SF-00006-02 08 - 0689
DEPARTMENT LABOR AND INDUSTRYPrevailing Wage Section
Office Memorandum
TO
FROM
Zona DeWittLegislative Library
Erik K o Oelker, Sr. Labor InvestigatorLabor Standards DivisionPrevailing Wage Section
DATE: January 27, 1986
PHONE: 297-4475
SUBJECT: PREVAILI NG WAGE CERT IF ICATI ONS
Effective February 1, 1986 pursuant to ,Laws of Minnesota,Statutes 177.41 to 177.44, the Department of Labor andIndustry will certify prevailing wage rates for highway/heavy construction in the following Minnesota counties:Aitkin, Becker, Beltrami, Carlton, Cass, Clay, Clearwater,Cook, Crow Wing, Hubbard, Itasca, Kittson, Koochiching,Lake, Lake of the Woods, Mahnomen, Marshall, Norman;Ottertail, Pennington, Polk, Red Lake, Roseau, St. Louis,Wadena and Wilkin.
NOTE: MINNESOTA STATUTES 177.43, subd. 3 requiresthat the contract must specifically statethe prevailing wage rates, prevailing hoursof labor, and hourly basic rates of pay.
The attached copies are sent to you for the purpose ofincluding them in bid proposals.
EKO/cpEncls.
Pursuant to Mn Stat 177.41 ' 177.*
+" • •
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDgSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTROCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 01 AITKIN EFFECTIVE DATE p'F DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND EMPLOYEES~
rates should be repor~ed immediately toOffice of cons~ructioni Transpor~a~lonSt. Paul, Minnesota 55 55,
eigh~ (8) hours per day and for~y (491in excess of the p'reva~ling hours sha Iand one half (1 172) tlmes the basic
FRONT END LOADER OPERATOR
FIREMAN OR TANK HEATER OPERATOR
218
219
222
223
214
216
217
This project is covered by the Minnesota Prevail ing Wage Statutes. Thewage rates for the labor classifications 1is~ed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave ceen predetermined. Those rates and the effective date are alsoshown. LaDor classifications no~ listed below have had no rate de~ermineddue to lack of information.The prevailing hours of labor arehours per weeK. All hours workedbe paia a~ a rate of a~ leas~ onehourly ra~e paid to the employee.
Violations of the prevailing wagethe. Department of Transpor~a~ion,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates tha~ adjacen~ county ra~es were used for this classifica~iondetermination due to insufficlen~ dat'fE'1A~vMEfo~ t~~'l'ti.INGRATE
CODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR. RATE.............................----- -..---- _ _._._----~-_._-
101 LABORER. COMMON (GENERAL LABOR WORK)llO. 23 11. 17 1 11.40 I102 LABORER, SKILLED (ASSISTING SKILLED i10.23i1.17i 11.40 I
CRAFT JOURNEYMAN) I I I I! I I I
103 *LABORER. LANDSCAPING (GARDNER, SOD I 9.2510.001 9.25 ILAYER AND NURSERYMAN) I I I i
I I I I104 FLAGPERSON I 8.58ll.17! 9.75 '
I I ! i107 *PIPELAYER (WATER, SEWER & GAS) I 9.9513.251 13.20 I
- .! I ! I201 AIR COMPRESSOR OPERATOR 112.8412.901 15.74 I
. I I ! i202 ASPHALT~ BITUMINOUS STABILIZER PLANTI15.1112.901 18.01 I
OPERATOK I I ! II I I I
203 DRAGLINE AND/OR OTHER SIMILAR 115.9610.001 15.96 IEQUIPMENT WITH SHOVEL TYPE CONTROLS I ! I I
I I I I204 BITUMINOUS SPREADER AND FINISHING 115.1112.901 18.01 I
OPERATOR I I I II I I I
205 BITUMINOUS SPREADER AND BITUMINOUS 114.0711.171 15.24 IFINISHING MACHINE OPERATOR (HELPER) I I I I
I I I I206 CONVEYER OPERATOR I 5.7911.171 6.96 I
I I ! I209 CRUSHING PLANT OPERATOR (GRAVEL AND 115.1112.901 18.01 I
STONE) OR GRAVEL WASHINq! CRUSHING I I I IAND SCREENING PLANT OPEKATORS I I I I
I ! I i210 *CURB MACHINE 115.1112.901 18.01 !
I I ! I211 *FRONT END LOADER OPERATOR UP TO AND 112.8412.901 15.74 ,
INCLUDING 1 CU. YD. I I ! iI I I I
213 *FORKLIFT OPERATOR 115.1112.901 18.01 iI ! I I116.1811.17! 17.35 i! I I !110.3911.17! 11.56 II ! I i
GRADER OR MOTOR PATROL, FINISHING, 116.4711.171 17.64 iEARTHWORK AND BITUMINOUS ! I I I
I I ! iGRADER OPERATOR (MOTOR PATROL) 112.8412.90! 15.74 I
! I I iGREASER (TRUCK AND TRACTOR) 112.1212.90! 15.02 !
I ! ! !MECHANIC OR WELDER 115.1112.90! 18.01 !
, , I !OILERS (POWER SHOVEL, CRANE, DRAG- i12.12i2.90i 15.02 !LINE) I ! ! I
I I ! i224 PICK UP SWEEPER 116.1811.17! 17.35 !
I ! ! I226 ROLLER OPERATOR, SELF PROPELLED 114.0711.171 15.24 !
ROLLER FOR COMPACTION ! I ! !, I I !
227 ROLLER OPERATOR, UP TO AND INCLUDINGi14.07i1.17i 15.24 !6 TONS FOR BITUMINOUS FINISHING I ! ! !AND/ OR WEARING COURSES !!! !
235 "'TRACTOR OPERATOR, 02, TD6, ORSIMILIAR H.P. WITH POWER TAKE-OFF
236 TRACTOR OPERATOR~ OVER D2~ TD6 ORSIMILIAR H.P. WI~H POWER lAKE-OFF
237 *POWER ACTUATED AUGERS AND BORINGMACHINE
239 "'CRANE OPERATOR
240 "'BOOM TRUCK
241 "'MILLING MACHINE
242 *TRENCHER
301 BITUMINOUS DISTRIBUTOR DRIVER
302 DUMPMAN
304 *SELF PROPELLED PACKER OPERATOR
305 TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
306 SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
308 FOUR AXLE UNIT
309 FIVE AXLE UNIT
404 *CARPENTER
406 "'CEMENT MASON
407 "'ELECTRICIAN
413 "'LINEMAN
417 "'PIPEFITTER - STEAMFITTER
419 "'PLUMBER
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION (01 AITKIN RATE FB HR RATEIDATE RATE FB HR RATE=••••••••_---.__••••••••••••_----- -_ __._-228 ROLLER OPERAYOR~ OVER 6 TONS FOR· 115.1112.901 18.01 1 1 1
BITUMINOUS FINI:;HING AND/OR WEARING I 1 1 I I ICOURSES I I I i I I
1 I 1 I i I231 "'RUBBER TIRED TRACTOR, BACK HOE 115.1112.901 18.01 II I 'I·
ATTACHMENT 1 1 1 II I I I i I
232 "'SHOULDERING MACHINE OPERATOR (POWER)112.8412.901 15.74 1 I I(APSCO OR SIMILIAR TYPE) I I I I! I
I I I 1 I I234 TURNAPULL OPERATOR (OR SIMILAR TYPE)115.1112.901 18.01 1 I I
1 1 1 1 I I115.1112.901 18.01 I I 11 1 I 1 I 1I 1 IIi 1115.1112.901 18.01 I I 1I I 1 1 1 1I I I 1 1 1112.8412.901 15.74 1 1 1I I 1 I 1 11 1 I !! I115.9612.901 18.86 'I 1I 1 Iii I115.1112.901 18.01 I I 11 I I ! I ,!15.1112.901 18.01 I! i1 1 I I' I115.1112.90! 18.01 I i II I I I I I112.5811.171 13.75 I i II I I ! I I112.5811.171 13.75 1 I I1 I I ! I I1 8.8311.031 9.86 I!'! I 1 IIi113.5111.171 14.68 I!'1 1 I 1 1I 1 1 I I! ! 1 i!I I I I'111.4112.451 13.86 ! iI 1 I 1 I·112.8311.171 14.00 1 i1 I ! I!111.7812.451 14.23 I'I 1 I I i113.5111.171 14.68 i II 1 I I 1117.7310.001 17.73 1 I1 1 1 1 1115.5011.501 17.00 I!! I I 1 1116.0015.121 21.12 I!I I 1 'I115.9213.001 18.92 i 1! 1 I ! 1115.4312.661 18.09 I!I I 1 I 1!15.43!2.661 18.09 !!1 I II!
j
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 03 BECKER EFFECTIVE DATE: qF_DETERMINATION: FEBRUARY 1, 1986
rates should be reported immediately toOffice of construction! TransportatIonSt. Paul, Minnesota 55 55,
*ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
*FlNE GRADE OPERATOR
*FORKLIFT OPERATOR
*FRONT END LOADER OPERATOR
*FIREMAN OR TANK HEATER OPERATOR
*GRADER OR MOTOR PATROL~ FINISHING,EARTHWORK AND BITUMINOuS
*GRADER OPERATOR (MOTOR PATROL)
*GREASER (TRUCK AND TRACTOR)
*SELr PROPELLED CHIP SPREADER
*MECHANIC OR WELDER
*PICK UP SWEEPER
218
219
221
222
224
226
212
213
214
216
217
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave Deen predetermined. Those rat,s and the effective date are alsoshown. Lacor classifications not lIsted below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'reva~ling hours ,ha 1be paia at a rate of at least one and one half (1 172) tImes the baSIChourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.* Indicates that adjacent county rates were used for this classification
determination due to insufficIent dats~vl~~v~~hfoF t~REqJg~LINGRATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE IDATE RATE FB HR RATE....-- --_ -- _---.---.---_.--_.._..__..~_.--101 LABORER, COMMON (GENERAL LABOR WORK)110.2511.651 11.90 I I I
I I ! I I I102 *LABORER, SKILLED (ASSISTING SKILLED ! 9.2411~171 10.41 I I I
CRAFT JOURNEYMAN) I I I I I II I I I I I
103 LABORER, LANDSCAPING (GARDNER, SOD I 8.25/0.001 8.25 I I ILAYER AND NURSERYMAN) / / I I 1 I
I I / I' I104 *FLAGPERSON I 7.24/1.171 8.41 I 1 I
I I I I I 1107 PIPELAYER (WATER, SEWER & GAS) 110. 70 11. 65 1 12.35 l I I201 *AIR COMPRESSOR OPERATOR i 9.6011.03i 10.63 1 I I
I I I I 1 I202 *ASPHALT~ BITUMINOUS STABILIZER PLANTl11.6711.171 12.84 I I I
OPERATOK· ! I / I I II / I I i I
203 *DRAGLlNE AND/OR OTHER SIMILAR /14.1512.90/ 17.05 I / IEQUIPMENT WITH SHOVEL TYPE CONTROLS I I / I I I
I / I I! I204 *BlTUMINOUS SPREADER AND FINISHING 110.9211.17/ 12.09 I I I
OPERATOR ! I I I I II I I I I I
205 *BlTUMINOUS SPREADER AND BITUMINOUS 111.26/1.171 12.43 I' IFINISHING MACHINE OPERATOR (HELPER) I I / Iii
I I I I I I209 *CRUSHING PLANT OPERATOR (GRAVEL AND 112.9112.90/ 15.81 I! I
STONE) OR GRAVEL WASHIN~I. CRUSHING I I I I I IAND SCREENING PLANT OPEKATORS I I I I i I
I I I I! I
210 *CURB MACHINE /14.3011.501 15.80 I! 1I I I I I I
211 *FRONT END LOADER OPERATOR UP TO AND !11.3512.901 14.25 Ii/INCLUDING 1 CU. YD. I I / !! I
I ! I I I I113.22/2.90/ 16.12 I i 1I I I I! Iil1.26i1.17i 12.43 1! I/ I I I! I110.92/1.171 12.09 I' /! I I I i I110.1111.171 11.28 I I 1I I I ! i I!11.3011.171 12.47 I! II I I '! Iiii i I I110.3911.171 11.56 I i II I I I! I/10.8412.901 13.74 I' 1, , , 'i 'i 8.25i2.05i 10.30 1! 1I I I !! I110.5111.171 11.68 I! 1I ! I I I I110.39/1.171 11.56 I i 1! ! 1 I I I! 9.65/1.171 10.82 ! i I! I I I! II I I !! I
227 *ROLLER OPERATOR, UP TO AND INCLUDING I 7.75/2.051 9.80 I! I6 TONS FOR BITUMINOUS FINISHING ! ! ! ! I IAND/ OR WEARING COURSES !!! ! i I
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION (03 BECKER RATE FB HR RATEIDATE RATE FB HR RATEa •••••••••••__•••••aa•••• __•••__• __• ••••_ .
229 *SCRAPER, 32 CU. YDS. AND OVER
404 *CARPENTER
406 *CEMENT MASON
228 *ROLLER OPERATOR~ OVER 6 TONS FOR !11.26!1.17!BITUMINOUS F'INI:;HING AND/OR WEARING "I ! ICOURSES I I I
I • 1 1!13:0212.901I I I
231 *RUBBER TIRED TRACTOR, BACK HOE 112.9112.901ATTACHMENT I I I
I I I232 *SHOULDERING MACHINE OPERATOR (POWER)!10.3911.171
(APSCQ OR SIMILIAR TYPE) I I I234 *TURNAPULL OPERATOR (OR SIMILAR TYPE) I 12.9112.901
1 I 1235 *TRACTOR OPERATOR~D2, TD6, OR 112.9112.901
SIMILIAR H.P. WI~tt POWER TAKE-OFF 1 I II I I
236 *TRACTOR OPERATOR, OVER D2, TD6 OR 112.9112.901SIMILIAR H.P. WITH POWER TAKE-OFF I I I
I I I238 *TRUCK CRANE OILER 111.2212.05!, , ,239 *CRANE OPERATOR i11.45i2.05i
I I301 *BlTUMINOUS DISTRIBUTOR DRIVER 10.3911.171
I I302 *DUMPMAN 9.2411.171
I I303 *GREASER AND TRUCK SERVICEMAN 9.0011.251
I I305 *TRUCK DRIVER (HAULING MACHINERY FOR 10. 9311. 171
CONTRACTORS OWN USE INCLUDING OP- ! IERATION OF HAND OR POWER OPERATED I IWINCHES) ! I
I I I306 *SINGLE AXLE OR 2 AXLE UNIT 110.1111.051
I II307 TANDEM AXLE OR 3 AXLE UNIT I 9.0510.001
I I I309 *FIVE AXLE UNIT 110.8211.17!
I I I111.7311.44 I
~ 9.0010.001I ! I
12.43
15.92
15.81
11.56
15.81
15.81
15.81
13.27
13.50
11.56
10.41
10.25
12.10
11.16
9.05
11.99
13.17
9.00
IIII!IIIIIIIII
iIIIII,iI!,i,iI
iIIII!III!III
iII
III
iII!IIIII!IIIII,iII,iIIII!I!I,iIIIIII,iiII
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
ROLLER OPERATOR, OVER 6 TONS FORBITUMINOUS FINISHING AND/OR WEARINGCOURSES
FIREMAN OR TANK HEATER OPERATOR
FINE GRADE OPERATOR
FRONT END LOADER OPERATOR
GRADER OR MOTOR PATROL~ FINISHING,EARTHWORK AND BITUMINOuS
GRADER OPERATOR (MOTOR PATROL)
GREASER (TRUCK AND TRACTOR)
MECHANIC OR WELDER
*OILERS (POWER SHOVEL,LINE)
*PICK UP SWEEPER
229 *SCRAPER, 32 CU. YOS. AND OVER
228
224
226
218
219
222
223
210 *CURB MACHINE
212
214
216
217
COUNTY 04 BELTRAMI EFFECTIVE DATE:··<1r DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND EMPLOYEES:This project is covered by the· Minnesota Prevailing Wage Statutes, Thewage rates for the labor classifications listed below are the minImumhourly rate to be paid on this project. In some instances, future rateshave ceen predetermined. Those rates and the effective date are alsoshown. Lacor classifications not listed below have had no rate detecnineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'reva~ling hours ~ha 1be paic at a rate of at least one and one half (1 172) tImes the baSIChourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.W Indicates that adjacent county rates were used for this classification
determination due to insufficIent data received for this county.PREVAILING RATE I FUTURE PREVAILING RATE
CODE NUMBER & BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE....---- --_.__ - - ------ _----- __ ---_..~---~101 LABORER, COMM()N (GENERAL LABOR WORK) l 8. 72 10 • 00 I 8.72 I I I102 LABORER, SKILLED (ASSISTING SKILLED i 9.00io.00i 9.00 iii
CRAFT JOURNEYMAN) I I 1 I 1 II I lIt 1
103 *LABORER, LANDSCAPING (GARDNER, SOD 1 9.2510.001 9.25 litLAYER AND NURSERYMAN) I I II! i
! I I ! I I104 FLAGPERSON I 6.6711.031 7.70 II!
I I 1 I! ,107 *PIPELAY~ (WATER, SEWER & GAS) i10.7011.651 12.35 1 I i109 UNDERGROUND AND OPEN DITCH LABORER 111.0010.001 11.00 I I I
(8 FEET BELOW STARTING GRADE LEVEL) I I I I! I1 I ! I' I
201 AIR COMPRESSOR OPERATOR 110.0111.031 11.04 ! i II I ! I I ,
202 ASPHALT~ BITUMINOUS STABILIZER PLANTI11.87!1.17! 13.04 I I iOPERATOK 1 I ! I! !
I ! I I! ,203 DRAGLINE AND/OE OTHER SIMILAR 114.1512.901 17.05 I! i
EQUIPMENT WITH SHOVEL TYPE CONTROLS I I 1 I I I1 II! i '
204 BITUMINOUS SPREADER AND FINISHING 114.0711.171 15.24 I! iOPERATOR 1 I II! I
I I ! I! I205 BITUMINOUS SPREADER AND BITUMINOUS 111.2611.171 12.43 I!'
FINISHING MACHINE OPERATOR (HELPER) I I I ! I iI ! ! I I !
209 CRUSHING PLANT OPERATOR (GRAVEL AND 112.59!3.211 15.80 I I ISTONE) OR GRAVEL WASHIN!?, CRUSHING! I 1 I i IAND SCREENING PLANT OPE1<ATORS I ! I !! ,
I ! I !! i112.9112.901 15.81 I! III! I' I113.2212.901 16.12 ! i I1 1 II! 1112.59!3.211 15.80 I! I! ! II! i110.3911.17! 11.56 I' i1 ! ! ! i 1113.2212.90! 16.12 I! 1, , , '! 1iii i, 1I 11.35 I2.90 I 14.25 Ii,1 I II! i110.6613.081 13.74 I! I! ! II! I112.5913.221 15.81 I! II I I !! i
CRANE, DRAG- 110.8412.901 13.74 I! 1I I , I I I
iii iiii10.39il.17i 11.56 i! 1, , , '! Iil2.9li2.90i 15.81 i!!I I , I! Iiii i! ii 1O.32i2.30i 12.62 i!!! I II! I! ! ! !! II I , I! I
ho.ooio.ooi 10.00 j! j
239 CRANE OPERATOR
301 BITUMINOUS DISTRIBUTOR DRIVER
302 DUMPMAN
303 *GREASER AND TRUCK SERVICEMAN
304 *SELF PROPELLED PACKER OPERATOR
305 *TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION .OF HAND OR POWER OPERATEDWINCHES)
306 SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
308 *FOUR AXLE UNIT
309 FIVE AXLE UNIT
404 CARPENTER
406 CEMENT MASON
410 *LATHER
412 IRONWORKER
417 *PIPEFITTER - STEAMFITTER
418 *PLASTERER
419 *PLUMBER
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASS;IFICATION ~04 BELTRAMI ) . RATE FB HR RATE 1DATE RATE FB HR RATE• • __•• • ~-- _. • __._._.__• __._._._••••••_ •••••_ ._•••_._. am
231 RUBBER TIRED TRACTOR, BACK HOE I 9.6511.171 10.82 I! IATTACHMENT 1 • I I 1 I I
, • I , I I I232 *SHOULDERING MACHINE OPERATOR (POWER)i11.35i2.90i 14.25 I I !
(APSCO OR SIMILIAR TYPE) I I I I I 11 I I ! I !
234 TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.901 15.81 " II ! ! i i !
235 *TRACTQR OPERATOR, D2, TD6~ OR !12.91!2.901 15.81 I I !SIMILIAR H.P. WITH POWER "rAKE-OFF! ! ! 1 I !
I ! 1 I I !236 TRACTOR OPERATOR, OVER D2, TD6 OR !12.91!2.901 15.81 I I !
SIMILIAR H.P. WITH POWER TAKE-OFF! 1 ! !! II ! II! !!14.15!2.901 17.05 II!1 1 I I I !! 9.5112.301 11.81 ! I !! 1 I I I !I 9.24!1.171 10.41 "!! ! 1 i i !! 11.5911.05! 12.64 "!II! i i !! 8.83!1.03! 9.86 I I '! ! 1 I I i110.9311.171 12.10 ! I !I ! 1 f I !1 I Iii !1 ! I 1 I !1 1 I I I !! 9.5111.03! 10.54 I I !1 ! ! ! I !110.54!0.001 10.54 I!!! I ! I I !111.7812.451 14.23 III!10.8211.17! 11.99 Iii! ! ! f I !! 9.75!0.00! 9.75 i i !1 II! I !116.10!1.501 17.60 1 I IJ 1 1 I ! I I~14.80!2.401 17.20 105/01/86114.9512.40! 17.351 ! 1 I' . ",- !!11.7011.171 12.87 , I f
I I Iii i115.4312.661 18.09 ! ! Ir I 1 II!117.6011.101 18.70 1 ! !I 1 1 II!!15.4312.661 18.09 II!1 1 1 I ! !
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND IND~STRY
Minn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICU.OUS PLACE
COUNTY 09 CARLTON EFFECTIVE DATE ~F DETERMINATION: FEBRUARY I, 1986
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
GRADER OR MOTOR PATROLJ. FINISHING,EARTHWORK AND BITUMINOuS
*GRADER OPERATOR (MOTOR PATROL)
GREASER (TRUCK AND TRACTOR).
