    22 .0 O&M ISSUES

    Contents:

    .

    22.3 ISSUES TO BE TAKEN UP WITH CORPORATE CENTRE DEPARTMENTS

    22.1 O&M ISSUES

    Area S.No.

    Brief description of the

    problem

    Problem

    Initiated on

    (Month/year)

    22.1 Boiler &

    Aux.1

    Re heater Tube Problem in

    Stage-I

    22.2 Turbine &

    Aux.1

    Availability of Spare HP

    Module after refurbishmentSept.'2008

    22.3 Electrical

    22.5 BOP

    22.6 Fuel

    Management

    22.1 O&M ISSUES

  • 7/27/2019 o&m & Other Issues

    2/67

    22.7 Others 1

    Ash Dyke Stage-II (Umaran) --

    - Ash Dyke inner wall erosion

    all around the dyke.

    22.2 CRITICAL ISSUES-STATION RELATED (OTHER THAN O&M ISSUES)

    Area S.N

    Brief description of the

    problem

    Problem

    Initiated on

    (Month/year)

    ---- NIL----

    22.3 ISSUES TO BE TAKEN UP WITH CORPORATE CENTRE DEPARTMENTS

    Area S.N

    Brief description of the

    problem

    Problem

    Initiated on

    (Month/year)

  • 7/27/2019 o&m & Other Issues

    3/67

    Boiler (Unit-I) 1 Re heater Tube Problem in Stage-I Jan-08

  • 7/27/2019 o&m & Other Issues

    4/67

  • 7/27/2019 o&m & Other Issues

    5/67

    Action Plan

    Responsibi

    lity

    Target

    Date Present statusase upon s u y n

    U#2, 59 Nos. coils of re-

    heater and 13 Nos. coils in

    super heater are to bereplaced. All 59nos. RH coil

    recvd. 13 no. SH coils

    recived at site. For Unit-1 it

    will be done as per CC-OS

    DGM (BMD), Nov.06 O/H

    Exploring the parties for

    following works :

    Both Casing & Rotor needs

    refining for improvement of

    efficiency. Repair of HPinner casing at I-seal area

    & exposed tenons also to

    be carried out.

    DGM (TMD) --

    Completed in unit-2 in O

    recommended for Rear

    Proposal for material pr

    CC OS cleared & sent t

    CEA clearance.10 nos

    nos indent raised for wh

    obtained from CA under

    process.

    Module is to be sent t

    assessing of scope of

  • 7/27/2019 o&m & Other Issues

    6/67

    Consultant ( Dr.Gandhi)

    from IIT, Chennai has given

    the recommendation to site.

    40% work of Phase-I hasbeen completed. Balance

    work in

    progress.Completion by

    Nov'06. Informed by site,

    for long term measures

    Engg CC shall be visit site

    to give input for further

    course of action.

    DGM(Civil),DGM(

    C&M)Sept'09

    Action Plan

    Responsibi

    lity

    Target

    Date Present status

    Action Plan

    Responsibi

    lity (CC DEPT)

    Target

    Date Present status

    Engg visited site in Oct'

    on 19-20 Feb'07. Recomeasures given to site f

    taken action for implem

    consulted IIT Kanpur. II

    08.05.07 for remedial m

    cavity filling work compl

    in progress. Comp by S

  • 7/27/2019 o&m & Other Issues

    7/67

  • 7/27/2019 o&m & Other Issues

    8/67

  • 7/27/2019 o&m & Other Issues

    9/67

    /H in Jun'07. For Unit 1 CC

    oil with improved material.

    curement sent to CC-OS.

