re-Use Study
20,000
AODE 100,984 105,926
Loan 218 - MRF Construction-Internal 19,574 17,048
Loan 240C - MRF-External 11.11% 1,275 1,037
Loan 219 -MRF- External 5,131 2,262
Loan 223 - Ileachate Dam-Internal 4,072 3,746
Loan 247 Recycling Upgrade 40,855 39,228
TOTAL MRF OPERATING EXPENDITURE 726,590 770,456
TOTAL OPERATING EXPENDITURE 965,139 1,019,718
CAPITAL EXPENDITURE
Loan 247 Recycling Upgrade 21,181 22,809
Loan 218 - MRF Construction-Internal 30,950 33,475
Loan 240C - MRF-External 11.11% 3,701 3,939
Loan 219 - MRF-External 46,251 49,121
Loan 223 - Leachate Dam-Internal 4,076 4,402
TOTAL CAPITAL EXPENDITURE 106,160 113,747
TOTAL EXPENDITURE 1,071,299 1,133,464
OPERATING REVENUE
1204 Sale of Recycled Material (200,850) (206,876)
1213 Land Rental (3,825) (3,940)
1211 Interest on Overdue Charges (4,120) (4,244)
1206 Weighbridge Charges (310,454) (319,768)
1205 2nd Hand Shop Sales (3,183) (3,278)
1201 Recycling Charge (411,814) (424,168)
TOTAL OPERATING REVENUE (934,246) (962,274)
CAPITAL REVENUE
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE (934,246) (962,274)
NET COST OF SERVICES 137,053 171,191
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 270
Waste Overheads & Employees’ Leave & Entitlements
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
19022 Superannuation 72,223 71,405
19024 Public Holidays 20,362 18,735
19027 Workers Comp. Insurance 62,676 23,834
19020 Annual Leave 45,249 46,839
19021 Long Service Leave 0 0
19023 Sick Leave 11,312 11,710
TOTAL OPERATING EXPENDITURE 211,822 172,523
TOTAL EXPENDITURE 211,822 172,523
CAPITAL REVENUE
Tr. From LSL Provision 0 0
TOTAL CAPITAL REVENUE 0 0
TOTAL REVENUE 0 0
NET COST OF SERVICES 211,822 172,523
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 271
Water Operations
Water
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
ADMIN OPERATING EXPENDITURE
SUPPLY SERVICES
Contribution to Administration Salaries 127,678 131,828
Contribution to TS Assets Salaries
65,662
10781 Public Promotion & Education 10,712 11,033
10707 Programming Expenses 11,642 11,991
10710 Meter Reading 72,459 74,633
10226 Staff Training 13,305 13,704
10783 Computer Software 5,356 5,517
10784 Printing, Stationery & Postage 16,631 17,130
10785 Rates & Charges - Internal 13,305 13,704
10714 Telephone/Fax 6,728 6,930
10786 Protective Equipment/ Safety Supplies 5,356 5,517
AODE 692,355 726,237
10708 Donations 32,262 33,230
ENGINEERING & SUPERVISION
23446 Integrated Water Cycle Management 18,000 0
10757 Sludge Management Study 20,000 0
10736 Emergency Ground Water Construction - Aquifer 8,000 0
Review - Drought Management Plan 10,000 0
Review - Demand Management Plan 10,000 0
Review - Business Plan 10,000 0
Review - Developer Service Plan 5,000 0
10793 Koorawatha Operational Cost
0
PURCHASE OF WATER
10716 - CTCC 222,130 228,794
10715 - Lachlan River 72,549 74,725
PUMPING STATION
10738 Repairs & Operating Expenses 48,783 50,272
10739 Energy Costs 232,830 239,815
RESERVOIRS
10740 Repairs & Operating Expenses 40,000 41,240
TREATMENT PLANT
10720 Energy Costs 77,611 79,939
10721 Repairs & Maintenance 105,000 108,253
10722 Wages 164,723 225,000
10760 Wyangala Operation 19,470 50,068
10763 Darbys Falls Operation 6,388 26,582
10725 Chlorine 46,566 47,963
10726 Fluoride 23,283 23,981
10727 Poly Aluminium Chloride (PAC) 164,000 168,920
10746 EPA Licence 7,000 7,210
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 272
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
10728 Caustic Soda 40,745 41,967
Permanganate 10,000 10,300
10729 Testing 53,500 55,135
10787 Buildings Maintenance 4,000 4,120
10723 Telephone 6,652 6,852
10724 Rates & Charges 9,978 10,277
MAINS
10741 Repairs & Maintenance 505,000 520,663
10743 Mains Flushing & Scouring 140,937 93,094
10733 Infiltration Gallery 12,852 13,255
TELEMETRY
10751 Service & Maintenance 46,566 47,963
METERS
10750 Repairs & Maintenance 87,708 90,454
STAFF HOUSING
10730 Repairs & Maintenance 5,356 5,517
10748 Rates & Charges 1,607 1,655
LOAN REPAYMENTS - INTEREST
Proposed Loan- External - WTP Upgrade 114,531 181,848
Loan 242a - 1C1 Zone External ($1.286,500 @6.8% 30yr) 93.12% 83,214 81,996
Loan - Emergency Water supply ($1,322,268 ) 112,179 96,181
Loan 241a - Mains Replacement Stage 3- External ($1.256 @6.5% 25yr) 74,576 73,520
Loan No 238 -Mains Replacement 05/06- External 53,827 52,498
OVERHEADS & E.L.E.
