Upload
others
View
10
Download
0
Embed Size (px)
Citation preview
235
NE 23rd STREET
LIN
CO
LN
B
LV
D
LIN
CO
LN
B
LV
D
HODGE BLDG
CONNORS BLDG
THORPE BLDG
WILL ROGERS BLDG
ODOT
CAPITOL BLDGNE 21st STREET
NE 28rd STREET
N L
IN
DS
AY
A
VE
OKLAHOMA STATE BANKING
CONCOURSE THEATER
SEQUOYAH BUILDING
ATTORNEY GEN. BLDG
NE 18th STREET
WA
LN
UT
A
VE
DENVER DAVISON BLDG
Oklahoma City, OK
Project Information:
Project Location: Oklahoma City, OK
Using Agency:
CAP Project Number: 20367
Issue Date:
CA
P P
RO
JE
CT
N
UM
BE
R: 2
03
67
O
ME
S C
on
co
urs
e T
he
ate
r A
ud
io
/V
is
ua
l U
pg
ra
de
sV
OL
UM
E 1
O
F 1
Approvals:
State Fire Marshal
Department of Environmental Quality
Water Resources Board
Architect Of Record:
GH2 ARCHITECTS, LLC
320 S. BOSTON AVE.
SUITE 100
TULSA, OK 74103
918-587-6158
WWW.GH2.COM
DateMickerl Jones
Director
This approval is for compliance with State
Statute 61 O.S. 204 A. 2 only. This review and
approval shall not be considered a
comprehensive review or a quality control check
of the Contract Documents. The Consultant
shall be solely responsible for any and all errors,
omissions or conflicting information in the
Contract Documents.
Sheet: Of
Cover Sheet
G001 9
STATE OF OKLAHOMA
Office of Management
& Enterprise Services,
Capital Assets Management,
Construction & Properties
Copyright © 2021 State of Oklahoma, Office of Management
and Enterprise Services, Capital Asset Management,
Construction and Properties. The documents contained
herein are protected by the United States copyright laws and
may not be reproduced, distributed, sold transmitted,
displayed, published or broadcast without prior written
consent of the State of Oklahoma, Construction and
Properties.
G001
GENERAL
ARCHITECTURAL
A101
Project Name: OMES Concourse
Theater AV
OMES Concourse Theater
Audio/Visual Upgrades
FLOOR PLAN & DETAILS
COVER SHEET, SHEET INDEX, AND VICINITY
MAP
Engineer Of Record:
The Americans with Disabilities Act of 1990 (2010 ADA Standards for Accessible Design)
A.
APPLICABLE CODES AND STANDARDS (www.ok.gov/oubcc/)
2015 International Building Code (as modified by State of Oklahoma)
2015 International Plumbing Code (as modified by State of Oklahoma)
2015 International Mechanical Code (as modified by State of Oklahoma)
2015 International Fire Code (as modified by State of Oklahoma)
2015 International Fuel Gas Code (as modified by State of Oklahoma)
2015 International Residential Code (as modified by State of Oklahoma)
2015 International Existing Building Code (as modified by State of Oklahoma)
2014 National Electric Code (as modified by State of Oklahoma)
CRUX TECHNOLOGY
2448 E. 81ST ST.
SUITE 4817
TULSA, OK 74137
800-685-6440
TG 101 GENERAL NOTES, SYMBOLS &
RESPONSIBILITY SCHEDULE
T 101 FLOOR PLAN RCP
T 102 FLOOR PLAN RCP - ALTERNATE
AUDIO VISUAL
T 103 VIDEO WALL PROJECTION SCREEN
T 104 PLATE DETAILS
T 105 FRONT END FUNCTIONAL
T 106 BACK END FUNCTIONAL
A101
FLOOR PLAN
& DETAILS
B
D
C
E
A
320 S Boston Ave, Suite 100
Tulsa, Oklahoma 74103
918.587.6158
gh2.com
08-09-2021
STANDARD TECHNOLOGY LEGENDNOT ALL SYMBOLS AND NOTES MAY BE USED
DATA OUTLET LOCATION(S) INSTALLED ON WALL. CONTRACTOR SHALL PROVIDE (1) 1" CONDUIT PATHWAYFROM EACH LOCATION TO THE NEAREST ACCESSIBLE CEILING SPACE TO A 1-GANG BACK BOX. COORDINATEDATA AND POWER LOCATIONS SO THAT DATA AND POWER ARE AT THE SAME HEIGHT AND IN CLOSEPROXIMITY. CONTRACTOR SHALL PROVIDE AND INSTALL DATA CABLING TO 1-GANG BACK BOX,FACEPLATE(S) AND JACK(S) AS SHOWN ON PLANS. REFERENCE DATA NOMENCLATURE FOR DATA OUTLETQUANTITY AND INSTALLATION HEIGHT AND TYPE.