    R&M Engg,CC for their

    H coil PO placed & rest 49

    ich approval has been

    R&M. Procurement under

    o M/s BHEL BHOPAL for

    ork for repair. ( PR Raised)

  • 7/27/2019 o&m & Other Issues

    10/67

    6, Committee visited site

    medations for remedialr implementation. Site has

    ntation. Station has also

    professor visited site on

    asure. Boulder placing,

    ted.Peripherial drain work

    p'09

  • 7/27/2019 o&m & Other Issues

    11/67

  • 7/27/2019 o&m & Other Issues

    12/67

    15.0 FINANCIAL PARAMETERS

    Contents:15.6 STATUS OF MOU PARAMETERS

    15.7 REPAIR & MAINTENANCE COST15.8 FINANCIAL RATIOS (MOU)

    15.9 DISCUSSION :

    15.6 STATUS OF MOU PARAMETERS

    MOU Parameter

    Excellent

    Target

    Very Good

    Target

    Pro-rata

    Target Actual

    O&M Cost17499 15749.1 7092 6286

    Renovation &

    Modernisation Cost(Crores)

    19.15 17.235 -- 180.61 Lacs

    15.7 REPAIR & MAINTENANCE COST

    Approved

    R&M Budget for the

    year

    Pro rata

    Budget till

    date

    Actual

    utilization

    till date

    Reason for

    increase

    or large

    shortfall, if any

    Proposed

    corrective

    action

    4955 1468 1687 --- ---

    S.NO

    A

    B

    C

    D Percentage of variable cost actually incurred / Energy ch

    Percentage of cost of overhaul/ Total cost of routine & ov

    RATIO

    Percentage of cost of spares/ Total cost of routine maint

    Percentage of cost of spares/ Total cost of overhaul

    http://localhost/var/www/apps/conversion/tmp/scratch_4/O&M%20%20&%20OTHER%20ISSUES.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_4/O&M%20%20&%20OTHER%20ISSUES.xls
  • 7/27/2019 o&m & Other Issues

    13/67

    15.9 DISCUSSION :

    Detailed disc uss ion on Repair & Maintenance Cost & Other Financial Parameters to

  • 7/27/2019 o&m & Other Issues

    14/67

    Deviation from

    Excellent

    -806

    180.61 Lacs

    Ratio of OH cost

    to Routine maint.

    cost

    Ratio of cost of

    spares to cost of

    contracts for OH

    Ratio of cost of

    spares to

    cost of contracts

    for routine maint.

    0.48 2.52 2.95

    MOU TARGET

    ACTUAL

    (FY CUMULATIVE)

    70% 74.67

    70% 71.56

    50% 32.35

    93% 96.85

    1. Routine

    on spares

    Expenses(

    NTPC L

    Comparis

    rges from tariff

    erhaul maintenance

    4. Variable

    Charges)

    3. Expense

    overhaul(s

    maintenan

    2. Overhau

    / Total over

    Contract)

    Recovery Plan

    ---

    ---

    nance

  • 7/27/2019 o&m & Other Issues

    15/67

    be done in ORT Meeting.

  • 7/27/2019 o&m & Other Issues

    16/67

    MOU

    SegmentRs(Lac) Ratio

    Segment

    Spares 873 Spares

    Contract 296 Contract

    Total 1169 Total

    Spares 400 Spares

    Contract 159 Contract

    Total 559 Total

    OH Exp 559 OH Exp

    Total (1+2) 1728 Total (1+2)

    Cost53813

    Cost

    Revenue55566

    Revenue

    71.56

    Current month

    Maintenance Expenses incurred

    / Total routine maintenance

    pares +Contract)

    74.67

    D: UNCHAHAR

    n of Monthly Ratios vis--vis of MOU (2007-08)

    Description of Ratio

    74.67

    Current

    Month

    cost / variable Revenue(Energy

    s incurred on

    ares+contract) / Total

    e Expenses (Routine+OH)

