    DESIGN: "MM 73 MSV"

    Main Dimensions:

    Length, over all 76.40 mBreadth, moulded 16.20 mDepth, moulded 6.00 m

  • 7/28/2019 Offshore Vessell

    2/50

    Berths 70Gross Tonnage 3631 t

    Class: DnV 1A1 General Cargo Carrier, E0, Heldk-S, Dynpos-Autr, Crane

    Name: Stril Explorer

    Owners/Operators:Simon Mkster Rederi

    Design: Multi Maritime AS

    ard: Westcon new building number 33.

    Delivered: September 2010

    http://www.mokster.no/http://www.mokster.no/http://www.mokster.no/http://www.mokster.no/
  • 7/28/2019 Offshore Vessell

    3/50

    ROV Hangar (courtesy of Simon Mkster)

  • 7/28/2019 Offshore Vessell

    4/50

    Polar Pevek, an icebreaker of Multi Maritime's "MM 65 ICE" design.

  • 7/28/2019 Offshore Vessell

    5/50

    Picture copyright: Harald Valderhaug

    Main Dimensions:Length, over all 74.36 mBreadth, moulded 17.00 mDepth, moulded 8.60/8.00 mGross Tonnage ~3396 tonDeadweight ~1300 ton

    Class: DnV 1A1, Icebreaker ICE-10, Tug, SF, E0, Naut-AW, Deice, RP, FI-FI I

    Owners/Operators: Rieber Shipping ASA / Primorsk

    Design: Multi Maritime AS / Rieber Shipping

    ard: Aker Langsten, yard no. 199

    Built: June 2006

  • 7/28/2019 Offshore Vessell

    6/50

    Downloads:

    Brochure "Polar Pevek"

    Pictures of "Polar Pevek" in operation in eastern Russia:

    Picture courtesy of Rieber Shipping ASA

    http://www.multi-maritime.no/Portals/87/filer/polar_pevek.pdfhttp://www.multi-maritime.no/Portals/87/filer/polar_pevek.pdfhttp://www.multi-maritime.no/Portals/87/filer/polar_pevek.pdf
  • 7/28/2019 Offshore Vessell

    7/50

    Picture courtesy of Rieber Shipping ASA

  • 7/28/2019 Offshore Vessell

    8/50

    Picture courtesy of Rieber Shipping ASA

    Picture courtesy of Rieber Shipping ASA

  • 7/28/2019 Offshore Vessell

    9/50

    Picture courtesy of Rieber Shipping ASA

    DESIGN: "MM 80 SEISMIC" - MV SANCO STAR

  • 7/28/2019 Offshore Vessell

    10/50

    Picture courtesy of Vaagland Btbyggeri AS

    Main Dimensions:

    Length, over all ~80.00 mBreadth, moulded 16.00 mDepth, moulded 7.70 mTransit speed 16 knotsBollard pull ~40 t at 4.5 knotsGross Tonnage 3953Deadweight 2150 t

    Class: DnV 1A1 E0, DYNPOS-AUT, RP, HELDK-SH, ICE-C

    Owners/Operators: Sanco Holding AS

    Design: Multi Maritime AS

    ard: Vaagland Btbyggeri AS, yard no. 140

    Delivered: December 2008

    Current building status: Delivered to Sanco Shipping.

  • 7/28/2019 Offshore Vessell

    11/50

    Pictures from the steel production

    Downloads:

    Brochure "Sanco Star"

    Pictures of the vessel:

    Picture courtesy of Vaagland Btbyggeri AS

    http://www.multi-maritime.no/LinkClick.aspx?link=5386&tabid=4730&language=en-UShttp://www.multi-maritime.no/LinkClick.aspx?link=5386&tabid=4730&language=en-UShttp://www.multi-maritime.no/Portals/87/filer/sanco_star.pdfhttp://www.multi-maritime.no/Portals/87/filer/sanco_star.pdfhttp://www.multi-maritime.no/Portals/87/filer/sanco_star.pdfhttp://www.multi-maritime.no/LinkClick.aspx?link=5386&tabid=4730&language=en-US
  • 7/28/2019 Offshore Vessell

    12/50

    The vessel at Vaagland Btbyggeri just before the christening.

  • 7/28/2019 Offshore Vessell

    13/50

    The aftship.

  • 7/28/2019 Offshore Vessell

    14/50

    The midship, showing the gangway and one of the hinged helicopter deck flaps.

  • 7/28/2019 Offshore Vessell

    15/50

  • 7/28/2019 Offshore Vessell

    16/50

    The helicopter deck seen from the monkey top.

  • 7/28/2019 Offshore Vessell

    17/50

  • 7/28/2019 Offshore Vessell

    18/50

    Pictures from the steel construction

    Week 12, 2007(Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    19/50

    Week 12, 2007(Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    20/50

    Week 12, 2007(Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    21/50

    Week 36, 2007(Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    22/50

    Week 36, 2007(Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    23/50

    Week 36, 2007. Axle tunnel (Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    24/50

    Week 39, 2007. (Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    25/50

    Week 39, 2007. (Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    26/50

    Week 45, 2007. (Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    27/50

    Week 45, 2007. (Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    28/50

    Week 49, 2007. (Picture courtesy of Vaagland Btbyggeri).

