Off-grid Hydropower Status of Myanmar

The NEP Workshop on Off-Grid Electrification in MyanmarGrand Ball Room, Thingaha Hotel, Nay Pyi Taw

January 28-29, 2015

P G Ajith [email protected]

OutlineVisited Hydro power projectsCategories of hydro power

projectsCharacteristics of Hydro powerTechnical statusHydro power service providersComparison with Sri Lanka off

grid Hydro power

35kW 200 HHPrivate own

200W1 HH

300kW2000> HHESE owned

Mechanical powerSmall industry

runs Private owned

7kW130HHDRD Funded

Unknown power 80 HHDRD funded

Distribution line

300VA voltage stabilizer

Visited Hydro power projects Shan, Chin, Mandalay and

Sagaing states 22 hydro projects visited Capacity range 0.1kW to

1,500kW 6 nos. of service providers

interviewed Individual, community based,

private ,government owned and government funded projects

Categories of hydro power projects

Domestic HPP (06 nos.)◦ 1 – 5 HH◦ <500W power

Village HPP (12 nos.)◦ Upto 100kW◦ Few hundreds HH◦ Private, community and DRD funded◦ Operate by Community or owner

Government (DHPI, ESE) HPP (03 nos.)◦ Upto 1,500kW◦ National grid tariff structure◦ O & M by ESE

Domestic HPPAvailable in Shan and Sagaing

statesLow head turbine technology Unit cost Ks. 500,000 – 800,000Fix in Irrigation channelsOutput power 100W – 400WPowerPal (

http://www.powerpal.com) Canadian design (available upto 75kW)

Water wheel

Domestic HPP…Not required any form of approval/

permissionCan be acquired only well income and

water sources owned familiesOwners may supply electricity for few

neighbors at Ks. 2,000 per bulbOwners use light as well as TV and audio

systemNo significant bad impact on environmentEquipments can be purchased by cash only

Domestic HPP…Monthly O & M cost Ks. 3,000 – 6,000

◦Bearing life span 1 to 3 monthsVery poor power

◦Voltage varies 150V – 260V◦Frequency varies 35Hz – 65Hz◦Not use controller ◦Tube bulb with magnetic ballast and Incandescent

bulb only useReady made (PMG) generator available in

marketTurbine and housing manufacturing by local

technicians

Village HPP Invested by Private entrepreneur, community and

DRD or two of these Capacity range is 3kW to 75kWActual output is less than 50% of the designed

powerLocally manufactured turbines useMonthly energy cost is Ks. 300 to 3,000/= ( one

project15,000)Project implementation cost upto ks250,000 per HHEnergy demand 2 to 5 bulbs, TV Audio systems,

mobile phone and Rice cookerFinancing management not much transparent

Village HPP... Private owned

Started targeting own industry2 projects in Shan state based on

grain crusher, rice mill and oil expeller

One project from Sagaing state based on turbine manufacturing

Owners have technical capacity for O & M

Do not deal with banks

Village HPP... Community basedProject starting

◦ By practicing neighbour village HPP or◦ By encouraging hydro power developer or

manufacturerPer house invest up to Ks. 250,000All advices are taken from developer/

machine suppliersElectricity consumer society run with

mutual understandWritten approval not requiredSocial, financial or technical record are not

maintaining

Village HPP... DRD developedDRD fully funded and contractor

selected by tender callingCapacity less than 20kWO & M by communityBeneficiaries have little aware on

incomeVery poor specification in tender

documents

Village HPP general comment- policy

DRD has been started 100% funded HP development last couple of years

No recording/ registration methods of projects

Local governments have supported for some projects in financing and technically

Monthly charge based on nos. of appliances or fix rate

Village HPP general comment- Social

Over 80% of beneficiaries are farmers and the balance is retails seller, labours(skilled, unskilled)

Businessmen, labours(skilled, unskilled) Monthly energy consumption 4kWh- 75kWhMajor electricity usages are Lighting, Audio/ video,

Phone.(rice cooker) Freely electricity supply for community centres,

School and monasteryProject manage with mutual understand and no record

minutes Project developing and purchasing through a single

person or a company Very poor safety level (not use RCCBs, MCBs or fuses)

