284
OPERATIONAL PLAN 2012-2013 ADOPTED 25 JUNE 2012

OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN 2012-2013

ADOPTED 25 JUNE 2012

Page 2: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Contents Message from the Mayor and General Manager ......................................................................... 1

Your Elected Councillors ............................................................................................................... 4

Vision & Values ............................................................................................................................... 5

Future Directions ........................................................................................................................... 6

Organisational Profile .................................................................................................................... 8

Introduction .................................................................................................................................... 9

Measuring and Reporting Progress ............................................................................................. 10

The Operational Plan ................................................................................................................... 12 Health & Well-being .............................................................................................................................. 12 Education Training and Research ......................................................................................................... 42 Lifestyle ................................................................................................................................................... 49 Governance ............................................................................................................................................ 86 Business and Industry .......................................................................................................................... 115 Transport and Infrastructure .............................................................................................................. 140 Natural Resource Management .......................................................................................................... 165

2012/2013 Revenue Policy – Rates & Annual Charges ............................................................ 174 Rates...................................................................................................................................................... 174 Water Supply ....................................................................................................................................... 175 Sewerage Service ................................................................................................................................. 178 Waste Charges ..................................................................................................................................... 179 Other Charges and Rebates ................................................................................................................ 180

2012/2013 Revenue Policy – Fees & Charges ........................................................................... 183 General Administration ....................................................................................................................... 183 Roads ..................................................................................................................................................... 185 Environmental Services ....................................................................................................................... 185 Waste Disposal ..................................................................................................................................... 196 Discharge of Liquid Trade Waste To Sewerage System .................................................................. 198 Noxious Weeds .................................................................................................................................... 200 Cemetery .............................................................................................................................................. 200 Water .................................................................................................................................................... 202 Sewer .................................................................................................................................................... 204 Venue Hire ........................................................................................................................................... 204 Swimming Pool Admission ................................................................................................................. 206 Sportsfields Hire & Usage ................................................................................................................... 208 Banners and Street Signs .................................................................................................................... 209 Quarry Charges .................................................................................................................................... 209 Business Undertakings ......................................................................................................................... 209 Aerodrome ........................................................................................................................................... 209 Saleyards ............................................................................................................................................... 210 Library ................................................................................................................................................... 211 Private Works ...................................................................................................................................... 212

Page 3: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

2012/2013 Budget ....................................................................................................................... 213 Programs .............................................................................................................................................. 213 Budget - Summary By Program / Function ....................................................................................... 214 Consolidated Summary ....................................................................................................................... 216 General Manager's Operations ........................................................................................................... 217

Civic Activities ..................................................................................................................................................................................................... 217 Land Development ............................................................................................................................................................................................. 218 General Manager‟s Office ................................................................................................................................................................................. 219 Tourism ................................................................................................................................................................................................................. 220 Overheads & Employees‟ Leave & Entitlements......................................................................................................................................... 221

Corporate Services Department ........................................................................................................ 222 Corporate Services ............................................................................................................................................................................................ 222 General Purpose Revenue ................................................................................................................................................................................ 223 Other Revenue .................................................................................................................................................................................................... 224 Administration Building - Working Expenses ............................................................................................................................................. 225 Information Services........................................................................................................................................................................................... 226 Staff Maintenance ................................................................................................................................................................................................ 227 Loans ...................................................................................................................................................................................................................... 228 Library Services ................................................................................................................................................................................................... 229 Art Gallery ............................................................................................................................................................................................................ 230 Civic Centre ......................................................................................................................................................................................................... 231 Community Projects .......................................................................................................................................................................................... 232 Depreciation ......................................................................................................................................................................................................... 233 Corporate Services Overheads & Employees‟ Leave & Entitlements .................................................................................................. 234

Environmental Services Department ................................................................................................. 235 Ranger Services.................................................................................................................................................................................................... 235 Environmental Services ..................................................................................................................................................................................... 236 Environmental Services Overheads ............................................................................................................................................................... 237

Infrastructure & Operations Department ......................................................................................... 238 Infrastructure & Operations - Administration ............................................................................................................................................ 238 Technical Services ............................................................................................................................................................................................... 239 Plant & Depot Operations ............................................................................................................................................................................... 240 Plant Purchases .................................................................................................................................................................................................... 241 RMS Maintenance / Construction .................................................................................................................................................................. 242 Cowra Street Maintenance .............................................................................................................................................................................. 243 Cowra Street Construction ............................................................................................................................................................................. 244 Rural Roads Maintenance ................................................................................................................................................................................. 245 Rural Roads Construction ................................................................................................................................................................................ 246 Village Streets ....................................................................................................................................................................................................... 247 Bushfire & Emergency Services ....................................................................................................................................................................... 248 Culvert / Causeway Construction ................................................................................................................................................................. 249 Bridges .................................................................................................................................................................................................................... 250 Quarry Operations ............................................................................................................................................................................................. 251 Drainage................................................................................................................................................................................................................. 252 Private Works ...................................................................................................................................................................................................... 253 Noxious Plants ..................................................................................................................................................................................................... 254 Public Cemeteries ............................................................................................................................................................................................... 255 Public Amenities .................................................................................................................................................................................................. 256 Swimming Pool .................................................................................................................................................................................................... 257 Parks, Gardens & Reserves .............................................................................................................................................................................. 258 Sportsfields ............................................................................................................................................................................................................ 259 Village Parks .......................................................................................................................................................................................................... 260 Rural & Urban Trees .......................................................................................................................................................................................... 261 Aerodrome ........................................................................................................................................................................................................... 262 Caravan Park ........................................................................................................................................................................................................ 263 Saleyards ................................................................................................................................................................................................................ 264 Council Buildings And Structures Maintenance.......................................................................................................................................... 265 Infrastructure & Operations - Overheads & Employees‟ Leave & Entitlements ............................................................................... 266

Waste Operations ................................................................................................................................ 267 Waste Collection ................................................................................................................................................................................................ 267 Waste Disposal .................................................................................................................................................................................................... 268 Recycling ................................................................................................................................................................................................................ 269 Waste Overheads & Employees‟ Leave & Entitlements ........................................................................................................................... 270

Water Operations ................................................................................................................................ 271 Water ..................................................................................................................................................................................................................... 271

Sewer Operations ................................................................................................................................ 275 Sewer ...................................................................................................................................................................................................................... 275

Overheads Summary ........................................................................................................................... 278 Reserves Schedule ................................................................................................................................ 279 Loan Summary ..................................................................................................................................... 280

External Loans ..................................................................................................................................................................................................... 280 Internal Loans ....................................................................................................................................................................................................... 281

Page 4: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 1

Message from the Mayor and General Manager

Following the gazettal of the Local Government Amendment (Planning and Reporting) Act 2009 all New

South Wales councils are introducing a new planning and reporting framework. During late 2011 Council

carried out community surveys and workshops to review the existing Community Strategic Plan that

articulates the community‟s vision and Council‟s mission for at least the next 10 years. That process

generally endorsed the guiding principles and strategies of the previous plan

The following values were endorsed to guide Council and the community:‐

In all our dealings we will….

show and grow leadership

be positive and work together

value each other and what we have

create opportunities for our next generations

These values set the framework for the Community Strategic Plan which is the overall planning

document for Cowra. It has a 20+ year timeframe and encompasses a broad range of goals that will need

input and support from a range of organisations and government agencies to achieve under the identified

future directions of:

Health and Wellbeing

Education, Training and Research

Lifestyle

Governance

Business and Industry

Transport and Infrastructure

Natural Resource Management

The Delivery Program 2012‐2017 is based on the Community Strategic Plan and outlines the actions that

Cowra Council will undertake to work towards addressing the goals and strategies.

The Operational Plan 2012‐2013 completes the planning documents and details the activities to be

undertaken during the financial year to deliver the commitments of the Delivery Program. The

Operational Plan also includes Council‟s detailed annual budget and revenue policy including fees and

charges.

This three tiered process ensures that there are clear links between the long terms goals of the

community and the activities of Council. It also ensures that there are clear long term strategies and

needs identified whilst still allowing for the day to day delivery of services.

Page 5: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 2

The new Delivery Program and Operational Plan were placed on public exhibition during May and June.

The community was invited to inspect the plans and to make written submissions during the public

review process so that Council could consider any such comments before the final Plans were adopted.

OPERATIONAL PLAN

A key element of the Operational Plan is the budget for 2012/2013 year. The budget exceeds

$35 million and includes a small budget surplus.

The budget is based on the 3.6% rate variation approved by the Independent Pricing and Regulatory

Tribunal.

Cowra remains in a sound financial position. However councils are finding it difficult to achieve balanced

budgets when the cost of wages, materials and utility charges are increasing at a greater rate than

income. In addition there has been long term cost shifting to local government from Federal and State

Governments where Councils are required to carry out additional activities without appropriate

compensation.

Adequate planning remains the key to a sustainable future for Council and 2012/2013 will see a

continuation on this path. Key actions planned for the coming year to achieve Delivery Program

strategies include:

Complete Local Environmental Plan

Complete CBD Masterplan

Complete installation of Darbys Falls water filtration plant

Develop a Cowra Council traineeship program

Develop a Road Asset Management Plan

Develop a Water Asset Management Plan

Develop a Wastewater Asset Management Plan

Complete Cowra Shire Economic Development Plan

Complete Cowra Shire Development Control Plan

Develop plan for heavy vehicle alternative route

Design and cost implementation plan for Cowra Regional Airport Masterplan

Conduct detailed energy audits of major council infrastructure

Continue development of water best practice suite of documents

The Works Program for 2012/2013 continues to place a strong emphasis on the maintenance of current

service standards and targeted improvements.

As a result of the floods over the last few years Council has a commitment to addressing the areas of

concern. The West Cowra flood study will be completed in 2012/2013 providing a detailed

implementation plan to alleviate the damage and disruption. The cost of works will be determined upon

finalisation of the study.

Page 6: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 3

A number of projects outside the scope of the West Cowra study have been identified and will be

undertaken in 2012/2013:

Target Car park drainage and Rowston Lane

Ranken Street Drainage

Taragala Street stormwater pipe flood flaps

Bennelong Place

Additional funding has been provided to ensure an adequate reseal program is implemented for the

streets and roads in the shire. The funding in the 2012/2013 and forward estimates is set at a level to

achieve an average reseal timeframe of 13 years.

Council will continue to roll out the Roads to Recovery program. In particular a decision will be made

on the appropriate structure to replace the Koorawatha-Greenethorpe bridge and the relevant funding

will be directed to that long awaited project.

The Integrated Plans including the Long Term Financial Plan, Delivery Program and Operational Plan

provide further details of the activities Council is carrying out. Members of the community are

encouraged to read the documents and submit comments that will be reviewed by Council.

Cr Bill West Paul Devery

Mayor General Manager

Page 7: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 4

Your Elected Councillors

Back row, left to right: Councillor Jack Mallon, Councillor Rob Watt, Councillor Peter Wright,

Councillor Ray Walsh

Front row, left to right: Councillor Bruce Miller, Councillor Judi Smith, Councillor Bill West (Mayor),

Councillor Robert Bridges, Councillor Ian Brown (Deputy Mayor)

Page 8: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 5

Vision & Values

Vision

A leading, innovative and creative community, proud of our place in history, offering opportunity

with the best of country living.

Values

In all our dealings we will…..

show and grow leadership

be positive and work together

value each other and what we have

create opportunities for our next generations.

Page 9: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 6

Future Directions

The Community Strategic Plan 2012-2036 provides a strategic framework for Cowra. The identified

goals and the strategies will only be achieved through the collective input of government and non-

government agencies, businesses, community organisations and individuals. These goals are grouped into

seven themes:

Health and Wellbeing

To enjoy our unique country lifestyle and be fit and healthy, we need a range of facilities, services and

programs that cater for the needs of all age groups. We also need to take steps to prevent conditions

that could lead to loss of health and wellbeing. This will involve health, social and family care service

professionals, together with volunteers.

Education Training and Research

We must work to make Cowra a centre of excellence for education, training and research. Education,

training and research are key components for Cowra‟s present and future development. They provide a

sound basis for the economic improvement of individuals and businesses. They help build the capacity of

the community to get things done. We are challenged to create an environment where the concept of

„life long learning‟ is encouraged and supported.

Lifestyle

Cowra has a distinctive country lifestyle. Access to and enjoyment of our sporting, recreational, cultural

and heritage facilities together with our natural environment is key to a sense of community and

wellbeing. The range and quality of these many assets together with our history, heritage and indigenous

culture, provide an opportunity to fully develop Cowra‟s potential as a unique place to live and work.

Governance

Understanding the roles and responsibilities of key organisations within our community is the key to

working together. Communication between council, other levels of government and the community is

fundamental for effective consultation. Leadership is needed from council and from other organisations,

groups and individuals within Cowra. Planning is a shared responsibility and purposeful partnerships are

the way forward.

Business and Industry

Cowra needs a strong and vital economy to provide opportunity and build its desirable country lifestyle.

We will promote Cowra to the rest of the world as an area of agricultural excellence and opportunity

for a variety of businesses. We need to respond to the needs of new and existing businesses, encourage

Page 10: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 7

innovation and high standards and develop ways to help businesses prosper. We must plan, develop and

implement the facilities and infrastructure needed for business to locate and expand in Cowra.

Transport and Infrastructure

Transport and infrastructure issues are critical for the future development of an access to Cowra. We

need to improve and develop our public infrastructure and associated services in a sustainable way.

Service delivery is challenged by new demands and a changing world. The diverse demands of public

health, community safety, access for all, population change and the reality of climate change will require a

range of innovative solutions for the future.

Natural Resource Management

Cowra looks forward to enjoying both a country lifestyle and economic growth, but not at any cost.

Our natural resource base is the foundation of Cowra today and tomorrow. Caring for our natural

resources means managing all the elements of land, water and air, now and for the future. It will require

expertise and commitment. In undertaking this task, Cowra will become a centre of natural resource

management excellence.

Page 11: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 8

Organisational Profile

Page 12: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 9

Introduction

What is the Operational Plan?

The Operational Plan is one layer of the Planning and Reporting framework that all NSW Councils must

develop to meet the requirements of the Local Government Amendment (Planning & Reporting) Act

2009.

The Community Strategic Plan is the overall planning document for Cowra. It has a 10+ year timeframe

(2012-2036) and encompasses a broad range of goals that will need input and support from a range of

organisations and government agencies to achieve. It is supported by a 10 year Resourcing Strategy that

addresses Council‟s Asset Management, Long Term Financial Planning and Workforce Planning.

The Delivery Program 2012-2017 is based on the Community Strategic Plan and outlines the actions that

Cowra Council will undertake to work towards addressing the goals and strategies.

The Operational Plan 2012-2013 completes the planning documents and details the activities to be

undertaken during the financial year to deliver the commitments of the Delivery Program. The

Operational Plan also includes council‟s detailed annual budget. The 2012-2013 Fees and Charges are

available in a separate document.

This process ensures that there are clear links between the long term goals of the community and the

activities of council. The diagram below demonstrates these linkages, the Operational Plan coloured

dark orange.

Page 13: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 10

Measuring and Reporting Progress

Cowra Council is committed to providing open and honest feedback to the community about the

progress being made toward meeting community goals, and whether the desired results are being

achieved.

Different strategies will be utilised to measure progress, dependent on whether we are measuring 10+

year goals from the Community Strategic Plan, 5 year goals from the Delivery Program, or 1 year goals

from the Operational Plan. Council will focus on measuring in two key ways:

Outcomes: Are the strategies being undertaken and the services we are providing making a

difference? Has community satisfaction increased? Has the condition of our natural environment,

urban areas and lifestyle improved?

Outputs/inputs: Have we been delivering services and programs on time, within budget, and to

stated standards? What did we do and how often did we do it?

To report on the Operational Plan, the focus will be on outputs and inputs and whether or not council

has delivered its programs and services within budget and to timeframes.

The following diagram outlines the measuring and reporting framework that council will be adopting

across all the Integrated Planning documents and highlights the Operational Plan.

Page 14: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 11

Plan What are we

measuring?

What measures will be

used?

When will results be

reported to the community?

Community Strategic

Plan 2012 – 2036

What progress is being

made towards the goals

identified in the

Community Strategic

Plan that focus on the

theme areas of:

Health & Wellbeing;

Education Training &

Research; Lifestyle;

Governance; Business

& Industry; Transport

& Infrastructure; and

Natural Resource

Management

There are a range of

stakeholders working

towards these goals.

Measures that tell us

about the condition of the

natural environment, our

built infrastructure and

our human and social

assets.

We will use a range of

statistics, as well as results

from broad community

surveys and consultation.

A report will be prepared every

four years at the end of each

council term.

Delivery Program

2012-2017

The outcomes of the

council’s service

delivery – whether

the council is making

a positive difference

for the community

through its service

delivery.

Service outcome

measures that focus on

the condition of the

built assets council is

responsible for and

community satisfaction

with the services that

council provides.

We will use a range of

statistics, service

reports and targeted

satisfaction surveys.

A progress report will be

prepared every six months

and tabled in council.

Operational Plan

2012-2013

The outputs/inputs of

council‟s service delivery

– whether the council is

delivering its activities as

planned and within its

financial budget.

Service output/input

measures with a focus on

completion of activities on

time and within budget.

A progress report will be

prepared quarterly and tabled in

council.

An annual report (including

audited financial reports) will be

prepared at the end of the

financial year (and will include a

report on the state of the

environment every four years).

Supporting Documents:

Long Term Financial

Plan

Asset Management

Plan

Workforce Plan

The sustainability of

council. Whether we

are improving our overall

performance and viability

as an organisation.

Organisational

sustainability measures

with a focus on financial,

asset and human resource

measures.

A progress report will be

included in council‟s Annual

Report each year

Page 15: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 12

The Operational Plan Health & Wellbeing

HEALTH and WELLBEING

H1 Research and identify the future needs of aged care accommodation and support services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H1.1

Cowra Access Committee to

include representatives from local

aged care accommodation and

support services

H1.1.a

In addition to existing members the

committee include a staff member

from Bilyara and Weroona Nursing

Homes

Active membership from Bilyara and Weroona Nursing

Homes achieved.

DES

Page 16: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 13

HEALTH and WELLBEING

H1 Research and identify the future needs of aged care accommodation and support services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H1.2

Improve access for aged persons in

high movement public

environments as well as shops,

offices and public buildings and

places

H1.2.a

Upgrade Cowra CBD to include

provision for aged and disabled

persons

Cowra CBD Masterplan makes provision for aged and

disabled persons throughout the CBD study area

DIO

H1.2.b

Maintain the Access Incentive Program

A number of incentive programs are completed and

completed and promoted in local media subject to

available budget

DES

Page 17: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 14

HEALTH and WELLBEING

H1 Research and identify the future needs of aged care accommodation and support services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H1.3

Increase public awareness and

tolerance of health related issues

particularly relevant to an aging

demographic, including need for

disabled parking, improved

pedestrian access, sharing the CBD

H1.3.a

Subsidise local promotion of health

related activities and needs

Provide funding within budget to local community groups

to help pay for media promotion of events and programs

DES

H1.3.b

Regular promotion of local activities

and events that are user friendly for

aged and disabled persons

Sports Council presentation to local sporting clubs

raising awareness of needs of aged and disabled persons

attending their events.

Facilities for aged and disabled persons provided in all

council run events.

DES

H1.3.c

Provide a Domestic Sharps Container

Waste Management Program

Program implemented and promoted in local media

DES

H1.3.d

Patrol disabled parking spaces to

ensure they are being correctly used

Regular patrols of disabled parking spaces in Cowra CBD

are conducted and reported in accordance with the

Cowra Ranger Services Contract Agreement.

DES

Page 18: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 15

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.1

Support and encourage programs

that promote health and wellbeing

H2.1.a

Provide transport subsidy support to

local health related activities and

events

A limited number of subsidised taxi vouchers are made

available to the Cowra Aquatherapy Group and Winter

Exercise Group for use by their members that cannot

drive to their sessions

DCS/DES

H2.1.b

Work with sporting groups to develop

programs and activities

Activities plan is developed, approved and implemented

DCS

H2.1.c

Work with health care professionals

to developed targeted activities for

aged and related groups

Activities plans are developed, approved and

implemented

DCS

H2.1.d

Respond to requests to participate in

agency programs within resources

Activities assisted

DCS

H2.1.e

Support and encourage participation in

sport, recreation and cultural

activities

Meet with sport, recreation and cultural groups to

develop and implement activities

DCS

Page 19: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 16

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.2

Provide opportunities for staff to

participate in a range of health and

wellbeing programs

H2.2.a

Develop “Your Health” program for

employees

Program developed with Consultative Committee and

implemented

DCS

H2.2.b

Respond to health and wellbeing

initiatives within resources

Requests for ideas and projects considered and enacted

DCS

Page 20: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 17

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.3

Support and participate in the

Cowra Interagency to contribute

to partnerships in community

wellbeing initiatives

H2.3.a

Attend meetings of Interagency group

Meetings attended on a regular basis and six monthly

report prepared for council

DCS

Page 21: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 18

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.4

Work with the Cowra Access

Committee to assist in identifying

and addressing priority access

issues

H2.4.a

Provide administrative support to the

Cowra Access Committee

Procedural and administrative support provided at all

Committee Meetings

Technical support provided at all Committee Meetings

where requested

Minutes taken for all Committee meetings and reported

to council prior to the next Access Committee meeting

DES/DIO

Page 22: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 19

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.5

Improve access in line with actions

from the Pedestrian Access and

Mobility Plan (PAMP)

H2.5.a

Continue to identify access issues as

part of PAMP review

Appropriate access issues resolved and updated in

Pedestrian Access Mobility Plan

DIO

Page 23: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 20

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.6

Inspect and enforce health

standards through a regular food

shop inspection program

H2.6.a

Maintain a food shop inspection

program that is proactive and

educational, but that also responds

appropriately to breaches of the

health standards.

All food premises in the Cowra Shire are inspected and

action taken to achieve compliance

NSW Food Authority is satisfied with Council‟s food

shop inspection program

Promotion of best practice food handling procedures,

equipment and training programs is undertaken via

council website and direct contact with food businesses

DES

Page 24: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 21

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.7

Provide companion animal

management services across the

shire

H2.7.a

Maintain a ranger service throughout

Cowra Shire that responds to

customer requests relating to

companion animals

Dog attacks and nuisance complaints are responded to in

accordance with Cowra Ranger Services Procedures

Manual and Council‟s Guarantees of Service

Regular patrols of Cowra and surrounding villages are

conducted and reported in accordance with the Cowra

Ranger Services Contract Agreement

DES

H2.7.b

Inspect all enclosures for dangerous

and restricted dogs to ensure

compliance with regulatory

requirements

All premises in the Cowra Shire where declared

dangerous and restricted breed dogs are normally kept

are inspected for compliance

DES

H2.7.c

Provide a companion animal re-

homing incentive program

Regular promotion of companion animals available for re-

homing is conducted in local media

Financial incentives available to persons wishing to own a

pound animal, including discounted micro-chipping and

registration fees

DES

Page 25: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 22

H2.7.d

Undertake public education of

companion animal owner

responsibilities

Regular education and promotion of companion animal

matters in local media

DES

Page 26: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 23

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.8

Ensure Workplace Health & Safety

compliance of both staff and

others in the workplace

H2.8.a

Review and implement risk

management plans, policies and

procedures

Plans and procedures are reviewed and presented to

Manex/Council for adoption on scheduled basis

DCS

H2.8.b

Develop strategies to minimise

Council‟s exposure to higher

Workers Compensation premiums

Conduct regular meetings with StateCover and meet

with internal Workers Compensation management group

to micro-manage associated matters

DCS

Page 27: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 24

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.9

Maintain community safety by

management of public nuisance in

line with community expectations

H2.9.a

Maintain a ranger service throughout

Cowra Shire that responds to

customer requests

Telephone calls, CARS and written correspondence are

appropriately actioned in a timely manner

Regular patrols of Cowra and surrounding villages are

undertaken to identify, monitor and respond to public

nuisance complaints

DES

H2.9.b

Enforce ordinance signage to ensure

council requirements are being

complied with

Regular patrols of timed parking spaces in Cowra CBD

and school zones

DES

Page 28: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 25

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.10

Work with NSW Police to

implement „Safer by Design‟

protocols

H2.10.a

Provide Crime Prevention Through

Environmental Design training for

development assessment staff

CPTED training undertaken

DES

Page 29: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 26

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.11

Improve facilities for passive

recreation for all ages with their

companion animals

H2.11.a

Improve walking tracks/paths and road

crossings

Implement according to Peace Precinct Masterplan

subject to funding

Implement according to Riverbank Masterplan subject to

funding including leash free area

DIO

Page 30: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 27

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.12

Maintain and improve the current

high standard of the Cowra

Aquatic

H2.12.a

Implement a “Satisfaction Level”

survey of users

Survey conducted and information collated for future

benchmarking

DIO

H2.12.b

Replace intake and delivery pump

system

Refurbishment completed prior to 2012/2013 swimming

season

DIO

H2.12.c

Maintain swimming pool water quality

compliance

Swimming pool water quality standards are met at all

times

DIO

Page 31: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 28

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.13

Support the Woodstock

community in the maintenance and

improvement of Woodstock

Swimming Pool

H2.13.a

Support Community with donation

towards operation of Woodstock

swimming pool facility

Donation made and advice given if required

DCS

Page 32: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 29

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.14

Maintain parks and gardens to the

current high standard

H2.14.a

Mow parks according to schedule

Adhere to adopted mowing standards

DIO

H2.14.b

Carry out weekly Horticultural works

in high profile areas eg. Rose Gardens

Gardens maintained to high standard especially high

profile areas

DIO

Page 33: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 30

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.15

Work with the Cowra Sport and

Recreation Council to ensure

optimal use of Cowra sporting

facilities and programs

H2.15.a

Attend Sport and Recreation Council

meetings and conduct regular liaison

with sporting groups and Cowra

Services to ensure maximum usage of

facilities

Meetings are attended and issues addressed

DCS

H2.15.b

Identify and pursue funding

opportunities commensurate with

identified sporting and recreational

needs

Research undertaken in response to requests received

DCS/GM

Page 34: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 31

HEALTH and WELLBEING

H2 Provide facilities and programs for health and wellbeing needs including disability and mental health services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H2.16

Work with Police and other

stakeholders to support programs

improving community safety

H2.16.a

Participate in meetings and/or

discussions with police and other

stakeholders in relation to identified

programs

Attend and participate in discussions

GM/DCS

H2.16.b

Advocate for adequate operational

policing numbers in Cowra shire

Letters sent and lobbying of relevant Ministers

GM

Page 35: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 32

HEALTH and WELLBEING

H3 Investigate ways to attract and retain health professionals

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H3.1

Advocate for the development of

state of the art hospital facilities

and services

H3.1.a

Meet with Hospital Advisory Board to

support development of strategy for

determining future needs and whether

these are best pursued in existing

facilities or on a greenfield site

Meeting held with Hospital Advisory Board

Strategy developed

NSW Government endorsement of strategy

GM

Page 36: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 33

HEALTH and WELLBEING

H3 Investigate ways to attract and retain health professionals

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H3.2

Liaise with local medical and allied

health professionals to identify

community healthcare needs

H3.2.a

6 monthly meetings held with relevant

stakeholders to review gaps in

healthcare needs

Meetings held

Council undertakes appropriate advocacy to support

retention of or increases in services

GM

H3.2.b

Support the Centroc “Beyond the

Ranges” concept, a website based

application to attract professionals to

the region

Council‟s website incorporates link and relevant

information

GM

Page 37: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 34

HEALTH and WELLBEING

H3 Investigate ways to attract and retain health professionals

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H3.3

Advocate for and support the

provision of new medical facilities

H3.3.a

Work with local medical fraternity in

their endeavour to create a new

augmented medical practice for

Cowra

Provide assistance with infrastructure construction

GM/DIO

Page 38: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 35

HEALTH and WELLBEING

H3 Investigate ways to attract and retain health professionals

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H3.4

Maintain accommodation for

visiting healthcare professionals

H3.4.a

Manage lease of council properties for

health professionals

Accommodation occupancy rate

DIO

Page 39: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 36

HEALTH and WELLBEING

H4 Support and encourage voluntary community services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H4.1

Work with Cowra Interagency and

other organisations to identify and

support the work of voluntary

community service providers

H4.1.a

Maintain regular contact with Cowra

Interagency

Respond positively to requests for information and

assistance within budget and resources

DCS

H4.1.b

Develop publicity and promotion of

volunteerism

Media and promotions program undertaken twice a year

GM

Page 40: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 37

HEALTH and WELLBEING

H4 Support and encourage voluntary community services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H4.2

Actively encourage community

volunteering

H4.2.a

Develop publicity and promotion of

volunteerism

Undertake six monthly media and promotions program

GM

Page 41: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 38

HEALTH and WELLBEING

H4 Support and encourage voluntary community services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H4.3

Continue to support the

community through provision of

Community Strategic Plan funding

H4.3.a

Provide funding for projects that

meet Community Strategic Plan

objectives

Funding delivered and projects implemented

GM

Page 42: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 39

HEALTH and WELLBEING

H4 Support and encourage voluntary community services

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H4.4

Provide support for emergency

services in Cowra as required

H4.4.a

Corporate services staff to be engaged

for LEMO needs

Staff asked to provide names on voluntary basis for

inclusion in Emergency management staffing procedures

DCS

H4.4.b

Council to chair Local Emergency

Management Committee

Meetings held quarterly with State Emergency Service,

Police, Rural Fire Service and others

DIO

H4.4.c

Council have Local Emergency Officer

available

Local Emergency Management Officer undertakes

administration during emergency events

DIO

Page 43: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 40

HEALTH and WELLBEING

H5 Develop programs to meet the needs of Cowra’s young people

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H5.1

Continue to promote and support

the Cowra Youth Council

H5.1.a

Attend Youth Council Meetings held

on a monthly basis

Meetings attended, minutes taken and regular reports on

key issues reported to Manex and council

DCS

H5.1.b

Coordinate regular Youth Council

events

Events co-ordinated in conjunction with program

developed

DCS

Page 44: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 41

HEALTH and WELLBEING

H5 Develop programs to meet the needs of Cowra’s young people

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

H5.2

Advocate for retention and

expansion of youth services as

appropriate

H5.2.a

Advocate for retention and/or

expansion of Headspace service in

Cowra

Letters of support provided

Media statements

GM

Page 45: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 42

Education Training and Research

EDUCATION TRAINING and RESEARCH

E1 Make Cowra a Learning Community

Delivery Program (5 years) Operational Plan (1year)

Strategy Action Performance Measure Responsibility

E1.1

Liaise with post school education

providers to improve access and

remove impediments for Cowra

residents seeking to further

skills/education

E1.1.a

Seek feedback from Cowra Business

Chamber and the community on

impediments for individuals accessing

educational institutions within and

beyond Cowra

Feedback sought and report developed detailing

constraints

Council seeks to work with educational institutions and

the Cowra community to remove or mitigate

impediments

GM

Page 46: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 43

EDUCATION TRAINING and RESEARCH

E1 Make Cowra a learning community

Delivery Program (5 years) Operational Plan (1year)

Strategy Action Performance Measure Responsibility

E1.2

Provide a Council Traineeship

program

E1.2.a

Research and develop a Cowra

Council traineeship program for

implementation in 2012/13

Program endorsed and implemented

DCS

Page 47: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 44

EDUCATION TRAINING and RESEARCH

E1 Make Cowra a learning community

Delivery Program (5 years) Operational Plan (1year)

Strategy Action Performance Measure Responsibility

E1.3

Provide work experience

placement opportunities for

Cowra students

E1.3.a

Work Experience Program developed

for Secondary and Tertiary students

and “Job Seekers”

Program completed and approved for implementation in

2012/13

DCS

Page 48: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 45

EDUCATION TRAINING and RESEARCH

E2 Maintain and develop learning infrastructure and programs to respond to education and training needs

Delivery Program (5 years) Operational Plan (1year)

Strategy Action Performance Measure Responsibility

E2.1

Continue to support Cowra

Library

E2.1.a

Manage operation of Library with

Central West Library Service (Orange

City Council) to operate Cowra

Library

Budget and management objectives are agreed to with

CWL

DCS

E2.1.b

Review equipment, service and asset

needs

Develop a priority list of assets, maintenance of

equipment and provision of services.