MECHANIC OR WELDER
OILERS (POWER SHOVEL,LINE)
*PICK UP SWEEPER
*ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
224
226
218
219
222
223
217
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed b.low are the minimumhourly rate to be paid on this project. In some lnstances, future rateshave Deen predetermined. Those rates and the effective date are alsoshown. Lacor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weei. All hours worked in excess of the p'reva~ling hours ,ha 1be paia at a rate of at least one and one half (1 172) tlmes the baslchourly rate paid to the employee~
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland BOUlevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent da~IEM~drEfor: t~R!~~n""INGRATE
CODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE..........................................------ _----- -.-------101 LABORER, COMMON (GENERAL LABOR WORK)112.1313.251 15.38 I I
1 Iii i102 LABORER, SKILLED (ASSISTING SKILLED 112.1313.251 15.38 ! 1
CRAFT JOURNEYMAN) 1 II! 1II! ! !
104 FLAGPERSON !lO.2313.251 13.48 ! 11 II! I
107 *PIPELAYER (WATER, SEWER & GAS) 112.5813.251 15.83 I i1 Iii 1
201 *AIR COMPRESSOR OPERATOR 112.8412.901 15.74 ! II 1 Iii
202 ASPHALT~ BlTUMlNOUS STABILIZER PLANTI15.1112.901 18.01 I 1OPERATOK 1 Iii 1
1 II! 1203 DRAGLlNE AND/OR OTHER SIMILAR 115.9612.901 18.86 1 1
EQUIPMENT WITH SHOVEL TYPE CONTROLS 1 II! 11 II! 1
204 BITUMINOUS SPREADER AND FINISHING 115.1112.901 18.01 ! IOPERATOR 1 1 Iii
1 1 1 1 1205 BITUMINOUS SPREADER AND BITUMINOUS 112.8412.901 15.74 I 1
FINISHING MACHINE OPERATOR (HELPER) 1 Iii 11 II! 1
206 *CONVEYER OPERATOR 1 5.7911.171 6.96 I 11 Iii 1
209 CRUSHING PLANT OPERATOR (GRAVEL AND 115.1112.901 18.01 ! ISTONE) OR GRAVEL WASHIN~, CRUSHING 1 1 IiiAND SCREENING PLANT OPEKATORS 1 II! 1
1 II! '210 CURB MACHINE 114.3011.501 15.80 1 i
! 1 ! , I
211 FRONT END LOADER OPERATOR UP TO AND !l2.8412.901 15.74 i iINCLUDING 1 CU. YD. 1 1 1 I i
1 Iii 1213 *FORKLIFT OPERATOR 115.1112.901 18.01 ! ,
1 II! i214 FRONT END LOADER OPERATOR 115.1112.901 18.01 ' I
1 Iii i216 *FlREMAN OR TANK HEATER OPERATOR 110.3911.171 11.56 ! i
I II! 1115.4112.901 18.31 I 1! 1 ! i 11 1 1 ' 1112.8412.901 15.74 i I! 1 Iii112.1212.901 15.02 I I1 Iii i115.1112.901 18.01 1 i1 ! Iii
CRANE, DRAG- 112.1212.901 15.02 1 1! ! ! 1 '1 1 Iii116.1811.171 17.35 I 11 ! ! i I115.1112.901 18.01 1 i! ! ! 1 !! 1 ! 1 !
227 *ROLLER OPERATOR, UP TO AND INCLUDING 114.0711.171 15.24 1 !6 TONS FOR BITUMINOUS FINISHING ! ! II!AND/OR WEARING COURSES I!! 1 !
II! I I
228 ROLLER OPERATOR, OVER 6 TONS FOR 115.1112.901 18.01 i iBITUMINOUS FINISHING AND/OR WEARING 1 ! ! ! !COURSES
241 *MILLING MACHINE
242 *TRENCHER
301 BITUMINOUS DISTRIBUTOR DRIVER .
302 *DUMPMAN
305 *TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
306 SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
308 FOUR AXLE UNIT
309 *FIVE AXLE UNIT
404 *CARPENTER
406 CEMENT MASON
407 *ELECTRICIAN
4-13 *LINEMAN
417 *PIPEFITTER - STEAMFITTER
419 *PLUMBER
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL !EFFECT BASIC TOTALCLASSIFICATION (09 CARLTON RATE FB HR RATE IDATE RATE FB IIR RATE.a••~.~••_•••••••••••_••_•••__••__•••••__ __••_••• __••••_•••••••••••••••••••••••••231 *RUBBER TIRED TRACTOR, BACK HOE 115.1112.901 18.01 I 1
ATTACHMENT I 1 1 I 11 1 I 1 1
232 *SHOULDERING MACHINE OPERATOR (POWER) 112.8412.901 15.74 I 1(APSCO OR SIMILIAR TYPE) I I IiI
. I 1 I ! 1234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)115.1112.901 18.01 I I
I 1 I 1 I236 TRACTOR OPERATOR~.OVER D2
tTD6 OR 115.1112.901 18.01 1 1
SIMILIAR H.P. 1011".1:11 POWER AKE-OFF I 1 I I 11 I IiI
237 *POWER ACTUATED AUGERS AND BORING 112.8412.901 15.74 I 1MACHINE 1 I ! 1 '
I 1 IIi239 *CRANE OPERATOR 115.9612.901 18.86 1 1
I I I I '240 *BOOM TRUCK 115.1112.901 18.01 I i
I I ! ! 1115.1112.901 18.01 1 I! I 1 I 1115.1112.901 18.01 I 11 1"2.'f~1 I 1113.051~1 15.50 i 1I 1 1 I 1112.5811.171 13.75 ' 1, , Ii'il3.70i2.45i 16.15 I iI I 1 1 'I 1 IIiI 1 I I ,
1 I Iii112.8012.451 15.25 i 11 1 I I 1113.0512.451 15.50 i 11 1 I 1 I113.1512.451 15.60 , 1I IIi 1113051110171 14.68 I 11 1 I 1 I116.1312.201 18.33 1 1! 1 1 I I115.5011.501 17.00 I 1, , I I ,iI6.00i5.12i 21.12 I i1 1 I I I11509213.001 18.92 1 1I I ! 1 1115.7614.251 20001 1 11 I 1 I 111507614.251 20001 I ,I I ! I i
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MOST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 11 CASS EFFECTIVE DATE Q£ DETERMINATION: FEBRUARY 1, 1986
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
213 "'FORKLIFT OPERATOR
214 FRONT END LOADER OPERATOR
216 FIREMAN OR TANK HEATER OPERATOR
217 GRADER OR MOTOR PATROL~ FINISHING,EARTHWORK AND BITUMINOuS
218 GRADER OPERATOR (MOTOR PATROL)
219 "'GREASER (TRUCK AND TRACTOR)
222 "'MECHANIC OR WELDER
223 "'OILERS (POWER SHOVEL,LINE)
224 PICK UP SWEEPER
205 BITUMINOUS SPREADER AND BITUMINOUSFINISHING MACHINE OPERATOR (HELPER)
206 "'CONVEYER OPERATOR
209 "'CRUSHING PLANT OPERATOR (GRAVEL ANDSTONE) OR GRAVEL WASHIN~1 CRUSHINGAND SCREENING PLANT OPEJ.<ATORS
210 "'CURB MACHINE
212 "'FINE GRADE OPERATOR
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave oeen predetermined. Those rates and the effective date are alsoshown. Lacor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (481hours per weeK. All hours worked in excess of the p'reva~ling hours ,ha Ibe paid at a rate of at least one and one half (1 172) tlmes the baslchourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland BOUlevard.phone (6 2) 296-6353.
'" Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
. PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE! DATE RATE FB IIR RATE..............--------- ----------- ----------.- --_ -~--_..101 LABORER, COMMON (GENERAL LABOR WORK) 110.25 ! 1. 65 ! 11.90 1 1
! !.! I !102 LABORER, SKILLED (ASSISTING SKILLED 110.0411.17! 11.21 i !
CRAFT JOURNEYMAN) !! ! ! 1! ! ! ! !
103 LABORER, LANDSCAPING (GARDNER, SOD ! 9.25!0.00! 9.25 ! 'LAYER AND NURSERYMAN) !!! I i
! ! ! ! !104 FLAGPERSON ! 8.6011.65! 10.25 ! !
! ! ! 1 !107 "'PIPELAYER (WATER, SEWER &. GAS) !10.70!1.651 12.35 ! 1
l ! 1 ! !109 "'UNDERGROUND AND OPEN DITCH LABORER 1"11.00!0.001 11.00 1 !
(8 FEET BELOW STARTING GRADE LEVEL) ! 1 1 I !.! 1 II!
201 "'AIR COMPRESSOR" OPERATOR 112.84!2.90! 15.74 1 !I ! 1 ! !
202 ASPHALT~ BITUMINOUS STABILIZER PLANT!11.67!1.171 12.84 I"
OPERATOK ! IIi! ! ! ! !
203 DRAGLlNE AND/OR OTHER SIMILAR !14.15!2.901 17.05 1 !EQUIPMENT WITH ·SHOVEL TYPE CONTROLS ! ! I 1 1
1 1 I ! 1204 BITUMINOUS SPREADER AND FINISHING 111.2611.171 12.43 ! ,
OPERATOR I 1 I ! i1 I 1 I 1111.2611.171 12.43 1 1I ! ! 1 I! I I ! i! 5.79!1.17! 6.96 ! !! I I ! ,115.1112.90! 18.01 , iI II! '! I ! , i1 I I I I!15.1112.901 18.01 I II ! Ii I113.2212.901 16.12 ! i1 1 1 I I!15.1112.901 18.01 i II I , ! ,!11.26il.17! 12.43 I iI I , i I
ilO.39!1.17! 11.56 I i! 1 Ii,113.2212.901 16.12 i iI , , ! 'iii ! i!12.8412.901 15.74 ! I, , , I ,il2.12i2.90! 15.02 ! i! 1 ! ! ,115.1112.901 18.01 ! !II! I !
CRANE, DRAG- 112.1212.901 15.02 ! 1II! ! 1I ! ! ! I110.3911.171 11.56 ! iI 1 I ! !
226 "'ROLLER OPERATOR, SELF PROPELLED ! 9.6511.17! 10.82 ! !ROLLER FOR COMPACTION ,!! ! 1
! ! 1 I !227 "'ROLLER OPERATOR, UP TO AND INCLUDINGII0.39!1.17! 11.56 i 1
6 TONS FOR BITUMINOUS FINISHINGAND/OR WEARING COURSES
419 "'PLUMBER
301
302
304
305
239 "'CRANE OPERATOR
BITUMINOUS DISTRIBUTOR DRIVER
"'DUMPMAN"'SELF PROPELLED PACKER OPERATOR
TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
306 "'SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
308 "'FOUR AXLE UNIT
309 FIVE AXLE UNIT
404 "'CARPENTER
406 "'CEMENT MASON
412 "'IRONWORKER
417 "'PIPEFITTER - STEAMFITTER
· "PREVAILING RATE FUTURE PREVAILING RATECODE NUMBER & '. BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION (11 CASS ) RATE FB HR RATE IDATE RATE FB HR RATEaa······················..··..····-_···..···9··..·········._..-..--.._....._~._._._....-.228 ROLLER OPERATOR1 OVER 6 TONS FOR 112:91!2.90! 15.81 I ! I !
BITUMINOUS FINI~HING AND/OR WEARING I I 1 1 I I !COURSES I ! 1 I ! 1 !
I I I ! !!!229 "'SCRAPER, 32 CU. YDS. AND OVER 110.0010.00! 10.00 ! ! 1 !
I ! I I I I !231 RUBBER TIRED TRACTOR, BACK HOE 1 9.65!1.171 10~82 ! ! 1 !
ATTACHMENT I ! 1 I II!" ! I I ! ! I !
232 "'SHOULDERING MACHINE OPERATOR (POWER)112.84!2.901 15.74 I ! 1 !(APSCO OR SIMILIAR TYPE) I! 1 I ! I !
! !! ! ! I !234 "'TURNAPULL OPERATOR (OR SIMILAR TYPE)115.11!2.90! 18.01 ! II!
1 !! I ! I !235 "'TRACTOR OPERATOR, D2, T06, OR 115.11!2.90! 18.01 1 II!
SIMILIAR H.P. WITH POWER TAKE-oFF I !! ! ! 1 !I !! ! !!!
236 TRACTOR OPERATOR~.OVER D2, T06 OR !15.1112.90! 18.01 ! II!SIMILIAR H.P. WI".rtt POWER TAKE-OFF! 1 I I ! I !
1 ! I ! I I !!15.9612.901 18.86 ! I I !1 I I 1 'I!110.39!1.171 11.56 ! I!I ! II! !I 9.24!1.17! 10.41 ! I!, '" I'i 8.83iI.03i 9.86 iii1 II! I!!10.93!1.17! 12.10 II!! I!! I!1 I! I I!I I! II!I 1"1 1 I!111.4112.45! 13.86 I I!I I!! !!110.39!1.17! 11.56 ! !!1 I!! !!111.7812.451 14.23 I I!I '" "t10.82i1.17i 11.99 iii! 1 I II!114.9710.00! 14.97 ! I!1 I! 1 1 I116.1011.501 17.60 I !!I I I II!111.7011.171 12.87 ! I" !I I 1 1 I!115.4312.661 18.09 I 1 II I I I I I115.4312.661 18.09 ! !!I I I I I!
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDgSTRYMinn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 14 CLAY EFFECTIVE DATE 9F DETERMINATION: FEBRUARY I, 1986
TO CONTRACTORS AND EMPLOYEES:
205 BITUMINOUS SPREADER AND BITUMINOUSFINISHING MACHINE OPERATOR (HELPER)
209 CRUSHING PLANT OPERATOR (GRAVEL ANDSTONE) OR GRAVEL WASHIN~! CRUSHINGAND SCREENING PLANT OPEl<ATORS
210 *CURB MACHINE
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
FRONT END LOADER OPERATOR
MECHANIC OR WELDER
FIREMAN OR TANK HEATER OPERATOR
FRONT END LOADER OPERATOR UP TO ANDINCLUDING 1 CU. YD.
FINE GRADE OPERATOR
FORKLIFT OPERATOR
GRADER OR MOTOR PATROL~ FINISHING,EARTHWORK AND BITUMINOuS
GRADER OPERATOR (MOTOR PATROL)
GREASER (TRUCK AND TRACTOR)
SELF PROPELLED CHIP SPREADER
*PICK UP SWEEPER
218
219
221
222
224
226
212
213
214
216
217
211
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave ceen predetermined. Those rates and the effective date are alsoshown. Lacor classifications not listed below have had no rate determineddue to lack of information. "
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'reva~ling hours ,ha 1be paia at a rate of at least one and one half (1 172) times the bas1chourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.* Indicates that adjacent county rates were used for this classification
determination due to insuffic1ent data received for this county.PREVAILING RATE 1 FUTURE PREVAILING RATE
CODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE!DATE RATE FB HR RATE..__ _~a __..__._._._._.. _.s . . __ ..101 LABORER, COMMON (GENERAL LABOR WORK)! 5.75!0.00! 5.75! ! 1 !
! !! ! I!!102 LABORER, SKILLED (ASSISTING SKILLED ! 8.25!0.00! 8.25! i!!
CRAFT JOURNEYMAN) I!! I !!!! !! i ! I !
103 LABORER, LANDSCAPING (GARDNER, SOD ! 8.25!0.00! 8.25! Ii!LAYER AND NURSERYMAN) !!!!! i I
I I I ! !! i104 FLAGPERSON ! 7.24iI.17i 8.41! I!!
! !! ! i!!107 *PIPELAYER (WATER, SEWER & GAS) !10.70!1.65! 12.35 I !!!
"J I I ! !!!201 *AIR COMPRESSOR OPERATOR i 9.60i1.03i 10.63 ! !!!
I I! I ! I !202 ASPHALT, BITUMINOUS STABILIZER PLANTl11.6711.17! 12.84 I I I I
OPERATOR ! I I i I! II I I ! ! I i
203 DRAGLINE AND/OR OTHER SIMILAR 114.1512.901 17.05 ! ! I IEQUIPMENT WITH SHOVEL TYPE CONTROLS ! I! I I i I
! I I ! ! i !204 BITUMINOUS SPREADER AND FINISHING !11.2611.171 12.43 I I! I
OPERATOR I I I I I I iI I! I I!!111.26!1.171 12.43 ! '! I! I! ! i I I! I! ! ! i! 6.00!0.00! 6.00 I ! !! !! i I !! !! ! i !! !! ! ! !!14.3011.50! 15.80 ! I !! !! ! i !111.3512.90! 14.25 ! I !! I! Ii!! ! Ii! !!13.22!2.90! 16.12 ! ' !! !! Ii!!11.26!1.171 12.43 1 ! !I " ! ! !!12.91!2.90i 15.81 I ! !! !! i ! !l10. 39 l1. 17 l 11.56III!13.22i2.90i 16.12 ! i i! !! I ! !! ! 1 i ! !110.39!1.17! 11.56 ! I !! II! i !!10.84!2.901 13.74 ! 1 I1 ! II! i! 8.25!2.051 10.30 1 , !, " ! i !iI2.91i2.90i 15.81 ' , !! I! i ! !!10.3911.17! 11.56 ! 1 !! !! I ! !! 12.90!2.90! 15.80· i ! 11 !! ! , II I Iii i
227 ROLLER OPERATOR, UP TO AND INCLUDINGi 7.75i2.05! 9.80! 1 !6 TONS FOR BITUMINOUS FINISHING ! ! II! !AND/OR WEARING COURSES I! 1 ! ! 1
TRUCK CRANE OILER
CRANE OPERATOR
BITUMINOUS DISTRIBUTOR DRIVER
DUMPMAN
GREASER AND TRUCK SERVICEMAN
TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
SINGLE AXLE OR 2 AXLE UNIT
TANDEM AXLE OR 3 AXLE UNIT
FIVE AXLE UNIT
CARPENTER
CEMENT MASON
306
307
309
404
406
238
239
301
302
303
305
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION (14 CLAY RATE FB HR RATE! DATE RATE FB HR RATE..............._----_ --_ _---- __.-_ __ .228 ROLLER OPERATOR~ OVER 6 ~ONS FOR 111.2611.17! 12.43 I
BITUMINOUS FINI:;HING AND/OR WEARING I I I ICOURSES I I I I
I I I !229 SCRAPER, 32 CU. YDS. AND OVER 113.0212.901 15.92 I
I ! I I231 RUBBER TIRED TRACTOR, BACK HOE 112.9112.90! 15.81 I
ATTACHMENT I ! I II ! I I
232 .SHOULDERING MACHINE OPERATOR (POWER)110.3911.171 11.56 I(APSCO OR SIMILIAR TYPE) !! I I
I I I I234 TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.901 15.81 I
I I I I235 TRACTOR OPERATOR~D2, TD6~ OR 112.9112.901 15.81 I
SIMILIAR H.P. WI'.L"l1 POWER '.rAKE-OFF! I ! II I I I
236 TRACTOR OPERATOR, OVER D2, TD6 OR 112.9112.901 15.81 ISIMILIAR H.P. WITH POWER TAKE-OFF I ! I I
I I I IIll.2212.051 13.27 iI I I !I 1l.4512.051 13.50 II I ! I110.3911.17 I 1l.56 II ! I I! 9.2411.171 10.41 iI I I I! 9.0011.251 10.25 I! I I I110.9311.171 12.10 II I I !I I I II I I II I I II 6.0010.001 6.-00 !I I I II 7.6711.25! 8.92 I! I I I110.8211.171 1l.99 II I I i
,lll.7311.441 13.17 i"1 I I II 9.0010.001 9.00 II I I I
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND IND~STRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 15 CLEARWATER EFFECTIVE DATE SF DETERMINATION: FEBRUARY I, 1986
217 "'GRADER OR MOTOR PATROL~ FINISHING,EARTHWORK AND BITUMINOuS
218 "'GRADER OPERATOR (MOTOR PATROL)
219 "'GREASER (TRUCK AND TRACTOR)
222 "'MECHANIC OR WELDER
224 "'PICK UP SWEEPER
226 "'ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPaCTION
rates should be reported immediately toOffice of construction! TransportatIonSt. Paul, Minnesota 55 55,
231 "'RUBBER TIRED TRACTOR, BACK HOEATTACHMENT
229 "'SCRAPER, 32 CU. YDS. AND OVER
216 "'FIREMAN OR TANK HEATER OPERATOR
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes, Thewage rates for the labor classifications listed below are the minImumhourlY rate to be paid on this proiect. In some instances, future rateshave Deen predetermined. Those rat,s and the effective date are alsoshown. Lacor classifications not lIsted below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (481hours,per weeK. All hours worked in excess of the p'reva~ling hours ,ha 1be pala at a rate of at least one and one half (1 172) tImes the baslchourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,BUilding! John Ireland Boulevard,phone (6 2) 296-6353.
'" Indicates that adjacent county rates were used for this classificationdetermination due to insufficIent data received for this county.
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR. RATE..............--_.---- ---._-- ------.- _.._..- -_..~_.--.101 LABORER, COMMON (GENERAL LABOR WORK)110.2511.651 11.90 I 1 I
I 1 1 I I 1102 *LABORER, SKILLED (ASSISTING SKILLED 1 9.2411.171 10.41 I I I
CRAFT JOURNEYMAN) I I 1 I I II I ! i I I
103 *LABORER, LANDSCAPING (GARDNER, SOD ! 9.2510.00! 9.25 I I 1LAYER AND NURSERYMAN) I I Iii 1
I 1 I 1 I !104 *FLAGPERSON I 7.6711.171 8.84 I 1 I
I 1 Ii! !107 "'PIPELAYER (WATER, SEWER & GAS)110.70!1.651 12.351 ' I
• 0 -o! 1 Iii I
109 "'UNDERGROUND AND OPEN DITCH LABORER !11.0010.00! 11.00 I I i(8 FEET BELOW STARTING GRADE LEVEL) I I II! I
! ! I I I I201 "'AIR COMPRESSOR OPERATOR 110.0111.031 ll.04 I' I
1 ! ! I i I202 "'ASPHALT~ BITUMINOUS STABILIZER PLANT 111.6711.171 12.84 'I'
OPERATOK I ! 1 iIiI I I ! I I
203 "'DRAGLINE AND/OR OTHER SIMILAR 114.1512.901 17.05 I I IEQUIPMENT WITH SHOVEL TYPE CONTROLS II! iiI
I 1 I ! I I204 "'BITUMINOUS SPREADER AND FINISHING !11.2611.171 12.43 I' I
OPERATOR I ! I I i II I I I I '
205 "'BITUMINOUS SPREADER AND BITUMINOUS 111.2611.171 12.43 iIiFINISHING MACHINE OPERATOR (HELPER) I I I I I I
I I I I I I206 "'CONVEYER OPERATOR I 9.6511.171 10.82 I' I
I I I I i I209 CRUSHING PLANT OPERATOR (GRAVEL AND 112.9112.901 15.81 I I 1
STONE) OR GRAVEL WASHINQ, CRUSHING I I 1 I! IAND SCREENING PLANT OPEl.<ATORS 1 I I I I I
I I Iii i212 FINE GRADE OPERATOR 112.9015.771 18.67 i I I
I I I I! I214 "'FRONT END LOADER OPERATOR 111.2611.171 12.43 ! I I
1 I I I! I110.3911.171 11.56 ! I I! ! I Iii111.6711.171 12.84 I I 'I I I '! iiii i! I111.3512.901 14.25 '! I! I I i I I110.6613.081 13.74 Ii'! 1 ! !! i112.5913.221 15.81 "!! ! 1 iii110.3111.171 11.48 !! i! ! ! '! 'I 9.6511.171 10.82 i! iI I I '! I1 ! ! i! !