Village HPP general comment- Technical

Turbine are not match for the site specification

Not use a control system (fix load/ sluice gate control)very poor quality power (150V- 260V and 35Hz to 70Hz)

Hidden cost to maintain appliancesVoltage stabilizer has to be used with TV and

audio systemProject failure rate is unacceptable level and

maintenance cost is very highOver all efficiency is less than 30% Machines life time is 3 – 10 year

Village HPP....TechnicalLocally made turbinesLittle knowledge on critical aspects

on turbine (speed matching, controlling, bearing selection, finishing or turbine)

Some projects abandoned due to endless failures

Poor workshop facility (very old lathe and drills)

Energy pricingEnergy cost vary Ks. 40 -250 per

kWhEnergy consumption 5kWh to

70kWh per monthMajor electricity demand for 2 to

5 bulbs, TV/ Audio, phone charge , Rice cooker

Government Hydro power projects

DHPI has developed in 1980s and1990s

ESE tariff structure applyCapacity is 200kW to 1500kWImported machineries use11kV transmission line with

multiple nos. Of step down transformers

Regularly fail bearing, generator and electronics components

Government Hydro power ....

Var HPP bearing fail 5 time per year

Laiva HPP diode fail few times per year

Very poor attention on maintenance activities(non of flow controller functioning)

Service providers(Domestic and village HPPs)Hydro power developer

◦Acting as an intermediary linking villagers with equipment suppliers

◦Advice on technical, social and financial aspects

◦Supply all equipment and earn profit◦Contribute for maintenance work

Machine manufacturer◦Manufacture turbines, penstock(steel)

panel board◦Act as a developer also

LCC analysis

Project Actual power

Investment15yrs LCC

@10% discount rate

(ks/kWh)

Capacity cost @ 20yrs (Ks/kW)Amount(Ks) Year

NPV @ 10% discounted

Domestic HPP 0.25 600,000 2014 600,000 220 6,000,000

Pan Oo Tang 25 60,000,000 2002

188,305,703 380 7,900,000

Mong In 1 5,000,000 2014 5,000,000 550 12,000,000

Owe Kong 15 50,000,000 2014 50,000,000 200 6,650,000

Ming In 3 500,000 2014 500,000 860 7,500,000

Laouk Lon 10 10,000,000 2011 13,310,000 376, 4,100,000

35Ks

LCC analysis...By practicing advance technology (use

in developing countries)Energy cost(ks/kWh) can be reduced up to 20% -

50%Capacity cost(Ks/kW) can be reduced upto 20%

to 50% (based on 20years LCC)

Cost variationProject cost increases 20% - 50%Life time increase over 20 years (3 times)O and M cost reduce upto 50%Energy generation increase about 50%

Comparison with Sri Lanka HP

Community based conceptProject implementation cost TechnologyProject O & M expenses

Community based conceptRegistering in local government as a welfare

society(Electricity consumer society, ECS)Main posts of society are adviser, president,

secretary, treasurer and working committeeMaintain minutes of each meetingGeneral meeting calls quarterly and emergency

meeting call to get special occasionsPass the annual budget 20% to 40% project cost is in-kind labour and

materialsAll construction doing by members with

guidance of the developer

Community based..Maintain bank account and monthly

saving depositsTwo of president, secretary and

treasurer have to be present to withdraw money from account

ECS management has to be change annually

Knowledge sharing between ECS

TechnologyDeveloper

◦ Facilitate between villages and all other stakeholder◦ Manage technical, project, social and financial areas

Manufacturer◦ Design and manufacture according to site

specification◦ Install and commissioning◦ Maintenance◦ Mechanical and electrical parts manufacturers

Main components◦ Water intake, Head race, Forebay tank Penstock,

Turbine, Generator, Controller, Distribution panel, Distribution line

Forebay tank

Short wall Trash rack

Flush outsFlush outs

Spill way

Penstock

Forebay tank...

Control system

Controller – ballast load

Project O & M expenses10kW project, 50 HHMonthly income (LKR 300x50)

=15,000($115)Operator salary =

6,000($46)Monthly saving

=9,000($70)Annual saving

=108,000($830)