    ling Expenses incurred on spares

    hauling Expenses .(Spares +

    96.8596.85

    71.56

    32.35

    32.35

  • 7/27/2019 o&m & Other Issues

    17/67

  • 7/27/2019 o&m & Other Issues

    18/67

    Rs(Lac) Ratio Segment Rs(Lac) Ratio Segment Rs(Lac) Ratio Segment

    136.64 Spares 243 Spares 293 Spares

    57.23 Contract 101 Contract 136 Contract

    193.87 Total 344 Total 429 Total

    650.00 Spares 359 Spares 400 Spares

    300.00 Contract 150 Contract 159 Contract

    950.00 Total 509 Total 559 Total

    950.00 OH Exp 509 OH Exp 559 OH Exp

    1143.87 Total (1+2) 853 Total (1+2) 988 Total (1+2)

    7034.64Cost 21547 Cost 31902 Cost

    7711.05Revenue 23637 Revenue 33825 Revenue

    94.31

    June'09

    68.22

    71.58

    56.60

    May'09

    70.58

    91.23

    83.05

    70.56

    59.70

    91.16

    68.42

    Apr-08

    70.48

  • 7/27/2019 o&m & Other Issues

    19/67

  • 7/27/2019 o&m & Other Issues

    20/67

    Rs(Lac) Ratio Segment Rs(Lac) Ratio

    589 Spares 873

    225 Contract 296

    813 Total 1169

    400 Spares 400

    159 Contract 159

    559 Total 559

    559 OH Exp 559

    1372 Total (1+2) 1728

    32836 Cost 53813

    34025 Revenue 55566

    96.85

    Aug'2009

    74.67

    71.56

    32.35

    96.50

    July'09

    72.35

    71.56

    40.73

  • 7/27/2019 o&m & Other Issues

    21/67

    23.0 R&M ISSUES

    Contents:

    23.1 IDENTIFICATION OF R&M NEEDS:

    A. EQUIPMENTS WHICH ARE CONSTRAINTS IN ACHIEVING THE TARGETEB. EQUIPMENTS / SYSTEMS WHOSE PERFORMANCE IS BECOMING A CO

    C. WEAK AREAS / SYSTEMS WHICH ARE LIKELY TO CAUSE PROBLEM BA

    D. ITEMS / SYSTEMS WHICH ARE OBSOLETE / NEARING OBSOLESCENCE

    23.2 STATUS OF R&M WORKS OF STATION

    23.1 IDENTIFICATION OF R&M NEEDS:

    A. EQUIPMENTS WHICH ARE CONSTRAINTS IN ACHIEVING THE TARGETE

    (Based on last 3 years performance):

    S. No. Name of Equipment

    Generation

    ux. power

    cons. Sp. oil cons.

    1Condensor Tubes Y

    2Reheater coils Y

    3Expansion bellows Y

    B. EQUIPMENTS / SYSTEMS WHOSE PERFORMANCE IS BECOMING A COSAFETY NORMS:

    Desired Present Shortfall

    1

    Flue gas analyser Required as per

    statutory norms

    Made

    available

    Reqd. as

    per

    2Elevator in Primary

    crusher house

    Mandatory for high

    rise buildin s

    Made

    available

    Safety

    as ect

    3BAH gates Hydraulic Manual Safety

    as ect

    C. WEAK AREAS / SYSTEMS WHICH ARE LIKELY TO CAUSE PROBLEM BA

    S. No. Area / System Predicted performance deficiency

    1

    Air Circuit Breakers ( CHP

    )

    Effect of performance shortfall on

    S. No.

    Name of Equipment /

    System

    Performance level

    Frequent breakdown Existing Brea

    lived its life o

    Re

  • 7/27/2019 o&m & Other Issues

    22/67

    2

    ID/FD Blade Pitch

    Actuators

    Frequent Failures leading to Gen. Loss

    3

    Disturbance recorder

    4

    HPT/IPT Turb. Fasteners

    D. ITEMS / SYSTEMS WHICH ARE OBSOLETE / NEARING OBSOLESCENCE

    S. No. Item / System

    Details of

    obsolescence

    1Burners Existing split type

    burners are obsolete

    2Rails & crossing 90 lbs. Rails are non-

    standard and their

    3 6.6KV MOCB'S No more in OEM'smanf. ran e and

    4AVRof static excitation

    system

    Spares not aaavilable

    with OEM, the

    5SWAS Panel Outlived its life &

    spares not available.

    23.2 STATUS OF R&M WORKS OF STATION

    S.N Description

    1

    Total no. of schemes

    approved

    2 Date of approval

    3 Total approved cost

    4 RE for Financial Year

    5 Amount Spent till date

    6

    Cumulative amount

    spent till date

    7

    .

    to be completed in FY

    8

    o. o sc emes

    completed in FY

    9

    Cumulative no. of

    schemes completed

    10

    Action plan for

    meeting shortfall

    Outlived its O

    13-15 years

    Analysis to establish exact reason of

    fault becomes difficult.

