22
One Team Project to rule them all

One team project to rule them all

Embed Size (px)

Citation preview

Page 1: One team project to rule them all

One Team Project to rule them all

Page 2: One team project to rule them all

Vinícius Hana

Consultor

Page 3: One team project to rule them all

O que seus Team Projects representam?

Times? Projetos? Setores? Clientes?

Page 4: One team project to rule them all

Quando pensamos em Team Projects, devemos considerar

que:

Page 5: One team project to rule them all

Cada Team Project tem...

Seus próprios Work Items

Page 6: One team project to rule them all

Métricas isoladas

Page 7: One team project to rule them all

Cada Team Project tem...

Seus próprios Alerts

Page 8: One team project to rule them all

Duplicação de Alerts

Page 9: One team project to rule them all

Cada Team Project tem...

Seu próprio Process Template

Page 10: One team project to rule them all

Deployment dificultado

Page 11: One team project to rule them all

Mas tem como evitar isso tudo?

Page 12: One team project to rule them all

Tem, utilizando apenas um Team Project com:

AreasTeams

Iterations

Page 13: One team project to rule them all

Teams podem ser criados com uma Area específica

Page 14: One team project to rule them all

Areas criam uma separação lógica dos Work Items

Page 15: One team project to rule them all

Iterations organizam os backlogs para cada Team

Page 16: One team project to rule them all

Visão geralJulia Ilyiana

Demo

Time 1Projeto 1User 1

Time 2Projeto 2User 2

Page 17: One team project to rule them all

E existem mais benefícios ainda:

Apenas um Process Template

Mobilidade de Work Items pelas Areas

Renomear projetos

Page 18: One team project to rule them all

“What you describe is what we generally do internally and what we recommend. We make very heavy use of area path to categorize the work within a larger project.”

Brian Harry - Program Manager do TFS

Page 19: One team project to rule them all

“In general, I believe this approach provides consistency [to multi-product engagements] and lowers the administration and maintenance costs. All good.”

Michael Fourie - ALM Ranger, ALM MVP

Page 20: One team project to rule them all

Mas também existem problemas!

Sharepoint pode precisar de subsitesBuilds podem ficar bagunçados

Process Template unificado

Page 21: One team project to rule them all

Dúvidas?

Page 22: One team project to rule them all

Obrigado!

[email protected]

@vinicius_hana