Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Key features of the new upgrade
The design of the Motorway has been improved to incorporate:• Enhancementstothecarriagewaygeometry,toimprove
safety by providing motorists with greater sight distances in order to identify hazards sooner.
• IntelligentTransportSystems(ITS)fora‘Motorwaythatthinks’.
• Urbandesignincorporatingextensivelandscaping.• Environmentalmeasuressuchasfaunafencingand
faunaunderpasses,tominimisepotentialforinjurytowildlife(refertoFactSheet13).
• Additionalemergencystoppingbaysandanewheavyvehicleinspectionsite.
• Widerroadshouldersforvehiclebreakdowns.• Additionalemergencyservicescrossoversnear
GreendaleWay,CarindaleandWynnumRoad,Tingalpa.
• Emergencytelephonespositionedeverykilometrealongthe Motorway.
Road traffic noise mitigation
To mitigate road traffic noise from the Gateway Motorway noisebarriersarebeinginstalledatseverallocationsinthesouthernsectionoftheProject.Additionally,theroadsurfaceisbeingupgradedtoopengradedasphalt,whichwillfurtherreducenoiseandprovideasaferdrivingsurface.Forfurtherinformation,refertoFactSheet10–RoadtrafficnoiseandFactSheet14–Pavingthewayforroadconstruction.
Looking forward
TheDepartmentofMainRoadshasbeenworkingwiththecommunityandstakeholderstodevelopdraftplanningoptionstoupgrade4.5kmoftheGatewayMotorwaybetweenandincludingtheinterchangeswithMtGravatt-CapalabaRoadandthePacificMotorway.Forfurtherinformation,phone1800268257orvisitwww.mainroads.qld.gov.au
Leighton AbigroupJoint Venture
The Gateway Upgrade Project is a Queensland Governmentinitiative being delivered by Queensland Motorwaysin partnership with the Leighton Abigroup Joint Venture.
As part of the Gateway Upgrade Project, the Gateway Motorway is being upgraded with additional lanes south of the Brisbane River between the Gateway bridges and Mt Gravatt-Capalaba Road.
Oncecomplete,motoristswillexperiencesafer,quickerandeasiertravelalongthisvitalsectionoftheMotorway.• Additionallaneswillprovidereducedtraveltimesand
improve traffic flows.• Enhancedon-rampsandoff-rampswillprovideasafer
drivingexperiencebyreducingthenumberofweavingmovementscausedbymotoristsusingtheMotorway.
• ConnectionstokeytransportrouteswillbeimprovedincludingthePortofBrisbaneMotorway.
Section by section
The12kmupgradecommencedconstructioninMarch2007andwillbecompletedbyearly2010.Sectionsoftheupgradearebeingopenedastheyarecompletedtoprovide benefits to motorists sooner.
Keyfeatures:• UpgradefromfourtoninelanesbetweenLyttonRoad
andWynnumRoadincludingadditionalexitlanestoWynnumRoadandthePortofBrisbaneMotorway.
• DirectaccessfromtheGatewayBridgetothePortofBrisbaneMotorwayviaanewsouthboundoff-ramp(previously,accesswasonlyavailableviaLyttonRoad).
• UpgradefromfourtoeightlanesbetweenWynnumRoadandOldClevelandRoad(dualfour-lanecarriageway,includingextendedon-andoff-ramps).
• UpgradefromfourtosixlanesbetweenOldClevelandRoadMtGravatt-CapalabaRoad(dualthree-lanecarriageway).
Southernsection12kmGatewayMotorwayupgrade
FactSheet15
Community Notice
enquiries@gatewayupgradeproject.com.auwww.gatewayupgradeproject.com.au
For more information
1800 700 525The Gateway Upgrade Project is a Queensland Government initiative being delivered by Queensland Motorwayswith design and construction by the Leighton Abigroup Joint Venture.
Heading
It lorer sequamet pratum nulpute dignim vel dipit, sectetue erat numsandigna at, qui bla commodiam, velis non el eu facilis sequat utem dolore tat. Nonsequat. Ud et ver senis dionsecte dolor seniam nonsequat utpat, quisisl iriusci duisi.
Nim aliquat venibh eugait, si ea facing erci blamconsequi bla augait vulla feui tin henit in vulputet inisl ut ut dolo-borem eugue tat dunt iustie modolenis nos nim iusci tat laorercilis nonsequat praesecte min exer sum ing ex eraestio odo odolorp erostrud tisit ip etuer sim ipisi.