DCS

Page 49: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 46

EDUCATION TRAINING and RESEARCH

E2 Maintain and develop learning infrastructure and programs to respond to education and training needs

Delivery Program (5 years) Operational Plan (1year)

Strategy Action Performance Measure Responsibility

E2.2

Maintain Cowra Entrepreneur

Program

E2.2.a

Conduct a Entrepreneur Program

Program successfully undertaken with adequate

participation

GM

Page 50: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 47

EDUCATION TRAINING and RESEARCH

E3 Build a mutually supportive education sector

Delivery Program (5 years) Operational Plan (1year)

Strategy Action Performance Measure Responsibility

E3.1

Facilitate discussion between

educational institutions, business

and training providers to assist

students make the transition from

school to the workforce

E3.1.a

Attend meetings with relevant

stakeholders to discuss constraints

and opportunities for students and

prospective employers

Council represented at meetings and strategies

determined

GM

Page 51: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 48

EDUCATION TRAINING and RESEARCH

E4 Strengthen the role and use of local education and training providers

Delivery Program (5 years) Operational Plan (1year)

Strategy Action Performance Measure Responsibility

E4.1

Research and utilise appropriate

local service providers

E4.1.a

Utilise local training providers in

delivering staff training subject to cost

comparisons

Quotations sought from local providers for planned

training programs

DCS

Page 52: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 49

Lifestyle

LIFESTYLE

L1 Build strong linkages with our indigenous community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L1.1

Acknowledge Cowra Shire is

Wiradjuri country

L1.1.a

Acknowledge Cowra Shire as

Wiradjuri Country at all civic

functions

Appropriate welcome delivered at functions

Aboriginal flag flown in accordance with Flag policy

Maintain Welcome to Wiradjuri signs at Cowra town

entries

GM/MAYOR

Page 53: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 50

LIFESTYLE

L1 Build strong linkages with our indigenous community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L1.2

Work with the Aboriginal

community to promote stronger

links, identify common goals and

projects

L1.2.a

Work with aboriginal community to

determine plan for refurbishment of

bridge pylon murals

Plan for refurbishment agreed upon

Funding applications submitted

GM/DCS/DES

L1.2.b

Meet at least annually with Cowra

Local Aboriginal Land Council

Mayor and General Manager attend meetings

GM/MAYOR

L1.2.c

Consult with community on all

council works and projects that have

the potential to impact upon

aboriginal cultural heritage

Consultation undertaken in accordance with council

policy

GM/DIO/DES/DCS

Page 54: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 51

LIFESTYLE

L1 Build strong linkages with our indigenous community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L1.3

Identify mutually beneficial grant

funding opportunities for local

Aboriginal groups and assist in

completion of applications

L1.3.a

Work with aboriginal community to

lodge funding submissions for relevant

projects from the Lachlan Riverbank

Masterplan

At least one submission lodged annually

GM/DIO

L1.3.b

Work with aboriginal community to

lodge funding submissions for relevant

projects from the Peace Precinct

Masterplan

At least one submission lodged annually

GM/DIO

L1.3.c

Work with aboriginal community to

lodge funding submissions for projects

identified by the local aboriginal

community

At least one submission lodged annually

GM/DIO/DCS/DES

Page 55: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 52

LIFESTYLE

L1 Build strong linkages with our indigenous community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L1.4

Improve Aboriginal access to

employment opportunities

L1.4.a

Develop Aboriginal Employment

program to reflect Cowra‟s

demographic mix with our workforce

mix

Program is developed and accepted by staff and

management and indigenous persons are employed

DCS

Page 56: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 53

LIFESTYLE

L1 Build strong linkages with our indigenous community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L1.5

Liaise with Aboriginal stakeholders

on development proposals that

have potential to impact on known

cultural heritage sites

L1.5.a

Maintain a development assessment

process that consults with Aboriginal

stakeholders before determining

potential threatening proposals

All DA files includes assessment criteria that requires

consideration against Council‟s Aboriginal Consultation

Policy to determine whether consultation with Aboriginal

stakeholders is required

DES

Page 57: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 54

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.1

Develop and implement

celebratory program for the 70th

anniversary of the POW Breakout

in 2014

L2.1.a

Work with relevant stakeholders to

develop program for anniversary

Program developed in conjunction with relevant

stakeholders

GM

Page 58: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 55

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.2

Develop and implement

celebratory program for the 50th

anniversary of Cowra‟s Festival of

International Understanding in

2014

L2.2.a

Plan developed with stakeholder

groups

Plan completed and accepted by stakeholder groups and

submitted to council with recommendations

DCS

Page 59: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 56

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.3

Develop and implement

celebratory program for the 125th

anniversary of local government in

Cowra – July 2013

L2.3.a

Work with relevant stakeholders to

develop program for anniversary

Program developed

GM

Page 60: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 57

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.4

Continuing to investigate

establishment of a Cowra Museum

L2.4.a

New body formed to investigate

feasibility of project

Committee formed and recommendation provided to

council

DCS

Page 61: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 58

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.5

Continue to develop the

Cowra/Japan relationship and to

promote Cowra as a centre of

international understanding and

friendship

L2.5.a

Council delegation visit Japan to

strengthen ties

Visit undertaken

GM

L2.5.b

Maintain Saburo Nagakura Park

Park maintained to current high standard

DIO

L2.5.c

Participate in Nagakura Foundation

and continue to foster relations with

Kyushu Power Company as

appropriate

Council responds positively to any requests for

assistance with delegations visiting the park

GM

L2.5.c

Support Joetsu Staff Exchange

Program

Provide support to program within budget

GM

Page 62: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 59

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.6

Maintain a heritage advisory

service

L2.6.a

Employ a properly qualified and

experienced heritage advisor to

provide advisory services to council

and the wider community

Heritage advisor engaged

Submission of monthly report to council

DES

Page 63: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 60

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.7

Include Heritage Inventory in

Cowra Local Environmental Plan

(LEP)

L2.7.a

Draft Cowra Local Environmental Plan

includes an updated heritage inventory

An updated heritage inventory is included in the Draft

Cowra Local Environmental Plan

DES

L2.7.b

Raise community awareness of

heritage issues

Council‟s Heritage Adviser to conduct a community

forum

DES

Page 64: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 61

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.8

Work with the Cowra and District

Historical Society and Cowra

Family History Group

L2.8.a

The Heritage Advisor meets with the

Cowra and District Historical Society

and Cowra Family History Group on a

regular basis

The Heritage Advisor meet with the Cowra and District

Historical Society and Cowra Family History Group at

least once every quarter

DES

Page 65: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 62

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.9

Ensure new development

proposals do not impact on

heritage sites

L2.9.a

Maintain a development assessment

that properly assesses heritage sites

and potential threatening proposals

All DA files include assessment criteria that requires

consideration of heritage matters

DES

Page 66: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 63

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.10

Support Peace Bell Committee in

celebrating World Peace Day

L2.10.a

Work with Peace Bell Committee to

develop annual program

Program developed and event conducted successful

DCS

Page 67: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 64

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.11

Develop the Cowra Peace Precinct

with a focus on the Aboriginal,

European and Military history

L2.11.a

Implement Cowra Peace Precinct

Masterplan

Works completed as funds become available

DIO

Page 68: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 65

LIFESTYLE

L2 Find ways to tell Cowra’s story

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L2.12

Support program for 100 year

anniversary of significant World

War 1 events

L2.12.a

Assist relevant stakeholders in

development of program

Program developed

GM

Page 69: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 66

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.1

Maintain and improve the current

high standard of the Cowra

Aquatic Centre

L3.1.a

Implement a “Satisfaction Level”

survey of users

Survey conducted and information collated for future

benchmarking

DIO

L3.1.b

Replace intake and delivery pump

system

Refurbishment completed prior to 2012/2013 swimming

season

DIO

L3.1.c

Undertake “Level 2” Energy Audit of

Aquatic Centre.

Audit completed and grants applied for

DIO

Page 70: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 67

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.2

Provide recreation opportunities

through the provision of attractive

parks and gardens

L3.2.a

Maintain parks and gardens to a high

standard for use of all recreation users

Recreational playgrounds and reserves (including

facilities) are maintained to a high standard and according

to compliance. Checks completed quarterly

DIO

L3.2.b

Develop the Gooloogong primitive

camping ground

Improvements carried out within budget to a satisfactory

standard

DIO

Page 71: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 68

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.3

Provide good quality facilities to

meet the needs of sporting clubs

and users

L3.3.a

Maintain Sporting fields for all sporting

associations in Cowra

Sporting fields maintain to required standards

DIO

L3.3.b

Liaise with Sports Council to ensure

all sports are catered for

All users are catered for with high standard fields

provided. All works carried out as required by sporting

groups

DIO

Page 72: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 69

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.4

Promote and support cultural and

artistic activities within the

community

L3.4.a

Develop and present a diverse

program of high quality exhibitions,

public events and workshop activities

at the Cowra Regional Art Gallery

Two year forward program developed and implemented

DCS

L3.4.b

Develop educational activities with

local schools and the Cowra Regional

Art Gallery

Develop and implement educational program.

DCS

L3.4.c

Develop and maintain the Gallery

website including the introduction of

the Calleen Collection online

Website will positively reflect the gallery‟s objectives and

programs

DCS

Page 73: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 70

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.5

Develop the Lachlan River Precinct

as a major focal point for passive

recreation

L3.5.a

Start implementing Lachlan River

Precinct Masterplan

First year of Masterplan completed subject to funding

DIO

Page 74: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 71

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.6

Develop the Cowra Peace Precinct

as a major focal point for passive

recreation and multicultural

awareness

L3.6.a

Implement Cowra Peace Precinct

Masterplan

First year of Masterplan completed subject to funding

DIO

Page 75: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 72

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.7

Develop Cowra CBD as a major

shopping location and a place for

social interaction and investment

L3.7.a

Adopt and implement CBD

Masterplan

CBD Masterplan is adopted and commenced

DIO

Page 76: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 73

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.8

Develop the Cowra Civic Square

Cultural Precinct

L3.8.a

Work with stakeholder groups to

develop master plan

Masterplan completed and presented to council

DCS/DIO

Page 77: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 74

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.9

Maintain and improve the Cowra

Civic Centre as Cowra‟s principal

performance venue

L3.9.a

Prepare Marketing/Business plan to

promote varied use of Civic Centre

Plan completed, considered by Manex and presented to

council

DCS/DIO

L3.9.b

Prepare and maintain a Civic Centre

improvements schedule

Detailed schedule prepared and costed and presented to

council for budgetary consideration

DCS/DIO

L3.9.c

Maintain Civic Centre as required to

meet venue requirements

Maintenance programme undertaken

Future requirements to be identified in Building AMP to

be developed in 2013/14

DIO

Page 78: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 75

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.10

Maintain and improve facilities at

the Cowra Library

L3.10.a

Prepare and maintain a Library

improvements schedule

Develop a maintenance and improvements program

DCS/DIO

L3.10.b

Prepare a maintenance schedule

Schedule prepared in conjunction with Central Western

Library

DCS/DIO

L3.10.c

Maintain building as per required

standard

All programmed works completed

DIO

Page 79: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 76

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.11

Maintain and improve the

Cowra Regional Art Gallery as

a major cultural feature of the

Cowra community

L3.11.a

Prepare and maintain an Art Gallery

Library improvements schedule

Schedule prepared in conjunction with Gallery Director,

Gallery Advisory Committee and considered by Manex

and presented to council for budgetary consideration

DCS/DIO

L3.11.b

Prepare a maintenance schedule

Schedule prepared in conjunction with Gallery Director,

Gallery Advisory Committee

DCS

L3.11.c

Maintain building to the required

standards

Programmed works completed

DIO

Page 80: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 77

LIFESTYLE

L3 Continue to develop our leisure and cultural facilities, infrastructure and natural environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L3.12

Maintain and operate the Cowra

Caravan Park to its current high

standard

L3.12.a

Work with lessee to maintain current

high standard

Park maintained within budget

DIO

L3.12.b

Monitor current lease agreement

Lease agreement received in accordance with agreement

DIO

Page 81: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 78

LIFESTYLE

L4 Build participation in community life

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L4.1

Work with the government

departments and other agencies to

promote and support volunteer

involvement in community

activities

L4.1.a

Contact NSW and Commonwealth

Government to ascertain their range

of sponsored volunteer programs

Contact made and listings prepared and media produced

DCS/GM

L4.1.b

Contact local volunteers groups to

ascertain level of activities and

projects

Contact made and listings prepared and media produced

DCS/GM

Page 82: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 79

LIFESTYLE

L4 Build participation in community life

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L4.2

Coordinate endorsed civic events

that are celebrated by our

community and recognise and

support our residents

L4.2.a

Plan and administer events determined

by council

Events administer and co-ordinated to agreed level and

satisfaction of the community

DCS

Page 83: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 80

LIFESTYLE

L4 Build participation in community life

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L4.3

Review and update Social Plan

L4.3.a

Undertake and review plan, utilising

best practice and advice from

associated agencies and community

Plan completed and agreed to by stakeholder groups and

presented to council

DCS

Page 84: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 81

LIFESTYLE

L4 Build participation in community life

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L4.4

Review and update the Cowra

Cultural Plan

L4.4.a

Undertake and review plan utilising

best practice and advice from

associated agencies and community

Plan completed and agreed to by stakeholder groups and

presented to council

DCS

Page 85: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 82

LIFESTYLE

L5 Continue to develop our unique country lifestyle

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L5.1

Promote Cowra Shire as a

desirable place to live and work

L5.1.a

Complete new Cowra Shire Economic

Development Plan

Plan adopted by council

GM

L5.1.b

Attend Country Week advertising

Cowra and the opportunities that

exist

Attendance at Country Week

GM

L5.1.c

Complete review of New Residents

Kit

Review completed and new collateral produced

GM

Page 86: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 83

LIFESTYLE

L5 Continue to develop our unique country lifestyle

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L5.2

Promote Cowra Shire as a

desirable place to visit

L5.2.a

Attend Country Week advertising

Cowra and the opportunities that

exist

Attendance at Country Week

GM

L5.2.b

Complete Cowra Shire Economic

Development Plan

Plan adopted by council

GM

L5.2.c

Complete review of New Residents

Kit

Review completed and new collateral produced

GM

L5.2.d

Provide financial support to Cowra

Tourism Corporation

Annual contribution provided

GM

Page 87: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 84

LIFESTYLE

L6 Recognise and grow the talent in our community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L6.1

Support Australia Day Citizen of

the Year and related awards

L6.1.a

Work with Australia Day Committee

and administer events for Australia

Day

Events are well planned and executed to satisfaction of

committee and community

DCS

Page 88: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 85

LIFESTYLE

L6 Recognise and grow the talent in our community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

L6.2

Maintain donation policy to

support community development

L6.2.a

Respond to requests for donations in

accordance with policy.

Request are processed in accordance with policy

guidelines and submitted to council and paid within

allocated budget for year

DCS

Page 89: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 86

Governance

GOVERNANCE

G1 Develop and implement a council community communication and consultation strategy

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G1.1

Maintain and improve appropriate

mechanisms to consult with key

community groups and

stakeholders

G1.1.a

Hold village community meetings

At least one meeting held in each village annually

GM

G1.1.b

Provide online feedback opportunities

for key council initiatives

Website developed to cater for online feedback

DCS

Page 90: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 87

GOVERNANCE

G1 Develop and implement a council community communication and consultation strategy

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G1.2

Provide an interactive up to date

website that services community

needs

G1.2.a

New website developed to replace

existing website

Website development planned, development undertaken

and completed to satisfaction of council , management

and internal/external customers

DCS

G1.2.b

Monitor and update website on

regular basis

Website administration becomes part of normal

operating procedures

DCS

Page 91: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 88

GOVERNANCE

G1 Develop and implement a council community communication and consultation strategy

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G1.3

Maintain and improve Council's

ongoing corporate communication

activities

G1.3.a

Issue regular media releases informing

the community of council decisions,

activities and programs

Press release issued outlining key items from each

council meeting within one week of each council meeting

GM

G1.3.b

Maintain Weekly Noticeboard

production

Noticeboard produced every week and distributed to

appropriate media outlets

GM

G1.3.c

Maintain production of Cowra

Quarterly

Cowra Quarterly produced each quarter

GM

Page 92: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 89

GOVERNANCE

G1 Develop and implement a council community communication and consultation strategy

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G1.4

Improve communication of council

information and decisions

G1.4.a

Issue regular media releases informing

the community of council decisions

and where appropriate the rationale

for those decision

Press release issued outlining key items from each

council meeting within one week of each council

meeting

GM

G1.4.b

Persons with matters requiring

council determination are advised of

council‟s decision in a timely manner

Relevant parties advised of decisions within one week of

council meeting

GM/DIO/DES/DCS

G1.4.c

Council resolutions acted upon in a

timely manner

Monthly report on progress in implementing Council

decisions is provided

GM

Page 93: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 90

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.1 Provide responsible financial

management

G2.1.a

Prepare a Resource Strategy, that

includes a long term Financial Plan, an

Asset Management Plan and a

Workforce Plan

Plans prepared and adopted

DCS

G2.1.b

Maintain long term financial

sustainability by providing key financial

information and advice to Manex and

council

Advice via detailed reports prepared and provided to

Manex and council

DCS

G2.1.c

Establish council‟s current

commitments and proposed initiatives

Research completed and provided to Manex

DCS

Page 94: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 91

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.2

Develop a new system of land-use

planning to guide growth and

development in the Shire

G2.2.a

Complete Draft Cowra Local

Environmental Plan 2012

Cowra Local Environmental Plan 2012 signed by Minister

and gazetted in government gazette

DES

G2.2.b

Complete Draft Cowra Shire

Development Control Plan 2012

Cowra Shire Development Control Plan 2012 adopted

by Council

DES

Page 95: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 92

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.3

Develop a council workforce that

supports our corporate values and

meets the organisations present

and future skill needs

G2.3.a

Prepare and maintain a Workforce

Management Plan

Plan prepared and presented to Manex

DCS/GM

G2.3.b

Review and adopt Workforce Plan

detailing threats and opportunities for

the council workforce

Workforce Plan adopted

DCS

G2.3.c

Provide skills and professional

development training for staff

Every member of staff undertakes at least one

skills/professional development course annually

DCS

G2.3.d

Develop and implement a corporate

Performance Management system in

consultation with staff and relevant

unions

New system developed and implemented

DCS

Page 96: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 93

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.4

Develop an integrated Risk

Management Plan and develop and

implement supporting processes to

ensure ongoing integration of risk

management principles into council

operations

G2.4.a

Develop and sustain an enterprise risk

management culture within the

Organisation

Cultural change is accepted as a normal operating

procedure within entire council organisation

DCS

G2.4.b

Provide risk management and

assurance advice

RMO and Insurance officer liaise with insurers to provide

best advice to satisfaction of management

DCS

G2.4.c

Incorporate an enterprise risk

management template in the project

management guidelines

RMO and DCS work with Manex to complete template

for adoption

DCS

G2.4.d

Complete a risk management

assessment of all services and Review

and implement improvements to

enterprise risk

management reports and reporting to

Six monthly review completed and submitted to council

DCS

Page 97: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 94

the Audit Committee

G2.4.e

Manage insurance and claims to

reduce risk and contain premiums

Staff administer system in conjunction with insurers to

satisfaction of Director.

DCS

Page 98: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 95

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.5

Review and implement Council‟s

Planning Instruments

G2.5.a

Complete Draft Cowra Local

Environmental Plan 2012

Cowra Local Environmental Plan 2012 signed by Minister

and gazetted in government gazette

DES

G2.5.b

Complete Draft Cowra Shire

Development Control Plan 2012

Cowra Shire Development Control Plan 2012 adopted

by council

DES

Page 99: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 96

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.6

Undertake asset management

planning to ensure that council‟s

infrastructure is maintained and

improved

G2.6.a

Undertake review of Road Asset

Management Plan

Review completed

DIO

G2.6.b

Review Strategic Water Program and

develop Water Asset Management

Plan

Water Asset Management Plan adopted

DIO

G2.6.c

Review Wastewater Strategic Plan &

develop new Wastewater Asset

Management Plan

Wastewater Asset Management Plan adopted

DIO

Page 100: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 97

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.7

Develop strategies to position

Cowra for a low carbon emission

environment

G2.7.a

Prepare a brief to undertake a strategy

to optimally position Cowra in a low

carbon emission future

Brief prepared and endorsed by council

DES

G2.7.b

Provide administrative support to the

Cowra NRM Advisory Committee

Procedural and administrative support provided at all

Committee meetings

Minutes taken for all committee meetings and reported

to council prior to next committee meeting

DES

G2.7.c

Implement strategies under the RSAP

Projects completed in accordance with RSAP

DES

Page 101: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 98

GOVERNANCE

G2 Develop a planning framework that responds to changing community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G2.8

Maintain a current Equal

Employment Opportunity Plan

G2.8.a

Review current Equal Employment

Opportunity Plan

Plan reviewed and adopted by council

DCS

Page 102: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 99

GOVERNANCE

G3 Strengthen partnerships with government and other agencies

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G3.1

Liaise with relevant government

and other agencies to provide

appropriate levels of resources and

assistance to shire communities

G3.1.a

Liaise with key agencies on a regular

basis to gather information on funding

programs and provide information on

opportunities

Six monthly meetings held with key agencies

GM/DCS

G3.1.b

Respond to approaches from the

community to address shortfalls in

commonwealth or state government

service delivery to residents

Relevant ministers are approached advocating on behalf

of residents

GM

Page 103: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 100

GOVERNANCE

G3 Strengthen partnerships with government and other agencies

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G3.2

Work with the NSW Rural Fire

Service to prevent and control

bushfires

G3.2.a

Undertake roadside slashing

Hazard reduction completed according to budget and

claimed for

DIO

G3.2.b

Support RFS with building

developments

Project financed with funding recuperated from Rural

Fire Service

DIO

Page 104: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 101

GOVERNANCE

G3 Strengthen partnerships with government and other agencies

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G3.3

Continue to develop council‟s

relationship with other local

government bodies

G3.3.a

Mayor, Councillors and senior staff

meet with Kogarah representatives to

share ideas and discuss projects of

mutual benefit

Council representatives meet at least annually with

Mayor, councillors and senior staff of Kogarah City

Council

GM

G3.3.b

Participate in staff exchange/program

collaboration to foster relations and

ideas and as a professional

development opportunity

Council staff meet with or visit Kogarah City Council

At least one joint project delivered annually

GM

G3.3.c

Maintain relationship with Centroc

Attend and participate in all Centroc meetings and

appropriate activities

GM

G3.3.d

Maintain the Cowra Council / Joetsu

City Staff Exchange program

Host Joetsu City employee

GM

Page 105: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 102

G3.3.e

Maintain relationships with local

government bodies including the

Cowra Lines Rail Group and Joint

Audit Committee

Participate in meetings as appropriate

GM

Page 106: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 103

GOVERNANCE

G3 Strengthen partnerships with government and other agencies

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G3.4

Council undertake appropriate

research and investigation to

respond to government inquiries

and initiatives to consider reform

in the local government industry

G3.4.a

Participate in responding to

Destination 2036 outcomes

Council position determined and submission(s) lodged

GM

Page 107: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 104

GOVERNANCE

G4 Maximise funding opportunities

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G4.1

Maintain and improve Council‟s

revenue raising and collection so

as to resource the Delivery

Program

G4.1.a

Review current revenue streams to

ensure cash flow maximisation

Collections and bad debt follow up procedures achieve

established goals

DCS

G4.1.b

Investigate new sources of revenue

Research undertaken to identify potential new sources of

revenue and report provided to council

DCS

G4.1.c

Review future requirements to

establish loan borrowing

commitments and effect on future

budgets

Research undertaken and report submitted to council.

DCS

Page 108: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 105

GOVERNANCE

G4 Maximise funding opportunities

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G4.2

Capitalise on grant funding

opportunities for council

G4.2.a

Respond to available grant funding

opportunities with projects that are

endorsed in council‟s planning

framework

All funding opportunities that council is eligible for are

capitalised on and a submission lodged

At least one successful funding submission annually

GM

Page 109: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 106

GOVERNANCE

G4 Maximise funding opportunities

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G4.3

Work with community groups to

locate funding opportunities

consistent with the Community

Strategic Plan

G4.3.a

Undertake workshop to assist

community groups in sourcing funding

opportunities and developing

submissions

Workshop conducted

GM

Page 110: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 107

GOVERNANCE

G5 Develop leadership skills across the community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G5.1

Work with and support council

355 Committees

G5.1.a

Support the Saleyards committee in

fulfilling its delegated role for council

Council provide appropriate administrative support.

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DIO

G5.1.b

Support the Cowra Youth Council in

fulfilling its delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DCS

Page 111: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 108

G5.1.c

Support the Friends of the Cowra

Regional Art Gallery in fulfilling its

delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DCS

G5.1.d

Support the Museum committee in

fulfilling its delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

Council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DCS

G5.1.e

Support the Noonbinna Village

committee in fulfilling its delegated

role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

GM

Page 112: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 109

G5.1.f

Support the Natural Resource

Management Advisory Committee in

fulfilling its delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

Council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DES

G5.1.g

Support the Tidy Towns and Urban

Landcare committee in fulfilling its

delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DIO

G5.1.h

Support the Access committee in

fulfilling its delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DES/DIO

Page 113: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 110

G5.1.i

Support the Australian Chapter of

World Peace Bell Association in

fulfilling its delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DCS

G5.1.j

Support the Cowra Breakout

Association in fulfilling its delegated

role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

Council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DCS/GM

G5.1.k

Support the Cowra Cultural Council

in fulfilling its delegated role for

council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

Council meeting in a timely manner

Minutes from all 355 committee meetings provided to

DCS

Page 114: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 111

council in a timely manner

G5.1.l

Support the Cowra Festival of

International Understanding

committee in fulfilling its delegated

role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DCS

G5.1.m

Support the Cowra Italy Friendship

Association in fulfilling its delegated

role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DCS

G5.1.n

Support the Cowra Regional Art

Gallery committee in fulfilling its

delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

Council meeting in a timely manner

Minutes from all 355 committee meetings provided to

DCS

Page 115: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 112

council in a timely manner

G5.1.o

Support the Cowra Sport and

Recreational Council in fulfilling its

delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DIO

Page 116: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 113

GOVERNANCE

G5 Develop leadership skills across the community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G5.2

Provide support for the continued

professional development of

councillors

G5.2.a

Work with incoming Council to

identify training/skill development

requirements

Development Plan completed

GM

G5.2.b

Provide details of

training/skill/professional development

opportunities to councillors

Council is kept regularly informed of all opportunities

Attendance is sought in accordance with council Policy

GM

G5.2.c

Provide training for prospective

councillors prior to election

Training provided

GM

Page 117: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 114

GOVERNANCE

G5 Develop leadership skills across the community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

G5.3

Work with community groups to

help them improve their overall

operational standard

G5.3.a

Respond to community requests

Community projects officers respond to requests within

budget and time resources to satisfaction of community

DCS

G5.3.b

Research ways of assisting community

groups to function more effectively

(i.e. meeting procedures, executive

training for committees)

Information provided to community groups as outreach

activity

DCS

Page 118: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 115

Business and Industry

BUSINESS and INDUSTRY

B1 Plan for business and industry growth and change

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B1.1

Provide infrastructure to meet

business and industry need

B1.1.a

Identify council infrastructure to cater

for business and industry needs

Appropriate infrastructure included in Asset Management

Plans

DIO

Page 119: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 116

BUSINESS and INDUSTRY

B1 Plan for business and industry growth and change

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B1.2

Explore and promote

opportunities for the attraction

and retention of industry, retail

and Government Services

B1.2.a

Finalise the Cowra Shire Economic

Development Plan

Plan adopted by council

GM

B1.2.b

Develop prospectus for prospective

business operators to distribute at

relevant events

Prospectus developed

GM

Page 120: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 117

BUSINESS and INDUSTRY

B1 Plan for business and industry growth and change

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B1.3

Work with Cowra Business

Chamber and business operators

to ensure that council services and

facilities are keeping pace with

business community requirements

B1.3.a

Review council‟s Guarantees of

Service to ensure high customer

service levels are maintained

Customer Service Guarantees reviewed in consultation

with community and key stakeholders

GM

Page 121: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 118

BUSINESS and INDUSTRY

B1 Plan for business and industry growth and change

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B1.4

Develop a new system of land-use

planning to guide growth and

development in the Cowra Shire

B1.4.a

Complete Draft Cowra Local

Environmental Plan 2012

Cowra Local Environmental Plan 2012 signed by Minister

and gazetted in government gazette

DES

B1.4.b

Complete Draft Cowra Shire

Development Control Plan 2012

Cowra Shire Development Control Plan 2012 adopted

by council

DES

B1.4.c

Improve access to development

assessment information

All development related forms and policies placed on

council website

DES

Page 122: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 119

BUSINESS and INDUSTRY

B1 Plan for business and industry growth and change

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B1.5

Identify council‟s role in business

and industry growth in Cowra

Shire

B1.5.a

Finalise the Cowra Shire Economic

Development Plan

Plan adopted by council

GM

Page 123: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 120

BUSINESS and INDUSTRY

B1 Plan for business and industry growth and change

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B1.6

Develop the Cowra CBD to make

it the major focus of business and

investment in Cowra Shire

B1.6.a

Complete CBD Masterplan

CBD Masterplan adopted and commenced

DIO

Page 124: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 121

BUSINESS and INDUSTRY

B1 Plan for business and industry growth and change

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B1.7

Position Cowra Shire to prosper in

a low carbon emission future

B1.7.a

Prepare a brief to undertake a strategy

to optimally position Cowra in a low

carbon emission future

Brief prepared and endorsed by council

DES

B1.7.b

Implement strategies under the

Regional Sustainability Action Plan

Projects completed in accordance with RSAP

DES

B1.7.c

Provide administrative support to the

Cowra NRM Advisory Committee

Procedural and administrative support provided at all

committee meetings

Minutes taken for all committee meetings and reported

to council prior to next committee meeting

DES

Page 125: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 122

BUSINESS and INDUSTRY

B2 Tell the world about the opportunities and benefits of Cowra

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B2.1

Work with state and federal

funding bodies to support business

opportunities in Cowra Shire

B2.1.a

Ensure Cowra businesses are aware of

and have access to Central West

Regional Development Authority

(RDA)

Council co-ordinates annual attendance of RDA

representatives at meeting of Cowra Business Chamber

GM

B2.1.b

Ensure Cowra businesses are aware of

and have access to NSW Trade and

Investment (T&I)

Council co-ordinates annual attendance of T & I

representatives at meeting of Cowra Business Chamber

GM

Page 126: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 123

BUSINESS and INDUSTRY

B2 Tell the world about the opportunities and benefits of Cowra

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B2.2

Promote Cowra Shire as a

desirable location for business

development at relevant trade

shows and industry events

B2.2.a

Maintain presence at Country Week

exhibition

Attendance at exhibition

Report provided to council

GM

B2.2.b

Develop prospectus for prospective

business operators to distribute at

relevant events

Prospectus developed

GM

Page 127: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 124

BUSINESS and INDUSTRY

B2 Tell the world about the opportunities and benefits of Cowra

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B2.3

Provide a website that makes it

easy to do business in Cowra Shire

B2.3.a

Website development incorporates

business requirements

Website development planned, development undertaken

and completed to satisfaction of local businesses

DCS

B2.3.b

Updates for business access

Website administration to ensure business component is

updated is part of normal operating procedures

DCS

Page 128: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 125

BUSINESS and INDUSTRY

B3 Add value and support to our existing businesses and industries

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B3.1

Support Cowra businesses by

making relevant programs available

B3.1.a

Deliver Cowra Entrepreneur Program

to provide business skills to existing

Cowra business operators

At least one CEP group conducted

GM

B3.1.b

Work with Cowra Business Chamber,

State Government and other agencies

to provide appropriate

information/skills programs and

workshops

At least one program identified by Cowra Business

Chamber provided with assistance from council

GM

Page 129: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 126

BUSINESS and INDUSTRY

B3 Add value and support to our existing businesses and industries

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B3.2

Liaise with the Cowra Business

Chamber to assist with their

initiatives

B3.2.a

Respond to initiatives of Cowra

Business Chamber

Respond to initiatives presented in a timely manner

GM

Page 130: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 127

BUSINESS and INDUSTRY

B4 Link and connect Cowra to the world

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B4.1

Liaise with Cowra and Central

West Business Chambers to

promote business links and

opportunities

B4.1.a

Support Cowra businesses in

accessing resources through the local

and regional Business Chambers

Council representation at local and regional Business

Chamber meetings

GM

Page 131: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 128

BUSINESS and INDUSTRY

B4 Link and connect Cowra to the world

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B4.2

Provide adequate transport

infrastructure that links Cowra to

other regions

B4.2.a

Develop plan for Heavy Vehicle

Alternative Route through Cowra

Transportation study completed including the public

exhibition process

DIO

B4.2.b

Advocate for Darbys Falls Road to be

classified as a regional road

Submission made to Roads and Maritime Services and

relevant Minister

DIO

B4.2.c

Advocate for reopening of Blayney to

Demondrille Rail Line and Inland Rail

Participate in Rail Group

GM

B4.2.d

Develop Cowra Airport as a regional

aviation centre

Develop and commence implementation plan for airport

development

GM/DIO

B4.2.e

Advocate for construction of Bells

Line Expressway

Attend and participate in Bells Line Expressway Group

meetings

GM

Page 132: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 129

B4.2.f

Advocate for upgrading of the Lachlan

Valley Way

Submission made to Roads and Maritime Services and

relevant Minister

GM/DIO

Page 133: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 130

BUSINESS and INDUSTRY

B4 Link and connect Cowra to the world

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B4.3

Improve communication

infrastructure in Cowra Shire

B4.3.a

Liaise with mobile phone providers to

ascertain their plans for coverage in

the Shire

Responses received from mobile phone providers

indicating their plans for Cowra Shire

GM/DCS

B4.3.b

Advocate for rollout of the National

Broadband Network in Cowra Shire

Cowra‟s timetable for the rollout is determined

GM

Page 134: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 131

BUSINESS and INDUSTRY

B5 Grow Cowra as a centre for excellence in agriculture, research and innovation

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B5.1

Maintain Cowra‟s position as a

premier livestock producing region

B5.1.a

Maintain saleyards to the required

standards to meet regional demand

Standards are maintained and improved to meet demand

Saleyards promoted as a regional livestock facility

DIO

Page 135: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 132

BUSINESS and INDUSTRY

B5 Grow Cowra as a centre for excellence in agriculture, research and innovation

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B5.2

Promote retention and

improvement of an Agricultural

Research Station that supports the

local agricultural sector

B5.2.a

Meet with representatives of Research

Station to determine support that

council can offer

Advocate for retention and improvement of facility

Seek feedback from DPI regarding research conducted at

Cowra Agricultural Research Station

GM

Page 136: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 133

BUSINESS and INDUSTRY

B5 Grow Cowra as a centre for excellence in agriculture, research and innovation

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B5.3

Develop a council policy toward

mining development

B5.3.a

Create a council policy that identifies

and values high quality food lands

Policy developed

DES

Page 137: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 134

BUSINESS and INDUSTRY

B5 Grow Cowra as a centre for excellence in agriculture, research and innovation

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B5.4

Support initiatives to grow and

show our local agricultural sector

B5.4.a

Provide appropriate support to

identified programs and events.