DATA OUTLET(S) INSTALLED IN FLOOR BOX. CONTRACTOR SHALL PROVIDE AND INSTALL A FLOOR BOX.CONTRACTOR SHALL PROVIDE AND INSTALL (1) 1" CONDUIT PATHWAY FROM NEAREST ACCESSIBLE CEILINGSPACE TO FLOOR BOX LOCATION SHOWN ON PLANS. COORDINATE WITH MEP PLANS AND SHARE COMMONPATHWAY. CONTRACTOR SHALL PROVIDE AND INSTALL DATA CABLING TO FLOOR BOX, FACEPLATE(S) ANDDATA JACK(S) TO EACH LOCATION SHOWN. REFERENCE DATA NOMENCLATURE FOR DATA OUTLET QUANTITYAND INSTALLATION HEIGHT AND TYPE.
DATA OUTLET(S) INSTALLED ABOVE CEILING SPACE. CONTRACTOR SHALL PROVIDE AND INSTALL A 1-GANGBACK BOX 6" ABOVE CEILING. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL 6" OF 1" CONDUITPATHWAY FROM 1-GANG BACK BOX. CONTRACTOR SHALL PROVIDE AND INSTALL DATA CABLING TO 1-GANGBACK BOX, FACEPLATE(S) AND DATA JACK(S) TO EACH LOCATION SHOWN.
PROJECT ABBREVIATIONS
GENERAL PROJECT NOTES
01. ANY DIMENSIONS SHOWN ON THESE DRAWINGS ARE INTENDED TO PROVIDE A GENERAL LOCATION ASREQUESTED BY THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING ALL DIMENSIONS PRIORTO ROUGH-IN AND IMMEDIATELY REPORT ANY CONFLICTS WITH THE OUTLET PLACEMENT TO THE GENERALCONTRACTOR.
02. ALL CABLE BUNDLES WILL BE SUPPORTED EVERY 48"-60" OC WITH A J-HOOK OR OTHER APPROVED PATHWAYDEVICE. REFERENCE SPECIFICATIONS AND DETAILS FOR ADDITIONAL CABLING PATHWAY INSTALLATIONREQUIREMENTS. CONTRACTOR WHO VIOLATES THESE REQUIREMENTS WILL BE REQUIRED TO REPLACE THEAFFECTED CABLE PLANT AT THEIR EXPENSE.
03. PLASTIC TIE WRAPS ARE NOT PERMITTED AT ANY TIME ON THIS INSTALLATION. ALL CABLE ROUGH-IN AND DRESS-OUT WILL BE WITH VELCRO ONLY. ALL CABLES BUNDLED WITH PLASTIC TIE WRAPS SHALL BE IMMEDIATELYREPLACED AT THE CONTRACTOR'S EXPENSE.
04. DO NOT INSTALL ANY CABLES IN ANY CONDUIT SLEEVE, STUB UP, OR WALL CAP WITHOUT A PROTECTIVEBUSHING. CABLES PULLED INTO UNPROTECTED CONDUITS WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE. DONOT INSTALL ANY CABLING INTO ANY CONDUIT THAT HAS NOT BEEN CONFIRMED TO BE BLOWN CLEAR. COORDINATEWITH ELECTRICAL PRIOR TO ROUGH IN OF ANY CABLING.
05. ANY CABLING FOUND PAINTED DURING THE CONSTRUCTION PROCESS WILL BE REPLACED AT CONTRACTOR'SEXPENSE. CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND PAINTER TO AVOID CONFLICTS.
06. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REFERENCE BOTH THE PROJECT DRAWINGS AND THEPROJECT SPECIFICATIONS. TOGETHER THEY FORM THE COMPLETE CONTRACT DOCUMENTS. PLEASE REFERENCETHE PROJECT SPECIFICATIONS FOR ALL MATERIALS, EQUIPMENT AND COMPONENTS NOT INDICATED ON THEDRAWING SET.
07. CONTRACTOR SHALL COORDINATE ALL FINAL CAMERA LOCATIONS, HEIGHTS AND CAMERA VIEWING ANGLES WITHOWNER/OWNER'S REPRESENTATIVE. FAILURE TO COORDINATE ALL FINAL CAMERA LOCATIONS, HEIGHTS AND VIEWANGLES MAY REQUIRE RELOCATION OF CONDUITS, CABLE AND CAMERA LOCATIONS AT CONTRACTOR'S EXPENSE.