    Made availabl

    Composite fish-plate joints p

    failures More maintenance o

    Frequent outages of Breakers

    Standby channel is manual, P

    non-adoptive type inadequate

    Non availability of samples d

    leakages of Primary & secon

    Avoidance of catastrophic failure of

    fasteners due to fatigue &creep

    Mandatory as

    exceeding Ope

    Effect on Unit / Eqpt. Pe

    Poor & unreliable combustio

    Furnace stability

    738.15 lacs

    180.61 Lacs

    5512.35 Lacs

    12

    Status

    36

    12.08.05

    8535.66 lacs

    1

    14

  • 7/27/2019 o&m & Other Issues

    23/67

    S.No Pkg. No

    RE 09-10 ( In

    Lacs )

    Actual Budget

    Utz.till Aug '09

    1 R2 26.0

    2 R4 14.0

    3 R5 330.0 53.08

    4 R8 13.9

    5 R10 110.8

    6 R11 75.0 13.47

    7 R17 27.0

    8 R18 6.0

    9 R21 60.0

    10 R22 150.0 30.2

    11 R23 41.0

    12 R24 80.070.65

    13 R27 6.0

    14 R30 25.0

    15 R31 35.0

    16 R32 26.5

    17 R34 42.013.21

    Total 1068.2 180.61

    Instalation of guillotine gates before millsns a a on o y rau ca y oper e o om as

    hopper gates

    Description

    Modernisation of DAS SER,ACS

    Renovation of CHP Logic System

    Replacement of HPT/ IPT Turbine Fasteners

    Replacement of HP Heater no.5

    Renovation of 6.6KV MOCB'S

    Renovation of 11 KV main sub station switchgear

    Renovation of ID/FD/PA Fan blade IGV Actuators

    Renovation of fire fighting system

    Renovation of chlorination System

    Separate 220 V DC package for CHP

    Replacement of Air circuit breakers Coal coveyor

    Motors

    Replacement of reheater coils of unit No.I

    Control of Fugitive dust at Arkha Ash dyke

    Replacement of 4 nos. IAC & 3 nos PAC of

    compressed Air System along with Air Drier.

    Renovation of regulation (AVR) panel of static

    excitation system

  • 7/27/2019 o&m & Other Issues

    24/67

    PERFORMANCE PARAMETERSSTRAINT IN MEETING STATUTORY /

    SED ON OPERATORS GUT FEELINGS:

    :

    PERFORMANCE PARAMETERS

    Heat rate

    Y Replacement of condenser tubes

    Replacement of re-heater of unit No. 2

    Y Replacement of existing metallic expansionbellows by fabric bellows

    STRAINT IN MEETING STATUTORY /

    SED ON OPERATORS GUT FEELINGS:

    Proposed R&M Intervention

    Replacement of air circuit breakers of coal

    conveyors motors by vacuum contactors.

    Proposed R&M Intervention

    Proposed R&M Intervention

    ers has out

    20,000

    Provision of flue gas analyzer system

    Provisions for elevator primary crusher house stage-I

    Installation of hydraulically operated bottom ash

    ho er ates

    son

  • 7/27/2019 o&m & Other Issues

    25/67

    Replaement of ID/Fd Blade Pitch Actuators

    in Unit 1& 2

    Disturbance recorder for Unit-!&II

    Replacement of HPT & IPT turbine

    fasteners

    :

    Proposed R&M Intervention

    Replacement of obsolete burners by wide

    angle burners including burner tilt

    Converting 90lbs points and crossing into

    52Kg points & crossing

    Renovation of 6.6KV MOCB'S

    Renovation of regulation (AVR) panel of

    static excitation system

    Replacement of SWAS,

    erating life of

    e

    rone to

    tracks

    SS single input

    to meet

    e to frequent

    ary coolers

    per OEM after

    rating life of 1

    formance

    jeopardizing

  • 7/27/2019 o&m & Other Issues

    26/67

    Remarks

    Material received for Unit-2. Instt. in unit O/H

    Material received for Unit-2. Instt. in unit O/H

    Material received for Unit-2. Instt. in unit O/H

    E&C work in progress.