19014 Superannuation 57,788 64,806
19013 Public Holidays 21,391 20,712
19025 Workers Comp. Insurance 62,676 23,834
19011 Annual Leave 47,536 51,781
19010 Long Service Leave 0 0
19012 Sick Leave 11,884 12,945
OTHER
10771 S.611 Charges 774,928 798,176
Depreciation Charge
Depreciation - Water 1,400,000 1,442,000
TOTAL OPERATING EXPENDITURE 6,058,553 6,291,426
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 273
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
CAPITAL EXPENDITURE
23014 New Meter Installation (Reserve) 33,824 34,862
Reservoir Upgrade 60,000 0
Treatment Plant Automation - Stage 1 1,375,000 2,500,000
River Lift Pump Replacement (Reserve) 75,000 0
23015 Meters Replacement (Reserve) 74,588 76,888
23120 Darbys Falls Water Treatment Plant 550,000 0
SOUTHERN SECTION
MAINS CONSTRUCTION
23410 Emergency Water Supply (Subsidy $2,250,000, Loan $1,322,268) 0 0
1C1 Extension - Eloura Road - Loan 330,594 91,814
Redfern St - Main Extension - S94 0 120,301
Main Extensions - S94 0 120,301
LOAN REPAYMENTS - PRINCIPAL
Proposed Loan- External - WTP Upgrade 10,511 24,168
Loan 242a - 1C1 Zone External ($1.286,500 @6.8% 30yr) - 93.12% 17,670 18,888
Loan - Emergency Water supply ($1,322,268 ) 10,295 12,873
Loan 241a- Mains Replacement Stage 3 - External 19,671 20,728
Loan No 238 -Mains Replacement 05/06- External 24,151 25,480
TRANSFERS TO RESERVES
Long Service Leave 8,500 8,500
Infrastructure 820,861 843,556
Equalisation 150,000 150,000
Developer Contributions 64,274 66,202
TOTAL CAPITAL EXPENDITURE 3,624,939 4,114,562
TOTAL EXPENDITURE 9,683,492 10,405,988
OPERATING REVENUE
1300 Water Access-Vacant Land - Residential (148,120) (152,565)
1303 Water Access-Vacant Land - Non Residential 0 0
Residential
1336 - Access Charges (1,244,893) (1,282,240)
1341 - Consumption Charges (1,867,340) (1,923,360)
Non-Residential
1337 - Access Charges (447,439) (460,863)
1342 - Consumption Charges (908,438) (935,691)
Non-Residential (Industrial)
1338 - Access Charges (23,441) (24,144)
1343 - Consumption Charges (189,655) (195,345)
Non-Residential (Nurseries)
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 274
A/C NUMBER DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
1347 - Access Charges (2,415) (2,487)
1348 - Consumption Charges (5,374) (5,536)
Education Consumers
1876 - Access Charges (18,323) (18,873)
1877 - Consumption Charges (40,785) (42,008)
Raw Water
1339 - Access Charges (21,200) (21,836)
1344 - Consumption Charges (70,972) (73,102)
1321 Standpipe Sales (5,536) (5,702)
1326 Pensioner Rate Subsidy (63,795) (65,709)
1302 Pensioner Rates Abandoned 115,991 119,471