228 "'ROLLER OPERATOR, OVER 6 TONS FOR Ill. 26 I1.17 I 12.43 I! IBITUMINOUS FINISHING AND/OR WEARING I ! I !! ICOURSES ! ! ! !! I
! ! ! !! !!l0.0010.001 10.00 !!!! I ! !! !! 9.6511.171 10.82 !!!! ! ! !! I
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL !EFFECT BASIC TOTALCLASSIFICATION (15 CLEARWATER ) RATE FB HR RATElDATE RATE FB HR RATE-_.._..-.--.----_.- ---- ----_.-.----_.~ _ _- _----_ .232 *SHOULDERING MACHINE OPERATOR (POWER)!10.39!1.171 11.56 !
(APSCO OR SIMILIAR TYPE) I I I I. ! • 1 1 I
234 *TURNAPULL OPERATOR (OR SIMILAR TYPE) 112.9112.901 15.81 III! i
235 *TRACTOR OPERATOR~D21 TD6, OR 112.0010.001 12.00 ISIMILIAR H.P. WI"J:11 PuWER TAKE-OFF 1 I I I
I I I I236 *TRACTOR OPERATOR~.OVER D2~ TD6 OR !12.9112.901 15.81 1
SIMILIAR H.P. Whl1 POWER "tAKE-OFF I 1 I I! 1 I I
239 *CRANE OPERATOR 114.1512.901 17.05 !! I 1 I
301 *BlTUMINOUS DISTRIBUTOR DRIVER 110.3911.171 11.56 1I I I I
302 *DUMPMAN ! 9.2411.171 10.41 I! I ! I
305 *TRUCK DRIVER (HAULING MACHINERY FOR 113.3811.171 14.55 !CONTRACTORS OWN USE INCLUDING OP- I I ! 1ERATION OF HAND OR POWER OPERATED! 1 I 1WINCHES) 1 ! ! '
! ! 1 i306 *SINGLE AXLE OR 2 AXLE UNIT I 9.5111.03! 10.54 1
! ! I '307 *TANDEM AXLE OR 3 AXLE UNIT ! 10.3911.17! 11.56 i
! I I 1309 *FIVE AXLE UNIT 110.8211.171 11.99 1
! I I !404 *CARPENTER 111.7011.17! 12.87 1
I 1 I 1406 *CEMENT MASON 114.751" O.QOI 14.75 1
! ! I ,412 *IRONWORKER 1 7.00 IO. 00 I 7.00 i
I I I i
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDgSTRY
Minn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 16 COOK EFFECTIVE DATE ~F DETERMINATION: FEBRUARY I, 1986
eight (8) hours per day and forty (491in excess of the p'reva~ling hours ,ha 1and one half (1 172) tlmes the baS1C
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
TO CONTRACTORS AND EMPLOYEES:
This project is covered by the Minnesota Prevailing Wage Statutes, Thewage rates for the labor classifications listed b.low are the minlmumhourly rate to be paid on this project. In some lnstances, future rateshave Deen predetermined. Those rates and the effective date are also •shown. LaDor classifications not listed below have had no rate determxneddue·to lack of information.
The prevailing hours of labor arehours per weeK. All hours workedbe paia at a rate of at least onehourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland BOUlevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent da~fEVA!~v~foF t~0M2~Xn.INGRATE
CODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE! DATE RATE FB HR RATE....................._--.......................................--..................__..--101 *LABORER, COMMON (GENERAL LABOR WORK) 112. 13 13.251 15.38 1 1
1 1 1 ! 1102 *LABORER, SKILLED (ASSISTING SKILLED 112.1313.251 15.38 ! 1
CRAFT JOURNEYMAN) 1 1 1 1 ,1 1 1 1 i
104 *FLAGPERSON 110.2313.251 13.48 1 ,! 1 1 , i
201 *AIR COMPRESSOR OPERATOR 113.5812.901 16.48 i 1, , , 1 1202 *ASPHALT
iBITUMINOUS STABILIZER PLANTi15.87i2.90i 18.77 1 ,
OPERATO _ - ! 1 1 1 i.~ 1 , 1 1
203 *DRAGLlNE AND/OR OTHER SIMILAR il6. 72 12. 90 i 19.62 , ,EQUIPMENT WITH SHOVEL TYPE CONTROLS 1 1 ! i i
1 1 , 1 1204 *BlTUMINOUS SPREADER AND FINISHING 115.8712.90i 18.77 1 1
OPERATOR 1 1 1 1 11 1 1 , ,
205 *BlTUMINOUS SPREADER AND BITUMINOUS 113.5812.901 16.48 i iFINISHING MACHINE OPERATOR (HELPER) 1 1 ! 1 1
1 1 1 1 1209 *CRUSHING PLANT OPERATOR (GRAVEL AND 115.8712.901 18.77 1 1
STONE) OR GRAVEL WASHINll CRUSHING II! ! 1AND SCREENING PLANT OPE TORS 1 1 1 1 1, , , 1 1
214 *FRONT END LOADER OPERATOR il5.87i2.90i 18.77 ! 1II! ! 1
217 *GRADER OR MOTOR PATROLd
FINISHING, 116.1712.901 19.07 , ,EARTHWORK AND BlTUMINO S ! 1 1 i i
1 1 1 1 1219 *GREASER (TRUCK AND TRACTOR) 112.8212.901 15.72 I 1, , , i 1222 *MECHANIC OR WELDER i 15.87i2.90i 18.77 ! I
! 1 ! I i223 *OILERS (POWER SHOVEL, CRANE, DRAG- 112.8212.901 15.72 i ,
LINE) 1 1 1 i iII! I 1
227 ROLLER OPERATOR, UP TO AND INCLUDINGI13.5812.90! 16.48 i 16 TONS FOR BITUMINOUS FINISHING ! ! 1 ! !AND/OR WEARING COURSES II! I 1
II! i 1228 *ROLLER OPERATORS OVER 6 TONS FOR 115.8712.901 18.77 ! 1
BITUMINOUS FINI HING AND/OR WEARING ! 1 ! I I
COURSES ' , I i iiii ! ,
229 *SCRAPER, 32 CU. YDS. AND OVER 115.8712.90! 18.77 ! 1! 1 ! I !
231 *RUBBER TIRED TRACTOR, BACK HOE 115.8712.90! 18.77 i I
ATTACHMENT ! 1 1 ! i1 1 ! I ,
232 *SHOULDERING MACHINE OPERATOR (POWER) 113.5812.90! 16.48 i i(APSCO OR SIMILIAR TYPE) ! 1 ! ! !
1 1 ! ! ,236 *TRACTOR OPERATOR, OVER D2, TD6 OR 115.8712.901 18.77 ! i
SIMILIAR H.P. WITH POWER TAKE-OFF ! ! ! ! 11 ! ! ! 1
301 *BlTUMINOUS DISTRIBUTOR DRIVER 113.9512.451 16.40 ! 1! 1 ! , !
306 *SINGLE AXLE OR 2 AXLE UNIT !13.7012.451 16.15 i !, , ,! 1
307 *TANDEM AXLE OR 3 AXLE UNIT 113.9512.451 16.40 ! !, I I
I,
404 *CARPENTER i15.33i3.lOi 18.43 i
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND IND~STRY
Minn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 16 COOK EFFECTIVE DATE ~F DETERMINATION: FEBRUARY 1, 1986
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
eight (8) hours per day and forty (491in excess of the p'revatling hours ~ha 1and one half (1 172) t mes the baslc
*BITUMINOUS DISTRIBUTOR DRIVER
*CARPENTER
*SINGLE AXLE OR 2 AXLE UNIT
*TANDEM AXLE OR 3 AXLE UNIT
301
306
307
404
TO CONTRACTORS AND EMPLOYEES:
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave Deen predetermined. Those ra~es and the effective date are alsoshown. Labor classifications not listed below have had no rate determineddue'to lack of information.
The prevailing hours of labor arehours per weeK. All hours workedbe paia at a rate of at least onehourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent da~lEVA!flNbv~foF t~Ri0M2VXn.INGRATE
CODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE IDATE RATE FB HR RATE••------ -------- •••• •••_ ••••_ ••~.~_••=a
101 *LABORER, COMMON (GENERAL LABOR WORK)112.1313.251 15.38 105/01/86112.4813.25 115.73I I I I 1 1 I
102 *LABORER, SKILLED (ASSISTING SKILLED 112.1313.251 15.38 105/01/85112.4813.25 115.73CRAFT JOURNEYMAN) I I 1 I I I I
1 I I I I I I104 *FLAGPERSON 110.2313.251 13.48 105/01/86110.2813.25113.53
I 1 I I I I I201 *AIR COMPRESSOR OPERATOR 113.5812.90116.48 105/01/86113.8312.90116.73
I I I I I I I202 *ASPHALT~ BITUMINOUS STABILIZER PLANTI15.8712.901 18.77 105/01/86116.3712.90 119.27
OPERATOK I 1 I I I· I I'i I I II I 1
203 *DRAGLlNE AND/OR OTHER SIMILAR ,116.7212.901 19.62 105/01/86117.2212.90 I 20.12EQUIPMENT WITH SHOVEL TYPE CONTROLS I I I I I I 1
I I I I I I I204 *BITUMINOUS SPREADER AND FINISHING 115.8712.90118.77 105/01/86116.3712.90119.27
OPERATOR 1 I I 1 I 1 II I I I I I I
205 *BITUMINOUS SPREADER AND BITUMINOUS 113.5812.901 16.48 105/01/86 113.83 12.90 1 16 73FINISHING MACHINE OPERATOR (HELPER) 1 I I I I I 1 •
I I I I I I I209 *CRUSHING PLANT OPERATOR (GRAVEL AND 115.8712.90118.77 105/01/86116.3712.90119.27
STONE) OR GRAVEL WASHIN~, CRUSHING I I I 1 1 1 IAND SCREENING PLANT OPEKATORS I 1 I 1 I I I
I 1 1 I I I I214 *FRONT END LOADER OPERATOR 115.8712.90118.77 105/01/86116.3712.901 1~.27
I I 1 I I I 1217 *GRADER OR MOTOR PATROLJ. FINISHING, 116.1712.901 19.07 105/01/86116.67 12.901 1~ .57
EARTHWORK AND BITUMINOuS I 1 1 I I I I1 I I I 1 I I
219 *GREASER (TRUCK AND TRACTOR) 112.8212.90 I 15.72 !05/01/86 !12 .92 !2.90 I 15 .82I 1 I I I 1 I
222 *MECHANIC OR WELDER 115.87 I2. 901 18.77 !05/01/86 116.37 12.90 I 19.27I I I 1 I I I
223 *OILERS (POWER SHOVEL, CRANE, DRAG- 112.8212.901 15.72 105/01/86112.9212.90 115.82LINE) I 1 I II! I
1 I I I 1 I I227 ROLLER OPERATOR, UP TO AND INCLUDINGI13.5812.901 16.48 105/01/86113.8312.901 ~ .73
6 TONS FOR BITUMINOUS FINISHING I ! 1 ! I 1 IAND/ OR WEARING COURSES I I 1 I 1 I !
I 1 II! I I228 *ROLLER OPERATOR~ OVER 6 TONS FOR 115.8712.901 18.77 105/01/86116.3712.90 119 _27
BITUMINOUS FINI::;HING AND/OR WEARING I !.! 1 1 I ICOURSES I I 1 I 1 I I
I I 1 I I! I229 *SCRAPER, 32 cu. YDS. AND OVER 115.8712.90118.77 105/01/86116.4912.90119_39
1 1 1 1 I 1 I231 *RUBBER TIRED TRACTOR, BACK HOE 115.8712.901 18.77 105/01/86116.3712.90 I 19 _27
ATTACHMENT ! 1 1 I ! 1 II I I ! 1 1 I
232 *SHOULDERING MACHINE OPERATOR (POWER) I13.5812.90 I 16.48 105/01/86113.83 !2.90 I 16 _73(APSCO OR SIMILIAR TYPE) I! 1 1 1 I I, " , '"
236 *TRACTOR OPERATOR, OVER D2, TD6 OR iI5.87i2.90i 18.77 i05/01/86h6.37h.90i 19 _27SIMILIAR H.P. WITH POWER TAKE-OFF I !! 1 !! I
I ! II! I !113.9512.451 16.40 ! I! I1 I I 1 I! I113.7012.451 16.15 I I! I! 1 II! ! I113.9512.45! 16.40 ! !! III! I ! 1 I115.3312.90 I 18.23 I 1 I I
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDgSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 18 CROW WING EFFECTIVE DATE BF DETERMINATION: FEBRUARY I, 1986
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Tbewage rates for the labor classifications listed b.low are the minimumhourly rate to be paid on this project. In some lnstances, future rateshave eeen predetermined. Those rates and the effective date are alsoshown. LaDor classifications not listed below have had no rate deterDineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeR. All hours worked in excess of the erevalling hours .ba 1be paia at a rate of at least one and one half (1 172) t mes the baslehourly rate paid to the employee.
Violations of the prevailing wage rates should be reported immediately tothe Department of Transportation, Office of construction! TransportatlonBUilding! John Ireland Boulevard, St. Paul, Minnesota 55 55,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE 1 FUTURE PREVJULING RATECODE NUMBER & BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE 1DATE RATE FB HR RATE• __ __• a.__• • _. ._~_••__
101 LABORER, COMMON (GENERAL LABOR WORK)II0.2511.651 11.90 1 1 II I 1 1 1 I
102 LABORER, SKILLED (ASSISTING SKILLED 110.2511.651 11.90 I I ICRAFT JOURNEYMAN) 1 1 1 1 1 I
1 I 1 I I I103 LABORER, LANDSCAPING (GARDNER, SOD 1 9.0010.001 9.00 I I I
LAYER AND NURSERYMAN) 1 r· I I 1 I1 I I I 1 I
104 *FLAGPERSON I 8.5811.171 9.75 I 1 I1 1 1 1 1 I
201 *AIR COMPRESSOR -OPERATOR 112.8412~901 15.74 J I I'1 II! 1 I
202 ASPHALT.2 BITUMINOUS STABILIZER PLANT I 11.67 11. 17 I 12.84 I I IOPERATOJ.<. 1 I I I I I
1 1 1 1 I I293 DRAGLINE AND/OR OTHER SIMILAR 115.9612.901 18.86 I 1 I
EQUIPMENT WITH SHOVEL TYPE CONTROLS I I 1 I I I1 I 1 1 I I
204 BITUMINOUS SPREADER AND FINISHING 111.2611.171 12.43 1 1 1OPERATOR 1 1 1 1 1 I
I I 1 I 1 I205 BITUMINOUS SPREADER AND BITUMINOUS 111.2611.171 12.43 I 1 1
FINISHING MACHINE OPERATOR (HELPER) I 1 1 I I I1 1 I I 1 I
206 *CONVEYER OPERATOR 1 5.7911.171 6.96 1 1 11 I 1 1 1 I
209 *CRUSHING PLANT OPERATOR (GRAVEL AND 115.1112.901 18.01 I I 1STONE) OR GRAVEL WASHIN~? CRUSHING 1 1 1 1 1 IAND SCREENING PLANT OPEJ.<.ATORS 1 I 1 1 I 1
I 1 1 1 I 1213 FORKLIFT OPERATOR 115.11 12. 901 18.01 I 1 1
1 IIi 1 1214 FRONT END LOADER OPERATOR 111.2611.171 12.43 1 I 1
1 I 1 'I I216 FIREMAN OR TANK HEATER OPERATOR 110.3911.171 11.56 i! I
1 II! 1 I217 GRADER OR MOTOR PATROL.t FINISHING, 111.6711.171 12.84 II!
EARTHWORK AND BITUMINOuS ! 1 II! 1II! 1 I !
218 GRADER OPERATOR (MOTOR PATROL) 110.3911.171 11.56 1 I I1 1 1 I 1 1
219 *GREASER (TRUCK AND TRACTOR) 112.1212.901 15.02 i! I1 II! 1 1
222 *MECHANIC OR WELDER 115.1112.901 18.01 ! 1 11 1 1 I 1 1
223 *OILERS (POWER SHOVEL, CRANE, DRAG- 112.1212.901 15.02 illLINE) I 1 II! I
. II! ! 1 1224 *PICK UP SWEEPER 116.1811.171 17.35 !!!
1 1 II! !226 *ROLLER OPERATOR, SELF PROPELLED 114.0711.171 15.24 I! 1
ROLLER FOR COMPACTION ! 1 ! '! 1! IIi 1 1
227 *ROLLER OPERATOR, UP TO AND INCLUDINGII0.3911.171 11.56 !!!6 TONS FOR BITUMINOUS FINISHING ! 1 ! '! 1AND/OR WEARING COURSES I IIi 1 I
! ! ! I! !228 *ROLLER OPERATOR, OVER 6 TONS FOR 115.1112.90118.01 !! 1
BITUMINOUS FINISHING AND/OR WEARING !' II! ! 1COURSES ! 1 ! ! I 1
! ! ! ! 1 1231 RATUTBABCEHMERTNTIRED TRACTOR, BACK HOE !15.1112.90118.01 I! 1
! ! ! !! 1
.PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL !EFFECT BASIC TOTALCLASSIFICATION (18 CROW WING RATE FB HR RATE!DATE RATE FB HR RATEa ••••••••••••••••••••••_ ••••••••••• •••••••••••••••••_ • __•••a •••••
234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)115.1112.901 18.01 I
I I I i235 *TRACTOR OPERATOR
fHD26 TD6
tOR 115:11!2.90! 18.01 I
SIMILIAR H.P. WI P WER AKE-OFF I I I I! I I I
236 TRACTOR OPERATOR, OVER D2, TD6 OR !15.1112.901 18.01 ISIMILIAR H.P. WITH POWER TAKE-OFF ! ! I I
I I I I239 CRANE OPERATOR 115.9612.901 18.86 I
I I ! !301 *BITUMINOUS DISTRIBUTOR DRIVER 112.5811.17! 13.75 I
! I I I302 *DUMPMAN 112.5811.171 13.75 !
! I I I305 TRUCK DRIVER (HAULING MACHINERY FOR 110.9311.17 I 12.10 I
CONTRACTORS OWN USE INCLUDING OP- I I I 1ERATION OF HAND OR POWER OPERATED 1 i 1 IWINCHES) I 1 1 I
! 1 I I306 *SINGLE AXLE OR 2 AXLE UNIT 111.4112.451 13.86 I
1 ! ! !307 TANDEM AXLE OR 3 AXLE UNIT 110.3911.17! 11.56 1
I I I !308 *FOUR AXLE UNIT i 11. 78i2.45i 14.23 !
! I 1 I309 FIVE AXLE UNIT !10.8211.171 11.99 I
I I 1 I404 CARPENTER 114.9710.001 14.97 I
! I I i
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLAC~
COUNTY 29 HUBBARD EFFECTIVE DATE OF DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND EMPLOYEES:
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
FRONT END LOADER OPERATOR
226 ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
224 *PICK UP SWEEPER
FIREMAN OR TANK HEATER OPERATOR
GRADER OR MOTOR PATROL, FINISHING,EARTHWORK AND BITUMINOUS
218 GRADER OPERATOR (MOTOR PATROL)
219 *GREASER (TRUCK AND TRACTOR)
222 *MECHANIC OR WELDER
214
216
217
212 *FINE GRADE OPERATOR
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourlY rate to be paid on this proiect. In some instances, future rateshave Deen predetermined. Those rates and the effective date are alsoshown. LaDor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (431hours per weeK. All hours worked in excess of the p.revalling hours ,ha 1be paia at a rate of at least one and one half (1 172) times the baslehourly rate paid. to the. employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.* Indicates that adjacent county rates were used for this classification
determination due to insufficlent data received for this county.PREVAILING RATE ! FUTURE PREVAILING RATE
CODE NUMBER & BASIC TOTAL !EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE IDATE RATE FB HR RATE......._-- --- _------.__ ------ ---------_ -_ --_.._-----101 LABORER, COMMON (GENERAL LABOR WORK) 110025110651 11.90 ! !
! I ! ! !102 LABORER~ SKILLED (ASSISTING SKILLED I 9.2411.171 10.41 ! !
CRAFT JuURNEYMAN) I I ! ! I! I ! ! I
103 LABORER, LANDSCAPING (GARDNER, SOD I 9.2510.00! 9.25 ! ILAYER AND NURSERYMAN) I I I ! I
I I ! ! I104 FLAGPERSON ! 702411.171 8.41 ! I
I I I 1 I107 *PIPELAYER (WATER, SEWER & GAS) 110.7011.651 12.35 ! I
! ! ! I I109 *UNDERGROUND AND OPEN DITCH LABORER 111.00!0.001 11.00 1 I
(8 FEET BELOW STARTING GRADE LEVEL) ! I I ! II I I I I
201 *AIR COMPRESSOR OPERATOR 110.0111.031 11004 I !I I I ! !
202 ASPHALT~ BITUMINOUS STABILIZER PLANTl11.67!1.17! 12.84 1 IOPERATOK. I I I 1 I
I I I ! I203 DRAGLINE AND/OR OTHER SIMILAR 114.1512.901 17.05 1 I
EQUIPMENT WITH SHOVEL TYPE CONTROLS ! I ! ! II I I ! !