  • 7/28/2019 Offshore Vessell

    29/50

    Week 49, 2007. (Picture courtesy of Vaagland Btbyggeri).

    New building 140's hull approaching Vaagland Btbyggeri after being towed from Helgelandske Sveiseindustri (week 5

  • 7/28/2019 Offshore Vessell

    30/50

    courtesy of Vaagland Btbyggeri.

    DESIGN: "MM 86 SEISMIC"

    Picture copyright: Daniel Kvalvik

    Main Dimensions:Length, over all 86.00 mBreadth, moulded 16.00 mDepth, moulded 7.70 mGross Tonnage 4384Deadweight ~2300 t

  • 7/28/2019 Offshore Vessell

    31/50

  • 7/28/2019 Offshore Vessell

    32/50

  • 7/28/2019 Offshore Vessell

    33/50

    Arriving at Vaagland Btbyggeri week 50, 2008.

  • 7/28/2019 Offshore Vessell

    34/50

    Safely docked.

    Polar Queen, Subsea Construction And Flowline Lay Ship

  • 7/28/2019 Offshore Vessell

    35/50

    Courtesy of Acergy

    Main Dimensions:

    Length, over all 147.90 mBreadth, moulded 27.00 mDepth, moulded 13.20 mSummer draft 8.00 m

    Accomodation for 121 PersonsGross Tonnage 14520 GRT

    Class: DnV 1A1, E0, WI-OC, DYNPOS-AUTR, HELDK-S

    Name: Polar Queen

    Owners/Operators: Rieber Shipping / Acergy Group

    The rebuilding of the former cable layer Polar Queen has now been completed at Damen Ship Repair Yard in Rotterdam.The vessel is one of the most advanced flexlay and subsea construction vessels in the world.

    The vessel was originally built at Hyundai Mipo in 2001. The rebuilding was performed in two phases. The first phase wascompleted at A&P Teesside last summer. There all the cable laying equipment and the shelter deck were removed. Twolarge pipe carousels and a helicopter deck was installed. Further the main deck was strengthened to 10 t/m2.

    The second phase involved the installation of a 200 t offshore crane (300 t inshore), a 340 t lay tension lay tower, a 400 theave compensated deployment winch system, ROVs and additional accommodation/office space. The vessel's beam was

  • 7/28/2019 Offshore Vessell

    36/50

    increased from 21.0 m to 27.0 by adding sponsons.

    Multi Maritime's involvement has been design development in cooperation with Acergy Group, lines design and stabilitydocumentation.

    View of the forward part of the port sponson:

  • 7/28/2019 Offshore Vessell

    37/50

  • 7/28/2019 Offshore Vessell

    38/50

    View of the aft part of the starboard sponson:

    Multi Maritime AS

    The Polar Queen left the conversion yard in mid August 2007. Its first jobs are in west Africa, namely pipelaying in the Moho

  • 7/28/2019 Offshore Vessell

    39/50

    Bilondo and Kizomba C fields.

    The laytower seen from below:

    Multi Maritime AS

    Night view of the laytower:

  • 7/28/2019 Offshore Vessell

    40/50

    Multi Maritime AS

  • 7/28/2019 Offshore Vessell

    41/50

    Multi Maritime AS

  • 7/28/2019 Offshore Vessell

    42/50

    Courtesy of Acergy

    Pictures from the construction

  • 7/28/2019 Offshore Vessell

    43/50

    Week 34, 2008 at CNPC Liahoe Shipyard in China (Picture courtesy of Seametric International).

  • 7/28/2019 Offshore Vessell

    44/50

    Week 34, 2008 at CNPC Liaohe Shipyard in China (Picture courtesy of Seametric International).

    Week 45, 2008 at CNPC Liaohe Shipyard in China (Picture courtesy of Seametric International).

  • 7/28/2019 Offshore Vessell

    45/50

    Week 45, 2008 at CNPC Liaohe Shipyard in China (Picture courtesy of Seametric International).

  • 7/28/2019 Offshore Vessell

    46/50

    Week 49, 2008 at CNPC Liaohe Shipyard in China (Picture courtesy of Seametric International).

  • 7/28/2019 Offshore Vessell

    47/50

    Week 02, 2009 at CNPC Liaohe Shipyard in China (Picture courtesy of Seametric International). Blocks for the two Seametricvessels scattered around the yard.

  • 7/28/2019 Offshore Vessell

    48/50

  • 7/28/2019 Offshore Vessell

    49/50

    Week 02, 2009 at CNPC Liaohe Shipyard in China (Picture courtesy of Seametric International). Blocks for the two Seametricvessels scattered around the yard.

  • 7/28/2019 Offshore Vessell

    50/50

    Week 02, 2009 at CNPC Liaohe Shipyard in China (Picture courtesy of Seametric International). Aerial view of bottom block.