Key features of the new upgrade The design of the Motorway has been improved to incorporate: • Enhancements to the carriageway geometry, to improve safety by providing motorists with greater sight distances in order to identify hazards sooner. • Intelligent Transport Systems (ITS) for a ‘Motorway that thinks’. • Urban design incorporating extensive landscaping. • Environmental measures such as fauna fencing and fauna underpasses, to minimise potential for injury to wildlife (refer to Fact Sheet 13). • Additional emergency stopping bays and a new heavy vehicle inspection site. • Wider road shoulders for vehicle breakdowns. • Additional emergency services crossovers near Greendale Way, Carindale and Wynnum Road, Tingalpa. • Emergency telephones positioned every kilometre along the Motorway. Road traffic noise mitigation To mitigate road traffic noise from the Gateway Motorway noise barriers are being installed at several locations in the southern section of the Project. Additionally, the road surface is being upgraded to open graded asphalt, which will further reduce noise and provide a safer driving surface. For further information, refer to Fact Sheet 10 – Road traffic noise and Fact Sheet 14 – Paving the way for road construction. Looking forward The Department of Main Roads has been working with the community and stakeholders to develop draft planning options to upgrade 4.5km of the Gateway Motorway between and including the interchanges with Mt Gravatt- Capalaba Road and the Pacific Motorway. For further information, phone 1800 268 257 or visit www. mainroads.qld.gov.au As part of the Gateway Upgrade Project, the Gateway Motorway is being upgraded with additional lanes south of the Brisbane River between the Gateway bridges and Mt Gravatt- Capalaba Road. Once complete, motorists will experience safer, quicker and easier travel along this vital section of the Motorway. • Additional lanes will provide reduced travel times and improve traffic flows. • Enhanced on-ramps and off-ramps will provide a safer driving experience by reducing the number of weaving movements caused by motorists using the Motorway. • Connections to key transport routes will be improved including the Port of Brisbane Motorway. Section by section The 12km upgrade commenced construction in March 2007 and will be completed by early 2010. Sections of the upgrade are being opened as they are completed to provide benefits to motorists sooner. Key features: • Upgrade from four to nine lanes between Lytton Road and Wynnum Road including additional exit lanes to Wynnum Road and the Port of Brisbane Motorway. • Direct access from the Gateway Bridge to the Port of Brisbane Motorway via a new southbound off-ramp (previously, access was only available via Lytton Road). • Upgrade from four to eight lanes between Wynnum Road and Old Cleveland Road (dual four-lane carriageway, including extended on- and off-ramps). • Upgrade from four to six lanes between Old Cleveland Road Mt Gravatt- Capalaba Road (dual three-lane carriageway). Southern section 12km Gateway Motorway upgrade Fact Sheet 15 [email protected] www.gatewayupgradeproject.com.au For more information 1800 700 525 The Gateway Upgrade Project is a Queensland Government initiative being delivered by Queensland Motorways with design and construction by the Leighton Abigroup Joint Venture. Leighton Abigroup Joint Venture [email protected] www.gatewayupgradeproject.com.au For more information 1800 700 525 The Gateway Upgrade Project is a Queensland Government initiative being delivered by Queensland Motorways with design and construction by the Leighton Abigroup Joint Venture. Leighton Abigroup Joint Venture Visit the Gateway Upgrade Project Community Information Centre 1051 Lytton Road, Murarrie (behind the Queensland Motorways Customer Service Centre) Open Monday – Friday, 8.30am to 5.30pm and Saturday, 10am to 2pm The new Motorway under construction, March 2009 Widening of the Old Cleveland Road overbridge, March 2009. ALREADY DELIVERED Opened December 2007 – New Port of Brisbane Motorway southbound on-ramp. Opened May 2008 – Two additional lanes southbound between Lytton Road and Wynnum Road, including an extra exit lane to Wynnum Road. Opened September 2008 – Additional southbound lane over the Wynnum Road bridge.

Opened December 2007 Community Notice - Expressway...dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipit

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Opened December 2007 Community Notice - Expressway...dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipit

Key features of the new upgrade

The design of the Motorway has been improved to incorporate:• Enhancementstothecarriagewaygeometry,toimprove

safety by providing motorists with greater sight distances in order to identify hazards sooner.

• IntelligentTransportSystems(ITS)fora‘Motorwaythatthinks’.

