40
1 e-petroleumservices.com Online Field-Wide Gas- lift Optimisation Dr Alasdair S Brown Technical Manager EPS Americas Inc

Online Field-Wide Gas-lift Optimisation

  • Upload
    lamis

  • View
    32

  • Download
    0

Embed Size (px)

DESCRIPTION

Online Field-Wide Gas-lift Optimisation. Dr Alasdair S Brown Technical Manager EPS Americas Inc. Presentation Structure. Introduction Single Well vs Field Wide Online vs Offline Case Studies Latin America Middle East Conclusions Questions. Single Well. - PowerPoint PPT Presentation

Citation preview

Page 1: Online Field-Wide Gas-lift Optimisation

1

e-petroleumservices.com

Online Field-Wide Gas-lift Optimisation

Dr Alasdair S BrownTechnical ManagerEPS Americas Inc

Page 2: Online Field-Wide Gas-lift Optimisation

2

e-petroleumservices.com

Presentation Structure

• Introduction• Single Well vs Field Wide• Online vs Offline• Case Studies

– Latin America– Middle East

• Conclusions• Questions

Page 3: Online Field-Wide Gas-lift Optimisation

3

e-petroleumservices.com

Single Well

• Single Well Gas Lift Optimisation– Valve Spacing– Injection Depth– Valve Performance– GL Injection

Pressure

– Qgaslift

– CHP

Page 4: Online Field-Wide Gas-lift Optimisation

4

e-petroleumservices.com

Single Well

• Conditions change– GL is inherently flexible– Design in flexibility

• Single well optimum– Well performance curve– Different for each well– Not necessary optimal

for system

Page 5: Online Field-Wide Gas-lift Optimisation

5

e-petroleumservices.com

Gas Lift Optimisation

Gas Lift Compressor

Well

Well

Well

Well

Equal Gradients Method

Common Pressure

Page 6: Online Field-Wide Gas-lift Optimisation

6

e-petroleumservices.com

Field Wide Optimisation

• Field Wide Gas Lift Optimisation– Distribution of Gas to competing wells– Pressure losses in gas lift distribution system– Pressure losses in production system– “Closing the Loop”

• Total system modellingTotal system modelling– including produced gas reinjection– Compressor performance

– Offline/Online

Page 7: Online Field-Wide Gas-lift Optimisation

7

e-petroleumservices.com

Why Online?

• Large Number of Wells• Complex optimisation problem• Reduce cycle time

– Optimisation-to-implementation– Engineer’s time concentrated on value adding tasks

• Goals– Automate Process– Automate Repetitive Tasks– Optimise

Page 8: Online Field-Wide Gas-lift Optimisation

8

e-petroleumservices.com

Sustainable Production Optimisation

Time

Incr

ease

d V

alu

e O

ver

‘Do

No

thin

g’

Simple Manual Optimisation

Complex Manual Optimisation (Offline GLO)

Complex Automated Optimisation (Online GLO)

Page 9: Online Field-Wide Gas-lift Optimisation

9

e-petroleumservices.com

Automation & Optimisation• Off-line

– Data input manually into system model– Results from system model implemented manually

• Open loop– Data input automatically into model from SCADA– Results from model implemented manually

• Closed loop– Data input automatically into model from SCADA– Results from model implemented automatically via

set point controllers– Operator review may be required to ensure that

implemented results are “sensible”

Page 10: Online Field-Wide Gas-lift Optimisation

10

e-petroleumservices.com

Off-line Optimisation

Optimiser

Field

OPERATOR • Advice• Approval• Implementation

Manual Data Input Data Output

Page 11: Online Field-Wide Gas-lift Optimisation

11

e-petroleumservices.com

Open Loop Optimisation

Optimiser

FieldOPERATOR • Advice• Approval• Implementation

Automatic Data Input Data Output

Page 12: Online Field-Wide Gas-lift Optimisation

12

e-petroleumservices.com

Closed Loop Optimisation

Optimiser

Field

OPERATOR •Advice•Approval•Implementation

Automatic Data Input

Data O

utp

ut

SetpointControllers

Page 13: Online Field-Wide Gas-lift Optimisation

13

e-petroleumservices.com

Case 1: PdVSA On-Line

– SCADA data automatically loaded to give current block valve and compressor status and to constrain the optimisation to stay close to existing operating conditions

– Price/cost and equipment constraint data loaded from Corporate databases

– Gas injection well set-points sent directly to SCADA controllers (after production operator review as a block)

– Recommended pressure control valve set-points and compressor operating conditions sent to production operators in open-loop advisory messages

– Results stored in central database for access by other applications.

