    Plant location

    Meaning-the establishment of an industryat a particular place.It is of 2 types-1.

    Localization /centralization-meansconcentration of similar type ofindustries at some particular place.E.g. textile in Mumbai.

    2. Delocalization /Decentralization-means spreading of similar type ofindustries at different places. E.g.banking industries.

  • 7/28/2019 OM2.1plant Location and Lyt

    2/66

    Factors affecting location & site decisions

    1.

    Availability of raw material2. Nearness to the potential market3. Near to the source of operating requirements like

    electricity, disposal of waste, drainage facilities.

    4. Supply of labor5. Transport & communication facilities6. Integration with other group of companies7. Suitability of land & climate

    8. Availability of housing, other amenities & services9. Local building & planning regulations10. Safety requirements11. Others like low interest on loans, special grants,

    living standards

  • 7/28/2019 OM2.1plant Location and Lyt

    3/66

    selection of the site for the factory

    Known as location analysis where firstly somegeographical area is selected & from thatarea a particular site is selected for theestablishment of the plant.

    Methods for the evaluation of plant location-1. Involving quantitative factors-

    a. Comparative cost chart, b. dimensional

    analysis.2. Comparison of qualitative factors.

  • 7/28/2019 OM2.1plant Location and Lyt

    4/66

    Comparative cost chart

    Is appropriate where the location problemconcerns the placement of a single plant. This isbased on location cost summary chart. Acomparative chart of total costs involved in

    setting up a plant of desired size is prepared.

    0

    10

    20

    30

    40

    locations

    A

    B

    C

    D

  • 7/28/2019 OM2.1plant Location and Lyt

    5/66

    The total cost is represented by the height of columnfor each location. we select a location for whichtotal cost is minimum.

    The cost summary chart has advantage of clarity inpresentation. but analysis is restricted to certainspecified factors only.

    Least cost centre analysis-Here transportation cost associated with variouslocation alternatives is considered.

    Limitation of these techniques-

    1.Choice of plant location assumed to be entirelydependent upon minimization of operational costs.

    2.Operational costs are assumed to be linearly

    related to distance involved.

  • 7/28/2019 OM2.1plant Location and Lyt

    6/66

    Dimensional analysis

    It involves1. calculation of the relative merits or

    cost ratios for each of the factors,

    2. giving each of the cost factor anappropriate weightage by means of anindex to which the cost ratio is raised

    3. & multiplying these weighted ratios inorder to arrive at a figure on therelative merits of alternative sites.

  • 7/28/2019 OM2.1plant Location and Lyt

    7/66

    Let Cm1,Cm2,Cm3,..Cmz are the costs associatedwith site M for various cost factors.Cn1,Cn2,Cn3,.Cnz are of site

    N.W1,W2,W3,.Wz are weightage for variousfactors.

    Merit of location M=(Cm1)W1*(Cm2)W2*(Cmz)Wz

    Merit of location N=(Cn1)W1*(Cn2)W2*(Cnz)Wz

    Relative merits of sites M & N are-

    merit of M

    merit of N

    If this value is > 1, then select site M & vice-versa.

    Advantages- it compares both subjective & objectivefactors & gives a quantitative figure.

  • 7/28/2019 OM2.1plant Location and Lyt

    8/66

    Comparison of qualitative factors.

    These are the factors to which cost valuescant be assigned. Like lack of good schools,community attitude. These can be termed asgood or excellent.

    Clearly location B appears to be better one.

    factors Location A Location B

    labor adequate excellent

    relation good Very goodeducation Good Very good

  • 7/28/2019 OM2.1plant Location and Lyt

    9/66

    Ranking & weight method

    1. Various locations are ranked acc. Totheir contribution

    2. Various factors are assigned weights

    acc. To their importance3. Weights are then multiplied with rank

    assigned

    4. Total of these products for eachlocation is calculated

    5. Location having max. total is then

    selected.