Support provided

Link to Cowra Council website

GM

Page 138: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 135

BUSINESS and INDUSTRY

B5 Grow Cowra as a centre for excellence in agriculture, research and innovation

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B5.5

Support and encourage forums for

encouraging excellence and

innovation in the agricultural

sector

B5.5.a

Provide administration and conference

management support to the Cowra

NRM Advisory Committee

Support at next Futures Forum provided to satisfaction

of Committee Chairman and council

DES

B5.5.b

Provide appropriate support to

identified forums

Support provided to Agricultural Shows and other events

within the shire

GM/DIO

Page 139: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 136

BUSINESS and INDUSTRY

B6 Identify and develop profitable and sustainable tourism products for Cowra

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B6.1

Provide resources and financial

assistance to Cowra Tourism

Corporation to effectively support

and grow the Shire‟s tourism

sector

B6.1.a

Support Cowra Tourism in

accordance with Memorandum of

Understanding

Provide annual financial contribution to Cowra Tourism

Corporation

GM

B6.1.b

Provide two representatives on

Cowra Tourism Board

Council representatives attend board meetings and

report back key issues to council

GM

B6.1.c

Respond to initiatives and requests

from Cowra Tourism Corporation

Respond to initiatives/requests in a timely manner

GM

Page 140: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 137

BUSINESS and INDUSTRY

B6 Identify and develop profitable and sustainable tourism products for Cowra

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B6.2

Work with the board of the

Cowra Japanese Garden and

Cultural Centre Inc to ensure the

long-term future of the facility

B6.2.a

Provide board member (Mayor) to

company

Mayor attends board meetings and report key issues to

council

GM

B6.2.b

Respond to initiatives and requests

from the Cowra Japanese Garden and

Cultural Centre Inc

Respond to initiatives/requests in a timely manner

Requests requiring Council determination referred to

council meeting process in a timely manner

GM

Page 141: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 138

BUSINESS and INDUSTRY

B6 Identify and develop profitable and sustainable tourism products for Cowra

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B6.3

Develop the Lachlan River Precinct

as an attractive tourist destination

B6.3.a

Implement Lachlan River Precinct

Masterplan

Masterplan implemented subject to budget

Inform community and business of progress

DIO

Page 142: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 139

BUSINESS and INDUSTRY

B6 Identify and develop profitable and sustainable tourism products for Cowra

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

B6.4

Develop the Cowra Peace Precinct

as an attractive tourist destination

B6.4.a

Encourage walking and travelling

through Peace Precinct

Works completed as per Masterplan and within budget

Inform community and business of progress

DIO

Page 143: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 140

Transport and Infrastructure

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.1

Maintain local and regional road

networks to enable the safe and

efficient movement of traffic at the

lowest life-cycle cost

T1.1.a

Develop and implement works

program for maintenance of roads and

bridges

Roads and bridges maintained to satisfactory standard

within budget

DIO

T1.1.b

Review Road Asset Management Plan

Review completed of Road Asset Management Plan

DIO

T1.1.c

Provide a safe road network

Respond to identified safety issues in a timely manner

DIO

Page 144: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 141

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.2

Work with Roads and Maritime

Services (RMS) to enable the safe

and efficient movement of traffic

on the state owned road network

within Cowra Shire

T1.2.a

Work with Roads & Maritime Services

to agree on improvements required to

state owned road networks

Program agreed and council engaged as principal

contractor to carry out works

DIO

T1.2.b

Maintain working relationship with

Roads & Maritime Services

Regular meetings held and recommendations addressed

DIO

Page 145: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 142

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.3

Maintain ancillary road facilities

(e.g. signs, delineation and

associated structures) to enable

the safe and efficient movement of

traffic

T1.3.a

Review of signage to be undertaken

Signage amended according to recommendations for

review

DIO

T1.3.b

Street lighting efficiency audit

undertaken

Audit completed and options presented

DIO

T1.3.c

Ancillary road facilities to be

maintained

Facilities maintained according to agreed standards

DIO

Page 146: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 143

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.4

Source road making materials in an

environmentally responsible

manner

T1.4.a

Investigate program to address

Environmental Protection Authority

condition for council quarries

All conditions are complied with i.e.

Dust monitoring

Water discharge from quarry floor

Adhering to time of operation

Bird boxes erected

DIO

T1.4.b

Reconstruct entrance to Gospel Oak

Quarry

Revised entrance way is completed

DIO

T1.4.c

Review operating season for Gospel

Oak to meet compliance

Sufficient gravel is stockpiled to avoid operating during a

Parrot Breeding Season (CPA requirement)

DIO

Page 147: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 144

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.5

Maintain, improve and develop

footpaths and walkways to ensure

the safe and efficient movement of

users, including access for aged and

disabled persons

T1.5.a

Maintain footpaths to user standards

All complaints investigated and appropriate remedial

works completed within timeframe

DIO

T1.5.b

Improve walkways

Peace Precinct and Riverbank Masterplan implemented in

accordance with budget

DIO

T1.5.c

Review footpaths and road crossings

for rideability of mobility scooters

Repairs undertaken according to review and within

allocated budget

DIO

Page 148: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 145

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.6

Improve local traffic conditions

within the Cowra CBD

T1.6.a

Develop plan for Heavy Vehicle

Alternative Route through Cowra

Transportation study completed including the public

exhibition process

DES/ DIO

T1.6.b

Complete CBD Masterplan

CBD Masterplan adopted and commenced

DIO

Page 149: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 146

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.7

Develop cycleways in Cowra Shire

T1.7.a

Review cycleway‟s policy

Policy is reviewed

DIO

Page 150: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 147

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.8

Plan for an alternative heavy

vehicle route for Cowra

T1.8.a

Develop plan for Heavy Vehicle

Alternative Route through Cowra

Transportation study completed including the public

exhibition process

DIO

Page 151: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 148

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.9

Maintain and improve Cowra

Airport as a certified aerodrome

and a place of aviation related

business

T1.9.a

Market Cowra Airport as a regional

aviation facility

Include airport in Cowra Shire Economic Development

Plan

GM

T1.9.b

Undertake investigation and liaise with

potential regular passenger transport

operators

Business opportunity presented to prospective operators

and proposals invited

GM

T1.9.c

To maintain sealed runway

Undertake crack sealing as required

Plan to re-seal in 2013/2014

DIO

T1.9.d

Taxiways are improved to meet

compliance

100% compliance is met

DIO

Page 152: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 149

T1.9.e

Prepare business case for

development

Development program approved by council

upgrades carried out in a timely manner determined by

need

DIO

Page 153: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 150

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.10

Be an active supporter and

advocate of regional and inland rail

T1.10.a

Work with relevant government and

industry stakeholders to reopen the

Blayney-Demondrille rail line

NSW Government commits to reopen the line

GM

Page 154: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 151

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.11

Advocate for construction of Bells

Line Expressway

T1.11.a

Attend at least on BLEG meeting

annually

Attend and participate in meeting

GM

T1.11.b

Participate in co-ordinated Centroc

media on the route

Media statements

GM

Page 155: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 152

TRANSPORT and INFRASTRUCTURE

T1 Develop an integrated transport system that addresses local and regional needs in relation to road, rail and air

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T1.12

Advocate for improvements to the

Lachlan Valley Way as a major

regional road

T1.12.a

Make representations to appropriate

Members of Parliament

Representations made and response received

GM

Page 156: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 153

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.1

Maintain and improve shire‟s water

supply network to meet consumer

demand and satisfy health

requirements at the lowest life-

cycle cost

T2.1.a

Support Centroc (CWUA) to achieve

best practice

Plans are completed for Council adoption:

Demand Management Plan

Drought Management Plan

DIO

T2.1.b

Improve water supply network

Develop and adopt water Asset Management Plan

Renewal program developed

Complete installation of Darbys Falls Water Filtration

Plant

DIO

T2.1.c

Water samples taken as per Health

Department requirements

Water samples tested and meet health standards

(Australian Drinking Water Standards)

DIO

Page 157: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 154

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.2

Work with NSW Government to

determine the feasibility of

establishing a council operated

Wyangala village sewerage system

T2.2.a

Work with NSW Government and

Wyangala community to progress

establishment of Wyangala village

sewerage system

Respond to request from NSW Office of Water

Council position presented to NSW Government

DIO

Page 158: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 155

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.3

Provide a treated waste water

system that meets environmental

standards with maximum

opportunity for re-use

T2.3.a

Operate wastewater network

effectively

Network operated within budget

DIO

T2.3.b

Improve network for robustness

Renewal programs developed for future expansion

DIO

T2.3.c

Discharge from wastewater treatment

plant to meet EPA sensitive water

standards

100% compliance achieved

DIO

T2.3.d

Undertake Re-use study

Re-use study completed (Including Public Exhibition

Process)

DIO

T2.3.e

Minimise odour emissions from Waste

Water Treatment Facility

Less than 5 odour complaints received per year

DIO

Page 159: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 156

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.4

Maintain and improve the

collection and removal of

stormwater to minimise damage

and public nuisance throughout the

shire

T2.4.a

Manage stormwater network to public

satisfaction

A community satisfaction Survey undertaken

Develop and adopt stormwater AMP

DIO

T2.4.b

Identify and implement stormwater

projects

Projects are completed as budget allows

DIO

Page 160: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 157

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.5

Maintain and improve Council

buildings to support operational

requirements

T2.5.a

Inspect council buildings for

Maintenance program

Inspections undertaken and maintenance recommended

DIO

T2.5.b

Implement repairs and Maintenance of

Buildings

Buildings maintained to required standards

DIO

T2.5.c

Develop register for council buildings

and properties

Report to council on surplus

property

Register is developed and updated

Recommendations made to Council

DIO

Page 161: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 158

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.6

Maintain and improve other

council assets to meet operational

requirements

T2.6.a

Maintain all public facilities to required

standards

All works are completed within budget

Community satisfaction survey is to be completed

DIO

T2.6.b

Develop plan for the expansion of

Cowra Cemetery

Design and costing for expansion are completed

DIO

Page 162: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 159

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.7

Provide and maintain plant of an

appropriate type, size and number

to undertake council operations

T2.7.a

Develop 10 year program

Program completed annually and within budget

DIO

T2.7.b

Review high maintenance plant

Recommendations made to replace high maintenance

plant as soon as practical in next financial year

DIO

T2.7.c

Identify improvements to Cowra

Council Depot

Approved improvements completed

DIO

Page 163: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 160

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.8

Work with government and

relevant telecommunication

providers to deliver equitable

access to communication and

technology for our entire shire

T2.8.a

Research mobile phone coverage in

the shire and advocate for extension

of service with providers

Research undertaken and approaches made to providers

seeking commitments to extend coverage

GM

T2.8.b

Advocate for rollout of the NBN in

Cowra Shire

Cowra‟s timetable for the rollout is determined

GM

Page 164: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 161

TRANSPORT and INFRASTRUCTURE

T2 Provide water, sewerage, stormwater, innovative energy and communication services to meet community needs

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T2.9

Undertake research and

development to improve energy

efficiency of council buildings, plant

and equipment

T2.9.a

Conduct level 2 Energy Audit of Civic

Centre / Administration Building/

Waugoola House

Recommendations for increasing energy efficiency

included for consideration in 2013/2014 Operational Plan

DIO

T2.9.b

Conduct Level 2 Energy Audit of

Major Water Infrastructure

Recommendations for increasing energy efficiency

included for consideration in 2013/2014 Operational Plan

DIO

T2.9.c

Conduct Level 2 Energy Audit for

Major Wastewater Infrastructure

Recommendations for increasing energy efficiency

included for consideration in 2013/2014 Operational Plan

DIO

T2.9.d

Participate in Centroc Energy review

Report on options for increased energy efficiency

DES

Page 165: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 162

TRANSPORT and INFRASTRUCTURE

T3 Secure Cowra’s water supply

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T3.1

Provide a secure water supply for

community needs and

contingencies

T3.1.a

Test readiness of supply between

Central Tablelands Water and Cowra

No faults in network operation

DIO

T3.1.b

Development Water Quality

Management Plan

Water Quality Management Plan developed to

Department of Health requirements

DIO

T3.1.c

Investigate suitability of existing intake

infrastructure

Recommendations are made for improvements

DIO

Page 166: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 163

TRANSPORT and INFRASTRUCTURE

T3 Secure Cowra’s water supply

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T3.2

Maintain Cowra Council as the

principal water supply authority for

Cowra

T3.2.a

Work with Centroc Water Utilities

Alliance to achieve best practice

Regular attendance of meetings and participation in

CWUA projects

DIO

T3.2.b

Mayor, councillors and staff advocate

at appropriate forums

Advocacy undertaken

GM

Page 167: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 164

TRANSPORT and INFRASTRUCTURE

T3 Secure Cowra’s water supply

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

T3.3

Provide a land-use planning

framework to identify and protect

vulnerable aquifers

T3.3.a

Incorporate water sensitive lands

mapping in new Local Environmental

Plan

Local Environmental Plan includes environmentally

sensitive lands for mapping for water

DES

Page 168: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 165

Natural Resource Management

NATURAL RESOURCE MANAGEMENT

N1 Make Cowra a centre of environmental excellence

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N1.1

Position Cowra to grow and

prosper in a low carbon emission

environment

N1.1.a

Prepare a brief to undertake a strategy

to optimally position Cowra in a low

carbon emission future

Brief prepared and endorsed by council

DES

N1.1.b

Implement strategies under the RSAP

Projects completed in accordance with RSAP

DES

Page 169: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 166

NATURAL RESOURCE MANAGEMENT

N1 Make Cowra a centre of environmental excellence

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N1.2

Investigate opportunities for the

use of renewable/alternative

energy sources for council

infrastructure

N1.2.a

Undertake energy efficiency strategy

in collaboration with Centroc and

neighbouring councils

Energy efficiency strategy completed

DES/ DIO

Page 170: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 167

NATURAL RESOURCE MANAGEMENT

N1 Make Cowra a centre of environmental excellence

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N1.3

Lead on NRM initiatives and

projects in the region

N1.3.a

Support to the Cowra NRM Advisory

Committee to lead on NRM initiatives

and projects

A least one NRM initiative/project is carried out to the

satisfaction of committee Chairman and council

DES

Page 171: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 168

NATURAL RESOURCE MANAGEMENT

N2 Build partnerships with people who work with and care for the land to secure a healthy environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N2.1

Support Lachlan Catchment

Management Authority (LCMA),

Livestock Health and Pest

Authorities (LHPA), Department

of Primary Industries (DPI), NSW

Farmers and other authorities to

deliver their environmental

management programs for non-

urban environs

N2.1.a

Attend strategy meetings as requested

LCMA Local Government Advisory Group attendance

Timely response to government authority referrals

DES/DIO

Page 172: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 169

NATURAL RESOURCE MANAGEMENT

N2 Build partnerships with people who work with and care for the land to secure a healthy environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N2.2

Liaise with the local Aboriginal

community to identify suitable

projects, key sites and projects

that improve environmental

outcomes

N2.2.a

Meet at least annually with Cowra

Local Aboriginal Land Council

Mayor and General Manager attend meetings with Land

Council

At least one collaborative project identified annually

DES/GM

N2.2.b

Support the Cowra Local Aboriginal

Land Council to undertake

environmental projects

At least one environmental based indigenous project is

carried out to the satisfaction of the Cowra Local

Aboriginal Land Council and council

DES

Page 173: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 170

NATURAL RESOURCE MANAGEMENT

N2 Build partnerships with people who work with and care for the land to secure a healthy environment

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N2.3

Work with LCMA, other agencies,

community groups and other

stakeholders to deliver

environmental improvement

projects and programs in urban

environments and other council

managed land

N2.3.a

Provide small grants for community

groups to undertake environmental

improvement projects

Environmental Improvements Grant Scheme established.

At least one project is funded under the new scheme.

DES/GM

Page 174: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 171

NATURAL RESOURCE MANAGEMENT

N3 Promote practices to encourage Cowra to be an environmentally responsible community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Strategy Performance Measure Responsibility

N3.1

Work with the community to

maximise re-cycling

N3.1.a

Continue with Recycling Education

Strategy (RES)

Recycling has increased through education – Recycling

Educating Strategy

Waste watchers program implemented through schools

DIO

N3.1.b

Investigate expansion of Cowra

Material Recycling Facility to operate

as a regional facility

Investigations undertaken and reported to council

Increased volume through Material Recycling Facility is

achieved

DIO

Page 175: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 172

NATURAL RESOURCE MANAGEMENT

N3 Promote practices to encourage Cowra to be an environmentally responsible community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N3.2

Support Tidy Towns Committee

and other groups conducting

environmental awareness

programs/events

N3.2.a

Support the NRM Advisory

Committee and other environmental

based organisations to advance

environmental awareness

Support the NRM Advisory Committee‟s Futures Forum

Events

DES

N3.2.b

Support the Tidy Towns and Urban

Landcare committee in fulfilling its

delegated role for council

Council provide appropriate administrative support

within available resources

Requests requiring Council determination referred to

council meeting in a timely manner

Minutes from all 355 committee meetings provided to

council in a timely manner

DES

Page 176: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 173

NATURAL RESOURCE MANAGEMENT

N3 Promote practices to encourage Cowra to be an environmentally responsible community

Delivery Program (5 years) Operational Plan (1 year)

Strategy Action Performance Measure Responsibility

N3.3

Investigate opportunities for the

use of renewable/alternative

energy sources for council

infrastructure

N3.3.a

Undertake energy efficiency strategy

in collaboration with Centroc and

neighbouring councils

Energy efficiency strategy completed

DIO

Page 177: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 174

2012/2013 Revenue Policy – Rates & Annual Charges

Rates

The rating system provides for the net funding requirements of Council‟s programs as stated in the

Management Plan.

Any increase in the Rates is reviewed annually after having regard to the maximum provided under the

State Government‟s rate pegging legislation. For 2012/2013 the maximum allowable rate increase has

been announced by the Minister for Local Government as 3.6%.

Ordinary Rates:

The ordinary rating structure for 2012/2013 is detailed below (2011/2012) charges shown in brackets.

Rate Category % of total

$ to be raised

% to be Raised by

$ to be Raised by Number of Base

$ to be Raised by 2011 Ad Valorem

Rate Yield

by category

Base Amount

Base Amount Assessments Amount Ad Valorem Land Value cents in $

Residential 4.64% $269,776 48 $129,492 808 160 140,284 32,795,660 0.00427750

Village & Others

(155)

(0.00388141)

Residential - Cowra 25.68% $1,491,414 48 $715,879 3688 193 775,535 178,021,401 0.00435642

(189)

(0.00421760)

Residential - Rural 5.38% $312,528 40 $125,011 385 325 187,517 33,901,670 0.00553120

(313)

(0.00527480)

Farmland 44.03% $2,557,466 20 $511,493 1779 288 2,045,973 657,444,605 0.00311201

(277)

(0.00310020)

Business 18.97% $1,101,759 0 $- 411 0.0000 1,101,758 35,888,789 0.03069922

(0.03143070)

Mining 1.30% $75,768 0 $- 1 0.0000 75,768 1,015,000 0.07464828

(0.07066180)

100.00% $5,808,710

$1,481,876 7072

$4,326,834 939,067,125

Land Categories:

All rateable land in the shire is required to be classified into one of the categories detailed below. This

task was initially undertaken in 1994 and is continued as applications and/or determinations are made.

Farmland: (Section 515)

Land is to be categorised as farmland if it is a parcel of rateable land valued as one assessment and its

dominant use is for farming or agricultural production. Rural residential land is not categorised as

farmland.

Page 178: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 175

Residential: (Section 516)

Land is to be categorised as residential if it is a parcel of rateable land valued as one assessment and its

dominant use is for residential accommodation or rural residential land or if it is vacant land and zoned

or otherwise designated for use under an environmental planning instrument for residential purposes.

Council has three sub-categories for Residential being:-

(i) Residential – Cowra: Land defined as being within the boundaries of the Cowra township, and;

(ii) Residential – Rural: Land is to be categorised Rural Residential if the land is more than 2 hectares and less than 40

hectares with the primary use being for residential purposes.

(iii) Residential/Villages And Others: Land that is deemed residential but not falling into categories (i) and (ii) above.

Mining: (Section 517)

Land is to be categorised as mining if it is a parcel of rateable land valued as one assessment and its

dominant use is for mining.

Business: (Section 518)

Land is to be categorised as business if it cannot be categorised as farmland or residential. Caravan parks

and manufactured home communities are to be categorised as business.

Water Supply

The following pricing structure has been adopted for 2012/2013:-

RESIDENTIAL 2012/2013 2011/2012

Access Charges Meter Size

20mm $ 287.00 $ 280.00

25mm $ 448.00 $ 438.00

32mm $ 735.00 $ 717.00

40mm $ 1,148.00 $ 1,120.00

50mm $ 1,794.00 $ 1,750.00

80mm $ 2,219.00 New Charge

Usage Charges Consumption per kl

First 400 kl $ 2.05 $ 1.93

Balance $ 2.95 $ 2.83

Page 179: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 176

NON-RESIDENTIAL

(rural, commercial, government/non-business consumers)

2012/2013

2011/2012

Access Charges Meter Size

20mm $ 288.00 $ 280.00

25mm $ 450.00 $ 438.00

32mm $ 737.00 $ 717.00

40mm $ 1,152.00 $ 1,120.00

50mm $ 1803.00 $ 1,750.00

80mm $ 2,219.00 $ 2,154.00

100mm $ 3,466.00 $ 3,365.00

150mm $ 7,799.00 $ 7,572.00

Usage Charges Consumption per kl

First 400 kl $ 2.00 $ 1.93

Balance $ 1.45 $ 1.40

NON-RESIDENTIAL

(Industrial consumers)

2012/2013 2011/2012

Access Charges Meter Size

20mm $ 288.00 $ 283.00

25mm $ 450.00 $ 442.00

32mm $ 737.00 $ 724.00

40mm $ 1,152.00 $ 1,132.00

50mm $ 1,803.00 $ 1,751.00

80mm $ 2,219.00 $ 2,154.00

100mm $ 3,466.00 $ 3,365.00

150mm $ 7,799.00 $ 7,572.00

Usage Charges All consumption

per kl

$ 0.78 $ 0.74

RAW WATER 2012/2013 2011/2012

Access Charges Meter Size

20mm $ 288.00 $ 280.00

25mm $ 450.00 $ 438.00

32mm $ 737.00 $ 717.00

40mm $ 1,152.00 $ 1,120.00

50mm $ 1,803.00 $ 1,750.00

80mm $ 2,219.00 $ 2,154.00

100mm $ 3,466.00 $ 3,365.00

150mm $ 7,799.00 $ 7,572.00

Usage Charges All consumption

per kl

$ 1.20 $ 1.10

Page 180: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 177

Wholesale Nurseries

WHOLESALE NURSERIES

Serviced by the Cowra Shire Council water supply system

2012/2013

2011/2012

Access Charges Meter Size

20mm $ 288.00 $ 283.00

25mm $ 450.00 $ 442.00

32mm $ 737.00 $ 724.00

40mm $ 1,152.00 $ 1,132.00

50mm $ 1,803.00 $ 1,751.00

80mm $ 2,219.00 $ 2,154.00

100mm $ 3,466.00 $ 3,365.00

150mm $ 7,799.00 $ 7,572.00

Usage Charges All consumption

per kl

$ 0.92 $ 0.77

User charges per kl to be incremented by 20% per annum until parity reached with second step of the

Non-Residential (Rural Commercial).

Education

The Education Tariff will apply to the Education Providers listed below and serviced by the Cowra Shire Council Water Supply system:

Cowra High School Woodstock Public School Mulyan Public School Wyangala Dam Public School St Raphael‟s School Koorawatha Public School Holman Place School Greenethorpe Public School Cowra Public School Bendick Murrell School Cowra TAFE Holmwood School Gooloogong Public School MET School – Cowra Campus

EDUCATION TARIFF 2012/2013 2011/2012

Access Charges Meter Size

20mm $ 288.00 $ 283.00

25mm $ 450.00 $ 442.00

32mm $ 737.00 $ 724.00

40mm $ 1,152.00 $ 1,132.00

50mm $ 1,803.00 $ 1,751.00

80mm $ 2,219.00 $ 2,154.00

100mm $ 3,466.00 $ 3,365.00

150mm $ 7,799.00 $ 7,572.00

Usage Charges All consumption

per kl

$ 1.10 $ 1.00

User charges per kl to be incremented by 10% per annum until parity reached with Non-Residential

(Rural Commercial).

Page 181: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 178

Water Access Charge - Refunds

Council will provide a refund of 100% of the applicable Water Access Charges to the following bodies in recognition of Council‟s Community Service Obligation:

Cowra Showground

Cowra District Hospital Council will provide a refund of 100% of the applicable Water Access Charges for Windsor Farm Foods and the Cowra Abattoir as an industry incentive.

Vacant Properties

A $288 availability charge will be applied to all vacant un-metered properties as a contribution towards

infrastructure costs.

Sewerage Service

The following pricing structure has been adopted for 2012/2013:-

Residential 2012/2013 2011/2012 Increase Access Charge $ 618.00 $ 597.00 3.51%

Usage Charge* $ 137.00 $ 132.00 3.78%

*The Usage Charge is based on an average residential water consumption of 206 kilolitres per annum and a sewer Discharge factor of 0.6 (i.e. 60%).

Non-Residential

Non-Residential Sewerage charges in 2012/13 will be calculated differently from 2011/12 as directed by the NSW Office of Water. Non-Residential Sewer Accounts will be charged on a User-Pays basis calculated on the total water consumption multiplied by a Sewerage Discharge Factor which identifies the percentage of water consumed that goes to the sewer. The following charges are in addition to Liquid Trade Waste charges which are the specific Trade Wastes in the course of a business activity.

Non-Residential 2012/2013 2011/2012 Increase

Access Charge $ $597.00

20mm service $ $618.00 Not Applicable 3.51%

25mm service $ $637.00 Not Applicable

32mm service $ $656.00 Not Applicable

40mm service $ $676.00 Not Applicable

50mm service $ $696.00 Not Applicable

80mm service $ $717.00 Not Applicable

100mm service $ $739.00 Not Applicable

150mm service $ $761.00 Not Applicable

Commercial - per cistern $ Not applicable in 2012/13 $ 66.00

Page 182: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 179

Non-Residential 2012/2013 2011/2012 Increase

- minimum charge $ Not applicable in 2012/13 $ 132.00

User Charge $ $0.71 per kilolitre is charged to sewer $

Total yield in 2012/2013 from the Access Charges for the shire‟s sewerage system is estimated to be $2,303,283. Total yield in 2012/2013 from the Usage Charge for the shire‟s sewerage system is estimated to be $553,340.

Vacant properties

A $618 Access Charge will be applied to all properties where sewer is available but not connected. This

charge will be levied on the annual rate notice

Waste Charges

Domestic Waste Management Charge

The domestic waste management charge is a single charge with two components being the „garbage

service‟ and the „recycling service‟.

Council has a strong commitment to a recycling program for the Shire, to reduce the amount of waste

material going to landfill at its Materials Recycling Facility and to maximise the sale of recyclable products.

As a component of Council‟s waste management charges, Council will levy under Section 496 of the

Local Government Act, a recycling charge of $97.00 ($94.00 in 2011/12) for a fortnightly pickup service

for a 240 litre recycling bin. That charge will be added to the charge for each property depending upon

whether they have a 240 litre ($430) or a 120 litre ($249) garbage bin service. See the table below.

The charge will be applicable for all serviced properties within the township of Cowra and the villages of

Darbys Falls, Wyangala, Woodstock, Wattamondara, Gooloogong, Noonbinna, Billimari and Morongla.

The domestic waste service is available upon request and by agreement, to a limited number of

properties situated on the main access roads between Cowra township and the above villages.