    Material received for Unit-2. Instt. in unit O/H

    Material received for Unit-2. Instt. in unit O/H

    Material received for Unit-2. Instt. in unit O/H

    LOA placed. Material is being expedited

    Material received for Unit-2. Instt. in unit O/H

    LOI placed to M/s Lloyd Insulations

    NIT Placed . BOD on 16.10.09

    LOA placed. Battery & Battery chargers recieved . DCDB

    under despatch .

    Proposal initiated. NIT to be placed by 15.09.09

    PO Placed on 14.08.09. material is being expedited

    Proposal initiated. BOD on 26.09.09

    NIT placed . Bid to be opened .

    Material received for Unit-2. Instt. in unit O/H

  • 7/27/2019 o&m & Other Issues

    27/67

    23.0 R&M ISSUES

    Contents:

    23.3 DEPARTMENT WISE REPAIR & MAINTENANCE EXPENDITURE

    AREA MATL. JOB TOTAL MATL. JOB TOTAL

    BOILER 0 0

    a) Routine 0 0

    b) Overhaul 0 0TURBINE 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    CW/CT 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    DM & Clarified Water 0 0

    a) Routine 0 0

    b) Overhaul 0 0CHP(MECH.) 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    CHP(ELEC.) 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    ELECTRICAL 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    C&I 0 0a) Routine 0 0

    b) Overhaul 0 0

    GEN.PLANT 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    SUB TOTAL (1) 0 0 0 0

    23.3 DEPARTMENT WISE REPAIR & MAINTENANCE EXPEN

    MOU 2008-09 Apr-08

  • 7/27/2019 o&m & Other Issues

    28/67

    a) Routine 0 0

    b) Overhaul 0 0

    MGR 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    PLANT CIVIL 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    TOWNSHIP 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    OTHERS(EDP,SIMU,ETC) 0 0

    a) Routine 0 0

    b) Overhaul 0 0

    SUB TOTAL (2) 0 0 0 0a) Routine 0 0

    b) Overhaul 0 0

    TOTAL (1+2) 0 0 0 0

  • 7/27/2019 o&m & Other Issues

    29/67

    AND PROJECTED EXPENDITURE

    MATL. JOB TOTAL MATL. JOB TOTAL MATL. JOB TOTAL

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0 0 0 0 0 0 0

    DITURE AND PROJECTED EXPENDITURE

    May-08 Jun-08 Jul-08

  • 7/27/2019 o&m & Other Issues

    30/67

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0 0 0 0 0 0 00 0 0

    0 0 0

    0 0 0 0 0 0 0 0 0

  • 7/27/2019 o&m & Other Issues

    31/67

    MATL. JOB TOTAL MATL. JOB TOTAL MATL. JOB TOTAL

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0 0 0 0 0

    Aug-08 Sep-08 Oct-08

  • 7/27/2019 o&m & Other Issues

    32/67

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0 0 0 0 0 0 00 0 0

    0 0 0

    0 0 0 0 0 0 0

  • 7/27/2019 o&m & Other Issues

    33/67

    MATL. JOB TOTAL MATL. JOB TOTAL MATL. JOB TOTAL

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 00 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0 0 0 0 0 0 0

    Dec-08 Jan-09Nov-08

  • 7/27/2019 o&m & Other Issues

    34/67

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0

    0 0 0 0 0 0 0 0 00 0 0

    0 0 0

    0 0 0 0 0 0 0 0 0

  • 7/27/2019 o&m & Other Issues

    35/67

    MATL. JOB TOTAL MATL. JOB TOTAL MATL. JOB

    0 0 0 0

    0 0

    0 00 0 0 0

    0 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 0

    0 0

    0 00 0 0 0

    0 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 00 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 0 0 0 0 0