  • 7/28/2019 OM2.1plant Location and Lyt

    10/66

    Advantages &disadvantages of urban, rural & sub-urbansites for a plant-

    urban rural Sub-urban

    Bettertransportation

    More water Plannedindustrial

    Large labor

    supply

    Cheaper land Larger area

    Big local market Lower taxes

    Easy finance Few ordinances

    Municipalservices

    Better civilattitude

    Labor stability

    B & i t i i

  • 7/28/2019 OM2.1plant Location and Lyt

    11/66

    Bac war area & in ustria po icy In the facilities location problems, the industrial

    policies of the governments are very important

    inputs in the overall consideration. In India, theindustrial development of backward areas forbalanced regional development of the country hasalways been emphasized. This has been attempted

    mainly through:1. Licensing policy (practice of leasing a legally protected property to another party )2. Location of public sector projects3. Investment subsidy (money granted by the State to keep down the price of commodities)4. Concessional finance (by IDBI, IFCI , ICICI)5. Concession on income tax import duty etc and6. Setting up of industrial estates (property

    consisting of much land )

    B k d & i d i l li d

  • 7/28/2019 OM2.1plant Location and Lyt

    12/66

    Backward area & industrial policy contd.All the districts in the country have been classified

    into four categories:

    A. No industry districts,B. Moderately backward districtsC. Least backward districts, andD. Non-backward districts

    The A, B, and C categories are eligible for subsidy oninvestment in fixed assets in an industrial unit, asgiven below:

    Category Percent Subsidy Maximum Limit Per unit

    A 25 Rs 25 lakhB 15 Rs15 lakhC 10 Rs 10 lakhD not eligible for subsidy

  • 7/28/2019 OM2.1plant Location and Lyt

    13/66

    Global locations

    World-wide locations are called global

    locations.E.g. MNCs are setting up their branches in

    India & Indian companies are extending their

    operations in other countries like -USA, EUROPE , CHINA.

    virtual proximity Social networking at a

    distance .with the advances intelecommunications technology , a firm canbe in virtual proximity to its customers.

  • 7/28/2019 OM2.1plant Location and Lyt

    14/66

    Virtual Factory

    Many firms based in USA and UKin theservice sector and in the manufacturingsectoroften outsource part of theirbusiness processes to foreign locations

    such as India. Thus, instead of one'sown operations, a firm could use itsbusiness associates' operationsfacilities. In a way, the Indian BPO firmis that foreign-based company's 'virtualservice factory'. So, one's businessassociate's operations facilities is called

    virtual factory.

  • 7/28/2019 OM2.1plant Location and Lyt

    15/66

    REASONS FOR A FOREIGN LOCATION1. Reaching the Customer -One obvious reason for

    locating a facility abroad is that of capturing a share of the market

    expanding worldwide.2. Other Tangible Reasons- The host country may have/offer substantial tax advantages

    compared to the home country.

    The costs of manufacturing and/or running operations may besubstantially less in that foreign country. This may be due to Low labor cost

    Low raw material cost

    Better availability of inputs

    The co. may overcome the tariff (table of fixed charges) barriers bysetting up a manufacturing plant in foreign country rather than

    exporting the items to that country.

    3. Intangible reasons-

    l

  • 7/28/2019 OM2.1plant Location and Lyt

    16/66

    Customer-related reasons-firms customer may feel secure that firm is mor

    accessible.

    Firm may be able to give a personal touch.Firm may understand customers requirements better.

    It may discover other potential customers in abroad.

    Organizational learning related reasonsFirm can learn advanced technologyFirm can learn from its customers abroad

    It can also learn from its competitors operatin

    in abroad.It may also learn from its suppliers abroad.

  • 7/28/2019 OM2.1plant Location and Lyt

    17/66

    Plant layout

    Meaning-Plant layout is the physical arrangement

    of industrial facilities. It involves the

    allocation of space & the arrangementof equipment in such a manner thatoverall operating costs are minimized.

    D D

    D D

    G G

    G G

    G G

    M M

    M M

    M M

    A A

    A A

    L

    L L

    L L

    L L

    L

  • 7/28/2019 OM2.1plant Location and Lyt

    18/66

    Objectives of plant layout

    An efficient layout can beinstrumental in the accomplishment ofthe following objectives-

    1. Economies in materials, facilitatemanufacturing process & handling ofsemi-finished & finished goods.

    2. Proper & efficient utilization of

    available floor space.3. To avoid congestion & bottlenecks.4. Provision of better supervision &

    control of operations.