08. CONTRACTOR SHALL COORDINATE TECHNOLOGY, TELECOM, SECURITY AND AUDIO VISUAL LOCATIONS SO THATDATA AND POWER ARE AT THE SAME HEIGHT AND SPACED 18"-24" APART UNLESS SPECIFIED OTHERWISE.REFERENCE TECHNOLOGY AND MEP SHEETS FOR COORDINATION.
09. ALL CABLING INSTALLED IN AREAS WITH EXPOSED CEILINGS SHALL BE INSTALLED IN A PROPERLY SIZED CONDUITPATHWAY. CONDUIT PATHWAYS SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. THE CONDUIT MAY BEPAINTED TO MATCH CEILING COLOR AS DIRECTED BY THE CONTRACT DOCUMENTS.
10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE ARCHITECTURAL DEMOLITION DRAWINGS FORALL DEMOLITION AREAS.
11. CONTRACTOR SHALL DOCUMENT ALL EXISTING TECHNOLOGY, TELECOM, SECURITY AND AUDIO VISUAL DEVICESAND LOCATIONS PRIOR TO DEMOLITION OF CEILINGS AND SPACES. PROVIDE TEMPORARY SUPPORT IN ALLDEMOLITION AREAS FOR DEVICES, RE-INSTALL ALL EXISTING DEVICES IN NEW CEILINGS.
12. CONTRACTOR SHALL DOCUMENT ALL EXISTING CEILING TECHNOLOGY, TELECOM, SECURITY AND AUDIO VISUALLABELING ON EXISTING CEILING GRID. PROVIDE NEW LABELING PER SPECIFICATIONS.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR STOPPING ALL TECHNOLOGY, TELECOM, SECURITY AND AUDIOVISUAL CONDUIT PENETRATIONS FROM WATER OR RODENT INGRESS IN ALL BUILDINGS UPON COMPLETION OF THEPROJECT.
XX #
OUTLET INSTALLATION TYPE:
OUTLET INSTALLATION LOCATION
# INDICATES QUANTITY OF DATA DROPS TOBE INSTALLED
XX#
XX#
XX#
AC - OUTLET INSTALLED IN CEILING SPACEAP - OUTLET INSTALLED ABOVE CEILING FOR ACCESS POINTCC - OUTLET INSTALL 18" ON CENTER AFFFB - OUTLET INSTALLED IN FLOOR BOXFN - OUTLET INSTALLED IN FURNITUREHD - OUTLET INSTALLED AT 44" AFFHG - OUTLET INSTALLED AT 12" AFF UNOMB - OUTLET INSTALLED 6" ABOVE MARKER BOARDML - OUTLET INSTALLED 18" AFF IN MULLIONPI - OUTLET INSTALLED IN CEILING FOR PAGING INTERFACEPOS - OUTLET INSTALLED ABOVE WORK SURFACE FOR POINT OF SALESRW - OUTLET INSTALLED IN RACEWAYSC - OUTLET INSTALLED FOR SURVEILLANCE CAMERATV - OUTLET INSTALLED AT 24" BELOW CEILING HEIGHT UNOVP - OUTLET INSTALLED AT PROJECTOR LOCATIONWS - OUTLET INSTALLED ABOVE WORK SURFACE
DATA SYMBOLS LEGEND
AC - ACCESS CONTROLAFF - ABOVE FINISHED FLOORAHJ - AUTHORITY HAVING JURISDICTIONAV - AUDIO AND VIDEOBBC - BACKBONE BONDING CONDUCTORBICSI - BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONALC - CONDUITCD - CONSTRUCTION DOCUMENTSCCTV - CLOSED CIRCUIT TELEVISIONCO - CONDUIT ONLY (EMPTY CONDUIT WITH MULE TAPE)CP - CONTROL PANELCU - COPPERDR - DOOR RELEASEEC - ELECTRICAL CONTRACTOREF - ENTRANCE FACILITYEL - EMERGENCY LOCK DOWNEP - ENTRANCE POINTEPT - ELECTRONIC POWER TRANSFERESS - ELECTRONIC SAFETY AND SECURITYFBO - FURNISHED BY OTHERSFCC - FEDERAL COMMUNICATIONS COMMISSIONGND - GROUNDHC - HORIZONTAL CROSS-CONNECTHR - HOME RUNHVAC - HEATING, VENTILATION, AND AIR CONDITIONINGIBO - INSTALLED BY OTHERSIDF - INTERMEDIATE DISTRIBUTION FRAMEIEEE - THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERSISP - INTERNET SERVICE PROVIDERJB - JUNCTION BOXLV - LOW VOLTAGEMB - MARKER BOARDMC - MAIN CROSS- CONNECTMDF - MAIN DISTRIBUTION FRAMEMH - MANHOLEMIC - MICROPHONEMMF - MULTI-MODE FIBERMD - MOTION DETECTORMPOE - MAIN POINT OF ENTRYNEC - NATIONAL ELECTRICAL CODENEMA - ATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNIC - NOT IN CONTRACTNTS - NOT TO SCALEOC - ON CENTERPB - PULL BOXPBB - PRIMARY BONDING BUSBARPM - PROJECTOR MOUNTPNL - PANELPOC - POINT OF CONTACTPOE - POWER OVER ETHERNETPOS - POINT OF SALEPP - PATCH PANELRCP - REFLECTED CEILING PLANRFI - REQUEST FOR INFORMATIONRFP - REQUEST FOR PROPOSALRMU - RACK MOUNT UNITSBB - SECONDARY BONDING BUSBARSMF - SINGLE MODE FIBERSMR - SURFACE MOUNTED RACEWAYSW - SWITCHTBC - TELECOMMUNICATION BONDING CONDUCTORTE - TELECOMMUNICATIONS ENCLOSURETIA - TELECOMMUNICATIONS INDUSTRY ASSOCIATIONTYP - TYPICALUG - UNDERGROUNDUL - UNDERWRITERS LABORATORIES INCUNO - UNLESS NOTED OTHERWISEUPS - UNINTERRUPTIBLE POWER SUPPLYUSB - UNIVERSAL SERIAL BUSVC - VOLUME CONTROLVP - VIDEO PROJECTORWAP - WIRELESS ACCESS POINTWP - WEATHER PROOF
WALL MOUNTED AUDIO VIDEO DEVICE. DIVISION 26 REFER TO: KEYNOTES FOR DETAIL, KEYNOTES FORCOORDINATION. AV CONTRACTOR REFER TO DRAWINGS FOR QUANTITIES, SPECIFICATIONS FORMANUFACTURER AND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
AV
AV
M
VP
TP
FB
XX
XX
XX
XX
XX
XX
ERXX
AUDIO VISUAL SYMBOLS LEGEND
PS
RESPONSIBILITY SCHEDULETHIS SCHEDULE IS FOR REFERENCE AND DOES NOT INCLUDE ALL PROJECT COMPONENTS. IT SHALL BE USED IN CONJUNCTION WITH THE PROJECT DRAWINGS AND PROJECT SPECIFICATIONS.
SECTION DESCRIPTION DESIGNED BY: FURNISHED BY: INSTALLED BY:27 0000 COMMUNICATIONS CABLING OTHERS OTHERS OTHERS BY OTHERS
27 4116 INTEGRATED AUDIO-VIDEO EQUIPMENT FIRM RESPONSIBLE FOR DESIGN CONTRACTOR OWNER CONTRACTOR OWNER NOTES
CEILING PROJECTORS
CRUXNA
XNA
CONTRACTOR FURNISHED, CONTRACTORINSTALLED
CEILING PROJECTOR MOUNTS
CRUXNA
X NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
PROJECTOR LIFT CRUX NA X X NA OWNER FURNISHED, OWNER INSTALLED
MICROPHONES / CABLESCRUX
NA X NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
DSP / AMPLIFIER / INPUT SOURCE CRUX NA X X NA OWNER FURNISHED, OWNER INSTALLED
AMPLIFIERS CRUX NA X X NA OWNER FURNISHED, OWNER INSTALLED
DISTRIBUTED SPEAKERS
NA NAX
X NA TO BE EVALUATED AND ADVICE PROVIDED BYCONTRACTOR
PORTABLE SPEAKERS NA NA NA NA NA NOT APPLICABLE TO THIS PROJECT
CONTROL PANEL(S)CRUX
NA X NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
WALL PLATESCRUX
NA X NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
WIRING
CRUX NA X NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
FLOOR BOXES CRUX NA NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
AV RACK CRUX NA NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
AV PATCH CORDSCRUX
NA XNA
CONTRACTOR FURNISHED, CONTRACTORINSTALLED
AV CABLINGCRUX
NA X NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
POWER CONDITIONER / SEQUENCER
CRUX NAX
X NA CONTRACTOR FURNISHED, CONTRACTORINSTALLED
VIDEO WALL CRUX NA X NA ALTERNATE
VWxx
CEILING MOUNTED AUDIO VIDEO DEVICE. DIVISION 26 REFER TO: KEYNOTES FOR DETAIL, KEYNOTES FORCOORDINATION. AV CONTRACTOR REFER TO DRAWINGS FOR QUANTITIES, SPECIFICATIONS FORMANUFACTURER AND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
