Presentation Content

General, Key Points

Mechanical features and maintenance

10 November 2010

Product Quality

Page 3: OK Mill Symposuim Indonesia2

OK Roller Mill

10 November 2010

Page 4: OK Mill Symposuim Indonesia2

OK Mill Capacity RangeOPC Cement

OK 33-4

OK 36-4

OK 39-4

OK 42-4

OK 45-4

Mill size

10 November 2010

0 50 100 150 200 250 300 350 400 450

t/h

OK 19-3

OK 22-3

OK 25-3

OK 27-4

OK 30-4

OK 33-4

Page 5: OK Mill Symposuim Indonesia2

OK Mill Capacity RangeSlag

OK 33-4

OK 36-4

OK 39-4

OK 42-4

OK 45-4

Mill size

10 November 2010

0 50 100 150 200 250

t/h

OK 19-3

OK 22-3

OK 25-3

OK 27-4

OK 30-4

OK 33-4

Page 6: OK Mill Symposuim Indonesia2

OK Mills Installed and Available Power

Mill size OK

Motor size (kW)

Avail. Power (kW)

19-3 675 602

22-3 975 869

25-3 1350 1196 27-4 1800 1653

10 November 2010

27-4 1800 1653 30-4 2350 2152 33-4 3000 2733 36-4 3750 3394 39-4 4600 4145 42-4 5500 4984 45-4 6960 5928

Available power is used for capacity calculations in combination with material

characteristics and grindability

Page 7: OK Mill Symposuim Indonesia2

• Simple and space-saving layout

• Proven technology based on alicense (1993) from Onoda and KobeSteel, Japan

• High efficiency separator

• Equivalent or better cement qualitythan tube mill cement

OK MillOK Mill layoutlayout

10 November 2010

than tube mill cement

• Energy saving. 20% to 40% in kWhcompared to Ball Tube Mills

• Very suitable for grinding blendedcement or slag

• Easily controllable particle sizedistribution

• Easy maintenance due toswing-in/out roller support system

Page 8: OK Mill Symposuim Indonesia2

OK Roller

Mill Details

Separator drive

Rotary sluice

Mill feed inlet

Grinding roller

Mill outlet

Separator

Separator rotor

Separator reject

Mill stand

Main drive

Hydraulic system

Swing out cylinder

Roller stopper

Grinding table

Page 9: OK Mill Symposuim Indonesia2

Unique design developed specifically for cement and slag grinding ……

10 November 2010

for cement and slag grinding ……

Page 10: OK Mill Symposuim Indonesia2

OK Roller Mill – Roller and Table profile

10 November 2010

Page 11: OK Mill Symposuim Indonesia2

OK Vertical mill grinding partsPressure distribution

10 November 2010

Page 12: OK Mill Symposuim Indonesia2

A B4500

4000

Blaine

[cm2 /g]Maximum

acceptable

vibrations

Optimum Design of Rollers and Table

10 November 2010

C D

200 300100

3500

3000

0

AB

C

D

Capacity [kg/h]

Page 13: OK Mill Symposuim Indonesia2

30

35

40

Spec. Energy Cons., Total, kWh/t

Spherical roller

Flat roller OK

OK Mills vs. Competitor VRMBest Grinding Efficiency

15

20

25

30

2500 3000 3500 4000 4500 5000

Blaine

Spec. Energy Cons., Total, kWh/t

Page 14: OK Mill Symposuim Indonesia2

OK mill efficiency compared to ball mills

50

55

60

65

70Spec. Energy Cons.,Total, kWh/t

Ball mill

For OPC

10 November 2010

20

25

30

35

40

45

2500 2700 2900 3100 3300 3500 3700 3900 4100 4300 4500

Blaine, cm2/g

Spec. Energy Cons.,Total, kWh/t

OK mill

≈ 33 %

≈ 50 %

Page 15: OK Mill Symposuim Indonesia2

OK mill versus ball millsSpecific energy consumption

EXAMPLES

Plant AA BB CC DD

Cement type OPC OPC OPC Slag cement

Type of mill BM OK BM OK BM OK BM OK

10 November 2010

Blaine, cm2/g 3200 3200 3700 3700 3880 3900 3640 3640

kWh/t

Mill 32.5 22.2 39.2 21.1 35.2 18.3 34.4 17.2

Total 38.5 28.9 42.3 32.2 42.4 25.7 40.0 25.7

Conclusion: The energy consumption of the OK mill system is 25% to 40% lower than for the ball mill system

Page 16: OK Mill Symposuim Indonesia2

50

60

70

80

90

100

OK mills - Composition of mill feed

10 November 2010

0

10

20

30

40

A+B C C D D D E F + G +

H

I + J I + J

Plant

Clinker, % Gypsum, % Limestone, % Pozzolana, % Slag, % Fly ash, %

Page 17: OK Mill Symposuim Indonesia2

Reliability …..