  • 7/28/2019 OM2.1plant Location and Lyt

    19/66

    Objectives of plant layout cont.

    5. Careful planning to avoid frequent changes inlayout which may result in undue increase in cost ofproduction.

    6. To provide adequate safety to the workers from

    accidents.7. To meet the quality & capacity requirements in themost economical manner.

    8. Provision of medical facilities & cafeteria at

    suitable & convenient places.9. To provide efficient material handling system.10. To suggest the improvements in production

    process & work methods.

  • 7/28/2019 OM2.1plant Location and Lyt

    20/66

    Principles of plant layout

    1. Principle of integration (of 5Ms)2. Principle of minimum distance3. Principle of cubic space utilization(

    both horizontal & vertical space).4. Principle of flow( must be forward no

    backtracking)5. Principle of maximum flexibility6. Principle of safety, security &

    satisfaction7. Principle of minimum handling.

  • 7/28/2019 OM2.1plant Location and Lyt

    21/66

    Types of plant layout1. Product layout

    2. Process layout3. Fixed Position/ Stationary layout

    Product layout- Layout that uses standardized processing

    operations to achieve smooth, rapid, high-volume flow

    Here machines are arranged acc. To theneeds of product & in the same sequenceas the operations are necessary formanufacture. E.g. back office of services

    such as banks and insurance companies.

  • 7/28/2019 OM2.1plant Location and Lyt

    22/66

    Raw

    materials

    or customer

    Finished

    itemStation

    2

    Station

    3

    Station

    4

    Material

    and/or

    labor

    Station

    1

    Material

    and/or

    labor

    Material

    and/or

    labor

    Material

    and/or

    labor

    Used for Repetitive or Continuous Processing

    Product Layout

  • 7/28/2019 OM2.1plant Location and Lyt

    23/66

    1. High rate of output2. Low unit cost

    3. Labor specialization

    4. Low material handling cost5. High utilization of labor and

    equipment

    6. Established routing and scheduling7. Short processing time

    Advantages of Product Layout

    D d f P d L

  • 7/28/2019 OM2.1plant Location and Lyt

    24/66

    1. Creates dull, repetitive jobs

    2. Poorly skilled workers may not maintainequipment or quality of output

    3. Fairly inflexible to changes in volume

    4. Highly susceptible to shutdowns

    5. Needs preventive maintenance

    6.

    Require large capital investment

    Disadvantages of Product Layout

  • 7/28/2019 OM2.1plant Location and Lyt

    25/66

    1 2 3 4

    5

    6

    78910

    In

    Out

    Workers

    A U-Shaped Production Line

    P l t

  • 7/28/2019 OM2.1plant Location and Lyt

    26/66

    Process layout-

    Layout that can handle varied processing

    requirements Here all machines performing similar type of

    operations are grouped together at one locationin the process layout. Thus here facilities aregrouped together acc. To their functions. E.g. alldrilling machines are located at one place knownas drilling section.

  • 7/28/2019 OM2.1plant Location and Lyt

    27/66

    Dept. A

    Dept. B Dept. D

    Dept. C

    Dept. F

    Dept. E

    Used for Intermittent processing

    Job Shop or Batch

    Process Layout(functional)

    Process Layout

  • 7/28/2019 OM2.1plant Location and Lyt

    28/66

    Work

    Station 1

    Work

    Station 2

    Work

    Station 3

    Product Layout(sequential)

    Used for Repetitive Processing

    Repetitive or Continuous

    Product Layout

    Ad t f P L t

  • 7/28/2019 OM2.1plant Location and Lyt

    29/66

    1. Can handle a variety of processing

    requirements2. Machines breakdown doesnt result in

    shutdown.

    3. Equipment used is less costly4. Wide flexibility in production facilities.

    5. Each production unit of system works

    independently.6. High utilization of facilities

    7. Variety makes the job interesting.

    Advantages of Process Layouts

  • 7/28/2019 OM2.1plant Location and Lyt

    30/66

    1. In-process inventory costs can behigh

    2. Challenging routing and scheduling

    3. Equipment utilization rates are low4. Material handling is slow and

    inefficient & is more.