INTEREST
1319 - On Overdue Charges (20,700) (21,321)
OTHER
1322 Tapping Fees (26,781) (27,584)
1346 Japanese Garden Water Subsidy (10,712) (11,033)
1325 Sundry Revenue (5,356) (5,517)
Depreciation Write-back (1,400,000) (1,442,000)
TOTAL OPERATING REVENUE (6,405,284) (6,597,444)
CAPITAL REVENUE
Developer Contributions (64,274) (66,202)
1958 Subsidy - Darbys Falls Plant (185,373) 0
Loan Funding-Emergency Water Supply 0 0
Loan Funding-1C1 (330,594) (91,814)
Loan Funding-Treatment Plant Automation (1,375,000) (2,500,000)
Emergency Water Supply Subsidy 0 0
Tr. From General Fund (S.611) (774,928) (798,176)
Tr. From Infrastructure Reserve (548,039) (111,750)
Tr. From Developer Contribution Reserve 0 (240,602)
TOTAL CAPITAL REVENUE (3,278,208) (3,808,544)
TOTAL REVENUE (9,683,492) (10,405,988)
NET COST OF SERVICES 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 275
Sewer Operations
Sewer
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
OPERATING EXPENDITURE
ADMINISTRATION
Contribution to Admin Salaries 127,688 131,828
Contribution to TS Assets Salaries 160,267 0
10804 Office Expenses 15,522 15,988
10806 Telephone 5,356 5,517
10851 Training & Conferences 11,087 11,420
10852 Computer Software 5,543 5,709
10853 Rates & Charges (Internal) 5,543 5,709
10827 Donations 1,108 1,141
AODE 335,406 351,820
10854 Protective Clothing & Safety Supplies 7,761 7,994
10807 EPA Licences 60,000 20,000
Review - Business Plan 10,000 0
Review - Developer Service Plan 5,000 0
Integrated Water Cycle Management 18,000 0
ENGINEERING & SUPERVISION
10839 Trade Waste Implementation 68,824 0
TREATMENT WORKS
10810 Fuel & Energy 100,000 115,000
10812 Wages 98,465 114,951
STP Insurance
55,000
STP Chemicals
115,000
10811 Maintenance & Repairs 10,000 20,000
11322 Bealieu - House 0 5,517
Treatment Plant -Insurance 50,000 51,500
10813 Rates & Water 5,892 6,069
10815 Testing & Monitoring 11,087 11,420
SEWER MAINS
10819 Maintenance & Repairs 237,634 256,644
10841 Condition Audit - Mains Inspecition 30,000 30,900
10836 S.611 Charges 133,631 137,640
10842 Identify Illegal Connections - Storm Water 20,000 20,000
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 276
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
PUMPING STATION
10821 Fuel & Energy 21,855 22,511
10823 Wages 43,231 50,469
10822 Maintenance & Repairs 33,000 33,990
LOAN REPAYMENTS - INTEREST
Loan 240A/B - Sewer & Drainage - External 88.89% 10,197 8,293
Loan 212 - North Cowra Drainage-External 7,268 5,101
Loan 248/249- STP Upgrade 665,917 663,997
Loan 237 -North Cowra Drainage- External 13,766 10,375
EMPLOYMENT OVERHEADS & E.L.E.