• Urbandesignincorporatingextensivelandscaping.• Environmentalmeasuressuchasfaunafencingand

faunaunderpasses,tominimisepotentialforinjurytowildlife(refertoFactSheet13).

• Additionalemergencystoppingbaysandanewheavyvehicleinspectionsite.

• Widerroadshouldersforvehiclebreakdowns.• Additionalemergencyservicescrossoversnear

GreendaleWay,CarindaleandWynnumRoad,Tingalpa.

• Emergencytelephonespositionedeverykilometrealongthe Motorway.

Road traffic noise mitigation

To mitigate road traffic noise from the Gateway Motorway noisebarriersarebeinginstalledatseverallocationsinthesouthernsectionoftheProject.Additionally,theroadsurfaceisbeingupgradedtoopengradedasphalt,whichwillfurtherreducenoiseandprovideasaferdrivingsurface.Forfurtherinformation,refertoFactSheet10–RoadtrafficnoiseandFactSheet14–Pavingthewayforroadconstruction.

Looking forward

TheDepartmentofMainRoadshasbeenworkingwiththecommunityandstakeholderstodevelopdraftplanningoptionstoupgrade4.5kmoftheGatewayMotorwaybetweenandincludingtheinterchangeswithMtGravatt-CapalabaRoadandthePacificMotorway.Forfurtherinformation,phone1800268257orvisitwww.mainroads.qld.gov.au

Leighton AbigroupJoint Venture

The Gateway Upgrade Project is a Queensland Governmentinitiative being delivered by Queensland Motorwaysin partnership with the Leighton Abigroup Joint Venture.

As part of the Gateway Upgrade Project, the Gateway Motorway is being upgraded with additional lanes south of the Brisbane River between the Gateway bridges and Mt Gravatt-Capalaba Road.

Oncecomplete,motoristswillexperiencesafer,quickerandeasiertravelalongthisvitalsectionoftheMotorway.• Additionallaneswillprovidereducedtraveltimesand

improve traffic flows.• Enhancedon-rampsandoff-rampswillprovideasafer

drivingexperiencebyreducingthenumberofweavingmovementscausedbymotoristsusingtheMotorway.

• ConnectionstokeytransportrouteswillbeimprovedincludingthePortofBrisbaneMotorway.

Section by section

The12kmupgradecommencedconstructioninMarch2007andwillbecompletedbyearly2010.Sectionsoftheupgradearebeingopenedastheyarecompletedtoprovide benefits to motorists sooner.

Keyfeatures:• UpgradefromfourtoninelanesbetweenLyttonRoad

andWynnumRoadincludingadditionalexitlanestoWynnumRoadandthePortofBrisbaneMotorway.

• DirectaccessfromtheGatewayBridgetothePortofBrisbaneMotorwayviaanewsouthboundoff-ramp(previously,accesswasonlyavailableviaLyttonRoad).

• UpgradefromfourtoeightlanesbetweenWynnumRoadandOldClevelandRoad(dualfour-lanecarriageway,includingextendedon-andoff-ramps).

• UpgradefromfourtosixlanesbetweenOldClevelandRoadMtGravatt-CapalabaRoad(dualthree-lanecarriageway).

Southernsection12kmGatewayMotorwayupgrade

FactSheet15

Community Notice

enquiries@gatewayupgradeproject.com.auwww.gatewayupgradeproject.com.au

For more information

1800 700 525The Gateway Upgrade Project is a Queensland Government initiative being delivered by Queensland Motorwayswith design and construction by the Leighton Abigroup Joint Venture.

Heading

It lorer sequamet pratum nulpute dignim vel dipit, sectetue erat numsandigna at, qui bla commodiam, velis non el eu facilis sequat utem dolore tat. Nonsequat. Ud et ver senis dionsecte dolor seniam nonsequat utpat, quisisl iriusci duisi.

Nim aliquat venibh eugait, si ea facing erci blamconsequi bla augait vulla feui tin henit in vulputet inisl ut ut dolo-borem eugue tat dunt iustie modolenis nos nim iusci tat laorercilis nonsequat praesecte min exer sum ing ex eraestio odo odolorp erostrud tisit ip etuer sim ipisi.