    5. More space is required6. Longer processing time

    7. Back tracking may occur.

    Disadvantages of Process Layouts

    omparison o pro uct & process ayout

  • 7/28/2019 OM2.1plant Location and Lyt

    31/66

    omparison o pro uct & process ayoutfactors Product layout Process layout1. nature Sequence of facilities Similar aregp2gether

    2. Machines utilization Not to full capacity Better utilization

    3. product standardized diversified4. Processing time less more

    5. Material handling less more6. inventory High WIP Low WIP7. breakdown Cant tolerate Can tolerate

    8. Production centre simple complex9.flexibilty low high10. floor space Requires less more

    11. investment high low

    Stationary layout Layout in which the

  • 7/28/2019 OM2.1plant Location and Lyt

    32/66

    Stationary layout- Layout in which theproduct or project remains stationary, andworkers, materials, and equipment are moved

    as needed. E.g. construction of DAMS.The product, because of its size and/orweight, remains in one location and

    processes are brought to it.

    Factors affecting plant layout

  • 7/28/2019 OM2.1plant Location and Lyt

    33/66

    Factors affecting plant layout1. Nature of product- e.g. some products need air-

    conditioned plants.2. Size of output- For bulk-product/line layout For small-functional layout3. Nature of manufacturing system-

    For intermittent-functional layout For continuous-product/line layout4. Localization of plant- e.g. there will be different

    transportation arrangement if site is located nearrailway line.

    5. Machines or equipment- e.g. heavy machines needstationary layout

    6. Climatic conditions, need of light, temperaturealso affect design of layout.

  • 7/28/2019 OM2.1plant Location and Lyt

    34/66

    THANK U

    CRAFT: COMPUTER PROGRAM TO SOLVE PROCESS

  • 7/28/2019 OM2.1plant Location and Lyt

    35/66

    CRAFT: COMPUTER PROGRAM TO SOLVE PROCESSLAYOUT PROBLEMS

    CRAFT- Computerized Relative Allocation of Facilities Technique

    A CRAFT program basically has the followingelements:

    1. It reads the load summary (the number of loadscarried between pairs of departments), the costs

    per unit load per unit distance for the handling ofmaterials between various pairs of departments.

    2. It computes the centres of the departments and

    computes the various inter-departmentaldistances.

    3. On the basis of the above it computes the totalmaterial handling costs per unit period for the

    layout.

    4 It makes paired and/or three-way exchanges

  • 7/28/2019 OM2.1plant Location and Lyt

    36/66

    4. It makes paired and/or three-way exchangesbetween the different departmental locations soas to produce a valid and improved layout pattern.

    The improvement is in terms of reducing the totalmaterial handling costs.

    5. The computer prints out the scaled layout patternand the corresponding cost.

    The ultimate aim of the CRAFT program is tominimize the material handling costs for theentire plant.

  • 7/28/2019 OM2.1plant Location and Lyt

    37/66

    Capacity Planning

    Capacity is the upper limit or ceiling onthe load that an operating unit can handle.

    The basic questions in capacity handling

    are:What kind of capacity is needed?

    How much is needed?

    When is it needed?

  • 7/28/2019 OM2.1plant Location and Lyt

    38/66

    Types of Capacity

    Design capacitymaximum output rate or service capacity anoperation, process, or facility is designed for

    Effective capacityDesign capacity minus allowances such as personal

    time, maintenance, and scrap

    Actual outputrate of output actually achieved--cannot

    exceed effective capacity.

