8

Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive

Embed Size (px)

Citation preview

Page 1: Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive
Page 2: Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive

• More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, among others.

• Extensive experience in heavy oil upgrading, hydro-treating and hidrocracking plants, marine terminals, tank installation, environmental facilities, electrical and te-lecommunication installations, erection of steel structures, piping works and equipment assembly. Also turnaround and shutdown of plants, pumping stations, tank farms, compressor units, clusters and power generation.

• More than 30.000.000 man hours performed in electro-mechanical construction projects.

• Installation of more than 40.000 tons of structural steel, 80.000 tons of pipes, 15.000 tons of rotating equipment and 18.000 tons of static equipment.

• Industrial projects in Brazil, Colombia, St. Thomas, Tri-nidad & Tobago and Venezuela.

Oil and Gas

Power Generation

American and European companies among the major customers for industrial plants construction.

Electromechanical erection of hydroelectric generation units as well as gas or coal ones, including pre-commissioning and “Start Up” phases.

• Construction of hydro-treating plant in the ISBL area of the Barrancabermeja oil complex.

• Final Customer: Ecopetrol S.A.• Contract Amount: 270 MM USD• September 2007 - October 2010 - Colombia

• (348 Mw). UHE Simplício - Anta

• Final Customer: Inverall Construções e Bens de ca-pital Ltda. - IMPSA

• Contract Amount: 23 MM USD • February 2010 - October 2012 - Brazil

• Electromechanical erection and relevant substation of hydroelectric plant “La Vueltosa”

• Final Customer: Alstom Hydro Venezuela• Contract Amount: 20 MM USD• January 2008 - April 2013 - Venezuela

Petrochemical PlantsElectromechanical erection of petrochemical plants, including pre-commissioning phase.

• Detailed engineering, procurement, installation and commissioning of propylene storage and delivery in the Barrancabermeja oil complex

• Final Customer: Ecopetrol S.A.• Contract Amount: 18,22 MM USD• January 2007 - September 2008 - Colombia

Industrial Installations

Page 3: Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive

• More than 140 high voltage projects, up to 500 Kv, in ten different countries: Brazil, Colombia, Ecuador, El Salvador, Honduras, Mexico, Peru, Dominican Repu-blic, Trinidad & Tobago and Venezuela.

• Installation of more than 9.000 Km of OPGW cable in OHTL ranging from 115 Kv to 800 Kv; 50% (approx.) executed under “hot line” conditions.

• More than 6.500 Km of transmission lines installed, voltages ranging from 32 up to 500 Kv.

• Engineering, procurement and installation of under-ground power lines up to 230 Kv.

Transmission Lines

Transmission Systems

• Replacing conventional ground wire with OPGW in 7500 km Corpoelec transmission lines, under “hot line” conditions.

• Final Customer: ZTE de Venezuela• Contract Amount: 112,50 MM USD• September 2007 - August 2012 - Venezuela

• Erection and stringing of 500 Kv, double circuit and four conductors per phase Tucuruí - Xingu transmission line.

• Final Customer: Isolux Corsan• Contract Amount: 24,40 MM USD• November 2011 - October 2012 - Brazil

• Project 1114 STL eastern transmission and transfor-mation system (1st Phase)

• Final Customer: Comisión Federal de Electricidad - CFE

• Contract Amount: 80 USD MM• August 2011 - April 2013 - Mexico

• 2nd circuit stringing of 400 Kv OHTL Ixtapa Potencia - Pie de la Cuesta

• Final Customer: Comisión Federal de Electricidad - CFE

• Contract Amount: 12,80 MM USD• May 2008 - May 2010 - Mexico

Page 4: Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive

• Engineering, procurement and construction (EPC) of projects, on a “turnkey basis” installation for up to 800 Kv electrical substatios, promoting synergies with worldwide leading manufacters.

• EPC for reactive compensation projects in substa-tions of up to 500 Kv.