EQUIPMENT RACK. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AV CONTRACTOR REFER TO:KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FOR MANUFACTURER AND MODELAND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
AUDIO VIDEO FLOOR BOX. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AV CONTRACTORREFER TO: KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FOR MANUFACTURERAND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
CEILING MOUNTED MICROPHONE. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AVCONTRACTOR REFER TO: KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FORMANUFACTURER AND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
CEILING MOUNTED PROJECTION SCREEN. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AVCONTRACTOR REFER TO: KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FORMANUFACTURER AND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
WALL MOUNTED TOUCH PANEL. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AV CONTRACTORREFER TO: KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FOR MANUFACTURERAND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
WALL MOUNTED TOUCH PANEL. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AV CONTRACTORREFER TO: KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FOR MANUFACTURERAND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
XXWP
WALL MOUNTED AUDIO VIDEO WALL PLATE. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AVCONTRACTOR REFER TO: KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FORMANUFACTURER AND MODEL AND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
VIDEO WALL. DIVISION 26 REFER TO KEYNOTES FOR COORDINATION. AV CONTRACTOR REFER TO:KEYNOTES FOR DETAIL, DRAWINGS FOR QUANTITIES, SPECIFICATIONS FOR MANUFACTURER AND MODELAND FUNCTIONAL DRAWINGS FOR CONNECTIVITY.
CONSTRUCTIONDOCUMENTS
© 2020 COPYRIGHT GH2 ARCHITECTS, LLC
SHEET NUMBER:
SHEET NAME:
08/09/2021ISSUE:
ISSUE DATE:
20170013.42GH2 PROJECT NUMBER:
OM
ES
SE
QU
OY
AH
CO
NC
OU
RS
E T
HE
AT
ER
RE
NO
VA
TIO
N
OTHER ISSUE DATES:
NO. DESCRIPTION DATE
OKL
AHO
MA
CIT
Y, O
K
D-GH2-1009-01 - - BF -Project No. PDS SEC AV BIM TG-101
GENERAL NOTESSYMBOLS AND
RESPONSABILITYMATRIX
FB 01 FB 01
ER34"
60"
10"
FB 02
AV 01
AV 01
FLOOR PLAN/RCP
01
0302
KEYNOTE LEGEND x
04
TP 01
05
AV 02
WP01
38"10"
01
09
VP AV 03
06
07
08
07
CONSTRUCTIONDOCUMENTS
© 2020 COPYRIGHT GH2 ARCHITECTS, LLC
SHEET NUMBER:
SHEET NAME:
08/09/2021ISSUE:
ISSUE DATE:
20170013.42GH2 PROJECT NUMBER:
OM
ES
SE
QU
OY
AH
CO
NC
OU
RS
E T
HE
AT
ER
RE
NO
VA
TIO
N
OTHER ISSUE DATES:
NO. DESCRIPTION DATE
OKL
AHO
MA
CIT
Y, O
K
D-GH2-1009-01 - - BF -Project No. PDS SEC AV BIM T-101
FLOORPLAN / RCP
38"
151"CENTERED TO WALL
PS
02
(NOT ALL KEYNOTES MAY APPLY)
01. DIVISION 26 TO PROVIDE 120V POWER AND 1" CONDUIT FROMFLOOR BOX TO ER (TYPICAL). ALL CONDUIT TO HAVE NYLONGROMMETS AND PULL STRING. SEE DETAIL T-104.
02. DIVISION 26 TO PROVIDE 120V TO RECESSED PROJECTOR AND 1"CONDUIT FROM CONNECTION END TO ER-01. ALL CONDUIT TO HAVENYLON GROMMETS AND PULL STRING.COORDINATE WITH AVCONTRACTOR.
03. DIVISION 26 TO PROVIDE 3- 120V 20A CIRCUITS TO ER (DUPLEXOK) AND 2- 2" CONDUITS WITH NYLON BUSHINGS AND PULL-STRINGFROM RACK TO ACCESSIBLE CEILING LOCATION.