In accordance with Section 496 of the Local Government Act 1993, Council proposes to levy charges on

properties for which the domestic waste service is available. For 2012/2013 the following charges are to

be levied:

DOMESTIC WASTE 2012/2013 2011/2012 1 x 240 litre garbage bin (1 pick-up per week) and

1 x 240 Litre Recycling Bin (fortnightly pickup)

Total

$

$

430.00

97.00

527.00

$

$

415.00

94.00

509.00

1 x 120 litre garbage bin (1 pick-up per week) and

1 x 240 Litre Recycling Bin (fortnightly pickup)

Total

$

$

$

249.00

97.00

346.00

$

$

$

240.00

94.00

334.00

Page 183: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 180

The total yield from the Domestic Waste Management Charge in 2012/2013 is estimated to be

$1,468,481. In accordance with Section 496 and having regard to the criteria in Section 539 of the 1993

Local Government Act, Council has reviewed the Domestic Waste Management (DWM) Charges for

Vacant Land and has decided to charge $0 for 2012/2013. The total revenue raised in 2012/2013

through DWM for vacant land will be $0.

Commercial Waste Management Charge

Council will levy under Section 501 of the 1993 Local Government Act, a Waste Management Charge on commercial properties for which a waste service is provided. For 2012/2013 the following charges are to be levied:

COMMERCIAL WASTE 2012/2013 2011/2012

1 x 240 litre bin (1 pick-up per week) $ 430.00 $ 415.00

1 x 120 litre bin (1 pick-up per week) $ 249.00 $ 240.00

Commercial Recycling Management Charge

In addition to the above charge, Council will levy under Section 501 of the 1993 Local Government Act,

a Commercial Recycling Management Charge. A Commercial Recycling service will continue to be rolled

out in 2012/2013 for all commercial properties wishing to utilise the service.

COMMERCIAL RECYCLING 2012/2013 2011/2012

1 x 240 litre recycling bin (1 pick-up per week) $ 195.00 $ 188.00

Subsequent and additional bins $ 97.00 $ 94.00

The total yield from the Commercial Waste Management Charge in 2012/2013 is estimated to be $191,709. In accordance with Section 496 and having regard to the criteria in Section 539 of the 1993 Local Government Act, Council has reviewed the Commercial Waste Management Charges for Vacant Land and has decided to charge $0 for 2012/2013. The total revenue raised in 2011/2012 through Commercial Waste Management for vacant land will be $0.

Other Charges and Rebates

Pensioner Rebates:

In accordance with Section 575 of the Local Government Act 1993, Council provides a rate reduction of 50% of the amount of the rate levy. Of this rate reduction 55% is reimbursed by the NSW Government and the remaining 45% is written off by the Council.

The maximum reductions and estimated costs are as follows:

PENSIONER REBATES MAXIMUM REDUCTION ESTIMATED COSTS

(to be abandoned) General Rates (including Domestic Waste) $ 250.00 $ 212,108

Water $ 87.50 $ 119,471

Sewer Availability & Service Charges $ 87.50 $ 80,032

Page 184: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 181

Interest - Overdue Rates & Charges

Interest will be calculated at 10% on a daily basis using the simple interest method. The rate of interest is the rate specified by the Minister and published in the Government Gazette.

Private Works Rate

In accordance with Section 67(1) of the Local Government Act 1993, Council may by agreement with the owner or occupier of any private land carry out on the land any kind of work that may lawfully be carried out on the land. The rates proposed to be adopted by Council are set to recover the full estimated cost (including on cost) to Council in providing the works on private land plus a profit margin of 20%.

Proposed Borrowings

It is Council‟s policy to only borrow to fund capital projects that have a life expectancy beyond the term for repayment of the loan. All loans are secured over the income of the Council. It is also Council‟s policy to invite quotes for the provision of loan funds from lending institutions and the most competitive quotation is accepted. The following loan is proposed for 2012/2013:

LOAN AMOUNT

Water Treatment Plant Automation $ 500,000

Drainage $ 250,000

It is anticipated that borrowings may be required for Airport Masterplan development

Page 185: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 182

Fees and Charges

In accordance with Section 608 of the Local Government Act 1993, Council may charge and recover an approved fee for any service it provides other than a service provided, or proposed to be provided, on an annual basis for which it may make an annual charge under Section 501. A list of the fees proposed to be charged by Council for the financial year ending June 30, 2013 is set out in the attached Schedule of Fees. The fees shown in the Schedule of Fees are arrived at after allowing for normal inflationary growth in the cost of providing these services. However, where the fee is based on the costs of providing the service and those costs increase extraordinarily during the year, Council reserves the right to amend the fees to recover the cost increase. Council‟s general pricing policy is to ensure that all fees and charges with respect to the goods and services provided by it are levied equitably.

Pricing Policies are adopted as follows:

Fees and charges for Council‟s business activities are set in accordance with the prevailing market to maximise Council‟s return;

Fees and charges for community facilities such as swimming pools, sporting fields and cemeteries are set at what Council considers to be a reasonable cost for the user to bear, the balance being met from general revenues;

Fees and charges fixed by legislation and regulations such as zoning certificates, building certificates and building approvals are statutory charges;

Fees and charges such as town planning consents, subdivision fees and dog registrations have maximum fees prescribed by regulation and Council, at its discretion, adopts amounts at or below the maximum fee prescribed;

Section 94 contributions are fixed in accordance with the relevant Contribution Plan;

Fees and charges for all other goods and services are fixed on a cost recovery basis.

Page 186: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 183

2012/2013 Revenue Policy – Fees & Charges

Code for Fees and Charges

Charge set by Council =1

Charge set by Statue =2

Maximum charge set by statue and Council charges less than maximum =3

Charge set by Council in accordance with statutory guidelines =4

Set by Central West Library =5

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

General Administration

Miscellaneous Charges (including Interest on Overdue Rates)

Interest on Overdue Rates & Charges

Accrual of interest on Rates and Charges (refer s566 Local Government Act 1993)

N 2 0.11 10%

Returned Cheques

Fee for Returned Cheques Each instance

Y 1 $ 66.75 $ 69.15

Photocopying, Printing & Document Copies

Photocopying

Photocopies - A4 black & white Per copy Y 1 $ 0.75 $ 0.75

Photocopies - A3 black & white Per copy Y 1 $ 0.95 $ 1.00

Photocopies - A4 colour Per copy Y 1 $ 1.40 $ 1.45

Photocopies - A3 colour Per copy Y 1 $ 1.80 $ 1.85

Plan Copies - AO size Per copy Y 1 $ 13.45 $ 14.00

Plan Copies - A1 size Per copy Y 1 $ 12.40 $ 12.85

Plan Copies - A2 size Per copy Y 1 $ 8.65 $ 9.00

Large documents Per document

Y 1 POA POA

Map Production

Coloured A1 & AO maps – plan printer

Per copy Y 1 $ 43.05 $ 44.60

Black and white A1 & AO maps – plan printer

Per copy Y 1 $ 26.95 $ 27.90

Coloured A2 & A3 maps – plan printer

Per copy Y 1 $ 26.95 $ 27.90

Black and white A2 & A3 maps – plan printer

Per copy Y 1 $ 15.10 $ 15.60

Coloured A4 maps – laser printer Per copy Y 1 $ 1.60 $ 1.65

Document Copies

Rate Notice Copies Per rate year

Y 1 $ 5.50 $ 5.70

Publication Documents

Combined draft Delivery Program, Operational Plan & Long Term Financial Plan documents

Adopted Delivery Program, Operational Plan & Long Term Financial Plan documents

Annual Report

Annual Financial Statements

Per hard copy

Y 1 $ 16.75 $ 17.35

Page 187: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 184

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Publication CD

Combined draft Delivery Program, Operational Plan & Long Term Financial Plan documents

Adopted Delivery Program, Operational Plan & Long Term Financial Plan documents

Annual Report

Annual Financial Statements

Per Item - CD copy

Y

1

$

5.60

$

5.80

Public Documents - Environmental Services

Swimming Pool Resuscitation Chart Each Y 1 $ 20.65 $ 21.40

Document Lodging and Transmission

Fax Sending Australia

First Page Per page Y 1 $ 3.55 $ 3.70

Subsequent Pages Per page Y 1 $ 0.25 $ 0.25

Fax Receiving Australia

First Page Per page Y 1 $ 3.55 $ 3.70

Subsequent Pages Per page Y 1 $ 0.25 $ 0.25

Fax Sending International

First Page Per page Y 1 $ 5.75 $ 5.95

Subsequent Pages Per page Y 1 $ 1.15 $ 1.20

Fax Receiving International

First Page Per page Y 1 $ 5.70 $ 5.90

Subsequent Pages Per page Y 1 $ 1.15 $ 1.20

Electronic Lodgement

A4 or less per page Per sheet Y 1 $ 2.20 (maximum $50)

$ 2.30

(maximum 50) A3 or larger per page Per sheet Y 1 $ 17.80

(maximum $200)

$ 18.45 (maximum

200)

Laminating Maps and Plans

AO (per sheet) Each Y 1 $ 17.85 $ 18.50

A1 (per sheet) Each Y 1 $ 14.45 $ 15.00

A2 (per sheet) Each Y 1 $ 10.10 $ 10.45

A3 (per sheet) Each Y 1 $ 6.75 $ 7.00

A4 (per sheet) Each Y 1 $ 5.60 $ 5.80

Hiring of Equipment

Hire of Data Projector Per day Y 1 $ 69.40 $ 71.90

Hire of Slide Projector Per day Y 1 $ 17.85 $ 18.50

Hire of Overhead Projector Per day Y 1 $ 24.55 $ 25.40

Rates and Charges Certificate (Section 603)

Section 603 Certificate Per certificate

N 2 $ 65.00 $ 65.00

Section 603 Certificate – urgent 1 day processing additional fee

Per certificate

Y 1 $ 39.10 $ 40.50

Government Information (Public Access)

Access to Records by Person regarding their personal affairs

Application Fee - Includes up 20hrs processing time

Per application

N 2 $ 30.00 $ 31.10

Page 188: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 185

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 Per hour of employee time after 20hrs Per

application /Per hour

N 2 $ 30.00 $ 31.10

Non Personal Information Access by Persons or Corporations regarding Non-personal affairs

Application Fee - Includes the 1st hour

of employee time

Per application

N 1 $ 30.00 $ 31.10

Processing charge after the first hour Per hour N 1 $ 30.00 $ 31.10

Internal Review of Refusal of Access Per application

N 1 $ 40.00 $ 41.45

Roads

Roads Fees (Section 138)

Section 138 Application fee (Traffic

Control Plan is supplied by applicant)

N 1 $ 122.70 $ 127.10

Section 138 Application fee (erect minor

structures and perform works within the

road where Traffic Control Plan Not

Required)

N 1 $ 43.70 $ 45.25

Section 138 Application fee (when TCP

is to be supplied by Council)

N 1 $ 351.50 $ 364.15

Road Usage

Road Opening Permit Y 1 $ 84.70 $ 87.75

Rent Of Unused Public Roads

Fees and costs will vary depending on

the size and use of the land. Licence max

5 years

Application Fee Each Y 1 $ 109.20 $ 113.15

Advertising fee Each Y 1 $ 92.55 $ 95.90

Notification fee Each Y 1 $ 92.55 $ 95.90

Amounts invoiced in 2011/12 will be increased by the following percentage rate over the 2012/13

Y I 3.5% 3.5%

Traffic Control Plan

Prepare and Print Traffic Control Plan

(TCP)

Each Y 1 $ 228.80 $ 237.00

Sign Rental (for implementing TCP) Per sign/Per

day

Y 1 $ 5.75 $ 5.95

Roads - Public Events

Road Event Permit (Roads Act 1993 -

Div 4, C1 144) Each Y 1 $ 91.50 $ 94.80

Resident notification for road event

Each Y 1 $ 322.40 $ 334.00

Environmental Services

Approval Fees (Local Government

Act)

Application fee for Approvals under Section 68

Solid Fuel Heating Appliance Approval

Application fee

N 1 $ 201.75 $ 209.00

Page 189: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 186

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Amusement Devices (shows, fairs, functions)

All amusement devices (includes one

inspection fee)

Per device N 1 $ 46.80 $ 48.50

Install moveable dwelling

Install a manufactured home, moveable

dwelling or associated structure in

caravan park, manufactured home estate

or the like and where existing

development consent for such purpose is

in place (includes two compliance

inspection fees)

N 1 $ 327.60 $ 339.40

Install a manufactured home, moveable

dwelling or associated structure on land

other than caravan park or manufactured

home estate or the like.

(includes two compliance inspection

fees)

N 1 $ 762.80 $ 790.25

Install temporary structure

Install a temporary structure on land

(includes inspection fee)

N 1 $ 201.75 $ 209.00

Hoist goods over public road

Swing or hoist goods across or over any

part of a public road by means of a lift,

hoist or tackle projecting over the

footway (includes one inspection fee)

N 1 $ 201.75 $ 209.00

Awnings

Expose or allow to be exposed (whether

for sale or otherwise) any article in or

on or so as to overhang any part of the

road or outside a shop window or

doorway abutting the road, or hang an

article beneath

an awning over the road (includes one

inspection fee)

N 1 $ 201.75 $ 209.00

Annual approval fee for existing approval

to expose or allow to be exposed

(whether for sale or otherwise) any

article in or on or so as to overhang any

part of the road or outside a shop

window or doorway abutting the road,

or hang an article beneath an awning

over the road (includes one inspection

fee)

N 1 $ 43.70 $ 45.25

Plumbing and Drainage

Plumbing and Drainage Approval Permit-

includes approval, inspections and

compliance certificate issue (includes one

inspection fee)

N 1 $ 201.75 $ 209.00

Plumbing and Drainage Approval Permit

minor alterations and repairs- includes

approval, inspections and compliance

certificate issue

N 1 $ 43.70 $ 45.25

Page 190: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 187

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Footpath Dining

Engage in a trade or business on

community land application fee e.g.

footpath dining, display goods for sale,

portable signage (includes one inspection

fee)

N 1 $ 201.75 $ 209.00

Annual renewal fee for existing approval

to engage in a trade or business on

community land.

N 1 $ 43.70 $ 45.25

Waste Storage Container

Place a waste storage container in a

public place-application fee (includes one

inspection fee)

N 1 $ 201.75 $ 209.00

Busking

Play a musical instrument or sing on

community land for fee or reward-

application fee

N 1 $ 18.70 $ 19.35

Caravan Park /Manufactured Home Estate Approval Fees

Application for Approval –per site N 1 $ 8.05 $ 8.35

Renewal fee – per site N 1 $ 5.20 $ 5.40

Annual Compliance Inspection – per site N 1 $ 5.20 $ 5.40

Inspection other than annual inspection

including reinspection for non

compliance – per half hour or part

thereof

N 1 $ 129.00 $ 133.65

On-Site Sewerage Management Systems

Application to install and operate –

includes approval, inspections and

compliance certificate issue (includes one

inspection fee)

N 1 $ 201.75 $ 209.00

Alteration to Existing Approved OSSM N 1 $ 43.70 $ 45.25

Application for Approval to Operate

Existing OSSM N 1 $ 43.70 $ 45.25

Registration of existing approved OSSM N 1 $ 43.70 $ 45.25

Inspection fee to verify compliance of

existing system

N 1 $ 129.00 $ 133.65

Additional Inspection Fee

Additional inspection fee for compliance

inspections relating to Section 68

approvals

N 1 129.00 133.64

Mortuary/Undertakers

Application to Operate a

Mortuary/Undertakers Business

N 1 $ 201.75 $ 209.00

Other

Other S68 Approval not listed

(application fee includes one inspection

fee)

Per application

N 1 $ 201.75 $ 209.00

Page 191: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 188

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Miscellaneous Environmental Service Fees

Section 608 Fee for Advice/Service

Fee for certificate Y 1 $ 83.20 $ 86.20

Fee for certificate (inspection required) Y 1 $ 126.90 $ 131.45

Copy of drainage diagram Y 1 $ 33.30 $ 34.50

Rural Addressing

Rural Addressing Plate Each Y 1 $ 18.40 $ 19.05

Food Services

Food Premises Annual Administration

Fee (only where inspection of premises

carried out)

Per annum N 3 $ 31.00 $ 32.00

Inspection Fee Per hour N 3 $ 146.19 $ 150.00

Additional inspection time over first half

hour

Per half hour

N 3 $ New Charge $ 100.00

Improvement Notice Fee Per notice N 2 $ 330.00 $ 330.00

Mobile food premises inspection fee Per hour N 3 $ 146.19 $ 150.00

Public Health Act

Compliance inspection fee for premises

regulated under Public Health Act. E.g.

skin penetration premises

N 1 $ 122.70 $ 127.10

Swimming Pools

Clause 12 - Exemption Application N 3 $ 70.00 $ 70.00

Clause 24 - Certificate of Compliance N 3 $ 70.00 $ 70.00

Animals - Companion

Companion Animals Act

Registration desexed animal N 2 $ 40.00 $ 40.00

Registration recognised Breeder N 2 $ 40.00 $ 40.00

Pensioner with a desexed animal N 2 $ 15.00 $ 15.00

Non-desexed animal N 2 $ 150.00 $ 150.00

Note:

Dogs only need to be microchipped

and registered if they have been

purchased or born since 1 July 1999

Assistance Animals are required to

be microchipped and registered but

there is no registration fee

Working dogs are not required to be

microchipped and registered but it is

recommended for the protection of

the dog

Greyhounds registered with the

Greyhound Racing Authority Act

1985 are not required to be

microchipped and registered but it is

recommended for the protection of

the dog

Page 192: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 189

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Pound Release fees

Possum/Cat Traps Per trap – refundable

deposit only

Y 1 $ 56.20 $ 58.20

Dog/Cat N 1 $ 11.45 $ 11.45

Sustenance per day impounded-Dog/Cat N 1 $ 5.70 $ 5.70

Large Animals N 1 $ 53.55 $ 55.50

Sheep, goats, pigs & similar size animals N 1 $ 11.45 $ 11.85

Sustenance per day impounded-horses &

cattle

N 1 At Cost At Cost

Sustenance per day impounded-sheep,

goats, pigs N 1 At Cost At Cost

Conveyance of animals to pound N 1 At Cost At Cost

Release impounded shopping trolleys N 1 $ 44.70 $ 46.30

Environmental Clean Up and Noise Control

Administrative cost of prepare and giving

clean up notice Clause 60

N 2 $ 455.00 $ 466.00

Administrative cost of prepare and giving

prevention notice Clause 61 N 2 $ 455.00 $ 466.00

Administrative cost of prepare and giving

noise control notice Clause 61A

N 2 $ 455.00 $ 466.00

Building (Environmental Planning and Assessment)

Development Application Fees

Development involving the erection of a

building, the carrying out of work or the

demolition of a work or a building based

on estimated cost of development. Based

on cost of works as determined under

section 255 EPAR (2000).

Minor work under $5000 N 3 $ 110.00 $ 110.00

$5,001–$50,000 N 3 $ $170, plus an

additional $3

for each

$1,000 (or

part of

$1,000) of the

estimated

cost.

$ 170, plus an

additional 3

for each

1,000 (or part

of 1,000) of

the estimated

cost.

$50,001–$250,000 N 3 $ $352, plus an

additional

$3.64 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$50,000.

$ 352, plus an

additional

3.64 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

50,000.

Page 193: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 190

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 $250,001–$500,000 N 3 $ $1,160, plus

an additional

$2.34 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$250,000.

$ 1,160, plus an

additional

2.34 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

250,000.

$500,001–$1,000,000 N 3 $ $1,745, plus

an additional

$1.64 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$500,000.

$ 1,745, plus an

additional

1.64 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

500,000.

$1,000,001–$10,000,000 N 3 $ $2,615, plus

an additional

$1.44 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$1,000,000.

$ 2,615, plus an

additional

1.44 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

1,000,000.

More than $10,000,000 N 3 $ $15,875, plus

an additional

$1.19 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$10,000,000.

$ 15,875, plus

an additional

1.19 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

10,000,000.

Outdoor Advertisement N 3 $ $285+ $93 for

each

additional

advertisement

in excess of

one

$ 285 plus 93

for each

additional

advertisement

in excess of

one

Dwelling House <$100,000 N 3 $ 455.00 $ 455.00

Additional fee residential flat buildings

where SEPP 65 applies

N 3 $ 760.00 $ 760.00

Class 1 & 10 buildings $5,000 to $50000

value

N 3 $ 150.00 $ 150.00

Page 194: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 191

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 Development being change of use (NOT

involving the erection of a building,

NOT involving the carrying out of a

work, NOT involving the subdivision of

land or NOT involving the demolition of

a building or work)

N 3 $ 285.00 $ 285.00

Subdivision Fees

Subdivision of land involving opening of

public road N 3 $ 665.00 $ 665.00

Plus per each additional lot created N 3 $ 65.00 $ 65.00

Subdivision of land not involving opening

of public road

N 3 $ 330.00 $ 330.00

Plus per each additional lot created N 3 $ 53.00 $ 53.00

Subdivision of land for Strata Title N 3 $ 330.00 $ 330.00

Plus per each additional lot created N 3 $ 65.00 $ 65.00

Note: For example, a plan of subdivision

that provides for 5 lots over land that

has previously comprised 2 lots will

result in the creation of 3 additional lots,

and so attract a fee that includes a base

amount of $665 or $330, as the case

requires, together with a further amount

of $65 or $53, as the case requires, for

each of the 3 additional lots.

Subdivision Certificate Application N 3 $ 150.00 $ 150.00

Compliance Certificate Fees (Including Subdivision)

per inspection required determined by

PCA

1. Water Y 1 $ 57.20 $ 59.25

2. Sewer Y 1 $ 57.20 $ 59.25

3. Roads, kerb & gutter, Footpath Y 1 $ 57.20 $ 59.25

4. Access Y 1 $ 57.20 $ 59.25

5. Drainage Y 1 $ 57.20 $ 59.25

Designated Development additional fee

(in addition to DA fee and other

applicable fees)

N 3 $ 715.00 $ 920.00

Fees for Advertising of Development

Advertising Fee for Designated

Development N 3 $ 2,220.00 $ 2,220.00

Advertising Fee for Advertised

Development

N 4 $ 500.00 $ 500.00

Advertising fee for development for

which an environmental planning

instrument or development control plan

requires notice to be given

N 3 $ 100.00 $ 100.00

Note: Consent authority must refund so

much of the fee paid under this clause as

is not spent in giving the notice

Page 195: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 192

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Additional fees for approvals requiring referral

Additional fee for application requiring

Concurrence Referral

N 3 $ 140.00 $ 140.00

Concurrence fee payable to a

Concurrence Authority N 3 $ 320.00 $ 320.00

Additional fee for application requiring

Integrated Referral

N 3 $ 140.00 $ 140.00

Integrated Authority approval fee

payable to Integrated Approval Authority N 3 $ 320.00 $ 320.00

Fee for application to review Development Application Determination under S82(A)EPAA

Development involving the erection of a

building, the carrying out of work or the

demolition of a work or a building based

on estimated cost of development. Based

on cost of works as determined under

Cl 255 EPAR.

Up to $5,000 N 3 $ 55.00 $ 55.00

$5,001–$250,000 N 3 $ $85, plus an

additional

$1.50 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$5,000.

$ 85, plus an

additional

1.50 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

5,000.

$250,001–$500,000 N 3 $ $500, plus an

additional

$0.85 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$250,000.

$ 500, plus an

additional

0.85 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

250,000.

$500,001–$1,000,000 N 3 $ $712, plus an

additional

$0.50 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$500,000.

$ 712, plus an

additional

0.50 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

500,000.

Page 196: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 193

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 $1,000,001–$10,000,000 N 3 $ $987, plus an

additional $0.40 for each

$1,000 (or part of

$1,000) by which the estimated

cost exceeds $1,000,000.

$ 987, plus an additional

0.40 for each 1,000 (or part

of 1,000) by which the estimated

cost exceeds 1,000,000.

More than $10,000,000 N 3 $ $4,737, plus

an additional

$0.27 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$10,000,000.

$ 4,737, plus an

additional

0.27 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

10,000,000.

Review change of use application N 3 50% of the

original fee

50% of the

original fee

Review of Development Application for

Dwelling House <$100000

N 2 $ 190.00 $ 190.00

Fee for application to modify a consent for local development or State significant development

Modification for Dwelling house

<$100,000 N 3 $ 190.00 $ 190

Modifications involving minor error,

misdescription or miscalculation

N 3 $ 71.00 $ 71

Application for modifications involving

minimal environmental impact and the

development to which the consent as

modified relates is substantially the same

development as the development for

which the consent was originally granted

N 3 $ $645 or 50 %

of the fee for

the original

development

application

fee, whichever

is the lesser

$ 645 or 50 %

of the fee for

the original

development

application

fee, whichever

is the lesser

Application for modification which, in the

opinion of the consent authority, is not

of minimal environmental impact. Where

the original fee for the original

application was less than $100

N 3 50% of

original fee.

50% of

original fee.

Application for modifications under 96 (2) of the Act, or under section 96AA (1) of the Act in respect of a modification which, in the opinion of the consent authority, is not of minimal environmental impact. Based on cost of works as determined under Cl 255 EPAR.

Up to $5,000

N 3 $ 55.00 $ 55.00

Page 197: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 194

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 $5,001–$250,000 N 3 $ $85, plus an

additional

$1.50 for each

$1,000 (or

part of

$1,000) of the

estimated

cost.

$ 85, plus an

additional

1.50 for each

1,000 (or part

of 1,000) of

the estimated

cost.

$250,001–$500,000 N 3 $ $500, plus an

additional

$0.85 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$250,000.

$ 500, plus an

additional

0.85 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

250,000.

$500,001–$1,000,000 N 3 $ $712, plus an

additional

$0.50 for

each $1,000

(or part

of $1,000) by

which the

estimated

cost exceeds

$500,000.

$ 712, plus an

additional

0.50 for

each 1,000

(or part

of 1,000) by

which the

estimated

cost exceeds

500,000.

$1,000,001–$10,000,000 N 3 $987, plus an

additional

$0.40 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$1,000,000.

987, plus an

additional

0.40 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

1,000,000.

More than $10,000,000 N 3 $4,737, plus

an additional

$0.27 for each

$1,000 (or

part of

$1,000) by

which the

estimated

cost exceeds

$10,000,000.

4,737, plus an

additional

0.27 for each

1,000 (or part

of 1,000) by

which the

estimated

cost exceeds

10,000,000.

Page 198: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 195

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 Plus an additional amount if notice of

the application is required to be given

under section 96 (2) or 96AA (1) of the

Act.

N 3 $ 665.00 $ 665.00

Plus an additional fee for modification of consent for residential flat buildings where SEPP 65 applies

N 3 $ 760.00 $ 760.00

Note: The consent authority must

refund so much of the additional amount

as is not spent in giving the notice under

section 96 (2) or 96AA (1) of the Act.

The consent authority must refund the

additional fee paid under subclause (2A)

if the development is not referred to a

design review panel.

Planning Certificates

Section149(2) N 2 $ 53.00 $ 53.00

Section149(5) N 2 $ 80.00 $ 80.00

Section 121ZP / 735A N 1 $ 72.30 $ 74.90

Building Certificate Fee Section 149A

Same for each dwelling contained in the

building or in any other building on the

allotment.

Class 1 and 10 buildings Per dwelling

N 2 $ 250.00 $ 250.00

Any other class of Building not exceeding

200m2

N 2 $ 250.00 $ 250.00

Any other class of Building exceeding 200m2 but not exceeding 2,000m2

• base fee N 2 $ 250.00 $ 250.00

• plus per m2 over 200m2 N 2 $ 0.50 $ 0.50

Any other class of Building exceeding 2000m2

• base fee N 2 $ 1,165.00 $ 1165.00

• plus per m2 over 2000m2 N 2 $ 0.08 $ 0.075

Subsequent Inspections N 2 $ 90.00 $ 90.00

Copy of Building Certificate N 2 $ 13.00 $ 13.00

The prescribed fee for a certified copy of

a document, map or plan referred to in

section 150 (2) of the Act

N 2 $ 53.00 $ 53.00

Fees for lodgement of Certificates (by Private Certifier)

Fee for lodgement of Complying

Development Certificate

N 2 $ 36.00 $ 36.00

Fee for lodgement of Part 4A certificates

• construction certificate-per certificate N 2 $ 36.00 $ 36.00

• occupation certificate-per certificate N 2 $ 36.00 $ 36.00

• subdivision certificate-per certificate N 2 $ 36.00 $ 36.00

Page 199: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 196

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Complying Development Certificate (CDC) Assessment Fee

Complying Development Certificate fee

base amount (note CDC fee plus the

corresponding Construction Certificate

Fee)

Y 1 $ 58.75

plus CC fee

$ 60.90

plus CC fee

Construction Certificate Assessment fee

Cost not exceeding $5000 Y 1 $ 79.05 $ 81.90

Cost Exceeding $5000: 1

• First $5000 Y 1 $ 79.05 $ 81.90

• Plus each additional $1000 over $5000

up to $100000 – per $1000

Per $1000 Y 1 $ 4.90 $ 5.10

• Plus each additional $1000 over

$100000 up to $250000 – per $1000 Per $1000 Y 1 $ 2.80 $ 2.90

• Plus each additional $1000 over

$250000 – per $1000

Per $1000 Y 1 $ 1.45 $ 1.50

Construction Certificate Modification Fee

Classes 1 & 10

• Minor change Y 1 $ 35.90 $ 37.20

Class 2-9

• Minor change Y 1 $ 79.05 $ 81.90

Inspection Fee

Inspection fee Y 1 $ 129.00 $ 133.65

Inspection carried out on behalf of PCA Y 1 $ 245.00 $ 253.80

Guideline for charging at CC lodgement

stage: Base charge 4 inspections plus

Occupation certificate fee for class 1

buildings new dwelling, dwelling additions

and the like. Base charge 2 inspections

plus Occupation Certificate for class 10

buildings garage carport, swimming pools

and the like. Commercial and industrial

buildings charge base 4 plus OC. Note:

Additional inspection fees may be

charged over and above base number

per inspection.