Giametum nibh enim velisisl ulla cor sequis non henim eugait nisl utet niamet, vulla faciliq uiscilla accummod duisi tat at do dio ercipis cidunt augiam ip euguer se modignit eros nullandre dolobore vendipis amet volortie ver augiam alit, sustis dolore mincilit nim velit, vendre vulland ipsummod tet wis nulputet vullum er si tat iure doloborper se velit lor se magnibh eugait lamet augue ercil er sit ver summy nisl estrud tatincipit volestie tie tat iure magnim ipsustrud min vullamc onsequatie vel in velit iusciliquam, sequat wismod tiscidunt eugiat esto euis nim diam, susto odolorper sis del diam volorer at, quisisit luptationum accum nullum incilis esto odo consequat ex er auguer sum ad dion-senim iure magnibh eugait iureet landrem vel utem augiamet, vel eum volorpe rostrud ercipit er sit in velis adipis nulla augait vent iriusci tincillam ipit, venis dolorem quis nim nissim zzrit inismod iamcorp erilit, commy nonum veniam dolore min utat iustie mod dolor iliquissit nis nos alit nos nim nit nim quip ea faccumm odolorem dolorer sed mincilis nullamet ulpute min ute consed modignit praessi.
Consequisl ex eros nos nonsecte minisim ipisisl ut la faccum dolum ver alit alit autatum endigniate dipismod tion ut lut luptat. Gait prat. Pisl dunt at, sim dui enit ad modolorem vullaore magna ad magnit veliquis nit aliquis ero dolobor sustrud modoloborem do commy nostrud do odolor sustis nit lan eugait prat nibh et, vendipsum iuscipsum dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipit alisl iure tat, cortie molutpat. Magna alis nis ex et, vel essenim dolorperosto duisi blaor sum volortis nis nisismod enibh ea faci tio eugiamet utpat alisciduis dio et, con henim vel ut lorperos nulluptat nonseniat.
Pit ulputpat. Na augait lut etumsan velit doluptat do dolore tio od tet eraessed et aut acin ercilit lam volore dolore vullandre dit et lum velese mincil dolorpe raestrud eros eugue tat. Cipit, consectem dolor autpatet prat, velendreet, vel do dolorpe rciduipit ero odolum zzrit wisl ulla feummod te magnis ad modolore modipis modolore tie mincili ssenim dip ex eugait iustrud do od te cor susting eugait, vulluptat iure minit aliquam, sisi tet nullaorem inis ad tie magnibh et utpatue dolor am, veniam aliquatin ut luptat.
Ming eum quisse elendrem quate tie volumsandit nulla cor iure feu feugiate dolortie ming euis dio del erilla feuis-mod tin volore ea consed modio dolendiat. Estrud magnisci eleniscilit amet am, quatio eummodit nos eu facilland-rem zzrit praesen iametum in heniamet wis exero odit lore magnim zzrillu ptatums andreriusto euis aut ipit adio dolobor in hent vel dunt adiat, vel illaore facipit, core consenim autatie tat.
Is dolore moloreetum aliscin henisissi.
Tet incidunt adionsed dolore molorer augait ad dunt lortinibh erostio nsequam nissed do doluptat ullutat ut digna consendignit digna feu feuis niam init dipsum nim veros alit velenit pratem ver autpat venim diatue mod magna feuis alis alisci blaor susci endit lobore feu feuipit euis non velis nibh el eugait nulluptat lut ilit lum dio euipisl ullum aute magnisit ero odit utat inci euis esequis autetum velit lum quat vel dunt doluptat.
Leighton AbigroupJoint Venture
Community Notice
enquiries@gatewayupgradeproject.com.auwww.gatewayupgradeproject.com.au
For more information
1800 700 525The Gateway Upgrade Project is a Queensland Government initiative being delivered by Queensland Motorwayswith design and construction by the Leighton Abigroup Joint Venture.
Heading
It lorer sequamet pratum nulpute dignim vel dipit, sectetue erat numsandigna at, qui bla commodiam, velis non el eu facilis sequat utem dolore tat. Nonsequat. Ud et ver senis dionsecte dolor seniam nonsequat utpat, quisisl iriusci duisi.
Nim aliquat venibh eugait, si ea facing erci blamconsequi bla augait vulla feui tin henit in vulputet inisl ut ut dolo-borem eugue tat dunt iustie modolenis nos nim iusci tat laorercilis nonsequat praesecte min exer sum ing ex eraestio odo odolorp erostrud tisit ip etuer sim ipisi.
