8
Ummar L. Alam Objective To be part of Multi-National Organization and development career opportunities. Experience 03-Jun-2006 to 31-Aug-2015 Inspector GSM2 MOBILY Planning and site preparation. Site selection layout, installation preparation & safety instruction. A-Type of Land, B- Accessibility of the site, C- Site surrounding requirement. Conduct Field Survey both civil and electrical design on GSM 2 Project for Rooftop & Green Field Sites. Supervise the contractor and daily follow up of electrical works to improve in construction of new cell sites. Conduct (RDS) Rapid deployment solution survey and implementation. Responsible for the construction of GSM Base Stations. In Western Region & review engineering plan and to make necessary recommendation based on actual site condition. Preparing (FIS) field inspection sheet. Commissioning and testing of electro mechanical equipment. Power generators commissioning and testing. Standby duties. Troubleshoot and repair the fire alarm in cell site. To conduct insulation test, continuity test insulation test, earth resistance test. Conduct Field Survey Design on GSM 2 Project for Rooftop & Green Field Sites Responsible for the construction of GSM Base Stations. In Western Region Design group for site acquisition, Survey, Feasibility Studies and Design New GSM2 Base Station. Responsible (ISR) Initial Site Survey to search best location of proposed new sites and check minimum three nominee; Responsible (SSR) Site Search Al-Faysaliyah Jeddah KSA Mobile # 00966- 566012627 Mobile # 00966- 541934394 Mobile # 00966- 504157656 E-mail [email protected] [email protected]

omarPro updated latest 2015

Embed Size (px)

Citation preview

Page 1: omarPro updated latest 2015

Ummar L. Alam Objective To be part of Multi-National Organization and development career opportunities.

Experience 03-Jun-2006 to 31-Aug-2015

Inspector GSM2 MOBILY

Planning and site preparation.Site selection layout, installation preparation & safety instruction.A-Type of Land, B- Accessibility of the site, C- Site surrounding requirement.

Conduct Field Survey both civil and electrical design on GSM 2 Project for Rooftop & Green Field Sites. Supervise the contractor and daily follow up of electrical works to improve in construction of new cell sites. Conduct (RDS) Rapid deployment solution survey and implementation. Responsible for the construction of GSM Base Stations. In Western Region & review engineering plan and to make necessary recommendation based on actual site condition. Preparing (FIS) field inspection sheet.

Commissioning and testing of electro mechanical equipment. Power generators commissioning and testing. Standby duties. Troubleshoot and repair the fire alarm in cell site. To conduct insulation test, continuity test insulation test, earth resistance test.

Conduct Field Survey Design on GSM 2 Project for Rooftop & Green Field Sites Responsible for the construction of GSM Base Stations. In Western Region

Design group for site acquisition, Survey, Feasibility Studies and Design New GSM2 Base Station. Responsible (ISR) Initial Site Survey to search best location of proposed new sites and check minimum three nominee; Responsible (SSR) Site Search Reports to finalize which candidate or nominee to be selected. Responsible (FSS) Final Site Survey to confirm what is going to put antenna support or generate FSS. Responsible (DDS) Detail Designed Survey to investigate the structure if it is capable to carry another additional load for Equipment shelter and mounts. To make site Acquisition with the owner of the building, Including the investigation of the structure In Western Region. Review Engineering Plans & Designs & make necessary recommendation based on actual site conditions. Prepare work schedule to determine the availability of resources for the smooth implementation of project. To verify the bill of quantity of each site, to determine the actual dimension what in actual as per as built drawing both civil and electro mechanical. Prepare daily progress report, both civil and electro mechanical.Prepare proper documentation for (PAT) Preliminary Acceptance Test both civil and electro mechanical.Installation preparation Checklist,Has scope of work for the site has been obtain? Have all relevant prototype reports been obtain? FDED Final Designed Engineering Detail have been Obtain? And Have supplier for application equipment been received? Etc.

Al-Faysaliyah Jeddah KSA Mobile # 00966-566012627Mobile # 00966-541934394Mobile # 00966-504157656

[email protected] [email protected]

Page 2: omarPro updated latest 2015

2004-to 2006 HIFAB Ericsson

Inspector GSM2 MOBILY PROJECT

Conduct Field Survey both civil and electrical design on GSM 2 Project for Rooftop &Green Field Sites. Supervise the sub-contractor and daily follow up of electrical works to improve inConstruction of new cell sites. Conduct (COW) cell on wheel survey and implementation.

Responsible for the construction of GSM Base Stations. In Western Region & review engineering plan and to make necessary recommendation, Based on actual site condition. Preparing (FIS) field inspection sheet. Commissioning and testing of electro mechanical equipment. Power generators commissioning and testing. Standby duties. Troubleshoot and repair the fire alarm in cell site.