204 BITUMINOUS SPREADER AND FINISHING 111.6711.17! 12.84 I IOPERATOR I II! I
I I I I I205 BITUMINOUS SPREADER AND BITUMINOUS 111.2611.171 12.43 ! I
FINISHING MACHINE OPERATOR (HELPER) I I I 1 II I I 1 I
209 CRUSHING PLANT OPERATOR (GRAVEL AND 112.9112.90! 15.81 1 !STONE) OR GRAVEL WASHIN~, CRUSHING I I 1 I IAND SCREENING PLANT OPE1<ATORS I II! I
! ! I I I112.9015.771 18067 ! I! I ! ! !!1400711.171 15.24 I !! ! II!!10.39!1.17! 11.56 I!1 ! ! ! !!11.67!1.17! 12.84 !!! ! ! ! !! ! ! 1 !!10.39!1.171 11.56 I!1 ! ! 1 !110.66!3008! 13.74 ! !1 ! 1 ! !!12.5913.22! 15081 ! !I ! I ! !!10.39!1.17! 11.56 !!! I II!1 9.6511.171 10.82 ! !1 II! !! I ! ! !
228 *ROLLER OPERATOR, OVER 6 TONS FOR 111.2611.171 12.43 ! !BITUMINOUS FINISHING AND/OR WEARING ! ! 1 ! !COURSES ! ! ! ! I
! ! 1 ! !229 SCRAPER, 32 CU. YDS. AND OVER !10.00!0.001 10.00 !!
! 1 ! ! !231 *RUBBER TIRED TRACTOR, BACK HOE ! 9.6511.171 10.82 ! !
~UCHMENT ! 1 ! ! !! ! 1 ! !
234 TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.90! 15.81 ! !
BITUMINOUS DISTRIBUTOR DRIVER
DUMPMAN
"'CRANE OPERATOR
TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
306 "'SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
309 FIVE AXLE UNIT
404 "'CARPENTER
406 "'CEMENT MASON
412 "'IRONWORKER
239
301
302
305
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION (29 HUBBARD RATE FB HR RATE IDATE RATE FB -HR. RATE.........................................................-- _•••.•....235 TRACTOR OPERATOR, D2~ TD6~ OR 112.00!0.00! 12.00 !
SIMILIAR H. P. WITH PuWER -1'AKE-OFF! ! ! !I ! ! !
236 TRACTOR OPERATOR.2...0VER D2t
TD6 OR ! 12.9112.901 15.81 !SIMILIAR H.P. WITt:! POWER AKE-OFF! ! ! !
! I ! '114.15!2.90! 17.05 i, , , !il0.39il.17i 1l.56 !! ! ! !1 9.2411.171 10.41 !! ! ! !110.9311.171 12.10 !I I ! !! ! ! !! ! ! !I ! ! !! 9.5111.03! 10.54 !
-! ! I !110.3911.17! 1l.56 'I ., , i!10.82il.17i 1l.99 !! ! ! !! 9.7510.00! 9.75 !! ! ! !!16.0512.65! 18.70 !! ! ! !!1l.7011.171 12.87 !! ! ! !
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND IND~STRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 31 ITASCA EFFECTIVE DATE OF DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND EMPLOYEES:
rates should be reported immediately toOffiee of construction! TransportatlonSt. Paul, Minnesota 55 55,
226 ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
216 *FlREMAN OR TANK HEATER OPERATOR
217 GRADER OR MOTOR PATROL, FINISHING,EARTHWORK AND BITUMINOUS
218 GRADER OPERATOR (MOTOR PATROL)
219 *GREASER (TRUCK AND TRACTOR)
222 MECHANIC OR WELDER
223 OILERS (POWER SHOVEL,LINE)
224 *PICK UP SWEEPER
213 *FORKLIFT OPERATOR
214 FRONT END LOADER OPERATOR
211 *FRONT END LOADER OPERATOR UP TO ANDINCLUDING 1 CU. YD.
212 *FlNE GRADE OPERATOR
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this proieet. In some lnstances, future rateshave aeen predetermined. Those rates and the effective date are alsoshown. Labor classifieations not 11sted below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (481hours per weeK. All hours worked in excess of the p'reva~ling hours sha 1be paia at a rate of at least one and one half (1 172) tlmes the basichourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indieates that adjacent eounty rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE I FUTURE PREVaILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE I DATE RATE FB HR. RATE..........................................................--_._- -_.._ .101 LABORER, COMMON (GENERAL LABOR WORK)112.9312.451 15.38 'I I I
I I I I! I102 LABORER~ SKILLED (ASSISTING SKILLED 119.3910.151 19.54 ! I I
CRAFT JuURNEYMAN) I I I 1 I II I I !! I
103 *LABORER, LANDSCAPING (GARDNER, SOD I 9.2510.001 9.25 I I ILAYER AND NURSERYMAN) I! I I! 1
I I I I! I104 FLAGPERSON 113.5011.051 14.55 I I I
I I 1 I 1 I107 PIPELAYER (WATER, SEWER & GAS) 113.1312.451 15.58 ~ I I
I I I 1 I I109 *UNDERGROUND AND OPEN DITCH LABORER 111.0010.001 11.00 I I I
(8 FEET BELOW STARTING GRADE LEVEL) ! I I I I II I I I I I
201 *AIR COMPRESSOR OPERATOR 112.8412.901 15.74 I I II . I I !! I
202 ASPHALT,1 BITUMINOUS STABILIZER PLANTI15.1110.601 15.71 1 I IOPERATOK I I I II!
I I I I I I203 DRAGLlNE AND/OR OTHER SIMILAR 115.9612.901 18.86 I I I
EQUIPMENT WITH SHOVEL TYPE CONTROLS I ! I I I II I I I I !
204 BITUMINOUS SPREADER AND FINISHING 115.1112.901 18.01 I 1 IOPERATOR 1 I 1 I I I
I I I I 1 I205 *BlTUMINOUS SPREADER AND BITUMINOUS 112.8412.901 15.74 I! I
FINISHING MACHINE OPERATOR (HELPER) I I 1 1 I I1 1 I 1 1 I
206 *CONVEYER OPERATOR I 5.7911.171 6.96 I! II II! 1 I
209 CRUSHING PLANT OPERATOR (GRAVEL AND 115.1112.901 18.01 I I ISTONE) OR GRAVEL WASHIN~! CRUSHING 1 1 1 I! IAND SCREENING PLANT OPEl<ATORS I 1 I I I I
I 1 I ! I I210 CURB MACHINE 115.11!2.901 18.01 I I I
I II! ! I112.8412.901 15.74 I! II I I !! I1 ! I I! !113.2212.901 16.12 I!!II! !! !115.1112.90! 18.01 I! I, I I !! I15.11!2.901 18.01 I!!II! ! I
10.3911.171 11.56 I!!1 I ! I I
15.4112.901 18.31 I! I1 II! II I !! I
15.1112.901 18.01 !! II ! I! I
12.1212.90! 15.02 I! I1 I !! !
15.1112.901 18.01 I! II ! !! I
CRANE, DRAG- 12.1212.901 15.02 I!!! 1 !! I! ! !! !
16.1811.17! 17.35 I!!I I !! !
15.74!0.001 15.74 !!!
410 "'LATHER
412 "'IRONWORKER
413 "'LINEMAN
417 PIPEFITTER - STEAMFITTER
418 "'PLASTERER
419 PLUMBER
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION ~31 ITASCA RATE FB HR RATE IDATE RATE FB HR RATE........................................- _-.-----..--- - - -227 "'ROLLER OPERATOR, UP TO AND INCLUDINGI14.0711.171 15.24 I I I
6 TONS FOR BITUMINOUS FINISHING !.! I ! I IIAND/OR WEARING COURSES I! I I!
! I I I! I228 ROLLER OPERATOR~ OVER 6 TONS FOR 115.11!2.90! 18.01 ! I !
BITUMINOUS FINI::;HING AND/OR WEARING I I ! ! I ICOURSES I I I I' I
I I I I i I231 RUBBER TIRED TRACTOR, BACK HOE 115.1112.901 18.01 I I I
ATTACHMENT I I I I I II I I I I '
232 SHOULDERING MACHINE OPERATOR (POWER)112.8412.901 15.74 I I i(APSCO OR SIMILIAR TYPE) I I I I I I
I I I I I I234 TURNAPULL OPERATOR (OR SIMILAR TYPE)115.1112.901 18.01 I I I
I I I I' ,235 TRACTOR OPERATOR, D2, TD6~ OR 115.11!2.901 18.01 ! i i
SIMILIAR H.P. WITH POWER ·tAKE-OFF I I I I II I I I I
236 TRACTOR OPERATOR, OVER D2, TD6 OR 15.1112.901 18.01 I"SIMILIAR H.P. WITH POWER TAKE-OFF I I Iii
I I 'I '237 "'POWER ACTUATED AUGERS AND BORING 12.8412.90! 15.74 1 I i
MACHINE I 1 'I ,I I 1 I i
239 "'CRANE OPERATOR 15.9612.901 18.86 I' I! I I 1 '
240 "'BOOM TRUCK 15.1112.901 18.01 I I iI I I I I I
241 "'MILLING MACHINE 115.11 I 2. 90 I 18.01 I' II I ! I 1 I
242 "'TRENCHER 115.1112.901 18.01 ! I, I! I I 'I
301 "'BITUMINOUS DISTRIBUTOR DRIVER 113.0512.45! 15.50 1 1 I1 I ! ! I I
302 *DUMPMAN 112.5811.171 13.75 I!!I I II! I
304 SELF PROPELLED PACKER OPERATOR ! 8.8311.031 9.86 "II I I 1; I
305 TRUCK DRIVER (HAULING MACHINERY FOR 113.7012.45! 16.15 I 1 ICONTRACTORS OWN USE INCLUDING OP-! ! I I I IERATION OF HAND OR POWER OPERATED I I I I I 1WINCHES) I I I I' 1
1 ! IIi 1306 "'SINGLE AXLE OR 2 AXLE UNIT 112.8012.451 15.25 I 1 1
1 ! ! ! I '307 TANDEM AXLE OR 3 AXLE UNIT ! 13.0512.451 15.50 1 I 1
I 1 I !' I308 FOUR AXLE UNIT 113.1512.451 15.60 ! 1 I
I ! I ! 1 I309 FIVE AXLE UNIT ! 12.0512.101 14.15 ! 1 I
I II! ! 1404 CARPENTER 116.3312.001 18.33 I I 1
! 1 I " I406 CEMENT MASON 115.2010.951 16.15 1;'
, , , I 1 1407 "'ELECTRICIAN 116.0015.121 21.12 I ! I I
I !! I ! 1 1114.8012.401 17.20 105/01/86114.9512.401 17.35! ! I , '"111.7011.171 12.87 1 illI I! 1 1 I I115.9213.001 18.92 ' '"I I! i i;;115.8513.901 19.75 ill 1I I! I '"114.7010.001 14.70 1 ill1 I! 1 I 1 I115.8513.901 19.75 ! 1 I II 1 1 I 1 1 I
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDqSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTROCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 3S KITTSON EFFECTIVE DATE ~F DETERMINATION: FEBRUARY I, 1986
TO CONTRACTORS AND EMPLOYEES:
228 *ROLLER OPERATOR}. OVER 6 TONS FORBITUMINOUS FINI:;HING AND/OR WEARINGCOURSES
239 CRANE OPERATOR
rates should be reported immediately toOffice of construction! Transportatl0nSt. Paul, Minnesota 55 55,
301 *BITUMINOUS DISTRIBUTOR DRIVER
302 *DUMPMAN
303 *GREASER AND TRUCK SERVICEMAN
309 *FIVE AXLE UNIT
404 *CARPENTER
This project is covered by the Minnesota Prevailing Wage Statutes, Thewage rates for the labor classifications listed below are the minlmumhourlY rate to be paid on this proiect. In some instances, future rateshave ceen predetermined. Those rat.s and the effective date are alsoshown. Lacor classifications not 11sted below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight· (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'reva~ling hours ,ha 1be paia at a rate of at least one and one half (1 172) tlmes the baslchourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Soulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATElDATE RATE FB HR RATE........................ .. •• .a•••__••••••••• • __ .
101 *LABORER, COMMON (GENERAL LABOR WORK) I 8. SO I0.00 I 8. SO I I I
I I I " i102 LABORER}. SKILLED (ASSISTING SKILLED I I Iii I
CRAFT JuURNEYMAN) I I I I! !I I I I! !
104 *FLAGPERSON I 7.1611.0S1 8.21 I I I! ! I I i I
202 *ASPHALT, BITUMINOUS STABILIZER PLANTIll.S9!l.OS! 12.64 '! IOPERATOR I I Ii! I
, I , I! !203 *DRAGLINE AND/O~ OTHER SIMILAR h4.1Si2.90i 17.0S .1 I I
EQUIPMENT WITH SHOVEL TYPE CONTROLS I ! Iii II I I I I I
204 *BITUMINOUS SPREADER AND FINISHING 111.S912.0S1 13.64 I I IOPERATOR I I Iii i
I I I I i I20S *BITUMINOUS SPREADER AND BITUMINOUS 111.1811.0S1 12.23 I! 1
FINISHING MACHINE OPERATOR (HELPER) I I I I! II I I I! 1
214 *FRONT END LOADER OPERATOR 112.S913.211 IS.80 !! II I ! 'I I
216 *FIREMAN OR TANK HEATER OPERATOR 110.3111.0SI 11.36 iiII 1 I I! i
222 *MECHANIC OR WELDER p2.S9p.21\ IS.80 iii111.1811.0S1 12.23 I i II 1 Ii! II ! I I! i! I ! I! I111.4SI2.0S1 13.S0 I! I1 1 I I! I! 9.0010.2S1 9.2S 1 I II I , I i Ii 9.16iI.S9i 10.7S i! 1! I I !! I111.S911.0S1 12.64 I I II I , I i Iil0.74il.0si 11.79 i! 1! ! ! I I I110.S010.001 10.S0 'i I! ! ! i! i
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDQSTRYMinn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 36 KOOCHICHING EFFECTIVE DATE ~F DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed b.low are the minimumhourly rate to be paid on this proiect. In some lnstances. future rateshave Deen predetermined. Those rat.s and the effective date are alsoshown. LaDor classifications not Ilsted below bave had no rate determineddue to lack of information.The prevailing hours of labor are eight (8) bours per day and forty (491hours per weeK. All hours worked in excess of tbe p'reva~ling hours .ha 1be paia at a rate of at least one and one half (1 172) tlmes tbe baslchourly rate paid to the employee.Violations of tbe prevailing wage rates sbould be reported immediately tothe Department of Transportation. Office of construction! TransportatlonBuilding! John Ireland Boulevard. St. Paul. Minnesota 55 55.phone (6 2) 296-6353.* Indicates that adjacent county rates were used for tbis classification
determination due to insufficlent data received for this county.PREVAILING RATE ! FUTURE PREVAILING RATE
CODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE IDATE RATE FB HR RATE...... __ _ _ _. •••m
101 LABORER, COMMON (GENERAL LABOR WORK)110.25!1.65! 11.90 'I" I! I I I
102 LABORER1 SKILLED (ASSISTING SKILLED 110.2511.65! 11.90 I 'CRAFT JuURNEYMAN) !! I ! i
1 I I I'104 FLAGPERSON I 8.6011.65! 10.25 1 i
I 1 I I I107 PIPELAYER (WATER, SEWER & GAS) 110.7011.65! 12.35 1 I
I I I I I109 *UNDERGROUND AND OPEN DITCH LABORER 111.0010.001 11.00 ! I
(8 FEET BELOW 5-TARTING GRADE LEVEL) 1 I!I II I I !!
201 *AIR COMPRESSOR OPERATOR 112.8412.901 15.74 1 I! I ! I I
202 *ASPHALT, BITUMINOUS STABILIZER PLANT!15.1112.901 18.01 ! IOPERATOR. I I ! I I
1 . I I I I203 DRAGLlNE AND/OR OTHER SIMILAR !15.9612.901 18.86 I I
EQUIPMENT WITH SHOVEL TYPE CONTROLS I 1 I I II I I ! I
204 *BlTUMINOUS SPREADER AND FINISHING 115.1112.90! 18.01 ! IOPERATOR I I I I I
I ! ! 1 I205 *BlTUMINOUS SPREADER AND BITUMINOUS 112.84!2.901 15.74 ! I
FINISHING MACHINE OPERATOR (HELPER) I I I 'I! IIi I
209 *CRUSHING PLANT OPERATOR (GRAVEL AND 115.1112.901 18.01 1 'STONE) OR GRAVEL WASHIN~ I CRUSHING I I ! I iAND SCREENING PLANT OPEl<ATORS 1 I I ! I
I I ! !'210 *CURB MACHINE 115.1112.90! 18.01 ' i
! ! ! i I211 *FRONT END LOADER OPERATOR UP TO AND 112.8412.901 15.74 ! I
INCLUDING 1 CU. YD. I! ! I II I I 'I
212 *FINE GRADE OPERATOR 113.2212.901 16.12 i II ! ! I'
213 *FORKLIFT OPERATOR 115.1112.90! 18.01 I iI ! I i I
214 FRONT END LOADER OPERATOR 115.1112.901 18.01 I I! 1 ! !'
216 *FlREMAN OR TANK HEATER OPERATOR 110.3911.17! 11.56 ! i! I ! 'I
217 *GRADER OR MOTOR PATROL~ FINISHING, 115.4112.901 18.31 i 'EARTHWORK AND BITUMINOuS I!! I i
! 1 I !'218 *GRADER OPERATOR (MOTOR PATROL) 112.8412.901 15.74 I i
1 ! ! 1 I·219 *GREASER (TRUCK AND TRACTOR) 112.1212.901 15.02 1 !
I ! I '!222 *MECHANIC OR WELDER 115.11!2.901 18.01 i !
I ! ! 'I223 *OILERS (POWER SHOVEL, CRANE, DRAG- 112.12!2.90! 15.02 i !
LINE) II!!'! ! IIi
226 ROLLER OPERATOR, SELF PROPELLED 115.1112.901 18.01 ! IROLLER FOR COMPACTION ! 1 ! "
1 IIi i228 *ROLLER OPERATOR, OVER 6 TONS FOR !15.1112.901 18.01 1 i
BITUMINOUS FINISHING AND/OR WEARING 1 ! 1 1 ICOURSES 1 ! 1 ! I
1 ! ! !'231 RUBBER TIRED TRACTOR, BACK HOE 115.1112.901 18.01 ! i
ATTACHMENT
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION (36 KOOCHICHING RATE FB HR RATE 1DATE RATE FB HR RATE...................._._._._......--.._........--....._~_........_-_......-............._-232 *SHOULDERING MACHINE OPERATOR (POWER)112.8412.451 15.29 ! I 1
(APSCO OR SIMILIAR TYPE) 1 • 1 1 , 1 11 1 i 1 1
234 TURNAPULL OPERATOR (OR SIMILAR TYPE) 15.1112.901 18.01 1 1 11 1 1 1 1
235 *TRACTOR OPERATORfHD20 TD6t
OR 15.1112.901 18.01 , 1 1SIMILIAR H.P. WI P WER AKE-OFF 1 1 i 1 !
1 1 ! ! 1236 TRACTOR OPERATORfHOVER D2, TD6 OR 15.1112.901 18.01 ! 1 !
SIMILIAR H.P. WI POWER TAKE-OFF 1 1 1 ! 11 1 1 1 ,
237 *POWER ACTUATED AUGERS AND BORING 12.8412.901 15.74 1 , iMACHINE 1 1 ! 1 i i
1 1 1 1 ! !239 CRANE OPERATOR 115.9612.901 18.86 ! ! 1
! 1 1 1 ! 1240 *BOOM TRUCK 115.1112.901 18.01 , , !
1 1 ! i i 1241 *MILLING MACHINE 115.1112.901 18.01 1 1 !
II! ! , !242 *TRENCHER 115.1112.901 18.01 1 i !
1 1 1 1 1 1301 *BITUMINOUS DISTRIBUTOR DRIVER 111.6612.45 ! 14.11 1 ! ,
II! 1 1 i302 *DUMPMAN 1 8.97 11. 78 1 10.75 1 ! !
1 1 1 1 ! 1304 *SELF PROPELLED PACKER OPERATOR 1 8.8311.031 9.86 1 , 1
1 1 1 1 i 1~05 *TRUCK DRIVER (HAULING MACHINERY FOR 112.3412.451 14.79 1 1 1
CONTRACTORS OWN USE INCLUDING OP- 1 1 1 1 ! ,ERATION OF HAND OR POWER OPERATED 1 1 ! 1 1 iWINCHES) 1 1 1 1 ! !
1 1 1 , ! !306 *SINGLE AXLE OR 2 AXLE UNIT 111.4112.451 13.86 i ! 1
1 1 1 1 1 1307 TANDEM AXLE OR 3 AXLE UNIT 111.6612.451 14.11 1 1 1
1 1 1 ! I !308 *FOUR AXLE UNIT 111.7812.451 14.23 1 i 1
1 1 1 1 ! 1309 *FIVE AXLE UNIT 112.3412.451 14.79 ! 1 1
1 ! 1 1 ! 1404 CARPENTER 116.8111.171 17.98 1 1 1
! ! 1 1 1 1406 *CEMENT MASON 116;1011.501 17.60 , 1 1
! ! 1 i , 1407 *ELECTRICIAN 116.1715.251 21.42 1 i 1
! 1 1 1 ! 1 1410 LATHER 114.8012.401 17.20 105/01/86114.9512.40! 17.35
! 1 ! 1 1 I
412 IRONWORKER 1 9.6010.001 9.60 1 I i! ! 1 I i !
413 *LINEMAN 115.9213.001 18.92 i 1 1! ! ! I ! 1
417 *PIPEFITTER - STEAMFITTER 118.0712.551 20.62 i ! ,! 1 ! 1 1 i
418 PLASTERER 117.6011.101 18.70 1 , !II! ! i 1
419 *PLUMBER 118.0712.551 20.62 I i I
! 1 ! i 1 i
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 38 LAKE EFFECTIVE DA~·OF DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave ceen predetermined. Those rates and the effective date are alsoshown. Lacor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours Qer weeK. All hours worked in excess of the p'revalling hours ~ha 1be paie at a rate of at least one and one half (1 172) times the bas1chourly rate paid to the employee.
Violations of the prevailing wage rates should be reported immediately tothe Department of Transportation, Office of construction! TransportatlonBuilding! John Ireland Boulevard, St. Paul, Minnesota 55 55,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insuffic1ent data received for this county.