19019 Superannuation 35,988 32,177
19018 Public Holidays 9,437 7,729
19026 Workers Comp. Insurance 24,106 9,167
19016 Annual Leave 20,970 19,324
19015 Long Service Leave 0 0
19017 Sick Leave 5,243 4,831
Depreciation Charge
Depreciation - Sewer 305,000 314,150
TOTAL OPERATING EXPENDITURE 2,729,792 2,678,881
CAPITAL EXPENDITURE
23415 Mains Replacement (Reserve) 250,000 250,000
23363 Treatment Plant- Contract A 0 0
Caravan Park Pump station Safety Improvements
50,000
LOAN REPAYMENT - PRINCIPAL
Loan 240A/B -Sewer & Drainage- External 88.89% 29,615 31,519
Loan 212 -North Cowra Drainage- External 31,011 33,088
Loan 237 -North Cowra Drainage- External 53,212 56,603
Loan 248/249- STP Upgrade 64,335 5,218,460
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 277
A/C NUMBER
DESCRIPTION Original Estimate 2011/12
Estimate for 2012/13
TRANSFERS TO RESERVES
Tr. To LSL Provisions 9,000 9,270
Tr. To Developer Contributions Reserve 70,000 72,100
Tr. To Infrastructure Reserve 319,656 511,643
TOTAL CAPITAL EXPENDITURE 826,829 6,232,683
TOTAL EXPENDITURE 3,556,621 8,911,563
OPERATING REVENUE
1400 Sewer Access Charges (2,186,214) (2,303,283)
1420 Sundry Income (10,609) (10,927)
1401 Sewer Service Charges (531,130) (553,340)
1423 Pensioner Rate Subsidy (42,736) (44,018)
1402 Pensioner Rates Abandoned 77,701 80,032
1403 Council Services (18,206) (18,752)
Interest
1412 - On Overdue Charges (20,000) (20,600)
1418 Treatment Works Land / Residence Rental (16,896) (17,403)
1419 Trade Waste Fees (49,900) (51,397)
Depreciation Write-back (305,000) (314,150)
TOTAL OPERATING REVENUE (3,102,990) (3,253,838)
CAPITAL REVENUE
Developer Contributions (70,000) (72,100)
Loan Funding 0 0
STP Subsidy 0 (5,147,986)
Tr. From General Fund (S.611) (133,631) (137,640)
Tr. From Infrastructure Reserve (250,000) (300,000)
TOTAL CAPITAL REVENUE (453,631) (5,657,726)
TOTAL REVENUE (3,556,621) (8,911,564)
NET COST OF SERVICES 0 0
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 278
Overheads Summary
General Manager
Corporate Services Operations
Environmental Services
General Fund Water Sewer Waste
2012/2013 Estimated
Total
Superannuation
71,010
150,396
623,354
67,355
912,115
64,806
32,177
71,405
1,080,503
Workers Comp.
Insurance
9,167
49,502
183,339
22,001
264,009
23,834
9,167
23,834
320,844
Annual Leave
33,258
108,631
395,773
56,243
593,905
51,781
19,324
46,839
711,849
Sick Leave
8,314
27,158
98,943
14,061
148,476
12,945
4,831
11,710
177,962
Public Holidays
11,562
42,016
155,638
21,060
230,276
20,712
7,729
18,735
277,452
Long Service Leave
2,568,610
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 279
Reserves Schedule
2012 2013
General Long Service Leave 440,949 496,704
General Plant & Vehicle Replacement 976,470 714,101
General Carry Over Works - -
General Aerodrome 36,802 36,802
General Art Gallery 11,255 11,255
General Bad Debts 17,529 12,012
General Business Assistance 150,039 150,039
General Caravan Park 173,069 209,284
General Election 70,345 (14,655)
General Environmental Projects 8,330 8,330
General Fire Mitigation 16,320 18,820
General Futures 30 12,239 12,239
General Gravel Rehabilitation 118,726 1,298
General IT Equipment 30,000 40,000
General Main St Improvements 206,000 206,000
General POW Maintenance 2,663 2,663
General Risk Management 139,036 159,562
General RTA Warranty 303,922 332,974
General Saleyards 133,635 178,843