Design group for site acquisition, Survey, Feasibility Studies and Design New GSM2 Base Station. Responsible (ISR) Initial Site Survey to search best location of proposed new sites and check minimum

three nominee; Responsible (SSR) Site Search Reports to finalize which candidate or nominee to be selected. Responsible (FSS) Final Site Survey to confirm what is going to put antenna support or generate FSS. Responsible (DDS) Detail Designed Survey to investigate the structure if it is capable to carry another

additional load for Equipment shelter and mounts. To make site Acquisition with the owner of the building, Including the investigation of the structure In Western Region. Review Engineering Plans & Designs & make necessary Recommendation based on actual site conditions. Coordinate with consultants & representative for proper Implementation regarding standard & specification Prepare work schedule to determine the availability of resources for the smooth implementation of project. To verify the bill of quantity of each site, to determine the actual dimension what in actual as per as built

drawing. Prepare daily progress report with Spread sheet, Prepare proper documentation for (PAT) Preliminary Acceptance Test.

2002–2004 Seder Telecom co. LTD Saudi ArabiaSite Engineer GSM E-6 STC Project

Conduct Field Survey Design on GSM E-6 Project for Rooftop & Green Field Sites

Responsible for the construction of GSM Base Stations. In Western Region Design group for site acquisition, Survey, Feasibility Studies and Design New GSM base Station To make site Acquisition with the Owner of the Building, Including the investigation of the structure of The building. The Transmit Radio Unit (TRU) Site in Western Region To locate the Exact location Cell site And Erect And Search the Far end Site coordination to STC etc., cell on Wheel (COW) In Western Region Review Engineering Plans & Designs & make necessary recommendation based on actual site condition Coordinate with consultants & representative for proper implementation regarding standard & specification Prepare work schedule to determine the availability of resources for The smooth implementation of the project. Prepare daily progress report, red line drawings Prepare proper documentation for Preliminary Acceptance Test

Page 3: omarPro updated latest 2015

(PAT)

1998–2000 Abdullah Ayash Al-Mihmadi Com. LTD Saudi ArabiaGSM- 4 Jeddah K.S.A.Outside-plant (OSP) Engineer / Site Engineer Outside Plant Engineer Responsible for taking Plant (Copper, Fiber, Etc.) From the wire center to a distribution point directly. If a

distribution point design is used, then a cross-connect box is placed in a strategic location to feed a determined distribution area. Responsible of studying of cellular towers and telephone poles as well as calculating pole capabilities of telephone or power poles onto which new plant is being added. To investigate or calculation are also required when the boring under heavy traffic areas such as highways or when attaching to other structures such as bridges. Shoring also has to be taken into consideration for a larger trench or pits. Conduit structures often include encasements of slurry that needs to be designed to support the structure and withstand the environment around it (soil type, high traffic, Etc.). Responsible for drafting plans either by hand or using computer aided designed (CAD) software, for how telecom plan5t facilities will be placed. Also securing permits drawing and necessary papers for implementation,

Supervision of sub-contractors for GSM project Design group for site acquisition, Survey, Feasibility Studies and Design New GSM base Station Conduct detail field survey, designing of self-support Tower and Roof Top Coordinate the project to Lucent Technologies Inc. representative for Proper implementation regarding

the standard & specification. Conduct on the job quality & safety inspection of activities in process Is undertaken by subcontractor. Prepare red line, site diaries & as built drawings Participated on the pre acceptance test (PAT) with NorConsult telematic Representative. To conduct insulation test Continuity test insulation test

Site EngineerSAUDI JAPANESSE AUTOMOBILE HIGH INSTITUTE & ABDULLAH AYASH HANGAR Responsible to bear direct control in the construction site. To plan and work schedule and give guidance and instruction to site key personnel. Prepared daily work progress reports, Manpower, Equipment, To check the quantity of back up calculation of monthly certificates.

1996-1998 TARIK BIN SAED Co. Saudi ArabiaSite Engineer Chamber of commerce / 35 Villas Al- Hamra Villages Durat Al- Arus Prepare daily progress report, site instructions as built drawings. Prepare proper documentation & participated actively for preliminary To coordinate with the consultant concerning the propose method, Materials submittal to the satisfactory execution of the works in accordance with specification and preparing of progress billing or interim Payment.

1994-1996 Al-Amoudi Co. LTD Saudi ArabiaSite Engineer Golf center / Bridgestone BuildingPRINCIPAL ACCOUNTABILITIES:•Undertake engineering design and documentation across a wide range of civil engineering projects based on established templates, produce specifications, design documentation and Tender documentation.