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE........................._..------- _--- __.._-- ...101 LABORER, COMMON (GENERAL LABOR WORK)!12.13!3.251 15.38 1 1
1 !. 1 I 1102 LABORER, SKILLED (ASSISTING SKILLED 112.1313.251 15.38 i 1
CRAFT JOURNEYMAN) I! ! i 11 ! 1 I 1
104 FLAGPERSON 110.2313.25! 13.48 i 11 ! 1 1 1
107*PIPELAYER (WATER, SEWER & GAS) 112.5813.251 15.83 1 1! ! 1 I 1
201 AIR COMPRESSOR OPERATOR 113.5812.901 16.48 i!I 1 , 1 !
202 ASPHALT, BITUMINOUS STABILIZER ~15.8712.90i 18.77 I!OPERATOR 1 ! 1 ! !
1 ! 1 I ,
203 DRAGLlNE AND/OR OTHER SIMILAR· 116.7212.90! 19.62 i iEQUIPMENT WITH SHOVEL TYPE CONTROLS 1 I I I I
204 BITUMINOUS SPREADER AND FINISHING iI5.87i2.90i 18.77 I!OPERATOR ' 1 II! !
1 II! !205 BITUMINOUS SPREADER AND BITUMINOUS 113.5812.901 16.48 !!
FINISHING MACHINE OPERATOR (HELPER) I I Iii209 CRUSHING PLANT OPERATOR (GRAVEL AND 115.8712.901 18.77 ! i
STONE) OR GRAVEL WASHIN~, CRUSHING II! ! 1AND SCREENING PLANT OPEKATORS ! ! 1 1 1
! ! II!210 *CURB MACHINE 115.8712.90! 18.77 I!
1 ! 1 i !211 *FRONT END LOADER OPERATOR UP TO AND !13.5812.901 16.48 ! 1
INCLUDING 1 cu. YD. ! 1 ! , 1II! i !
213 *FORKLIFT OPERATOR 115.8712.901 18.77 I 1! Iii !
214 FRONT END LOADER OPERATOR 115.8712.901 18.77 i 11 1 1 1 1
217 GRADER OR MOTOR PATROL, FINISHING, 116.17!2.90! 19.07 !!EARTHWORK AND BITUMINOUS ! II! '
1 ! 1 I i219 GREASER (TRUCK AND TRACTOR) 112.8212.90! 15.72 i i
! Iii 1222 MECHANIC OR WELDER 115.87!2.90! 18.77 'I
1 ! 1 i ,223 OILERS (POWER SHOVEL, CRANE, DRAG- 112.82!2.901 15.72 ! i
LINE) ! ! ! I 11 ! 1 ! 1
226 *ROLLER OPERATOR, SELF PROPELLED 115.87!2.901 18.77 '!ROLLER FOR COMPACTION II! i !
! ! 1 I I227 *ROLLER OPERATOR, UP TO AND INCLUDING! 13.58!2.901 16.48 i i
6 TONS FOR BITUMINOUS FINISHING ! ! ! I !AND/OR WEARING COURSES !!! , I
1 ! ! i i228 ROLLER OPERATOR, OVER 6 TONS FOR 115.87!2.901 18.77 ! 1
BITUMINOUS FINISHING AND/OR WEARING ! ! ! ! !COURSES ! ! 1 ! 1
1 ! ! I !229 SCRAPER, 32 CU. YDS. AND OVER 115.99!2.90! 18.89 i 1
! ! ! ! !231 RUBBER TIRED TRACTOR, BACK HOE !15.87!2.90! 18.77 ! !
ATTACHMENT ! ! ! ! !! ! ! I ,
232 SHOULDERING MACHINE OPERATOR (POWER)! 13.58!2.90! 16.48 i i(APseo OR SJ:MILIAR TYPE)
417 *PIPEFITTER - STEAMFITTER
419 *PLUMBER
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION (38 LAKE RATE FB HR RATE! DATE RATE FB HR RATE.............................._-- - _- .234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)!15.87!2.90! 18.77 ! !
1 1 I 1 I236 TRACTOR OPERATOR.t..0VER D2
tTD6 OR 115.8712.901 18.77 ! !
SIMILIAR H.P. WI.tl POWER AXE-OFF! 1 I I !1 IIi I
237 *POWER ACTUATED AUGERS AND BORING 113.5812.90! 16.48 I IMACHINE I ! Ii!
1 II! !239 *CRANE OPERATOR ! 16.1712. 901 19.07 1 !
I I I ! I240 *BOOM TRUCK 115.8712.901 18.77 ! 1
! ! 1 ! I241 *MILLING MACHINE P5.• 87 12. 901 18.77 I I242 *TRENCHER 115.8712.90! 18.77 ! !
! 1 I ! ,301 BITUMINOUS DISTRIBUTOR DRIVER 113.95!2.45! 16.40 ! i
II! ! !305 *TRUCK DRIVER (HAULING MACHINERY FOR ! 14.6012.451 17.05 I !
CONTRACTORS OWN USE INCLUDING OP- II! I ,ERATION OF HAND OR POWER OPERATED! Iii iWINCHES) I I ! I ,
! I Iii306 SINGLE AXLE OR2 AXLE UNIT !13.7012.45! 16.15 ! !
1 ! 1 I I307 TANDEM AXLE OR 3 AXLE UNIT !13.95!2.451 16.40 1 I
! ! I ! '308 *FOUR AXLE UNIT 114.0512.45! 16.50 ' i
! ! 1 i !309 *FIVE AXLE UNIT 114.6012.45! 17.05 ! !
! I ! ! !404 CARPENTER 115.3313.101 18.43 ! I
! I Ii!407 *ELECTRICIAN 116.0015.12121.12 i !
1 II! !413 *LINEMAN 117.71!3.191 20.90 !'
1 ! 1 ! i115.8513.901 19.75 I I! ! 1 ! !115.7614.251 20.01 1 !! ! I. ! !
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRYMinn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MOST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
. COUNTY 38 LAKE EFFECTIVE DA~·OF DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND ~PLOYEES:
rates should be reported immediately toOffice of construction! TransportatIonSt. Paul, Minnesota 55 55,
FRONT END LOADER OPERATOR
RUBBER TIRED TRACTOR, BACK HOEATTACHMENT
GRADER OR MOTOR PATROL. FINISHING.EARTHWORK AND BITUMINOUS
GREASER (TRUCK AND TRACTOR)
MECHANIC OR WELDER
OILERS (POWER SHOVEL, CRANE.LINE)
219
222
223
231
205 BITUMINOUS SPREADER AND BITUMINOUSFINISHING MACHINE OPERATOR (HELPER)
209 CRUSHING PLANT OPERATOR (GRAVEL ANDSTONE) OR GRAVEL WASHIN~, CRUSHINGAND SCREENING PLANT OPEKATORS
210 *CURB MACHINE
211 *FRONT END LOADER OPERATOR UP TO ANDINCLUDING 1 CU. YO.
213 *FORKLIFT OPERATOR
229 SCRAPER. 32 CU. yos. AND OVER
214
217
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave been predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determinedcue to lack of information.The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeR. All hours worked in excess of the p'reval1ing hours sha 1be paia at a rate of at least one and one half (1 172) tImes the basichourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.* Indicates that adjacent county rates were used for this classification
determination due to insuffiCIent data received for this county.PREVAILING RATE 1 FUTURE PREVAILING RATE
CODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE 1DATE RATE FB HR RATE• • •• •••• ••• •••• ......__•__.... ••••__••_••_•••_=__•••~_••a.=101 LABORER, COMMON (GENERAL LABOR WORK}!l2.1313.251 15.38 105/01/86112.4813.25! 3.5.73
! I· 1 1 II!102 LABORER, SKILLED (ASSISTING SKILLED 112.13!3.251 15.38 105/01/86112.4813.2513.5.73
CRAFT JOURNEYMAN) II! 1 II!1 1 1 1 II!
104 FLAGPERSON 110.2313.251 13.48 !,05/01/86 I,10.28 1,3.25!, 3.3.53"1 1 1
107 *PIPELAYER (WATER, SEWER & GAS) 112.5813.251 15.83 ',i05/01/86',;12.93',i3.25',; 3.6.18! 1 1
201 AIR COMPRESSOR OPERATOR 113.5812.901 16.48 j05/01/86j13.83!2.90j 3.6.73
202 ASPHALT~ BITUMINOUS STABILIZER P~15.87i2.90i 18.77 i,05/01/86 i,16.37:,'2.90',i 3.9.27OPERATOK 1 1 1
1 IIi i j i203 DRAGLINE AND/OR OTHER SIMILAR· 116.72! 2.901 19.62 105/01/86117.2212.90! 20.12
EQUIPMENT WITH SHOVEL TYPE CONTROLS II! 1 II!1 1 II! 1 !
204 BITUMINOUS SPREADER AND FINISHING 115.8712.901 18.77 !05/01/86116.3712.90! 3.9.27·OPERATOR 1 1 II! ! !
1 1 1 , '"113.58!2.901 16.48 j05/01/86i13.83j2.90' 3.6.731 II! II!1 1 1 II!!115.8712.901 18.77 !05/01/86116.3712.90! 3.9.271 II! ! 1 !1 1 1 1 II!1 1 II! ! !115.8712.901 18.77 105/01/86116.37!2.90! 3.9.271 1 1 II!!113.5812.90! 16.48 105/01/86113.8312.90! 3.6.37! 1 1 , " I1 IIi i i ;115.8712.901 18.77 i05/01/86!16.37j2.90' L9.27! 1 1 , "I115.87 12.901 18.77 i 05/01/86i 16 .37 i2 .90j L9.27II! i ;; i116.17!2.901 19.07 i05/01/86;16.67;2.90j L9.57, " 1 Iii1 ii' '"! 12.8212.901 15.72 105/01/86j 12 .921 2.90i L5.821 1 1 II!!!15.8712.901 18.77 !05/01/86!16.3712.90! L9.271 II! !!!
DRAG- ! 12.8212.901 15.72 105/01/86! 12 .92! 2.90! L5.821 1 1 , "I1 1 1 i ; i j
226 *ROLLER OPERATOR, SELF PROPELLED 115.8712.901 18.77 i05/01/86j16.37i2.90j L9.27ROLLER FOR COMPACTION !! 1 1 j i 1
, " , "I227 *ROLLER OPERATOR, UP TO AND INCLUDINGi13.58i2.90i 16.48 105/01/86113.8312.901 L6.73
6 TONS FOR BITUMINOUS FINISHING ! 1 1 , "IAND/ OR WEARING COURSES 1 1 1 1 1 1 1
I " 1 !!!228 ROLLER OPERATOR, OVER 6 TONS FOR i15.87i2.90i 18.77 105/01/86!16.37!2.90! L9.27
BITUMINOUS FINISHING AND/OR WEARING 1 1 1 , "ICOURSES 1 1 1 1 1 i j
, " I "I115.9912.901 18.89 105/01/86 116.49j2.90j L 9.39! 1 1 I "I! 15.8712.901 18.77 105/01/86j16.37j2.90j L 9.27! ! 1 ! !!!, "I! ! !
232 SHOULDERING MACHINE OPERATOR (POWER}i13.58i2.90i 16.48 105/01/86113.8312.90! LoG.73(APSCO OR SIMILIAR TYPE)
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION (38 LAKE RATE FB HR RATE 1DATE RATE FB HR RATE
234-:~;;~;ULL·o;i~;o;·(O;·si;~~·TYPE)ii5:87i2:90i-i8:77-io sioiis6ji6:37r2:90imi9:2,=a1 !! ! !!!
236 TRACTOR OPERATORL.OVER D2t
TD6 OR 115.8712.901 18.77 105/01/86!16.37!2.90! 19.27SIMILIAR H.P. WIItt POWER AKE-OFF 1 1 1 1 1 I !
I I I , '"237 *POWER ACTUATED AUGERS AND BORING i13.58i2.90i 16.48 i05/01/86i13.83i2.90i 16.73
MACHINE 1 1 1 1 II!1 1 1 II!!
239 *CRANE OPERATOR 116.1712.901 19.07 105/01/86117.2212.90! 20.121 1 1 1 II!
240 *BOOM TRUCK 115.8712.901 18.77 105/01/861 16.3712.90! 19.271 1 II! ! 1
241 *MILLING MACHINE 115.8712.901 18.77 105/01/861 16.37!2.901 19.271 1 1 II! 1
242 *TRENCHER 115.8712.901 18.77 !16.37 2.'0 19~27 !1 1 II! ! !
301 BITUMINOUS DISTRIBUTOR DRIVER 113.9512.45! 16.40 1 II!1 1 1 II!!
305 *TRUCK DRIVER (HAULING MACHINERY FOR 114.6012.451 17.05 ! I!!CONTRACTORS OWN USE INCLUDING OP- 1 1 II! I !ERATION OF HAND OR POWER OPERATED 1 1 1 II!WINCHES) 1 1 II! !
1 1 1 II!306 SINGLE AXLE OR 2 AXLE UNIT 113.7012.451 16.15 II!
1 1 1 II!307 TANDEM AXLE OR 3 AXLE UNIT 113.9512.451 16.40 II!
1 1 1 II!308 *FOUR AXLE UNIT 114.0512.451 16.50 II!
1 1 1 II!309 *FIVE AXLE UNIT 114.6012.451 17.05 1 ! !
1 1 1 II!404 CARPENTER 115.3312.901 18.23 II!
1 1 1 1 1 I407 *ELECTRICIAN 116.0015.121 21.12 106/01/86116.35 5.23! 21.58
1 1 1 II!413 *LINEMAN 117.7113.191 20.90 104/01/86118.33 3.59! 21.92
1 1 1 II!417 *PIPEFITTER - STEAMFITTER 115.8513.90! 19.75 1 ! !
1 1 II! !419 *PLUMBER 115.7614.251 20.01 1 ! !
1 1 1 II!
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 39 LAKE OF THE WOODS EFFECTIVE DATE OF DETERMINATION: FEBRUARY I, 1986
TO CONTRACTORS AND EMPLOYEES:
217 *GRADER OR MOTOR PATROL, FINISHING,EARTHWORK AND BITUMINOUS
218 GRADER OPERATOR (MOTOR PATROL)
219 *GREASER (TRUCK AND TRACTOR)
222 MECHANIC OR WELDER
226 *ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPaCTION
228 ROLLER OPERATOR1 OVER 6 TONS FORBITUMINOUS FINI:;HING AND/OR WEARINGCOURSES
eight (8) hours per day and forty (491in excess of the p'reval1ing hours sha 1and one half (1 172) times the basic
rates should be reported immediately toOffice of construction! Transportatl0nSt. Paul, Minnesota 55 55,
CRANE OPERATOR239
301 BITUMINOUS DISTRIBUTOR DRIVER
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave oeen predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determineddue to lack of information.
~he prevailing hours of labor arehours per weeK. All hours workedbe paia at a rate of at least onehourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE..........._ _-- --------_..__....101 LABORER, COMMON (GENERAL LABOR WORK) I 8. 1611.051 9.21 I I
I I I I '102 *LABORER, SKILLED (ASSISTING SKILLED I 9.0010.001 9.00 ! i
CRAFT JOURNEYMAN) I! I ! II ! I ! I
104 FLAGPERSON ! 7.1611.051 8.21 I iI I 1 I I
107 *PIPELAYER (WATER, SEWER & GAS) 110.7011.651 12.35 1 II I ! ! I
109 *UNDERGROUND AND OPEN DITCH LABORER 111.00!0.001 11.00 ! I(8 FEET BELOW STARTING GRADE LEVEL) I I I I I
1 I I ! I201 *AIR COMPRESSOR OPERATOR 110.0111.031 11.04 ! !
I I ! 1 I202 ASPHALT~ BITUMINOUS STABILIZER PLANTlll.59!1.051 12.64 ' ,
OPERATOK ! I IiiI I I ! !
203 DRAGLlNE AND/OR OTHER SIMILAR 114.1512.901 17.05 ' ,EQUIPMENT WITH SHOVEL TYPE CONTROLS I I Iii
I I I ! I204 BITUMINOUS SPREADER AND FINISHING 111.1811.05! 12.23 ! I
OPERATOR ! ! I I II 1 Iii
205 BITUMINOUS SPREADER AND BITUMINOUS 111.1811.051 12.23 I iFINISHING MACHINE OPERATOR (HELPER) I I 1 ' I
1 I I i I209 CRUSHING PLANT OPERATOR (GRAVEL AND 112.5913.221 15.81 ! ,
STONE) OR GRAVEL WASHIN~, CRUSHING! I I ! iAND SCREENING PLANT OPEKATORS 1 I I ! I
I I ! ! I212 *FlNE GRADE OPERATOR 113.2212.901 16.12 ! I, , , I i214 FRONT END LOADER OPERATOR i16.20i1.051 17.25 I ,
I I I I i216 FIREMAN OR TANK HEATER OPERATOR 110.3111.051 11.36 ' I
I ! I i I113.22!2.901 16.12 ' iI 1 I i I, , I I 1i11.16i3.09i 14.25 i I1 ! 1 ! i110.66!3.081 13.74 I I1 ! 1 i II 7.0016.501 13.50 ! !I , I , 1!I2.91i2.90i 15.81 i II ! 1 , i! I I i I111.1811.051 12.23 ! 1I II! I! II! i, I I I ,
231 *RUBBER TIRED TRACTOR, BACK HOE i12.91i2.90i 15.81 ! 1ATTACHMENT I II! ,
! 1 ! I i234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.901 15.81 i I
! I 1 I I236 TRACTOR OPERATOR, OVER D2, TD6 OR 112.5913.221 15.81 i I
SIMILIAR H.P. WITH POWER TAKE-OFF! ! ! I !I , I I 1114.1512.901 17.05 i 1! 1 ! ! ,110.3111.051 11.36 ! i
PIPEFITTER - STEAMFITTER
*PLASTERER
*CEMENT MASON
*LATHER
*IRONWORKER
406
410
412
417
418
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION (39 LAKE OF THE WOODS) RATE FB HR RATEIDATE RATE FB HR RATE~..-_.__ _ -..-_.._.._.-----_.._._.--..-_ _ - ---_ _ .302 DUMPMAN ! 8.9711.781 10.75 I 1 1
1 !! ! ! !306 *SINGLE AXLE OR 2 AXLE UNIT ! 9:5111.031 10.54 II!
! I! ! ! !307 *TANDEM AXLE OR 3 AXLE UNIT 111.6612.45! 14.11 I ! I
! I! I ! !309 *FIVE AXLE UNIT !10.8211.17! 11.99 I ! 1
! I! I ! I404 CARPENTER !10.0010.00! 10.00 ! I 1
I !! I ! 1!16.1011.501 17.60 1 ! 1 !I I I I I I I114.8012.401 17.20 !05/01/86114.95!2.40! 17.35I I I I I I !111.70!1.171 12.87 1 ! 1 !! 1 II! I !115.4312.661 18.09 ! ! 1 I1 1 I II! 1114.7510.001 14.75 ! ! 1 I! ! 1 ! !!!
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 43 MAHNOMEN EFFECTIVE DATE eF DETERMINATION: FEBRUARY 1. 1986
TO CONTRACTORS AND EMPLOYEES:
305 TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING op-ERATION OF HAND OR POWER OPERATEDWINCHES)
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
301 BITUMINOUS DISTRIBUTOR DRIVER
302 *DUMPMAN
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave oeen predetermined. Those rates and the effective date are alsoshown. Laoor classifications not listed below have had no rate determinedcue to lack of information.
~he prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p.revalling hours ~ha 1be paia at a rate of at least one and one half (1 172) times the baslchourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,BUilding! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE! DATE RATE FB HR RATE................................_ ---_ --.-- --._~_ -101 LABORER. COMMON (GENERAL LABOR WORK)! 7.85!l. 17 ! 9.02! !
. ! II! I102 LABORER. SKILLED (ASSISTING SKILLED! 9.24!l.17! 10.41 ! i
CRAFT JOURNEYMAN) !! I! !I ! I I I
103 *LABORER. LANDSCAPING (GARDNER. SOD I 9.2510.00! 9.25! iLAYER AND NURSERYMAN) I I!! i
I ! I I !104 FLAGPERSON ! 7.24!l.171 8.41 I I
I I! I !107 *PIPELAYER (WATER. SEWER & GAS) 110.70!l.651 12.35 I I
! I! I i202 ASPHALT~ BITUMINOUS STABILIZER PLANTlll.67!1.17! 12.84 I I
OPERATOK ! I! I I1 I II!
203 *DRAGLlNE AND/OR OTHER SIMILAR !14.15!2.90! 17.05 1 IEQUIPMENT WITH SHOVEL TYPE CONTROLS I ! I I !
! I! I !204 BITUMINOUS SPREADER AND FINISHING 110.92!1.171 12.09 1 I
OPERATOR I ! I I II I I 1 I
205 BITUMINOUS SPREADER AND BITUMINOUS 111.1811.171 12.35 ! IFINISHING MACHINE OPERATOR (HELPER) II!! i
I I!! !206 *CONVEYER OPERATOR I 9.6511.171 10.82 ! !
! ! I! !209 CRUSHING PLANT OPERATOR (GRAVEL AND !10.9211.17! 12.09 ! !
STONE) OR GRAVEL WASHIN~1 CRUSHING! ! I I IAND SCREENING PLANT OPEKATORS ! !!! i
! ! I! I212 *FlNE GRADE OPERATOR !12.90!5.77! 18.67 ! i
1 !!! !214 FRONT END LOADER OPERATOR 110.9211.17! 12.09 ! !
! !!! !216 FIREMAN OR TANK HEATER OPERATOR 110.1111.17! 11.28 ! I
1 ! I! I217 GRADER OR MOTOR PATROL~ FINISHING. !11.67!1.17! 12.84 ! i
EARTHWORK AND BITUMINOuS !!!! I! !!! i
218 *GRADER OPERATOR (MOTOR PATROL) 113.0811.17! 14.25 ! !! I!! !
222 MECHANIC OR WELDER !10.51!1.17! 11.68 ! !, '" ,224 PICK UP SWEEPER ilO.3lil.17i 11.48 ! i
! !!! I228 ROLLER OPERATOR~ OVER 6 TONS FOR 111.2611.17! 12.43 ! i
BITUMINOUS FINI:;HING AND/OR WEARING ! I!! !COURSES I !! I I
! !!! i231 *RUBBER TIRED TRACTOR. BACK HOE ! 9.6511.17! 10.82 ! I
ATTACHMENT ! !!! i! !!! i
232 SHOULDERING MACHINE OPERATOR (POWER)!10.3911.17! 11.56 ! i(APSCO OR SIMILIAR TYPE) ! I!! !
! !!! I236 TRACTOR OPERATOR. OVER D2. TD6 OR 110.92!1.171 12.09 ! !