Giametum nibh enim velisisl ulla cor sequis non henim eugait nisl utet niamet, vulla faciliq uiscilla accummod duisi tat at do dio ercipis cidunt augiam ip euguer se modignit eros nullandre dolobore vendipis amet volortie ver augiam alit, sustis dolore mincilit nim velit, vendre vulland ipsummod tet wis nulputet vullum er si tat iure doloborper se velit lor se magnibh eugait lamet augue ercil er sit ver summy nisl estrud tatincipit volestie tie tat iure magnim ipsustrud min vullamc onsequatie vel in velit iusciliquam, sequat wismod tiscidunt eugiat esto euis nim diam, susto odolorper sis del diam volorer at, quisisit luptationum accum nullum incilis esto odo consequat ex er auguer sum ad dion-senim iure magnibh eugait iureet landrem vel utem augiamet, vel eum volorpe rostrud ercipit er sit in velis adipis nulla augait vent iriusci tincillam ipit, venis dolorem quis nim nissim zzrit inismod iamcorp erilit, commy nonum veniam dolore min utat iustie mod dolor iliquissit nis nos alit nos nim nit nim quip ea faccumm odolorem dolorer sed mincilis nullamet ulpute min ute consed modignit praessi.

Consequisl ex eros nos nonsecte minisim ipisisl ut la faccum dolum ver alit alit autatum endigniate dipismod tion ut lut luptat. Gait prat. Pisl dunt at, sim dui enit ad modolorem vullaore magna ad magnit veliquis nit aliquis ero dolobor sustrud modoloborem do commy nostrud do odolor sustis nit lan eugait prat nibh et, vendipsum iuscipsum dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipit alisl iure tat, cortie molutpat. Magna alis nis ex et, vel essenim dolorperosto duisi blaor sum volortis nis nisismod enibh ea faci tio eugiamet utpat alisciduis dio et, con henim vel ut lorperos nulluptat nonseniat.

Pit ulputpat. Na augait lut etumsan velit doluptat do dolore tio od tet eraessed et aut acin ercilit lam volore dolore vullandre dit et lum velese mincil dolorpe raestrud eros eugue tat. Cipit, consectem dolor autpatet prat, velendreet, vel do dolorpe rciduipit ero odolum zzrit wisl ulla feummod te magnis ad modolore modipis modolore tie mincili ssenim dip ex eugait iustrud do od te cor susting eugait, vulluptat iure minit aliquam, sisi tet nullaorem inis ad tie magnibh et utpatue dolor am, veniam aliquatin ut luptat.

Ming eum quisse elendrem quate tie volumsandit nulla cor iure feu feugiate dolortie ming euis dio del erilla feuis-mod tin volore ea consed modio dolendiat. Estrud magnisci eleniscilit amet am, quatio eummodit nos eu facilland-rem zzrit praesen iametum in heniamet wis exero odit lore magnim zzrillu ptatums andreriusto euis aut ipit adio dolobor in hent vel dunt adiat, vel illaore facipit, core consenim autatie tat.

Is dolore moloreetum aliscin henisissi.

Tet incidunt adionsed dolore molorer augait ad dunt lortinibh erostio nsequam nissed do doluptat ullutat ut digna consendignit digna feu feuis niam init dipsum nim veros alit velenit pratem ver autpat venim diatue mod magna feuis alis alisci blaor susci endit lobore feu feuipit euis non velis nibh el eugait nulluptat lut ilit lum dio euipisl ullum aute magnisit ero odit utat inci euis esequis autetum velit lum quat vel dunt doluptat.

Leighton AbigroupJoint Venture

Community Notice

enquiries@gatewayupgradeproject.com.auwww.gatewayupgradeproject.com.au

For more information

1800 700 525The Gateway Upgrade Project is a Queensland Government initiative being delivered by Queensland Motorwayswith design and construction by the Leighton Abigroup Joint Venture.

Heading

It lorer sequamet pratum nulpute dignim vel dipit, sectetue erat numsandigna at, qui bla commodiam, velis non el eu facilis sequat utem dolore tat. Nonsequat. Ud et ver senis dionsecte dolor seniam nonsequat utpat, quisisl iriusci duisi.

Nim aliquat venibh eugait, si ea facing erci blamconsequi bla augait vulla feui tin henit in vulputet inisl ut ut dolo-borem eugue tat dunt iustie modolenis nos nim iusci tat laorercilis nonsequat praesecte min exer sum ing ex eraestio odo odolorp erostrud tisit ip etuer sim ipisi.