• Liaison with drafters and technical staff for drawing production.• Checking of Drawings and Specifications. • Carry out site inspections of construction work, and provide support to the Resident Engineer in Contract Administration and Construction Supervision.•Assistance in the preparation of reports and attendance of design progress meetings as required.

Page 4: omarPro updated latest 2015

• Management of own workload and utilization.• Operating in accordance with the corporate health and safety, environment and quality standards.• Operating in accordance with the corporate health and safety, environment and quality standards.KNOWLEDGE/EXPERIENCE: • Previous design office experience desirable. • Previous involvement in a selection of the following: • Earthworks and Drainage • Land Development • Water Supply and Sewerage • Pumping and Pipe Systems • Roadworks • Construction Supervision • Contract Administration 

1992-1994 Saudi Oger Co. LTD Saudi ArabiaMarble Controller Prince Palace Prince Sultan, King Fahd

To control all the marble which are going to deliver to the site, To check by physical checking to avoid any delay of the work, To check specially the quality because special stone and not available in market. If any Missing Marble to make a report to the supplier.

1991-1992 Saudi Oger Co. LTD Saudi ArabiaCivil General Foreman steel fabrication (Faypa Sogex)

To review and study the shop drawing to avoid mistake for ordering the reinforcement. Prepared bar bending schedule from time to time.

1990-1991 PROVINCIAL ENGINEER OFFICE ISABELA BASILAN PROVINCE PHIL.Civil Engineer Aide: school Building / public works & High way

Field Supervision, Inspection Construction planning and engineering administration. To Review & study the drawing & any documents related to contract. Check & monitor the project for weekly reports.

Education EDUCATIONAL ATTAINMENTColleges: Zamboanga A. E. Colleges Zamboanga City- Philippines Bachelor of Science in civil engineering Graduated 1989-1990

PERSONAL DATAB.SC in Civil Engineering. Registered from Saudi Council of Engineers as Consultant.

Birth Date : September 19, 1965 Birth Place : Tuburan Basilan Provice Civil Status : Married, (4 children) Spouse : Warda S. Garingan

Children : Marwa G. Alam

Page 5: omarPro updated latest 2015

Bhandar G. Alam Al-Ryan G. Alam Reema G. Alam

Height : 5’6”

Weight : 140 lbs.

Nationality : Filipino

Religion : Islam

TRAINING AND SPECIAL COURSES

1. Concrete Technology in Construction Sponsored by Philippines institute of civil Engineer

Manila Philippine Jan. 27, 31 1988 2. Construction & Management

Sponsored by Philippines institute of civil Engineer Structure & Failure June 1988

3. Introduction to computer National Institute of Computer Management Jeddah Saudi A4. Safety Induction Course Sponsored By Saudi ABV

Chamber of Commerce Industrial City, Jeddah Saudi Arabi 5. Quality Procedure Training Course for Site Supervision Sponsored by Saudi ABV 6. GPRS system Survey Sponsored By LM Ericsson 7. GSM System Survey Sponsored by LM Ericsson 8. Team works advance Sponsored by Modily 9. Six Value (Open, Energetic & Respectful) Sponsored by Mobily 10.The Comprehensive Program on Project & construction management (CMC Workshops 3 & 4) – Certicate program Kuala Lumpur Malaysia. PROJACS PROJECT MANAGESMENT & CONTROLS CO.

11. Contract Planning & Design to Prevent Disputes University of Waterloo

12 Contract Administration University of Waterloo Appreciation Certification of Appreciation hammed al-Kharji Hajj 2008 project appreciation letter from Abdulaziz I. Al- Tamani Chief operation Officer

REFERENCE

Abdullah Ayash Al-Mihmadi Company Owner Abdullah Ayash Al-Mihmadi Com LTD.

Hon. Abdulgani (Gerry) Salapuddin Congress of lone District Basilan

Isabela Basilan Province

Page 6: omarPro updated latest 2015

Magnus Asplund HIFAB Middle East (ERICSSON) Regional Manager Western Region

Mats AnderssonHIFAB Middle East (Ericsson)Asst. Regional Manager Western Region

Ahmed Jabr Mobily General Manager Access Engineering, Access Engineering

Mohammed Abu Mansour Mobily Executive Manager RAN Implementation, RAN Implementation - Western

Alaa Malki Mobily Chief Networks Officer, Networks

Amir I. Hajali Mobily

Executive Manager Site Engineering & Projects, Site Engineering & Projects - Western

Ayman Arab Mobily

Civil Site Engineering & Projects Engineering Manager, Site Engineering & Projects - Western

Habit: Swimming, Chess, Karate, running, gardening, carpentry, computers. Fishing,