Occupation Certificate Fee

per application Y 1 $ 129.00 $ 133.65

Assessment of Alternative Solution

per performance clause-not fire Y 1 $ 129.00 $ 133.65

Waste Disposal

Waste

Any materials disposed at this facility

which are generated from a regulated

waste area will attract the appropriate

EPA levies

All commercial transactions are to be

weighed and the appropriate waste

stream tonnage charge applied

Page 200: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 197

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

MRF Charges

Plastics only – PET, HDPE, PVE N/A N/A - No Charge No Charge

Cans – steel & aluminium N/A N/A - No Charge No Charge

Paper & cardboard N/A N/A - No Charge No Charge

Glass – brown, green & clear N/A N/A - No Charge No Charge

Clean Green Waste

Minimum Charge Each Y 1 $ 5.80 $ 6.00

Sedan and/or station wagon Per Load Y 1 $ 5.80 $ 6.00

Ute and/or single axle trailer 1/4 Load Y 1 $ 5.80 $ 6.00

1/2 Load Y 1 $ 5.80 $ 6.00

3/4 Load Y 1 $ 8.65 $ 8.95

Full load Y 1 11.50 11.90

Large trucks and large trailers Per tonne Y 1 $ 60.00 $ 62.15

Large tree trunks & roots Per tonne Y 1 $ 121.00 $ 125.35

Fill (as determined by Site Attendant)

Clean N/A N/A 1 No Charge No Charge

Inert Fill New Charge $ 60.00

Contaminated Per tonne Y 1 $ 247.90 $ 255.35

Residential Waste (to landfill)

Sedan and/or station wagon Per Load Y 1 $ 5.90 $ 6.10

Ute and/or trailer - 1/4 Load Y 1 $ 13.70 $ 14.20

1/2 Load Y 1 $ 27.40 $ 28.40

3/4 Load Y 1 $ 41.15 $ 42.65

Full load Y 1 $ 54.85 $ 56.85

Large trucks and large trailers Per tonne Y 1 $ 150.00 $ 155.40

Council garbage truck Per tonne Y 1 $ 146.45 $ 151.70

Commercial Trade Per tonne Y 1 $ 185.25 $ 190.00

Document Security Disposal Per Item Y 1 $ 23.40 $ 24.25

Mattress (new charge) Per Item Y 1 $ New Charge $ 10.00

Commercial Waste - 240L MGB - One Off

Waste disposal per 240L MGB (includes

delivery & pick-up) Per MGB Y 1 $ 12.75 $ 13.20

Bin Hire Per MGB Y 1 $ 4.55 $ 4.70

Collection Fee Per MGB Y 1 $ 8.20 $ 8.50

Tyres

Push Bike Each Y 1 $ 2.60 $ 2.70

Motor Bike and/or Car Each Y 1 $ 19.15 $ 19.85

Light Truck and/or 4WD Each Y 1 $ 23.00 $ 23.85

Heavy Truck Each Y 1 $ 35.70 $ 37.00

Tractor Front Each Y 1 $ 35.70 $ 37.00

Tractor Rear Each Y 1 $ 96.80 $ 100.30

Metal (Attendant‟s discretion to

volume)

Car Bodies Each Y 1 No Charge No Charge

Steel/black iron Per tonne Y 1 No Charge No Charge

White goods Per unit Y 1 $ 6.35 $ 6.60

Fencing wire Per tonne Y 1 No Charge No Charge

200 litre drums (empty & clean) Each Y 1 No Charge No Charge

20 litre drums (empty & clean) Each Y 1 No Charge No Charge

Water tanks (empty & clean) Each Y 1 No Charge No Charge

Page 201: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 198

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Building materials (clean)

Bulk demolition Per tonne Y 1 $ 100.00 $ 103.60

Asbestos Per tonne Y 1 $ 410.40 $ 425.15

Bricks and/or concrete Per tonne Y 1 $ 61.00 $ 63.20

Timber Per tonne Y 1 As per Green

Waste

Charge

As per Green

Waste

Charge

All types of oils Each Y 1 No Charge No Charge

Batteries (vehicles, cars etc.) Each Y 1 No Charge No Charge

Hospital Contamination Waste

Minimum charge Y 1 $ 51.00 $ 52.85

Assorted Waste Per m3 Y 1 $ 51.00 $ 52.85

Private Needle Disposal Each Y 1 No Charge No Charge

Animal Disposal

Horses, Cows, Bulls & Bullocks Per animal Y 1 $ 57.70 $ 59.80

Calves and foals Per animal Y 1 $ 51.00 $ 52.85

Sheep, goats, deer, pigs, kangaroos etc. Per animal Y 1 $ 36.60 $ 37.70

Dogs, cats, possums etc. Per animal Y 1 $ 13.85 $ 14.35

Offal Per m3 Y 1 $ 23.10 $ 23.95

Hazardous Waste

Liquid Per litre Y 1 $ 19.15 $ 19.85

Solid Per tonne Y 1 $ 359.15 $ 372.10

Recycled Material Charges

Sale of topsoil Per tonne Y 1 $ 37.45 $ 38.80

Sale of topsoil to wholesalers Per tonne Y 1 $ 20.70 $ 21.45

Sale of garden mulch Per m3 Y 1 $ 12.75 $ 13.20

MGB Replacement Charges

240 litre bin (New) Per Bin Y 1 $ 114.35 $ 118.45

120 litre bin (New) Per Bin Y 1 $ 102.05 $ 105.70

240 litre bin (Second Hand) Per bin Y 1 $ 56.50 $ 58.50

120 litre bin (Second Hand) Per Bin Y 1 $ 51.00 $ 52.85

Discharge of Liquid Trade

Waste To Sewerage

System

Application Fee Application fee N 4 $ 78.00 $ 80.00

Annual trade waste fee

Category 1 discharger N 4 $ 80.00 $ 83.00

Category 2/2S discharger N 4 $ 160.00 $ 165.00

Catergory 3 discharger N 4 $ 535.00 $ 555.00

Re-inspection Fee N 4 $ 73.00 $ 75.00

Trade Waste usage Charge $/kL N 4 $ 1.46 $ 1.51

Trade Waste usage Charge for

dischargers where appropriate pre-

treatment facilities are not installed or

maintained.

$/kL N 4 $ 13.39 $ 13.82

Page 202: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 199

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Substances

Excess Mass Charges U value for substance (see section 3.5.5 of Council's policy 3.60)

Acid demand, pH>10 $/kg N 4 $ 0.66 $ 0.68

Alkali demand, pH<7 $/kg N 4 $ 0.66 $ 0.68

Aluminium $/kg N 4 $ 0.66 $ 0.68

Ammonia (as N) $/kg N 4 $ 1.95 $ 2.01

Arsenic $/kg N 4 $ 65.73 $ 67.86

Barium $/kg N 4 $ 32.87 $ 33.93

BOD $/kg N 4 $ 0.66 $ 0.68

Boron $/kg N 4 $ 0.66 $ 0.68

Bromine $/kg N 4 $ 13.15 $ 13.57

Cadmium $/kg N 4 $ 304.33 $ 314.18

Chloride $/kg N 4 $ 0.00 $ 0.00

Chlorinated Hydrocarbons $/kg N 4 $ 32.87 $ 33.93

Chlorinated Phenolics $/kg N 4 $ 1,314.68 $ 1,357.24

Chlorine $/kg N 4 $ 1.34 $ 1.38

Chromium $/kg N 4 $ 21.91 $ 22.62

Herbicides/Defoliants $/kg N 4 $ 657.34 $ 678.62

Cobalt $/kg N 4 $ 13.39 $ 13.82

Copper $/kg N 4 $ 13.39 $ 13.82

Cyanide $/kg N 4 $ 65.73 $ 67.86

Fluoride $/kg N 4 $ 3.29 $ 3.39

Formaldehyde $/kg N 4 $ 1.34 $ 1.38

Total Oil and Grease $/kg N 4 $ 1.18 $ 1.22

Lead $/kg N 4 $ 32.87 $ 33.93

Lithium $/kg N 4 $ 6.57 $ 6.79

Manganese $/kg N 4 $ 6.57 $ 6.79

Mercaptans $/kg N 4 $ 65.73 $ 67.86

Mercury $/kg N 4 $ 2,191.14 $ 2,262.06

Methylene Blue Active Substances

(MBAS)

$/kg N 4 $ 0.66 $ 0.68

Molybdenum $/kg N 4 $ 0.66 $ 0.68

Nickel $/kg N 4 $ 21.91 $ 22.62

Total kjeldahl Nitrogen $/kg N 4 $ 0.17 $ 0.18

Organoarsenic Compounds $/kg N 4 $ 657.34 $ 678.62

Pesticides General (excludes

organochlorines and organophosphates) $/kg N 4 $ 657.34 $ 678.62

Petroleum Hydrocarbons (non-

flammable)

$/kg N 4 $ 2.19 $ 2.26

Phenolic Compounds (non-chlorinated) $/kg N 4 $ 6.57 $ 6.79

Total Phosphorous $/kg N 4 $ 1.34 $ 1.38

Polynuclear Aromatic Hydrocarbons

(PAHs)

$/kg N 4 $ 13.39 $ 13.82

Selenium $/kg N 4 $ 46.26 $ 47.75

Silver $/kg N 4 $ 1.22 $ 1.26

Sulphate (SO4) $/kg N 4 $ 0.13 $ 0.14

Sulphide $/kg N 4 $ 1.34 $ 1.38

Sulphite $/kg N 4 $ 1.46 $ 1.51

Suspended Solids $/kg N 4 $ 0.84 $ 0.87

Thiosulphate $/kg N 4 $ 0.23 $ 0.24

Page 203: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 200

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 Tin $/kg N 4 $ 6.57 $ 6.79

Total Dissolved Solids $/kg N 4 $ 0.05 $ 0.05

Uranium $/kg N 4 $ 6.57 $ 6.79

Zinc $/kg N 4 $ 13.39 $ 13.82

Excess Mass Charges C Value for

BOD>600mg/L

(see section 3.5.5 of Council's policy

3.60)

C - Value N 4 $ 0.66 $ 0.68

Food waste disposal charge per bed N 4 $ 24.35 $ 25.13

Non-compliance

Non-compliance Charges (see

section 3.5.7 of Council's policy 3.60)

Non-compliance pH charge k value N 4 $ 0.37 $ 0.38

Non-compliance excess mass charge (Values as for excess mass charge)

Discharge of stormwater to the

sewerage system

$/kL N 4 $ 13.39 $ 13.82

Portable toilet waste $/kL N 4 $ 14.61 $ 15.08

Septic tank and pan waste disposal

charge (where accepted with prior

arrangement from Council)

$/kL N 4 $ 2.31 $ 2.39

Septic tank sludge (where accepted with

prior arrangement of Council) $/kL N 4 $ 19.48 $ 20.11

Noxious Weeds

Noxious Weeds Certificate Per application

Y 1 $ 52.10 $ 54.00

Cemetery

Columbarium (Ashes only)

Reservation Fee: (Selected position)

(Note: Accepted as deposit and to be

deducted from amount of charges at

time of Interment)

Each Y 1 $ 318.00 $ 329.45

Interment of Ashes: Includes niche for

casket, installation and perpetual mtc and

including plaque (to a standard amount

of inscription)

Each Y 1 $ 499.40 $ 517.50

Memorial Tree (Ashes only)

Reservation Fee: (Selected position) (Note: Accepted as deposit and to be deducted from amount of charges at time of Interment)

Each Y 1 $ 503.50 $ 521.60

Interment of Ashes: Provision of tree, reception and Interment of ashes if desired, perpetual mtc and plaque (to a standard amount of inscription)

Each Y 1 $ 726.60 $ 752.75

Additional Interment(s) of Ashes: Existing tree – includes reception and Interment of ashes if desired, perpetual mtce. And plaque (to a standard amount of inscription) Note: See Misc. Items for cost of Plaques, Vases, Weekends etc.

Each Y 1 $ 498.35 $ 516.30

Page 204: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 201

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Lawn Sections

Reservation Fee: (Selected position)

(Note: Accepted as deposit and to

be deducted from amount of charges

at time of Interment)

Interment Fee: Land for each grave,

first Interment, perpetual mtc, and

large concrete headstone, and

provision for and including bronze

plaque (to a standard amount of

inscription)

Each Y 1 $ 562.50 $ 582.75

New Lawn/Old Lawn Each Y 1 $ 2,287.35 $ 2,369.70

Catholic Lawn Section (larger plaque) Each Y 1 $ 2,351.50 $ 2,436.15

Children‟s Lawn Each Y 1 $ 1,016.40 $ 1,053.00

Interment of ashes in existing grave Each Y 1 $ 423.30 $ 450.00

Extra depth (Below 1.6m to make

provision for a second interment)

Each Y 1 $ 303.25 $ 326.00

Re-opening of grave for second

interment and provision for and including

bronze plaque (to a standard amount of

inscription)

Each Y 1 $ 1,001.90 $ 1,038.00

Interment of ashes into new lawn plot Each Y 1 $ 1,842.00 $ 1,908.30

Monumental Garden Section

Reservation Fee: (Selected position)

(Note: Accepted as deposit and to be

deducted from amount of charges at

time of interment)

Each Y 1 $ 405.72 $ 420.30

Interment Fee: Land for each grave, first

interment, perpetual mtc, Each Y 1 $ 2,035.30 $ 2,108.60

Extra depth (Below 1.6m to make

provision for a second interment)

Each Y 1 $ 314.65 $ 326.00

Re-opening of grave for second

interment Each Y 1 $ 609.10 $ 634.00

Interment of ashes into new plot including perpetual maintenance.

Each Y 1 New Charge $ 1858.00

Interment of ashes into an existing grave Each Y 1 New Charge $ 450.00

Monumental Section & Villages

Reservation Fee: (Selected position)

(Note: Accepted as deposit and to be

deducted from amount of charges at

time of interment)

Each Y 1 $ 408.30 $ 423.00

Interment fee: land for each grave, first

interment, perpetual maintenance Each Y 1 $ 1,275.10 $ 1,321.00

Extra depth (Below 1.6m to make

provision for a second interment)

Each Y 1 $ 316.20 $ 326.00

Re-opening of grave for second

interment Each Y 1 $ 612.70 $ 634.00

Interment of Ashes

Exclusive use includes land for each

grave, first interment, perpetual

maintenance

Each Y 1 $ 996.20 $ 1,032.00

Existing Grave Each Y 1 $ 434.20 $ 438.00

Page 205: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 202

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Saturday & Public Holidays

Lawn/Monumental Sections (Note:

Additional payment over and above

normal weekday Interment fee)

Each Y 1 $ 883.90 $ 915.70

Columbarium/Memorial Sections (Note:

additional payment over and above

normal weekday Interment fee)

Each Y 1 $ 281.00 $ 291.10

Monument Applications

All applications to Council for approval Each N 1 $ 66.75 $ 50.00

Headstones

Large concrete headstone Each Y 1 $ 122.10 $ 126.50

Small concrete headstone Each Y 1 $ 51.25 $ 53.10

Plaque

Children's:

Lawn/Memorial/Tree/Columbarium

Sections 149mm x 111mm bronze die

cast plaque – standard of nine lines

inscription

Each Y 1 $ 268.60 $ 278.30

New Lawn/Old Lawn Sections 254mm x

203mm bronze die cast plaque –

standard of five lines inscription

Each Y 1 $ 469.40 $ 486.30

Catholic Lawn Section 279mm x

381mm bronze die cast plaque –

standard of eight lines inscription

Each Y 1 $ 549.05 $ 568.80

Ultra Image Photographs

5x7 Each Y 1 $ 193.00 $ 200.00

7x9 Each Y 1 $ 225.10 $ 233.20

True to Life Photographs

5x7 Each Y 1 $ 351.40 $ 351.40

7x9 Each Y 1 $ 394.30 $ 394.30

Colour Ceramic photographs

5 x 7 Each Y 1 $ 364.30 $ 364.30

7 x 9 Each Y 1 $ 408.30 $ 408.30

Vases

Concrete block surround with chrome

insert Each Y 1 $ 61.00 $ 61.00

Chrome insert for vase Each Y 1 $ 55.90 $ 45.00

Niche Strap vase Each Y 1 $ 61.00 $ 63.20

Cemetery/Information (Excluding Funeral Directors)

Search Fee Per hour Y 1 No Charge No charge

Water

Standpipe Bulk Water Sales

Avdata Access Key (accounts) - no

refund available Per key Y 1 $ 42.00 $ 43.50

Avdata Access Key (pre-paid) - key price

is a refundable deposit if returned in

good condition

Y 1 $ 42.00 $ 43.50

Rate per kl inclusive of Avdata Charge

Per kl N 1 $ 3.65 $ 3.80

Page 206: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 203

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Connections (New) (Applications and Connections to

Council's Water Supply System

- A capital contribution charge is

applicable

New service and meter

< 4m N 1 $ 899.00 $ 931.30

N 1 $ 1,184.00 $ 1,226.60

> 4m < 15m Cowra N 1 $ 1,485.50 $ 1,539.00

N 1 $ 1,894.50 $ 1,962.70

Villages N 1 $ 1,571.50 $ 1,628.00

N 1 $ 1,975.50 $ 2,046.60

> 15m < 30m Cowra N 1 $ 1,733.00 $ 1,795.40

N 1 $ 2,314.50 $ 2,397.80

Villages N 1 $ 2,136.50 $ 2,213.40

N 1 $ 2,702.00 $ 2,799.50

(i) New meter and service greater than

30mm diameter

N 1 POA POA

(ii) Meter installation only – 20mm N 1 $ 183.00 $ 189.60

Non Payment of Account

Disconnection/Reconnection N 1 $ 120.50 $ 124.50

Existing Connections - Disconnection

Urban – Cowra, Noonbinna Each instance

N 1 $ 81.00 $ 83.90

Village – Rural Each instance

N 1 $ 120.50 $ 124.80

Existing Connections - Reconnection

Urban – Cowra, Noonbinna Each instance

N 1 $ 115.50 $ 119.65

Village – Rural Each instance

N 1 $ 120.50 $ 124.85

(i) New meter and service other than

20mm and 25mm diameter N 1 POA POA

(ii) Meter installation only – 20mm N 1 $ 184.00 $ 190.60

Fee to provide quotation for change in

water meter size

Y 1 $ 34.50 $ 35.75

Meter Size Change N 1 POA POA

Ancillary Services

Meter Testing (for accuracy) -

- Cowra Each instance

N 1 $ 80.75 $ 83.65

- Other Each instance

N 1 $ 111.80 $ 115.80

Flow & Pressure Tests - Cowra Each instance

N 1 $ 67.75 $ 70.20

Flow & Pressure Tests - Other Each instance

N 1 $ 111.30 $ 115.30

Flow & Pressure Tests - for fire rating

purposes & report

Each instance

N 1 $ 124.30 $ 128.75

Special one-off meter reads - Cowra Each instance

N 1 $ 54.00 $ 55.95

Special one-off meter reads – Other

Each

instance N 1 $ 78.05 $ 80.85

Page 207: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 204

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Capital Contribution

Capital contribution charge for

developments on existing unconnected

lots, not subject to subdivision (in-fill

blocks) and not previously paying water

availability charge. This charge is in

addition to the connection fee.

The base capital charge;

A – Darbys Falls, Wyangala, Cowra,

Billimari N 1 $ 3,352.00 $ 3,473.00

B – 1C1 Zone N 1 $ 8,590.00 $ 8,900.00

C – Southern Section N 1 $ 6,771.00 $ 7,015.00

D – CTW N 1 $ 8,757.00 $ 9,072.00

Headworks Charge/ET (as per DSP (Section 64 LGA, Section

306 WMA)

A – Darbys Falls, Wyangala, Cowra,

Billimari

N 1 $ 3,352.00 $ 3,473.00

B – 1C1 Zone N 1 $ 8,590.00 $ 8,900.00

C – Southern Section N 1 $ 6,771.00 $ 7,015.00

D – CTW N 1 $ 8,757.00 $ 9,072.00

Sewer

Supply and install new junction Each instance

N 1 POA POA

Inspect line with camera Per hour Y 1 $ 140.00 $ 145.00

Pipe cleaning with water jet Per hour Y 1 $ 196.50 $ 203.60

Headworks Charge/ET (as per DSP ( Section 64 LGA, Section 306 WMA)

Cowra N 1 $ 5,005.00 $ 5,185.00

Wyangala N 1 $ 5,005.00 $ 5,185.00

Venue Hire

Multi-Purpose Room

Hire of Multi-Purpose Room for

community or non profit groups

Per hour Y 1 No Charge No Charge

Cleaning Fee if room not left in clean and

tidy condition Y 1 53.80 55.75

Lost key fee will be charged for any keys

lost or damaged.

Y 1 20.80 21.55

Public Meeting Room

Hire of Public Meeting Room for

commercial purposes

Per hour Y 1 $ 26.95 $ 27.90

Bookings for community or non profit

groups No Charge No Charge

Cleaning Fee if room not left in clean and

tidy condition

Y 1 $ 32.30 $ 33.45

Lost key fee will be charged for any keys

lost or damaged

Y 1 $ 20.80 $ 21.55

Page 208: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 205

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Civic Centre - Auditorium (includes use of auditorium. Dance floor and front of house amenities)

Catered Functions (eg: wedding

reception, balls, parties, dinners)

Single hire Y 1 $ 451.00 $ 467.25

Non-Catered Functions (ie: where no

food or drink is served) Single hire Y 1 $ 331.00 $ 342.90

Council functions (charged to relevant

department) (maximum $348 per day)

Per hour Y 1 $ 58.00 $ 60.10

Civic Centre - Stage Production (includes use of auditorium, front of house amenities, stage, sound and lighting and back of stage amenities)

Local Organisations Single hire Y 1 $ 331.00 $ 342.90

Non-Local Organisations Single hire Y 1 $ 499.00 $ 517.00

Additional charges for use of Tarkett

Dance Matt

Single hire Y 1 $ 267.00 $ 276.60

Civic Centre - Theatrette (where required with or without use of the auditorium)

Catered Functions Single hire Y 1 $ 236.00 $ 244.50

Non-Catered Funcitons (ie: where no

food or drink is served) Single hire Y 1 $ 175.00 $ 181.30

Council functions (charged to relevant

department) (maximum $178.00 per day)

Per hour Y 1 $ 35.50 $ 36.80

Civic Centre - Additional Charges

Kitchen (includes use of vain-marie, urns,

stoves/ovens, refrigerators)

Single hire Y 1 $ 175.00 $ 181.30

Bar - alcohol served (includes use of

fridges, urn, glass, washes) Single hire Y 1 $ 175.00 $ 181.30

Rehersals or Set Up Per hour Y 1 $ 32.20 $ 33.35

Additional charge if spot or floodlighting

required at rehersals

Per hour Y 1 $ 57.10 $ 59.15

Foyer (where no other part of the hall is

required)

Single hire Y 1 $ 175.00 $ 181.30

Additional charge for each session above

one on the same day (auditorium or

stage booking)

Single hire Y 1 $ 175.00 $ 181.30

Deposits

All bookings must be accompanied by a

deposit as per the following:

- Auditorium/Stage Productions - $200

deposit

- Theaterette Functions - $100 deposit

Bookings will not be processed until

this deposit is paid

Cancellation

Notification of any cancellation is to be

made in writing at least 14 days prior to

the event date otherwise the deposit is

forfeited. *GST payable if deposit

forfeited.

Page 209: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 206

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

After Hours

Failure to vacate hall after 1.30 a.m. -

$345.00 per hour or part thereof.

Multiple Bookings

Any organisation hiring the hall for a

minimum of 5 events over a 12 month

period (at least 3 of which must be full

performances as which admission fees

are charged) maybe eligible for a 50%

rebate on the total hire charge.

Swimming Pool Admission

Conditions

Daily Pass It is proposed that daily pass outs be

available, for use on the day of purchase

only, and at no extra charge other than

initial cost of entry. Daily pass outs are

to be issued by the pool customer

service staff and are to be non-

transferable between customers

(enforced through digital photo id linking

the customer with the card)

Ticket Classification

• Family tickets (including pensioner

family season ticket) comprise two

(2) adults (either parents or

grandparents of the children) and

two nominated children

• Child tickets refer to children of

school age through to the age of 18

years.

• Children under school age are

admitted free of charge.

Reduced Rate Entry

Aged, Disability Support and/or Veterans

Affairs card must be shown to receive

Pensioner entry.

Concessions

The definition of a Pension cardholder is

as follows:

• Person(s) in possession of a

Department of Verterans Affairs or

Centrelink Pension Card as shown in

Attachement B that displays any of

the following codes:

- AGE

- DSP

- DVA

To receive entry at a reduced rate an

application must be completed at the

pool. Eligible criteria includes: holders of

Aged, Veterans Affairs and Disability

Pension Cards or Families with

Page 210: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 207

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 Centrelink Low Income Cards. On

approval an Aquatic Centre Concession

Card will will be issued to be shown on

entry. This card would be valid for one

season, renewable annually, and be

shown on entry to the Aquatic Centre

Admission

General Admission

Adult Per person Y 1 $ 4.50 $ 4.50

Child Per person Y 1 $ 2.50 $ 2.50

Pensioner (aged, invalid & Veterans

Affairs only)

Per person Y 1 $ 2.50 $ 2.50

Family ticket Per “Family”

Y 1 $ 13.00 $ 13.00

Non-swimmer/Spectator Per person Y 1 $ 2.50 $ 2.50

Daily Pass Outs N/A - No Charge No Charge

School Students completing regular

structured classes/ carnivals Per student Y 1 $ 2.00 $ 2.00

Low Income Card Daily Tickets

The definition of Low Income Family

cardholder is as follows: Person(s) in

possession of a Centrelink Health Care

Card with listed dependants.

Low Income Admission

Adult Per person Y 1 $ 2.50 $ 2.50

Child Per person Y 1 $ 2.50 $ 2.50

Family Ticket Per "Family"

Y 1 $ 8.50 $ 8.50

Season Tickets

Adult Per person Y 1 $ 145.00 $ 145.00

Child Per person Y 1 $ 75.00 $ 75.00

Family Per “Family”

Y 1 $ 265.00 $ 265.00

Pensioner Family Per “Family”

Y 1 $ 125.00 $ 125.00

Non-swimmer/Spectator Per person Y 1 $ 75.00 $ 75.00

Pensioner (aged, invalid & Veterans

Affairs only)

Per person Y 1 $ 75.00 $ 75.00

Low Income Card Season Tickets

Adult Per person Y 1 $ 75.00 $ 75.00

Child Per person Y 1 $ 75.00 $ 75.00

Family Ticket Per "Family"

Y 1 $ 125.00 $ 125.00

Other Entry

School based Learn-to-Swim (10 Day Program)

Child Per person/Per

day

Y 1 $ 2.00 $ 2.00

10 Entry Pass

Adult Per person Y 1 $ 39.00 $ 39.00

Child Per person Y 1 $ 20.00 $ 20.00

Family Per Y 1 $ 120.00 $ 120.00

Page 211: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 208

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 “Family”

Pensioner (aged, invalid & Veterans

Affairs only)

Per person Y 1 $ 20.00 $ 20.00

Non-swimmer/Spectator Per person Y 1 $ 20.00 $ 20.00

The 10 entry pass is valid for the duration of the season in which it was purchased and can be re-activated with another 10 entries upon payment. The cards are non-transferable between customers (enforced through digital photo id linking the customer with the card).

Hire of Aquatic Centre for School Carnivals

With the exception of the Cowra Swimming Club & all Learn to Swim Classes, use of the pool for the purpose of conducting private Aquatic classes for the public (where a fee is being charged to participants)

Per person, per day

Y 1 $ 1.00 $ 1.00

Locker Hire

Per Day Each Y 1 $ 2.00 $ 2.00

Per Week Each Y 1 $ 10.00 $ 10.00

Per Season Each Y 1 $ 120.00 $ 120.00

Lost or damaged pool Season Cards

Per card Y 1 $ 6.00 $ 6.00

Sportsfields Hire & Usage

Variations to Sports Field season fees should be calculated according to the following formula: padlock charge + capital maintenance charge + kiosk (if used) + amenities (if used) + mowing (base rate X frequency X no. fields) + wicket preparation (base rate X frequency X no. wickets) = Season Fee."

One off hire of facility/Special Event

(junior, school and charities exempt) Each event Y 1 $ 75.40 $ 78.10

Additional fees for use of facilities at

venue and/or work required e.g. wicket

preparation Maximum fee payable

Each event Y 1 $ 272.70 $ 282.50

Netball - Summer Per season Y 1 $ 829.00 $ 858.80

Netball - Winter Per season Y 1 $ 655.15 $ 678.75

Touch Football Per season Y 1 $ 1,427.25 $ 1,478.60

7-a-side Soccer Per season Y 1 $ 889.50 $ 1,200.00

Senior Soccer Per season Y 1 $ 957.90 $ 992.40

Cricket Per season Y 1 $ 9,127.15 $ 9,456.00

AFL Per season Y 1 $ 1,526.60 $ 1,581.50

Hockey Per season Y 1 $ 1,495.60 $ 1,300.00

Twilight Hockey Per season Y 1 $ 968.75 $ 1,003.60

Rugby League Per season Y 1 $ 1,476.40 $ 1,529.55

Linemarking Fees

Netball Per field Y 1 $ 32.10 $ 33.25

Soccer Per field Y 1 $ 155.25 $ 160.85

Page 212: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 209

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 Touch Football Per field Y 1 $ 32.10 $ 33.25

AFL Per field Y 1 $ 155.25 $ 160.85

Hockey Per field Y 1 $ 155.25 $ 160.85

Rugby League Per field Y 1 $ 155.25 $ 160.85

7 - A-Side Soccer Per field Y 1 $ 155.25 $ 160.85

Other

Lights Per hour Y 1 $ 72.15 $ 74.75

Cleaning/Litter collection when cleaning is not carried out by the hirer to the satisfaction of Council

Per hour Y 1 $ 102.05 $ 105.70

Waste disposal per 240L MGB Per MGB Y 1 $ 12.75 $ 13.20

Covering/uncovering Cricket Pitches for Summer/Winter

Cricket: 1 x charge

N/A 1 No Charge No charge

Covering/uncovering Cricket Pitches for Summer/Winter

AFL: 1 x charge

N/A 1 No Charge No charge

Erection & dismantle of facility equipment - e.g. goal posts etc.

Each instance

N/A 1 No Charge No charge

Padlock/Key Deposit Each instance

Y 1 $ 59.90 $ 62.10

Banners and Street Signs

Fee to erect directional sign (Community based non-profit and religious organisations only)

Each sign Y 1 $ 159.90 $ 165.70

Installation & Dismantling fee - all groups including charities - one off cost per hire period for site

Y 1 $ 349.30 $ 361.90

Daily rate commercial enterprises Per day/Site

Y 1 $ 34.95 $ 36.20

Community & Sporting Groups Per day/Site

N/A 1 FREE FREE

Registered Charities - upon receipt of appropriate documentation

N/A 1 FREE FREE

Quarry Charges

Cost of production for each quarry as determined and varied each quarter from analysis of real cost of production. (Commercial Advantage) These costs do not include loading or transport which will be provided on application

Houghton's Quarry $/m3 Y 1 $ 30.00 $ 30.00

Gospel Oak $/m3 Y 1 $ 30.00 $ 30.00

Holmwood $/m3 Y 1 $ 30.00 $ 30.00

Business Undertakings

Camping Sites Woodstock Showground Per Event Y 1 $ 53.80 $ 55.75

Annual Fee

In village areas - Average land value of adjoining lands based on latest VG valuations

Ha Y 1 0.05 TBA

In rural areas - Average land value of adjoining lands based on latest VG valuations

Ha Y 1 0.05 TBA

Aerodrome

Landing Charge - Emergency aircraft: N/A - No Charge No Charge

Page 213: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 210

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 (Careflight, Child Flight, Health Admin

Corp of NSW, Air Ambulance Service,

NSW Department Health, NSW Police

Service, Sydney Helicopter Rescue

Service, Sydney Helicopter Rescue) and

any defence force aircraft.

Annual Fee - Locally owned or regular

aircraft: (in accordance with written

agreement with Council)

Per annum Y 1 $ 571.30 $ 591.90

Local passenger aircraft & Country Connections:

landing fees Per passenger

N/A - No Charge $6.60

minimum fee Each N/A - No Charge No Charge

terminal rental Per week N/A - No Charge No Charge

• all other aircraft - per tonne in excess

of 7 tonnes M.T.O.W.

Per

tonne

Y 1 New Charge $ 11.00

Aero Club:

room rent Per annum Y 1 $ 372.60 $ 386.00

hangar rent Per annum Y 1 $ 154.20 $ 159.75

Aerodrome Hire Fee Each event Y 1 $ 775.20 $ 803.10

Land and Terminal Lease Agreements

(refer to individual contracts for details)

Saleyards

Advertising Fee Per application

Y 1 On

Application

On

Application

Auctioneer's Permit

Regular sales Per agent Y 1 $ 62.90 $ 65.15

Special sales Per agent Y 1 $ 62.88 $ 65.15

NLIS levy for cattle Per head Y 1 $ 0.83 $ 0.86

NLIS levy for sheep Per head Y 1 $ 0.05 $ 0.05

Saleyard Fees (cents per head per day including GST)

Regular & Special Sales:

Cattle/Head Per head Y 1 $ 5.95 $ 6.15

Sheep/Head Per head Y 1 $ 0.83 $ 0.86

Pigs/Head Per head Y 1 $ 2.17 $ 2.25

Horses/Head Per head Y 1 $ 4.25 $ 4.40

Special Use of Yards (no scales)

Minimum Charge Per head Y 1 $ 11.07 $ 11.45

Cattle/Head Per head Y 1 $ 2.90 $ 3.00

Sheep/Head Per head Y 1 $ 0.41 $ 0.42

Horses/Head Per head Y 1 $ 4.25 $ 4.40

Pigs/Head Per head Y 1 $ 2.23 $ 2.30

NOTE: Additional to special sales and

special use of yards (where used)

Cattle Crush (per head) Per head Y 1 $ 4.25 $ 4.40

Truck Wash Key Per key Y 1 $ 42.00 $ 42.00

Truck-Wash (per minute) Per minute Y 1 $ 0.70 $ 0.70

Truck-Wash turn on fee Each Y 1 $ 3.77 $ 3.90

Saleyard Scales Private Use Per head Y 1 $ New Charge $ 5.00

Page 214: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 211

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013

Re-transporting of Stock

Minimum charge Per load Y 1 $ 11.07 $ 11.45

Cattle/Head Per head Y 1 $ 2.79 $ 2.90

Sheep/Head Per head Y 1 $ 0.31 $ 0.32

Horses/Head Per head Y 1 $ 2.79 $ 2.90

Pigs/Head Per head Y 1 $ 2.07 $ 2.15

Disposal of Dead Animals

Sheep/Head Per head Y 1 $ 48.90 $ 50.65

Sale Cattle/Head Per head Y 1 $ 133.00 $ 137.80

Horse/Head Per head Y 1 $ 133.00 $ 137.80

Pigs/Head Per head Y 1 $ 48.90 $ 50.65

NOTE: A cow and calf offered for sale

together shall be charged the fee

applicable for one head only. Per day

means any continuous period of 24

hours from arrival of stock at saleyards.