10 November 2010

Reliability …..

Page 18: OK Mill Symposuim Indonesia2

Entry Cement type Capacity, t/h Blaine kWh/t

Guarant. Achieved Guarant. Achieved Garant. Achieved

1 Slag cement 145 192 3670 3550 37.1 28.3

2 OPC 170 189 3000 2900 26.3 23.0

3 OPC 170 189 3000 3300 26.3 24.3

Slag cement 55 60 4000 4105 36.0 34.4 4

Slag 45 51 4000 3982 44.0 40.3

5 OPC 66 70 3800 3800 34.3 31.0

6 OPC 145 161 3000 3060 24.8 21.8

7 Blended 140 155 7% > 45 µµµµ 6.2% > 45 µµµµ 17.2 (Mill) 17.6 (Mill)

8 Blended 170 172 4400 4378 None 27.4

9 OPC 118 144 3900 3900 - 25.7

OK mill performance

10 November 2010

9 OPC 118 144 3900 3900 - 25.7

10 Blended 120 130 3450 3900 26.8 22.8

11 Blended 150 154 3200 3650 22.9 18.3

12 Slag 84 91 4600 (a) 4210 (b) 32.5 (M+S) 31.1 (M+S)

13 OPC 150 150 3300 3350 19.7 18.0

14 OPC 152 155 3800 4024 36.7 29,4

15 OPC 154 166 3750 3743 n/a 29,4

16 Blended 120 123 3450 3700 26.8 23.5

17 OPC 180 186 3000 3050 29 21.5

18 OPC 175 194 3000 3050 n/a 22,6

19 OPC 180 182 3200 3300 33 25,4

20 OPC 180 189 3200 3230 33 26,0

21 Blended 120 138 3650 3702 27 20,0

(a): With gypsum (b): Without gypsum

+ 9 % + 3 % - 14 %

Page 19: OK Mill Symposuim Indonesia2

150.0

200.0

250.0

3000

4000

5000

3800 - Guar.

Guar. - 168

Easy commissioning of millFirst 40 days of OK mill operation

10 November 2010

0.0

50.0

100.0

150.0

2/1 2/3 2/5 2/7 2/9 2/11 2/14 2/16 2/18 2/20 2/22 2/24 2/26 2/28 3/3 3/5 3/7

Date, 2006

Pro

du

cti

on

0

1000

2000

3000

Bla

ine

Page 20: OK Mill Symposuim Indonesia2

Example of smooth commissioning

OK 36 Mill in USA

5000.0

6000.0

140.0

160.0

180.0

200.0

Roller and table

liner rewelding

16-19 January

Cement sales

decrease, mill

capacity reduced

10 November 2010

0.0

1000.0

2000.0

3000.0

4000.0

8-1 8-14 8-22 8-28 9-4 9-12 9-18 9-25 10-1 10-7 10-

13

10-

19

10-

25

11-1 11-7 11-

13

11-

22

11-

28

12-4 12-

11

12-

17

12-

23

12-

29

1-4 1-10 1-22

Bla

ine

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

Cap

ac

ity, t/

h

Guaranteed performance: 154 t/h; Blaine 3750 cm2/g

Average achieved over the first 24 weeks: 157 t/h; Blaine 3790 cm2/g

Page 21: OK Mill Symposuim Indonesia2

OK mills recently commissioned

Plant Cement type Capacity, t/h Blaine

Duration from 1. start to operation with

guaranteed performance

Guarant. Achieved Guarant. Achieved

Saloniki 1 Blended 120 130 3450 3900 ~ 4 weeks (1)

Dongjun Slag 84 91 4600 4210 (a) < 3 weeks

Dongjun OPC 150 150 3300 3350 < 3 weeks

Mojave OPC 152 155 3800 4024 ~ 1 week

Lehigh UB OPC 154 166 3750 3743 ~ 3 weeks

10 November 2010

Lehigh UB OPC 154 166 3750 3743 ~ 3 weeks

Saloniki 2 Blended 120 123 3450 3700 < 2 weeks

FFCC OPC 180 186 3000 3050 ~ 1 day

Khairpur OPC 175 194 3000 3050 ~ 13 weeks (2)