SIMILIAR H.P. WITH POWER TAKE-OFF! ! I! ,, '" i!10.39i1.17i 11.56 i !I I I I !! 9.24il.17! 10.41 i !! !!! !!13.38!1.171 14.55 ! !
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL !EFFECT BASIC TOTALCLASSIFICATION (43 MAHNOMEN RA'J;E FB HR RATE I DATE RATE FB HR RATEa _ ••••••••__ _ __•••••_ ••••
307 TANDEM AXLE OR 3 AXLE UNIT 110.1111.171 11.28 !! ! ! I
309 FIVE AXLE UNIT 110.511 1.171 11.68 I! I ! !
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
eight (8) hours per day and forty (491in excess of the p'reva~ling hours ~ha 1and one half (1 172) tlmes the baslc
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul. Minnesota 55 55,
231 *RUBBER TIRED TRACTOR, BACK HOEATTACHMENT
COUNTY 44 MARSHALL EFFECTIVE DATE 9F DETERMINATION: FEBRUARY I, 1986
TO CONTRACTORS AND EMPLOYEES:
This E'roject is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourlY rate to be paid on this project. In some instances, future rateshave oeen predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determinedcue to lack of information.~he prevailing hours of labor arehours per weeK. All hours workedbe paia at a rate of at least onehourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,E'hone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE....................._---- ----- _ -- --_ -101 LABORER, COMMON (GENERAL LABOR WORK)I 8.5010.00! 8.50 1 1 1
1 1 1 II!102 *LABORER~ SKILLED (ASSISTING SKILLED ! 9.00!0.00! 9.00! 1 1
CRAFT JuURNEYMAN) ! 1 1 1 1 11 II! I'
103 *LABORER, LANDSCAPING (GARDNER, SOD 1 9.2510.001 9.25! 1 iLAYER AND NURSERYMAN) I! II! I
! II! !!104 FLAGPERSON 1 7.1611.051 8.21 I !!
I I I 1 1 I109 *UNDERGROUND AND OPEN DITCH LABORER 111.0010.001 11.00 I I 1
(8 FEET BELOW STARTING GRADE LEVEL) 0'1 I I 1 1 I! I I I 1 I
201 *AIR COMPRESSOR OPERATOR 110.0111.031 11.04 I I I. I I I! I I
202 ASPBALT~ BITUMINOUS STABILIZER PLANTI11.5911.051 12.64 I 'IOPERATOK I I I I 1 I
I I 1 I I'203 DRAGLINE AND/OR OTHER SIMILAR 114.1512.901 17.05 Iii
EQUIPMENT WITH SHOVEL TYPE CONTROLS ! 1 I 1 I II I! I I I
204 BITUMINOUS SPREADER AND FINISHING 111.5912.051 13.64 I ! IOPERATOR I 1 I' ,r
I I Ii! i205 BITUMINOUS SPREADER AND BITUMINOUS 111.1811.051 12.23 i 'I
FINISHING MACHINE OPERATOR (HELPER) 1 1 1 , . i II 'I ill
206 *CONVEYER OPERATOR I 9.6511.171 10.82 1 I II 1 I 1 'I
209 *CRUSHING PLANT OPERATOR (GRAVEL AND 112.5913.211 15.80 I i ISTONE) OR GRAVEL WASHINq, CRUSHING 1 1 I 1 ',IAND SCREENING PLANT OPEKATORS I I I' I
1 ! Iii 1212 *FINE GRADE OPERATOR 113.2212.901 16.12 ' I I
I 1 Ii! I214 FRONT END LOADER OPERATOR 112.5913.211 15.80 ' I'
I Iii 'i216 FIREMAN OR TANK HEATER OPERATOR 110.3111.051 11.36Ii'
I 1 I I ! i217 *GRADER OR MOTOR PATROL~ FINISHING, 113.2212.901 16.12 1 ! I
EARTHWORK AND BITUMINOuS 1 I' I I'1 I I' I i
218 *GRADER OPERATOR (MOTOR PATROL) 111.3512.901 14.25 i ! I1 1 I! ! I
219 *GREASER (TRUCK AND TRACTOR) 110.6613.081 13.74 ' "1 I Iii i
222 MECHANIC OR WELDER 112.5913.211 15.80 I ! I1 I! 1 ! I
224 *PICK UP SWEEPER 110.3911.171 11.56 I "! I· I I ! i
226 *ROLLER OPERATOR, SELF PROPELLED 112.9112.901 15.81 i ! IROLLER FOR COMPACTION 'I I' I'
I Iii ! i228 ROLLER OPERATOR, OVER 6 TONS FOR 111.1811.051 12.23 1 ! I
BITUMINOUS FINISHING AND/OR WEARING ! I'! 'ICOURSES 1 1 I! i I
! 1 1 I ! I! 9.6511.17! 10.82 ! ! I! !!! I I, ,!! i'
234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.901 15.81 ! I iI I' I !'
236 *TRACTOR OPERATOR, OVER D2, TD6 OR iI2.9112.90i 15.81 i ! ISIMILIAR H.P. WITH POWER TAKE-OFF
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & . BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION ",44 MARSHALL ) . RATE FB HR RATE! DATE RATE FB 1IR RATE......--_._--- ---_ _._--.- _-_ -~ -239 "'CRANE OPERATOR 114,15 I 2. 90 1 17.05 I I
I • I I I I301 BITUMINOUS DISTRIBUTOR DRIVER 1 9.0010.25! 9.25 I I
I I I 1 I302 DUMPMAN I 9.1611.59! 10.75 I I
II! I I303 GREASER AND TRUCK SERVICEMAN 111.5911.051 12.64 ! I
I ! ! 1 I305 "'TRUCKDRIVER (HAULING MACHINERY FOR 113.3811.17! 14.55 ! I
CONTRACTORS OWN USE INCLUDING OP- 1 I ! I IERATION OF HAND OR POWER OPERATED I I I I IWINCHES) ! ! I 1 I
I I II!306 "'SINGLE AXLE OR 2 AXLE UNIT I 9.5111.031 10.54 ! !
! ! ! ! !307 "'TANDEM AXLE OR 3 AXLE UNIT 110.5410.001 10.54 ! !
I ! ! ! I309 FIVE AXLE UNIT ! 10.7411.051 11.79 I !, , , ! !404 CARPENTER 110.50l0.00i 10.50 f !
I I ! I I406 "'CEMENT MASON 114.7510.00! 14.75 I I
! ! I ! I412 "'IRONWORKER ! 7.0010.001 7.00 ! I
I 1 I I I
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 54 NORMAN EFFECTIVE DA~_OP DETERMINATION: FEBRUARY I, 1986
TO CONTRACTORS AND EMPLOYEES:
217 *GRADER OR MOTOR PATROL~ FINISHING,EARTHWORK AND BITUMINOuS
218 GRADER OPERATOR (MOTOR PATROL)
219 *GREASER (TRUCK AND TRACTOR)
221 *SELF PROPELLED CHIP SPREADER
205 BITUMINOUS SPREADER AND BITUMINOUSFINISHING MACHINE OPERATOR (HELPER)
206 *CONVEYER OPERATOR
209 CRUSHING PLANT OPERATOR (GRAVEL ANDSTONE) OR GRAVEL WASHINq, CRUSHINGAND SCREENING PLANT OPEi<ATORS
211 *FRONT END LOADER OPERATOR UP TO ANDINCLUDING 1 CU. YD.
212 *FlNE GRADE OPERATOR
213 *FORKLIFT OPERATOR
214 FRONT END LOADER OPERATOR
216 FIREMAN OR TANK HEATER OPERATOR
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
eight (8) hours per day and forty (491in excess of the p'reva~ling hours ,ha 1and one half (1 172) tlmes the bas1c
222 MECHANIC OR WELDER
224 PICK UP SWEEPER
226 *ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourlY rate to be paid on this project. In some instances, future rateshave been predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor arehours per weeK. All hours workedbe paia at a rate of at least onehourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,BUilding! John Ireland BOUlevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE••••..··--·---··.····..·-------..•• __ aa ••__••~ ____
101 LABORER, COMMON (GENERAL LABOR WORK)I 7.85!!.17! 9.02! ! I II ! - I I I I I
102 LABORER~ SKILLED (ASSISTING SKILLED! 9.2411.17! 10.41 I I! ICRAFT JuURNEYMAN) ! I I ! ! I I
I !! ! ! I I103 *LABORER, LANDSCAPING (GARDNER, SOD I 8.2510.00! 8.25! I! I
LAYER AND NURSERYMAN) ! I! ! !! II I! ! ! I I
104 FLAGPERSON I 7.3811.17! 8.55 I !' iI I I I ! i I
107 *FIPELAYER (WATER, SEWER & GAS) "10.7011.651 12.35 I !! I1<. I! ! !!!
202 ASPHALT.! BITUMINOUS STABILIZER PLANT!14.6311.171 15.80 ! '! IOPERATOK I !! ! i! I
_ ! !! ! i! I203 *DRAGLlNE AND/OR OTHER SIMILAR 114.15 I2. 90! 17.05 ! ! I ,
EQUIPMENT WITH SHOVEL TYPE CONTROLS I ! I ! ! i iI !! ! I I I
204 BITUMINOUS SPREADER AND FINISHING -110.9211.17! 12.09 I ! I IOPERATOR I ! I ! !! I
! !! I ! I !! 13.0811.17! 14.25 ! I i II ! I ! i I !! I I I ! I I! 9.65H.171 10.82 ! I i I! I I ! ! I I110.92!1.171 12.09 ! " I! I I Iii II !! i I! I! ! I ! i I I111.3512.90! 14.25 I ! i '! !! ! I I i! !! ! ! i I!13.2212.901 16.12 ' !!'I I! i !' i!11.2611.171 12.43 ! Ii'I " ! !' ii10.92i1.17i 12.09 I ! i I! !! i ! I !!10.1111.17! 11.28 i '!!! !! ! i I I!13.22!2.90! 16.12 ! 'i!! I I ' i I !! !! i ! i !!13.08!1.17! 14.25 I ! l !i10.84i2.90i 13.74 ! iii! !! ! i I I! 8.25!2.05! 10.30 ! i i !I " ! !!'i10.51i1.17i 11.68 ' '! i! !! i i!!!10.3911.17! 11.56 ! !!'! !! , !! i!12.9112.901 15.81 i I! I! !! ! !!!, " ! !!!
227 *ROLLER OPERATOR, UP TO AND INCLUDINGi 7.75i2.05i 9.80! !! I6 TONS FOR BITUMINOUS FINISHING ! !! ! !!'AND/OR WEARING COURSES !!!!!! i
! !! ! !!!228 ROLLER OPERATOR, OVER 6 TONS FOR !11.26!1.17! 12.43 ! !! I
BITUMINOUS FINISHING AND/OR WEARING ! !! ! !!!COURSES
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION (54 NORMAN RATE FB HR RATEIDATE RATE FB HR RATE.- -._._----._-.-._ _ _--_._ -.~-.--.-- _ _ - .229 *SCRAPER, 32 cu. YDS. AND OVER !13.0212.901 15.92
II!231 RUBBER TIRED TRACTOR, BACK HOE 1 9.6511.171 10.82
ATTACHMENT 1 I 1I 1 1
232 SHOULDERING MACHINE OPERATOR (POWER) 110.3911.171 11.56(APSCO OR SIMILIAR TYPE) 1 1 1
1 1 I234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.901 15.81
I 1 1235 *TRACTOR OPERATOR~D21 TD6~ OR 112.9112.901 15.81
SIMILIAR H.P. Wb"11 PuWER "tAKE-OFF 1 I III!
236 TRACTOR OPERATOR, OVER D2, TD6 OR 110.9211.17! 12.09SIMILIAR H.P. WITH POWER TAKE-OFF 1 1 1
1 1 1238 *TRUCK CRANE OILER 111.2212.051 13.27
1 1 1239 *CRANE OPERATOR 111.4512.051 13~50
1 1 1301 BITUMINOUS DISTRIBUTOR DRIVER 110.3911.171 11.56
1 1 1302 DUMPMAN 1 9.2411.171 10.41
1 1 1303 *GREASER AND TRUCK SERVICEMAN I 9.0011.251 10.25
I 1 1305 TRUCK DRIVER (HAULING MACHINERY FOR 113.6211.171 14.79
CONTRACTORS OWN USE INCLUDING OP-! I IERATION OF HAND OR POWER OPERATED II!WINCHES) 1 1 1
1 1 I306 *SINGLE AXLE OR 2 AXLE UNIT ! 6.00!0.001 6.00
II!307 TANDEM AXLE OR 3 AXLE UNIT 110.11!1.17! 11.28
I ! I309 FIVE AXLE UNIT 110.8211.171 11.99
1 1 1404 *CARPENTER 111.7311.44! 13.17
! ! 1406 *CEMENT MASON 1 9.0010.00! 9.00
! 1 1
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 56 OTTERTAIL EFFECTIVE DATE OF DETE.RMINATION: FEBRUARY 1, 1986
rates should be reported immediately toOffice of constructionr TransportatlonSt. Paul, Minnesota 55 55,
TO CONTRACTORS AND EMPLOYEES:
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourlY rate to be paid on this project. In some instances, future rateshave been predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'reva~ling hours sha 1be paia at a rate of at least one and one half (1 172) tlmes the basichourly rate paid to the empl.oyee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE 1DATE RATE FB IIR RATE............................--------.- _------ - ------ .101 LABORER, COMMON (GENERAL LABOR WORK) I 7.8511. 17 ! 9.02 I! , , ,102 *LABORER, SKILLED (ASSISTING SKILLED I 8.25io.00i 8.25 i
CRAFT JOURNEYMAN) ! I ! iI I I I
103 *LABORER, LANDSCAPING (GARDNER, SOD I 8.25!0.00! 8.25 !LAYER AND NURSERYMAN) ! II!
I I ! !104 FLAGPERSON ! 7.8511.17! 9.02 !
I II!107 *PIPELAYER (WATER, SEWER & GAS) 110.7011.651 12.35 !
I I ! !201 AIR COMPRESSOR OPERATOR ! 9.6011.03! 10.63 !
! ! ! I202 ASPHALT~ BITUMINOUS STABILIZER PLANT I11.30!1.171 12.47 !
OPERATOK 1 ! ! !, ., , I203 *DRAGLlNE AND/OR OTHER SIMILAR i14.15i2.90i 17.05 1
EQUIPMENT WITH SHOVEL TYPE CONTROLS ! ! I !! ! ! !
204 BITUMINOUS SPREADER AND FINISHING 110.9211.17! 12.09 !OPERATOR ! ! 1 '
! ! I i205 BITUMINOUS SPREADER AND BITUMINOUS !10.92!1.17! 12.09 !
FINISHING MACHINE OPERATOR (HELPER) I ! 1 !II! I
209 CRUSHING PLANT OPERATOR (GRAVEL AND 110.92!1.17! 12.09 iSTONE) OR GRAVEL WASHIN~1 CRUSHING! ! ! !AND SCREENING PLANT OPEl<ATORS ! ! ! ,
! 1 ! i210 CURB MACHINE 114.3011.501 15.80 !
! ! ! !211 FRONT END LOADER OPERATOR UP TO AND !14.2511.501 15.75 !
INCLUDING 1 CU. YD. I! ! !1 II!
212 FINE GRADE OPERATOR !13.22!2.90! 16.12 !! ! 1 !
213 *FORKLIFT OPERATOR 111.26!1.17! 12.43 I! ! 1 i
214 FRONT END LOADER OPERATOR 110.92!1.17! 12.09 '! IIi
216 FIREMAN OR TANK HEATER OPERATOR 110.11!1.17! 11.28 !! 1 ! !
217 GRADER OR MOTOR PATROL, FINISHING, 111.30!1.17! 12.47 !EARTHWORK AND BITUMINOUS '" 1iii !
218 *GRADER OPERATOR (MOTOR PATROL) !10.39!1.171 11.56 ,! ! 1 i
219 *GREASER (TRUCK AND TRACTOR) 11O.84! 2. 90! 13.74 !! II!
221 *SELF PROPELLED CHIP SPREADER ! 8.25!2.05! 10.30 !! ! 1 !
222 MECHANIC OR WELDER !12.91!2.90! 15.81 ,! IIi
226 ROLLER OPERATOR, SELF PROPELLED !12.91!2.901 15.81 ,ROLLER FOR COMPACTION I! 1 i
! 1 ! !227 *ROLLER OPERATOR, UP TO AND INCLUDING! 7.7512.051 9.80 !
6 TONS FOR BITUMINOUS FINISHING ! ! 1 !AND/OR WEARING COURSES !!! 1
1 ! 1 !228 ROLLER OPERATOR, OVER 6 TONS FOR !10.9211.171 12.09 !
~1'fP~1~OUS FINISHING AND/OR WEARING ! ! ! !
BITUMINOUS DISTRIBUTOR DRIVER
*DUMPMAN
TRACTOR OPERATOR~OVER D2t
TD6 ORSIMILIAR H.P. WI-J:1t POWER AKE-OFF
*TRUCK CRANE OILER
*CRANE OPERATOR
*GREASER AND TRUCK SERVICEMAN
*TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION _OF HAND OR POWER OPERATEDWINCHES)
306 SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
309 FIVE AXLE UNIT
404 *CARPENTER
406 CEMENT MASON
236
238
239
301
302
303
305
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION (56 OTTERTAIL RATE FB· HR RATE!DATE RATE FB HR RATE•••••• •.••••••••••..••••••• _ .••_••••••••_.a ••••229 *SCRAPER, 32 CU. YDS. AND OVER !l3.02!2.90! 15.92 !
! I I I231 RUBBER TIRED TRACTOR, BACK HOE !12.9112.901 15.81 I
ATTACHMENT I ! ! '! I I i
234 *TURNAPULL OPERATOR (OR SIMILAR TYPE) 112.9112.901 15~81 '! ! ! i
235 TRACTOR OPERATOR.L..D2, TD6, OR 112.9112.901 15.81 1SIMILIAR H.P. Whit POWER TAKE-OFF! I ! 1
1 1 1 1110.92!1.171 12.09 I! I ! 'I ! ! i!11.22!2.05! 13.27 I1 I I I111.4512.051 13.50 II ! ! I!10.11!l.171 11.28 I! ! ! '1 9.2411.17! 10.41 i! ! ! I! 9.0011.25! 10.25 I1 ! 1 I110.9311.171 12.10 11 ! 1 \ !II! 1! ! 1 !! I 1 1110.11!l.051 11.16 !II! 1110.11!l.17! 11.28 !! ! ! 111O.5111.17! 11.68 I! 1 1 ,111.7311.441 13.17 i1 II!!l4.5911.50! 16.09 1! 1 I 1
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 57 PENNINGTON EFFECTIVE DATE OF DETERMINATION: FEBRUARY 1, 1986
TO CONTRACTORS AND EMPLOYEES:
217 *GRADER OR MOTOR PATROL~ FINISHING,EARTHWORK AND BITUMINOuS
218 *GRADER OPERATOR (MOTOR PATROL)
219 *GREASER (TRUCK AND TRACTOR)
222 *MECHANIC OR WELDER
224 *PICK UP SWEEPER
226 *ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
228 *ROLLER OPERATOR! OVER 6 TONS FORBITUMINOUS FINI::>HING AND/OR WEARINGCOURSES
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
231 *RUBBER TIRED TRACTOR, BACK HOEATTACHMENT
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave Deen predetermined. Those rates and the effective date are alsoshown. Lacor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (431hours per weeK. All hours worked in excess of the p'reva~ling hours ~ha 1be paia at a rate of at least one and one half (1 172) tlmes the baslehourly rate paid to the emp~oyee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent da~vK~~v~foF t~R!~~I~LINGRATE
CODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE~ --.----.._._-----.__..-- _..--------._.._ ---- _.---.--..-_..~-----101 LABORER, COMMON (GENERAL LABOR WORK) 1 7.00 10.00 I 7.00 I
I I I I102 *LABORER! SKILLED (ASSISTING SKILLED 1 9.0010.001 9.00 1
CRAFT JuURNEYMAN) I 1 1 'I I I i
103 *LABORER, LANDSCAPING (GARDNER, SOD I 9.2510.001 9.25 ILAYER AND NURSERYMAN) . 1 I I I
I I 1 '104 FLAGPERSON I 7.6710.001 7.67 i
1 1 1 1109 *UNDERGROUND AND OPEN DITCH LABORER 111.0010.001 11.00 I
(8 FEET BELOW STARTING GRADE LEVEL) I I I 1I I I 1
201 *AIR COMPRESSOR OPERATOR 110.0111.031 11.04 1I I I I
202 *ASPHALT~ BITUMINOUS STABILIZER PLANTl11.6711.171 12.84 1OPERATOK I I 1 1
I . I I I203 *DRAGLINE AND/OR OTHER SIMILAR 114.1512.901 17.05 1
EQUIPMENT WITH SHOVEL TYPE CONTROLS I I 1 1I 1 I I
204 *BITUMINOUS SPREADER AND FINISHING 111.2611.171 12.43 IOPERATOR I 1 1 I
I I 1 I205 *BITUMINOUS SPREADER AND BITUMINOUS 111.2611.171 12.43 I
FINISHING MACHINE OPERATOR (HELPER) I I I II I I I
206 *CONVEYER OPERATOR I 9.6511.171 10.82 I1 IIi209 *CRUSHING PLANT OPERATOR (GRAVEL AND 112.9112.901 15.81 I
STONE) OR GRAVEL WASHIN~! CRUSHING I I I IAND SCREENING PLANT OPEl<ATORS I I I I
I I I 1212 *FINE GRADE OPERATOR 112.9015.771 18.67 I
1 1 I i214 *FRONT END LOADER OPERATOR 112.5913.211 15.80 I
I I I I216 *FIREMAN OR TANK HEATER OPERATOR 110.3911.171 11.56 !
I I I I113.2212.901 16.12 I, I , Iiii I111.3512.901 14.25 iI I I I110.6613.081 13.74 I! I I i112.5913.221 15.81 iII! i!10.3911.171 11.56 iI ! I I1'l2.9112.901 15.81 II I ! !! I I !111.2611.17! 12.43 II I I i1 I ! III! ,I 9.6511.171 10.82 iI I I !iii I
234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.901 15.81 I! I I !