• Substations installed in eight Latin-American coun-tries: Brazil, Colombia, Guatemala, Honduras, Méxi-co, Nicaragua, Trinidad &Tobago and Venezuela.

Electrical Substations

• 194 SS 1124 Bajío Centro (1st Phase) Asuncion electrical substation project.

• Final Customer: Comisión Federal de Electricidad - CFE

• Contract Amount: 23,84 MM USD• December 2009 - March 2011 - Mexico

• Engineering, procurement and construction (EPC) of Amarateca substation, 230/138/34,5 Kv.

• Final Customer: Empresa Nacional de Energía Eléctrica - ENEE

• Contract Amount: 22,70 MM USD• April 2011 - April 2013 - Honduras

• Engineering, procurement and construction (EPC) of Mene Grande substation 115/13,8 Kv, 2x40 MVA.

• Final Customer: C.A. Energía Eléctrica de la Costa Oriental - ENELCO

• Contract Amount: 15 MM USD• January 2010 - August 2011 - Venezuela

• Engineering, procurement and construction (EPC) of Temixco and Altamirano substations; 115/34,5 Kv, with a capacity 30 MVA, 7,5 MVAR capacitor at high voltage and 1,8 MVAR capacitive medium voltage

• Final Customer: Comisión Federal de Electricidad - CFE

• Contract Amount: 7,50 MM USD • May 2009 - March 2010 - Mexico

Transmission Systems

Page 5: Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive

Planning and Control of Projects

Procurement

Engineering and Design of Transmission Systems

SADEVEN uses technological tools and techniques for project management, such as: Primavera, Mi-crosoft Project and its own PMS (Project Monitoring System) software to guarantee accurate, on time, information development in each project. SADE-

follow up and control to ensure the successful com-

control parameters, according to the costumers and market requirements.

SADEVEN´s Supply Chain Management assures

and international standards in accordance with in-dustry requirements and procedures, as established in its Integral Management System. The company periodically performs evaluations on its suppliers, to guarantee availability of the best products and ser-vices for its projects.

SADEVEN has wide experience and knowledge in -

wares and all necessary resources, our group de-velops the basic and detailed engineering of trans-mission lines as well as electrical distribution and substation projects. This capacity allows SADEVEN to enter into “turnkey contracts”, guaranteeing cus-tomers the prompt delivery of the projects, on time, with quality and on budget.

Integrated Management System

SADEVEN´s Integrated Management System, gua-rantees control of all environmental risks and related aspects, as well as the quality of works and the wel-fare of personnel, whilst protecting the environment,

QUALITY HSE ENVIRONMENT

ISO

mseijas
Cuadro de texto
mseijas
Cuadro de texto
mseijas
Cuadro de texto
mseijas
Cuadro de texto
mseijas
Cuadro de texto
mseijas
Cuadro de texto
mseijas
Cuadro de texto
mseijas
Texto escrito a máquina
SDV
mseijas
Texto escrito a máquina
mseijas
Texto escrito a máquina
SDV
mseijas
Texto escrito a máquina
SDV
mseijas
Texto escrito a máquina
SDV
mseijas
Texto escrito a máquina
SDV
mseijas
Texto escrito a máquina
SDV
Page 6: Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive

Turnover average last 5 years

Annual man hours

Own construction equipment

Staff Transmission SystemsManufacturing and GalvanizingIndustrial Plants

SDV Group relevant data

Revenue breakdown by

business area

“Elec – SDV Plant, Chile”

Integrated Management System

41%

SDV’s Integrated Management System,

guarantees control of all environmental risks

and related aspects, as well as the quality of

works and the welfare of personnel, while

protecting the environment, fulfilling customers

and stakeholders requirements

QUALITY HSE ENVIRONMENT

170 MM USD

5.000.000 mh

800 people

25 MM USD

Page 7: Oil and Gas - sadeven.com · • More than 90 projects in the areas of oil and gas, power generation, petrochemical, mining and water treatment plants, amongothers. • Extensive