Per head 1 $ 2.80 $ 2.90

The charges shall apply to openings made

by Public Utility Bodies, Plumbers and

Drainers

Each Y 1 $ 81.55 opening

fee plus an

additional

restoration

charge

$ 84.50 opening

fee plus an

additional

restoration

charge

Library

General

Overdue Items

Videos, DVDs and CD ROMs - per item

per day

Per Item / Day

Y 1 $ 1.00 $ 1.05

Other Library Material Per Item / Day

Y 1 $ 0.55 $ 0.55

Lost Borrower Card

Lost or damaged material - replacement

cost and processing fee

Per Item Y 1 $ 2.20 $ 2.30

Reservations

Per Item Y 1 $ 1.00 $ 1.05

Lost or damaged library materials Per Item Y 1 Replacement

cost plus

processing fee

22.70

Replacement

cost plus

processing fee

23.50

Inter Library Loans

Search Fee Per Item Y 1 $ 5.50 $ 5.70

Lending library imposed fee Per Item Y 1 Various Various

Copying

Photocopying and Printing

- Photocopies A4 black & white Per sheet Y 1 $ 0.20 $ 0.20

Facsimile Transmission

Fax Sending Australia

First Page Per page Y 1 $ 3.40 $ 3.50

Subsequent Pages Per page Y 1 $ 0.20 $ 0.20

Fax Receiving Australia

First Page Per page Y 1 $ 3.40 $ 3.50

Subsequent Pages Per page Y 1 $ 0.20 $ 0.20

Fax Sending International

First Page Per page Y 1 $ 5.50 $ 5.70

Page 215: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 212

Function/Activity Unit of

Measure GST Code

Total Charge

2011/2012 Total Charge

2012/2013 Subsequent Pages Per page Y 1 $ 1.10 $ 1.15

Fax Receiving International

First Page Per page Y 1 $ 5.50 $ 5.70

Subsequent Pages Per page Y 1 $ 1.10 $ 1.15

Other

Email Access Per 10 minutes

Y 1 $ 2.00 $ 2.05

Local History Research Per hour Y 1 $ 25.00 $ 25.90

School Holiday Activities Per activity Y 1 POA POA

Private Works

Private Works - Payment required

upfront in accordance with Debt

Recovery Plan 1.10

Y 1 Cost +20% TBA

Page 216: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 213

2012/2013 Budget

Programs

Program Name

Program Name

Summary Infrastructure & Operations

Administration

General Manager's Operations Technical Services Civic Activities Plant & Depot Operations Land Development Plant Purchases General Manager's Office RMS Maintenance / Construction Tourism Cowra Street Maintenance Overheads & Employees‟ Leave & Entitlements Cowra Street Construction

Rural Road Maintenance

Corporate Services Rural Road Construction Corporate Services Village Streets General purpose revenue Bushfire & Emergency Services Other Revenue Culvert / Causeway Construction Administration - Building Working Exp. Bridges Information Services Quarry Operation Staff Maintenance Drainage Loans Private Works Library Noxious Plants Art Gallery Public Cemeteries Civic Centre Public Amenities Community Projects Swimming Pool Depreciation Parks & Gardens Ground Maintenance Overheads Sportsfields

Village Parks

Environmental Services Rural & Urban Trees Ranger Services Aerodrome Environmental Services Caravan Park Environmental Services Overheads Saleyards

Buildings/Structures Maintenance

Operations Overheads & Employee‟s Leave & Entitlements

Waste Water Sewer Overheads Summary Reserves Loan Schedule

Page 217: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 214

Budget - Summary By Program / Function

Program / Function 2011/2012 Original Estimate

2012/2013 Est. Total

Result

General Manager's Operation

Civic Activities 310,598 347,758

Land Development 0 0

General Manager's Office 549,101 575,903

Tourism 240,717 228,793

Overheads & Employees‟ Leave & Entitlements 146,122 133,311

Total - General Manager's Operations 1,246,538 1,285,765

Corporate Services

Corporate Services 1,624,489 1,714,790

General Purpose Revenue (10,185,372) (10,674,547)

Other Revenue (1,622,177) (1,700,529)

Administration Building Working Expenses 100,191 112,500

Information Services 496,342 505,253

Staff Maintenance 137,203 137,967

Loans 208,587 208,587

Library 254,619 220,180

Art Gallery 185,037 192,855

Civic Centre 229,735 231,708

Community Projects 149,842 161,053

Depreciation 0 0

Overheads & Employees‟ Leave & Entitlements 505,614 433,458

Total - Corporate Services (7,915,890) (8,456,724)

Environmental Services

Ranger Services 112,900 125,190

Environmental Planning 504,466 525,575

Overheads & Employees‟ Leave & Entitlements 199,751 180,720

Total - Environmental Services 817,117 831,485

Infrastructure & Operations

Infrastructure & Operations Administration 325,193 344,665

Technical Services 552,254 796,157

Plant Operations (1,263,937) (1,236,213)

Plant Purchases 0 0

RTA Maintenance / Construction 0 0

Cowra Street Maintenance 507,360 522,945

Cowra Street Construction 166,650 110,300

Rural Road Maintenance 444,479 520,076

Rural Road Construction 1,004,318 1,149,344

Culvert / Causeway Construction 30,725 31,647

Village Streets 97,034 230,637

Bridges 44,000 14,420

Quarry Operation (0) (0)

Page 218: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 215

Program / Function 2011/2012 Original Estimate

2012/2013 Est. Total

Result

Drainage 113,873 116,018

Private Works (92,818) (95,603)

Noxious Plants 176,650 183,384

Bushfire & Emergency Services 186,250 191,762

Tidy Towns 0 0

Public Cemeteries 2,335 8,706

Public Amenities 122,407 125,112

Amenities - Other 0 0

Swimming Pool 311,616 410,266

Parks & Gardens Grounds Maintenance 804,212 903,762

Sportsfields 207,134 209,968

Village parks 35,315 36,000

Rural & Urban Trees 293,746 279,777

Aerodrome 128,597 129,102

Caravan Park 0 (0)

Saleyards 0 0

Buildings & Structures Maintenance 145,349 126,456

Cowra Operations Overheads & Employees‟ Leave & Entitlements 1,464,940 1,200,457

Total - Infrastructure & Operations 5,807,683 6,309,146

Waste

Waste Collection (296,196) (293,885)

Waste Disposal (52,679) (49,828)

Recycling 137,053 171,191

Waste Operations Overheads & Employees‟ Leave & Entitlements 211,822 172,523

Total - Waste 0 0

Water

Water Supply 0 (0)

Total - Water 0 (0)

Sewer

Sewerage 0 (0)

Total - Sewer 0 (0)

Total - General (44,553) (30,330)

Total - Consolidated (44,553) (30,330)

Page 219: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 216

Consolidated Summary

Description 2011/2012 Employee

Costs Borrowing

Costs Materials & Contracts Depreciation

Internal Plant Hire

Legal Costs Consultants

Other Expenditure

Estimate for 2012/13

Expenditure General fund 25,603,142 8,798,505 387,859 7,562,706 5,329,262 2,157,300 55,438 36,500 1,992,584 26,320,153

Water supply 6,058,553 816,831 440,580 1,307,857 1,442,000 127,061 0 0 2,111,634 6,245,964 Sewerage services 2,729,792 341,447 687,766 573,328 314,150 44,954 0 0 717,235 2,678,881 Waste 2,899,128 840,725 63,321 748,840 227,630 599,491 0 20,000 479,893 2,979,901

Total operating expense 37,290,615 10,797,509 1,579,526 10,192,732 7,313,042 2,928,806 55,438 56,500 5,301,347 38,224,899

Description 2011/2012

Rates & Annual

Charges

User Charges &

Fees

Interest and Investment Revenue

Other Revenue

Grants & Contributions

Net Gain Disposal

of Assets Depreciation

Estimate for 2012/13

Revenue General fund (25,994,294) (5,713,262) (5,135,705) (871,464) (5,807,655) (4,500,305) 0 (5,329,261) (22,399) (27,380,052)

Water supply (6,405,284) 0 (5,155,444) 0 0 0 0 (1,442,000) 0 (6,597,444) Sewerage services (3,102,990) (2,278,196) (640,892) (20,600) 0 0 0 (314,150) 0 (3,253,838) Waste (3,162,313) (1,602,144) (1,407,715) (19,694) 0 0 0 (227,630) 0 (3,257,183)

Total operating revenue (38,664,881) (9,593,602) (911,758) (5,807,655) (4,500,305) 0 (7,313,041) (22,399) (40,488,516)

General fund operating result before capital amounts (391,152)

(1,059,899) Water fund operating result before capital amounts (346,731)

(351,480)

Sewer fund operating result before capital amounts (373,198)

(574,957) Waste fund operating result before capital amounts (263,185)

(277,282)

Total operating result before capital amounts (1,374,266)

(2,263,618)

Capital result General fund 346,600

1,029,570

Water 346,731

351,479 Sewerage 373,198

574,957

Waste 263,185

277,283

Total capital result 1,329,713 2,233,288

Estimated consolidated (surplus) / deficit (44,553)

(30,330)

Page 220: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 217

General Manager's Operations

Civic Activities

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10051 Mayoral Expenses 8,434 8,687

10050 Mayoral Allowance 21,770 22,423

10061 Mayor -Vehicle Running Expenses 20,461 21,075

10053 Cr. Travelling 12,049 12,410

10136 Cr. Telephone/Facsimile expenses 3,119 3,213

10137 Cr. Conference/Seminar attendance 10,000 10,300

10138 Cr. Training/Skill Development 5,000 5,150

10139 Cr. Interstate Visits 3,899 4,016

10141 Cr. Partners/Spouses expenses 3,000 3,090

New Councillor Induction 0 5,000

10142 Cr. Carers Expenses 500 515

10078 S.355 Committee Training 1,035 1,066

10054 Meeting/Function Expenses 14,637 15,076

10056 Member's Insurance 1,871 1,927

10021 LG&SA Membership 22,496 23,171

10062 CENTROC Contributions 16,141 16,625

Section 356 Donations 20,000 30,000

LG&SA - Contribution Fund 0 4,342

12105 Inf. & N/Hood Centre Contr. 8,606 8,864

10057 Election Expenses 0 100,000

10089 Cowra / Japan Relationship 15,000 25,000

10134 Cowra/Kogarah Relationship 5,000 5,150

10036 LGSA - Legal Costs 2,500 2,575

10058 Civic Receptions 5,175 5,330

10066 Civic Expenses 5,175 5,330

10052 Member's Fees 89,730 92,422

TOTAL OPERATING EXPENDITURE 295,598 432,758

CAPITAL EXPENDITURE

Transfer to Election Reserve 15,000 15,000

TOTAL CAPITAL EXPENDITURE 15,000 15,000

TOTAL EXPENDITURE 310,598 447,758

OPERATING REVENUE

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

Tr. from Election Reserve 0 (100,000)

Tr. from Carryover Reserve

0

TOTAL CAPITAL REVENUE 0 (100,000)

TOTAL REVENUE 0 (100,000)

NET COST OF SERVICES 310,598 347,758

Page 221: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 218

Land Development

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

Loan No. 232 - External - Land Dev. 4,786 947

TOTAL OPERATING EXPENDITURE 4,786 947

CAPITAL EXPENDITURE

Loan No. 232 - External - Land Dev. 62,876 31,065

Dividend 0 0

23185 Valley View - Stage 3 (16 blocks) 0 0

12119 Holding Costs 0 0

TOTAL CAPITAL EXPENDITURE 62,876 31,065

TOTAL EXPENDITURE 67,662 32,012

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

Property Sales 0 0

Tr. From Land Development Reserve (67,662) (32,012)

TOTAL CAPITAL REVENUE (67,662) (32,012)

TOTAL REVENUE (67,662) (32,012)

NET COST OF SERVICES 0 0

Page 222: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 219

General Manager’s Office

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10030 Salaries 325,640 346,217

10037 Vehicle Running Expenses 20,461 21,075

10004 Advertising 70,000 62,100

10038 Public Relations 10,000 10,300

10047 Sponsorship 5,000 5,150

Promote Our Regional Towns & Shires Project 6,000 0

11709 Cowra Business Officer Working Expenses 27,945 28,783

11711 Business Development (1) 100,000 0

11752 Business Assistance 15,500 15,965

New Residents / Marketing

10,000

11761 Community Strategic Plan Funding 25,000 25,750

Community / Customer Surveys 0 10,000

Economic Development Plan 20,000 6,000

10039 Legal Expenses/Opinions 12,855 13,241

10220 Training 10,350 10,661

10031 Office Expenses 10,350 10,661

TOTAL OPERATING EXPENDITURE 659,101 575,903

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 659,101 575,903

OPERATING REVENUE

1875 DSRD - Grant - Business Promotion 0 0

Grant - Economic development Plan (10,000) 0

1882 Business Promotion Income 0 0

TOTAL OPERATING REVENUE (10,000) 0

CAPITAL REVENUE

Tr. From Carryover Reserve (100,000) 0

TOTAL CAPITAL REVENUE (100,000) 0

TOTAL REVENUE (110,000) 0

NET COST OF SERVICES 549,101 575,903

Page 223: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 220

Tourism

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11700 Cowra Tourism Contribution 212,175 218,965

11703 Visitor's Centre Maintenance 10,000 10,300

Visitor's Centre - Update Hologram 19,000 0

11710 Japanese Garden Raw Water ( until 2021 ) 10,712 11,033

Depreciation Charge

Depreciation 9,202 9,478

TOTAL OPERATING EXPENDITURE 261,089 249,776

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 261,089 249,776

OPERATING REVENUE

1822 Japanese Garden Rent (1,478) (1,522)

1820 Visitor's Centre Rent (9,692) (9,983)

Depreciation Write-back (9,202) (9,478)

TOTAL OPERATING REVENUE (20,372) (20,983)

TOTAL REVENUE (20,372) (20,983)

NET COST OF SERVICES 240,717 228,793

Page 224: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 221

Overheads & Employee’s Leave & Entitlements

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

19046 Superannuation 68,365 71,010

19047 Public Holidays 12,798 11,562

19048 Workers Comp. Insurance 24,106 9,167

19050 Annual Leave 32,682 33,258

19049 Sick Leave 8,171 8,314

TOTAL OPERATING EXPENDITURE 146,122 133,311

TOTAL EXPENDITURE 146,122 133,311

OVERHEADS & ELE

CAPITAL REVENUE

Tr. From LSL Provision

0

Tr. From Carryover Reserve

0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 146,122 133,311

Page 225: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 222

Corporate Services Department

Corporate Services

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10000 Salaries 862,617 902,102 10003 Vehicle Running Expenses 33,744 34,756 10005 Printing & Stationery 66,900 68,907 10006 Postages 31,066 32,000 10090 Office Equipment Maintenance/Supplies 56,561 58,258 10007 Telephones 31,066 32,000 10008 Working Expenses 4,821 4,966 10048 Accounting Software 4,178 9,000

Consultants 10,000 20,000

10010 Fringe Benefits Tax 12,196 12,562 10011 Bank Charges 36,963 38,072 10012 Interest on Overdraft 1,500 1,545 10013 Valuer General Land Value Fee 47,550 48,977 10014 Audit Fees 32,137 33,101

Internal Audit 22,000 22,660

10041 Debt Recovery Expenses 5,356 5,517 10042 Write off Bad & Doubtful Debts 5,356 5,517

Insurance

- Valuations 0 0 10017 - Fidelity Guarantee 2,957 1,757 10018 - Public Liability/Professional Indemnity 215,039 182,000 10019 - Property/Industrial Special Risks 128,004 183,148 10020 - Miscellaneous 9,029 9,932 10016 - Insurance Legal Expenses 13,138 13,532

TOTAL OPERATING EXPENDITURE 1,632,178 1,720,307

CAPITAL EXPENDITURE

Tr. To Risk Management Reserve 17,595 20,526

TOTAL CAPITAL EXPENDITURE 17,595 20,526

TOTAL EXPENDITURE 1,649,773 1,740,833

OPERATING REVENUE

Statewide - Insurance Rebates (11,130) (11,464) Statecover - Performance rebate (8,798) (9,062) TOTAL OPERATING REVENUE (19,928) (20,526)

CAPITAL REVENUE

Tr. From Bad & Doubtful Debts Provision (5,356) (5,517)

Tr. From Carryover Reserve

TOTAL CAPITAL REVENUE (5,356) (5,517)

TOTAL REVENUE (25,284) (26,043)

NET COST OF SERVICES 1,624,489 1,714,790

Page 226: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 223

General Purpose Revenue

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

RATE REVENUE

1000 Residential - Cowra (1,425,748) (1,491,414)

1005 Residential (258,634) (269,776)

1004 Residential - Rural (301,425) (312,528)

1002 Farmland (2,468,259) (2,557,466)

1042 Mining (73,135) (75,768)

1003 Business (1,063,023) (1,101,759)

1007 Interest on Overdue Rates (27,563) (28,390)

1020 Income - Rate Legal Action (5,356) (5,517)

1019 Pensioner Rates Subsidy (113,262) (116,659)

1006 Pensioner Rates Abandoned 205,930 212,108

TOTAL RATE REVENUE (5,530,475) (5,747,169)

OTHER GENERAL PURPOSE REVENUE

1012 Interest on Investments (655,500) (800,000)

1856 Financial Assistance Grant - Local Roads (1,276,461) (1,317,308)

1018 Financial Assistance Grant - General (2,722,936) (2,810,070)

TOTAL REVENUE (10,185,372) (10,674,547)

NET COST OF SERVICES (10,185,372) (10,674,547)

Page 227: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 224

Other Revenue

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING REVENUE

1014 Interest on Internal Loans (49,037) (43,074)

AODE Distribution (1,441,091) (1,512,794)

1025 S.603 Certificates (16,630) (17,129)

Waste Dividend (43,264) (44,562)

Saleyards Dividend (16,068) (16,550)

Caravan Park Dividend (45,000) (55,000)

1155 S.611 Charges - Water (774,928) (798,176)

1155 S.611 Charges - Sewer (133,631) (137,640)

Tr. S.611 charges to Water & Sewer 908,559 935,816

Land Development Dividend 0 0

1026 Sundry (11,087) (11,420)

TOTAL OPERATING REVENUE (1,622,177) (1,700,529)

TOTAL REVENUE (1,622,177) (1,700,529)

NET COST OF SERVICES (1,622,177) (1,700,529)

Page 228: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 225

Administration Building - Working Expenses

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10081 Offices Cleaning 28,800 30,000

10082 Rates, Lighting ,Power & Operating Expenses 69,000 80,000

10083 Security Services 2,391 2,500

Depreciation Charge

Building 30,516 31,431

TOTAL OPERATING EXPENDITURE 130,707 143,931

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 130,707 143,931

OPERATING REVENUE

Depn. W/Back - Office Building (30,516) (31,431)

TOTAL OPERATING REVENUE (30,516) (31,431)

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (30,516) (31,431)

NET COST OF SERVICES 100,191 112,500

Page 229: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 226

Information Services

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10103 Salaries 114,134 117,009

10100 Computer Equipment Maintenance 25,000 25,750

10101 Licensing & Maintenance Agreements 176,208 181,494

10102 Operating Lease 171,000 171,000

10107 Authority - Consulting & Implementation 0 0

TOTAL OPERATING EXPENDITURE 486,342 495,253

CAPITAL EXPENDITURE

Tr. To IT Reserve 10,000 10,000

TOTAL CAPITAL EXPENDITURE 10,000 10,000

TOTAL EXPENDITURE 496,342 505,253

OPERATING REVENUE

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICE 496,342 505,253

Page 230: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 227

Staff Maintenance

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10221 Training - Corporate Services 15,533 15,999

10244 Risk Management Officer 63,357 58,906

10248 Risk Management Expenses 2,678 2,758

10219 Contr. To Centroc HR /OHS Training 3,996 4,116

10228 Employee Service Awards 1,393 1,435

10229 Consultative Committee 1,071 1,103

10230 Employee Assistance Program 5,892 6,069

10231 Indoor Staff Uniforms 12,000 12,360

Defibrillation Devices 0 3,000

Vehicle Running Expenses 20,000 20,600

10233 Pre-Employment Expenses 11,283 11,621

TOTAL OPERATING EXPENDITURE 137,203 137,967

TOTAL EXPENDITURE 137,203 137,967

OPERATING REVENUE

TOTAL REVENUE 0 0

NET COST OF SERVICES 137,203 137,967

Page 231: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 228

Loans

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE ( INT)

Loan No. 235 ( External - Admin Building) - Cash Back Internal Reserves 79,994 71,920

TOTAL OPERATING EXPENDITURE 79,994 71,920

CAPITAL EXPENDITURE (PRIN.)

Loan No. 235 ( External - Admin Building) - Cash Back Internal Reserve 128,593 136,667

TOTAL CAPITAL EXPENDITURE 128,593 136,667

TOTAL EXPENDITURE 208,587 208,587

CAPITAL REVENUE

Loan Funding

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 208,587 208,587

Page 232: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 229

Library Services

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10900 Contr. To Regional Library 234,308 216,924

10902 Building Maintenance 15,000 15,450

10903 Cleaning 10,080 10,382

Loan No. 224-Library-External 50% 3,118 2,364

Loan No.226-Library (1)-Internal 50% 10,349 9,922

10901 Working Expenses 11,034 15,000

Depreciation Charge

Library 30,889 31,816

TOTAL OPERATING EXPENDITURE 314,778 301,858

CAPITAL EXPENDITURE

Loan No. 224-Library-External 50% 10,517 11,272

Loan No.226-Library (1)-Internal 50% 5,342 5,770

Installation - New Front Door 20,000 0

TOTAL CAPITAL EXPENDITURE 35,859 17,041

TOTAL EXPENDITURE 350,637 318,899

OPERATING REVENUE

1500 Library Subsidy (53,836) (55,451)

1501 Sundry Income (5,293) (5,452)

Depn. W/Back - Library (30,889) (31,816)

TOTAL OPERATING REVENUE (90,018) (92,719)

CAPITAL REVENUE

Grant Funding -Special Projects (6,000) (6,000)

TOTAL CAPITAL REVENUE (6,000) (6,000)

TOTAL REVENUE (96,018) (98,719)

NET COST OF SERVICES 254,619 220,180

Page 233: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 230

Art Gallery

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10908 Building Maintenance 0 0 10904 Salaries 80,903 84,004

New Employee - Program Assistant 0 0

Gallery-Building & utilities 39,300 40,479

10912 Gallery-Administration & Marketing Expenses 14,858 15,304 10881 Gallery - Council Rates 1,500 1,545 10887 Gallery - Friends Postage & Printing 1,000 1,030 10890 Gallery - Collection Storage & Conservation 1,300 1,339 10911 Gallery - Art Awards 4,500 4,635 10907 Gallery - Exhibitions Expenses 17,140 17,654

Gallery - Exhibition Development 1,000 1,030

Gallery - Exhibition Public Programs/Outreach 7,010 9,220

Gallery - Shop/Art Sales Expenses 8,500 8,755

Gallery - Grant Expenditure - 20111 ITEG-MGNSW 4,400 4,532

10893 Gallery - Exhibitions Public Program Expenses 0 0 10898 Gallery - Special Event Expenses 0 0

Loan No. 224-Gallery-External 50% 3,118 2,364

Loan No. 226-Gallery (1)-Internal 50% 10,349 9,922

TOTAL OPERATING EXPENDITURE 194,878 201,813

CAPITAL EXPENDITURE

Loan No. 224-Gallery-External 50% 10,517 11,272

Loan No. 226-Gallery (1)-Internal 50% 5,342 5,770

Gallery - Foyer Upgrade 10,000 0

TOTAL CAPITAL EXPENDITURE 25,859 17,042

TOTAL EXPENDITURE 220,737 218,855

OPERATING REVENUE

Gallery Income (25,700) (26,000)

TOTAL OPERATING REVENUE (25,700) (26,000)

CAPITAL REVENUE

Tr. From Gallery Reserve (7,000) 0

Tr. From Gallery Trust (3,000) 0

TOTAL CAPITAL REVENUE (10,000) 0

TOTAL REVENUE (35,700) (26,000)

NET COST OF SERVICES 185,037 192,855

Page 234: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 231

Civic Centre

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10920 Working Expenses/Maintenance 25,500 26,265

10921 Contractor Payments 42,849 44,134

10092 Minor Improvements 15,500 15,965

10923 Fee Donations 5,543 5,709

Loan No. 244-Civic Centre Refurbishment 108,671 105,413

Loan No. 245-Civic Centre Refurbishment 18,982 18,041

Loan No. 231-Roof- External 3,611 3,082

Depreciation Charge

Depreciation 3,624 3,733

TOTAL OPERATING EXPENDITURE 224,280 222,343

CAPITAL EXPENDITURE

Loan No. 231-Roof- External 7,327 7,856

Loan No. 244-Civic Centre Refurbishment 21,968 25,225

Loan No. 245-Civic Centre Refurbishment 5,246 6,243

TOTAL CAPITAL EXPENDITURE 34,541 39,324

TOTAL EXPENDITURE 258,821 261,667

OPERATING REVENUE

1510 Civic Centre Hire Fees (25,462) (26,226)

Depreciation Write-back (3,624) (3,733)

TOTAL OPERATING REVENUE (29,086) (29,959)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (29,086) (29,959)

NET COST OF SERVICES 229,735 231,708

Page 235: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 232

Community Projects

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11011 Showground Trust Contribution 37,115 38,228 11012 Regional Arts Contribution 6,591 6,789 11023 Youth Week 2,588 2,666

NAIDOC Week 1,035 1,066

11025 Social Plan Implementation 5,356 5,517 11048 Cultural Plan Implementation 5,356 5,517 11068 Sport / Recreation Plan Implementation 0 0 11026 Seniors Week 1,000 1,030

Contribution - Youth Council 2,000 4,000

11014 Australia Day Celebrations 5,356 6,000 11049 Pardey collection project 2,142 2,206

Community Projects Office

11015 - Salaries 61,588 65,389 11018 - Working Expenses 7,724 7,956 11017 Festival Operations 16,455 20,000

TOTAL OPERATING EXPENDITURE 154,306 166,363

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 154,306 166,363

OPERATING REVENUE

1031 Youth Week Grant (1,250) (2,000) 1536 Festival Revenue (3,214) (3,310) 1037 Seniors Week Grant 0 0

TOTAL OPERATING REVENUE (4,464) (5,310)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (4,464) (5,310)

NET COST OF SERVICES 149,842 161,053

Page 236: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 233

Depreciation

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

Depreciation Charge

Buildings 84,135 86,659

Other Assets 292,716 301,498

Office Equipment 26,310 27,099

Furniture & Fittings 31,569 32,516

TOTAL OPERATING EXPENDITURE 434,730 447,772

TOTAL EXPENDITURE 434,730 447,772

OPERATING REVENUE

Depreciation Write-back (434,730) (447,772)

TOTAL OPERATING REVENUE (434,730) (447,772)

TOTAL REVENUE (434,730) (447,772)

NET COST OF SERVICES 0 0

Page 237: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 234

Corporate Services Overheads & Employees’ Leave & Entitlements

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

19028 Superannuation 150,794 150,396

19029 Public Holidays 45,297 42,016

19030 Workers Comp. Insurance 125,352 49,502

19032 Annual Leave 104,137 108,631

19033 Long Service Leave 0 0

19031 Sick Leave 26,034 27,158

TOTAL OPERATING EXPENDITURE 451,614 377,703

CAPITAL EXPENDITURE

Tr. To LSL Provision 54,000 55,755

Tr. To W/Comp Reserve

TOTAL CAPITAL EXPENDITURE 54,000 55,755

TOTAL EXPENDITURE 505,614 433,458

CAPITAL REVENUE

Tr. From LSL Provision 0 0

Tr. From Workers Comp Reserve 0 0

Tr. From Carryover Reserve

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 505,614 433,458

Page 238: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 235

Environmental Services Department

Ranger Services

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10310 Ranger's Contract 162,500 175,000

Dangerous/Restricted Dog Audit

15,000

10312 Pound Maintenance 2,142 5,000

10313 Sundries/Safety Equipment 4,166 4,291

10357 Companion Animal Incentive Scheme 3,416 3,518

10317 Waste Disposal Costs 1,553 1,600

10316 Infringement Processing Expense 7,499 8,250

Depreciation Charge 0 0

Depreciation 858 884

TOTAL OPERATING EXPENDITURE 182,134 213,543

CAPITAL EXPENDITURE

CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 182,134 213,543

OPERATING REVENUE

1070 Companion Animals Reimbursement (8,035) (8,276)

1071 Dog Impounding Fees (673) (1,000)

1073 Pound Rental (2,070) (5,000)

Dangerous/Restricted Dog Audit Sales

(5,000)

1072 Infringement Notice - Fines (56,925) (67,500)

1075 Animal Impounding Fees (673) (693)

Depreciation - Write-back (858) (884)

TOTAL OPERATING REVENUE (69,234) (88,353)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (69,234) (88,353)

NET COST OF SERVICES 112,900 125,190

Page 239: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 236

Environmental Services

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10511 Salaries 564,078 630,057 10223 Staff Training 20,000 20,600 10401 Vehicle Running Expenses 57,846 59,581 10402 Office Expenses / DA Advertising 31,500 32,445 10403 Legal Expenses 28,000 26,090 10412 Shire-Wide Development Control Plan 5,000 5,150

State of the Environment Report 2,750 2,750

10419 Working Expenses 5,000 5,150 11038 Heritage Advisor 16,500 16,500

CBD Traffic Management Study - Carryover 10,000 0

DA & Complying Development Shopfront 10,000 0

Planet Footprint ( LGETS) - Carryover 2,000 0

Regional Sustainability Action Plan Implimentation 10,000 15,000

Cowra Household Sharps Management Program 0 2,000

10416 Disabled Access Incentive Fund 5,000 5,150

TOTAL OPERATING EXPENDITURE 767,674 820,473

CAPITAL EXPENDITURE

Tr. To Developer Contribution Reserve 50,000 51,500

TOTAL CAPITAL EXPENDITURE 50,000 51,500

TOTAL EXPENDITURE 817,674 871,973

OPERATING REVENUE

1092 Food Act Administration Fee (8,500) (8,755) 1603 Registration of Pt 4A Certificates (70,000) (70,000) 1131 Planning & Building Cert. Application Fee (30,000) (32,000) 1130 DA Fees (55,000) (65,000) 1606 Sundry (850) (876) 1135 Rural Addressing Sales (1,035) (600) 1139 Heritage Advisors Grant (5,500) (5,665) 1600 Construction Certificate Application Fee (40,000) (41,200) 1136 Subdivision Certificate Building Compliance Certificate (2,000) (2,060) 1604 Long Service Levy Commission (2,070) (2,132)

1619 Public Health Act Registration/Compliance Inspection (500) (150)

1620 Roads Act Section 138 Application (1,035) (1,066) 1621 Swimming Pool Act Compliance/Exemption Application (500) (150) 1625 Complying Dev Cert Applications (13,000) (13,390) 1615 Section 68 Application Fee (15,525) (15,991) 1617 Drainage Diagrams (5,693) (5,864)