Maple Leaf 1 OPC 180 182 3200 3300 ~ 1 week

Maple Leaf 2 OPC 180 189 3200 3230 ~ 9 weeks (3)

Zlatna Blended 120 138 3650 3702 ~ 5 weeks (4)

(a) Without gypsum

(1) Customer’s preference was on other products than contractual fed mix

(2) Irregular supply of feed materials from external supplier

(3) Same time as kiln – not much focus (first of two mills to start)

(4) Problems with transport equipment (client’s supply)

Average duration of commissioning (incl. performance test): 4 weeks

Page 22: OK Mill Symposuim Indonesia2

60

70

80

90

100

Ru

n f

ac

tor,

%Run factor similar to the simple Ball Mill

10 November 2010

0

10

20

30

40

50

60

1999 2000 2001 2002

Ru

n f

ac

tor,

%

OK mill

Ball mill

Page 23: OK Mill Symposuim Indonesia2

Operation on 2 rollers – if needed

Condition Production

t/h

% Res.

45µ

Blaine

cm²/g

kWh/t

Mill

kWh/t

Fan

kWh/t

Sep

kWh/t

Total

Grinding

Aid %

2 rollers 92 3,8 3600 15,2 13,6 0,7 29,4 0,025

4 rollers 144 3,5 3800 16,1 8,7 0,6 25,4 0,025

10 November 2010

4 rollers 144 3,5 3800 16,1 8,7 0,6 25,4 0,025

Guarantee 140 7,0 17,2 0,6

In case 1 roller is down for maintenance, the mill can continue operating on 2 rollers with a production of app. 65 – 70% of nominal.

Data from industrial mill OK 33-4.

Page 24: OK Mill Symposuim Indonesia2

Mechanical design

10 November 2010

Mechanical design features …..

Page 25: OK Mill Symposuim Indonesia2

OK mill layoutCement grinding (without slag)

Metal detector Magnetic separator

10 November 2010

Page 26: OK Mill Symposuim Indonesia2

The ROKSH

The new generation High efficiency dynamicSeparator for the OK-Mill

10 November 2010

Lower gas velocities

Lower energy consumption

Cost optimal wear protection

Page 27: OK Mill Symposuim Indonesia2

ROKSH main parts

Access platforms

Drive station

Bearing arrangement

Inspection door

Separator outlet

10 November 2010

Coarse return cone

Separator casing

Rotor

Louvres

Coarse return outlet

Page 28: OK Mill Symposuim Indonesia2

Air velocities in the ROKSHReduced air velocities gives:

� Less wear

� Lower differential pressure

� Lower separator power

� Reduced mill fan power

� Overall reduced operation costs

10 November 2010

costs

Separator outlet: 19m/s Through rotor vanes: 2.5 m/sThrough guide vanes: 11 m/sSeparator inlet: 5.4 m/sMill housing: 2.7-3.8 m/s

Page 29: OK Mill Symposuim Indonesia2

ROKSH optimum wear protection

Densit Wear flex 2000 wear lining•Separator outlet

Based on experiences with more than85 ROKS and OKS separators sold

10 November 2010

Hard faced plate (Chromium Carbide)•Separator top section•Coarse return outlet •Rotor vanes•Upper part of reject cone

Ceramic Alumina tiles•Separator bearing arrangement•Supports

Page 30: OK Mill Symposuim Indonesia2

OK mill - nozzle ring

Designed to minimize abrasive blasting of key components

10 November 2010

Page 31: OK Mill Symposuim Indonesia2

OK Mill New Nozzle Ring

10 November 2010

Page 32: OK Mill Symposuim Indonesia2

OK mill - nozzle ring

10 November 2010

Page 33: OK Mill Symposuim Indonesia2

OK Mill - housing/roller seal

10 November 2010

Improved roller/housing seal

Page 34: OK Mill Symposuim Indonesia2

Flexible housing/roller seal

OK Mill - housing/roller seal

10 November 2010

� Durable

� Easy to maintain

� No ingress of false air

Page 35: OK Mill Symposuim Indonesia2

OK Mill - rotary feed sluice

10 November 2010

Designed for air heating in case of sticky feed materials

Page 36: OK Mill Symposuim Indonesia2

OK Mill - rotary feed sluice

10 November 2010

Lined with chromium carbide composite wear plate for

enhanced durability

Removable side walls for ease of maintenance

Page 37: OK Mill Symposuim Indonesia2

OK mill - Rotary feed sluice

10 November 2010

Removable sides for easy maintenance

Page 38: OK Mill Symposuim Indonesia2

10 November 2010

Dry fly ash injection

Page 39: OK Mill Symposuim Indonesia2

Maintenance …..