General Unexpended RTA Funds - -
General Land Development (176,336) (208,348)
General Works 8,880 8,880
General Workers Compensation 100,000 100,000
General Depot Redevelopment 200,000 200,000
General Unexpended Grants 1,500 1,500
General Unexpended Loans
2,981,373 2,678,303
Waste Waste - General 697,829 861,365
Waste Waste - Long Service Leave 2,826 2,826
700,655 864,191
Water Water - Long Service Leave 8,500 17,000
Water Water - Infrastructure 1,927,766 2,659,572
Water Water - Usage Equalisation 550,000 700,000
2,486,266 3,376,572
Sewer Sewer - Long Service Leave 99,218 108,488
Sewer Sewer - Infrastructure 3,842,356 3,996,241
3,941,574 4,104,729
TOTAL 10,109,868 11,023,795
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 280
Loan Summary
External Loans
Lender Purpose Date Due Principal Int. Annual
Principal o/s
2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Principal
o/s
Obtained Date
Rate Repayment 1/07/2012 Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal 1/07/2016
GENERAL
0.50
220
National Australia Bank Pool Refurbishment 26/3/1999 26/3/2014 200,000 6.60 21,106 34,883 1,832 19,274 523 15,609
0
224a
Commonwealth Bank Library 50% 30/06/2000 28/06/2015 125,000 7.05 13,636 36,299 2,364 11,272 1,555 12,080 689 12,947
0
224b
Commonwealth Bank Gallery 50% 30/06/2000 28/06/2015 125,000 7.05 13,636 36,299 2,364 11,272 1,555 12,080 689 12,947
0
231
National Australia Bank Civic Centre Roof 28/08/2002 31/03/2017 100,000 7.09 10,938 45,377 3,082 7,856 2,515 8,423 1,907 9,031 1,255 9,683 556 10,382
0
232
National Australia Bank Land Development 29/05/2003 29/11/2012 500,000 6.10 67,662 31,065 947 31,065
0
233
National Australia Bank Saleyards 29/05/2003 29/11/2022 220,000 6.20 19,415 146,775 8,940 10,475 8,281 11,134 7,580 11,835 6,834 12,581 6,042 13,373 5,200 14,215 4,305 15,110 3,354 16,061 2,343 17,072 1,268 18,147 6,774
234
National Australia Bank Pool 13/06/2003 13/6/2023 1,600,000 5.81 136,378 1,096,031 62,623 73,754 58,276 78,102 53,672 82,705 48,797 87,580 43,635 92,743 38,169 98,209 32,380 103,998 26,250 110,128 19,758 116,620 12,884 123,494 128,697
235 Westpac Cash Back Internal Reserves 27/02/2004 27/2/2019 2,000,000 6.34 208,587 1,165,204 71,920 136,667 62,910 145,678 53,527 155059.84 43,541 165,046 33,012 175,575 21,603 186,984 9,560 200,194
0
236a
Commonwealth Bank River Pk Amenities 22% 28/01/2005 1/2/2025 96,000 6.31 8,462 74,268 4,627 3,835 4,381 4,081 4,119 4,343 3,841 4,621 3,545 4,917 3,230 5,233 2,894 5,568 2,537 5,925 2,158 6,305 1,753
6708.6074 22,732
236b
Commonwealth Bank Vaux St Drainage 78% 28/01/2005 1/2/2025 337,500 6.31 30,002 263,313 16,404 13,598 15,532 14,470 14,605 15,397 13,618 16,384 12,568 17,434 11,450 18,552 10,261 19,741 8,996 21,006 7,650 22,352 6,217
23785.0626 80,594
239
National Australia Bank Houghton's Quarry 29/05/2006 31/5/2016 265,000 6.71 36,804
127,263
8,065
28,739
6,104
30,699
4,010
32,794
1,773
35,031
0
242b
Commonwealth Bank Mulyan Amenities 6.88% 22/8/2007 24/8/2037 255,000 6.80 7,454
89,583
6,058
1,396
5,961
1,492
5,857
1,596
5,778
1,676 5,612 1,842 5,500 1,954 5,364 2,090 5,233 2,221 5,091 2,362 4,883 2,570 70,385
243
National Australia Bank WCRG Amenities 30/6/2008 30/6/2018 160,000 8.05 23,624 110,629
8,611
15,013
7,378
16,246
6,044
17,580
4,612
19,012 3,039 20,585 1,341 22,193
0
241b
Commonwealth Bank