    Feb-09 Mar-09CUMULATIVE TAR

    CURRENT MO

  • 7/27/2019 o&m & Other Issues

    36/67

    0 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 0

    0 0

    0 0

    0 0 0 0 0 0 0 00 0

    0 0

    0 0 0 0 0 0 0 0

  • 7/27/2019 o&m & Other Issues

    37/67

    TOTAL MATL. JOB TOTAL MATL. JOB TOTAL MATL. JOB

    g h I j k l m n

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    ET UPTO

    NTH

    ACTUALS UPTO CURRENT

    MONTH

    BALANCE ( MOU-

    ACTUAL)VARIANC

  • 7/27/2019 o&m & Other Issues

    38/67

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

    0 0 0 0 0 0 0

  • 7/27/2019 o&m & Other Issues

    39/67

    TOTAL

    o

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    Reasons for Deviation

  • 7/27/2019 o&m & Other Issues

    40/67

    0

    0

    0

    0

    0

    0

  • 7/27/2019 o&m & Other Issues

    41/67

    24.0 MISCELLANEOUS CONTENTS

    Contents:

    24.1 TQM STATUS

    24.2 INVENTORY STATUS

    24 .3 SOFTWARE

    24.4 ANY ABNORMAL INCIDENT DURING THE MONTH

    24.5 FEEDBACK TO SITE

    24.1 TQM STATUS

    S.No. Project Objective

    Enabling process/processes

    selected

    As per PIP list in the bottom of this sheet

    24.2 INVENTORY STATUS

    Capital

    Spares

    O&M

    Spares

    Non moving

    items

    Inventory

    Head

    Stock

    Opening

    Balance Receipt (month)

    http://localhost/var/www/apps/conversion/tmp/COVER%20PAGE%20&%20CONTENTS.xlshttp://localhost/var/www/apps/conversion/tmp/COVER%20PAGE%20&%20CONTENTS.xls
  • 7/27/2019 o&m & Other Issues

    42/67

    24 .3 SOFTWARE

    Application Availability Status Usage, %

    OLIMFAS Not in use

    OPPMS Not in use

    ANURAKSHAN Not in use

    INTRANET 100% 100%

    OTHERS SAP/ERP (100%)

    24.4 ANY ABNORMAL INCIDENT DURING THE MONTH

    S.No Unit/Equipment Incident

    Nil

    24.5 FEEDBACK TO SITE

    S.No

    24.6 STATUS OF CSR BUDGET UTILISATION *

    Description

  • 7/27/2019 o&m & Other Issues

    43/67

    S.

    No

    1 EDUCATION

    1.1 Furniture to village Schools

    (Umran, Unchahar,

    Sawanpur, Gangauli,

    Kandrawan, Kharauli, Kotra

    Bahadurganj, Murarmau,

    Arkha, Delauli)

    1.2 Distn. Of Stationary to

    Village school children

    (Arkha, Kotra Bahadurganj,

    Kaithwal, Kharauli,

    Kandrawan, Unchahar

    Dehat, Raipur, Delauli,

    Mokhra, Madaripur)

    1.3 Distn. Of Tatpatti to village

    schools (Bhawanidinpur,

    Arkha, Raipur, Madaripur,

    Gopalpur, Hatwa, Baherwa,

    Purwara, Gangauli,

    Sawanpur)

    1.4 Inclusive Education for

    PCPs

    1.5 Education Scholarship to

    Meritorious Students

    ACTIVITIES PLANNED ACTIVITIES COMPLETED

  • 7/27/2019 o&m & Other Issues

    44/67

    S. No

    2 HEALTH

    2.1 Organising Rural Health

    Camps in surrounding

    villages

    2.2 Organising Eye Camps

    2.3 Organising Family Planning

    Camps

    3 Infrastructure

    3.1 Boundary Wall, Toilet &

    Approach Road to the

    school Building

    3.2 Construction of Individual

    Toilets (100 Houses)

    4 Drinking Water

    4.1 Drinking Water

    arrangement (Solar

    operated Submersible

    Pumps with Tap Water

    connection as per suitability

    in the area)

    ACTIVITIES PLANNED ACTIVITIES COMPLETED

  • 7/27/2019 o&m & Other Issues

    45/67

    4.2 Construction of WBM Road

    (Connecting Bikai,

    Babhanpur, Purwara &

    Sarai Parsu)

    5 Vocational Training

    5.1 Stitching Training to Village

    women/Girls

    5.2 Agro Based Training on

    Horticulture & Floriculture /

    Veterinary Camps

    5.3 Computer Training/Mobile

    Repairing/ ITI Training etc.