10 November 2010

Maintenance …..

Page 40: OK Mill Symposuim Indonesia2

Cement Mills - Maintenance Costs

0.6

0.73

0.5

0.6

0.7

0.8

Maintenance costs, EUR/t

Over 4 years Over 14 months

10 November 2010

0.36

0.42

0.11

0

0.1

0.2

0.3

0.4

BM BM+RP 1 BM+RP 2 OK 1 OK 2

Maintenance costs, EUR/t

Page 41: OK Mill Symposuim Indonesia2

OK mills versus ball millsMaintenance of wear parts (cont’d)

OPC, 3200 – 3600 cm2/g (Blaine) EUR per ton of cement

Cost of wear parts:

10 November 2010

OPC, 3200 – 3600 cm2/g (Blaine) EUR per ton of cement

Ball mills 0.15 – 0.20

Hardfacing not applied 0.15 – 0.20 OK mills

Hardfacing applied 0.10 – 0.15

Page 42: OK Mill Symposuim Indonesia2

Maintenance of wear segments

Extensive wear ⇒⇒⇒⇒ Deterioration of performance:

� Lower capacity

� Higher specific energy consumption

� Higher level of vibrations

10 November 2010

� Higher level of vibrations

Remedy of wear:

� (Reversal of roller segments)

� Hardfacing of roller and table segments – by far the

preferred method

Page 43: OK Mill Symposuim Indonesia2

OK Mill - Typical Wear Pattern

10 November 2010

Page 44: OK Mill Symposuim Indonesia2

Hardfacing of rollers and grinding table

Dual headed

welding gun

10 November 2010

Page 45: OK Mill Symposuim Indonesia2

Roller being hard-faced in situ

10 November 2010

Page 46: OK Mill Symposuim Indonesia2

Hardfaced RollerOK 27-4

10 November 2010

Page 47: OK Mill Symposuim Indonesia2

OK 27OK 27--4 Hardfacing after 350 Hours of Operation4 Hardfacing after 350 Hours of Operation

10 November 2010

Page 48: OK Mill Symposuim Indonesia2

Segments vs. Tyres

• No risk of thermal cracking during operation/welding

• Numerous re-welding’s possible (typical ~ 10)

• Lower lifetime cost

10 November 2010

Page 49: OK Mill Symposuim Indonesia2

Hydraulic maintenance cylinder

A maintenance cylinder with a separate pump station is supplied for swinging out the rollers.

This gives easy access to

10 November 2010

This gives easy access to maintenance/replacement of segments etc.

Page 50: OK Mill Symposuim Indonesia2

Lifetime of wear parts. 1

Clinker grinding:

A typical wear rate is around 1 g/t giving a life time of around 12.000 hours without hardfacing.

Hardfacing usually reduces wear to about 50%.

Hardfacing can usually be performed up to 10 times on the rollers,

10 November 2010

Hardfacing can usually be performed up to 10 times on the rollers, and 25 times on the table has been achieved.

Typical example:

OK 27-4 clinker 3800-4000 Blaine

Mill start 05/1999 Hours Ton g/t

Reversal 08/2000 8336 547098

Table hardfacing 12/2000 10300 662883 0,76

Roller hardfacing 01/2002 18072 1179723 0,47

Page 51: OK Mill Symposuim Indonesia2

Product quality

10 November 2010

Page 52: OK Mill Symposuim Indonesia2

OK mill – product quality

Plant Plant A Plant B Plant C

Cement type OPC Blended Blended

Mill BM OK RP+BM-1 RP+BM-2 OK-1 OK-2 RP+BM OK

Fineness . PSD

Blaine(m2/kg) 375 377 399 436 399 376 437 385

Res. 45 µm (%) 5.3 1.3 5.4 5.6 7.4 4.5 2.4 3.2

PSD / d-50% (µm) 13.4 12.0 13.6 12.8 14.1 14.9 11.7 13.0

PSD / d’ (µm) 17.7 16.3 18.6 17.8 19.4 19.5 16.3 17.6

PSD / n-value 1.05 1.10 1.11 1.07 1.07 1.06 1.01 1.05

10 November 2010

PSD / n-value 1.05 1.10 1.11 1.07 1.07 1.06 1.01 1.05

Dehydr./Prehydr.