Vaux Street Drainage 11.67% 18/12/2006 18/12/2036 166,000 6.35 12,452 153,631
9,713
2,739
9,537
2,915
9,349
3,103
9,223
3,229 8,915 3,537 8,719 3,765 8,469 3,983 8,235 4,217 7,940 4,512 7,693 4,759 116,873
National Australia Bank
Civic Centre Refurbishment 23/12/2008 30/9/2033 1,395,390 8.15 130,639 1,319,382
105,413
25,225
102,672
27,967
100,602
30,037
97,798
32,840 94,759 35,879 91,782 38,857 89,530 41,108 85,305 45,334 81,496 49,143 77,367 53,272 939,720
245
National Australia Bank
Civic Centre Refurbishment (2) 2009/2010 2029/2030 234,000 8.33 24,228 218,095
18,041
6,243
17,510
6,774
16,934
7,350
16,354
7,931 15,635 8,650 14,899 9,385 14,101 10,183 13,271 11,013 12,299 11,986 11,280 13,005 125,576
Quarry - Holmwood 2010/2011 2040/2041 120,000 8.50 18,053
0
246
National Australia Bank
Saleyards - Effluent Screens 2009/2010 2024/2025 225,000 8.01 25,921 208,114
16,390
9,530
15,604
10,317
14,752
11,168
13,944
11,976 12,838 13,083 11,693 14,228 10,588 15,333 9,347 16,574 7,957 17,963 6,524 19,396 68,545
Proposed Loan Drainage Works
250,000 7.30 20,602 250,000 18,185 2,417 18,004 2,598 17,809 2,793 17,599 3,003 17,374 3,228 17,132 3,470 16,871 3,730 16,591 4,010 16,291 4,311 15,967 4,634 215,806
8,373,890
829,598
5,406,210
365,581
410,369
338,298
400,665
312,144
410,687
284,966
410,595
257,529
401,228
230,718
417,042
204,324
421,038
179,118
236,489
162,983
252,625
145,837
269,771
1,775,702
WATER
238
Commonwealth Bank
Water Main Replacement 2005/2006 21/02/2006 22/02/2031 1,000,000 6.03 77,978 874,609 52,498 25,480 51,065 26,913 48,995 28,982 47,246 30,732 45,617 32,361 43,506 34,472 41,396 36,582 39,368 38,609 36,701 41,277 34,274 43,704 535,497
241a
Commonwealth Bank
Water Main Replacement 2006/2007 88.33% 18/12/2006 18/12/2036
1,256,000 6.35 94,248 1,162,829 73,520 20,728 72,183 22,065 70,759 23,488 69,810 24,438 67,475 26,772 65,991 28,495 64,103 30,145 62,327 31,921 60,099 34,149 58,226 36,021 884,607
242a
Commonwealth Bank 1C1 Zone 93.12% 22/8/2007 24/8/2037
1,286,500 6.80 100,883 1,212,497 81,996 18,888 80,687 20,197 79,274 21,601 78,200 22,684 75,959 24,925 74,442 26,442 72,597 28,287 70,825 30,059 68,913 31,971 66,094 34,790 952,652
Emergency Water Supply 2010/2011 2041/2042 1,322,268 8.50 122,473 1,322,268 96,181 12,783 95,222 13,742 94,191 14,773 93,083 15,881 91,891 17,072 90,610 18,353 89,234 19,730 87,753 21,210 86,162 22,801 84,451 24,512 1,141,411
NEW LOAN Water Treatment Plant Upgrade
2,500,000 7.30 206,014 2,500,000 181,848 24,168 180,035 25,981 178,086 27,930 175,991 30,026 173,738 32,278 171,316 34,700 168,713 37,303 165,914 40,102 162,906 43,111 159,672 46,345 2,158,056
7,364,768
601,596
7,072,204
486,042
102,047
479,192
108,897
471,306
116,774
464,329
123,761
454,680
133,409
445,866
142,462
436,042
152,047
426,187
161,902
414,781
173,309
402,718
185,372
5,672,223
SEWERAGE
0.1167
212
National Australia Bank Nth Cowra Drainage 22/8/1994 22/8/2014 381,000 10.06 38,279 88,574 5,101 33,088 2,975 35,304 610 20,183
0
237
National Australia Bank
Re-finance Loan 213 - Drainage 1/07/2005 28/6/2015 493,431 6.21 66,978 180,961 10,375 56,603 6,849 60,129 3,002 64,228
0
240a/b
Commonwealth Bank Drainage 88.89% 27/3/2006 25/2/2016 291,685 6.33 39,812 138,766
8,293
31,519
6,266
33,546
4,109
35,703
1,813
37,999
0
244
National Australia Bank
Sewerage Treatment Plant 2009/2010 2039/2040 7,213,320 8.13 644,024 7,132,376