    S. No

    6

    6.1

    7

    7.1

    8

    8.1

    Others

    Sports

    Organising Rural Sports Events

    Survey

    Need Assessment Survey (Rs.5 Lacs increased)

    ACTIVITIES PLANNED

  • 7/27/2019 o&m & Other Issues

    46/67

    8.2

    8.3

    8.4

    9

    9.1

    Sl No PIP Description Department

    1 Generation of drawings

    for spares

    MTP

    2 ST-II CLCW Pump providingmech. Seal in place of

    glands.

    TMD

    Impact Assessment Study of the neighboring villages

    * As per the information from Corporate CSR, responsibilty for details o

    GRAND TOTAL

    Regional Village QC Convention, Training & development of

    QC functioning in villages

    SPILL OVER BUDGET

    Adult Education

    Preparation of Sustainability Report

  • 7/27/2019 o&m & Other Issues

    47/67

    3 Reclaiming Soft water from

    Expansion tank ejector.

    TMD

    4 Installation and

    commissioning of

    Integrated Operating

    system for monitoring of

    ESP parameters for Unit

    1-4 ESP

    EMD

    5 Replacement of 220 KV

    CVT of accuracy class

    0.5 with that of 0.2. Total

    no. of CVT 39.

    EMD

    6 Installation and

    commissionig of Stage-2

    & 3 Energy Monitoring

    Package

    EMD

    7 Substential reduction in

    demurrage hours

    FM

    Legend

    Category may be any one o

    A1

    A2

    B

    C

    Impact code may be any o

    1

  • 7/27/2019 o&m & Other Issues

    48/67

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    Station Code may be one o

    11

    1213

    14

    21

    22

    23

    31

    32

    33

    34

    35

    41

    42

    43

    44

    51

    52

    53

    54

    55

    56

    Status may be one of the f

    Remarks column should c

  • 7/27/2019 o&m & Other Issues

    49/67

    System Guidelines

    1 Update status (in the above excel sheet) once a month

    2 On completion of the PIP, prepare a Power Point Prese

    3 Make a presentation in an appropriate forum as advised

  • 7/27/2019 o&m & Other Issues

    50/67

    Project

    sponsor

    Process

    Owner

    Team

    members Present status

    Position (Lakhs)

    Suggested Action

    PlanIssues (month)

    Closing

    Balance

    Diversion to other

    projects

    (Yearly)

    Click to go to Cover

  • 7/27/2019 o&m & Other Issues

    51/67

    Problem, if any Action Plan Responsibility Target date

    Nil

    Corrective action Responsibility

  • 7/27/2019 o&m & Other Issues

    52/67

    ANNUAL

    ALLOCATED

    Pro rata Target

    2.5

    0.75

    0.35 0.35

    1.75 0.4

    0.3 0.3

    BUDGET (Rs Lacs) Actual utilised

    Cumulative (Rs

    Lacs)

    Short fall (If any)

  • 7/27/2019 o&m & Other Issues

    53/67

    1

    2

    4.5

    4

    10

    10

    Short fall (If any)BUDGET (Rs Lacs) Actual utilised

    Cumulative (Rs

    Lacs)

  • 7/27/2019 o&m & Other Issues

    54/67

    12

    0.7 0.1

    0.5

    1.5

    Organising Water Booth 0.1

    1

    10

    ACTIVITIES COMPLETED BUDGET (Rs Lacs)

  • 7/27/2019 o&m & Other Issues

    55/67

    Station

    S

    tationCode

    Ca

    tegorycode

    Impactcode

    Unchahar 13 A1 11

    Unchahar 13 B 2

    5

    f CSR Budget shall be with HOHR of Stattions

    72.15

    1

    0.2

    3

    NTPC-UNCHAHAR

    erformance Improvement Projects (PIP) 09-10

  • 7/27/2019 o&m & Other Issues

    56/67

    Unchahar 13 B 12

    Unchahar 13 C 10

    Unchahar 13 C 15

    Unchahar 13 C 2

    Unchahar 13 A2 11

    f the following four:

