2
WORKING IN NEW DIMENSIONS We are expanding our international team and currently looking for dedicated Design Engineers – Project CEMTEC Cement & Mining Technology GmbH Human Resources Department Mag. Astrid Öllinger • Ennshafenstrasse 40 • 4470 Enns • Austria +43/7223/83620-0 • +43/7223/83620-333 • [email protected] • www.cemtec.at If the following key words sound interesting to you and if you love challenges, you should come and work with us! CEMTEC has its headquarters in Enns, Austria, and offers you a job that never gets boring. You will be able to grow both personally and professionally. We are carrying out projects in the cement, processing and bulk material industries all over the world. As we have many years of experience and lots of product knowledge, we offer our clients outstanding service and excellent support. Our employees are cosmopolitan and passionate specialists for our exceptional products and they love to travel. At CEMTEC, no two days are ever the same. Exciting and challenging tasks are waiting for you, and so are performance-based compensation, great co-workers and an informal working atmosphere. We will advance your career by providing you with an extensive training program. Our growth is your chance. Apply to become a part of CEMTEC. Turnkey gold ore processing plant with a production capacity of 35 tph / Ethiopia Semi-turnkey gold ore grinding plant with a production capacity of 1.300 tph, semi-autogenous mill with 15 MW and ball mill with 18 MW Turnkey cement grinding plant with a production capacity of 135 tph, ball mill (inside Ø: 4.6 m, length: 15 m, drive power: 4.700 KW) / Hands-on Flexibi Variety of tasks Adventurousness Drive power of 18.000 Innovation Huge machines Passion for travelling

old.eng.unideb.huold.eng.unideb.hu/.../2017/06/RZ_Stellenneinschaltung_K…  · Web viewSemi-turnkey gold ore grinding plant with a production capacity of 1.300 tph, semi-autogenous

  • Upload
    dinhnhu

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: old.eng.unideb.huold.eng.unideb.hu/.../2017/06/RZ_Stellenneinschaltung_K…  · Web viewSemi-turnkey gold ore grinding plant with a production capacity of 1.300 tph, semi-autogenous

WORKING IN NEW DIMENSIONS

We are expanding our international team and currently looking for dedicated

Design Engineers – Project Directors (m/f)

CEMTEC Cement & Mining Technology GmbH Human Resources DepartmentMag. Astrid Öllinger • Ennshafenstrasse 40 • 4470 Enns • Austria +43/7223/83620-0 • +43/7223/83620-333 • [email protected] • www.cemtec.at

If the following key words sound interesting to you and if you love challenges, you should come and work with us!

CEMTEC has its headquarters in Enns, Austria, and offers you a job that never gets boring. You will be able to grow both personally and professionally. We are carrying out projects in the cement, processing and bulk material industries all over the world. As we have many years of experience and lots of product knowledge, we offer our clients outstanding service and excellent support. Our employees are cosmopolitan and

passionate specialists for our exceptional products and they love to travel. At CEMTEC, no two days are ever the same. Exciting and challenging tasks are waiting for you, and so are performance-based compensation, great co-workers and an informal working atmosphere. We will advance

your career by providing you with an extensive training program.

Our growth is your chance.Apply to become a part of CEMTEC.

We are looking forward to receiving your application. Please send all your application documents to [email protected].

Due to statutory regulations, we have to state the minimum salary according to the collective bargaining agreement for the metal industry 2016, which is € 1.909,44. However, our company is known for paying its employees more than what is legally required, according to the individual

employee’s experience and qualification.

Turnkey gold ore processing plant with a production capacity of

35 tph / Ethiopia

Semi-turnkey gold ore grinding plant with a production capacity of 1.300 tph, semi-

autogenous mill with 15 MW and ball mill with 18 MW / Russia

Turnkey cement grinding plant with a production capacity of 135 tph, ball mill (inside Ø: 4.6 m, length: 15 m, drive power: 4.700 KW) / Ghana

Hands-on mentality Flexibility

Variety of tasks Adventurousness Drive power of 18.000 KWInnovation

Huge machines Passion for travelling