236 *TRACTOR OPERATOR, OVER D2, TD6 OR !12.91!2.901 15.81 1SIMILIAR H.P. WITH POWER TAKE-OFF
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION (57 PENNINGTON RATE FB HR RATElDATE RATE FB HR. RATE~ _._•..........---..__._ _ _.......•..__ ...239 CRANE OPERATOR 114.15 I2. 90 I 17.05
! ! !301 *BITUMINOUS DISTRIBUTOR DRIVER !10.3911.17! 11~56
! I I302 *DUMPMAN ! 9.2411.17! 10.41
I I I303 *GREASER AND TRUCK SERVICEMAN 111.5911.051 12.64
! I I305 *TRUCK DRIVER (HAULING MACHINERY FOR 113.3811.17 I 14.55
CONTRACTORS OWN USE INCLUDING OP- I ! IERATION OF HAND OR POWER OPERATED I I IWINCHES) ! I I
I ! I306 *SINGLE AXLE OR 2 AXLE UNIT ! 9.5111.031 10.54
! I I307 *TANDEM AXLE OR 3 AXLE UNIT 110.5410.001 10.54
! I I309 *FIVE AXLE UNIT 110.82! 1.17! 11.99
I I I404 CARPENTER 111.7011.171 12.87
! ! I406 *CEMENT MASON 114.7510.001 14.75
I I I412 IRONWORKER I 7.00!0.001 7.00
! I !
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEINA CONSPICUOUS PLACE
COUNTY 60 POLK EFFECTIVE DATE OF DETERMINATION: FEBRUARY 1, 1986
239 *CRANE OPERATOR.
303 *GREASER AND TRUCK SERVICEMAN
301 BITUMINOUS DISTRIBUTOR DRIVER
302 DUMPMAN
TO CONTRACTORS AND EMPLOYEES:
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourlY rate to be paid on this project. In some instances, future rateshave been predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'revalling hours ~ha 1be paie at a rate of at least one and one half (1 172) times the baslchourly rate paid to the employee.Violations of the prevailing wage rates should be reported immediately tothe Department of Transportation, Office of construction! TransportatlonBuilding! John Ireland Boulevard, St. Paul, Minnesota 55 55,phone (6 2) 296-6353.* Indicates that adjacent county rates were used for this classification
determination due to insufficlent data received for this county.PREVAILING RATE ! FUTURE PREVAILING RATE
CODE NUMBER & BASIC TOTAL I EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR. RATE....----. _ --- -- -.- _ ...101 LABORER, COMMON (GENERAL LABOR WORK)I 8.2411.171 9.41 I I I
I I ! ! I I102 LABORER~ SKILLED (ASSISTING SKILLED !10.3510.001 10.35 ,I! I
CRAFT JuURNEYMAN) I I I I II I IiI I
103 LABORER, LANDSCAPING (GARDNER, SOD ! 9.2510.001 9.25 I' ILAYER AND NURSERYMAN) 1 1 I I, i I
1 1 1 I 1104 FLAGPERSON I 7.6711.171 8.84 iiI
1 I ! I' 1202 ASPHALT, BITUMINOUS STABILIZER PLANTl11.6711.171 12.84 I i I
OPERATOR I 1 1 ·1' II I 1 I i I
203 DRAGLlNE AND/OR OTHER SIMILAR 114.1512.901 17.05 1 I IEQUIPMENT WITH SHOVEL TYPE CONTROLS 1 1 1 I I !
! 1 I ! I !204 BITUMINOUS SPREADER AND FINISHING 111.2611.171 12.43 1 I !
OPERATOR II! I I !1 1 1 I 1 1
205 BITUMINOUS SPREADER AND BITUMINOUS 111.26!1.171 12.43 illFINISHING MACHINE OPERATOR (HELPER) 1 I 1 " I
1 r Iii i206 CONVEYER OPERATOR I 9.6511.171 10.82 I' I
I I I Iii209 *CRUSHING PLANT OPERATOR (GRAVEL AND 112.9112.901 15.81 I 1 I
STONE) OR GRAVEL WASHIN~1 CRUSHING I IIi I !AND SCREENING PLANT OPEKATORS 1 I I 1 I I
I 1 I I I !212 *FlNE GRADE OPERATOR 1l2. 90 15.771 18.67 I 1 I214 FRONT END LOADER OPERATOR 111.2611.171 12.43 Ii',"
I 1 I i I216 FIREMAN OR TANK HEATER OPERATOR 110.3911.171 11.56 Iii
I I I 1 I I217 GRADER OR MOTOR PATROL, FINISHING, 114.3711.171 15.54 I I i
EARTHWORK AND BITUMINOUS '" I' Iiii Ii'
218 *GRADER OPERATOR (MOTOR PATROL) 113.0811.171 14.25 I! i! 1 I I I I
222 *MECHANIC OR WELDER 112.5913.211 15.80 I' II I I I i I
224 PICK UP SWEEPER 110.3911.17! 11.56 I ',, iI I I I I
228 ROLLER OPERATOR~ OVER 6 TONS FOR 111.2611.171 12.43 iiIBITUMINOUS FINI::iHING AND/OR WEARING I I I I I 'COURSES I 1 1 I I i
231 *RUBBER TIRED TRACTOR, BACK HOE i 9.65i1.17i 10.82 I i IATTACHMENT I I 1 I! I, , , I I i
232 *SHOULDERING MACHINE OPERATOR (POWER) i 10.39 il. 17 i 11.56 'i'(APSCO OR SIMILIAR TYPE) ! I ! iIi
I IIi i i236 TRACTOR OPERATOR, OVER D2, T06 OR 114.0711.171 15.24 '! I
SIMILIAR H.P. WITH POWER TAKE-OFF! 1 Ii! II I I !! !114.1512.901 17.05 !! II ! ! " I110.3911.171 11.56 iiII , , ! I ,
i 9.24i1.17i 10.41 Iii! ! ! !! I! 11.59 I 1.05 I 12.64 !! I
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL I EFFECT BASIC. TOTALCLASSIFICATION (60 POLK RATE FB HR RATEIDATE RATE FB HR RATE~ -- _ _..-.- _ -- _ -_ - _-- .305 TRUCK DRIVER (HAULING MACHINERY FOR 113.3811.17! 14.55 ! ! !
CONTRACTORS OWN USE INCLUDING OP-! ! I ! ! IERATION OF HAND OR POWER OPERATED! I I ! ! IWINCHES) . I II! I I
! ! I ! ! I307 TANDEM AXLE OR 3 AXLE UNIT ! 9.5910.00! 9.59 I ! !, " , , ,309 FIVE AXLE UNIT ilO.82i1.17i 11.99 iii
! I I ! 1 I404 *CARPENTER ! 11.7011.17! 12.87 I I I
I I I ! I I412 *IRONWORKER I 7.0010.001 7.00 I I I
! I! ! I I
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 63 RED LAKE EFFECTIVE DATE OF DETERMINATION: FEBRUARY I, 1986
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave Deen predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'reva~ling hours sha 1be paia at a rate of at least one and one half (1 172) tlmes the basichourly rate paid to the. employee.
Violations of the prevailing wage rates should be reported immediately tothe Department of Transportation, Office of construction! TransportatlonBuilding! John Ireland Boulevard, St. Paul, Minnesota 55 55,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE! DATE RATE FB HR RATE...............__ ------ ---•••••.....__ .101 *LABORER, COMMON (GENERAL LABOR WORK) 1 7.00 10.00 1 7.00 1
1 1 1 1102 *LABORER
6SKILLED (ASSISTING SKILLED 110.3510.001 10.35
,CRAFT J URNEYMAN) !! 1 i
1 1 1 i103 *LABORER, LANDSCAPING (GARDNER, SOD I 9.25!0.001 9.25 1
LAYER AND NURSERYMAN) 1 1 1 !II! !
104 *FLAGPERSON 1 7.6711.171 8.84 !1 ! 1 1
202 *ASPHALTRBITUMINOUS STABILIZER PLANT!11.6711.171 12.84 !OPERATO 1 ! 1 1
II! 1203 *DRAGLINE AND/OR OTHER SIMILAR 114.15!2.901 17.05 !
EQUIPMENT WITH SHOVEL TYPE CONTROLS 1 1 1 !1 .! ! 1
204 *BITUMINOUS SPREADER AND FINISHING 111.2611.17! 12.43 1OPERATOR ! ! 1 1
1 1 1 !205 *BITUMINOUS SPREADER AND BITUMINOUS 111
•26 P·17112.43 !
FINISHING MACHINE OPERATOR (HELPER) !1 ! 1 !
206 *CONVEYER OPERATOR I 9.6511.17! 10.82 !! ! ! ,
214 *FRONT END LOADER OPERATOR ! 11. 26 11. 17 ! 12.43 i1 ! ! !
216 *FIREMAN OR TANK HEATER OPERATOR 110.3911.171 11.56 !! ! ! !
217 *GRADER OR MOTOR PATROLd
FINISHING, !14.3711.171 15.54 1EARTHWORK AND BITUMINO S ! ! ! !
1 ! ! !224 *PICK UP SWEEPER !10.3911.17! 11.56 !
1 ! ! !228 *ROLLER OPERATORS OVER 6 TONS FOR 111.26!1.17! 12.43 !
BITUMINOUS FINI HING AND/OR WEARING ! 1 ! !COURSES I ! ! !
! 1 1 ,236 *TRACTOR OPERATORtH0VER D2t TD6 OR 114.0711.17! 15.24 i
SIMILIAR H.P. WI POWER AKE-OFF ! I I !II! 1
239 *CRANE OPERATOR ! 14. 1512.90! 17.05 !1 I ! ,
301 *BITUMINOUS DISTRIBUTOR DRIVER 110.3911.171 11.56 i! ! ! i
302 *DUMPMAN I 9.24! 1.17! 10.41 ,! I ! i
305 *TRUCK DRIVER (HAULING MACHINERY FOR !13.3811.17! 14.55 !CONTRACTORS OWN USE INCLUDING OP-! I ! !ERATION OF HAND OR POWER OPERATED I , , !WINCHES) iii !
, , I !307 *TANDEM AXLE OR 3 AXLE UNIT i 9.59io.00i 9.59 !
I ! ! ,309 *FIVE AXLE UNIT 110.8211.171 11.99 i
I ! ! I404 *CARPENTER Ill.7011.17! 12.87 I
I ' , 1412 *IRONWORKER ! 7.00io.ooi 7.00 !
! 1 ! I
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 68 ROSEAU EFFECTIVE DATE OF DETERMINATION: FEBRUARY I, 1986TO CONTRACTORS AND EMPLOYEES:
226 *ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
228 *ROLLER OPERATOR, OVER 6 TONS FORBITUMINOUS FINISHING AND/OR WEARINGCOURSES
214 *FRONT END LOADER OPERATOR
216 *FIREMAN OR TANK HEATER OPERATOR
217 *GRADER OR MOTOR PATROL, FINISHING,EARTHWORK AND BITUMINOUS
218 *GRADER OPERATOR (MOTOR PATROL)
219 *GREASER (TRUCK AND TRACTOR)
222 *MECHANIC OR WELDER
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
239 *CRANE OPERATOR
301 *BITUMINOUS DISTRIBUTOR DRIVER
302 *DUMPMAN
This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourlY rate to be paid on this proiect. In some instances, future rateshave Deen predetermined. Those rates and the effective date are alsoshown. LaDor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (4alhours per weeK. All hours worked in excess of the p'reva~ling hours sha 1be paia at a rate of at least one and one half (1 172) tlmes the basichourly rate paid to the employee.
Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATEIDATE RATE FB HR RATE..............._-- -- -----_ _-- - _-_ _-_ ..101 *LABORER, COMMON (GENERAL LABOR WORK) I 7.50 10.00 1 7.50 I
I 1 I I102 *LABORER~ SKILLED (ASSISTING SKILLED I 9.0010.001 9.00 I
CRAFT JuURNEYMAN) I I 1 II I I '
104 *FLAGPERSON I 6.6711.031 7.70 iI I 1 I
109 *UNDERGROUND AND OPEN DITCH LABORER 111.0010.001 11.00 I(8 FEET BELOW STARTING GRADE LEVEL) I I I I
I I I i201 *AIR COMPRESSOR OPERATOR 110.0111.031 11.04 I
1 I I I202 *ASPHALT~ BITUMINOUS STABILIZER PLANT I11.5911.051 12.64 I
OPERATOK I I I II I I I
203 *DRAGLINE AND/OR OTHER SIMILAR 114.1512.901 17.05 IEQUIPMENT WITH SHOVEL TYPE CONTROLS I I I I
I I I I204 *BITUMINOUS SPREADER AND FINISHING 111.1811.051 12.23 II
OPERATOR I 1 1I 1 1 1
205 *BITUMINOUS SPREADER AND BITUMINOUS 111.1811.051 12.23 IFINISHING MACHINE OPERATOR (HELPER) 1 I I '
1 Iii209 *CRUSHING PLANT OPERATOR (GRAVEL AND 112.5913.221 15.81 '
STONE) OR GRAVEL WASHIN~, CRUSHING 1 IiiAND SCREENING PLANT OPEKATORS 1 1 1 1
I I 1 '212 *FINE GRADE OPERATOR 113.2212.901 16.12 i
1 I 1 I112.5913.211 15.80 I1 I 1 I110.3111.051 11.36 II I I I113.2212.901 16.12 II I I II I I I111.1613.091 14.25 I! I 1 I110.6613.081 13.74 ,I Iii112.5913.221 15.81 I, , I Ii12.91i2.90i 15.81 II ! 1 II I , iill.18il.05i 12.23 II I ! II ! ! ,I I I i
231 *RUBBER TIRED TRACTOR, BACK HOE ! 9.6511.171 10.82 IATTACHMENT 1 Iii
1 I ! 1234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)112.9112.901 15.81 !
II! I236 *TRACTOR OPERATOR, OVER 02, TD6 OR 112.5913.221 15.81 !
SIMILIAR H. P. WITH POWER TAKE-OFF I I I Iiii !114.15!2.901 17.05 11 ! ! I1 9.5112.301 11.81 1! ! ! I! 8.9711.78! 10.75 i
412 *IRONWORKER
417 *PIPEFITTER - STEAMFITTER
PREVAILING RATE I FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION (68 ROSEAU RATE FB HR RATEI·DATE RATE FB HR RATE~ - -.._ _ --._ -_ _ - .303 *GREASER AND TRUCK SERVICEMAN !11.5911.051 12.64 !
I ! ! !306 *SINGLE AXLE OR 2 AXLE UNIT ! 9.5111.031 10.54 !
I II!307 *TANDEM AXLE OR 3 AXLE UNIT 110.5410.001 10.54 I
I I I !309 *FIVE AXLE UNIT 110.8211.171 11.99 I
I ! ! I404 *CARPENTER ! 9.7510.001 9.75 !
I ! 1 !406 *CEMENT MASON 114.75!0.001 14.75 !
I ! I !111.7011.171 12.87 !! ! ! I115.43!2.66! 18.09 !! I ! I
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDUSTRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 69 ST. LOUIS EFFECTIVE DA'lJ;:·QF DETERMINATION: FEBRUARY 1, 1986
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul. Minnesota 55 55,
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave aeen predetermined. Those rat,s and the effective date are alsoshown. Lacor classifications not Ilsted below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weeK. All hours worked in excess of the p'revalling hours ,ha 1be paio at a rate of at least one and one half (1 172) times the baslchourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE 1DATE RATE FB lIR RATE........-- - ------- ---- __..-_.- -~-..-=.101 LABORER, COMMON (GENERAL LABOR WORK)112.1313.251 15.38 I I I
1 I· IIi i102 LABORER, SKILLED (ASSISTING SKILLED 112.1313.25"1 15.38 I I 1
CRAFT JOURNEYMAN) I Iii I !1 1 IIi !
104 FLAGPERSON 110.2313.251 13.48 II!1 1 1 I 1 1
107 PIPELAYER (WATER, SEWER & GAS) 112.5813.251 15.83 1 1 I1 1 1 IIi
201 AIR COMPRESSOR OPERATOR 113.5812.901 16.48 I 1 1I 1 I I 1 I
202 ASPHALT, BITUMINOUS STABILIZER PLmh5.8712.90i 18.77 illOPERATOR . 1 1 1 I 1 1
1 1 1 'I 1203 DRAGLlNE AND/OR OTHER SIMILAR 116.7212.901 19.62 1 1 '
EQUIPMENT WITH SHOVEL TYPE CONTROLS 1 I 1 IIi1 IIi I I
204 BITUMINOUS SPREADER AND FINISHING 115.8712.901 18.77 IiIOPERATOR ' 1 IIi 1 1
1 1 1 1 1 I205 BITUMINOUS SPREADER AND BITUMINOUS !13.5812.901 16.48 IIi
FINISHING MAClilNE OPERATOR (HELPER) 1 1 Iii 11 1 1 1 1 I
206 *CONVEYER OPERATOR I 5.7911.171 6.96 IIi1 1 1 1 I I
209 CRUSHING PLANT OPERATOR (GRAVEL AND 115.8712.901 18.77 1 i iSTONE) OR GRAVEL WASHING, CRUSHING! I 1 1 I 1AND SCREENING PLANT OPERATORS 1 1 IIi 1
1 1 1 1 I 1210 CURB MACHINE 115.8712.901 18.77 I 1 1
1 I 1 I I I211 FRONT END LOADER OPERATOR UP TO AND 113.5812.901 16.48 iii
INCLUDING 1 CU. YD. 1 II! 1 1I I I I 1 1
213 FORKLIFT OPERATOR 115.8712.901 18.77 i! II 1 1 I 1 1
214 FRONT END LOADER OPERATOR 115.8712.901 18.77 illI Iii 1 1
216 *FlREMAN OR TANK HEATER OPERATOR 110.3911.171 11.56 I I I1 I Iii i
217 GRADER OR MOTOR PATROL, FINISHING, 116.1712.901 19.07 I!!EARTHWORK AND BITUMINOUS I! 1 i! I
1 ! I ! I i218 *GRADER OPERATOR (MOTOR PATROL)i13·5812.90i 16.48 iii219 GREASER (TRUCK AND TRACTOR) 112.8212.901 15.72 I! 1
1 IIi ! 1222 MECHANIC OR WELDER 115.8712.901 18.77 ill
I 1 I !! 1223 OILERS (POWER SHOVEL, CRANE, DRAG- 112.8212.901 15.72 I!'
LINE) 1 Iii I iI ! ! I i I
224 *PICK UP SWEEPER 116.1811.171 17.35 iI'! ! ! Iii
226 ROLLER OPERATOR, SELF PROPELLED 115.87!2.901 18.77 i! IROLLER FOR COMPACTION !!! I! I
I I Ii! I227 *ROLLER OPERATOR, UP TO AND INCLUDING!I4.07!I.17i 15.24 !! 1
6 TONS FOR BITUMINOUS FINISHING ! ! ! I! IAND/ OR WEARING COURSES 1 I ! i! 1
II! I! !228 ROLLER OPERATOR.l OVER 6 TONS FOR 115.8712.901 18.77 !! 1
BITUMINOUS FINI:;HING AND/OR WEARING ! ! I I! ICOURSES
STEAMFITTER
419 PLUMBER
413 LINEMAN
417 PIPEFITTER
418 *PLASTERER
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION (69 ST. LOUIS RATE FB HR RATE 1DATE RATE FB HR RATE•••••••••••••••••••••••••••__••••••••••••••••__••••••••••a. ......__•••••••••••••••••••
229 *SCRAPER, 32 CU. YDS. AND OVER 115.9912.901 18.89 II!1 ~ 1 1 II!
231 RUBBER TIRED TRACTOR, BACK HOE 115.8712.901 18.77 1 1 IATTACHMENT 1 1 1 'I!
1 IIi 1 !232 SHOULDERING MACHINE OPERATOR (POWER) 113.5812.901 16.48 I'!
(APSCO OR SIMILIAR TYPE) 1 1 IIi I1 1 1 1 I I
234 TURNA~ULL OPERATOR (OR SIMILAR TYPE)115.8712.901 18.77 Ii!1 IIi 1 I
235 *TRACTOR OPERATOR~D21 TD6~ OR 115.8712.901 18.77 1 1 ISIMILIAR H. P. WI1:1:1 PuWER 'l'AKE-OFF 1 1 1 'I !
! ! 1 i! !236 TRACTOR OPERATOR, OVER D2, TD6 OR 115.8712.90! 18.77 1 1 I
SIMILIAR H.P. WITH POWER TAKE-OFF II! ! 1 I1 1 1 " !
237 POWER ACTUATED AUGERS AND BORING ! 13.5812.901 16.48 i i !MACHINE 1 1 1 1 I I
1 1 IIi i239 CRANE OPERATOR 116.7212.90! 19.62 ! 1 I
I ! I I! I240 BOOM TRUCK 115.87 I2. 901 18.77 IIi
! I ! i ' I241 MILLING MACHINE 115.87 I2. 90! 18.77 ! i !
1 1 I 1 I I242 TRENCHER 115.8712.901 18.77 IIi
I ! I 1 I I301 BITUMINOUS DISTRIBUTOR DRIVER 113.9512.451 16.40 II!
1 I 1 II!302 *DUMPMAN 112.5811.171 13.75 '"
I 1 Iii i304 *SELF PROPELLED PACKER OPERATOR 1 8.8311.031 9.86 II!
! 1 I 1 I I305 TRUCK DRIVER (HAULING MACHINERY FOR !14.6012.451 17.,05 1 I I
CONTRACTORS OWN USE INCLUDING OP- II!' I' iERATION OF HAND OR POWER OPERATED 1 I I 'i !WINCHES) , I IiI I
iii II!306 SINGLE AXLE OR 2 AXLE UNIT 113.7012.451 16.15 I! I
I 1 1 I' I307 TANDEM AXLE OR 3 AXLE UNIT U3.9512.451 16.,40 ! i i
, , I 'I I308 FOUR AXLE UNIT i 14.05i2.45i 16.50 i 1 !
I II! ! ,309 FIVE AXLE UNIT 114.6012.451 17.05 'I i
1 IIi I I404 CARPENTER 115.7313.101 18.83 II!
1 1 I 1 1 1406 *CEMENT MASON 115.5011.501 17.00 1 I I
I 1 I I 1 I 1407 ELECTRICIAN 116.0015.121 21.12 106/01/86116.3515.231 21.58
, " I 1 1 I410 *LATHER iI4.80i2.40i 17.20 I 1 I !