Giametum nibh enim velisisl ulla cor sequis non henim eugait nisl utet niamet, vulla faciliq uiscilla accummod duisi tat at do dio ercipis cidunt augiam ip euguer se modignit eros nullandre dolobore vendipis amet volortie ver augiam alit, sustis dolore mincilit nim velit, vendre vulland ipsummod tet wis nulputet vullum er si tat iure doloborper se velit lor se magnibh eugait lamet augue ercil er sit ver summy nisl estrud tatincipit volestie tie tat iure magnim ipsustrud min vullamc onsequatie vel in velit iusciliquam, sequat wismod tiscidunt eugiat esto euis nim diam, susto odolorper sis del diam volorer at, quisisit luptationum accum nullum incilis esto odo consequat ex er auguer sum ad dion-senim iure magnibh eugait iureet landrem vel utem augiamet, vel eum volorpe rostrud ercipit er sit in velis adipis nulla augait vent iriusci tincillam ipit, venis dolorem quis nim nissim zzrit inismod iamcorp erilit, commy nonum veniam dolore min utat iustie mod dolor iliquissit nis nos alit nos nim nit nim quip ea faccumm odolorem dolorer sed mincilis nullamet ulpute min ute consed modignit praessi.
Consequisl ex eros nos nonsecte minisim ipisisl ut la faccum dolum ver alit alit autatum endigniate dipismod tion ut lut luptat. Gait prat. Pisl dunt at, sim dui enit ad modolorem vullaore magna ad magnit veliquis nit aliquis ero dolobor sustrud modoloborem do commy nostrud do odolor sustis nit lan eugait prat nibh et, vendipsum iuscipsum dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipit alisl iure tat, cortie molutpat. Magna alis nis ex et, vel essenim dolorperosto duisi blaor sum volortis nis nisismod enibh ea faci tio eugiamet utpat alisciduis dio et, con henim vel ut lorperos nulluptat nonseniat.
Pit ulputpat. Na augait lut etumsan velit doluptat do dolore tio od tet eraessed et aut acin ercilit lam volore dolore vullandre dit et lum velese mincil dolorpe raestrud eros eugue tat. Cipit, consectem dolor autpatet prat, velendreet, vel do dolorpe rciduipit ero odolum zzrit wisl ulla feummod te magnis ad modolore modipis modolore tie mincili ssenim dip ex eugait iustrud do od te cor susting eugait, vulluptat iure minit aliquam, sisi tet nullaorem inis ad tie magnibh et utpatue dolor am, veniam aliquatin ut luptat.
Ming eum quisse elendrem quate tie volumsandit nulla cor iure feu feugiate dolortie ming euis dio del erilla feuis-mod tin volore ea consed modio dolendiat. Estrud magnisci eleniscilit amet am, quatio eummodit nos eu facilland-rem zzrit praesen iametum in heniamet wis exero odit lore magnim zzrillu ptatums andreriusto euis aut ipit adio dolobor in hent vel dunt adiat, vel illaore facipit, core consenim autatie tat.
Is dolore moloreetum aliscin henisissi.
Tet incidunt adionsed dolore molorer augait ad dunt lortinibh erostio nsequam nissed do doluptat ullutat ut digna consendignit digna feu feuis niam init dipsum nim veros alit velenit pratem ver autpat venim diatue mod magna feuis alis alisci blaor susci endit lobore feu feuipit euis non velis nibh el eugait nulluptat lut ilit lum dio euipisl ullum aute magnisit ero odit utat inci euis esequis autetum velit lum quat vel dunt doluptat.
Leighton AbigroupJoint Venture
Visit the Gateway Upgrade Project Community Information Centre
1051 Lytton Road, Murarrie (behind the Queensland Motorways Customer Service Centre)
OpenMonday–Friday,8.30amto5.30pmandSaturday,10amto2pm
The new Motorway under construction, March 2009Widening of the Old Cleveland Road overbridge, March 2009.
ALREADY DELIVERED• Opened December 2007–NewPortofBrisbane
Motorwaysouthboundon-ramp.
• Opened May 2008–TwoadditionallanessouthboundbetweenLyttonRoadandWynnumRoad,includinganextraexitlanetoWynnumRoad.
• Opened September 2008–AdditionalsouthboundlaneovertheWynnumRoadbridge.