  • 7/28/2019 OM2.1plant Location and Lyt

    39/66

    Efficiency and Utilization

    Actual outputEfficiency =Effective capacity

    Actual outputUtilization =

    Design capacity

    Both measures expressed as percentages

  • 7/28/2019 OM2.1plant Location and Lyt

    40/66

    Actual output = 36 units/dayEfficiency = = 90%

    Effective capacity 40 units/ day

    Utilization = Actual output = 36 units/day= 72%

    Design capacity 50 units/day

    Efficiency/Utilization Example

    Design capacity = 50 trucks/dayEffective capacity = 40 trucks/day

    Actual output = 36 units/day

  • 7/28/2019 OM2.1plant Location and Lyt

    41/66

    Objectives of capacity planning

    1. To satisfy the future demand ofproducts without any shortage2. To find the optimal capacity of the

    facility so that the sum of costs of

    under-capacity & over- capacity is theminimum.

    3. To keep the initial investment in the

    facility as low as possible to achievelower break-even volume4. Investment in facility capacity are

    long-term & cant be reversed easily.

    D d R l

  • 7/28/2019 OM2.1plant Location and Lyt

    42/66

    Variations in Demand Relative to Capacity

    Determinants of Effective

  • 7/28/2019 OM2.1plant Location and Lyt

    43/66

    Determinants of EffectiveCapacity

    FacilitiesProduct and service factorsProcess factors

    Human factorsOperational factorsSupply chain factors

    External factors

  • 7/28/2019 OM2.1plant Location and Lyt

    44/66

    Steps for Capacity Planning

    1. Estimate future capacity requirements2. Evaluate existing capacity

    3. Identify alternatives

    4. Conduct financial analysis5. Assess key qualitative issues

    6. Select one alternative

    7. Implement alternative chosen8. Monitor results

    Strategies for Shifting Demand

  • 7/28/2019 OM2.1plant Location and Lyt

    45/66

    Strategies for Shifting Demandto Match Capacity

    Use signage to communicatebusy days and times

    Offer incentives tocustomers for usage duringnon-peak times

    Take care of loyal orregular customers first

    Advertise peak usage timesand benefits of non-peakuse

    Charge full price for theservice--no discounts

    Use sales and advertising to

    increase business from current

    market segments Modify the service offering to

    appeal to new market

    segments

    Offer discounts or pricereductions

    Modify hours of operation

    Bring the service to the

    customer

    Demand Too High Demand Too LowShift Demand

    Strategies for Flexing Capacity

  • 7/28/2019 OM2.1plant Location and Lyt

    46/66

    Strategies for Flexing apacityto Match Demand

    Stretch time, labor,facilities and equipment

    Cross-train employees

    Hire part-timeemployees Request overtime work

    from employees

    Rent or share facilities Rent or share equipment Subcontract or

    outsource activities

    Perform maintenance

    renovations

    Schedule vacations

    Schedule employee training

    Lay off employees

    Demand Too High Demand Too LowFlex Capacity

  • 7/28/2019 OM2.1plant Location and Lyt

    47/66

    Production planning & control

    Production planning implies formulation,co-ordination & determination ofactivities in a manufacturing systemnecessary for the accomplishment ofdesired objectives

    Production control is the process ofmaintaining a balance between variousactivities evolves during productionplanning providing most effective &efficient utilization of resources.

    Objectives of PPC

  • 7/28/2019 OM2.1plant Location and Lyt

    48/66

    Objectives of PPC

    1. Determining the nature & magnitude of

    various input factors to manufacturedesired output.2. To co-ordinate labor, machines in the most

    economic manner3. Setting targets & checking these against

    performance.4. Ensuring smooth flow of material by

    eliminating bottlenecks if any5. Utilization of under employed resources6. To produce desired output of right quality

    & quantity at right time.

    Importance of time horizon

  • 7/28/2019 OM2.1plant Location and Lyt

    49/66

    Importance of time horizonDepending on the time horizon, the plan is of 3 types- Long-term Planning: Strategic Planning normally more

    than an years time. Medium-term Planning: Aggregate Planning up to an

    years time.

    Short-term Planning: Routine Planning monthly/weekly.

    Dovetailing (fit together) of Plans-Shorter-range plans are always made within the framework of

    the longer-range plans. Production planning as it isgenerally understood, is really the intermediate-range and

    short-range plan. That is why. production planning is saidto follow from the marketing plan. The production plan isthe translation of the market demands into productionorders. The market demands have to be matched with the

    production capacities

    N d f D t il d Pl

  • 7/28/2019 OM2.1plant Location and Lyt

    50/66

    Need for Detailed Plans-

    At a gross level, one must balance the gross demandinto gross level availability of resources in machine-hours or man-hours, etc. At the detailed level oneneeds to balance the requirements of individual

    products with the availability of individualmachines/equipments and labor of different skillcategories.