    More than 20 LPA saving potential

    Saving potential not provided by the department, but in department's opinion it is a high

    Less than 20 LPA saving as given by the department

    Non financial or difficult to assess

    e of the following:

    HR

  • 7/27/2019 o&m & Other Issues

    57/67

    APC

    Forced outage

    Partial Loading

    Sp. Oil consumption

    Startup time

    Procurement lead time reduction

    Inventory reduction

    Safety

    Environment

    Cost Reduction

    DM Makeup

    Cycle time reduction

    MUDA Reduction

    Misc.

    f the following

    Rihand

    SingrauliUnchahar

    Tanda

    Simhadri

    Ramagundam

    Kayamkulam

    Korba

    Vindhyachal

    Kawas

    Gandhar

    Sipat

    Farakka

    Kahalgaon

    Talchar-K

    Talchar-Th

    Badarpur

    Dadri (coal)

    Dadri (Gas)

    Anta

    Auriya

    Faridabad

    llowing

    CompletedPartially Completed

    Abandoned

    In progress

    ntain the details of progress so far

  • 7/27/2019 o&m & Other Issues

    58/67

    first week) and send it to [email protected].

    tation and send it to [email protected] and [email protected], and obtain further advi

    by BE department.

  • 7/27/2019 o&m & Other Issues

    59/67

  • 7/27/2019 o&m & Other Issues

    60/67

    Target

    date Present Status

  • 7/27/2019 o&m & Other Issues

    61/67

    Tenderin

    g for

    award of

    work

    done in

    August'0

    9.

    Order for

    Purchase

    of Items

    done in

    August'0

    9.

    Work

    Complet

    ed in

    August'0

    9.

    Admissio

    n of

    Students

    done.

    Studies

    continuin

    g at

    SVM,

    NTPC

    UCR.

    Proposal

    under

    process,

    initiated

    on 20th

    Aug'09.

    Work

    Complet

    ed on

    15th

    Aug'09.

    Remarks

  • 7/27/2019 o&m & Other Issues

    62/67

    Arroval

    made. To

    be

    organise

    d from

    Sept'09.

    To be

    organise

    d by

    Project

    Hospital

    in Jan-

    Feb'10.

    To be

    organise

    d by

    Project

    Hospital

    in Jan-

    Feb'10.

    Proposal

    under

    Process.

    Proposal

    under

    process.

    Details of

    estimate

    and

    proposal

    awaited

    from

    NEDA,

    Raebarel

    i. To be

    initiated

    in

    Sept'09.

    Remarks

  • 7/27/2019 o&m & Other Issues

    63/67

    Proposal

    under

    process.

    Stitching

    classes

    started

    from 25th

    Aug'09.

    To be

    organise

    d in

    Nov'09

    and

    Feb'10.Approval

    made. To

    be

    started

    from 20th

    Sept'09.

    Actual

    utilised

    Cumulat

    ive (Rs

    Lacs)

    Short

    fall

    (If any)

    Remarks

    Proposal

    initiated in

    July'09.

    Pending in

    CS.

    To be

    organised inNov'09.

    0.1 0.1 Work

    Completed.

  • 7/27/2019 o&m & Other Issues

    64/67

    0.05 Continuing

    at 02

    villages

    from 25th

    July'09.

    0 Work in

    Progress.To be

    organised in

    Dec'09.

    3.5 2.5 Work in

    Progress.

    (70% work

    completed)

    4.8 2.6

    Year

    Name of

    Coordinat

    or,

    Designati

    on

    & MobileNo.

    Saving

    Potential

    Rs Lac/Yr

    Status Remarks

    09-10 Ravindr

    a Kumar

    Mittal,

    Supdt.(

    MTP),

    Mob:

    094155

    01209

    >25

    lacs/yea

    r

    09-10 SanjayShukla

    Sr Supdt

    (TMD)

    Mob:941

    5501183

  • 7/27/2019 o&m & Other Issues

    65/67

    09-10 Sanjay

    Shukla

    Sr Supdt

    (TMD)

    Mob:941

    5501183