Gypsum (%) 0.1 2.0 1.2 0.9 1.9 3.2 4.0 3.5

Hemihydr. (%) 1.5 0.5 2.3 2.3 1.7 1.0 2.0 1.5

Prehydr. (%) 0.25 0.15 - - - - 0.29 0.20

Cement testing (EN / ISO)

Water to NC (%) 27.0 26.5 29.5 29.0 31.0 32.5 27.5 27.5

Initial set (h:min) 2:05 1:50 2:35 2:25 3:05 3:15 1:20 1:45

Final set (h:min) 2:50 2:40 3:20 3:10 4:00 4:20 2:30 2:30

Str.-1day (MPa) 19.0 18.8 13.8 12.1 10.6 10.2 15.5 14.8

Str.-2 days (MPa) 27.6 28.8 32.1 32.5

Str.-3 day (MPa) 29.8 28.4 26.9 28.8

Str.-7 day (MPa) 39.0 42.8 39.4 36.1 35.7 37.5 39.8 41.7

Str.-28 day (MPa) 60.5 60.3 50.0 47.9 49.2 50.3 50.5 52.0

Conclusion: Quality of cements produced in OK mills is very similar to those produced in ball mills with high efficiency separators

Page 53: OK Mill Symposuim Indonesia2

OK Mill - Particle Size Distribution

Height of dam ring

1,4

Low

Airflow [%]

1,3100

Inclination of PSD Curve n (RRSB)

Height of dam ring

1,4

Low

Height of dam ring

1,4

Low

Airflow [%]

1,3100

Airflow [%]

1,3100

Inclination of PSD Curve n (RRSB)

10 November 2010

781,1

Grinding pressure [%]

1,2

1,3

83 89 100

Low

Medium

High

60

1,1

Separator speed [%]

1,2

1,080 100

80

781,1

Grinding pressure [%]

1,2

1,3

83 89 100

Low

Medium

High

781,1

Grinding pressure [%]

1,2

1,3

83 89 100

Low

Medium

High

60

1,1

Separator speed [%]

1,2

1,080 100

80

60

1,1

Separator speed [%]

1,2

1,080 100

80

Page 54: OK Mill Symposuim Indonesia2

OK Mill - Dam Ring and Nozzle Ring

Dam ringheight

Grindingpressure

Cement grinding Low High

Slag grinding High Low

Dam ringheight

Grindingpressure

Cement grinding Low High

Slag grinding High Low

10 November 2010

Slag grinding High Low

Segmented dam

ring, easy to

adjust in height

Slag grinding High Low

Segmented dam

ring, easy to

adjust in height

Page 55: OK Mill Symposuim Indonesia2

Cement Quality / Particle Size Distribution

Effects of steeper (narrower) PSD :

• Cement properties :

- Steeper strength development curve- Steeper strength development curve

- Higher (late) strength at fixed Blaine

- Lower (early) strength at fixed sieve residue (45 µm)

- Higher water demand for normal consistency of paste

but not necessarily for concrete

Page 56: OK Mill Symposuim Indonesia2

Comparison of cement quality

Ball Mill ( BM (CM1 )):

10 November 2010

UM 42 x 13 with Sepax IC-335

Vertical Roller Mill ( OK ) :

OK 27-4

Page 57: OK Mill Symposuim Indonesia2

Plant A

Cements

Ordinary Portland Cement (OPC)

10 November 2010

Clinker : 96 % Gypsum : 4%

SSA (Blaine) : 370 m2/kg

Page 58: OK Mill Symposuim Indonesia2

Cements . Plant A

Particle Size Distribution (RRSB-grid)

0.115

10203040

Resid

ue (

%)

10 November 2010

40506070

80

90

95969798

99

0.1 1 10 100 1000

Particle size (µm)

Resid

ue (

%)

BM (CM1)

OK

Page 59: OK Mill Symposuim Indonesia2

Cements . Plant A

Fineness data

BM (CM1) OK Specific Surface (Blaine) : m2/kg 375 377

Air Jet Sieving :

90 µm % 0.2

10 November 2010

63 µm % 1.2 0.1

45 µm % 5.3 1.3

32 µm % 15.1 9.3

Laser Diffraction :

d(50%) µm 13.4 12.0

d'-RRSB µm 17.7 16.3

n-RRSB 1.05 1.10

Sm m2/kg 367 372

Page 60: OK Mill Symposuim Indonesia2

Cements . Plant A

Setting

BM (CM1) OK Water to N.C. % 27.0 26.5

10 November 2010

Initial set h:min 2:05 1:50

Final set h:min 2:50 2:40

Page 61: OK Mill Symposuim Indonesia2

Cements . Plant A

Compressive strength

50

60

70

Co

mp

res

siv

e s

tre

ng

th [

EN

19

6]