    Centralization & decentralization-

    concentrate of authority (esp. administration) at asingle centre & transfer (power etc.) from central tolocal authority.

    AGGREGATE PLANNING DEFINED

  • 7/28/2019 OM2.1plant Location and Lyt

    51/66

    AGGREGATE PLANNING DEFINED Aggregate Planning may be defined as

    IntermediatePlanning which is normally done

    for a period of up to one years time. Theword Aggregate symbolizes that the planningis done at the broadest level.

    AGGREGATE PLANNING PROCESS1. Sales forecast for each product: the

    quantities to be sold in each time period(weeks, months, or quarters) over theplanning horizon (6 -18 months)

    2. Total all the individual product or serviceforecasts into one aggregate demand

  • 7/28/2019 OM2.1plant Location and Lyt

    52/66

    3. Transform the aggregate demand for each time periodinto production resource requirements (workers,materials, machines, etc.)

    4. Develop alternative resource plans to support thecumulative aggregate demand and compute the cost foreach.

    5. Select the best alternative which satisfies aggregatedemand and best meets the organizations objectives

    Goals for aggregate planning-there are number of goals to be satisfied

    It has to provide the overall levels of output, inventory and

    backlogs Proper utilization of the plant capacity. The aggregate plan should be consistent with the companys

    goals and policies regarding its employee

    Make sure enough capacity available to satisfy expecteddemand

    Assembly line balancing

  • 7/28/2019 OM2.1plant Location and Lyt

    53/66

    Assembly line balancing

    The sequence of machines & equipments

    arranged to produce the desired product iscalled assembly lines.

    The amount produced by machine depends on

    1. No. of operations performed on machine2. Time required for each operation

    There can be a situation that different

    machines may produce varying amount ofproduct during same period. This propertyis known as unbalanced assembly line

  • 7/28/2019 OM2.1plant Location and Lyt

    54/66

    Example of ALB

    Clearly, assembly line is unbalanced.Alternatively if in system we arrange 3 machines of type A, 4 o

    B & 6 of C, then output/hr. will

    machine

    Operation no. Time required to performoperation/unit

    Units processed by machine in1 hr.

    A 1 15 min. 60/15=4 units

    B 2 20 min. 60/20=3 units

    C 3 30 min. 60/30=2 units

    machine No. ofmachines Operation no. Time required toperformoperation/unit

    Units processed by machinin 1 hr.

    A 3 1 15 min. 3*60/15=12 units

    B 4 2 20 min. 4*60/20=12 units

    C 6 3 30 min. 6*60/30=12 units

    Such type of arrangement is called balanced

  • 7/28/2019 OM2.1plant Location and Lyt

    55/66

    assembly/production line.

    To balance the production line by increasing the machines maynot be in the interest of organization due to increased

    capital investment.So another method is to increase the working hours for

    machines. E.g.

    machine Operation no. Timerequiredto performoperation/unit

    Time requiredfor eachmachine shift

    Units processed by machine in1 hr.

    A 1 15 min. 1 hr. 60/15=4 units

    B 2 20 min. 1hr. 20 min. 80/20=4 units

    C 3 30 min. 2 hrs 120/30=4 units

    P d l d

  • 7/28/2019 OM2.1plant Location and Lyt

    56/66

    Production planning procedures

    It can be divided in 3 parts-1. Routing

    2. Scheduling

    3. LoadingRouting-

    It means determination of path or route

    over which each piece is to travel inbeing transformed from raw-materialinto finished product.

    In general routing consists of seven decisions

  • 7/28/2019 OM2.1plant Location and Lyt

    57/66

    In general routing consists of seven decisions,namely

    1. Whether to make/buy2. The form & shape of material

    3. Division of work to be done into operations

    4. The choice of machines on which eachoperation should be done.

    5. The sequence in which operations are to be

    performed6. The division of operations into work

    elements

    7. The choice of special tooling.

    Advantages of routing

  • 7/28/2019 OM2.1plant Location and Lyt

    58/66

    g g

    1. Efficient use of resources

    2.