Giametum nibh enim velisisl ulla cor sequis non henim eugait nisl utet niamet, vulla faciliq uiscilla accummod duisi tat at do dio ercipis cidunt augiam ip euguer se modignit eros nullandre dolobore vendipis amet volortie ver augiam alit, sustis dolore mincilit nim velit, vendre vulland ipsummod tet wis nulputet vullum er si tat iure doloborper se velit lor se magnibh eugait lamet augue ercil er sit ver summy nisl estrud tatincipit volestie tie tat iure magnim ipsustrud min vullamc onsequatie vel in velit iusciliquam, sequat wismod tiscidunt eugiat esto euis nim diam, susto odolorper sis del diam volorer at, quisisit luptationum accum nullum incilis esto odo consequat ex er auguer sum ad dion-senim iure magnibh eugait iureet landrem vel utem augiamet, vel eum volorpe rostrud ercipit er sit in velis adipis nulla augait vent iriusci tincillam ipit, venis dolorem quis nim nissim zzrit inismod iamcorp erilit, commy nonum veniam dolore min utat iustie mod dolor iliquissit nis nos alit nos nim nit nim quip ea faccumm odolorem dolorer sed mincilis nullamet ulpute min ute consed modignit praessi.

Consequisl ex eros nos nonsecte minisim ipisisl ut la faccum dolum ver alit alit autatum endigniate dipismod tion ut lut luptat. Gait prat. Pisl dunt at, sim dui enit ad modolorem vullaore magna ad magnit veliquis nit aliquis ero dolobor sustrud modoloborem do commy nostrud do odolor sustis nit lan eugait prat nibh et, vendipsum iuscipsum dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipit alisl iure tat, cortie molutpat. Magna alis nis ex et, vel essenim dolorperosto duisi blaor sum volortis nis nisismod enibh ea faci tio eugiamet utpat alisciduis dio et, con henim vel ut lorperos nulluptat nonseniat.

Pit ulputpat. Na augait lut etumsan velit doluptat do dolore tio od tet eraessed et aut acin ercilit lam volore dolore vullandre dit et lum velese mincil dolorpe raestrud eros eugue tat. Cipit, consectem dolor autpatet prat, velendreet, vel do dolorpe rciduipit ero odolum zzrit wisl ulla feummod te magnis ad modolore modipis modolore tie mincili ssenim dip ex eugait iustrud do od te cor susting eugait, vulluptat iure minit aliquam, sisi tet nullaorem inis ad tie magnibh et utpatue dolor am, veniam aliquatin ut luptat.

Ming eum quisse elendrem quate tie volumsandit nulla cor iure feu feugiate dolortie ming euis dio del erilla feuis-mod tin volore ea consed modio dolendiat. Estrud magnisci eleniscilit amet am, quatio eummodit nos eu facilland-rem zzrit praesen iametum in heniamet wis exero odit lore magnim zzrillu ptatums andreriusto euis aut ipit adio dolobor in hent vel dunt adiat, vel illaore facipit, core consenim autatie tat.

Is dolore moloreetum aliscin henisissi.

Tet incidunt adionsed dolore molorer augait ad dunt lortinibh erostio nsequam nissed do doluptat ullutat ut digna consendignit digna feu feuis niam init dipsum nim veros alit velenit pratem ver autpat venim diatue mod magna feuis alis alisci blaor susci endit lobore feu feuipit euis non velis nibh el eugait nulluptat lut ilit lum dio euipisl ullum aute magnisit ero odit utat inci euis esequis autetum velit lum quat vel dunt doluptat.

Leighton AbigroupJoint Venture

Visit the Gateway Upgrade Project Community Information Centre

1051 Lytton Road, Murarrie (behind the Queensland Motorways Customer Service Centre)

OpenMonday–Friday,8.30amto5.30pmandSaturday,10amto2pm

The new Motorway under construction, March 2009Widening of the Old Cleveland Road overbridge, March 2009.

ALREADY DELIVERED• Opened December 2007–NewPortofBrisbane

Motorwaysouthboundon-ramp.

• Opened May 2008–TwoadditionallanessouthboundbetweenLyttonRoadandWynnumRoad,includinganextraexitlanetoWynnumRoad.

• Opened September 2008–AdditionalsouthboundlaneovertheWynnumRoadbridge.