KEDRON BROOK FLOODWAY
Mount Petr ie RdC
ribb
Rd
Scrub Rd
Old
C
leve
land
Rd
Wyn
num
Rd
Queenspor t
King
sford Sm
ith Drive
Nudgee Rd
Nudgee Rd
Lyt tonRd
Rd
Belmont Rd
TO
BR
I SB
AN
E
CI T
Y
> >
>
TO
BR
I SB
AN
E
CI T
Y
> >
>
TO
PO
RT
OF
BR
I SB
AN
E
> >
>
< < < S O U T H T O G O L D C O A S T
N O R T H T OS U N S H I N E C O A S T > > >
MACKENZIE
MANSFIELD CARINDALE
BELMONT
TINGALPA
MURARRIE
PINKENBA
EAGLE FARM
BANYO
NORTHGATE
M
t G
rava
t t -
Cap
alab
a R
d
BELMONT SHOOT INGCOMPLEX
BELMONT H I L LSRESERVE MINN IPP I
PARKLANDS
KOALA COASTAREA
DOOMBENRACECOURSE
NUDGEEGOLFCLUB
ROYALQUEENSLAND
GOLFCLUB A
ir train
Murar r ie Rd
BUL IMBA CK
BRISBANE
R IVER
SCHU
LZ CANAL
Port Of Br isb
ane
Motorw
ay
GATEWAY
MOTORWAY
GATEWAY MOTORWAY
Existing Gateway Motorway
P inkenba
Ra
il Line
Airpor t D
rive
Moreton Drive
Nudgee RdIn t e r change
GATEWAY
BR IDGES
Airport
Interchange
Existing Gateway Motorway is being widened from 4 to 6 lanes
up to the Nudgee Road interchange
New airport access road under constructionby Brisbane Airport Corporation
Enhanced airport access via a new airport interchange
Cleveland Rai l L ine
Queensport Road
Port of Brisbane
Motorway
Lytton Road
Gateway M
otorwayMURARRIE
Enter Gateway Bridge
FLYOVER
CARINDALE
To Old Cleveland Road ramp
To WynnunRoad ramp
Gateway Motorway
To Old Cleveland Road ramp
To Mt Gravatt - Capalaba Road
Gateway Motorway
FAST FACTSInthesouthernsectionoftheProject:• Morethan50trafficswitchesarerequired
tokeeptrafficmovingduringconstruction.Traffic is transferred onto new and temporary pavementswhiletheexistingcarriagewaysareupgraded.Forfurtherinformation,seeFactSheet11.
• Morethan500,000predominatelynativeanddroughtresistanttreesandshrubswillbeplantedaspartofthelandscapingprogram.
• Morethan12bridgesarebeingbuilt,requiring167super-teebeams,2,900tonnesofreinforcementsteeland17,000m2ofbridge decking.
• Approximately720,000tonnesoffillmaterialand306,000tonnesofasphaltwillbeused.
Mt Gravatt- Capalaba Road to
Old Cleveland RoadUpgradefromfourtosixlanesbetweenMtGravatt-CapalabaRoad,WishartandOld
ClevelandRoad,Carindale(dualthree- lanecarriageway).
Port of Brisbane Motorway interchange,
Murarrie• Upgradefromfourtoninelanesbetween
WynnumRoad,TingalpaandLyttonRoad,MurarrieincludingadditionalexitlanestoWynnumRoadandthePortofBrisbaneMotorway.
• DirectaccessfromtheGatewayBridgetothePortofBrisbaneMotorwayviaanewsouthboundoff-ramp(previously,accesswasonlyavailableviaLyttonRoad).
Wynnum Road Upgrade, Tingalpa(opened July 2007)
UpgradebetweenStantonRoadtotheeastandGraystoneStreettothewest,includingadditionallanesthroughtheintersectionand
onto the Gateway Motorway. The works weredeliveredbyQueenslandMotorwaysunderaseparate$10.5millionearlyworks
contractandjointlyfundedbytheQueenslandGovernmentandBrisbaneCityCouncil.
Old Cleveland Road to Wynnum Road
Upgradefromfourtoeightlanesbetween OldClevelandRoad,Carindaleand
WynnumRoad,Tingalpa(dualfour-lanecarriageway,includingextendedon-and
off-ramps).
Under construction - a new direct access from the Gateway Bridge to the Port of Brisbane Motorway via a new southbound off-ramp.
Several upgrades have already been delivered between Lytton Road and Wynnum Road.
Southernsection-12kmGatewayMotorwayupgrade