15
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

  • Upload
    taylor

  • View
    45

  • Download
    0

Embed Size (px)

DESCRIPTION

OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013. Arvada’s TOD Vision. - PowerPoint PPT Presentation

Citation preview

Page 1: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

OLDE TOWN ARVADA TODUpdate to RTD Board

September 3, 2013

Page 2: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Arvada’s TOD Vision

• Dense• Pedestrian Oriented• Mixed Use• Vibrant• Multi modal

• Quality design• Connected• Distinct character• No surface parking• Sustainable

Our team’s development proposal was conceived in response to the Project Vision and Goals contained in the Request for Qualifications. The Vision and Goals appropriately identify the qualities of a new, vibrant urban place that generates transit ridership and sound economic development, including:

Page 3: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

A Design That Meets The VisionDense• Designed as urban, dense, and pedestrian orientedMixed use• A mix of uses supporting a vibrant street oriented developmentQuality• Quality contemporary design supportive of Olde Town’s characterConnected• Connected and grid oriented with activated street edgesStructured parking• Strategy to structure parking for all uses on siteSustainable• Sustainable site and buildings to meet Healthy Community and LEED

criteria

Option A Option B

Arvada TOD

Page 4: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Option A Program

RTD Stand Alone Garage• 400 Parking Spaces at Wadsworth/Grandview

(3 levels)• Bus Facility on Tiller Lot Site

Residential• 250 Multi Family Residential• 182 Micro Residential Units

Hotel at Vance• 108 Hotel rooms

Retail• 46,000 SF

Arvada TOD

Page 5: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Option B Program

RTD Bus Station with Public Parking• 400 – 700 Parking Spaces• 8 Stall Bus Facility

Hotel at Vance• 105 Hotel Rooms

Residential• 300 Multi Family Units• 162 Micro Residential Units

Retail• 28,500 SF

Arvada TOD

Page 6: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Transit Plan

Option B Perspective - 432 Parking Spaces and 8 Stall Bus Facility; Optional Bridge to Platform

Arvada TOD

Theatre

Page 7: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Arvada TOD

Option B LEVEL 1 - 43 SPACES 432 SPACES TOTAL

Theatre

Old

Wad

swor

th

Vanc

e St

.

Grandview

Page 8: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Transit Plan

Arvada TOD

Option B3 Perspective - 690 Parking Spaces and 8 Stall Bus Facility; Optional Bridge to Platform

Theatre

Page 9: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Arvada TOD

Option B3 LEVEL 1 - 42 SPACES 690 SPACES TOTAL

Theatre

Old

Wad

swor

th

Vanc

e St

.

Grandview

Page 10: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Transit Plan

OPTION B – 432 SPACES OPTION B3 – 690 SPACESArvada TOD

Page 11: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Arvada TOD

Transit Plan

View from Grandview Ave

Page 12: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Early Phase

• Block 1- Multi-modal transit facility at the Station.

• Block 2 and/or 3 - At grade “micro-housing” and multi-family development along 56th Avenue.

• Block 6 - Small retail or commercial office development along Wadsworth

• Block 4 - Limited service hotel use along Vance

• May incorporate interim surface parking solution

Arvada TOD

Page 13: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Later Phase

• Block 4 – Limited Service Hotel

Use along Vance

• Block 5 - Multi-family housing on a parking podium along Grandview and Wadsworth

• Accommodate parking for adjacent uses as required if land being used for interim surface parking

Arvada TOD

Page 14: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Community Outreach & Public Information Plan

Stakeholders • City of Arvada• Arvada Urban Renewal Authority• RTD• Trammell Crow Company• Community and Neighborhood Groups

Plan• Develop Project Fact Sheet• Regular Media Communications• Track Progress against Milestones• Conduct Public Meetings to Review Plans and Entitlement Progress• Update City Council, AURA Board and RTD as requested

Arvada TOD

Page 15: OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013

Milestone ScheduleEOC Agencies Initiate Partnership – 2010RFQ Issued – March 1, 2013RFQ Response – April 8, 2013RFP Response – May 24, 2013EOC Interviews – June 10, 2013Executed Exclusive Negotiating Agreement (ENA) – July 26, 2013Define Transit Element Concept Alternatives – September 3, 2013Approve Transit Element Concept Alternative – September 30, 2013Master Developer Completes Site Due Diligence – November, 2013Finalize Finance Plan for Transit Elements – December, 2013Master Developer Finalizes Land Use Program – December, 2013Arvada and Master Developer Finalize Site Infrastructure Plan – December, 2013Complete Site Master Plan, Zoning and Design Guidelines – March, 2014Execute Joint Development Agreement (JDA) – March, 2014

Arvada TOD