04. DIVISION26 TO PROVIDE 120V POWER AND 1-1/2" CONDUIT FROMFLOOR BOX TO ER (TYPICAL). ALL CONDUIT TO HAVE NYLONGROMMETS AND PULL STRING. SEE DETAIL T-104. CENTER TOSTAGE.
05. MOUNT 48" AFF DIVISION 26 TO PROVIDE 1" EMPTY CONDUIT TOER-01. ALL CONDUIT TO HAVE NYLON GROMMETS AND PULL STRING.COORDINATE WITH AV CONTRACTOR FOR CUSTOM BACK BOX.
06. PROJECTION SCREEN AND LIFT. DIVISION 26 TO PROVIDE 2-GANGQUAD 120V OUTLET ,ONE (1) 1-1/2" CONDUIT AND ONE (1) 1" CONDUITTO ER-01 TO ER-01. ALL CONDUIT TO HAVE NYLON GROMMETS ANDPULL STRING.
07. DIVISION 26 TO PROVIDE 1-1/2" CONDUIT FROM THIS CAMERALOCATION TO ER - 01. ALL CONDUIT TO HAVE NYLON GROMMETSAND PULL STRING.
08. DIVISION 26 TO PROVIDE 1" CONDUIT FROM THIS MICROPHONELOCATION TO ER - 01. ALL CONDUIT TO HAVE NYLON GROMMETSAND PULL STRING.
09. DIVISION 26 TO PROVIDE 1-GANG BOX 18" AFF (OR TYPICAL) WITH1" CONDUIT TO ER-01. ALL CONDUIT TO HAVE NYLON GROMMETSAND PULL STRING.
FB 01 FB 01
ER34"
60"
10"
FB 02
AV 01
AV 01
130"CENTERED TO WALL
FLOOR PLAN/RCP ALTERNATE
01
0302
KEYNOTE LEGEND(NOT ALL KEYNOTES MAY APPLY)
01. DIVISION26 TO PROVIDE 120V POWER AND 1" CONDUIT FROMFLOOR BOX TO ER (TYPICAL). SEE DETAIL T-104.
02. DIVISION 26 TO PROVIDE 120V IN RECESSED RECEPTACLECENTERED ON SUPPORT WALL FOR VIDEO WALL. COORDINATE WITHAV CONTRACTOR.
03. DIVISION 26 TO PROVIDE 3- 120V 20A CIRCUITS TO ER (DUPLEXOK) AND 2- 2" CONDUITS WITH NYLON BUSHINGS AND PULL-STRINGFROM RACK TO ACCESSIBLE CEILING LOCATION.
04. DIVISION26 TO PROVIDE 120V POWER AND 1-1/2" CONDUIT FROMFLOOR BOX TO ER (TYPICAL). SEE DETAIL T-104. CENTER TO STAGE.
05. MOUNT 48" AFF DIVISION 26 TO PROVIDE 1" EMPTY CONDUIT TOER-01. COORDINATE WITH AV CONTRACTOR FOR CUSTOM BACK BOX
06. DIVISION 26 TO PROVIDE 1-GANG BOX 18" AFF (OR TYPICAL) WITH1" CONDUIT TO ER-01. ALL CONDUIT TO HAVE NYLON GROMMETSAND PULL STRING.
07. DIVISION 26 TO PROVIDE 1-1/2" CONDUIT FROM THIS CAMERALOCATION TO ER - 01. ALL CONDUIT TO HAVE NYLON GROMMETSAND PULL STRING.
08.DIVISION 26 TO PROVIDE 1" CONDUIT FROM THIS MICROPHONELOCATION TO ER - 01. ALL CONDUIT TO HAVE NYLON GROMMETSAND PULL STRING..