    Reduction in manufacturing costs3. Improvement in quantity & quality of output

    4. Provides a basis for scheduling & loading.

    Scheduling- it means1. A description of when & where each

    operation is to be executed.

    2. Establishment of timetable at which tobegin/ complete each operation.

    Objectives of scheduling-

  • 7/28/2019 OM2.1plant Location and Lyt

    59/66

    j g1. Items are delivered on due date2. Production cost is minimum3. To minimize idle time of machines4. To prevent unbalanced allocation of time

    among various departments

    Types of schedules-1. Operations schedule- determine total time

    required to do a piece of work with given

    machine2. Master schedule- is a list showing how

    many of each item to make in each periodof time in future.

    S h d li d i

  • 7/28/2019 OM2.1plant Location and Lyt

    60/66

    Scheduling devices

    1. Gantt charts- portrays plannedproduction & actual performance overa period of time. It is a rectangularchart divided by horizontal & verticallines.

    2. PERT & CPM method- job is firstbroken in basic elements & network is

    constructed which is then analyzed toprepare schedule.

    3. The Run Out approach

    P d ti it

  • 7/28/2019 OM2.1plant Location and Lyt

    61/66

    Productivity

    ProductivityA measure of the effective use of

    resources, usually expressed as the ratio ofoutput to input

    Productivity =Outputs

    Inputs

    All Productivity measures

  • 7/28/2019 OM2.1plant Location and Lyt

    62/66

    y m Productivity = Number of units of output

    Number of persons employed to produce that output

    Productivity= no. of units producedno. of man-hours worked

    Productivity= output at standard price

    Amount of wages paid in order to produce that output

    Capital productivity = Value Added

    Capital employed

    Capital Productivity= Total sales in Rupees

    Depreciation of capital assets

    MULTI FACTOR PRODUCTIVITY = Production at standard price

    Labor + materials + overhead + k (capital invested)

    where, labor, materials overhead and capital constitute all the input factors

    Methods to increase productivity

  • 7/28/2019 OM2.1plant Location and Lyt

    63/66

    p y1. By increasing output, keeping input constant2. By decreasing inputs for same output

    3. By Better utilization of resources4. By using efficient & effective methods of working5. By using good layouts6. By reducing material handling

    7. By selecting new technology8. By proper maintenance9. By good working conditions to workers10. By good incentive schemes

    11. By better quality of purchase12. By Training to employees13. Be customer oriented.14. Assign right people for right jobs.

    15. Keep things simple

    Difference between efficiency &

  • 7/28/2019 OM2.1plant Location and Lyt

    64/66

    yeffectiveness-

    factors efficiency effectiveness

    Objective: To produce quantity andquality

    To enhance the value tothe customer and,therefore, to thesociety.

    Goal: To improve the process

    and/or the product

    To determine the right

    direction for theorganization and thevalue that needs lo begenerated.

    Questions:Howto perform a task

    (whether in production,marketing or any other

    area)

    Whyto perform

    something and, so. whatto perform.

    Satisfaction

    Measure:

    Is everything runningwell?"

    -Are we aiming right?"

    BUSINESS PROCESS REENGINEERING-B P b

  • 7/28/2019 OM2.1plant Location and Lyt

    65/66

    Business Process Reengineering is about revamping oroverhauling the existing processes and redesigning themfrom a clean slate, in order to achieve significant

    improvements in critical measures of performance.Benchmarking-

    1. Internal

    2. Competitive

    3. Functional

    4. generic

    TATA BUSINESS EXCELLENCE MODEL

  • 7/28/2019 OM2.1plant Location and Lyt

    66/66

    The TBEM criteria for performance excellence are built upona set of core values and concepts that are embodied inseven categories:

    1. Leadership

    2. Strategic Planning

    3. Customer and Market Focus4. Measurement Analysis and Knowledge Management

    5. Human Resource Focus

    6. Process Management

    7. Business Results