577,768
70,474
571,862
76,380
565,460
82,782
561,824
86,418
549,703
98,539
543,020
105,222
534,201
114,041
526,107
122,135
517,349
130,893
501,995
146,247 6,099,247
249
National Australia Bank
Sewerage Treatment Plant (Subsidy) 2009/2010 2011/2012 5,147,986 6.19
5,147,986 86,229
5,147,986
0
13,527,422
789,093
12,688,663
687,766
5,339,669
587,952
205,359
573,182
202,896
563,637
124,416
549,703
98,539
543,020
105,222
534,201
114,041
526,107
122,135
517,349
130,893
501,995
146,247
6,099,247
WASTE
240c
Commonwealth Bank
Materials Recycling Facility 11.11% 27/3/2006 25/2/2016 36,455 6.33 4,976 17,344
1,036
3,939
783
4,193
514
4,462
227
4,749
0
219
Commonwealth Bank
Materials Recycling Facility 5/6/1998 5/6/2013 500,000 6.11 51,383 49,121 2,262 49,121
0
247
National Australia Bank Recycling Plant 2009/2010 2024/2025 538,500 8.01 62,037 498,086 39,228 22,809 37,345 24,691 35,307 26,729 33,373 28,664
30,725
31,312
27,985
34,052
28,340
36,696
22,369
39,667
19,044
42,992
15,615
46,422 164,053
1,074,955
118,396
564,551
42,527
75,869
38,128
28,884
35,821
31,192
33,599
33,413
30,725
31,312
27,985
34,052
28,340
36,696
22,369
39,667
19,044
42,992
15,615
46,422
164,053
GRAND TOTAL - EXTERNAL LOANS
30,341,035
2,338,683
25,731,627
1,581,916
5,927,954
1,443,570
743,805
1,392,452
761,549
1,346,5
32
692,185
1,292,637
664,488
1,247,588
698,778
1,202,908
723,821
1,153,781
560,193
1,114,157
599,820
1,066,165
647,811
13,711,225
OPERATIONAL PLAN
Operational Plan 2012-2013 Page 281
Internal Loans
From To Purpose Date Due Principal Interest Annual
Principal o/s 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 2015/2016 2015/2016 2015/2016 2015/2016 2015/2016
Principal o/s
Obtained Date
Rate Repayment 1/07/2011 Interest Principal
Interest
Principal
Interest
Principal
Interest
Principal
Interest
Principal
Interest
Principal
Interest
Principal
Interest
Principal
Interest
Principal
Interest
Principal 1/07/2016
GENERAL
226a General General Library 30/06/2000 30/06/2025 167,500 8.00 15,691 124,020 9,922 5,770 9,460 6,231 8,962 6,730 8,423 7,268 7,842 7,850 7,214 8,477 6,536 9,156 5,803 9,888 5,012 10,679 4,158 11,533 40,438
226b General General Gallery 30/06/2000 30/06/2025 167,500 8.00 15,691 124,020 9,922 5,770 9,460 6,231 8,962 6,730 8,423 7,268 7,842 7,850 7,214 8,477 6,536 9,156 5,803 9,888 5,012 10,679 4,158 11,533 40,438
227 General General Busby Place Carpark 30/06/2000 30/06/2013 260,000 8.00 32,895 30,459 2,437 30,459
0
TOTAL
595,000
64,277
278,498
22,280
41,998
18,920
12,462
17,923
13,459
16,846
14,536
15,683
15,699
14,427
16,955
13,071
18,311
11,606
19,776
10,024
21,358
8,315
23,067
80,876
WASTE
218 General Waste MRF Construction 31/12/1997 30/12/2017 500,000 8.00 50,523 221305.15 17,048 33,475 14,316 36,207 11,362 39,162 8,166 42,357 4,710 45,813 972 24,291
0
223 General Waste Leachate Dam 30/06/2000 30/06/2020 80,000 8.00 8,148 46,825 3,746 4,402 3,394 4,754 3,013 5,135 2,603 5,546 2,159 5,989 1,680 6,468 1,162 6,986 604 7,545
0
580,000
58,671
268,130
20,794
37,878
17,710
40,961
14,375
44,296
10,769
47,903
6,869
51,803
2,652
30,759
1,162
6,986
604
7,545
-
-
-
-
-
GRAND TOTAL - INTERNAL LOANS
1,175,000
122,948
546,628
43,074
79,876
36,630
53,424
32,298
57,756
27,615
62,439
22,552
67,502
17,079
47,714
14,233
25,297
12,210
27,321
10,024
21,358
8,315
23,067
80,876
1,624,989.42
6,007,829.70
7,632,819.12