x
04
TP 01
05
AV 02
WP01
38"10"
01
06
07
08
07
VW01
CONSTRUCTIONDOCUMENTS
© 2020 COPYRIGHT GH2 ARCHITECTS, LLC
SHEET NUMBER:
SHEET NAME:
08/09/2021ISSUE:
ISSUE DATE:
20170013.42GH2 PROJECT NUMBER:
OM
ES
SE
QU
OY
AH
CO
NC
OU
RS
E T
HE
AT
ER
RE
NO
VA
TIO
N
OTHER ISSUE DATES:
NO. DESCRIPTION DATE
OKL
AHO
MA
CIT
Y, O
K
D-GH2-1009-01 - - BF -Project No. PDS SEC AV BIM T-102
FLOORPLAN / RCPALTERNATE
38"
130.7"
73.5"
VIDEO WALL / PROJECTION SCREEN SIZE COMPARISON
CONSTRUCTIONDOCUMENTS
© 2020 COPYRIGHT GH2 ARCHITECTS, LLC
SHEET NUMBER:
SHEET NAME:
08/09/2021ISSUE:
ISSUE DATE:
20170013.42GH2 PROJECT NUMBER:
OM
ES
SE
QU
OY
AH
CO
NC
OU
RS
E T
HE
AT
ER
RE
NO
VA
TIO
N
OTHER ISSUE DATES:
NO. DESCRIPTION DATE
OKL
AHO
MA
CIT
Y, O
K
D-GH2-1009-01 - - BF -Project No. PDS SEC AV BIM T-103
PROJECTION SCREENVIDEO WALL
PUSHPUSH
MIC 1 MIC 2PUSH
MIC 3
PUSHPUSH
MIC 4 MONITOR NET
MAKE: ACE BACKSTAGE
BACK BOX: CUSTOMHEIGHT: STAGE FLOOR
02FB
MODEL PNL106, C-15102, C-15141, C-15142, CUSTOM ENGRAVINGMAKE: ACE BACKSTAGE / HALL RESEARCH
BACK BOX: CUSTOMHEIGHT: STAGE FLOOR
01FB
MODEL PNL-107, PE / EX-HDU-WP
NEUTRIK
PUSH
RJ-45
DA-LIFT 15
20.00TO
30.00ADJUSTMENT
31.19 28.98
30.7534.00
33.75
9.50
20.00
PLATE DETAIL
LIFT DETAIL
MAKE:MODEL:
BACK BOX:
HALL RESEARCHEX-HDU-WP1-GANG
HEIGHT: 18" AFF OR TYPICAL
WP 01
5.14
[130.5]
2.83
[72.0]
.54
[13.8]
1.97
[49.9]
.49
[12.5]
1.85
[46.9]
3.42
[87.0]
.86
[21.8]
.60
[15.1]
.36
[9.1]
MAKE: CRESTRON
BACK BOX: CUSTOMHEIGHT: STAGE FLOOR
01FB
MODEL TSW-570
2.29
[58.1]
4.33
[110.1]
.05
[1.2]
1.78
[45.3].24
[6.0]
1.65
[42.0]
3.39
[86.0]
TP-01 DETAIL
CONSTRUCTIONDOCUMENTS
© 2020 COPYRIGHT GH2 ARCHITECTS, LLC
SHEET NUMBER:
SHEET NAME:
08/09/2021ISSUE:
ISSUE DATE:
20170013.42GH2 PROJECT NUMBER:
OM
ES
SE
QU
OY
AH
CO
NC
OU
RS
E T
HE
AT
ER
RE
NO
VA
TIO
N
OTHER ISSUE DATES:
NO. DESCRIPTION DATE
OKL
AHO
MA
CIT
Y, O
K
D-GH2-1009-01 - - BF -Project No. PDS SEC AV BIM T-104
DETAILS
RJ45
FB-01
EXISTINGBIAMP NEXIA TC
AUDIO DSP
RJ45
IN OUT
LANTO SWITCH
CISCOSG350-28P
POE SWITCH
RJ45RJ45
RJ45RJ45
RJ45
RJ45RJ45
RJ45RJ45
RJ45
PROJECTOR
RJ45
3.5 AUDIO
INPUTOUTPUT
TRANSFORMER
SWITCH
MIXER
PSTO CONTROL DSP
VDO360USB 2.0
PTZ CAMERA
TP 01
RJ45
AV 01
VDO360USB 2.0
PTZ CAMERA
AV 01
USB EXTENDER
VDO360VUSBEXT-U Rx
USB EXTENDER
VDO360VUSBEXT-U Tx
RJ45
RJ45
USB EXTENDER
VDO360VUSBEXT-U Rx
USB EXTENDER
VDO360VUSBEXT-U Tx
RJ45
RJ45
CPUUSB RJ45
RJ45
Rx
RJ45
Tx
EXISTINGBIAMP NEXIA TC
AUDIO DSP
RJ45
IN
OUT
LANTO SWITCH
RJ45
Rx
RJ45
Tx
SWITCH
