OpenHydro | 2016 Update
EU Maritime Day | Turku, Finland
Sue Barr | External Affairs Manager | May 2016
May 2016 1 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Agenda
1. Overview & Strategy
2. Company Roadmap
− Technology Development
− Demonstration Arrays
− Industrialisation
− Commercial Arrays
May 2016 2 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Company Overview & Strategy
May 2016 3 Corporate Presentation
Tidal Energy
The company’s vision is to deploy turbine arrays under the ocean’s surface to produce energy silently,
invisibly and with no impact on the environment.
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Company Overview & Strategy
May 2016 4 Corporate Presentation
Tidal System
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Company Overview & Strategy
Tidal Resource
May 2016 5 Corporate Presentation
UK/Ireland:
Largest European resource (16GW), strong
political and financial support.
Canada:
Large exploitable resource (7.5GW), strong
political and financial support.
France:
Second largest European resource (6.5GW),
developing framework of support.
Market Opportunity
Global tidal resource in the
range of 90 to 115GW
(technically exploitable).
This represents a market
opportunity of €200bn.
Asia/Pacific:
Major tidal resource potential
identified in Asia Pacific
region.
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Company Overview & Strategy
Company Overview
May 2016 6 Corporate Presentation
OpenHydro Ireland:
130 employees located in Greenore
Technical Centre and Dublin Office.
Plans to increase headcount by further
25% over next 12 month.
OpenHydro Canada:
Established in 2014 to deliver 4MW
demonstration array and drive
development of Canadian market.
15 employees in Halifax, Nova Scotia.
OpenHydro France:
Established in 2015 to
deliver EDF projects
and drive development
of French market.
ISO:9001 Accreditation
CPD Accredited Employer
€3.35bn in sales
€12.3bn in orders
13,648 employees
11 offices
worldwide
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Agenda
1. Overview & Strategy
2. Company Roadmap
− Technology Development
− Demonstration Arrays
− Industrialisation
− Commercial Arrays
April 2016 7 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Turbine Testing
OpenHydro has been testing at the European Marine Energy
Centre (EMEC) since 2006; grid connected in 2008.
2014/15/16 testing focused on new power convertor (ABB)
and in-house developed control system:
‒ Over 8,000 hours testing of current turbine.
‒ 16% improvement in turbine efficiency.
Technology Development
May 2016 8 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Technology Development
May 2016 9 Corporate Presentation
Turbine Control Centre (TCC) Production
The first full scale (2MW) TCC’s are currently in production for
the Cape Sharp (Canada) project.
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Technology Development
May 2016 10 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Technology Development
May 2016 11 Corporate Presentation
Turbine Design
OpenHydro has a strategy for a standard system design that can be deployed across all our sites.
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Installation & Recovery
Installation and recovery system
successfully demonstrated in:
‒ Scotland (2008)
‒ Canada (2009/10)
‒ France (2011/12/13/14/16)
Technology Development
May 2016 12 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Technology Development
May 2016 13 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Agenda
1. Overview & Strategy
2. Company Roadmap
− Technology Development
− Demonstration Arrays
− Industrialisation
− Commercial Arrays
May 2016 14 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Demonstration Arrays
May 2016 15 Corporate Presentation
Demonstration Arrays
OpenHydro is currently delivering turbines for demonstration arrays in Canada and France.
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Demonstration Arrays
May 2016 16 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Demonstration Arrays
May 2016 17 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Demonstration Arrays
May 2016 18 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Demonstration Arrays
May 2016 19 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Agenda
1. Overview & Strategy
2. Company Roadmap
− Technology Development
− Demonstration Arrays
− Industrialisation
− Commercial Arrays
April 2016 20 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Industrialisation
Levelised Cost of Energy (LCoE)
OpenHydro is targeting a competitive LCoE:
1. Design / Value Engineering
2. Supply Chain / Volume Effects
May 2016 21 Corporate Presentation
Pre-Series
Standard
Product
20162015 2017 2018 2019 2020
Cost
Time
Current Pre-Series Design
Cost Reduction - Design / Value Engineering
Supply Chain / Make or Buy Effect
Volume Effect ‘S’ Curve
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Agenda
1. Overview & Strategy
2. Company Roadmap
− Technology Development
− Demonstration Arrays
− Industrialisation
− Commercial Arrays
May 2016 22 Corporate Presentation
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
Commercial Arrays
May 2016 23 Corporate Presentation
Emera | Canada
Joint Venture with Emera for
300MW tidal farm.
− Phase 1 (2016): 4MW
− Phase 2 (2017): 12MW
− Phase 3 (2019): 34MW
− Phase 4 (2020+): 100MW
per annum to 300MW
Brookfield | Northern Ireland
100MW Joint Venture in Northern Ireland.
− Phase 1 (2018): 30MW
− Phase 2 (2019+): 70MW
SSE Renewables | Scotland
200MW Joint Venture in Scotland.
− Phase 1 (2019): 30MW
− Phase 2 (2021): 170MW
ARE | Channel Islands
Joint Venture to develop a 300MW
project. Site with 1GW+ potential.
Separately, ARE are progressing
FABLink; an interconnector between
France, Alderney and the UK (available
from 2020).
− Installation of 50MW per annum
(initially) from 2021.
EDF EN | France
Development of 14MW project in
the Raz Blanchard off the coast
of Normandy.
EDF | Paimpol-Brehat
Demonstration array of 2 x 16m
turbines.
Commercial Pipeline
Prospects
OpenHydro also has over 2.5GW of
projects under assessment covering
multiple international jurisdictions.
© O
penH
ydro
2016 –
All
rig
hts
reserv
ed
OpenHydro | 2016 Update
EU Maritime Day | Turku, Finland
Sue Barr | External Affairs Manager | May 2016
May 2016 24 Corporate Presentation