Page 14: Online Field-Wide Gas-lift Optimisation

14

e-petroleumservices.com

PdVSA Systems Overview

PROCESS CONTROL

CENTRAL CONTROL

OPTIMISATION

CIS

RTU, PLC..

SCADA

ASMS, WTO, NN, OM&S, IS

CENTINELA, SIAL, SICOT..

Page 15: Online Field-Wide Gas-lift Optimisation

15

e-petroleumservices.com

Integration Schematic

Page 16: Online Field-Wide Gas-lift Optimisation

16

e-petroleumservices.com

DataReconciliation

DGO

Well ModelRecalibration

LegacyData

Systems

Pri

m.Changes

NeuralNets

Well

Test

System Geometry

ASMS

OM&S

Decoupled

CDMS

One iGES Server per BU

iGES-basedapplications

OracleIntermediate

DataBase

MiddlewareTransaction Services

SCADA ServerSCU 2

Real Time History

SCADA ServerSCU 7

Real Time History

PIHistorian

Crude/WaterTreatment

&Water Injection

Dynamic LeakDetectionPI Decoupled

from PRAP

Databaseservers

CDB

MasterRecollectors

PI API

SCADA ServerSCU 1

Real TimeHistoryAverageData

Real Time

SCADA ServerSCU 6

Real TimeHistoryAverageData

OPC

ABB Simcon

KBC UpRight EPS

Valmet

Stoner

ODBC

COM

System Architecture

Page 17: Online Field-Wide Gas-lift Optimisation

17

e-petroleumservices.com

Process Control

Central Control

Optimisation

Corporate Systems

PdVSA Online GLO

GLO

Page 18: Online Field-Wide Gas-lift Optimisation

18

e-petroleumservices.com

Process Control

Central Control

Optimisation

Corporate Systems

The Online GLO Application

RTU/PLC

Optimiser

Database

SCADA

Input Output

Input Output

Page 19: Online Field-Wide Gas-lift Optimisation

19

e-petroleumservices.com

Online GLO Daily Operation

GLO

GLO is executed...

Gas lift rates andrecommendations downloadto SCADA

Gas Lift Well

MiniPlantas

Compressors

The results are evaluated...

Approval atSupervisory level

The SCADA Operatoraccepts the gas lift ratesand carries out adjustments

Page 20: Online Field-Wide Gas-lift Optimisation

22

e-petroleumservices.com

La Salina Online

Tuned Well ModelsGenerate Operating PtWellhead PerformanceCurveWells in FlowgroupsFlowgroup Performance

SurfacesHP Gas Lift NetworkLP Gas GatheringNetworkComplete Network

Page 21: Online Field-Wide Gas-lift Optimisation

23

e-petroleumservices.com

Field Implementation Results

Page 22: Online Field-Wide Gas-lift Optimisation

25

e-petroleumservices.com

POIS• POIS = Production Operation Information System• Northern fields of Kuwait• Performed by consortium including EPS, Aspentech, Daelim• EPS role was to provide the optimization software, software integration

and detailed engineering models for five fields in North Kuwait. • The fields included 197 wells (411 well strings)

– 33 water injectors, – 91 gas lifted producers and – 30 produced with ESPs.

• The wells and fields are connected through a complex network allowing wells to be switched between high, medium and low pressure as well as ‘wet’ and ‘dry’ separator trains

• Total production 600 Mstb/day

Page 23: Online Field-Wide Gas-lift Optimisation

26

e-petroleumservices.com

Design Brief

• Hydraulic model of GL Distribution System• Compressor Station behaviour and Performance

– Power turbines, compression, gearboxes, intercoolers, gas recycling

– Surge and stonewall constraints

• Multiphase Flow• Scalable to >1000 wells• Optimise non-hierarchical networks• Online Integration with

– Production Management System– DCS/SCADA System

Page 24: Online Field-Wide Gas-lift Optimisation

27

e-petroleumservices.com

Objectives

• Data acquisition via SCADA to MIS (Aspentech)

• GL optimisation for new GL wells– GL being installed following water injection

• Automatic acquisition of WT data • Automatic well model recalibration• Automatic online GL optimisation calculation• Manual setting of optimised setpoints

(initially)