SHUREMXWANI8
AUDIO INTERFACE
RJ45
OUT
1
RJ45
2
RJ45
3TO CHARGING STATION
TO ACCESS POINT
TO SWITCH
SHUREMXWANI4
AUDIO INTERFACE
OUT
RJ45
1
RJ45
2
RJ45
3TO CHARGING STATION
TP ACCESS POINT
TO SWITCH
RJ45
CHARGING STATION
SHUREMXWANI4
FROM AUDIO INTERFACE
RJ45
CHARGING STATION
SHUREMXWANI4
FROM AUDIO INTERFACE
FROM AUDIO INTERFACE
FROM AUDIO INTERFACE
FROM AUDIO DSP
FROM AUDIO DSP
RJ45
FB-01
FB-03
RJ45
TO AUDIO DSP
FROM CPU
TO SWITCH
RJ45
FB-01 Rx
CRESTRONHD-RX-101-C-E
FB-01
RJ45FB-02
FB 03
TO FB-01 Rx
TO FB-01 Rx
FROM FB-03FROM FB-03
CRESTRONHD-XSPSURROUND DSP
RJ45
IN OUT
LAN
CRESTRONHD-XSP
BLU-RAY
RJ45
OUT
LANTO SWITCH
TO SWITCH
FROM BLU-RAY
FROM SURROUND DSP
ATLONAAT-AD2
AUDIO CONVERTER
RJ45
CONTROL DSP
CRESTRONCP4
FROM CONTROL DSP
EPSONL1500UHNL
RDLTX-J2
PROJECTOR LIFT
DA-LIFT78088WHT
CONTROL DSP
FROM PROJECTOR SCREEN
RJ45RJ45
RJ45RJ45
FROM PROJECTOR
CONTROL PANEL
CRESTRONTSW-570-B-S
TO SWITCH
FROM CONTROL PANEL
USB INTERFACE
SHUREANIUSB-MATRIX
FROM SWITCH
FROM BEAMFORMING MICROPHONE
TO USB INTERFACE
USB INTERFACE
SHUREANIUSB-MATRIX
FROM AUDIO DSP
RJ45
RJ45
RJ45
RJ45
FROM MEDIA PLAYER
RJ45
BEAMFORMING MICROPHONE
SHUREMXA910
TO USB INTERFACEFROM SWITCH
TO BEAMFORMING MIC
TO USB Rx
TO USB Rx
FROM PROJECTOR LIFT
FROM USB Tx
FROM USB Tx
TO HDMI SWITCH
FB-02 Rx
CRESTRONHD-MD4X1-4K-E
FROM CPU
WIRELESS MOUSE AND KB
IOGEARGKM552R
ER-01
PA-1PA-1
PA-2PA-2
PA-4PA-4
PA-5PA-5
PA-3PA-3
PA-6PA-6
RJ45
RJ45
RJ45
RJ45
RJ45
RJ45
WiFi MEDIA PLAYER
SONOSHUB
RJ45TO SWITCH
AV 03FROM CPU
(HDMI)
TO PROJECTOR
FROM HDMI SWITCH
AV 02
FB-01 Rx
CRESTRONHD-RX-101-C-E
WP-01
TO CPU
TO CPU
FROM WP-01
FROM WP-01
CONSTRUCTIONDOCUMENTS
© 2020 COPYRIGHT GH2 ARCHITECTS, LLC
SHEET NUMBER:
SHEET NAME:
08/09/2021ISSUE:
ISSUE DATE:
20170013.42GH2 PROJECT NUMBER:
OM
ES
SE
QU
OY
AH
CO
NC
OU
RS
E T
HE
AT
ER
RE
NO
VA
TIO
N
OTHER ISSUE DATES:
NO. DESCRIPTION DATE
OKL
AHO
MA
CIT
Y, O
K
D-GH2-1009-01 - - BF -Project No. PDS SEC AV BIM T-105
FRONT ENDFUNCTIONAL
PA1A
PA1B
QSCCX502
PA2A
PA2B
QSCCX502
PA3A
PA3B
QSCCX502V
PA4A
PA4B
QSCCX502
PA5A
PA5B
QSCCX702
PA6A
PA6B
QSCCX602V
FRONT
SURROUND
SURROUND
BACK
HOUSE CEILING 70V
SUBWOOFER
CONSTRUCTIONDOCUMENTS
© 2020 COPYRIGHT GH2 ARCHITECTS, LLC
SHEET NUMBER:
SHEET NAME:
08/09/2021ISSUE:
ISSUE DATE:
20170013.42GH2 PROJECT NUMBER:
OM
ES
SE
QU
OY
AH
CO
NC
OU
RS
E T
HE
AT
ER
RE
NO
VA
TIO
N
OTHER ISSUE DATES:
NO. DESCRIPTION DATE
OKL
AHO
MA
CIT
Y, O
K
D-GH2-1009-01 - - BF -Project No. PDS SEC AV BIM T-106
BACK ENDFUNCTIONAL