Page 2: Opened December 2007 Community Notice - Expressway...dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipit

KEDRON BROOK FLOODWAY

Mount Petr ie RdC

ribb

Rd

Scrub Rd

Old

C

leve

land

Rd

Wyn

num

Rd

Queenspor t

King

sford Sm

ith Drive

Nudgee Rd

Nudgee Rd

Lyt tonRd

Rd

Belmont Rd

TO

BR

I SB

AN

E

CI T

Y

> >

>

TO

BR

I SB

AN

E

CI T

Y

> >

>

TO

PO

RT

OF

BR

I SB

AN

E

> >

>

< < < S O U T H T O G O L D C O A S T

N O R T H T OS U N S H I N E C O A S T > > >

MACKENZIE

MANSFIELD CARINDALE

BELMONT

TINGALPA

MURARRIE

PINKENBA

EAGLE FARM

BANYO

NORTHGATE

M

t G

rava

t t -

Cap

alab

a R

d

BELMONT SHOOT INGCOMPLEX

BELMONT H I L LSRESERVE MINN IPP I

PARKLANDS

KOALA COASTAREA

DOOMBENRACECOURSE

NUDGEEGOLFCLUB

ROYALQUEENSLAND

GOLFCLUB A

ir train

Murar r ie Rd

BUL IMBA CK

BRISBANE

R IVER

SCHU

LZ CANAL

Port Of Br isb

ane

Motorw

ay

GATEWAY

MOTORWAY

GATEWAY MOTORWAY

Existing Gateway Motorway

P inkenba

Ra

il Line

Airpor t D

rive

Moreton Drive

Nudgee RdIn t e r change

GATEWAY

BR IDGES

Airport

Interchange

Existing Gateway Motorway is being widened from 4 to 6 lanes

up to the Nudgee Road interchange

New airport access road under constructionby Brisbane Airport Corporation

Enhanced airport access via a new airport interchange

Cleveland Rai l L ine

Queensport Road

Port of Brisbane

Motorway

Lytton Road

Gateway M

otorwayMURARRIE

Enter Gateway Bridge

FLYOVER

CARINDALE

To Old Cleveland Road ramp

To WynnunRoad ramp

Gateway Motorway

To Old Cleveland Road ramp

To Mt Gravatt - Capalaba Road

Gateway Motorway

FAST FACTSInthesouthernsectionoftheProject:• Morethan50trafficswitchesarerequired

tokeeptrafficmovingduringconstruction.Traffic is transferred onto new and temporary pavementswhiletheexistingcarriagewaysareupgraded.Forfurtherinformation,seeFactSheet11.

• Morethan500,000predominatelynativeanddroughtresistanttreesandshrubswillbeplantedaspartofthelandscapingprogram.

• Morethan12bridgesarebeingbuilt,requiring167super-teebeams,2,900tonnesofreinforcementsteeland17,000m2ofbridge decking.

• Approximately720,000tonnesoffillmaterialand306,000tonnesofasphaltwillbeused.

Mt Gravatt- Capalaba Road to

Old Cleveland RoadUpgradefromfourtosixlanesbetweenMtGravatt-CapalabaRoad,WishartandOld

ClevelandRoad,Carindale(dualthree- lanecarriageway).

Port of Brisbane Motorway interchange,

Murarrie• Upgradefromfourtoninelanesbetween

WynnumRoad,TingalpaandLyttonRoad,MurarrieincludingadditionalexitlanestoWynnumRoadandthePortofBrisbaneMotorway.

• DirectaccessfromtheGatewayBridgetothePortofBrisbaneMotorwayviaanewsouthboundoff-ramp(previously,accesswasonlyavailableviaLyttonRoad).

Wynnum Road Upgrade, Tingalpa(opened July 2007)

UpgradebetweenStantonRoadtotheeastandGraystoneStreettothewest,includingadditionallanesthroughtheintersectionand

onto the Gateway Motorway. The works weredeliveredbyQueenslandMotorwaysunderaseparate$10.5millionearlyworks

contractandjointlyfundedbytheQueenslandGovernmentandBrisbaneCityCouncil.

Old Cleveland Road to Wynnum Road

Upgradefromfourtoeightlanesbetween OldClevelandRoad,Carindaleand

WynnumRoad,Tingalpa(dualfour-lanecarriageway,includingextendedon-and

off-ramps).

Under construction - a new direct access from the Gateway Bridge to the Port of Brisbane Motorway via a new southbound off-ramp.

Several upgrades have already been delivered between Lytton Road and Wynnum Road.

Southernsection-12kmGatewayMotorwayupgrade