Page 25: Online Field-Wide Gas-lift Optimisation

28

e-petroleumservices.com

PAS Concept

PAS

NewWellTest

WellFloWell Model

Compare with

trend

Engineerintervention

Rerun orretune

POIS

Fail

Pass

Manual Model Retune

Automatic Model Retune

Rerun Welltest

Data Transfer

Past data

Page 26: Online Field-Wide Gas-lift Optimisation

29

e-petroleumservices.com

GLO Concept

GLO

ReO System Model

POIS

Network model

Wells Wells Wells Wells Wells

InitiateGLO run

GetUpdated

well models

Generatewell

performanceRun GLO

Convert tochoke

settings

New SettingsNew gas allocation

Page 27: Online Field-Wide Gas-lift Optimisation

30

e-petroleumservices.com

Implementation

• Well modelling of all 411 wells (WellFlo)• Construction and tuning of network Model

(ReO)• Automatic tuning of Well models• Automatic GL optimisation• Integration with Aspentech MIS• Model maintenance and development

Page 28: Online Field-Wide Gas-lift Optimisation

31

e-petroleumservices.com

Important Issues Identified

• Data Quality– Well data– production data– Surface network data

• Business processes– building use of POIS model into std. procedures– model maintenance– model enhancement

• Compressor optimisation• Multistage separation optimisation

Page 29: Online Field-Wide Gas-lift Optimisation

32

e-petroleumservices.com

Network Config Modelling

Individual fields (viz., RA, SA, RQ, AD & BH) modelled as separate sub-sheets

Each GC has 7 headers that can take inflow from any or all wells

All fields interconnected through 3 Gathering Centres: GC-15, GC-23, and GC-25

Page 30: Online Field-Wide Gas-lift Optimisation

33

e-petroleumservices.com

Network Config Modelling

Multiple GC & MF options for all the wells made network very flexible to accommodate any future flow path definition

Optimiser easily handled this huge network - over 40,000 objects!

Page 31: Online Field-Wide Gas-lift Optimisation

34

e-petroleumservices.com

SCADA & POIS

Well Head PressureFrom 217 Wells

GC SCADA GC DCS

GC RTDB(POIS)

All DCS DATATRANSFERRED

RADIO LINK

PMDBALTAMEER

(POIS)

FINDER WELL INFORMATION

Business Process ExplorerGUI

WellFlo Reo&

WellFlo

Maintain Well Models(Administration of)

PAS

Hydrocarbon AccountingMaterial Balance

GLO

User

Page 32: Online Field-Wide Gas-lift Optimisation

35

e-petroleumservices.com

Top Level Network

Page 33: Online Field-Wide Gas-lift Optimisation

36

e-petroleumservices.com

Raudhatain-[RA]-GC15&GC25

Abdali-[AD]

Ratqa-[RQ]

Bahra-[BH]

Sabriyah-[SA]-GC23

C-GC15 C-GC25 C-GC23

Abdali:

16 Wells

to 2 GC

via 13 6in linesRatqa:

20 Wells

to 2 GC

via 36in & 10in lines

Raudhatain:

195 Wells

to 3 GC

thru’ 7 MF each

Sabriyah:

142 Wells

to 1 GC thru’ 7 MF

Bahra:

5 Wells

to 1 GC thru’ 7 MF

378 producers with choice of producing into any of 3 GCs through any of 21 MFs

Network Config Modelling

Page 34: Online Field-Wide Gas-lift Optimisation

37

e-petroleumservices.com

RA Field Network

Page 35: Online Field-Wide Gas-lift Optimisation

38

e-petroleumservices.com

Lift-Gas System

5x7 Possible inputs from RQ & AD fields

9 Sub-sheets holding 20-25 wells each

7x3 MF interconnecting all 194 wells across the field

7x3 MF outlets to production terminals

Lift gas to SA field

Network Config Modelling

Page 36: Online Field-Wide Gas-lift Optimisation

39

e-petroleumservices.com

NP & GLwells (FG)

Multi-header choice for lift-gas

at present & for future

Multi-MF choice for production

at present and for future

Network Config Modelling

Page 37: Online Field-Wide Gas-lift Optimisation

40

e-petroleumservices.com

GL Well Performance Surface Data

Page 38: Online Field-Wide Gas-lift Optimisation

41

e-petroleumservices.com

Conclusions

• KOC currently producing to quota– Current capacity higher than quota

• (how much higher is unknown)

– However additional production can be allocated to NK– Cost reduction is additional benefit

• Reduction in admin overhead• Reduction in flaring• Potential reduction in new well requirement• Network reconfiguration

• Work practices need to change to extract full value from the system

Page 39: Online Field-Wide Gas-lift Optimisation

42

e-petroleumservices.com

POIS project

• Client - Kuwait Oil Company• Year of Contract Award – 2000• Projected Value Generated:

– $100 million - $175 million per annum (projected)

Page 40: Online Field-Wide Gas-lift Optimisation

43

e-petroleumservices.com

Questions?