(MP

a)

BM (CM1)

OK

10 November 2010

0

10

20

30

40

50

Co

mp

res

siv

e s

tre

ng

th [

EN

19

6]

(MP

a)

1d 2d 7d 28d

Page 62: OK Mill Symposuim Indonesia2

Cement Quality / OK mills

OK Mill - Ball Mill comparisons

Conclusion :

An investigation on cement samples from plants having an

10 November 2010

An investigation on cement samples from plants having an OK mill and a ball mill unit producing cement from the same raw materials have indicated, that the OK mill cements tended to have a slightly steeper (narrower) particle size distribution and a lower dehydration level of the gypsum.

However, the resulting cement properties were similar to those of the cements produced in the ball mill installations.

Page 63: OK Mill Symposuim Indonesia2

Final remarks

10 November 2010

Page 64: OK Mill Symposuim Indonesia2

Repeated sale of OK mills after commissioning of customer’s first OK mill

Customer Plant Country Year Mill size

Polyiur India 1996 OK 36-4 Chettinad

Palayam India 1999 OK 36-4

Ecorama Argentina 1996 OK 27-4 Loma Negra

Catamarca Argentina 2008 OK 33-4

1996 OK 33-4 Progreso, San Miguel Guatamala

1999 OK 33-4

10 November 2010

Progreso, San Miguel Guatamala 1999 OK 33-4

Juan Minetti, Campana Argentina 1998 OK 36-4

Apasco, Ramos Arizpe Mexico 2000 Ok 36-4

Faraz Firouzkuh Iran 2003 OK 36-4

Ste. Genevieve USA 2006 4 x OK 36-4

Holcim

Boyaca Columbia 2008 OK 36-4

Kamari Greece 1998 OK 27-4

2002 OK 30-4 Saloniki Greece

2005 OK 30-4 Titan Cement

Zlatna Bulgaria 2005 OK 30-4

Tanda India 2002 OK 30-4 Jaypee Cement

Bhilai India 2007 2 x OK 42-4

Page 65: OK Mill Symposuim Indonesia2

50

60

70

80

Nu

mb

er

of

mills

so

ld

Sale of ball mills and VRM for cement grinding ex. China

10 November 2010

0

10

20

30

40

Nu

mb

er

of

mills

so

ld

2003 2004 2005 2006 2007 2008

BM

VRM

Page 66: OK Mill Symposuim Indonesia2

Summary of Experience with OK Mills commissioned by F.L.Smidth

� All the mills have proved capable of producing above the guaranteed output at the required fineness

� Their spec. energy consumption is at or below the estimated low level

10 November 2010

low level

� The OK mill has proved suitable for grinding not only slag and Ordinary Portland Cement, but also blended cements with a wide range of additives such as slag, pozzolana, limestone and fly ash.

Page 67: OK Mill Symposuim Indonesia2

Summary of Experience with OK Mills commissioned by F.L.Smidth (cont’d)

� The mill’s operational parameters can be adjusted to attain an end product that complies with the client’s specific requirements

� During maintenance of one or two rollers, the mill can continue to operate with two rollers only, at a somewhat

10 November 2010

continue to operate with two rollers only, at a somewhat reduced capacity

� The mill is reliable in operation, easy to operate and easy to maintain

Page 68: OK Mill Symposuim Indonesia2

OK mills sold – Marts 2010

OKOKOKOKOKOKOKOKOK

OK

OKOKOK

OK

OKOK

OK

OKOK

OKOKOK

OK

OKOK

OK

OKOK

OKOK

OK

OK

OK

OK

OKOK

OK

OK

OK

OK

OKOKOK

OK

OK OK

OK

OK

OK

OK

OK

OK

OKOK

OK

OK

OK

OKOK

OK

OKOK

OK

OK

OKOK

OK

10 November, 2010

O

OK

OK

OKOKOK

OK

OK

OK

OKOKOKOK

OKOK

OKOK

OKOK

OK

OKOK

All together 100 FLSmidth OK mills sold world wide

OK OK

OK

OKOK

OK

OK

OK

Page 69: OK Mill Symposuim Indonesia2

Thank you for your attention

10 November 2010