Subsidy - Aboriginal Traineeship Program

(30,000)

TOTAL OPERATING REVENUE (251,208) (294,898)

CAPITAL REVENUE

Section 94 Contributions (50,000) (51,500)

Tfr from Main Street Reserve 0 0

Grant Funding - Floodplain Management Plan 0 0

Grant Funding - Cowra Bike Racks Project 0 0

Tfr from Carryover Reserve (12,000) 0

TOTAL CAPITAL REVENUE (62,000) (51,500)

TOTAL REVENUE (313,208) (346,398)

NET COST OF SERVICES 504,466 525,575

Page 240: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 237

Environmental Services Overheads

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

19034 Superannuation 57,867 67,355

19035 Public Holidays 22,369 21,060

19036 Workers Comp. Insurance 53,033 22,001

19038 Annual Leave 53,186 56,243

19039 Long Service Leave 0 0

19037 Sick Leave 13,296 14,061

TOTAL OPERATING EXPENDITURE 199,751 180,720

TOTAL EXPENDITURE 199,751 180,720

CAPITAL REVENUE

Tr. From LSL Provision 0 0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 199,751 180,720

Page 241: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 238

Infrastructure & Operations Department

Infrastructure & Operations - Administration

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11420 Salaries - Administration 631,685 663,727

11421 Vehicle Running Expenses 62,345 64,215

11422 Phone & Fax 11,248 11,585

11423 Office Expenses 5,356 5,517

11424 Training 13,497 13,902

11206 Staff Uniforms 5,175 5,330

Depreciation Charge

Depreciation - Roads Infrastructure 3,088,354 3,181,005

TOTAL OPERATING EXPENDITURE 3,817,660 3,945,280

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 3,817,660 3,945,280

OPERATING REVENUE

Salary Contribution from Sewer (127,678) (131,828)

Salary Contribution from Water (127,678) (131,828)

Salary Contribution from Waste (70,459) (75,113)

Salary Contribution from RTA (61,808) (63,817)

1901 Training Subsidy (4,326) (4,467)

Salary Contribution from Saleyards (12,164) (12,559)

Depreciation Write-back (3,088,354) (3,181,005)

TOTAL OPERATING REVENUE (3,492,467) (3,600,615)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (3,492,467) (3,600,615)

NET COST OF SERVICES 325,193 344,665

Page 242: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 239

Technical Services

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10097 Salaries 600,856 670,039

10093 Staff Training 9,035 16,225

10098 Vehicle Running Expenses 27,479 28,303

10099 Telephone 5,346 4,000

10111 Computer Software 12,024 12,550

10096 Working Expenses 5,356 5,500

10157 Operating Lease - Survey Equipment 9,701 9,701

Design Equipment Supplies 4,477 0

10112 Equipment Supplies 5,712 13,100

10128 Asset Mment Software-Maintenance 13,390 8,800

10113 LEMO & SES 5,892 6,000

10114 Asset Modelling & Research 15,000 20,000

Alternative Route Investigation 0 50,000

10122 Legal & Land matters 20,000 40,000

TOTAL OPERATING EXPENDITURE 734,268 884,218

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 734,268 884,218

OPERATING REVENUE

Salary Contribution from Sewer (160,267) (65,662)

Contribution from SES for LEMO (21,747) (22,399)

TOTAL OPERATING REVENUE (182,014) (88,061)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (182,014) (88,061)

NET COST OF SERVICES 552,254 796,157

Page 243: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 240

Plant & Depot Operations

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10212 Salaries & Wages 156,752 195,366

10200 Plant Operating Expenses 1,631,214 1,676,011

10201 Plant Insurance 74,016 47,412

10213 Light Fleet Vehicle Costs 68,200 84,625

10214 Training 5,717 5,717

10215 Office Equipment Software & Hardware 5,718 7,100

10216 Telephone & Fax Costs 3,706 3,820

10205 Depot Working Expenses 66,163 76,100

Depreciation Charge

- Plant 744,871 767,217

- Depot 27,580 28,407

TOTAL OPERATING EXPENDITURE 2,783,937 2,891,775

CAPITAL EXPENDITURE

Tr. To Plant Reserve 400,000 450,000

Depot Redevelopment Design 0 0

TOTAL CAPITAL EXPENDITURE 400,000 450,000

TOTAL EXPENDITURE 3,183,937 3,341,775

OPERATING REVENUE

1900 Plant Hire (3,528,173) (3,642,264)

1902 Fuel Tax Credits (77,250) (68,000)

1950 Leaseback Contribution (70,000) (72,100)

Depn. W/Back - Plant & Depot (772,451) (795,624)

TOTAL OPERATING REVENUE (4,447,874) (4,577,988)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (4,447,874) (4,577,988)

NET COST OF SERVICES (1,263,937) (1,236,213)

Page 244: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 241

Plant Purchases

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

CAPITAL EXPENDITURE

New/Additional Plant

0

0

Replacement Plant

Light Vehicles 0 166,000

Small Plant (<$15k) 0 60,000

Minor Plant (>$15k<$150k) 0 86,000

Major Plant (>$150k) 0 565,000

Plant - all categories 610,000 0

TOTAL CAPITAL EXPENDITURE 610,000 877,000

TOTAL EXPENDITURE 610,000 877,000

CAPITAL REVENUE

Tr. From Plant Reserve (610,000) (877,000)

TOTAL CAPITAL REVENUE (610,000) (877,000)

TOTAL REVENUE (610,000) (877,000)

NET COST OF SERVICE 0 0

Page 245: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 242

RMS Maintenance / Construction

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

REGIONAL ROAD WORKS

Single Invitation Contract Works 500,200 1,055,783

Regional Rd (Block) - Road Component 281,000 289,430

Regional Rd (Block) - Supplementary 108,000 111,240

Regional Rd (Block) - Traffic Component 52,000 53,560

Regional Rd (Block) - Repair Grant 70,000 0

Heavy Patching 215,000 221,450

Resealing State Roads 800,000 824,000

Contribution to Administration Salaries 61,808 63,817

TOTAL OPERATING EXPENDITURE 2,088,008 2,619,280

CAPITAL EXPENDITURE

Tr. To Plant Reserve 159,963 164,631

Tr. To Works Reserve 0 0

Transfer to Warranty Reserve 28,229 29,052

TOTAL CAPITAL EXPENDITURE 188,192 193,683

TOTAL EXPENDITURE 2,276,200 2,812,963

PROGRAM

OPERATING REVENUE

RMS Payments (2,276,200) (2,812,963)

TOTAL OPERATING REVENUE (2,276,200) (2,812,963)

CAPITAL REVENUE

Tr. From Warranty Reserve 0 0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (2,276,200) (2,812,963)

NET COST OF SERVICES 0 0

Page 246: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 243

Cowra Street Maintenance

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10130 Supervisor - Maintenance 81,669 84,323

10123 Vehicle Running Expenses - Supervisor 17,306 17,825

10129 Maintenance Engineer 62,105 64,124

10615 Banner Poles/Town Entry Signs 5,225 5,382

50006 Sealed Street Pavement Repairs 42,434 43,707

50014 Unsealed Streets Maintenance 7,047 7,259

50500 Line Marking 32,562 33,539

50504 K & G & Drains Maintenance 40,306 41,515

50506 Footpaths Maintenance 47,412 48,835

50507 Fence Maint. & Repairs 1,000 1,030

50513 Street Lighting ( Electricity ) 185,000 190,550

50512 Disabled Crossings Maintenance 6,539 6,735

50508 Carparks Maintenance 11,200 11,536

50975 Urban Signs Maintenance 29,659 30,549

Loan 227-Busby Place Carpark (1)-Internal Interest 4,693 2,437

TOTAL OPERATING EXPENDITURE 574,157 589,346

CAPITAL EXPENDITURE

Loan 227-Busby Place Carpark (1)-Internal Principal 28,203 30,459

TOTAL CAPITAL EXPENDITURE 28,203 30,459

TOTAL EXPENDITURE 602,360 619,805

OPERATING REVENUE

Traffic Route Lighting Subsidy (61,000) (62,830)

Banner Pole Income (1,000) (1,030)

TOTAL OPERATING REVENUE (62,000) (63,860)

CAPITAL REVENUE

Carpark Levy (33,000) (33,000)

TOTAL CAPITAL REVENUE (33,000) (33,000)

TOTAL REVENUE (95,000) (96,860)

NET COST OF SERVICES 507,360 522,945

Page 247: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 244

Cowra Street Construction

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for

2012/13

OPERATING EXPENDITURE

50050 Cowra Street & Lane Reseals 196,650 110,300

50050 Cowra Street & Lane Reseals - Carryover 190,000 0

TOTAL OPERATING EXPENDITURE 386,650 110,300

CAPITAL EXPENDITURE

S94 Urban Road Expenditure 125,000 125,000

Roads to Recovery Expenditure 532,200 0

Roads to Recovery Expenditure - Carryover 0 170,736

Pedestrian Refuge - Brisbane / Liverpool Street 0 0

TOTAL CAPITAL EXPENDITURE 657,200 295,736

TOTAL EXPENDITURE 1,043,850 406,036

OPERATING REVENUE

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

Tr. From S94 Urban Roads (125,000) (125,000)

Roads to Recovery Grant (359,200) (170,736)

Tr. From Works Reserve 0 0

Tr. From Carryover Reserve (393,000) 0

TOTAL CAPITAL REVENUE (877,200) (295,736)

TOTAL REVENUE (877,200) (295,736)

NET COST OF SERVICES 166,650 110,300

Page 248: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 245

Rural Roads Maintenance

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

50104 Gravelling & Grading 364,592 375,529

50113 Line Marking 15,000 15,450

50108 Sealed Roads Maintenance 121,000 124,630

50970 Rural Signs Maintenance 19,337 19,917

TOTAL OPERATING EXPENDITURE 519,929 535,526

CAPITAL EXPENDITURE

Flood Damage - Rehabilitation 856,000.00 0

TOTAL CAPITAL EXPENDITURE 856,000 0

TOTAL EXPENDITURE 1,375,929 535,526

OPERATING REVENUE

1750 Rent of Dedicated Roads (15,450) (15,450)

1754 Road Opening Permits 0 0

TOTAL OPERATING REVENUE (15,450) (15,450)

CAPITAL REVENUE

Flood Damage Subsidy (856,000) 0

Transfer from Works Reserve (60,000) 0

TOTAL CAPITAL REVENUE (916,000) 0

TOTAL REVENUE (931,450) (15,450)

NET COST OF SERVICES 444,479 520,076

Page 249: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 246

Rural Roads Construction

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

50106 Gravel Resheeting 375,020 386,271

50200 Rural Reseals 324,266 500,000

50200 Rural Reseals - Carryover 273,000 0

10135 Supervisor - Construction 81,851 84,511

10124 Vehicle Running Expenses - Construction 15,134 15,588

10133 Construction Engineer 74,048 76,454

50203 Table Drain Maintenance 84,000 86,520

TOTAL OPERATING EXPENDITURE 1,227,318 1,149,344

CAPITAL EXPENDITURE

Flood Repairs

450,000

Roads To Recovery Expenditure 478,800 690,389

Roads To Recovery Expenditure - Carryover 0 312,089

Rural Roads - Heavy Patching 50,000 0

Capital Contribution Works: 190,000 0

23343 - Clements Rd Construction 86,000 100,000

- Kentucky Rd Construction 0 0

Kangarooby Rd

21,263

Pride of Oak Rd

13,031

Section 94 Works 65,000 0

TOTAL CAPITAL EXPENDITURE 869,800 1,586,772

TOTAL EXPENDITURE 2,097,118 2,736,116

OPERATING REVENUE

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

Tr. From Developer Cont.Reserve (65,000) 0

Grant - Flood repairs

(450,000)

Tr. From Works Reserve 0 0

Tr. From Carryover Reserve (463,000) 0

Capital Contributions (276,000) (134,294)

Roads to Recovery Grant (288,800) (1,002,478)

TOTAL CAPITAL REVENUE (1,092,800) (1,586,772)

TOTAL REVENUE (1,092,800) (1,586,772)

NET COST OF SERVICES 1,004,318 1,149,344

Page 250: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 247

Village Streets

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

MAINTENANCE

50300 Billimari 7,092 7,305

50302 Darbys Falls 7,092 7,305

50304 Noonbinna 7,092 7,305

50306 Wattamondara 10,064 10,366

50308 Wyangala 11,005 11,336

50310 Gooloogong 13,117 13,510

50312 Woodstock 13,117 13,510

50350 Village Reseals 28,457 160,000

Village Reseals - Carryover 50,046 0

TOTAL OPERATING EXPENDITURE 147,082 230,637

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 147,082 230,637

CAPITAL REVENUE

Tr. From Carryover Reserve (50,048) 0

TOTAL CAPITAL REVENUE (50,048) 0

TOTAL REVENUE (50,048) 0

NET COST OF SERVICE 97,034 230,637

Page 251: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 248

Bushfire & Emergency Services

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10300 Contr. To NSW Fire Brigade 28,463 29,317

Contribution for LEMO Salary 21,747 22,399

10299 RFS Utility Expense 2,070 2,132

11207 RFS Hazard Reduction 59,275 57,270

10301 Contr. To RFS 109,633 112,922

Contr. To SES 24,323 25,053

10350 SES Expenses 4,140 4,264

Depreciation Charge

Depn. - Bushfire Equipment 245,879 253,255

TOTAL OPERATING EXPENDITURE 495,530 506,613

CAPITAL EXPENDITURE

Bushfire Equipment Allocation 171,784 462,144

Tr. To Fire Mitigation Reserve 2,500 2,500

TOTAL CAPITAL EXPENDITURE 174,284 464,644

TOTAL EXPENDITURE 669,814 971,257

OPERATING REVENUE

1053 Rent of Fire Control Centre (6,626) (6,825)

1956 RFS Hazard Reduction Mechanical Activity (59,275) (57,270)

Depn. W/Back - Bushfire Equipment (245,879) (253,255)

TOTAL OPERATING REVENUE (311,780) (317,350)

CAPITAL REVENUE

Bushfire Equipment Subsidy (171,784) (462,144)

Tr. From Developer Contribution Reserve 0 0

TOTAL CAPITAL REVENUE (171,784) (462,144)

TOTAL REVENUE (483,564) (779,494)

NET COST OF SERVICES 186,250 191,762

Page 252: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 249

Culvert / Causeway Construction

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

CAPITAL EXPENDITURE

23320 Small culverts/causeways 30,725 31,647

TOTAL CAPITAL EXPENDITURE 30,725 31,647

TOTAL EXPENDITURE 30,725 31,647

CAPITAL REVENUE

Roads to Recovery 0 0

Tr. From carryover Reserve

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 30,725 31,647

Page 253: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 250

Bridges

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

50400 Low Level Bridge 10,000 10,300

50417 Pennsylvania Rd Bridge 4,000 4,120

TOTAL OPERATING EXPENDITURE 14,000 14,420

CAPITAL EXPENDITURE

Koorawatha/Greenethorpe Bridge Replacement 30,000 0

TOTAL CAPITAL EXPENDITURE 30,000 0

TOTAL EXPENDITURE 44,000 14,420

OPERATING REVENUE

1752 Boundary Bridges 0 0

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 44,000 14,420

Page 254: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 251

Quarry Operations

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10633 Working Expenses 5,356 20,000

10635 OH & S Compliance 5,356 0

DA Compliance Expenses 120,000 120,000

Loan 239-Houghtons Quarry)-Interest 9,901 8,065

New Loan - Holmwood Access Rd - Interest 10,033 0

TOTAL OPERATING EXPENDITURE 150,646 148,065

CAPITAL EXPENDITURE

Loan 239- Houghtons Quarry-Principal 26,903 28,739

New Loan - Holmwood Access Rd - Principal 8,020 0

23396 Holmwood Quarry access roadworks 0 0

Transfer to Quarry Reserve 47,746 51,743

TOTAL CAPITAL EXPENDITURE 82,669 80,482

TOTAL EXPENDITURE 233,315 228,547

OPERATING REVENUE

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

Tr. From Quarry Reserve (175,668) (169,171)

1951 Oncost on Gravel Issues (57,647) (59,376)

Loan Funds 0 0

TOTAL CAPITAL REVENUE (233,315) (228,547)

TOTAL REVENUE (233,315) (228,547)

NET COST OF SERVICES (0) (0)

Page 255: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 252

Drainage

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

Depreciation - Stormwater 414,464 426,898

Loan 236-Vaux St-External 78 % 17,223 16,403

Loan 241 - Vaux St West 11.67% 9,853 9,713

Proposed Loan - Drainage Works - Interest

18,185

Design Expenses - Flood Study 20,000 0

10590 Kerb Inlets Maintenance 51,419 52,962

TOTAL OPERATING EXPENDITURE 512,959 524,162

CAPITAL EXPENDITURE

Drainage - Flood Remediation 0 250,000

Proposed Loan - Drainage Works - Principal

2,417

Loan 236-Vaux St- External 78 % 12,779 13,599

Loan 241-Vaux St West 11.67% 2,599 2,739

TOTAL CAPITAL EXPENDITURE 15,378 268,754

TOTAL EXPENDITURE 528,337 792,916

OPERATING REVENUE

Depreciation Write-back (414,464) (426,898)

TOTAL OPERATING REVENUE (414,464) (426,898)

CAPITAL REVENUE

Loan Funding

(250,000)

TOTAL CAPITAL REVENUE 0 (250,000)

TOTAL REVENUE (414,464) (676,898)

NET COST OF SERVICES 113,873 116,018

Page 256: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 253

Private Works

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

13000 Private Works Expenditure 464,092 478,015

TOTAL OPERATING EXPENDITURE 464,092 478,015

CAPITAL EXPENDITURE

Transfer to Works Reserve 0 0

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 464,092 478,015

OPERATING REVENUE

1851 Private Works Revenue (464,092) (478,015)

Private Works Profit (92,818) (95,603)

TOTAL OPERATING REVENUE (556,910) (573,618)

TOTAL REVENUE (556,910) (573,618)

NET COST OF SERVICES (92,818) (95,603)

Page 257: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 254

Noxious Plants

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10450 Wages 89,111 97,209

10451 Vehicle Running Expenses 66,952 68,961

10453 Working Expenses 42,459 43,733

Contractor / Labour Hire 33,000 30,000

10459 Staff Training 2,142 2,206

TOTAL OPERATING EXPENDITURE 233,664 242,109

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 233,664 242,109

OPERATING REVENUE

1100 Grants (55,943) (57,622)

1102 Regulatory Fees & Fines (1,071) (1,103)

TOTAL OPERATING REVENUE (57,014) (58,725)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (57,014) (58,725)

NET COST OF SERVICES 176,650 183,384

Page 258: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 255

Public Cemeteries

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10600 Working Expenses 53,310 54,909

Private Cemeteries

10602 Plaques 31,827 32,782

10601 Wages 64,432 74,351

10604 Staff Training & Conferences 2,679 2,759

10605 Plant Running Costs 41,349 42,589

10606 Replacement Trees 2,070 0

AODE 23,578 24,732

Depreciation Charge

Depreciation 1,222 1,259

TOTAL OPERATING EXPENDITURE 220,467 233,382

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 220,467 233,382

OPERATING REVENUE

1220 Cemetery Fees (155,328) (159,988)

1222 War Graves Contribution (13,377) (13,778)

1221 Plaques & Vases (48,205) (49,651)

Depreciation Write-back (1,222) (1,259)

TOTAL OPERATING REVENUE (218,132) (224,676)

CAPITAL REVENUE

0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (218,132) (224,676)

NET COST OF SERVICES 2,335 8,706

Page 259: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 256

Public Amenities

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10616 Salaries & Wages 40,938 41,199

10617 Plant Running Expenses 18,854 19,420

10612 Working Expenses 25,795 26,569

10621 Carer's Rest Centre - Maintenance 8,409 8,661

10620 Carer's Rest Centre - Contractor 28,411 29,263

Depreciation Charge

Depreciation 414 426

TOTAL OPERATING EXPENDITURE 122,821 125,538

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 122,821 125,538

OPERATING REVENUE

Depreciation Write-back (414) (426) TOTAL OPERATING REVENUE (414) (426)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (414) (426)

NET COST OF SERVICES 122,407 125,112

Page 260: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 257

Swimming Pool

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10931 Working Expenses 88,805 91,469

10977 License - Pool Software 4,178 4,303

10930 Wages 190,340 188,673

11061 Staff Training 5,356 5,517

Loan 220-Refurbishment-External 3,052 1,832

Loan 234-Amenities- External 66,729 62,623

Depreciation Charge

Depreciation 79,399 81,781

TOTAL OPERATING EXPENDITURE 437,859 436,198

CAPITAL EXPENDITURE

Loan 220-Refurbishment-External 18,054 19,274

Plant Room Upgrade

70,000

Loan 234-Amenities- External 69,649 73,754

TOTAL CAPITAL EXPENDITURE 87,703 163,028

TOTAL EXPENDITURE 525,562 599,227

OPERATING REVENUE

1520 User Fees & Charges (128,547) (101,000)

Kiosk Income (6,000) (6,180)

Depreciation Write-back (79,399) (81,781)

TOTAL OPERATING REVENUE (213,946) (188,961)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (213,946) (188,961)

NET COST OF SERVICES 311,616 410,266

Page 261: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 258

Parks, Gardens & Reserves

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11200 Plant Running Expenses 156,667 161,367

11201 Working Expenses 180,000 185,400

Contractor Mowing 40,000 41,200

11202 Wages 340,684 342,860

10575 Tidy Towns Maintenance 6,963 7,172

Peace Precinct 15,000 50,000

Lachlan River Precinct Master Plan

50,000

11203 Vandalism 9,641 9,930

11205 Staff Training 10,712 11,033

10947 Water Charges 60,000 61,800

TOTAL OPERATING EXPENDITURE 819,667 920,762

CAPITAL EXPENDITURE

Peace Precinct Works - Stage 1 (RCLIP) 177,000 0

TOTAL CAPITAL EXPENDITURE 177,000 0

TOTAL EXPENDITURE 996,667 920,762

OPERATING REVENUE

Grant - Crown Reserve Maintenance (15,455) (17,000)

Grant - Peace Precinct

TOTAL OPERATING REVENUE (15,455) (17,000)

CAPITAL REVENUE

Grant - Peace Precinct Works - Stage 1 (RCLIP) (177,000) 0

TOTAL CAPITAL REVENUE (177,000) 0

TOTAL REVENUE (192,455) (17,000)

NET COST OF SERVICES 804,212 903,762

Page 262: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 259

Sportsfields

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

10961 Working Expenses 39,635 40,824

10968 Plant Running Expenses 44,777 46,120

Loan 236-River Park Amenities-External 22 % 4,858 4,627

Loan 243-WCRG Amenities ($160k @7.4% 30yrs) 9,774 8,611

Loan 242b-Mulyan Oval Amenities-External 6.88 % 6,148 6,058

10960 Wages 92,877 93,470

10969 Staff Training 2,142 2,206

10962 Vandalism 3,749 3,861

TOTAL OPERATING EXPENDITURE 203,960 205,778

CAPITAL EXPENDITURE

Loan 236-River Park Amenities-External 22 % 3,604 3,835

Loan 243-WCRG Amenities ($160k @7.4% 30yrs) 13,850 15,013

Loan 242b-Mulyan Oval Amenities-External 6.8 % 1,306 1,396

TOTAL CAPITAL EXPENDITURE 18,760 20,244

TOTAL EXPENDITURE 222,720 226,022

OPERATING REVENUE

1524 User Charges (15,586) (16,054)

TOTAL OPERATING REVENUE (15,586) (16,054)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (15,586) (16,054)

NET COST OF SERVICES 207,134 209,968

Page 263: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 260

Village Parks

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

Village Parks Maintenance 0 36,000

10985 Gooloogong 8,570 0

10986 Woodstock 8,570 0

10988 Billimari 3,214 0

10989 Wattamondara 3,214 0

10987 Woodstock Showground 3,214 0

11019 Morongla Showground 1,071 0

10993 Wyangala 1,035 0

10990 Darbys Falls 4,285 0

10991 Koorawatha 2,142 0

TOTAL OPERATING EXPENDITURE 35,315 36,000

CAPITAL EXPENDITURE

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 35,315 36,000

OPERATING REVENUE

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 35,315 36,000

Page 264: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 261

Rural & Urban Trees

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11000 Working Expenses 106,410 69,000

11050 Training 5,356 5,517

11004 Vandalism 5,356 5,517

11051 Plant Running Expenses 79,485 81,870

11001 Wages 92,318 92,908

10125 Remove Dead Trees 0 20,000

11003 National Tree Day 4,821 4,966

TOTAL OPERATING EXPENDITURE 293,746 279,777

CAPITAL EXPENDITURE

23401 New tree plantings 0 0

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 293,746 279,777

OPERATING REVENUE

TOTAL OPERATING REVENUE 0 0

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 293,746 279,777

Page 265: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 262

Aerodrome

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11501 Working Expenses 40,396 41,608

11500 Wages 62,316 60,833

Airport Promotion 5,000 5,150

11508 Contractor Inspections 10,921 11,249

11506 Plant Running Expenses 23,567 24,274

11507 Staff Training 3,750 3,863

Depreciation Charge

Depreciation 19,427 20,000

TOTAL OPERATING EXPENDITURE 165,377 166,976

CAPITAL EXPENDITURE

Airport Development 0 0

TOTAL CAPITAL EXPENDITURE 0 0

TOTAL EXPENDITURE 165,377 166,976

OPERATING REVENUE

1801 Rents & Fees (5,234) (5,391)

1802 Land Leases (12,119) (12,483)

Depreciation Write-back (19,427) (20,000)

TOTAL OPERATING REVENUE (36,780) (37,874)

CAPITAL REVENUE

Tr. From Airport Reserve 0 0

Loan funding

0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (36,780) (37,874)

NET COST OF SERVICES 128,597 129,102

Page 266: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 263

Caravan Park

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11600 Maintenance/Operating Expenses 7,500 10,000

Dividend 45,000 55,000

Depreciation Charge

Depreciation 22,147 22,147

TOTAL OPERATING EXPENDITURE 74,647 87,147

CAPITAL EXPENDITURE

Tr. To Caravan Park Reserve 41,530 36,215

TOTAL CAPITAL EXPENDITURE 41,530 36,215

TOTAL EXPENDITURE 116,177 123,362

OPERATING REVENUE

1812 Fixed Lease Fee (53,540) (55,146)

1813 Commission Lease Fee (40,490) (46,069)

Depreciation Write-back (22,147) (22,147)

TOTAL OPERATING REVENUE (116,177) (123,363)

CAPITAL REVENUE

Tr. From Caravan Park Reserve

0

Tr. From Unexpended Grants Reserve

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (116,177) (123,363)

NET COST OF SERVICES 0 0

Page 267: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 264

Saleyards

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11800 Wages 135,611 135,549

Contribution to Admin Salaries 12,164 12,559

Dividend 16,068 16,550

AODE 47,933 51,458

11801 Working Expenses/Maintenance 54,979 56,628

11810 Utilities 26,781 27,584

11803 Plant Running Expenses 13,476 13,880

11805 Advertising 5,356 5,517

11804 Staff Training/ Conferences 2,142 2,206

Overheads 32,194 33,240

Loan 246 - Effluent Screens 17,070 16,390

Loan 233 Saleyards-External Interest 9,561 8,940

Depreciation Charge

Depreciation 21,118 21,752

TOTAL OPERATING EXPENDITURE 394,453 402,255

CAPITAL EXPENDITURE

Loan 233 Saleyards-External Principal 9,854 10,475

Loan 246 - Effluent Screens 8,850 9,530

Tr. To Saleyards Reserve 30,294 45,208

TOTAL CAPITAL EXPENDITURE 48,998 65,213

TOTAL EXPENDITURE 443,451 467,468

OPERATING REVENUE

1830 Fees (388,073) (399,715)

1831 Truck Wash (34,260) (46,000)

Depreciation Write-back (21,118) (21,752)

TOTAL OPERATING REVENUE (443,451) (467,467)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (443,451) (467,467)

NET COST OF SERVICES 0 0

Page 268: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 265

Council Buildings And Structures Maintenance

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

11301 Salaries & Wages 86,624 86,966 10080 Administration Building 24,103 24,826 11702 Rose Garden Café 6,427 6,620 11307 Information & Neighbourhood Centre 4,285 4,414 12103 Senior Citizens Building 6,427 6,000 11309 House - Cnr Darling & Bartlett Avenue 3,214 3,310 11310 House - Bourke Street 8,034 8,275 11311 Liverpool Street House & Flat 14,234 14,661 11312 Public Toilets 25,390 26,152 12120 118 Kendal Street & Waugoola House 5,000 5,150 11319 Bus Shelters 5,356 5,517 10086 Darbys Falls TV Tower 5,356 0

Bealieu - House 5,356

11323 Airport Rd House - RFS 5,356 5,517 50982 Radio tower 6,963 7,172 12107 Council Property Rates 16,068 16,550 12102 Other Property Maintenance 10,712 11,033 11320 Council Depot 6,427 6,620 11321 Woodstock Grandstand 1,071 0

TOTAL OPERATING EXPENDITURE 246,403 238,782

CAPITAL EXPENDITURE

Extension - Visitors' Centre Kiosk 0 0

Senior Citizens Building - Toilet Upgrade 16,000 0

CAPITAL EXPENDITURE 16,000 0

TOTAL EXPENDITURE 262,403 238,782

OPERATING REVENUE

1840 Rent of Council Properties (18,722) (19,284) 1823 Rose Garden Kiosk Rent (24,486) (25,221) 1884 House cnr Darling & Bartlett Ave (11,646) (11,995) 1885 House Bourke St (7,431) (7,654) 1886 House Liverpool St (18,978) (19,547) 1888 118 Kendal St (27,791) (28,625)

TOTAL OPERATING REVENUE (109,054) (112,326)

CAPITAL REVENUE

Contribution - Lessee Kiosk

0

Grant - Senior Citizens Building - Toilet Upgrade (8,000) 0

TOTAL CAPITAL REVENUE (8,000) 0

TOTAL REVENUE (117,054) (112,326)

NET COST OF SERVICES 145,349 126,456

Page 269: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 266

Infrastructure & Operations - Overheads & Employee’s Leave & Entitlements

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

19040 Superannuation 619,960 623,354

19041 Public Holidays 165,160 155,638

19042 Workers Comp. Insurance 452,659 183,339

19044 Annual Leave 381,740 395,773

19045 Long Service Leave 0 0

19043 Sick Leave 93,935 98,943

Saleyards Overheads Contra (32,194) (33,240)

TOTAL OPERATING EXPENDITURE 1,681,260 1,423,807

TOTAL EXPENDITURE 1,681,260 1,423,807

OPERATING REVENUE

1855 Oncost on RTA Works (216,320) (223,350)

TOTAL OPERATING REVENUE (216,320) (223,350)

CAPITAL REVENUE

Tr. From LSL Povision 0 0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (216,320) (223,350)

NET COST OF SERVICES 1,464,940 1,200,457

Page 270: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 267

Waste Operations

Waste Collection

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

AODE 193,643 203,120

10530 Operator's Wages 51,069 54,128 10549 Working Expenses 23,508 24,213 10531 Plant Running Expenses 158,000 162,740 10532 MGB Maintenance 1,680 1,730 10832 Donations - DWMC 1,622 1,671 23149 MGB Replacements 21,632 22,281 10533 Deliver New Waste/Recycling Bins 4,702 4,843

Dividend 43,264 44,562

10536 MGB Disposal Costs (Weighbridge) - Internal 436,588 449,686

Street Sweeping - Cowra & Villages

0

10546 Salaries & Wages 39,755 42,239 10547 Plant Running Expenses 79,444 81,827 10548 Maintenance/Consumables 5,877 6,053

Cleaning Cowra CBD

0

10537 Salaries & Wages 43,449 46,164 10538 Plant Running Expenses 56,027 57,708 10539 Maintenance/Consumables 6,997 7,207