I II! 1 1 I412 *IRONWORKER 1 9.6010.001 9.60 1 1 1 1
II! 1 1 1 1117.7113.191 20.90 ! ! 1 !1 I I I I! 1115.8513.90! 19.75 1 1 1 1! I I I ! 1 1I 15.6511.551 17.20 I 05/01/86J15.85 11. 551 17.401 I! 1 II!115.7614.251 20.01 1 1 1 I1 I II! I 1
STATE OF MINNESOTA/DEPARTMENT-OF LABOR AND INDUSTRYMinn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 69 ST. LOUIS EFFECTIVE DA~·OF DETERMINATION: FEBRUARY 1, 1986
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
eight (8) hours per day and forty (491in excess of the p'revalling hours sha 1and one half (1 172) times the basic
FRONT END LOADER OPERATOR
*FIREMAN OR TANK HEATER OPERATOR
205 BITUMINOUS SPREADER AND BITUMINOUSFINISHING MACHINE OPERATOR (HELPER)
206 *CONVEYER OPERATOR
209 CRUSHING PLANT OPERATOR (GRAVEL ANDSTONE) OR GRAVEL WASHING, CRUSHINGAND SCREENING PLANT OPERATORS
213
214
216
217
210 CURB MACHINE
211 FRONT END LOADER OPERATOR UP TO ANDINCLUDING 1 CU. YD.
FORKLIFT OPERATOR
GRADER OR MOTOR 'PATROL, FINISHING,EARTHWORK AND BITUMINOUS
218 *GRADER OPERATOR (MOTOR PATROL)
219 GREASER (TRUCK AND TRACTOR)
222 MECHANIC OR WELDER
223 OILERS (POWER SHOVEL, CRANE,LINE)
224 *PICK UP SWEEPER
226 ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this project. In some instances, future rateshave been predetermined. Those rates and the effective date are alsoshown. Labor classifications not listed below have had no rate determined
.due to lack of information.The prevailing hours of labor arehours per weeK. All hours workedbe paia at a rate of at least onehourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insuffic1ent data received for this county.
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL 1EFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE! DATE RATE FB IIR RATE_ •• ••• •• • .. __••_ •••D __••_~=m__=_101 LABORER, COMMON (GENERAL LABOR WORK)!12.13!3.25! 15.38 !05/01/86112.4813.25! 25.73
! !,! 1 1 1 ,102 LABORER, SKILLED (ASSISTING SKILLED !12.13!3.25'! 15.38 !05/01/86!12.4813.25! 25.73
CRAFT JOURNEYMAN) ! I! ' '", , .. , 1 Iii104 FLAGPERSON 110.2313.251 13.48 l05/01/86 l10.28 13.251 23.53
107 PIPELAYER (WATER, SEWER & GAS) 112.58!3.25! 15.83 :,'05/01/86:,'12.93 1,3.25:,' 26.18! ! !
201 AIR COMPRESSOR OPERATOR " !13.58!2.90! 16.48 j05/01/86 !13.83 !2.90j 26.73
202 ASPHALT, BITUMINOUS STABILIZER PL~15.87!2.90! 18.77 .!;05/01/85.:,'16.37:,'.2.90,' 29.27OPERATOR ! ! !
! !! I '"203 DRAGLlNE AND/OR OTHER SIMiLAR !16.72!2.90! 19.62 1 ; i i
EQUIPMENT WITH SHOVEL TYPE CONTROLS! !! 105/01/87117.2212.90i 20.12! !! , '"
204 BITUMINOUS SPREADER AND FINISHING 115.8712.90! 18.77 ',i05/01/86',i16.37 ,12.90 /,' 19.27OPERATOR 1 ! !
1 !! 1 Iii113.5812.901 16.48 !05/01/86!13.8312.90! 16.731 !! ! !!!! I! ! !!!1 5.79!1.17! 6.96 1 !!!! !! , '"!15.87!2.90! 18.77 ',i05/01/86',i16.37:,'2.901, 19.27! 1 !! ! 1 i ; i i! !! 1 Iii!15.87!2.901 18.77 !,05/01/861,16.37','2.90,,' JL9.27! ! !113.58! 2. 90! 16.48 105/01/86113/83 iz .90 i JL6.73, " 1 1 1 1ill ! ! 1 !115.87!2.90! 18.77 !05/01/86!16.3712.90! JL9.271 !! ' '"!15.8712.90! 18.77 105/01/86116.3712.90i JL9.27! !! ' '"!10. 39 !1. 17! 11. 56iii i1 1 1 Iii i116.17!2.90! 19.07 105/01/86116.67!2.90! 1-9.571 !! ! I!', " ! I!!113.5812.901 16.48 !05/01/86!13.63!2.90' 1-6.73! !! ! !!!!12.82!2.90! 15.72 !05/01/86!12.92!2.90! 1-5.821 ! 1 ! I!!! 15.8712.90! 18.77 105/01/86!16.3712.90! 1-9.27! !! 1 !!!
DRAG- l12.82l2.90l 15.72 l05/01/86l12.9212.9011-5.82
1 1 1 Iii i!16.18!1.17! 17.35 1 ! 1 !I " , '"115.8712.901 18.77 105/01/86116.37i2.9011-9.27! !! 1 !!!, " ! !!!
227 *ROLLER OPERATOR, UP TO AND INCLUDINGI14.07i1.17i 15.24 , "I6 TONS FOR BITUMINOUS FINISHING ! !! iii iAND/ OR WEARING COURSES !!! 1 !!!
1 !! 1 !!!228 ROLLER OPERATOR~ OVER 6 TONS FOR 115.8712.901 18.77 P5/01/86 !16.37 12.90 !1~.27
BITUMINOUS FINI:sHING AND/OR WEARING ! !! ! !!!COURSES
236 TRACTOR OPERATOR, OVER D2t
T06 ORSIMILIAR H. P. WITH POWER AKE-OFF
239 CRANE OPERATOR
240 BOOM TRUCK
241 MILLING MACHINE
242 TRENCHER
301 BITUMINOUS DISTRIBUTOR DRIVER
302 *DUMPMAN
304 *SELF PROPELLED PACKER OPERATOR
305 TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
306 SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
308 FOUR AXLE UNIT
309 FIVE AXLE UNIT
404 CARPENTER
406 *CEMENT MASON
407 ELECTRICIAN
410 *LATHER
412 *IRONWORKER
413 LINEMAN
417 PIPEFITTER - STEAMFITTER
418 *PLASTERER
419 PLUMBER
POWER ACTUATED AUGERS AND BORINGMACHINE
237
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL! EFFECT BASIC TOTALCLASSIFICATION (69 ST. LOUIS RATE FB HR RATE!DATE RATE FB HR RATE•••••••s •••••••••••=_••••••__••••••••••__••••••__•••__._._••~••__••_•••_••_••~••__••• _229 *SCRAPER, 32 CU. YDS. AND OVER 115.99!2.90! 18.89 !05/01/86116.49!2.901 19.39
,~t I ! !.!!231 RUBBER TIRED TRACTOR, BACK HOE i15.87i2.90i 18.77 !05/01/86116.37!2.901 19.27
ATTACHMENT ' !! ! 1 1 1!! , !"
232 SHOULDERING MACHINE OPERATOR (POWER) 13.58!2.90! 16.• 48 i05/01/86,13.83j2.90i 16.73(APSCO OR SIMILIAR TYPE) !! ill i
!! ! !! I234 TURNAFULL OPERATOR (OR SIMILAR TYPE) 15.87!2.90! 18.77 !05/01/86!16.37!2.901 19.27
" , '"235 *TRACTOR OPERATOR, D2, T06, OR 15.8712.90i 18.77 i05/01/86116.37i2.90i 19.27SIMILIAR H.P. WITH POWER TAKE-OFF !! , '"
! 1 ill i15.87!2.90! 18.77 !05/01/86!16.37!2.90! 19.27
!! ! I!!!! , '"
13.58!2.90! 16.48 i05/01/86113.8312.901 16.73" ! !!!
! II! I! 1116.72!2.90! 19.62 !,05/01/86!, 17.22!, 2.901, 20.12! ! !!15.87!2.90! 18.77 i05/01/86i16.3712.901 19.27! !! ! !!!!15.87!2.90! 18.77 !05/01/86!16.37!2.90! 19.27! !! ! !!!!15.87!2.90! 18.77 !05/01/86!16.37!2.901 19.27! !! ! !! 1! 13.9512.45! 16.40 ! II!! !! 1 !! 1!12.58ll.17! 13.75 I !!!, " ! I!!i 8.8311.03i 9.86! !! I! !! , '"ll4.60!2.45! 17 •.05 iii i! !! ! !! 1! I! ! !! 1! !! ' '"! !! iii i!13.70!2.45! 16.15 ! I!!! !! ! !! I113. 95! 2.45! 16.;40 ! !! 1, " ! !! Ii14.05i2.45i 16.50 ! !!!! !! ! !! I! 14.60! 2.45! 17.05 I !!!! !! ! !!!!15.73!2.510! 18.63 I " I! !! iii i!15.50ll.50! 17.00! !!!! !! ! !!!!16.00!5.12! 21.12 !06/01/86!16.35!5.231 Zl.58! !! ! !!!!14.80!2.40! 17.20 105/01/861 14.951 2.40! L7.35! !! • .. I! 9.60!0.001 9.60! I!!! !! ! !!!\17. 71 13 • 19 \ 20.90 \04/01/86\18.33!3.59! 21.92
115.8513.90! 19.75 ' '"! !! iii 1! 15.65! 1.55! 17.20 ! 05/01/86.115.85 ll.55! L 7.40, I I , '"i15.76i4.251 20.01 ill i! !! ! I! 1
·,
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND INDQSTRY
Minn. Stat. 177.41 - 177.44 (1978)
CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTROCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 80 WADENA EFFECTIVE DATE QF DETERMINATION: FEBRUARY 1, 1986
rates should be reported immediately toOffice of construction! TransportatIonSt. Paul, Minnesota 55 55,
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Thewage rates for the labor classifications listed below are the minimumhourly rate to be paid on this proiect. In some instances, future rateshave ceen predetermined. Those refes and the effective date are alsoshown. Lacor classifications not listed below have had no rate determineddue to lack of information.
The prevailing hours of labor are eight (8) hours per day and forty (491hours per weel. All hours worked in excess of the erevalling hours ,ha 1be paia at a rate of at least one and one half (1 172) t mes the bas1chourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building! John Ireland Boulevard,phone (6 2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insuffic1ent da~lEvi~vf#n:foF t~~.A'i:UNGRATE
CODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE IDATE RATE FB HR RATE.............................-- --_ -_._-_.._.._ __..~_ -
212 *FINE GRADE OPERATOR
214 FRONT END LOADER OPERATOR
229 *SCRAPER, 32 CU. YDS. AND OVER
231 *RUBBER TIRED TRACTOR, BACK HOEATTACHMENT
216 *FlREMAN OR TANK HEATER OPERATOR
217 *GRADER OR MOTOR PATROL, FINISHING,EARTHWORK AND BITUMINOUS
218 *GRADER OPERATOR (MOTOR PATROL)
222 *MECHANIC OR WELDER
224 *PICK UP SWEEPER
226 *ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
IIIIIIIIIIIIIIIIIIIIIIIIIII,iiIIIIII,iI,iII
i,iI,i,iI
iIIIIIII,iI
1I1IIIII,iIIIII,iiII
iIII,i,iIIIIIII!II!III,iI
iI!!!!,i!!!!!!!,i!
9.25
8.41
12.35
10.63
12.84
12.43
15.81
11.90
11.21
17.05
15.81
12.43
15.80
15.75
14.25
15.81
1l.56
10.82
16.12
15.81
11.28
12.47
12.43
10.00
15.81
101 LABORER, COMMON (GENERAL LABOR WORK)II0.2511.651I I I
102 *LABORER~ SKILLED (ASSISTING SKILLED 110.0411.171CRAFT .JuURNEYMAN) 'I I
I I103 *LABORER, LANDSCAPING (GARDNER, SOD 9.2510.001
LAYER AND NURSERYMAN) I I1 I
104 *FLAGPERSON 7.2411.171I I
107 *PIPELAYER (WATER, SEWER & GAS) 10.7011.651- I 1
201 *AIR COMPRESSOR OPERATOR 9.6011.031I I
202 *ASPHALT~ BITUMINOUS STABILIZER PLANT 11.6711.171OPERATOK I I 1
I 1 I203 *DRAGLlNE AND/OR OTHER SIMILAR 114.1512.901
EQUIPMENT WITH SHOVEL TYPE CONTROLS I I II I I
204 BITUMINOUS SPREADER AND FINISHING 111.2611.171OPERATOR ! I I
1 I I205 BITUMINOUS SPREADER AND BITUMINOUS 111.2611.171
FINISHING MACHINE OPERATOR (HELPER) I I II I I
209 *CRUSHING PLANT OPERATOR (GRAVEL AND 112.9112.901STONE) OR GRAVEL WASHINq I CRUSHING I I IAND SCREENING PLANT OPEKATORS I I !
I I I210 *CURB MACHINE 114.3011.501
I I I211 *FRONT END LOADER OPERATOR UP TO AND 114.2511.501
INCLUDING 1 CU. YD. . 1 I 1I I I113.2212.901I I I!12.9112.901I ! !110.1111.171I I I111.3011.171I I !, , ,i 11.35 i2.90 i1 I !112.9112.901I I I110.3911.17 I, , ,i 9.65il.17iI I II I !
228 ROLLER OPERATOR~ OVER 6 TONS FOR 111.2611.171BITUMINOUS FINI::iHING AND/OR WEARING I I !COURSES I I 1
I I !110.0010.001! I !112.9112.90!! ! !I ! !
234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)!12.9112.901
, =
PREVAILING RATE 1 FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION (80 WADENA RATE FB HR RATE 1DATE RATE FB HR RATE.........--_ -_ --_.._._---_ _~_ -235 *TRACTOR OPERATOR, D2~ TD6~ OR
SIMILIAR H.P. WITH PuWER TAKE-OFF
236 TRACTOR OPERATOR~OVER D2~ TD6 ORSIMILIAR H.P. WII~ POWER TAKE-OFF
301 *BITUMINOUS DISTRIBUTOR DRIVER
302 *DUMPMAN
305 TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
306 *SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
309 *FIVE AXLE UNIT
406 *CEMENT MASON
112.9112.9011 I 1I • 1 1112.9112.901I 1 1I I I110.3911.171I 1 II 9.2411. 171I 1 I110.9311.171I I ,
iii1 I II I I110.1111.051! 1 1110.3911.171, , ,ilO.82i1.17i! I I114.5911.501! ! I
15.81
15.81
11.56
10.41
12.10
11.16
11.56
11.99
16.09
STATE OF MINNESOTA/DEPARTMENT OF LABOR AND IND~STRY
Minn. Stat. 177.41 - 177.44 (1978)CERTIFIED PREVAILING WAGES FOR HIGHWAY AND HEAVY CONSTRUCTION
THIS NOTICE MUST BE POSTED ON JOBSITEIN A CONSPICUOUS PLACE
COUNTY 84 WILKIN EFFECTIVE DATE·~F DETERMINATION: FEBRUARY 1, 1986
227 *ROLLER OPERATOR, UP TO AND INCLUDING6 TONS FOR BITUMINOUS FINISHINGAND/OR WEARING COURSES
228 *ROLLER OPERATOR, OVER 6 TONS FORBITUMINOUS FINISHING AND/OR WEARINGCOURSES
210 *CURB MACHINE
211 *FRONT END LOADER OPERATOR UP TO ANDINCLUDING 1 CU. YD.
212 *FlNE GRADE OPERATOR
213 *FORKLIFT OPERATOR
214 FRONT END LOADER OPERATOR
216 FIREMAN OR TANK HEATER OPERATOR
217 GRADER OR MOTOR PATROL, FINISHING,EARTHWORK AND BITUMINOUS
218 *GRADER OPERATOR (MOTOR PATROL)
219 *GREASER (TRUCK· AND TRACTOR)
221 *SELF PROPELLED CHIP SPREADER
rates should be reported immediately toOffice of construction! TransportatlonSt. Paul, Minnesota 55 55,
eight (8) hours per day and forty (491in excess of the p'reva~ling hours .ba 1and one half (1 172) tlmes the baslc
222 MECHANIC OR WELDER
226 *ROLLER OPERATOR, SELF PROPELLEDROLLER FOR COMPACTION
TO CONTRACTORS AND EMPLOYEES:This project is covered by the Minnesota Prevailing Wage Statutes. Tbewage rates for the labor classifications listed below are the minimumhourlY rate to be paid on this proiect. In some instances, future rateshave ceen predetermined. Those rat,s and the effective date are alsoshown. Labor classifications not llsted below have had no rate dete~ineddue to lack of information.
The prevailing hours of labor arehours per wee~. All hours workedbe paia at a rate of at least onehourly rate paid to the employee.Violations of the prevailing wagethe Department of Transportation,Building, John Ireland Boulevard,phone (6~2) 296-6353.
* Indicates that adjacent county rates were used for this classificationdetermination due to insufficlent data received for this county.
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL IEFFECT BASIC TOTALCLASSIFICATION RATE FB HR RATE IDATE RATE FB HR RATE.._-- -- _ -- _---- __.._-_ ..101 *LABORER, COMMON "(GENERAL LABOR WORK) I 5.7510.001 5.75 I I I
I I I !! I102 *LABORER, SKILLED (ASSISTING SKILLED ! 8.2510.001 8.25 I I I
CRAFT JOURNEYMAN) I! ! ! 1 1! I ! !' I
103 *LABORER, LANDSCAPING (GARDNER, SOD I 8.2510.001 8.25 ! 1 ILAYER AND NURSERYMAN) ! I ! !! I
I ! I !"104 *FLAGPERSON ! 7.2411.17! 8.41 I 1 1
I I ! !! !201 *AIR COMPRESSOR-OPERATOR ! 9.6011.031 10.63! I I
1 ! ! !! I202 ASPHALT.! BITUMINOUS STABILIZER PLANTIll.30!l.17! 12.47 I! I
OPERATOK ! I I ! I !I I I I I I
203 *DRAGLlNE AND/OR OTHER SIMILAR 114.1512.901 17.05 ! ,I IEQUIPMENT WITH SHOVEL TYPE CONTROLS I I I ! ,. ,
I I ! I I204 BITUMINOUS SPREADER AND FINISHING 110.9211.171 12.09 ! 1 '
OPERATOR I I I '! II I ! I' I
205 *BlTUMINOUS SPREADER AND BITUMINOUS !11.2611.17! 12.43 ! 1 IFINISHING MACHINE OPERATOR (HELPER) ! I ! I! I
! I I I! I209 CRUSHING PLANT OPERATOR (GRAVEL AND !l0. 9211.17 I 12.09 I!'
STONE) OR GRAVEL WASHIN~, CRUSHING! 1 I !! IAND SCREENING PLANT OPEl<ATORS ! I ! !"
, I ' i I14.3011.501 15.80 I! 1
, I '! I11.3512.901 14.25 i", , 'i I
1 Ii, I13.2212.901 16.12 ! i I
, , '! I11.2611.171 12.43 i! I
! ! '! I10.9211.17! 12.09 i' I
I ! 'i '10.1111.171 11.28 i! I
! ! ! I I11.3011.17! 12.47 'i I
I ! i! I, , !!!
10.3911.171 11.56 "I! ! iii
10.8412.901 13.74 '! II ! i! I
8.2512.05! 10.30 !! II ! !' ,
10.5111.17! 11.68 'i i! ! i I I
12.9112.901 15~81 I i I! ! iI', , 'i 1
7.7512.051 9.80 i! I, , '! ,iii ! Ii i !! I
11.2611.171 12.43 !! 1! ! !! !I ! !! I
BITUMINOUS DISTRIBUTOR DRIVER
*DUMPMAN
*TRUCK CRANE OILER
*CRANE OPERATOR
*GREASER AND TRUCK SERVICEMAN
*TRUCK DRIVER (HAULING MACHINERY FORCONTRACTORS OWN USE INCLUDING OPERATION OF HAND OR POWER OPERATEDWINCHES)
306 *SINGLE AXLE OR 2 AXLE UNIT
307 TANDEM AXLE OR 3 AXLE UNIT
309 FIVE AXLE UNIT
404 *CARPENTER
406 *CEMENT MASON
238
239
301
302
303
305
PREVAILING RATE ! FUTURE PREVAILING RATECODE NUMBER & BASIC TOTAL !EFFECT BASIC TOTALCLASSIFICATION (84 WILKIN RATE FB HR RATE 1DATE RATE FB HR RATEX2a=~z~•••••_. •••_ •••_."_•••_ •••••••_ •• ••••_.a••_._••__~.__• __••_•••_.__••_••••••229 *SCRAPER, 32 'cu. YDS. AND OVER 113.0212.90! 15.92 ! 1
1 ! 1 ! 1231 *RUBBER TIRED TRACTOR. BACK HOE !14.91!2.901 15.81 I 1
ATTACHMENT ! Iii !, , , ! !234 *TURNAPULL OPERATOR (OR SIMILAR TYPE)i12.91i2.90i 15.81 ' !
, I , i !235 *TRACTOR OPERATOR~.D2. TD62 OR iI2.91i2.90i 15.81 ! '
SIMILIAR H.P. Whtl POWER 'tAKE-OFF! ! ! 1 iII! ! '
236 *TRACTOR OPERATOR~.OVER D22 TD6 OR !12.9112.90! 15.81 ' iSIMILIAR H. P. Wh'tl POWER 'l'AKE-OFF! ! ! i !
II! ,i !111.22!2.051 13.27 ! I! ! ! ' !! 11.4512.05! 13.50 i I! ! I ! ;! 10.1111.17! 11.28 ! ;! ! ! ! i! 9.2411.17! 10.41 I ,, I , i ;i 9.00i 1.25i 10.25 I i! ! ! i !!1O.93!1.17! 12.10 ! !! ! ! ! !, , I ! I
iii , i, , IiIiIo.11 iI.05! 11.16 ! !! ! ! ! !!10.1111.171 11.28 ! '! ! ! I i110.5Ill.17! 11.68 i ', , , ! ii11.73iI.44i 13.17 , !! ! ! i !! 9.0010.00! 9.00 !!! ! ! ! !