Depreciation Charge

Depreciation - Waste 221,000 227,630

TOTAL OPERATING EXPENDITURE 1,388,257 1,437,803

CAPITAL EXPENDITURE

Tr. To Waste Reserve 107,026 113,536

TOTAL CAPITAL EXPENDITURE 107,026 113,536

TOTAL EXPENDITURE 1,495,283 1,551,339

OPERATING REVENUE

1200 Domestic Waste Management Charge (1,425,710) (1,468,481) 1215 Commercial Waste Management Charge (186,125) (191,709) 1214 Interest on Overdue Charges (15,000) (15,450) 1210 Pensioner Rates Abandoned 125,235 128,992 1209 Pensioner Subsidy (68,879) (70,946)

Depreciation Write-back (221,000) (227,630)

TOTAL OPERATING REVENUE (1,791,479) (1,845,224)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (1,791,479) (1,845,224)

NET COST OF SERVICES (296,196) (293,885)

Page 271: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 268

Waste Disposal

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

Contribution to Administration Salaries 70,459 75,113

Landfill

10542 - Wages 42,848 45,526

10540 - Working Expenses 13,860 14,276

10541 - Plant Running Expenses 99,764 102,757

10567 DEC Licence Fees 4,990 5,140

Village Tips

10544 - Wages 33,978 36,101

10543 - Working Expenses 9,978 10,277

10553 Plant Running Expenses 6,406 6,598

AODE 47,191 49,501

10545 Clean Up Australia Day 4,435 4,568

TOTAL OPERATING EXPENDITURE 333,909 349,857

CAPITAL EXPENDITURE

Tr. To Cell Construction Reserve 50,000 50,000

TOTAL CAPITAL EXPENDITURE 50,000 50,000

TOTAL EXPENDITURE 383,909 399,857

OPERATING REVENUE

1216 MGB Disposal (Weighbridge) (436,588) (449,686)

TOTAL OPERATING REVENUE (436,588) (449,686)

CAPITAL REVENUE

Tr. From Waste Reserve 0 0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (436,588) (449,686)

NET COST OF SERVICES (52,679) (49,828)

Page 272: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 269

Recycling

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

COLLECTION 10550 Wages 114,085 121,212

10569 Working Expenses 5,821 5,996

10619 Recycling - Education 21,425 22,068

Waste to Art - Netwaste 5,000 5,000

10551 Plant Running Expenses 92,219 94,986

10552 Crate Replacement 0 0

TOTAL COLLECTION COSTS 238,550 249,261

MRF OPERATION

10560 Wages 303,847 322,832

10561 Plant Running Expenses 90,170 92,875

10562 Working Expenses 141,694 145,945

10609 Waste Software Maintenance 2,357 2,428

10574 Staff Training/Conferences/Meetings 16,631 17,130

Old Tip Re-Use Study

20,000

AODE 100,984 105,926

Loan 218 - MRF Construction-Internal 19,574 17,048

Loan 240C - MRF-External 11.11% 1,275 1,037

Loan 219 -MRF- External 5,131 2,262

Loan 223 - Ileachate Dam-Internal 4,072 3,746

Loan 247 Recycling Upgrade 40,855 39,228

TOTAL MRF OPERATING EXPENDITURE 726,590 770,456

TOTAL OPERATING EXPENDITURE 965,139 1,019,718

CAPITAL EXPENDITURE

Loan 247 Recycling Upgrade 21,181 22,809

Loan 218 - MRF Construction-Internal 30,950 33,475

Loan 240C - MRF-External 11.11% 3,701 3,939

Loan 219 - MRF-External 46,251 49,121

Loan 223 - Leachate Dam-Internal 4,076 4,402

TOTAL CAPITAL EXPENDITURE 106,160 113,747

TOTAL EXPENDITURE 1,071,299 1,133,464

OPERATING REVENUE

1204 Sale of Recycled Material (200,850) (206,876)

1213 Land Rental (3,825) (3,940)

1211 Interest on Overdue Charges (4,120) (4,244)

1206 Weighbridge Charges (310,454) (319,768)

1205 2nd Hand Shop Sales (3,183) (3,278)

1201 Recycling Charge (411,814) (424,168)

TOTAL OPERATING REVENUE (934,246) (962,274)

CAPITAL REVENUE

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE (934,246) (962,274)

NET COST OF SERVICES 137,053 171,191

Page 273: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 270

Waste Overheads & Employees’ Leave & Entitlements

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

19022 Superannuation 72,223 71,405

19024 Public Holidays 20,362 18,735

19027 Workers Comp. Insurance 62,676 23,834

19020 Annual Leave 45,249 46,839

19021 Long Service Leave 0 0

19023 Sick Leave 11,312 11,710

TOTAL OPERATING EXPENDITURE 211,822 172,523

TOTAL EXPENDITURE 211,822 172,523

CAPITAL REVENUE

Tr. From LSL Provision 0 0

TOTAL CAPITAL REVENUE 0 0

TOTAL REVENUE 0 0

NET COST OF SERVICES 211,822 172,523

Page 274: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 271

Water Operations

Water

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

ADMIN OPERATING EXPENDITURE

SUPPLY SERVICES

Contribution to Administration Salaries 127,678 131,828

Contribution to TS Assets Salaries

65,662

10781 Public Promotion & Education 10,712 11,033

10707 Programming Expenses 11,642 11,991

10710 Meter Reading 72,459 74,633

10226 Staff Training 13,305 13,704

10783 Computer Software 5,356 5,517

10784 Printing, Stationery & Postage 16,631 17,130

10785 Rates & Charges - Internal 13,305 13,704

10714 Telephone/Fax 6,728 6,930

10786 Protective Equipment/ Safety Supplies 5,356 5,517

AODE 692,355 726,237

10708 Donations 32,262 33,230

ENGINEERING & SUPERVISION

23446 Integrated Water Cycle Management 18,000 0

10757 Sludge Management Study 20,000 0

10736 Emergency Ground Water Construction - Aquifer 8,000 0

Review - Drought Management Plan 10,000 0

Review - Demand Management Plan 10,000 0

Review - Business Plan 10,000 0

Review - Developer Service Plan 5,000 0

10793 Koorawatha Operational Cost

0

PURCHASE OF WATER

10716 - CTCC 222,130 228,794

10715 - Lachlan River 72,549 74,725

PUMPING STATION

10738 Repairs & Operating Expenses 48,783 50,272

10739 Energy Costs 232,830 239,815

RESERVOIRS

10740 Repairs & Operating Expenses 40,000 41,240

TREATMENT PLANT

10720 Energy Costs 77,611 79,939

10721 Repairs & Maintenance 105,000 108,253

10722 Wages 164,723 225,000

10760 Wyangala Operation 19,470 50,068

10763 Darbys Falls Operation 6,388 26,582

10725 Chlorine 46,566 47,963

10726 Fluoride 23,283 23,981

10727 Poly Aluminium Chloride (PAC) 164,000 168,920

10746 EPA Licence 7,000 7,210

Page 275: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 272

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

10728 Caustic Soda 40,745 41,967

Permanganate 10,000 10,300

10729 Testing 53,500 55,135

10787 Buildings Maintenance 4,000 4,120

10723 Telephone 6,652 6,852

10724 Rates & Charges 9,978 10,277

MAINS

10741 Repairs & Maintenance 505,000 520,663

10743 Mains Flushing & Scouring 140,937 93,094

10733 Infiltration Gallery 12,852 13,255

TELEMETRY

10751 Service & Maintenance 46,566 47,963

METERS

10750 Repairs & Maintenance 87,708 90,454

STAFF HOUSING

10730 Repairs & Maintenance 5,356 5,517

10748 Rates & Charges 1,607 1,655

LOAN REPAYMENTS - INTEREST

Proposed Loan- External - WTP Upgrade 114,531 181,848

Loan 242a - 1C1 Zone External ($1.286,500 @6.8% 30yr) 93.12% 83,214 81,996

Loan - Emergency Water supply ($1,322,268 ) 112,179 96,181

Loan 241a - Mains Replacement Stage 3- External ($1.256 @6.5% 25yr) 74,576 73,520

Loan No 238 -Mains Replacement 05/06- External 53,827 52,498

OVERHEADS & E.L.E.

19014 Superannuation 57,788 64,806

19013 Public Holidays 21,391 20,712

19025 Workers Comp. Insurance 62,676 23,834

19011 Annual Leave 47,536 51,781

19010 Long Service Leave 0 0

19012 Sick Leave 11,884 12,945

OTHER

10771 S.611 Charges 774,928 798,176

Depreciation Charge

Depreciation - Water 1,400,000 1,442,000

TOTAL OPERATING EXPENDITURE 6,058,553 6,291,426

Page 276: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 273

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

CAPITAL EXPENDITURE

23014 New Meter Installation (Reserve) 33,824 34,862

Reservoir Upgrade 60,000 0

Treatment Plant Automation - Stage 1 1,375,000 2,500,000

River Lift Pump Replacement (Reserve) 75,000 0

23015 Meters Replacement (Reserve) 74,588 76,888

23120 Darbys Falls Water Treatment Plant 550,000 0

SOUTHERN SECTION

MAINS CONSTRUCTION

23410 Emergency Water Supply (Subsidy $2,250,000, Loan $1,322,268) 0 0

1C1 Extension - Eloura Road - Loan 330,594 91,814

Redfern St - Main Extension - S94 0 120,301

Main Extensions - S94 0 120,301

LOAN REPAYMENTS - PRINCIPAL

Proposed Loan- External - WTP Upgrade 10,511 24,168

Loan 242a - 1C1 Zone External ($1.286,500 @6.8% 30yr) - 93.12% 17,670 18,888

Loan - Emergency Water supply ($1,322,268 ) 10,295 12,873

Loan 241a- Mains Replacement Stage 3 - External 19,671 20,728

Loan No 238 -Mains Replacement 05/06- External 24,151 25,480

TRANSFERS TO RESERVES

Long Service Leave 8,500 8,500

Infrastructure 820,861 843,556

Equalisation 150,000 150,000

Developer Contributions 64,274 66,202

TOTAL CAPITAL EXPENDITURE 3,624,939 4,114,562

TOTAL EXPENDITURE 9,683,492 10,405,988

OPERATING REVENUE

1300 Water Access-Vacant Land - Residential (148,120) (152,565)

1303 Water Access-Vacant Land - Non Residential 0 0

Residential

1336 - Access Charges (1,244,893) (1,282,240)

1341 - Consumption Charges (1,867,340) (1,923,360)

Non-Residential

1337 - Access Charges (447,439) (460,863)

1342 - Consumption Charges (908,438) (935,691)

Non-Residential (Industrial)

1338 - Access Charges (23,441) (24,144)

1343 - Consumption Charges (189,655) (195,345)

Non-Residential (Nurseries)

Page 277: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 274

A/C NUMBER DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

1347 - Access Charges (2,415) (2,487)

1348 - Consumption Charges (5,374) (5,536)

Education Consumers

1876 - Access Charges (18,323) (18,873)

1877 - Consumption Charges (40,785) (42,008)

Raw Water

1339 - Access Charges (21,200) (21,836)

1344 - Consumption Charges (70,972) (73,102)

1321 Standpipe Sales (5,536) (5,702)

1326 Pensioner Rate Subsidy (63,795) (65,709)

1302 Pensioner Rates Abandoned 115,991 119,471

INTEREST

1319 - On Overdue Charges (20,700) (21,321)

OTHER

1322 Tapping Fees (26,781) (27,584)

1346 Japanese Garden Water Subsidy (10,712) (11,033)

1325 Sundry Revenue (5,356) (5,517)

Depreciation Write-back (1,400,000) (1,442,000)

TOTAL OPERATING REVENUE (6,405,284) (6,597,444)

CAPITAL REVENUE

Developer Contributions (64,274) (66,202)

1958 Subsidy - Darbys Falls Plant (185,373) 0

Loan Funding-Emergency Water Supply 0 0

Loan Funding-1C1 (330,594) (91,814)

Loan Funding-Treatment Plant Automation (1,375,000) (2,500,000)

Emergency Water Supply Subsidy 0 0

Tr. From General Fund (S.611) (774,928) (798,176)

Tr. From Infrastructure Reserve (548,039) (111,750)

Tr. From Developer Contribution Reserve 0 (240,602)

TOTAL CAPITAL REVENUE (3,278,208) (3,808,544)

TOTAL REVENUE (9,683,492) (10,405,988)

NET COST OF SERVICES 0 0

Page 278: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 275

Sewer Operations

Sewer

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

OPERATING EXPENDITURE

ADMINISTRATION

Contribution to Admin Salaries 127,688 131,828

Contribution to TS Assets Salaries 160,267 0

10804 Office Expenses 15,522 15,988

10806 Telephone 5,356 5,517

10851 Training & Conferences 11,087 11,420

10852 Computer Software 5,543 5,709

10853 Rates & Charges (Internal) 5,543 5,709

10827 Donations 1,108 1,141

AODE 335,406 351,820

10854 Protective Clothing & Safety Supplies 7,761 7,994

10807 EPA Licences 60,000 20,000

Review - Business Plan 10,000 0

Review - Developer Service Plan 5,000 0

Integrated Water Cycle Management 18,000 0

ENGINEERING & SUPERVISION

10839 Trade Waste Implementation 68,824 0

TREATMENT WORKS

10810 Fuel & Energy 100,000 115,000

10812 Wages 98,465 114,951

STP Insurance

55,000

STP Chemicals

115,000

10811 Maintenance & Repairs 10,000 20,000

11322 Bealieu - House 0 5,517

Treatment Plant -Insurance 50,000 51,500

10813 Rates & Water 5,892 6,069

10815 Testing & Monitoring 11,087 11,420

SEWER MAINS

10819 Maintenance & Repairs 237,634 256,644

10841 Condition Audit - Mains Inspecition 30,000 30,900

10836 S.611 Charges 133,631 137,640

10842 Identify Illegal Connections - Storm Water 20,000 20,000

Page 279: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 276

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

PUMPING STATION

10821 Fuel & Energy 21,855 22,511

10823 Wages 43,231 50,469

10822 Maintenance & Repairs 33,000 33,990

LOAN REPAYMENTS - INTEREST

Loan 240A/B - Sewer & Drainage - External 88.89% 10,197 8,293

Loan 212 - North Cowra Drainage-External 7,268 5,101

Loan 248/249- STP Upgrade 665,917 663,997

Loan 237 -North Cowra Drainage- External 13,766 10,375

EMPLOYMENT OVERHEADS & E.L.E.

19019 Superannuation 35,988 32,177

19018 Public Holidays 9,437 7,729

19026 Workers Comp. Insurance 24,106 9,167

19016 Annual Leave 20,970 19,324

19015 Long Service Leave 0 0

19017 Sick Leave 5,243 4,831

Depreciation Charge

Depreciation - Sewer 305,000 314,150

TOTAL OPERATING EXPENDITURE 2,729,792 2,678,881

CAPITAL EXPENDITURE

23415 Mains Replacement (Reserve) 250,000 250,000

23363 Treatment Plant- Contract A 0 0

Caravan Park Pump station Safety Improvements

50,000

LOAN REPAYMENT - PRINCIPAL

Loan 240A/B -Sewer & Drainage- External 88.89% 29,615 31,519

Loan 212 -North Cowra Drainage- External 31,011 33,088

Loan 237 -North Cowra Drainage- External 53,212 56,603

Loan 248/249- STP Upgrade 64,335 5,218,460

Page 280: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 277

A/C NUMBER

DESCRIPTION Original Estimate 2011/12

Estimate for 2012/13

TRANSFERS TO RESERVES

Tr. To LSL Provisions 9,000 9,270

Tr. To Developer Contributions Reserve 70,000 72,100

Tr. To Infrastructure Reserve 319,656 511,643

TOTAL CAPITAL EXPENDITURE 826,829 6,232,683

TOTAL EXPENDITURE 3,556,621 8,911,563

OPERATING REVENUE

1400 Sewer Access Charges (2,186,214) (2,303,283)

1420 Sundry Income (10,609) (10,927)

1401 Sewer Service Charges (531,130) (553,340)

1423 Pensioner Rate Subsidy (42,736) (44,018)

1402 Pensioner Rates Abandoned 77,701 80,032

1403 Council Services (18,206) (18,752)

Interest

1412 - On Overdue Charges (20,000) (20,600)

1418 Treatment Works Land / Residence Rental (16,896) (17,403)

1419 Trade Waste Fees (49,900) (51,397)

Depreciation Write-back (305,000) (314,150)

TOTAL OPERATING REVENUE (3,102,990) (3,253,838)

CAPITAL REVENUE

Developer Contributions (70,000) (72,100)

Loan Funding 0 0

STP Subsidy 0 (5,147,986)

Tr. From General Fund (S.611) (133,631) (137,640)

Tr. From Infrastructure Reserve (250,000) (300,000)

TOTAL CAPITAL REVENUE (453,631) (5,657,726)

TOTAL REVENUE (3,556,621) (8,911,564)

NET COST OF SERVICES 0 0

Page 281: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 278

Overheads Summary

General Manager

Corporate Services Operations

Environmental Services

General Fund Water Sewer Waste

2012/2013 Estimated

Total

Superannuation

71,010

150,396

623,354

67,355

912,115

64,806

32,177

71,405

1,080,503

Workers Comp.

Insurance

9,167

49,502

183,339

22,001

264,009

23,834

9,167

23,834

320,844

Annual Leave

33,258

108,631

395,773

56,243

593,905

51,781

19,324

46,839

711,849

Sick Leave

8,314

27,158

98,943

14,061

148,476

12,945

4,831

11,710

177,962

Public Holidays

11,562

42,016

155,638

21,060

230,276

20,712

7,729

18,735

277,452

Long Service Leave

2,568,610

Page 282: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 279

Reserves Schedule

2012 2013

General Long Service Leave 440,949 496,704

General Plant & Vehicle Replacement 976,470 714,101

General Carry Over Works - -

General Aerodrome 36,802 36,802

General Art Gallery 11,255 11,255

General Bad Debts 17,529 12,012

General Business Assistance 150,039 150,039

General Caravan Park 173,069 209,284

General Election 70,345 (14,655)

General Environmental Projects 8,330 8,330

General Fire Mitigation 16,320 18,820

General Futures 30 12,239 12,239

General Gravel Rehabilitation 118,726 1,298

General IT Equipment 30,000 40,000

General Main St Improvements 206,000 206,000

General POW Maintenance 2,663 2,663

General Risk Management 139,036 159,562

General RTA Warranty 303,922 332,974

General Saleyards 133,635 178,843

General Unexpended RTA Funds - -

General Land Development (176,336) (208,348)

General Works 8,880 8,880

General Workers Compensation 100,000 100,000

General Depot Redevelopment 200,000 200,000

General Unexpended Grants 1,500 1,500

General Unexpended Loans

2,981,373 2,678,303

Waste Waste - General 697,829 861,365

Waste Waste - Long Service Leave 2,826 2,826

700,655 864,191

Water Water - Long Service Leave 8,500 17,000

Water Water - Infrastructure 1,927,766 2,659,572

Water Water - Usage Equalisation 550,000 700,000

2,486,266 3,376,572

Sewer Sewer - Long Service Leave 99,218 108,488

Sewer Sewer - Infrastructure 3,842,356 3,996,241

3,941,574 4,104,729

TOTAL 10,109,868 11,023,795

Page 283: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 280

Loan Summary

External Loans

Lender Purpose Date Due Principal Int. Annual

Principal o/s

2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Principal

o/s

Obtained Date

Rate Repayment 1/07/2012 Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal Interest Principal 1/07/2016

GENERAL

0.50

220

National Australia Bank Pool Refurbishment 26/3/1999 26/3/2014 200,000 6.60 21,106 34,883 1,832 19,274 523 15,609

0

224a

Commonwealth Bank Library 50% 30/06/2000 28/06/2015 125,000 7.05 13,636 36,299 2,364 11,272 1,555 12,080 689 12,947

0

224b

Commonwealth Bank Gallery 50% 30/06/2000 28/06/2015 125,000 7.05 13,636 36,299 2,364 11,272 1,555 12,080 689 12,947

0

231

National Australia Bank Civic Centre Roof 28/08/2002 31/03/2017 100,000 7.09 10,938 45,377 3,082 7,856 2,515 8,423 1,907 9,031 1,255 9,683 556 10,382

0

232

National Australia Bank Land Development 29/05/2003 29/11/2012 500,000 6.10 67,662 31,065 947 31,065

0

233

National Australia Bank Saleyards 29/05/2003 29/11/2022 220,000 6.20 19,415 146,775 8,940 10,475 8,281 11,134 7,580 11,835 6,834 12,581 6,042 13,373 5,200 14,215 4,305 15,110 3,354 16,061 2,343 17,072 1,268 18,147 6,774

234

National Australia Bank Pool 13/06/2003 13/6/2023 1,600,000 5.81 136,378 1,096,031 62,623 73,754 58,276 78,102 53,672 82,705 48,797 87,580 43,635 92,743 38,169 98,209 32,380 103,998 26,250 110,128 19,758 116,620 12,884 123,494 128,697

235 Westpac Cash Back Internal Reserves 27/02/2004 27/2/2019 2,000,000 6.34 208,587 1,165,204 71,920 136,667 62,910 145,678 53,527 155059.84 43,541 165,046 33,012 175,575 21,603 186,984 9,560 200,194

0

236a

Commonwealth Bank River Pk Amenities 22% 28/01/2005 1/2/2025 96,000 6.31 8,462 74,268 4,627 3,835 4,381 4,081 4,119 4,343 3,841 4,621 3,545 4,917 3,230 5,233 2,894 5,568 2,537 5,925 2,158 6,305 1,753

6708.6074 22,732

236b

Commonwealth Bank Vaux St Drainage 78% 28/01/2005 1/2/2025 337,500 6.31 30,002 263,313 16,404 13,598 15,532 14,470 14,605 15,397 13,618 16,384 12,568 17,434 11,450 18,552 10,261 19,741 8,996 21,006 7,650 22,352 6,217

23785.0626 80,594

239

National Australia Bank Houghton's Quarry 29/05/2006 31/5/2016 265,000 6.71 36,804

127,263

8,065

28,739

6,104

30,699

4,010

32,794

1,773

35,031

0

242b

Commonwealth Bank Mulyan Amenities 6.88% 22/8/2007 24/8/2037 255,000 6.80 7,454

89,583

6,058

1,396

5,961

1,492

5,857

1,596

5,778

1,676 5,612 1,842 5,500 1,954 5,364 2,090 5,233 2,221 5,091 2,362 4,883 2,570 70,385

243

National Australia Bank WCRG Amenities 30/6/2008 30/6/2018 160,000 8.05 23,624 110,629

8,611

15,013

7,378

16,246

6,044

17,580

4,612

19,012 3,039 20,585 1,341 22,193

0

241b

Commonwealth Bank

Vaux Street Drainage 11.67% 18/12/2006 18/12/2036 166,000 6.35 12,452 153,631

9,713

2,739

9,537

2,915

9,349

3,103

9,223

3,229 8,915 3,537 8,719 3,765 8,469 3,983 8,235 4,217 7,940 4,512 7,693 4,759 116,873

National Australia Bank

Civic Centre Refurbishment 23/12/2008 30/9/2033 1,395,390 8.15 130,639 1,319,382

105,413

25,225

102,672

27,967

100,602

30,037

97,798

32,840 94,759 35,879 91,782 38,857 89,530 41,108 85,305 45,334 81,496 49,143 77,367 53,272 939,720

245

National Australia Bank

Civic Centre Refurbishment (2) 2009/2010 2029/2030 234,000 8.33 24,228 218,095

18,041

6,243

17,510

6,774

16,934

7,350

16,354

7,931 15,635 8,650 14,899 9,385 14,101 10,183 13,271 11,013 12,299 11,986 11,280 13,005 125,576

Quarry - Holmwood 2010/2011 2040/2041 120,000 8.50 18,053

0

246

National Australia Bank

Saleyards - Effluent Screens 2009/2010 2024/2025 225,000 8.01 25,921 208,114

16,390

9,530

15,604

10,317

14,752

11,168

13,944

11,976 12,838 13,083 11,693 14,228 10,588 15,333 9,347 16,574 7,957 17,963 6,524 19,396 68,545

Proposed Loan Drainage Works

250,000 7.30 20,602 250,000 18,185 2,417 18,004 2,598 17,809 2,793 17,599 3,003 17,374 3,228 17,132 3,470 16,871 3,730 16,591 4,010 16,291 4,311 15,967 4,634 215,806

8,373,890

829,598

5,406,210

365,581

410,369

338,298

400,665

312,144

410,687

284,966

410,595

257,529

401,228

230,718

417,042

204,324

421,038

179,118

236,489

162,983

252,625

145,837

269,771

1,775,702

WATER

238

Commonwealth Bank

Water Main Replacement 2005/2006 21/02/2006 22/02/2031 1,000,000 6.03 77,978 874,609 52,498 25,480 51,065 26,913 48,995 28,982 47,246 30,732 45,617 32,361 43,506 34,472 41,396 36,582 39,368 38,609 36,701 41,277 34,274 43,704 535,497

241a

Commonwealth Bank

Water Main Replacement 2006/2007 88.33% 18/12/2006 18/12/2036

1,256,000 6.35 94,248 1,162,829 73,520 20,728 72,183 22,065 70,759 23,488 69,810 24,438 67,475 26,772 65,991 28,495 64,103 30,145 62,327 31,921 60,099 34,149 58,226 36,021 884,607

242a

Commonwealth Bank 1C1 Zone 93.12% 22/8/2007 24/8/2037

1,286,500 6.80 100,883 1,212,497 81,996 18,888 80,687 20,197 79,274 21,601 78,200 22,684 75,959 24,925 74,442 26,442 72,597 28,287 70,825 30,059 68,913 31,971 66,094 34,790 952,652

Emergency Water Supply 2010/2011 2041/2042 1,322,268 8.50 122,473 1,322,268 96,181 12,783 95,222 13,742 94,191 14,773 93,083 15,881 91,891 17,072 90,610 18,353 89,234 19,730 87,753 21,210 86,162 22,801 84,451 24,512 1,141,411

NEW LOAN Water Treatment Plant Upgrade

2,500,000 7.30 206,014 2,500,000 181,848 24,168 180,035 25,981 178,086 27,930 175,991 30,026 173,738 32,278 171,316 34,700 168,713 37,303 165,914 40,102 162,906 43,111 159,672 46,345 2,158,056

7,364,768

601,596

7,072,204

486,042

102,047

479,192

108,897

471,306

116,774

464,329

123,761

454,680

133,409

445,866

142,462

436,042

152,047

426,187

161,902

414,781

173,309

402,718

185,372

5,672,223

SEWERAGE

0.1167

212

National Australia Bank Nth Cowra Drainage 22/8/1994 22/8/2014 381,000 10.06 38,279 88,574 5,101 33,088 2,975 35,304 610 20,183

0

237

National Australia Bank

Re-finance Loan 213 - Drainage 1/07/2005 28/6/2015 493,431 6.21 66,978 180,961 10,375 56,603 6,849 60,129 3,002 64,228

0

240a/b

Commonwealth Bank Drainage 88.89% 27/3/2006 25/2/2016 291,685 6.33 39,812 138,766

8,293

31,519

6,266

33,546

4,109

35,703

1,813

37,999

0

244

National Australia Bank

Sewerage Treatment Plant 2009/2010 2039/2040 7,213,320 8.13 644,024 7,132,376

577,768

70,474

571,862

76,380

565,460

82,782

561,824

86,418

549,703

98,539

543,020

105,222

534,201

114,041

526,107

122,135

517,349

130,893

501,995

146,247 6,099,247

249

National Australia Bank

Sewerage Treatment Plant (Subsidy) 2009/2010 2011/2012 5,147,986 6.19

5,147,986 86,229

5,147,986

0

13,527,422

789,093

12,688,663

687,766

5,339,669

587,952

205,359

573,182

202,896

563,637

124,416

549,703

98,539

543,020

105,222

534,201

114,041

526,107

122,135

517,349

130,893

501,995

146,247

6,099,247

WASTE

240c

Commonwealth Bank

Materials Recycling Facility 11.11% 27/3/2006 25/2/2016 36,455 6.33 4,976 17,344

1,036

3,939

783

4,193

514

4,462

227

4,749

0

219

Commonwealth Bank

Materials Recycling Facility 5/6/1998 5/6/2013 500,000 6.11 51,383 49,121 2,262 49,121

0

247

National Australia Bank Recycling Plant 2009/2010 2024/2025 538,500 8.01 62,037 498,086 39,228 22,809 37,345 24,691 35,307 26,729 33,373 28,664

30,725

31,312

27,985

34,052

28,340

36,696

22,369

39,667

19,044

42,992

15,615

46,422 164,053

1,074,955

118,396

564,551

42,527

75,869

38,128

28,884

35,821

31,192

33,599

33,413

30,725

31,312

27,985

34,052

28,340

36,696

22,369

39,667

19,044

42,992

15,615

46,422

164,053

GRAND TOTAL - EXTERNAL LOANS

30,341,035

2,338,683

25,731,627

1,581,916

5,927,954

1,443,570

743,805

1,392,452

761,549

1,346,5

32

692,185

1,292,637

664,488

1,247,588

698,778

1,202,908

723,821

1,153,781

560,193

1,114,157

599,820

1,066,165

647,811

13,711,225

Page 284: OPERATIONAL PLAN 2012-2013 · Operational Plan 2012-2013 Page 118 BUSINESS and INDUSTRY B1 Plan for business and industry growth and change Delivery Program (5 years) Operational

OPERATIONAL PLAN

Operational Plan 2012-2013 Page 281

Internal Loans

From To Purpose Date Due Principal Interest Annual

Principal o/s 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 2015/2016 2015/2016 2015/2016 2015/2016 2015/2016

Principal o/s

Obtained Date

Rate Repayment 1/07/2011 Interest Principal

Interest

Principal

Interest

Principal

Interest

Principal

Interest

Principal

Interest

Principal

Interest

Principal

Interest

Principal

Interest

Principal

Interest

Principal 1/07/2016

GENERAL

226a General General Library 30/06/2000 30/06/2025 167,500 8.00 15,691 124,020 9,922 5,770 9,460 6,231 8,962 6,730 8,423 7,268 7,842 7,850 7,214 8,477 6,536 9,156 5,803 9,888 5,012 10,679 4,158 11,533 40,438

226b General General Gallery 30/06/2000 30/06/2025 167,500 8.00 15,691 124,020 9,922 5,770 9,460 6,231 8,962 6,730 8,423 7,268 7,842 7,850 7,214 8,477 6,536 9,156 5,803 9,888 5,012 10,679 4,158 11,533 40,438

227 General General Busby Place Carpark 30/06/2000 30/06/2013 260,000 8.00 32,895 30,459 2,437 30,459

0

TOTAL

595,000

64,277

278,498

22,280

41,998

18,920

12,462

17,923

13,459

16,846

14,536

15,683

15,699

14,427

16,955

13,071

18,311

11,606

19,776

10,024

21,358

8,315

23,067

80,876

WASTE

218 General Waste MRF Construction 31/12/1997 30/12/2017 500,000 8.00 50,523 221305.15 17,048 33,475 14,316 36,207 11,362 39,162 8,166 42,357 4,710 45,813 972 24,291

0

223 General Waste Leachate Dam 30/06/2000 30/06/2020 80,000 8.00 8,148 46,825 3,746 4,402 3,394 4,754 3,013 5,135 2,603 5,546 2,159 5,989 1,680 6,468 1,162 6,986 604 7,545

0

580,000

58,671

268,130

20,794

37,878

17,710

40,961

14,375

44,296

10,769

47,903

6,869

51,803

2,652

30,759

1,162

6,986

604

7,545

-

-

-

-

-

GRAND TOTAL - INTERNAL LOANS

1,175,000

122,948

546,628

43,074

79,876

36,630

53,424

32,298

57,756

27,615

62,439

22,552

67,502

17,079

47,714

14,233

25,297

12,210

27,321

10,024

21,358

8,315

23,067

80,876

1,624,989.42

6,007,829.70

7,632,819.12